Pekerja/Kenek AN :
LOKASI : KOTA KENYAM KABUPATEN NDUGA
TAHUN ANGG : 2021
HARGA SATUAN
NO. KODE URAIAN KOEFISIEN SATUAN ( Rp )
TOTAL HARGA ( Rp )
I PEKERJAAN PERSIAPAN
1 100 M2 Pekerjaan Pengukuran Gedung 2,856,666.67
U01 Pekerja/Kenek 8.000 O/h 180,000.00 1,440,000.00
U15 Mandor/Pengawas 2.000 O/h 300,000.00 600,000.00
U16 Pengawas / Ahli Teknik 0.500 O/h 833,333.33 416,666.67
U18 Asisten Ahli Ukur 2.000 O/h 200,000.00 400,000.00
A29 Sewa alat ukur 1.000 Hr -
JUMLAH 2,856,666.67
Untuk 1m2 Pekerjaan Pengukuran 1.00 m2 2,856,666.67 2,856,666.67
733291305.xlsx ANALISA 2 /2
HARGA SATUAN
NO. KODE URAIAN KOEFISIEN SATUAN ( Rp )
TOTAL HARGA ( Rp )
II PEKERJAAN TANAH
1 1 M3 Galian Tanah Biasa Sedalam 1 M 142,500.00
U01 Pekerja/Kenek 0.750 O/h 180,000.00 135,000.00
U15 Mandor/Pengawas 0.025 O/h 300,000.00 7,500.00
JUMLAH : 142,500.00
733291305.xlsx ANALISA 3 /3
HARGA SATUAN
NO. KODE URAIAN KOEFISIEN SATUAN ( Rp )
TOTAL HARGA ( Rp )
733291305.xlsx ANALISA 4 /4
HARGA SATUAN
NO. KODE URAIAN KOEFISIEN SATUAN ( Rp )
TOTAL HARGA ( Rp )
24 1 M3 Pasangan Pondasi Siklop, 60% Beton Capuran 1 PC : 2 PB : 3 KR dan 40% Batu Belah 4,310,300.00
B91 Batu Kali 0.480 M3 1,000,000.00 480,000.00
B304 Besi beton 75.000 Kg 28,000.00 2,100,000.00
B01 Semen Portland 202.000 Kg 2,500.00 505,000.00
B111 Pasir Beton (m3) 0.320 M3 360,000.00 115,200.00
B95 Kerikil 0.490 M3 480,000.00 235,200.00
B05 Kawat beton 0.800 Kg 67,000.00 53,600.00
U01 Pekerja/Kenek 3.000 O/h 180,000.00 540,000.00
U05 Tukang Batu 0.850 O/h 250,000.00 212,500.00
U14 Kepala Tukang 0.085 O/h 280,000.00 23,800.00
U15 Mandor/Pengawas 0.150 O/h 300,000.00 45,000.00
JUMLAH : 4,310,300.00
733291305.xlsx ANALISA 6 /6
HARGA SATUAN
NO. KODE URAIAN KOEFISIEN SATUAN ( Rp )
TOTAL HARGA ( Rp )
IV PEKERJAAN DINDING
25 1 M2 Pasangan Batu Tela, 1 PC : 1 PP 500,415.00
B125 Batu tela 25.000 Buah 5,500.00 137,500.00
B01 Semen Portland 64.030 Kg 2,500.00 160,075.00
B110 Pasir Pasang 0.059 M3 360,000.00 21,240.00
U01 Pekerja/Kenek 0.650 O/h 180,000.00 117,000.00
U05 Tukang Batu 0.200 O/h 250,000.00 50,000.00
U14 Kepala Tukang 0.020 O/h 280,000.00 5,600.00
U15 Mandor/Pengawas 0.030 O/h 300,000.00 9,000.00
JUMLAH : 500,415.00
733291305.xlsx ANALISA 8 /8
HARGA SATUAN
NO. KODE URAIAN KOEFISIEN SATUAN ( Rp )
TOTAL HARGA ( Rp )
8 1 M2 Pasangan Dinding Bata Berongga Ekspose (5 X 11 X 24) cm, Campuran Spesi 1 PC : 3 PP 146,720.00
B138 Bata berongga ekspose 70.000 Buah -
B01 Semen Portland 14.000 Kg 2,500.00 35,000.00
B110 Pasir Pasang 0.032 M3 360,000.00 11,520.00
U01 Pekerja/Kenek 0.300 O/h 180,000.00 54,000.00
U05 Tukang Batu 0.150 O/h 250,000.00 37,500.00
U14 Kepala Tukang 0.015 O/h 280,000.00 4,200.00
U15 Mandor/Pengawas 0.015 O/h 300,000.00 4,500.00
JUMLAH : 146,720.00
8 1 M2 Pasangan Dinding Batu bata ringan (Hebel), 10x16x60 cm, Campuran Spesi 1 PC : 3 PP 172,233.00
B01 Semen Portland (ambil koefisien pas bata 1Pc : 3Ps) 14.370 Kg 2,500.00 35,925.00
B131 Batu bata ringan (Hebel), 10x16x60 cm 8.340 BH -
B110 Pasir Pasang (keofesien diragukan) 0.073 M3 360,000.00 26,208.00
U01 Pekerja/Kenek 0.350 O/h 180,000.00 63,000.00
U05 Tukang batu 0.150 O/h 250,000.00 37,500.00
733291305.xlsx ANALISA 9 /9
HARGA SATUAN
NO. KODE URAIAN KOEFISIEN SATUAN ( Rp )
TOTAL HARGA ( Rp )
V PEKERJAAN PLESTERAN
32 1 M2 Plesteran, 1 PC : 1 PP, tebal 15 mm 144,720.00
B01 Semen Portland 15.504 Kg 2,500.00 38,760.00
B110 Pasir Pasang 0.016 M3 360,000.00 5,760.00
U01 Pekerja/Kenek 0.300 O/h 180,000.00 54,000.00
U05 Tukang Batu 0.150 O/h 250,000.00 37,500.00
U14 Kepala Tukang 0.015 O/h 280,000.00 4,200.00
U15 Mandor/Pengawas 0.015 O/h 300,000.00 4,500.00
JUMLAH : 144,720.00
41 1 M2 Acian 74,925.00
B01 Semen Portland 3.250 Kg 2,500.00 8,125.00
U01 Pekerja/Kenek 0.200 O/h 180,000.00 36,000.00
U03 Tukang 0.100 O/h 250,000.00 25,000.00
U14 Kepala Tukang 0.010 O/h 280,000.00 2,800.00
U15 Mandor/Pengawas 0.010 O/h 300,000.00 3,000.00
JUMLAH : 74,925.00
VI PEKERJAAN KAYU
1 1 M3 Membuat dan Memasang Kusen Pintu dan Jendela Kayu Kelas I 12,703,000.00
B119 Kayu Kelas I (balok ) 1.100 M3 5,000,000.00 5,500,000.00
U01 Pekerja/Kenek 7.000 O/h 180,000.00 1,260,000.00
U04 Tukang Kayu 21.000 O/h 250,000.00 5,250,000.00
U14 Kepala Tukang 2.100 O/h 280,000.00 588,000.00
U15 Mandor/Pengawas 0.350 O/h 300,000.00 105,000.00
JUMLAH : 12,703,000.00
2 1 M3 Membuat dan Memasang Kusen Pintu dan Jendela Kayu Kelas II dan III 10,374,000.00
B115 Kayu kelas II (balok) 1.200 M3 3,500,000.00 4,200,000.00
U01 Pekerja/Kenek 6.000 O/h 180,000.00 1,080,000.00
U04 Tukang Kayu 18.000 O/h 250,000.00 4,500,000.00
U14 Kepala Tukang 1.800 O/h 280,000.00 504,000.00
U15 Mandor/Pengawas 0.300 O/h 300,000.00 90,000.00
JUMLAH : 10,374,000.00
JUMLAH : 561,800.00
5 1 M2 Membuat dan Memasang Pintu dan Jendela Jalusi Kayu Kelas I 1,349,000.00
B118 Kayu kelas I (papan) 0.064 M3 5,000,000.00 320,000.00
U01 Pekerja/Kenek 1.000 O/h 180,000.00 180,000.00
U04 Tukang Kayu 3.000 O/h 250,000.00 750,000.00
U14 Kepala Tukang 0.300 O/h 280,000.00 84,000.00
U15 Mandor/Pengawas 0.050 O/h 300,000.00 15,000.00
JUMLAH : 1,349,000.00
6 1 M2 Membuat dan Memasang Daun Pintu dan Jendela Kaca Kayu Kelas I 1,223,200.00
B118 Kayu kelas I (papan) 0.026 M3 5,000,000.00 130,000.00
B354 Lem kayu 0.300 Kg -
B82 Kaca Polos 5 mm 1.000 M2 270,000.00 270,000.00
U01 Pekerja/Kenek 0.800 O/h 180,000.00 144,000.00
U04 Tukang Kayu 2.400 O/h 250,000.00 600,000.00
U14 Kepala Tukang 0.240 O/h 280,000.00 67,200.00
U15 Mandor/Pengawas 0.040 O/h 300,000.00 12,000.00
JUMLAH : 1,223,200.00
7 1 M2 Membuat Pintu Kayu Lapis (Plywood), Rangkap, Rangka Tertutup Kayu Kelas II (Lebar sampai 90cm) 814,950.00
B116 Kayu kelas II (papan) 0.025 M3 3,750,000.00 93,750.00
B32 Paku biasa 0.030 Kg 30,000.00 900.00
B354 Lem kayu 0.500 Kg -
B10 Plywood tebal 4 mm ( 90 x 220 ) cm 1.000 Lembar -
U01 Pekerja/Kenek 0.700 O/h 180,000.00 126,000.00
U04 Tukang Kayu 2.100 O/h 250,000.00 525,000.00
U14 Kepala Tukang 0.210 O/h 280,000.00 58,800.00
U15 Mandor/Pengawas 0.035 O/h 300,000.00 10,500.00
JUMLAH : 814,950.00
8 1 M2 Membuat Pintu Kayu Lapis (Plywood), Rangkap, Rangka Expose Kayu Kelas I dan II 920,100.00
B116 Kayu kelas II (papan) 0.026 M3 3,750,000.00 96,000.00
B32 Paku biasa 0.030 Kg 30,000.00 900.00
B354 Lem kayu 0.500 Kg -
B10 Plywood tebal 4 mm ( 90 x 220 ) cm 1.000 Lembar -
U01 Pekerja/Kenek 0.800 O/h 180,000.00 144,000.00
U04 Tukang Kayu 2.400 O/h 250,000.00 600,000.00
U14 Kepala Tukang 0.240 O/h 280,000.00 67,200.00
U15 Mandor/Pengawas 0.040 O/h 300,000.00 12,000.00
JUMLAH : 920,100.00
11 1 M2 Pasang Teakwood Rangkap Lapis Formika, Rangka Expose Kayu Kelas II 969,450.00
B116 Kayu kelas II (papan) 0.025 M3 3,750,000.00 93,750.00
B32 Paku biasa 0.030 Kg 30,000.00 900.00
B354 Lem kayu 0.800 Kg -
B18 Teakwood tebal 4 mm ( 90 x 220 ) cm 1.000 Lembar -
B21 Formika 0.500 Lembar -
U01 Pekerja/Kenek 0.850 O/h 180,000.00 153,000.00
U04 Tukang Kayu 2.550 O/h 250,000.00 637,500.00
U14 Kepala Tukang 0.255 O/h 280,000.00 71,400.00
U15 Mandor/Pengawas 0.043 O/h 300,000.00 12,900.00
JUMLAH : 969,450.00
JUMLAH : 7,834,600.00
21 1 M' Pasang Lisplank Ukuran (3 X 20) cm, Kayu Kelas I atau II 132,100.00
B118 Kayu kelas I (papan) 0.011 M3 5,000,000.00 54,000.00
B32 Paku biasa 0.100 Kg 30,000.00 3,000.00
U01 Pekerja/Kenek 0.100 O/h 180,000.00 18,000.00
U04 Tukang Kayu 0.200 O/h 250,000.00 50,000.00
U14 Kepala Tukang 0.020 O/h 280,000.00 5,600.00
U15 Mandor/Pengawas 0.005 O/h 300,000.00 1,500.00
JUMLAH : 132,100.00
23 1 M' Pasang Lisplank Ukuran (3 X 30) cm, Kayu Kelas I atau II 130,600.00
B118 Kayu kelas I (papan) 0.011 M3 5,000,000.00 54,000.00
B32 Paku biasa 0.050 Kg 30,000.00 1,500.00
U01 Pekerja/Kenek 0.100 O/h 180,000.00 18,000.00
U04 Tukang Kayu 0.200 O/h 250,000.00 50,000.00
U14 Kepala Tukang 0.020 O/h 280,000.00 5,600.00
U15 Mandor/Pengawas 0.005 O/h 300,000.00 1,500.00
JUMLAH : 130,600.00
24 1 M2 Pasang Rangka Dinding Pemisah (60 X 120) cm , Kayu Kelas II atau III 257,000.00
14 1 M2 Pekerjaan Rangka Dinding Pemisah / Partisi (60 X 120) Cm Kayu Besi 299,000.00
B119 Kayu Kelas I (balok ) 0.028 M3 5,000,000.00 140,000.00
B31 Paku campur 0.150 Kg 30,000.00 4,500.00
U01 Pekerja/Kenek 0.150 o/h 180,000.00 27,000.00
U03 Tukang 0.450 o/h 250,000.00 112,500.00
U14 Kepala Tukang 0.045 o/h 280,000.00 12,600.00
U15 Mandor/Pengawas 0.008 o/h 300,000.00 2,400.00
JUMLAH : 299,000.00
45 1 M2 Membuat Lantai Kerja Beton mutu fc = 7,4 Mpa (K 100), slump (3 - 6) cm, w/c = 0,87 345,080.00
56 Membuat 1 m3 beton mutu f’c = 26,4 MPa (K 300), slump (12 ± 2) cm, w/c = 0,52 3,147,636.51
B01 Semen Portland 413.000 Kg 2,500.00 1,032,500.00
B111 Pasir Beton (m3) 0.486 M3 360,000.00 175,114.29
B103 Split 2 - 3 cm (m3) 0.756 M3 480,000.00 363,022.22
B04 Air Bersih 215.000 Ltr 600.00 129,000.00
U01 Pekerja/Kenek 6.000 O/h 180,000.00 1,080,000.00
733291305.xlsx ANALISA 21 /21
HARGA SATUAN
NO. KODE URAIAN KOEFISIEN SATUAN ( Rp )
TOTAL HARGA ( Rp )
JUMLAH : #N/A
XI PEKERJAAN BESI
106 10 Cm Pengelasan Dengan Las Listrik 95,650.00
B08 Kawat Las Listrik 0.350 Kg 225,000.00 78,750.00
B378 Solar 0.300 Ltr 5,800.00 1,740.00
B379 Minyak Pelumas 0.040 Lter 45,000.00 1,800.00
U01 Pekerja/Kenek 0.040 O/h 180,000.00 7,200.00
U11 Tukang Las 0.020 O/h 250,000.00 5,000.00
U14 Kepala Tukang 0.002 O/h 280,000.00 560.00
U15 Mandor/Pengawas 0.002 O/h 300,000.00 600.00
A34 Peralatan Las 0.167 jam -
JUMLAH : 95,650.00
Untuk 1 cm 9,565.00
Untuk 1 Kg 670.80
116 1 m2 Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku 2,153,266.52
B312 Profil L 15.000 Kg 45,000.00 675,000.00
B221 Besi Plat 2 mm 32.800 kg 25,000.00 820,000.00
B08 Kawat Las Listrik 0.050 Kg 225,000.00 11,250.00
Pengecatan 2.200 m2 68,416.60 150,516.52
U11 Tukang las 1.050 O/h 250,000.00 262,500.00
U14 Kepala Tukang 0.105 O/h 280,000.00 29,400.00
U01 Pekerja/Kenek 1.050 O/h 180,000.00 189,000.00
U15 Mandor/Pengawas 0.052 O/h 300,000.00 15,600.00
2,153,266.52
117 1 m2 Membuat pintu besi plat baja tebal 2 mm 1 Layer, rangka baja siku 1,743,266.52
B312 Profil L 15.000 Kg 45,000.00 675,000.00
B221 Besi Plat 2 mm 16.400 kg 25,000.00 410,000.00
B08 Kawat Las Listrik 0.050 Kg 225,000.00 11,250.00
Pengecatan 2.200 m2 68,416.60 150,516.52
U11 Tukang las 1.050 O/h 250,000.00 262,500.00
U14 Kepala Tukang 0.105 O/h 280,000.00 29,400.00
U01 Pekerja/Kenek 1.050 O/h 180,000.00 189,000.00
U15 Mandor/Pengawas 0.052 O/h 300,000.00 15,600.00
1,743,266.52
JUMLAH : 198,444.69
50 1 M' Pasang Talang 1/2 Lingkaran D - 10 cm, Seng BJLS 30" 259,125.00
B65 Seng Plat bjls 30 0.300 Lembar 135,000.00 40,500.00
B32 Paku Biasa 0.100 Kg 30,000.00 3,000.00
B116 Kayu Kelas II (Papan) 0.019 M3 3,750,000.00 71,250.00
B48 Besi strip tebal 5 mm 0.500 Kg 95,000.00 47,500.00
U01 Pekerja/Kenek 0.150 O/h 180,000.00 27,000.00
U04 Tukang Kayu 0.250 O/h 250,000.00 62,500.00
U14 Kepala Tukang 0.025 O/h 280,000.00 7,000.00
U15 Mandor/Pengawas 0.001 O/h 300,000.00 375.00
JUMLAH : 259,125.00
20 1 M2 Pasang Rangka Langit-Langit (60 X 60) cm, Kayu Kelas II atau III 186,950.00
B115 Kayu kelas II (balok) 0.016 M3 3,500,000.00 57,050.00
733291305.xlsx ANALISA 52 /52
HARGA SATUAN
NO. KODE URAIAN KOEFISIEN SATUAN ( Rp )
TOTAL HARGA ( Rp )
1 1 m2 Pemasangan
Rangka rangka
metalBesi hollow40.40.2
hollow 1x40.40.2mm,
mm modul 60 x 60 cm, untuk plafon 216,150.00
B218 4.000 m 18,750.00 75,000.00
Assesoris
1.000 Ls 18,750.00 18,750.00
(perkuatan, las dll)
U01 Pekerja/Kenek 0.200 O/h 180,000.00 36,000.00
U03 Tukang 0.300 O/h 250,000.00 75,000.00
U14 Kepala Tukang 0.030 O/h 280,000.00 8,400.00
U15 Mandor/Pengawas 0.010 O/h 300,000.00 3,000.00
JUMLAH : 216,150.00
131 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 30 x 30 ) cm Tinggi 35 cm 1,070,310.00
B126 Batu Tela (m3) 0.145 M3 -
B01 Semen portland 44.000 Kg 2,500.00 110,000.00
B110 Pasir Pasang 0.070 M3 360,000.00 25,200.00
B95 kerikil 0.070 M3 480,000.00 33,600.00
B304 Besi beton 1.600 Kg 28,000.00 44,800.00
B111 Pasir beton (m3) 0.060 M3 360,000.00 21,600.00
U01 Pekerja/Kenek 3.200 O/h 180,000.00 576,000.00
U05 Tukang batu 1.015 O/h 250,000.00 253,750.00
U14 Kepala Tukang 0.002 O/h 280,000.00 560.00
U15 Mandor/Pengawas 0.016 O/h 300,000.00 4,800.00
JUMLAH : 1,070,310.00
132 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 45 x 45 ) cm Tinggi 50 cm 1,189,210.00
B126 Batu Tela (m3) 0.250 M3 -
B01 Semen portland 77.000 Kg 2,500.00 192,500.00
B110 Pasir Pasang 0.130 M3 360,000.00 46,800.00
B95 Kerikil 0.020 M3 480,000.00 9,600.00
B304 Besi beton 2.600 Kg 28,000.00 72,800.00
B111 Pasir beton (m3) 0.090 M3 360,000.00 32,400.00
U01 Pekerja/Kenek 3.200 O/h 180,000.00 576,000.00
U05 Tukang batu 1.015 O/h 250,000.00 253,750.00
U14 Kepala Tukang 0.002 O/h 280,000.00 560.00
U15 Mandor/Pengawas 0.016 O/h 300,000.00 4,800.00
JUMLAH : 1,189,210.00
133 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 60 x 60 ) cm Tinggi 65 cm 1,406,190.00
B126 Batu Tela (m3) 0.371 M3 -
B01 Semen portland 114.000 Kg 2,500.00 285,000.00
B110 Pasir Pasang 0.184 M3 360,000.00 66,240.00
B95 Kerikil 0.033 M3 480,000.00 15,840.00
B304 Besi beton 4.850 Kg 28,000.00 135,800.00
B111 Pasir beton (m3) 0.120 M3 360,000.00 43,200.00
U01 Pekerja/Kenek 3.200 O/h 180,000.00 576,000.00
U05 Tukang batu 1.015 O/h 250,000.00 253,750.00
U14 Kepala Tukang 0.002 O/h 280,000.00 560.00
U15 Mandor/Pengawas 0.016 O/h 300,000.00 4,800.00
U07 Tukang gali 0.100 O/h 250,000.00 25,000.00
JUMLAH : 1,406,190.00
135 1 M2 Pasang Lantai Mosaik Ukuran (30 x 30 ) cm, Campuran Spesi 1 pc : 3 PP 394,435.00
B155 Tegel Mozaik 30 x 30 cm 11.870 Buah 6,000.00 71,220.00
B01 Semen portland 14.150 Kg 2,500.00 35,375.00
B110 Pasir Pasang 0.039 M3 360,000.00 14,040.00
B03 Semen Warna 2.000 Kg 20,000.00 40,000.00
U01 Pekerja/Kenek 0.700 O/h 180,000.00 126,000.00
U05 Tukang batu 0.350 O/h 250,000.00 87,500.00
U14 Kepala Tukang 0.035 O/h 280,000.00 9,800.00
U15 Mandor/Pengawas 0.035 O/h 300,000.00 10,500.00
JUMLAH : 394,435.00
137 1 M' Pasang Plint Kayu Kelas II Tebal 2 cm, Lebar 10 cm 69,510.00
B116 Kayu kelas II (papan) 0.003 M3 3,750,000.00 11,250.00
B32 Paku biasa 0.050 Kg 30,000.00 1,500.00
U01 Pekerja/Kenek 0.120 O/h 180,000.00 21,600.00
U04 Tukang kayu 0.120 O/h 250,000.00 30,000.00
U14 Kepala Tukang 0.012 O/h 280,000.00 3,360.00
U15 Mandor/Pengawas 0.006 O/h 300,000.00 1,800.00
JUMLAH : 69,510.00
140 1 M2 Pengecatan Bidang Kayu Baru ( 1 Lapisan Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup 81,630.00
B323 Meni Kayu 0.200 Kg 120,000.00 24,000.00
B348 Plamur Kayu 0.150 Kg 65,000.00 9,750.00
B321 Cat Dasar 0.170 Kaleng 50,000.00 8,500.00
B331 Cat Kilat Kayu 0.260 Kaleng 85,000.00 22,100.00
U01 Pekerja/Kenek 0.070 O/h 180,000.00 12,600.00
U08 Tukang Cat 0.009 O/h 250,000.00 2,250.00
U14 Kepala Tukang 0.006 O/h 280,000.00 1,680.00
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
JUMLAH : 81,630.00
141 1 M2 Pengecatan Bidang Kayu Baru ( 1 Lapisan Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup 112,720.00
B323 Meni Kayu 0.200 Kg 120,000.00 24,000.00
B348 Plamur Kayu 0.150 Kg 65,000.00 9,750.00
B321 Cat Dasar 0.170 Kaleng 50,000.00 8,500.00
B331 Cat Kilat Kayu 0.350 Kaleng 85,000.00 29,750.00
U01 Pekerja/Kenek 0.070 O/h 180,000.00 12,600.00
U08 Tukang Cat 0.105 O/h 250,000.00 26,250.00
U14 Kepala Tukang 0.004 O/h 280,000.00 1,120.00
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
JUMLAH : 112,720.00
144 1 M2 Pelaburan Bidang Kayu Dengan Cat Residu dan Ter 19,800.00
B338 Cat Residu 0.350 Kg -
U01 Pekerja/Kenek 0.100 O/h 180,000.00 18,000.00
U08 Tukang Cat - O/h 250,000.00 -
U14 Kepala Tukang - O/h 280,000.00 -
U15 Mandor/Pengawas 0.006 O/h 300,000.00 1,800.00
JUMLAH : 19,800.00
146 1 M2 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar, 2 Lapis Cat Penutup ) 70,564.00
B347 Plamur Tembok 0.100 Kg 45,000.00 4,500.00
B322 Cat Dasar Tembok 0.100 Kg 80,000.00 8,000.00
B334 Cat Tembok 0.260 Kg 120,000.00 31,200.00
U01 Pekerja/Kenek 0.020 O/h 180,000.00 3,600.00
U08 Tukang Cat 0.063 O/h 250,000.00 15,750.00
U14 Kepala Tukang 0.006 O/h 280,000.00 1,764.00
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
Alat bantu, Scafolding 1.000 Ls 5,000.00 5,000.00
JUMLAH : 70,564.00
147 1 M2 Pengecatan Tembok Lama ( 1 Lapis Cat Dasar, 2 Lapis Cat Penutup) 53,666.00
B322 Cat Dasar Tembok 0.120 Kg 80,000.00 9,600.00
B334 Cat Tembok 0.180 Kg 120,000.00 21,600.00
U01 Pekerja/Kenek 0.028 O/h 180,000.00 5,040.00
U08 Tukang Cat 0.042 O/h 250,000.00 10,500.00
U14 Kepala Tukang 0.004 O/h 280,000.00 1,176.00
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
Alat bantu, Scafolding 1.000 Ls 5,000.00 5,000.00
JUMLAH : 53,666.00
452 1 M 2 Mengorek Karat Cat Lama Permukaan Baja Dengancara Manual 27,750.00
B346 Sabun 0.050 -
U01 Pekerja/Kenek 0.150 O/h 180,000.00 27,000.00
U08 Tukang Cat - O/h 250,000.00 -
U14 Kepala Tukang - O/h 280,000.00 -
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
JUMLAH : 27,750.00
454 1 M 2 Mengerok Karat Atau Cat Lama Permukaan Baja Dengan Pancar Pasir ( Samblasting ) Dengan Tingkat Kebersihan Sa #N/A
Pasir Silika 40.000 #N/A #N/A #N/A
BBM 10.000 #N/A #N/A #N/A
Kompresor, Blasting Pot, Selang Dan Nozzel #N/A #N/A #N/A
Sewa Hari #N/A #N/A #N/A
U01 Pekerja/Kenek 1.600 O/h 180,000.00 288,000.00
U08 Tukang Cat 1.600 O/h 250,000.00 400,000.00
U14 Kepala Tukang 0.800 O/h 280,000.00 224,000.00
U15 Mandor/Pengawas 0.500 O/h 300,000.00 150,000.00
JUMLAH : #N/A
457 1 M 2 Pengecatan Bidang Kayu Baru ( 1 Lapisan Plamir ), 1 Lapis Cat Dasar, 2 Lapis Cat Penutup #N/A
Cat Meni 0.200 #N/A #N/A #N/A
Plamir 0.150 #N/A #N/A #N/A
Cat Dasar 0.170 #N/A #N/A #N/A
Cat Penutup 2 Kali 0.260 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.070 O/h 180,000.00 12,600.00
U08 Tukang Cat 0.009 O/h 250,000.00 2,250.00
U14 Kepala Tukang 0.006 O/h 280,000.00 1,680.00
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
JUMLAH : #N/A
458 1 M 2 Pengecatan Bidang Kayu Baru ( 1 Lapisan Plamir ), 1 Lapis Cat Dasar, 3 Lapis Cat Penutup #N/A
Cat Meni 0.200 #N/A #N/A #N/A
Plamir 0.150 #N/A #N/A #N/A
Cat Dasar 0.170 #N/A #N/A #N/A
Cat Penutup 3 Kali 0.350 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.070 O/h 180,000.00 12,600.00
U08 Tukang Cat 0.105 O/h 250,000.00 26,250.00
U14 Kepala Tukang 0.004 O/h 280,000.00 1,120.00
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
JUMLAH : #N/A
461 1 M 2 Pelaburan Bidang Kayu Dengan Cat Residu Dan Ter #N/A
Residu atau Ter 0.350 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.100 O/h 180,000.00 18,000.00
U08 Tukang Cat - O/h 250,000.00 -
U14 Kepala Tukang - O/h 280,000.00 -
U15 Mandor/Pengawas 0.006 O/h 300,000.00 1,800.00
JUMLAH : #N/A
463 1 M2 Pengecatan Tembok Baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar,2 Lapis Cat Penutup ) #N/A
Plamir 0.100 #N/A #N/A #N/A
Cat Dasar 0.100 #N/A #N/A #N/A
Cat Penutup 2 x 0.260 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.020 O/h 180,000.00 3,600.00
U08 Tukang Cat 0.063 O/h 250,000.00 15,750.00
U14 Kepala Tukang 0.006 O/h 280,000.00 1,764.00
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
JUMLAH : #N/A
464 1 M2 Pengecatan Tembok Lama ( 1 Lapis Cat Dasar 2 Lapis Cat Penutup #N/A
Cat Dasar 0.120 #N/A #N/A #N/A
Cat Penutup 2 x 0.180 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.028 O/h 180,000.00 5,040.00
U08 Tukang Cat 0.042 O/h 250,000.00 10,500.00
U14 Kepala Tukang 0.004 O/h 280,000.00 1,176.00
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
JUMLAH : #N/A
467 1 M2 Melabur Tembok Lama Dengan Kapur Sirih ( Untuik Pemeliharaan ) #N/A
Peranca Kayu 0.002 #N/A #N/A #N/A
Kapur Sirih 0.300 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.040 O/h 180,000.00 7,200.00
U08 Tukang Cat 0.005 O/h 250,000.00 1,250.00
U14 Kepala Tukang 0.001 O/h 280,000.00 140.00
U15 Mandor/Pengawas 0.003 O/h 300,000.00 750.00
JUMLAH : #N/A
470 1 M2 Pengecatan Permukaan Baja Dengan Meni Besi Dan Perancah #N/A
B339 Meni Besi 0.100 Kg 59,666.00 5,966.60
Kuas 0.010 Buah 15,000.00 150.00
Perancah Kayu 0.002 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.250 O/h 180,000.00 45,000.00
U08 Tukang Cat 0.225 O/h 250,000.00 56,250.00
U14 Kepala Tukang 0.023 O/h 280,000.00 6,300.00
U15 Mandor/Pengawas 0.008 O/h 300,000.00 2,250.00
JUMLAH : #N/A
471 1 M2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) Secara Manual Sitem 4 Lapis Cat Konvensional Dengan Tebal 20 #N/A
Meni ( Read Lead ) A 0.100 #N/A #N/A #N/A
Meni ( Read Lead ) B 0.100 #N/A #N/A #N/A
Aluminium C 0.040 #N/A #N/A #N/A
Alluminium B 0.040 #N/A #N/A #N/A
Pengencer 0.010 #N/A #N/A #N/A
Perancah Kayu 0.002 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.006 O/h 180,000.00 1,080.00
U08 Tukang Cat 0.006 O/h 250,000.00 1,500.00
U14 Kepala Tukang 0.225 O/h 280,000.00 63,000.00
U15 Mandor/Pengawas 0.008 O/h 300,000.00 2,250.00
JUMLAH : #N/A
472 1 M2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) Secara Manual Sitem 1 Lapis Cat Konvensional Dengan Tebal 20 57,240.00
B340 Cat Minyak Besi 0.300 Kg 120,000.00 36,000.00
U01 Pekerja/Kenek 0.006 O/h 180,000.00 1,080.00
U08 Tukang Cat 0.060 O/h 250,000.00 15,000.00
U14 Kepala Tukang 0.012 O/h 280,000.00 3,360.00
U15 Mandor/Pengawas 0.006 O/h 300,000.00 1,800.00
JUMLAH : 57,240.00
473 1 M2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) Secara Manual Sitem 3 Lapis Cat Konvensional Dengan Tebal 20 #N/A
Cat Dasar 0.110 #N/A #N/A #N/A
Cat Antara 0.170 #N/A #N/A #N/A
Cat Penutup 0.080 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.500 O/h 180,000.00 90,000.00
U08 Tukang Cat 0.800 O/h 250,000.00 200,000.00
U14 Kepala Tukang 0.300 O/h 280,000.00 84,000.00
U15 Mandor/Pengawas 0.200 O/h 300,000.00 60,000.00
JUMLAH : #N/A
474 1 M2 Pengecatan Permukaan Baja Lapis Seng ( Galbani ) Secara Semprot ( Airless Spray ) Dengan Sitem 1 Lapis Cat Muta #N/A
Cat Dasar 0.300 #N/A #N/A #N/A
U01 Pekerja/Kenek 0.400 O/h 180,000.00 72,000.00
U08 Tukang Cat 0.700 O/h 250,000.00 175,000.00
U14 Kepala Tukang 0.200 O/h 280,000.00 56,000.00
U15 Mandor/Pengawas 0.200 O/h 300,000.00 60,000.00
JUMLAH : #N/A
PEKERJAAN LISTRIK
151 1 Titik Instalasi Lampu / Penerangan 856,150.00
B235 Kabel NYM 3 X 2,5 mm2 4.500 m 20,800.00 93,600.00
B234 Kabel NYM 2 X 2,5 mm2 10.000 m 16,240.00 162,400.00
B243 Pipa Clipsal PVC 3/4 5.000 Bh 8,750.00 43,750.00
B244 Pipa PVC Maspion 5/8 3.500 Bh 6,800.00 23,800.00
B245 T.Doos PVC 3/4 2.000 Bh 5,000.00 10,000.00
Jumlah Bahan
C. PERALATAN
1 Water Pass Sewa-Hari 0.0040 -
2 Theodolit Sewa-Hari 0.0040 -
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 4,080
E Overhead & Profit 15% X D 612
F Harga Satuan Pekerjaan ( D + E ) 4,692
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 63,470
E Overhead & Profit 15% X D 9,521
F Harga Satuan Pekerjaan ( D + E ) 72,991
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Bahan
C. PERALATAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 289,390
E Overhead & Profit 15% X D 43,409
F Harga Satuan Pekerjaan ( D + E ) 332,799
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #N/A
E Overhead & Profit 15% X D #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 184,240
E Overhead & Profit 15% X D 27,636
F Harga Satuan Pekerjaan ( D + E ) 211,876
Jumlah Peralatan
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #N/A
E Overhead & Profit 15% X D #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
Jumlah Bahan
C. PERALATAN
1 Peralatan Potong Pipa T2/Mekanik/Clinder Saw hari 0.0600 #N/A #N/A
Jumlah Peralatan #N/A
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #N/A
E Overhead & Profit 15% X D #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 344,650
E Overhead & Profit 15% X D 51,698
F Harga Satuan Pekerjaan ( D + E ) 396,348
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Memasang 1 M' pipa Steel dia. 250 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.3
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 574,070
E Overhead & Profit 15% X D 86,111
F Harga Satuan Pekerjaan ( D + E ) 660,181
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 478,870
E Overhead & Profit 15% X D 71,831
F Harga Satuan Pekerjaan ( D + E ) 550,701
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Accessories dia. 200 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.16
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 109,330
E Overhead & Profit 15% X D 16,400
F Harga Satuan Pekerjaan ( D + E ) 125,730
ANALISA HARGA SATUAN PEKERJAAN
Jenis Pekerjaan : Pemasangan Accessories dia. 50 - 150 mm
Satuan / Unit : 1 Buah
Analisa : AHSP PU A.8.4.3.15
Jenis Pekerjaan : Beton Mutu F'c = 19,3 Mpa (K 225), Slump (12 ± 2) cm, W/c = 0,58
Satuan / Unit : M3
Analisa : AHSP PU A.4.1.1.7
A. TENAGA
1 Pekerja/Kenek L.01 OH 1,6500 180,000.00 #VALUE!
2 Tukang L.02 OH 0,2750 250,000.00 #VALUE!
3 Kepala Tukang L.03 OH 0,0280 280,000.00 #VALUE!
4 Mandor/Pengawas L.04 OH 0,0830 300,000.00 #VALUE!
Jumlah Tenaga Kerja #VALUE!
B. BAHAN
1 Semen Portland Kg 371,0000 2,500.00 #VALUE!
2 Pasir Beton Kg 698,0000 #N/A #N/A
3 Kerikil Kg 1.047,0000 480,000.00 #VALUE!
4 Air Liter 215,0000 #N/A #N/A
Jumlah Bahan #VALUE!
C. PERALATAN
1 Peralatan Potong Pipa T2/Mekanik/Clinder Saw Hari 0.0450 #N/A #N/A
2
3
Jumlah Peralatan #N/A
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #N/A
E Overhead & Profit 15% X D #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) -
E Bekisting Dipakai 2 x = D / 2 #N/A
F Overhead & Profit 15% X E #N/A
G Harga Satuan Pekerjaan ( E + F ) #N/A
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Bahan -
C. PERALATAN
Jenis Pekerjaan Urugan Tanah Bekas Galian Termasuk Perataan dan Pemadatan (stamper)
Satuan / Unit M3
Analisa AHSP PU T.14.b
Jumlah Bahan -
C. PERALATAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #VALUE!
E Overhead & Profit 15% X D #VALUE!
F Harga Satuan Pekerjaan ( D + E ) #VALUE!
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #N/A
E Overhead & Profit 15% XD #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
ANALISA HARGA SATUAN PEKERJAAN
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #VALUE!
E Overhead & Profit 15% X D #VALUE!
F Harga Satuan Pekerjaan ( D + E ) #VALUE!
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) 28,403,000
E Overhead & Profit 15% X D 4,260,450
F Harga Satuan Pekerjaan ( D + E ) 32,663,450
1 #N/A #N/A
2 #N/A #N/A
3 #N/A #N/A
Jumlah Peralatan #N/A
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #N/A
E Overhead & Profit 15% XD #N/A
F Harga Satuan Pekerjaan ( D + E ) #N/A
Jumlah Bahan -
C. PERALATAN
Jumlah Peralatan -
D Jumlah Harga Tenga Kerja, Bahan dan Peralatan ( A + B + C ) #VALUE!
E Overhead & Profit 15% X D #VALUE!
F Harga Satuan Pekerjaan ( D + E ) #VALUE!
DAFTAR UPAH DAN BAHAN
HARGA SATUAN
NO. KODE NAMA BARANG / BAHAN / TENAGA SATUAN
(Rp.)
1 B01 Semen Portland Kg Rp 2,500.00
2 B02 Semen Putih Kg Rp 20,000.00
3 B03 Semen Warna Kg Rp 20,000.00
4 B04 Air Bersih Ltr Rp 600.00
5 B05 Kawat beton Kg Rp 67,000.00
6 B06 Kawat Duri Kg Rp 25,000.00
7 B07 Kawat Ram m2 Rp 125,000.00
8 B08 Kawat Las Listrik Kg Rp 225,000.00
9 B09 Plywood 3 mm Ukuran 122 x 224 cm Lembar
10 B10 Plywood tebal 4 mm ( 90 x 220 ) cm Lembar
11 B11 Plywood tebal 4 mm ( 120 x 240 ) cm Lembar
12 B12 Plywood 4 mm Lembar Rp -
13 B13 Plywood 5 mm Lembar
14 B14 Plywood 6 mm Lembar Rp 156,000.00
9 B15 Plywood 9 mm Lembar Rp 235,000.00
10 B16 Plywood 12 mm Lembar
11 B17 Plywood 18 mm Lembar
12 B18 Teakwood tebal 4 mm ( 90 x 220 ) cm Lembar
13 B19 Teakwood tebal 4 mm ( 120 x 240 ) cm Lembar
14 B20 Dolken Kayu Dia. 8-10/400 cm Batang Rp 35,000.00
15 B21 Formika Lembar
16 B22 Gypsum Board 9 mm Lembar Rp 120,000.00
17 B23 Akustik 60 x 60 cm Lembar
18 B24 Akustik 30 x 30 cm Lembar
19 B25 Akustik 60 x 120 cm Lembar
20 B26 List Plafon Profil M1 Rp 15,000.00
B27 List Plafon Profil Gypsum m Rp 25,000.00
B28 List Profil DINDING m
21 B29 Paku Kg Rp 30,000.00
22 B30 Sekrup Gypsum Doz Rp 250,000.00
23 B31 Paku campur Btg Rp 30,000.00
15 B32 Paku Biasa Kg Rp 30,000.00
16 B33 Paku Seng Kg
17 B34 Paku Plywood Kg Rp 30,000.00
18 B35 Paku Atap Kg Rp 220,000.00
19 B36 Paku Beton Kg
20 B37 Paku sekrup Kg Rp 260,000.00
21 B38 Paku Skrup bj Rp 1,300.00
22 B39 Paku hak panjang 15 cm Kg Rp 2,600.00
23 B40 Paku Pancing 60 x 230 Kg
24 B41 Besi Baja IWF Kg
25 B42 Gording Canal Kg
B43 Baja ringan profil C 75 0.75 M1 Rp 60,000.00
B44 Baut (screw driver) bh Rp 1,500.00
B45 Dynabolt bh Rp 15,000.00
TENAGA KERJA
1 U01 Pekerja/Kenek O/h Rp 180,000.00
2 U02 Pekerja/Kenek Terampil O/h Rp 200,000.00
3 U03 Tukang O/h Rp 250,000.00
4 U04 Tukang Kayu O/h Rp 250,000.00
5 U05 Tukang Batu O/h Rp 250,000.00
6 U06 Tukang besi O/h Rp 250,000.00
7 U07 Tukang gali O/h Rp 250,000.00
8 U08 Tukang Cat O/h Rp 250,000.00
9 U09 Tuk.Bongkar Bekisting O/h Rp 250,000.00
10 U10 Tukang Listrik O/h Rp 250,000.00
11 U11 Tukang Las O/h Rp 250,000.00
11 U12 Tukang Pipa O/h Rp 250,000.00
12 U13 Tukang Aspal O/h Rp 250,000.00
13 U14 Kepala Tukang O/h Rp 280,000.00
14 U15 Mandor/Pengawas O/h Rp 300,000.00
15 U16 Pengawas / Ahli Teknik O/h Rp 833,333.33
16 U17 Juru Ukur O/h Rp 280,000.00
17 U18 Asisten ahli ukur O/h Rp 200,000.00
PERALATAN
1 A01 Mesin penyaring 8 HP jam
2 A02 Chip Spreader jam
3 A03 Mesin penghampar 1820 MM 30 HP jam
4 A04 Thriller gandeng 1 ton jam
5 A05 Dump Truck 3,5 ton 44 HP jam
6 A06 Bulldozer 100 - 150 Hp jam Rp 1,639,067.00
7 A07 Compressor 4000-6500 L/M jam Rp 316,622.76
8 A08 Concrete Mixer 0,3 - 0,6 M3 jam Rp 169,305.60
9 A09 Dump Truck 3 - 4 M3 jam Rp 1,007,092.31
10 A10 Excavator 80 - 140 Hp jam Rp 1,867,598.58
11 A11 Generator/Genset jam Rp 91,224.58
12 A12 Motor Grader > 100 Hp jam Rp 1,847,064.37
13 A13 Wheel Loader 1 - 1,6 M3 jam Rp 1,210,344.64
14 A14 Vibratory Roller 5 - 8 Ton jam Rp 686,805.15
15 A15 Concrete Vibrator jam Rp 140,460.05
16 A16 Water Tanker 3000 - 4500 L jam Rp 945,142.31
17 A17 Water Pump jam Rp 145,237.63
18 A18 Tamper jam Rp 167,339.15
II B PEKERJAAN TANAH
1 B-01 1 M3 Galian Tanah Biasa Sedalam 1 M
2 B-02 1 M3 Galian Tanah Biasa Sedalam 2 M
3 B-03 1 M3 Galian Tanah Biasa Sedalam 3 M
4 B-04 1 M3 Galian Tanah Keras Sedalam 1 M
5 B-05 1 M3 Galian Tanah Cadas Sedalam 1 M
6 B-06 1 M3 Galian Tanah Lumpur Sedalam 1 M
7 B-07 1 M3 Pekerjaan Stripping Setinggi 1 M
8 B-08 1 M3 Pembuangan Tanah Sejauh 15 M
9 B-09 1 M3 Mengurug Kembali Galian
10 B-10 1 M3 Pemadatan Tanah ( per 20 cm)
11 B-11 1 M3 Urugan Pasir
12 B-12 1 M3 Urugan Sirtu
13 B-13 1 M3 Urugan Kerikil
14 B-14 1 M3 Pembuatan Jalan Sementara, Tebal 25 cm
15 B-15 Pek. Galian Tanah (Cut) Dengan Alat Berat / M3
16 B-16 Pek Urugan Sirtu (Fill) Dengan Alat Berat / M3
IV D PEKERJAAN DINDING
1 D-01 1 M2 Pasangan Batu Tela, 1 PC : 1 PP
2 D-02 1 M2 Pasangan Batu Tela, 1 PC : 2 PP
3 D-03 1 M2 Pasangan Batu Tela, 1 PC : 3 PP
4 D-04 1 M2 Pasangan Batu Tela, 1 PC : 4 PP
5 D-05 1 M2 Pasangan Batu Tela, 1 PC : 5 PP
6 D-06 1 M2 Pasangan Batu Batako Tebal 1 Batako, 1 PC : 1 PP
7 D-07 1 M2 Pasangan Batu Batako Tebal 1 Batako, 1 PC : 2 PP
8 D-08 1 M2 Pasangan Batu Batako Tebal 1 Batako, 1 PC : 3 PP
9 D-09 1 M2 Pasangan Batu Batako Tebal 1 Batako, 1 PC : 4 PP
10 D-10 1 M2 Pasangan Batu Batako Tebal 1 Batako, 1 PC : 5 PP
11 D-11 1 M2 Pasangan Dinding Roster/Terawang (10 X 20 X 20) cm, Campuran Spesi 1 PC : 3 PP
12 D-12 1 M2 Pasangan Dinding Roster/Terawang (12 X 11 X 24) cm, Campuran Spesi 1 PC : 4 PP
13 D-13 1 M2 Pasangan Dinding Bata Berongga Ekspose (5 X 11 X 24) cm, Campuran Spesi 1 PC : 3 PP
14 D-14 1 M2 Pasangan Dinding Batu bata ringan (Hebel), 10x16x60 cm, Campuran Spesi 1 PC : 3 PP
V E PEKERJAAN PLESTERAN
1 E-01 1 M2 Plesteran, 1 PC : 1 PP, tebal 15 mm
2 E-02 1 M2 Plesteran, 1 PC : 2 PP, tebal 15 mm
3 E-03 1 M2 Plesteran, 1 PC : 3 PP, tebal 15 mm
4 E-04 1 M2 Plesteran, 1 PC : 4 PP, tebal 15 mm
5 E-05 1 M2 Plesteran, 1 PC : 5 PP, tebal 15 mm
6 E-06 1 M2 Plesteran, 1 PC : 6 PP, tebal 15 mm
7 E-07 1 M2 Plesteran Beton, 1 PC : 2 PP, tebal 15 mm
8 E-08 1 M2 Plesteran Beton, 1 PC : 3 PP, tebal 15 mm
9 E-09 1 M2 Plesteran Skoning, 1 PC : 2 PP, Lebar 10 mm
10 E-10 1 M2 Acian
VI F PEKERJAAN KAYU
1 F-01 1 M3 Membuat dan Memasang Kusen Pintu dan Jendela Kayu Kelas I
2 F-02 1 M3 Membuat dan Memasang Kusen Pintu dan Jendela Kayu Kelas II dan III
3 F-03 1 M3 Membuat dan Memasang Pintu Klamp Standar, Kayu Kelas II
4 F-04 1 M2 Membuat dan Memasang Daun Pintu Panel Kayu Kelas I
5 F-05 1 M2 Membuat dan Memasang Pintu dan Jendela Jalusi Kayu Kelas I
6 F-06 1 M2 Membuat dan Memasang Daun Pintu dan Jendela Kaca Kayu Kelas I
7 F-07 1 M2 Membuat Pintu Kayu Lapis (Plywood), Rangkap, Rangka Tertutup Kayu Kelas II (Lebar sampa
8 F-08 1 M2 Membuat Pintu Kayu Lapis (Plywood), Rangkap, Rangka Expose Kayu Kelas I dan II
9 F-09 1 M2 Pasang Jalusi Kusen Kayu Kelas I
10 F-10 1 M2 Pasang Teakwood Rangkap, Rangka Expose Kayu Kelas I
11 F-11 1 M2 Pasang Teakwood Rangkap Lapis Formika, Rangka Expose Kayu Kelas II
12 F-12 1 M2 Pasang Kaca Tebal 6 Mm
13 F-13 1 M3 Pasang Konstruksi Kuda-Kuda Konvensional, Kayu Kelas II
14 F-14 1 M3 Pasang Konstruksi Kuda-Kuda Expose, Kayu Kelas I
15 F-15 1 M3 Pasang Konstruksi Gordeng, Kayu Kelas II
16 F-16 1 M2 Pasang Rangka Atap Genteng Keramik, Kayu Kelas II
17 F-17 1 M2 Pasang Rangka Atap Genteng Beton, Kayu Kelas II
18 F-18 1 M2 Pasang Rangka Atap Sirap, Kayu Kelas II
19 F-19 1 M' Pasang Lisplank Ukuran (3 X 20) cm, Kayu Kelas I atau II
20 F-20 1 M' Pasang Lisplank Ukuran (3 X 30) cm, Kayu Kelas I atau II
21 F-21 1 M' Papan Listplank Kayu Besi 3/30
22 F-22 1 M2 Pasang Rangka Dinding Pemisah (60 X 120) cm , Kayu Kelas II atau III
23 F-23 1 M2 Pasang Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kelas II
24 F-24 1 M2 Pasang Dinding Pemisah Plywood Rangkap, Rangka Kayu Kelas II
25 F-25 1 M2 Pasang Dinding Lambriziring dari Papan Kayu Kelas I
26 F-26 1 M2 Pasang Dinding Partisi Dari Plywood ( 120 X 240 ) Cm
27 F-27 1 M2 Pasang Dinding Bilik, Rangka Kayu Kelas II
28 F-28 1 M2 Pekerjaan Rangka Dinding Pemisah / Partisi (60 X 120) Cm Kayu Besi
29 F-29 1 M2 Pekerjaan Dinding Gypsum Board 9 Mm/Satu Sisi "
30 F-30 1 M3 Balok Lantai Dan Skor Kayu Kelas I
31 F-31 1 M3 gelagar kayu kelas I (BOW)
32 F-32 1 M2 Lantai Papan Kayu Klas I
33 F-33 1 M2 lantai papan kayu kelas I diketam (BOW)
34 F-34 1 M' Pemancangan Cerocok Kayu
35 F-35 1 M2 Dinding papan dilidah/alur
36 F-36 1 M2 Dinding papan susun sirih
37 F-37 1 M2 Dinding triplek 4 mm rangka kayu Kls II
38 F-38 1 M2 Dinding double triplek 4 mm kayu Kls II
39 F-39 1 M2 Dinding double triplek Sungkai rangka kayu Kls II
40 F-40 1 Ptg Mencincin/melancip tiang pancang/potong
41 F-41 1 M Memancang tiang ke dalam tanah lunak/M
42 F-42 1 Ps Membuat pen dan lobang pada tiang balok pemikul/
43 F-43 1 M Membuat alur dan lidah pada papan bendung
44 F-44 1 M Memancang papan bendung ke dalam tanah lunak
45 F-45 1 M Memaku/meratakan kepala papan bendung
46 F-46 1 M3 Memasang leger/balok tumbuk
47 F-47 1 M3 Pasangan Rangka Bawah Kayu Besi
48 F-48 1 M3 Membuat kayu sandaran jembatan
49 F-49 1 M3 Pasangan Rangka Atas Kayu besi
50 F-50 1 M2 Memasang papan lantai tebal 2 s/d 8 cm
XI I PEKERJAAN BESI
1 H-001 10 Cm Pengelasan Dengan Las Listrik
2 H-002 1 Kg Rangka Baja
3 H-003 1 Kg Pekerjaan Gording Canal
4 H-004 100 Kg Pekerjaan Perakitan Kuda-Kuda Baja
5 H-005 1 Kg Pekerjaan Erection Konstruksi Baja
6 H-006 1 Kg Pekerjaan Kuda-Kuda Baja
7 H-007 1 Kg Pekerjaan Pabrikasi Baja (Site)
8 H-008 1 k Pekerjaan Skur Dobel Profil L 60.60.6
9 H-009 1m Pekerjaan Tangga Besi Siku L 50 50.5 (Type 1)
10 H-010 1m Pekerjaan Tangga Besi Kotak 40x40 x2,3mm (Type 2)
11 H-011 1m Pekerjaan Tangga Pipa Giv 2" (Type 3)
12 H-012 1m Pekerjaan Tangga Pipa Giv 1,5" (Type 4)
13 H-013 1 M2 Pasang Pintu Besi Baja
14 H-014 1 m2 Membuat pintu besi plat baja tebal 2 mm rangkap, rangka baja siku
15 H-015 1 m2 Membuat pintu besi plat baja tebal 2 mm 1 Layer, rangka baja siku
16 H-016 1 m Pekerjaan Bending Pipa 3-SCH 40 Untuk Kuda-kuda bulat (Dom)
17 H-017 1 m Pekerjaan Bending Pipa 4-SCH 40 Untuk Kuda-kuda bulat (Dom)
18 H-018 1 m Pekerjaan Bending Pipa 3-SCH 80 Untuk Kuda-kuda bulat (Dom)
19 H-019 1 m Pekerjaan Bending Pipa 4-SCH 80 Untuk Kuda-kuda bulat (Dom)
20 H-020 1 m Pekerjaan Bending Pipa Hollow 4x4x2,3 kaso (Dom)
21 H-021 1 m Pekerjaan Railing Pengaman Type 1
22 H-022 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type K2.
23 H-023 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type K3.
24 H-024 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type K4.
25 H-025 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type K5.
26 H-026 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type Kb1.
27 H-027 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type Kb2.
28 H-028 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type Kb2a.
29 H-029 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type Kb3.
30 H-030 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type Kb4.
31 H-031 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type Kb4a.
32 H-032 1 Unit Pekerjaan Pemasangan Kuda Kuda Pipa Type Kb5.
33 H-033 1 m Pekerjaan Pemasangan Pipa 2 1/2-SCH 40 Untuk Gording
34 H-034 1 m Pekerjaan Pipa Hollow 4x4x2,3 kaso (Dom)
35 H-035 1 m Pekerjaan Pipa Ø6" -SCH 80 Untuk Kuda-kuda bulat (Dom)
36 H-036 1 kg Pekerjaan Pembuatan Plat Buhul 8mm
37 H-037 1 kg Pekerjaan Pembuatan Plat Buhul 10mm
38 H-038 1 kg Pekerjaan Pembuatan Plat Buhul/Join 12mm
39 H-039 1 kg Pekerjaan Pembuatan Plat Buhul/Join 16mm
40 H-040 1 kg Pekerjaan Pembuatan Plat Buhul/Join 20mm
41 H-041 1 kg Pekerjaan Pembuatan Plat Buhul/Join 25mm
42 H-042 1 Bh Pekerjaan Pemasangan Plat gording 8 mm
43 H-043 1 Bh Pekerjaan Pemasangan Plat Joint Balok FB 100 X 12
44 H-044 1 Bh Pekerjaan Pemasangan Plat Joint Balok PL. 12 THK
45 H-045 1 Bh Pekerjaan Pemasangan Plat Joint Balok PL. 16 THK
46 H-046 1 Bh Pekerjaan Pemasangan Plat Joint Balok PL. 25 THK
47 H-047 1 Bh Pekerjaan Pemasangan Plat Buhul/Sabungan 10mm
48 H-048 1 Bh Pekerjaan Pemasangan Plat Buhul 12mm
49 H-049 1 Bh Pekerjaan Pemasangan Plat Join Kuda Kuda 16mm
50 H-050 1 Lbr Pekerjaan Pasangan Base Plat PL.20.900.400mm
51 H-051 1 Lbr Pekerjaan Pasangan Base Plat 20 x623x275 mm
52 H-052 1 Btg Anchor Bolt Øm 28 Mm
53 H-053 1 Btg Anchor Bolt Øm 19 Mm
54 H-054 1 Bh Pemasangan baut/mur Angkur Geser Øm 19 MM
55 H-055 1 M' Gording Pipa Medium Dia. 1 ½ "
56 H-056 1 M2 Pasang Jendela Nako 7 klip & Tralis
57 H-057 1 M' Pasang Talang Datar, Seng BJLS 30"
58 H-058 1 M' Pasang Talang Miring, Seng BJLS 30"
59 H-059 1 M' Pasang Talang 1/2 Lingkaran D - 10 cm, Seng BJLS 30"
60 H-060 1 M2 Pemasangan Kuda - kuda baja ringan
61 H-061 1 m2 Pemasangan Covering Aluminium Composite (ACP)
62 H-062 1 m2 Pemasangan Covering GRC Kalsiboard eksterior 6 mm
X K PEKERJAAN SANITASI
1 K-001 Memasang 1 Buah Kloset Duduk/Monoblok
2 K-002 Memasang 1 Buah Kloset Jongkok Porselen
3 K-003 Memasang 1 Buah Wastafel
4 K-004 1 Bh Pasang Urinoir
5 K-005 1 Bh Pasang Floor Drain
6 K-006 1 Unit Pasang Tangki Fiber Glass Cap 2.2 M3
7 K-007 Memasang 1 Buah Bak Mandi Batu Batako Volume 0,30 M3
8 K-008 1 M' Pasang Pipa Tanah Penyalur Air Limbah Diameter 15 cm
9 K-009 1 M' Pekerjaan Pipa Gip Ø ½ " "
10 K-010 1 M' Pekerjaan PIPA GIP Ø ¾ " "
11 K-011 1 M' Pekerjaan PIPA GIP Ø 1 " "
12 K-012 1 M' Pekerjaan PIPA GIP Ø 1 ¼ " "
13 K-013 1 M' Pekerjaan PIPA GIP Ø 1 ½ " "
14 K-014 1 M' Pekerjaan PIPA GIP Ø 2 " "
15 K-015 1 M' Pekerjaan PIPA GIP Ø 3 "
16 K-016 1 M' Pekerjaan PIPA GIP Ø 4 "
17 K-017 1 M' Pekerjaan PIPA PVC Ø 6 "
18 K-018 1 M' Pekerjaan PIPA PVC Ø 4 "
19 K-019 1 M' Pekerjaan PIPA PVC Ø 3 "
20 K-020 1 M' Pekerjaan PIPA PVC Ø 2 "
21 K-021 1 M' Pekerjaan PIPA PVC Ø 1 ½ "
22 K-022 1 M' Pekerjaan PIPA PVC Ø 1 "
K-023 1 M' Pekerjaan PIPA PVC Ø 3/4"
23 K-024 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 30 x 30 ) cm Tinggi 35 cm
24 K-025 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 45 x 45 ) cm Tinggi 50 cm
25 K-026 Memasang 1 Buah Bak Kontrol Pasangan Batu Bata ukuran ( 60 x 60 ) cm Tinggi 65 cm
26 K-027 Memasang 1 Buah Cuci Piring Stainles Steel
27 K-028 Memasang 1 Buah Kran Diameter 3/4" atau 1/2"
28 K-029 Memasang 1 Kran air + shower bilas dia 3/4
29 K-030 1 Unit Ground Reservoar
30 K-031 1 Unit Pekerjaan Septictank & Rembesan
31 K-032 1 M' Saluran Type 1 (Tepi Pagar)
32 K-033 1 M' Saluran Type 2 (Dari Halaman Ke Saluran Type 1)
33 K-034 1 M' Saluran Ditepi Jalan Type 3
34 K-035 1 M' Pasang Kawat Duri Pada Pagar Keliling
35 K-036 1 M' Profil Beton
36 K-037 1 M' Pekerjaan Saluran Keliling Bangunan
37 K-038 1 M' Pek. Saluran Pembuangan Ke Riol Kota
O PEKERJAAN LISTRIK
1 O-001 1 Titik Instalasi Lampu / Penerangan
2 O-002 1 Titik Instalasi Stop Kontak / Power Outlet
3 O-003 1 Titik Instalasi Ac 1 Phase
4 O-004 1 Titik Instalasi Ac 3 Phase
5 O-005 1 Titik Instalasi Sound System
6 O-006 1 Titik Instalasi Telephone
7 O-007 1 Titik Instalasi Fire Alarm
8 O-008 Pemasangan Penangkal Petir(Unit)
9 O-009 1 Set Grounding Pentanahan
10 O-010 1 Ttk Lampu Tl 2 X 20 Watt
11 O-011 1 Ttk Lampu Tl 20 Watt
12 O-012 1 Ttk Lampu Pijar 40 Watt
13 O-013 1 Bh. Stop Kontak 2 Fase
14 O-014 1 Bh. Sekring Box 2 Group
15 O-015 1 Bh. Panel Instalasi
16 O-016 1 Bh Saklar Double
17 O-017 1 Bh Saklar Tunggal
BAHAN
HARGA SATUAN
SATUAN
(Rp.)
-
-
A
M2 Rp 2,856,666.67 A-01
M' Rp 470,969.70 A-02
M' Rp 534,120.00 A-03
M' Rp 817,120.00 A-04
M' Rp 139,350.00 A-05
M2 Rp 1,728,050.00 A-06
M2 Rp 1,816,500.00 A-07
M2 Rp 33,000.00 A-08
M2 Rp 1,628,300.00 A-09
M2 Rp 53,710.00 A-10
M2 Rp 348,600.00 A-11
M3 Rp 1,299,960.00 A-12
M3 Rp 1,209,960.00 A-13
-
B
M3 Rp 142,500.00 B-01
M3 Rp 175,500.00 B-02
M3 Rp 209,100.00 B-03
M3 Rp 189,600.00 B-04
M3 Rp 288,000.00 B-05
M3 Rp 229,500.00 B-06
M3 Rp 10,500.00 B-07
M3 Rp 62,400.00 B-08
M3 Rp 40,260.00 B-09
M3 Rp 105,000.00 B-10
M3 Rp 369,000.00 B-11
M3 Rp 364,500.00 B-12
M3 Rp 649,500.00 B-13
M3 Rp 517,400.00 B-14
M3 Rp 242,379.55 B-15
M3 Rp 755,099.89 B-16
-
C
M3 Rp 2,380,600.00 C-01
M3 Rp 2,295,700.00 C-02
M3 Rp 2,236,840.00 C-03
M3 Rp 2,195,460.00 C-04
M3 Rp 2,138,740.00 C-05
M3 Rp 1,616,040.00 C-06
n 40% Batu Belah M3 Rp 4,310,300.00 C-07
M3 Rp 2,169,400.00 C-08
M' Rp 2,091,340.00 C-09
M' Rp 1,631,810.00 C-10
-
D
M2 Rp 500,415.00 D-01
M2 Rp 456,650.00 D-02
M2 Rp 434,235.00 D-03
M2 Rp 418,955.00 D-04
M2 Rp 411,320.00 D-05
M2 Rp 550,415.00 D-06
M2 Rp 506,650.00 D-07
M2 Rp 484,235.00 D-08
M2 Rp 468,955.00 D-09
M2 Rp 461,320.00 D-10
pesi 1 PC : 3 PP M2 Rp 3,207,820.00 D-11
pesi 1 PC : 4 PP M2 Rp 3,816,400.00 D-12
an Spesi 1 PC : 3 PP M2 Rp 146,720.00 D-13
Spesi 1 PC : 3 PP M2 Rp 172,233.00 D-14
-
E
M2 Rp 144,720.00 E-01
M2 Rp 132,960.00 E-02
M2 Rp 127,920.00 E-03 103%
M2 Rp 124,440.00 E-04 97%
M2 Rp 122,520.00 E-05
M2 Rp 120,960.00 E-06
M2 Rp 136,030.00 E-07
M2 Rp 131,535.00 E-08
M2 Rp 132,730.00 E-09
M2 Rp 74,925.00 E-10
-
F
M3 Rp 12,703,000.00 F-01
M3 Rp 10,374,000.00 F-02
M3 Rp 561,800.00 F-03
M2 Rp 1,229,000.00 F-04
M2 Rp 1,349,000.00 F-05
M2 Rp 1,223,200.00 F-06
yu Kelas II (Lebar sampa M2 Rp 814,950.00 F-07
u Kelas I dan II M2 Rp 920,100.00 F-08
M2 Rp 1,081,600.00 F-09
M2 Rp 949,100.00 F-10
M2 Rp 969,450.00 F-11
M2 F-12
M3 Rp 9,559,000.00 F-13
M3 Rp 14,487,300.00 F-14
M3 Rp 7,834,600.00 F-15
M2 Rp 103,800.00 F-16
M2 Rp 103,800.00 F-17
M2 Rp 640,260.00 F-18
M' Rp 132,100.00 F-19
M' Rp 130,600.00 F-20
M' Rp 131,600.00 F-21
M2 Rp 257,000.00 F-22
M2 Rp 257,000.00 F-23
M2 Rp 308,300.00 F-24
M2 Rp 694,400.00 F-25
M2 Rp 27,290.00 F-26
M2 Rp 82,760.00 F-27
M Rp 299,000.00 F-28
M Rp 102,566.67 F-29
M3 Rp 11,790,000.00 F-30
M3 #VALUE! F-31
M2 Rp 245,120.00 F-32
M2 #VALUE! F-33
M' Rp 221,762.50 F-34 1 M' Pemancangan Cerocok Kayu
M2 Rp 357,250.00 F-35
M2 Rp 328,000.00 F-36
M2 #N/A F-37
M2 #N/A F-38
M2 #N/A F-39
Pt Rp 150,200.00 F-40
M Rp 348,675,000.00 F-41
Ps Rp 186,000,000.00 F-42
M Rp 225,300,000.00 F-43
M Rp 209,781,250.00 F-44
M Rp 62,000,000.00 F-45
M3 #VALUE! F-46
M3 #VALUE! F-47
M3 #VALUE! F-48
M3 #VALUE! F-49
M2 Rp 178,267,000.00 F-50
-
G
M3 Rp 1,540,300.00 G-001
M3 Rp 1,503,400.00 G-002
M3 Rp 1,445,800.00 G-003
cm, w/c = 0,87 M2 Rp 345,080.00 G-004
M3 Rp 1,540,090.00 G-005
M3 Rp 1,692,490.00 G-006
M3 Rp 1,816,090.00 G-007
M3 Rp 1,701,390.00 G-008
M3 Rp 1,907,090.00 G-009
M3 Rp 2,084,390.00 G-010
M3 Rp 2,731,600.00 G-011
M3 Rp 3,056,252.38 G-012
M3 Rp 3,084,365.08 G-013
M3 Rp 3,132,685.71 G-014
M3 Rp 3,147,636.51 G-015
M3 Rp 337,310.00 G-016
M3 Rp 324,500.00 G-017
M2 Rp 334,180.00 G-018
M2 Rp 352,930.00 G-019
M2 Rp 590,190.00 G-020
M2 Rp 737,737.50
M2 Rp 600,690.00 G-022
M2 Rp 730,190.00 G-023
M2 Rp 642,690.00 G-024
M2 Rp 803,362.50
M2 Rp 565,300.00 G-026
M2 Rp 290,300.00 G-027
M3 Rp 8,338,060.00 G-028
M3 Rp 10,586,790.00 G-029
M3 Rp 16,754,200.00 G-030
M3 Rp 11,055,900.00 G-031
M3 Rp 12,362,300.00 G-032
M3 Rp 11,204,950.00 G-033
M3 Rp 10,582,560.00 G-034
M3 Rp 11,683,290.00 G-035
M' Rp 124,055.00 G-036
M' Rp 178,860.00 G-037
M3 Rp 8,952,551.25 G-038
M3 Rp 8,874,060.59 G-039
M3 Rp 12,301,258.38 G-040
M3 G-041
M3 G-042
M3 G-043
M3 G-044
M3 G-045
M3 G-046
M3 G-047
M3 Rp 13,933,941.84 G-048
M3 G-049
M3 G-050
M3 Rp 15,514,551.68 G-051
M3 G-052
M3 G-053
M3 Rp 12,074,840.92 G-054
M3 Rp 17,180,998.66 G-055
M3 Rp 19,129,744.89 G-056
M3 G-057
M3 G-058
M2 #N/A G-059
M3 Rp 584,451.48 G-060
KG #N/A G-061
M2 #N/A G-062
M3 G-063
-
H
M2 Rp 110,680.00 H-001
M2 Rp 158,100.00 H-002
M1 Rp 125,600.00 H-003
M2 Rp 90,240.00 H-004
m² #N/A H-005
m² #N/A H-006
m² #N/A H-007
m' #N/A H-008
m' #N/A H-009
m' #N/A H-010
m' #N/A H-011
m' #N/A H-012
m' #N/A H-013
m' #N/A H-014
m' #N/A H-015
m² #N/A H-016
m² #N/A H-017
m² #N/A H-018
m² #N/A H-019
m² #N/A H-020
m² #N/A H-021
m² #N/A H-022
m² #N/A H-023
m² #N/A H-024
m² #N/A H-025
m' #N/A H-026
m' #N/A H-027
m' #N/A H-028
m' #N/A H-029
m' #N/A H-030
m' #N/A H-031
m' #N/A H-032
m' #N/A H-033
m' #N/A H-034
m² #N/A H-035
m² #N/A H-036
m² Rp 70,100.00 H-037
m² #N/A H-038
m' #N/A H-039
m' #N/A H-040
m' #N/A H-041
m' #N/A H-042
m' #N/A H-043
m² #N/A H-044
m² #N/A H-045
m² #N/A H-046
m² #N/A H-047
m² Rp 60,100.00 H-048
M2 #N/A H-049
M2 #N/A H-050
M2 Rp 84,550.00 H-051
M2 Rp 312,002.50 H-052
M2 Rp 138,904.50 H-053
M' Rp 336,600.00 H-054
M2 Rp 60,100.00 H-055
M2 Rp 128,350.00 H-056
m' Rp 161,300.00 H-057
I
Cm Rp 95,650.00 H-001
Kg Rp 28,380.00 H-002
Kg Rp 28,380.00 H-003
Kg Rp 67,080.00 H-004
Kg Rp 13,455.02 H-005
Kg Rp 41,835.02 H-006
#VALUE! H-007
Rp 91,859.78 H-008
Rp 533,808.28 H-009
Rp 1,886,415.95 H-010
Rp 594,958.38 H-011
Rp 453,291.71 H-012
Rp 1,157,300.00 H-013
Rp 2,153,266.52 H-014
Rp 1,743,266.52 H-015
Rp 475,140.49 H-016
Rp 359,397.14 H-017
Rp 476,432.32 H-018
Rp 661,556.54 H-019
Rp 6,222.04 H-020
Rp 1,311,650.00 H-021
Rp 54,609,040.06 H-022
Rp 54,093,436.22 H-023
Rp 43,629,572.37 H-024
Rp 48,176,254.22 H-025
Rp 31,360,672.17 H-026
Rp 24,590,781.57 H-027
Rp 18,126,849.82 H-028
Rp 10,466,129.84 H-029
Rp 12,462,317.80 H-030
Rp 16,019,471.52 H-031
Rp 45,042,482.76 H-032
Rp 139,880.41 H-033
#N/A H-034
Rp 1,075,203.28 H-035
Rp 40,071.43 H-036
Rp 44,150.00 H-037
Rp 44,900.00 H-038
Rp 49,218.75 H-039
Rp 50,718.75 H-040
Rp 52,593.75 H-041
Rp 146,485.44 H-042
Rp 198,444.69 H-043
Rp 280,843.71 H-044
Rp 1,096,017.84 H-045
Rp 2,153,694.91 H-046
Rp 229,305.70 H-047
Rp 267,086.84 H-048
Rp 361,613.89 H-049
Rp 4,033,093.54 H-050
Rp 1,942,126.36 H-051
Rp 522,030.09 H-052
Rp 207,560.03 H-053
Rp 29,901.50 H-054
H-055
Rp 472,500.00 H-056
Rp 253,241.50 H-057
Rp 271,674.80 H-058
Rp 259,125.00 H-059
Rp 373,987.68 H-060
Rp 956,260.00 H-061
Rp 633,510.00 H-062
- Covering GRC Kalsiboard eksterior 6 mm x 1220 x 2440
J
Rp 192,800.00 J-001
Rp 186,950.00 J-002
cm, untuk plafon Rp 216,150.00 J-003
Rp 105,680.00 J-004
Rp 86,416.00 J-005
Rp 54,100.00 J-006
Rp 24,100.00 J-007
Rp 48,800.00 J-008
Rp 48,800.00 J-009
Rp 106,700.00 J-010
Rp 613,400.00 J-011
#N/A J-012
Rp 339,100.00 J-013
Rp 309,100.00 J-014
Rp 39,850.00 J-015
Rp 63,640.00 J-016
#N/A J-017
-
K
Rp 4,945,280.00 K-001
Rp 1,041,600.00 K-002
Rp 2,230,100.00 K-003
Rp 4,484,100.00 K-004
Rp 533,640.00 K-005
K-006
Rp 2,689,500.00 K-007
#N/A K-008
Rp 125,496.25 K-009
Rp 125,496.25 K-010
Rp 142,027.50 K-011
Rp 196,076.25 K-012
Rp 181,308.33 K-013
Rp 236,412.50 K-014
Rp 71,100.00 K-015
Rp 88,890.00 K-016
Rp 53,340.00 K-017
Rp 205,427.50 K-018
Rp 145,915.00 K-019
Rp 118,206.25 K-020
Rp 41,731.25 K-021
Rp 36,985.00 K-022
Rp 35,331.88 K-023
Tinggi 35 cm Rp 1,070,310.00 K-024
Tinggi 50 cm Rp 1,189,210.00 K-025
Tinggi 65 cm Rp 1,406,190.00 K-026
Rp 639,250.00 K-027
Rp 151,725.00 K-028
K-029
#N/A K-030
Rp 34,236,656.71 K-031
K-032
K-033
K-034
K-035
K-036
Rp 600,289.00 K-037
Rp - K-038
-
L
Rp 178,500.00 L-001
Rp 581,100.00 L-002
Rp 531,100.00 L-003
Rp 219,625.00 L-004
Rp 194,750.00 L-005
Rp 194,750.00 L-006
Rp 164,625.00 L-007
Rp 148,750.00 L-008
Rp 1,348,750.00 L-009
Rp 379,750.00 L-010
Rp 194,625.00 L-011
Rp 406,300.00 L-012
Rp 74,375.00 L-013
Rp 44,625.00 L-014
Rp 314,625.00 L-015
Rp 49,080.00 L-016
Rp 3,909,580.00 L-017
Rp 7,868,240.00 L-018
-
M
Rp 654,875.00 M-001
Rp 497,294.00 M-002
Rp 504,500.00 M-003
Rp 479,090.00 M-004 Rp 28,745.40
Rp 394,435.00 M-005
Rp 393,730.00 M-006
Rp 72,410.00 M-007
Rp 606,730.00 M-008
Rp 291,470.00 M-009
Rp 69,510.00 M-010
Rp 101,650.00 M-011
#N/A M-012
-
N
Rp 27,750.00 N-001
Rp 27,750.00 N-002
Rp 19,970.00 N-003
Rp 66,900.00 N-004
r, 2 Lapis Cat Penutup Rp 81,630.00 N-005
r, 3 Lapis Cat Penutup Rp 112,720.00 N-006
Rp 41,340.00 N-007
Rp 98,800.00 N-008
Rp 19,800.00 N-009
Rp 88,530.00 N-010
s Cat Penutup ) Rp 70,564.00 N-011
Rp 53,666.00 N-012
Rp 68,416.60 N-013
Rp 59,050.00 N-014
Rp 49,657.68 N-015
Rp 117,800.00 N-016
Rp 27,750.00 N-017
Rp 27,750.00 N-018
Rp 27,750.00 N-019
Rp 27,750.00 N-020
ir ( Samblasting ) Dengan Tingkat Keb #N/A N-021
#N/A N-022
#N/A N-023
ar, 2 Lapis Cat Penutup #N/A N-024
ar, 3 Lapis Cat Penutup #N/A N-025
#N/A N-026
#N/A N-027
#N/A N-028
#N/A N-029
Cat Penutup ) #N/A N-030
#N/A N-031
#N/A N-032
#N/A N-033
#N/A N-034
Rp 68,316.60 N-035
#N/A N-036
tem 4 Lapis Cat Konvensional Deng #N/A N-037
tem 1 Lapis Cat Konvensional Deng Rp 57,240.00 N-038
tem 3 Lapis Cat Konvensional Deng #N/A N-039
Airless Spray ) Dengan Sitem 1 Lap #N/A N-040
Rp 81,114.29 N-041
#N/A N-042
Rp 131,489.58 N-043
-
O
Rp 856,150.00O-001
Rp 921,000.00O-002
Rp 1,639,750.00O-003
Rp 2,119,750.00O-004
Rp 791,600.00O-005
Rp 755,350.00O-006
Rp 748,675.00O-007
Rp 28,629,500.00O-008
Rp 8,025,500.00O-009
O-010
O-011
O-012
O-013
Rp 412,500.00 O-014
O-015
Rp 212,500.00 O-016
Rp 202,500.00 O-017
RENC.BANGUN
Memancang Tiang Pancang galam dia.10/12 - 4m
Memancang Tonkat ulin 5/10 - 2m
Pek. Pemasangan Sunduk 5/10 - 0,5m /Ptg
Pek. Pemasangan Kalang / Lapak 5/10 - 0,5m /Ptg
Pek. Pemasangan Sloof 5/7 - 2m /Btg
Pek. Pemasangan Suai ulin 5/7 - 4m /Btg
Pek. Pemasangan Gelagar ulin 5/7 - 4m /Btg
Pek. Pemasangan Lantai ulin 1,5/20 - 2m /Kpg
Pek. Pemasangan Tiang ulin 5/10 - 4m /Btg
Pek. Pemasangan Rangka Badan Kayu ulin 5/7 - 4m /Btg
Pek. Pemasangan Rangka Atap Kayu ulin 5/7 - 2m /Btg
Pek. Pemasangan Rangka Atap Kayu ulin 5/10 - 2m /Btg
Pek. Memasang atap seng gelombang BJLS / M2
Memancang Tiang Pancang galam dia.10/12 - 2m
Pek. Pengurugan tanah biasa 1 m3
1 M2 Dinding papan dilidah/alur
1 M2 Dinding papan susun sirih
1 M2 Dinding triplek 4 mm rangka kayu Meranti
1 M2 Dinding double triplek 4 mm rangka kayu Meranti
1 M2 Dinding double triplek Sungkai rangka kayu Meranti
erior 6 mm x 1220 x 2440
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN :
PEKERJAAN : REHABILITASI KANTOR CABANG
INSTANSI PERUM BULOG CABANG TIMIKA
LOKASI : JL.YOS SUDARSO SP1 TIMIKA,KAB.MIMIKA
TAHUN :
HARGA SATUAN
NO URAIAN JENIS PEKERJAAN SAT VOLUME JUMLAH
(Rp)
a b c d
TERBILANG : Tiga Milyar Tujuh Ratus Tiga Puluh Dua Juta Seratus Dua Puluh Empat Ribu Rupiah
RIYADI MUSLIM
--------------------------------
Page 139
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN :
PEKERJAAN : REHABILITASI RUMAH JABATAN KEPALA CABANG
INSTANSI PERUM BULOG CABANG TIMIKA
LOKASI : JL.YOS SUDARSO SP1 TIMIKA,KAB.MIMIKA
TAHUN :
HARGA SATUAN
NO URAIAN JENIS PEKERJAAN SAT VOLUME JUMLAH
(Rp)
a b c d
TERBILANG : Satu Milyar Dua Puluh Enam Juta Tiga Ratus Enam Puluh Tujuh Ribu Rupiah
RIYADI MUSLIM
--------------------------------
Page 144
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN :
PEKERJAAN : REHABILITASI RUMAH ASISTEN MANAGER (5 Unit)
INSTANSI PERUM BULOG CABANG TIMIKA
LOKASI : JL.YOS SUDARSO SP1 TIMIKA,KAB.MIMIKA
TAHUN : 2024
a b c d
TERBILANG :
Satu Milyar Delapan Ratus Enam Puluh Dua Juta Sembilan Ratus Sembilan Belas Ribu Dua
Ratus Rupiah
a b c d
TERBILANG : Satu Milyar Seratus Lima Puluh Tujuh Juta Delapan Ratus Tiga Puluh Tujuh Ribu Rupiah
RIYADI MUSLIM
--------------------------------
Page 154
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN :
PEKERJAAN : REHAB TOILET UMUM
INSTANSI PERUM BULOG CABANG TIMIKA
LOKASI : JL.YOS SUDARSO SP1 TIMIKA,KAB.MIMIKA
TAHUN : 2024
HARGA SATUAN
NO URAIAN JENIS PEKERJAAN SAT VOLUME JUMLAH
(Rp)
a b c d
TERBILANG : Enam Ratus Dua Puluh Sembilan Juta Sembilan Ratus Sembilan Puluh Lima Ribu Rupiah
RIYADI MUSLIM
--------------------------------
Page 158
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN :
PEKERJAAN : PEMBANGUNAN POS SECURITY
INSTANSI PERUM BULOG CABANG TIMIKA
LOKASI : JL.YOS SUDARSO SP1 TIMIKA,KAB.MIMIKA
TAHUN :
HARGA SATUAN
NO URAIAN JENIS PEKERJAAN SAT VOLUME JUMLAH
(Rp)
a b c d
TERBILANG : Dua Ratus Tiga Puluh Sembilan Juta Tiga Ratus Sembilan Puluh Ribu Rupiah
--------------------------------
--------------------------------
Page 161
REKAPITULASI TOTAL
#REF!
### : #REF!
### :
### : #REF!
### : #REF!
### : #REF!
SATUAN
VOLUME HARGA
NO UNIT PEKERJAAN JUMLAH
SATUAN
a b c d e f
Page 162
TERBILANG : Tiga Puluh Lima Milyar Dua Puluh Tujuh Juta Seratus Sembilan Belas Ribu Rupiah
--------------------------------
--------------------------------
Page 163
EKAPITULASI TOTAL
#REF!
JUMLAH KETERANGAN
Rp 14,627,774,000.00
Rp 3,732,124,000.00
Rp 1,026,367,000.00
Rp 2,864,919,000.00
Page 164
Seratus Sembilan Belas Ribu Rupiah
Page 165
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN :
PEKERJAAN : PEKERJAAN MENARA AIR BERSIH 349,975,148.30
INSTANSI PERUM BULOG CABANG TIMIKA
LOKASI : JL.YOS SUDARSO SP1 TIMIKA,KAB.MIMIKA
TAHUN :
HARGA SATUAN
NO URAIAN JENIS PEKERJAAN SAT VOLUME JUMLAH
(Rp)
a b c d
TERBILANG : Empat Ratus Dua Puluh Tujuh Juta Tiga Ratus Dua Puluh Ribu Rupiah
--------------------------------
--------------------------------
Page 168
REKAPITULASI TOTAL
RENCANA ANGGARAN BIAYA (RAB)
KEGIATAN :
PEKERJAAN :
INSTANSI :
LOKASI :
TAHUN :
SATUAN
VOLUME HARGA PPN 11%
NO UNIT PEKERJAAN JUMLAH HARGA TOTAL BIAYA
SATUAN PENGAWASAN/
DESIGN SUPERVISI REAL COST
5% 4% 11%
a b c d e f g h i j k
I PEMBANGUNAN GUDANG TYPE 3200 TON m2 1,440.00 7,813,727.13 Rp 11,251,767,073.50 Rp 562,588,353.68 Rp 450,070,682.94 Rp 12,264,426,110.12 Rp 1,349,086,872.11 13,613,512,982.23
II REHABILITASI GUDANG TYPE 1000 TON m2 450.00 9,069,767.96 Rp 4,081,395,580.09 Rp 204,069,779.00 Rp 163,255,823.20 Rp 4,448,721,182.29 Rp 489,359,330.05 4,938,080,512.35
III PEMBANGUNAN GUDANG PQG/GUDANG ALAT m2 108.00 8,860,820.50 Rp 956,968,613.98 Rp 47,848,430.70 Rp 38,278,744.56 Rp 1,043,095,789.24 Rp 114,740,536.82 1,157,836,326.06
IV REHABILITASI KANTOR GEDUNG KANTOR CABANG m2 300.00 10,282,182.44 Rp 3,084,654,731.68 Rp 154,232,736.58 Rp 123,386,189.27 Rp 3,362,273,657.53 Rp 369,850,102.33 3,732,123,759.86
V REAHABILITASI RUMAH DINAS m2 117.00 7,250,485.71 Rp 848,306,827.95 Rp 42,415,341.40 Rp 33,932,273.12 Rp 924,654,442.47 Rp 101,711,988.67 1,026,366,431.14
VI REHABILITASI RUMAH ASISTEN MANAGER m2 88.00 26,663,299.18 Rp 2,346,370,328.17 Rp 117,318,516.41 Rp 93,854,813.13 Rp 2,557,543,657.71 Rp 281,329,802.35 2,838,873,460.06
VIII INSTALASI AIR BERSIH ls 1.00 280,000,000.00 Rp 280,000,000.00 Rp 14,000,000.00 Rp 11,200,000.00 Rp 305,200,000.00 Rp 33,572,000.00 338,772,000.00
IX PEMBANGUNAN TOILET UMUM m2 55.00 9,381,204.43 Rp 515,966,243.54 Rp 25,798,312.18 Rp 20,638,649.74 Rp 562,403,205.45 Rp 61,864,352.60 624,267,558.05
X INSTALASI LISTRIK PENERANGAN LUAR LS 1.00 750,000,000.00 Rp 750,000,000.00 Rp 37,500,000.00 Rp 30,000,000.00 Rp 817,500,000.00 Rp 89,925,000.00 907,425,000.00
II REHABILITASI JALAN KOMLEX DAN PELATARAN M2 4,071.65 900,000.00 Rp 3,664,485,000.00 Rp 183,224,250.00 Rp 146,579,400.00 Rp 3,994,288,650.00 Rp 439,371,751.50 4,433,660,401.50
III REHABILITASI PAGAR SAMPING/BELAKANG M 382.00 4,452,275.94 Rp 1,700,769,408.00 Rp 85,038,470.40 Rp 68,030,776.32 Rp 1,853,838,654.72 Rp 203,922,252.02 2,057,760,906.74
IV REHABILITASI PAGAR DEPAN M 75.00 4,646,000.00 Rp 348,450,000.00 Rp 17,422,500.00 Rp 13,938,000.00 Rp 379,810,500.00 Rp 41,779,155.00 421,589,655.00
X PEMBUATAN PAGAR KANTOR M 105.00 3,154,285.71 Rp 331,200,000.00 Rp 16,560,000.00 Rp 13,248,000.00 Rp 361,008,000.00 Rp 39,710,880.00 400,718,880.00
Page 169
V PEMBUATAN DRAINASE M 532.00 678,697.13 Rp 361,066,875.00 Rp 18,053,343.75 Rp 14,442,675.00 Rp 393,562,893.75 Rp 43,291,918.31 436,854,812.06
VI REHABILITASI TIANG BENDERA UTAMA LS 1.00 13,200,000.00 Rp 13,200,000.00 Rp 660,000.00 Rp 528,000.00 Rp 14,388,000.00 Rp 1,582,680.00 15,970,680.00
VII PEMBUATAN POS SECURITY KOMPLEX (UTAMA) LS 16.00 13,479,153.76 Rp 215,666,460.18 Rp 10,783,323.01 Rp 8,626,658.41 Rp 235,076,441.60 Rp 25,858,408.58 260,934,850.17
VIII PEMBUATAN POS SECURITY KANTOR LS 4.00 6,102,000.00 Rp 24,408,000.00 Rp 1,220,400.00 Rp 976,320.00 Rp 26,604,720.00 Rp 2,926,519.20 29,531,239.20
IX PEMBUATAN TIANG BENDERA KANTOR LS 1.00 9,375,000.00 Rp 9,375,000.00 Rp 468,750.00 Rp 375,000.00 Rp 10,218,750.00 Rp 1,124,062.50 11,342,812.50
(a). GRAND TOTAL, ……………………........................... Rp 31,653,297,017.09 Rp 1,582,664,850.85 Rp 1,266,131,880.68 Rp 34,502,093,748.63 Rp 3,795,230,312.35 Rp 40,361,244,074.97
(f). DIBULATKAN, ...................................................................
Rp40,361,245,000.00
TERBILANG : Empat Puluh Milyar Tiga Ratus Enam Puluh Satu Juta Dua Ratus Empat Puluh Lima Ribu Rupiah
Page 170
Tabel Profil Baja
Ukuran Profil Baja Section Moment Inertia Jari jari Inertia Moment Lawa
Perimeter Berat Panjang
H B t1 t2 r Area Ix Iy ix iy Wx
mm mm mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
WF 100 x 50 x 5x 7 7.5 WF 100x50x5x7 11.78 37.71 9.25 12.00 178.15 14.67 3.90 1.12 35.63
WF 125 x 60 x 6x 8 8.8 WF 125x60x6x8 16.80 46.30 13.19 12.00 393.80 29.00 4.74 1.29 63.01
WF 148 x 100 x 6x 9 9.4 WF 148x100x6x9 26.55 66.79 20.85 12.00 980.51 150.23 5.33 2.09 132.50
WF 150 x 75 x 5x 7 7.5 WF 150x75x5x7 17.78 57.71 13.96 12.00 642.03 49.36 4.96 1.37 85.60
WF 175 x 90 x 5x 8 8.1 WF 175x90x5x8 22.92 68.61 17.99 12.00 1,172.26 97.37 5.66 1.63 133.97
WF 198 x 99 x 4.5 x 7 7.2 WF 198x99x4,5x7 22.58 77.07 17.73 12.00 1,498.24 113.34 5.75 1.58 151.34
WF 200 x 100 x 3.2 x 4.5 4.8 WF 200x100x3,2x4,5 15.31 78.53 12.02 12.00 1,045.92 75.05 4.76 1.28 104.59
WF 200 x 100 x 5.5 x 8 8.4 WF 200x100x5,5x8 26.73 77.45 20.98 12.00 1,760.93 133.59 6.16 1.70 176.09
WF 248 x 124 x 5x 8 8.1 WF 248x124x5x8 32.01 96.81 25.13 12.00 3,378.32 254.46 6.89 1.89 272.44
WF 250 x 125 x 6x 9 9.4 WF 250x125x6x9 37.17 97.19 29.18 12.00 3,892.93 293.39 7.33 2.01 311.43
WF 299 x 149 x 6x 8 8.8 WF 299x149x6x8 41.48 116.70 32.56 12.00 6,181.52 441.57 7.75 2.07 413.48
WF 300 x 150 x 6.5 x 9 9.7 WF 300x150x6,5x9 46.14 117.04 36.22 12.00 6,932.52 506.90 8.16 2.21 462.17
WF 346 x 174 x 6x 9 9.4 WF 346x174x6x9 51.75 135.99 40.63 12.00 10,658.94 790.79 8.76 2.38 616.12
WF 350 x 175 x 7x 11 11 WF 350x175x7x11 62.55 136.67 49.10 12.00 13,123.47 983.49 9.63 2.64 749.91
WF 400 x 200 x 8x 13 13 WF 400x200x8x13 83.40 156.15 65.47 12.00 22,964.87 1,734.93 11.14 3.06 1,148.24
WF 446 x 199 x 8x 12 13 WF 446x199x8x12 82.86 165.05 65.05 12.00 27,505.53 1,577.92 11.58 2.77 1,233.43
WF 450 x 200 x 9x 14 14 WF 450x200x9x14 95.75 165.73 75.17 12.00 32,258.95 1,869.23 12.45 3.00 1,433.73
WF 500 x 200 x 10 x 16 16 WF 500x200x10x16 113.07 175.21 88.76 12.00 46,036.55 2,137.23 14.10 3.04 1,841.46
WF 588 x 300 x 10 x 16 16 WF 588x300x10x16 153.87 232.81 120.79 12.00 92,867.94 7,204.63 15.10 4.21 3,158.77
WF 600 x 200 x 11 x 17 18 WF 600x200x11x17 132.89 194.80 104.32 12.00 74,418.64 2,272.94 16.37 2.86 2,480.62
WF 700 x 300 x 13 x 24 23 WF 700x300x13x24 233.35 253.43 183.18 12.00 194,606.99 10,811.94 20.01 4.72 5,560.20
WF 800 x 300 x 14 x 26 25 WF 800x300x14x26 266.09 272.91 208.88 12.00 282,553.57 11,717.10 22.55 4.59 7,063.84
Ukuran Profil Baja Section Moment Inertia Jari jari Inertia Moment Lawa
Perimeter Berat Panjang
H B t1 t2 r Area Ix Iy ix iy Wx
mm mm mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
H 100 x 100 x 6x 8 8 H 100x100x6x8 21.59 57.43 16.95 12.00 369.05 133.48 3.98 2.39 73.81
H 125 x 125 x 5x 7 7 H 125x125x5x7 23.47 72.80 18.42 12.00 666.87 227.98 4.29 2.51 106.70
H 125 x 125 x 6.5 x 9 9 H 125x125x6,5x9 30.15 72.15 23.67 12.00 824.78 293.21 4.76 2.84 131.96
H 150 x 150 x 7x 10 10 H 150x150x7x10 39.96 86.88 31.37 12.00 1,600.66 562.87 5.53 3.28 213.42
H 175 x 175 x 7x 11 11 H 175x175x7x11 50.25 101.71 39.45 12.00 2,801.55 982.99 6.27 3.72 320.18
H 200 x 200 x 8x 12 12 H 200x200x8x12 63.32 116.34 49.70 12.00 4,610.49 1,600.75 7.04 4.15 461.05
H 250 x 250 x 9x 14 14 H 250x250x9x14 91.66 145.80 71.96 12.00 10,578.81 3,647.18 8.54 5.01 846.30
H 300 x 300 x 10 x 15 15 H 300x300x10x15 118.93 175.42 93.36 12.00 19,932.75 6,752.25 9.77 5.69 1,328.85
H 350 x 350 x 12 x 19 19 H 350x350x12x19 173.54 204.34 136.23 12.00 39,506.18 13,581.58 11.79 6.91 2,257.50
H 400 x 400 x 13 x 21 21 H 400x400x13x21 218.33 233.79 171.39 12.00 65,361.59 22,406.55 13.27 7.77 3,268.08
Ukuran Profil Baja Section Moment Inertia Jari jari Inertia Moment Lawa
Perimeter Berat Panjang
H B t1 t2 r Area Ix Iy ix iy Wx
mm mm mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
UNP 50 x 38 x 5x 7.5 7.5 UNP 50x38x5 6.81 22.91 5.34 6.00 27.79 6.90 2.48 1.24 11.12
UNP 65 x 42 x 5x 7.5 7.5 UNP 65x42x5 8.16 27.51 6.40 6.00 57.58 9.31 2.99 1.20 17.72
UNP 75 x 40 x 5x 7.5 7.5 UNP 75x40x5 8.36 28.71 6.56 6.00 77.63 8.06 3.32 1.07 20.70
UNP 80 x 45 x 5x 7.5 7.5 UNP 80x45x5 9.36 31.71 7.35 6.00 100.46 11.46 3.45 1.16 25.11
UNP 100 x 50 x 5x 7.5 7.5 UNP 100x50x5 11.11 37.71 8.72 6.00 186.37 15.71 3.99 1.16 37.27
UNP 120 x 55 x 7x 10.5 11 UNP 120x55x7 17.22 42.80 13.52 6.00 403.88 29.40 5.10 1.38 67.31
UNP 125 x 65 x 6x 9 9 UNP 125x65x6 17.20 48.25 13.50 6.00 455.63 41.39 4.90 1.48 72.90
UNP 150 x 75 x 6.5 x 9.75 9.8 UNP 150x75x6,5 22.02 57.03 17.29 12.00 840.73 68.85 5.66 1.62 112.10
UNP 180 x 75 x 7x 10.5 11 UNP 180x75x7 25.62 62.80 20.11 12.00 1,367.18 74.28 6.59 1.54 151.91
UNP 200 x 80 x 7.5 x 11.3 11 UNP 200x80x7,5 29.87 68.57 23.45 12.00 1,954.62 96.62 7.24 1.61 195.46
UNP 250 x 90 x 9x 13.5 14 UNP 250x90x9 42.29 81.88 33.20 12.00 4,233.29 165.38 8.98 1.78 338.66
UNP 300 x 90 x 9x 13.5 14 UNP 300x90x9 46.79 91.88 36.73 12.00 6,516.17 165.68 10.18 1.62 434.41
UNP 300 x 100 x 10 x 16 16 UNP 300x100x10 55.88 95.25 43.86 12.00 8,063.38 268.90 10.73 1.96 537.56
Ukuran Profil Baja Section Moment Inertia Jari jari Inertia Moment Lawa
Perimeter Berat Panjang
H B t r1 r2 Area Ix Iy ix iy Wx
mm mm mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
L 20 x 20 x 3 3 1.5 L 20x20x3 1.13 11.14 0.89 6.00 0.94 0.40 1.00 0.65 0.94
L 25 x 25 x 3 3 1.5 L 25x25x3 1.43 14.14 1.12 6.00 2.00 0.79 1.16 0.73 1.60
L 25 x 25 x 5 5 2.5 L 25x25x5 2.30 13.57 1.81 6.00 2.69 1.32 1.34 0.94 2.15
L 30 x 30 x 3 3 1.5 L 30x30x3 1.73 17.14 1.36 6.00 3.64 1.36 1.31 0.80 2.43
L 40 x 40 x 3 3 1.5 L 40x40x3 2.33 23.14 1.83 6.00 9.21 3.21 1.57 0.93 4.61
L 40 x 40 x 4 4 2 L 40x40x4 3.07 22.86 2.41 6.00 11.50 4.28 1.75 1.07 5.75
L 40 x 40 x 5 5 2.5 L 40x40x5 3.80 22.57 2.99 6.00 13.46 5.36 1.89 1.19 6.73
L 45 x 45 x 4 4 2 L 45x45x4 3.47 25.86 2.73 6.00 16.87 6.09 1.89 1.13 7.50
L 45 x 45 x 5 5 2.5 L 45x45x5 4.30 25.57 3.38 6.00 19.88 7.63 2.04 1.26 8.84
L 50 x 50 x 4 4 2 L 50x50x4 3.87 28.86 3.04 6.00 23.68 8.36 2.01 1.20 9.47
L 50 x 50 x 5 5 2.5 L 50x50x5 4.80 28.57 3.77 6.00 28.08 10.46 2.19 1.33 11.23
L 50 x 50 x 6 6 3 L 50x50x6 5.72 28.28 4.49 6.00 31.96 12.57 2.33 1.46 12.79
L 60 x 60 x 5 5 2.5 L 60x60x5 5.80 34.57 4.56 6.00 50.71 18.05 2.45 1.46 16.90
L 60 x 60 x 6 6 3 L 60x60x6 6.92 34.28 5.43 6.00 58.23 21.69 2.62 1.60 19.41
L 65 x 65 x 6 6 3 L 65x65x6 7.52 37.28 5.90 6.00 75.56 27.56 2.76 1.67 23.25
L 70 x 70 x 6 6 3 L 70x70x6 8.12 40.28 6.37 6.00 96.02 34.40 2.89 1.73 27.44
L 70 x 70 x 7 7 3.5 L 70x70x7 9.42 40.00 7.39 6.00 107.88 40.18 3.06 1.87 30.82
L 75 x 75 x 6 6 3 L 75x75x6 8.72 43.28 6.84 6.00 119.89 42.30 3.02 1.79 31.97
L 75 x 75 x 7 7 3.5 L 75x75x7 10.12 43.00 7.94 6.00 135.05 49.39 3.20 1.93 36.01
L 75 x 75 x 8 8 4 L 75x75x8 11.50 42.71 9.03 6.00 149.00 56.50 3.35 2.07 39.73
L 80 x 80 x 6 6 3 L 80x80x6 9.32 46.28 7.31 6.00 147.43 51.32 3.14 1.85 36.86
L 80 x 80 x 8 8 4 L 80x80x8 12.30 45.71 9.65 6.00 184.05 68.54 3.50 2.13 46.01
L 90 x 90 x 8 8 4 L 90x90x8 13.90 51.71 10.91 6.00 269.85 97.52 3.77 2.27 59.97
L 90 x 90 x 9 9 4.5 L 90x90x9 15.56 51.43 12.22 6.00 294.81 109.79 3.94 2.40 65.51
L 90 x 90 x 10 10 5 L 90x90x10 17.21 51.14 13.51 6.00 318.08 122.08 4.08 2.53 70.69
L 100 x 100 x 8 8 4 L 100x100x8 15.50 57.71 12.17 6.00 378.93 133.69 4.02 2.39 75.79
L 100 x 100 x 10 10 5 L 100x100x10 19.21 57.14 15.08 6.00 449.33 167.33 4.37 2.67 89.87
L 120 x 120 x 11 11 5.5 L 120x120x11 25.45 68.86 19.98 12.00 873.08 317.89 5.08 3.07 145.51
L 120 x 120 x 12 12 6 L 120x120x12 27.67 68.57 21.72 12.00
L 125 x 125 x 12 12 6 L 125x125x12 28.87 71.57 22.66 12.00
L 130 x 130 x 9 9 4.5 L 130x130x9 22.76 75.43 17.87 12.00
L 130 x 130 x 12 12 6 L 130x130x12 30.07 74.57 23.60 12.00
L 150 x 150 x 12 12 6 L 150x150x12 34.87 86.57 27.37 12.00
L 150 x 150 x 15 15 7.5 L 150x150x15 43.23 85.71 33.94 12.00
L 200 x 200 x 15 15 7.5 L 200x200x15 58.23 115.71 45.71 12.00
L 200 x 200 x 20 20 10 L 200x200x20 76.86 114.28 60.33 12.00
L 200 x 200 x 25 25 13 L 200x200x25 95.09 112.85 74.65 12.00
L 250 x 250 x 25 25 13 L 250x250x25 120.09 142.85 94.27 12.00
Ukuran Profil Baja Section Moment Inertia Jari jari Inertia Moment Lawa
Perimeter Berat Panjang
H B h1 t r Area Ix Iy ix iy Wx
mm mm mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
C 60 x 30 x 10 x 1.6 4 C 60x30x10x1,6 2.08 25.99 1.63 6.00 23.46 1.19 2.35 0.53 7.82
C 75 x 35 x 15 x 1.6 4 C 75x35x15x1,6 2.64 32.99 2.07 6.00 61.36 3.16 3.13 0.71 16.36
C 74 x 45 x 15 x 1.6 4 C 74x45x15x1,6 2.94 36.79 2.31 6.00
C 74 x 45 x 15 x 2.3 4 C 74x45x15x2,3 4.20 36.51 3.30 6.00
C 100 x 50 x 20 x 1.6 4 C 100x50x20x1,6 3.68 45.99 2.89 6.00
C 100 x 50 x 20 x 2.3 4 C 100x50x20x2,3 5.26 45.71 4.13 6.00
C 100 x 50 x 20 x 3.2 4 C 100x50x20x3,2 7.26 45.35 5.70 6.00
C 125 x 50 x 20 x 2.3 6 C 125x50x20x2,3 5.75 50.02 4.52 6.00
C 125 x 50 x 20 x 3.2 6 C 125x50x20x3,2 7.95 49.66 6.24 6.00
C 150 x 50 x 20 x 2.3 6 C 150x50x20x2,3 6.33 55.02 4.97 6.00
C 150 x 50 x 20 x 3.2 6 C 150x50x20x3,2 8.75 54.66 6.87 6.00
C 150 x 65 x 20 x 2.3 6 C 150x65x20x2,3 7.02 61.02 5.51 6.00
C 150 x 65 x 20 x 3.2 6 C 150x65x20x3,2 9.71 60.66 7.62 6.00
C 200 x 75 x 20 x 3.2 7 C 200x75x20x3,2 11.89 74.32 9.33 6.00
Carbon Steel Pipe - SCH 40 Section Outer Moment Inertia Jari jari Inertia Moment Lawa
Berat Panjang
Size OD ID t Area Perimeter Ix Iy ix iy Wx
Inchi mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
SCH 40 1/2 21.7 16.1 2.8 PIPA SCH 40-0,5" 1.66 6.82 1.31 6.00 0.76 0.76 0.68 0.68 0.70
SCH 40 3/4 27.2 21.4 2.9 PIPA SCH 40-0,75" 2.21 8.55 1.74 6.00 1.66 1.66 0.87 0.87 1.22
SCH 40 1 34 27.2 3.4 PIPA SCH 40-1" 3.27 10.68 2.57 6.00 3.87 3.87 1.09 1.09 2.28
SCH 40 1 1/4 42.7 35.5 3.6 PIPA SCH 40-1,25" 4.42 13.41 3.47 6.00 8.52 8.52 1.39 1.39 3.99
SCH 40 1 1/2 48.6 41.2 3.7 PIPA SCH 40-1,5" 5.22 15.27 4.10 6.00 13.24 13.24 1.59 1.59 5.45
SCH 40 2 60.5 52.7 3.9 PIPA SCH 40-2" 6.93 19.01 5.44 6.00 27.90 27.90 2.01 2.01 9.22
SCH 40 2 1/2 76.3 65.9 5.2 PIPA SCH 40-2,5" 11.62 23.97 9.12 6.00 73.79 73.79 2.52 2.52 19.34
SCH 40 3 89.1 78.1 5.5 PIPA SCH 40-3" 14.45 27.99 11.34 6.00 126.74 126.74 2.96 2.96 28.45
SCH 40 4 114.3 102.3 6 PIPA SCH 40-4" 20.41 35.91 16.03 6.00 300.21 300.21 3.83 3.83 52.53
SCH 40 5 139.8 126.6 6.6 PIPA SCH 40-5" 27.62 43.92 21.68 6.00 614.02 614.02 4.72 4.72 87.84
SCH 40 6 165.2 151 7.1 PIPA SCH 40-6" 35.26 51.90 27.68 6.00 1,104.05 1,104.05 5.60 5.60 133.66
SCH 40 8 216.3 199.9 8.2 PIPA SCH 40-8" 53.61 67.95 42.08 6.00 2,906.46 2,906.46 7.36 7.36 268.74
SCH 40 10 267.4 248.8 9.3 PIPA SCH 40-10" 75.41 84.01 59.20 12.00 6,287.39 6,287.39 9.13 9.13 470.26
SCH 40 12 318.5 297.9 10.3 PIPA SCH 40-12" 99.73 100.06 78.29 12.00 11,854.41 11,854.41 10.90 10.90 744.39
SCH 40 14 355.6 333.4 11.1 PIPA SCH 40-14" 120.13 111.72 94.30 12.00 17,840.26 17,840.26 12.19 12.19 1,003.39
SCH 40 16 406.4 381 12.7 PIPA SCH 40-16" 157.08 127.67 123.31 12.00 30,465.73 30,465.73 13.93 13.93 1,499.30
Carbon Steel Pipe - SCH 80 Section Outer Moment Inertia Jari jari Inertia Moment Lawa
Berat Panjang
Size OD ID t Area Perimeter Ix Iy ix iy Wx
Inchi mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
SCH 80 1/2 21.7 14.3 3.7 PIPA SCH 80-0,5" 2.09 6.82 1.64 6.00 0.88 0.88 0.65 0.65 0.81
SCH 80 3/4 37.2 19.4 8.9 PIPA SCH 80-0,75" 7.91 11.69 6.21 6.00 8.70 8.70 1.05 1.05 4.68
SCH 80 1 34 25 4.5 PIPA SCH 80-1" 4.17 10.68 3.27 6.00 4.64 4.64 1.06 1.06 2.73
SCH 80 1 1/4 42.7 32.9 4.9 PIPA SCH 80-1,25" 5.82 13.41 4.57 6.00 10.57 10.57 1.35 1.35 4.95
SCH 80 1 1/2 48.6 38.4 5.1 PIPA SCH 80-1,5" 6.97 15.27 5.47 6.00 16.71 16.71 1.55 1.55 6.88
SCH 80 2 60.5 49.5 5.5 PIPA SCH 80-2" 9.50 19.01 7.46 6.00 36.29 36.29 1.95 1.95 12.00
SCH 80 2 1/2 76.3 62.3 7 PIPA SCH 80-2,5" 15.24 23.97 11.96 6.00 92.42 92.42 2.46 2.46 24.23
SCH 80 3 89.1 73.9 7.6 PIPA SCH 80-3" 19.46 27.99 15.28 6.00 162.97 162.97 2.89 2.89 36.58
SCH 80 4 114.3 97.1 8.6 PIPA SCH 80-4" 28.56 35.91 22.42 6.00 401.47 401.47 3.75 3.75 70.25
SCH 80 5 139.8 120.8 9.5 PIPA SCH 80-5" 38.89 43.92 30.53 6.00 829.70 829.70 4.62 4.62 118.70
SCH 80 6 165.2 143.2 11 PIPA SCH 80-6" 53.29 51.90 41.83 6.00 1,591.88 1,591.88 5.47 5.47 192.72
SCH 80 8 216.3 190.9 12.7 PIPA SCH 80-8" 81.23 67.95 63.77 6.00 4,225.55 4,225.55 7.21 7.21 390.71
SCH 80 10 267.4 237.2 15.1 PIPA SCH 80-10" 119.69 84.01 93.95 12.00 9,557.44 9,557.44 8.94 8.94 714.84
SCH 80 12 318.5 283.7 17.4 PIPA SCH 80-12" 164.59 100.06 129.21 12.00 18,714.98 18,714.98 10.66 10.66 1,175.19
SCH 80 14 355.6 317.6 19 PIPA SCH 80-14" 200.92 111.72 157.72 12.00 28,545.48 28,545.48 11.92 11.92 1,605.48
SCH 80 16 406.4 363.6 21.4 PIPA SCH 80-16" 258.84 127.67 203.19 12.00 48,105.59 48,105.59 13.63 13.63 2,367.40
SEAMLESS BOILER TUBE Section Outer Moment Inertia Jari jari Inertia Moment Lawa
Berat Panjang
Size OD ID t Area Perimeter Ix Iy ix iy Wx
Inchi mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
SBT 1/4 13.5 9.9 1.8 PIPA SBT-0,25" 0.66 4.24 0.52 6.00 0.12 0.12 0.42 0.42 0.17
SBT 3/8 17.2 13.6 1.8 PIPA SBT-0,375" 0.87 5.40 0.68 6.00 0.26 0.26 0.55 0.55 0.30
SBT 1/2 21.3 17.3 2 PIPA SBT-0,5" 1.21 6.69 0.95 6.00 0.57 0.57 0.69 0.69 0.54
SBT 3/4 26.9 22.3 2.3 PIPA SBT-0,75" 1.78 8.45 1.40 6.00 1.36 1.36 0.87 0.87 1.01
SBT 1 36.6 30.8 2.9 PIPA SBT-1" 3.07 11.50 2.41 6.00 4.39 4.39 1.20 1.20 2.40
SBT 1 31.8 26 2.9 PIPA SBT-1" 2.63 9.99 2.07 6.00 2.78 2.78 1.03 1.03 1.75
SBT 1 1/4 42.4 37.2 2.6 PIPA SBT-1,25" 3.25 13.32 2.55 6.00 6.46 6.46 1.41 1.41 3.05
SBT 1 1/4 44.5 39.3 2.6 PIPA SBT-1,25" 3.42 13.98 2.69 6.00 7.54 7.54 1.48 1.48 3.39
SBT 1 1/4 38 32.8 2.6 PIPA SBT-1,25" 2.89 11.94 2.27 6.00 4.55 4.55 1.25 1.25 2.40
SBT 1 1/2 48.3 42.5 2.9 PIPA SBT-1,5" 4.14 15.17 3.25 6.00 10.70 10.70 1.61 1.61 4.43
SBT 2 60.3 54.5 2.9 PIPA SBT-2" 5.23 18.94 4.11 6.00 21.59 21.59 2.03 2.03 7.16
SBT 2 57 51.2 2.9 PIPA SBT-2" 4.93 17.91 3.87 6.00 18.08 18.08 1.92 1.92 6.35
SBT 2 1/2 76.1 70.3 2.9 PIPA SBT-2,5" 6.67 23.91 5.24 6.00 44.74 44.74 2.59 2.59 11.76
SBT 3 88.9 82.5 3.2 PIPA SBT-3" 8.62 27.93 6.76 6.00 79.21 79.21 3.03 3.03 17.82
SBT 4 114.3 106.3 4 PIPA SBT-4" 13.86 35.91 10.88 6.00 211.07 211.07 3.90 3.90 36.93
SBT 5 139.7 131.7 4 PIPA SBT-5" 17.05 43.89 13.39 6.00 392.86 392.86 4.80 4.80 56.24
SBT 6 168.3 159.3 4.5 PIPA SBT-6" 23.16 52.87 18.18 6.00 777.22 777.22 5.79 5.79 92.36
PIPA HITAM STK 41 Section Outer Moment Inertia Jari jari Inertia Moment Lawa
Berat Panjang
Size OD ID t Area Perimeter Ix Iy ix iy Wx
Inchi mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
STK 41 2 1/2 76.3 70.7 2.8 PIPA STK 41-2,5" 6.47 23.97 5.08 6.00 43.72 43.72 2.60 2.60 11.46
STK 41 2 1/2 76.3 69.9 3.2 PIPA STK 41-2,5" 7.35 23.97 5.77 6.00 49.18 49.18 2.59 2.59 12.89
STK 41 3 89.1 82.7 3.2 PIPA STK 41-3" 8.64 27.99 6.78 6.00 79.76 79.76 3.04 3.04 17.90
STK 41 4 114.3 107.3 3.5 PIPA STK 41-4" 12.18 35.91 9.56 6.00 187.15 187.15 3.92 3.92 32.75
STK 41 4 114.3 105.3 4.5 PIPA STK 41-4" 15.52 35.91 12.19 6.00 234.32 234.32 3.89 3.89 41.00
STK 41 5 139.8 130.8 4.5 PIPA STK 41-5" 19.13 43.92 15.02 6.00 438.17 438.17 4.79 4.79 62.69
STK 41 5 139.8 127.8 6 PIPA STK 41-5" 25.22 43.92 19.80 6.00 565.53 565.53 4.74 4.74 80.90
STK 41 6 165.2 156.2 4.5 PIPA STK 41-6" 22.72 51.90 17.83 6.00 733.94 733.94 5.68 5.68 88.85
STK 41 6 165.2 155.2 5 PIPA STK 41-6" 25.16 51.90 19.75 6.00 808.05 808.05 5.67 5.67 97.83
STK 41 6 165.2 153.2 6 PIPA STK 41-6" 30.01 51.90 23.56 6.00 952.04 952.04 5.63 5.63 115.26
STK 41 7 190.7 180.1 5.3 PIPA STK 41-7" 30.87 59.91 24.23 6.00 1,327.45 1,327.45 6.56 6.56 139.22
STK 41 8 216.3 204.7 5.8 PIPA STK 41-8" 38.36 67.95 30.11 6.00 2,126.05 2,126.05 7.45 7.45 196.58
STK 41 8 216.3 199.9 8.2 PIPA STK 41-8" 53.61 67.95 42.08 6.00 2,906.46 2,906.46 7.36 7.36 268.74
STK 41 10 267.4 254.2 6.6 PIPA STK 41-10" 54.08 84.01 42.45 12.00 4,600.50 4,600.50 9.22 9.22 344.09
STK 41 12 318.5 304.7 6.9 PIPA STK 41-12" 67.55 100.06 53.02 12.00 8,201.90 8,201.90 11.02 11.02 515.03
STK 41 14 355.6 339.8 7.9 PIPA STK 41-14" 86.29 111.72 67.74 12.00 13,047.44 13,047.44 12.30 12.30 733.83
PIPA HITAM BLACK STEEL MEDIUM Section Outer Moment Inertia Jari jari Inertia Moment Lawa
Berat Panjang
Size OD ID t Area Perimeter Ix Iy ix iy Wx
Inchi mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
BS. MED. 1/2 21.4 16.2 2.6 PIPA BS. MED.-0,5" 1.54 6.72 1.21 6.00 0.69 0.69 0.67 0.67 0.65
BS. MED. 3/4 27 21.8 2.6 PIPA BS. MED.-0,75" 1.99 8.48 1.56 6.00 1.50 1.50 0.87 0.87 1.11
BS. MED. 1 33.7 27.3 3.2 PIPA BS. MED.-1" 3.07 10.59 2.41 6.00 3.60 3.60 1.08 1.08 2.14
BS. MED. 1 1/4 42.4 36 3.2 PIPA BS. MED.-1,25" 3.94 13.32 3.09 6.00 7.62 7.62 1.39 1.39 3.59
BS. MED. 1 1/2 48.3 41.9 3.2 PIPA BS. MED.-1,5" 4.53 15.17 3.56 6.00 11.59 11.59 1.60 1.60 4.80
BS. MED. 2 60.2 53 3.6 PIPA BS. MED.-2" 6.40 18.91 5.03 6.00 25.74 25.74 2.01 2.01 8.55
BS. MED. 2 1/2 76 68.8 3.6 PIPA BS. MED.-2,5" 8.19 23.88 6.43 6.00 53.78 53.78 2.56 2.56 14.15
BS. MED. 3 88.7 80.7 4 PIPA BS. MED.-3" 10.64 27.87 8.36 6.00 95.66 95.66 3.00 3.00 21.57
BS. MED. 4 113.9 104.9 4.5 PIPA BS. MED.-4" 15.47 35.78 12.14 6.00 231.77 231.77 3.87 3.87 40.70
BS. MED. 5 140.6 131 4.8 PIPA BS. MED.-5" 20.48 44.17 16.08 6.00 472.65 472.65 4.80 4.80 67.23
BS. MED. 6 166.1 156.5 4.8 PIPA BS. MED.-6" 24.32 52.18 19.09 6.00 791.75 791.75 5.71 5.71 95.33
PIPA HITAM BLACK STEEL LIGHT Section Outer Moment Inertia Jari jari Inertia Moment Lawa
Berat Panjang
Size OD ID t Area Perimeter Ix Iy ix iy Wx
Inchi mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
BS. Light 1/2 21.4 15.4 3 PIPA BS. Light-0,5" 1.73 6.72 1.36 6.00 0.75 0.75 0.66 0.66 0.70
BS. Light 3/4 27 22.4 2.3 PIPA BS. Light-0,75" 1.78 8.48 1.40 6.00 1.37 1.37 0.88 0.88 1.02
BS. Light 1 33.7 28.5 2.6 PIPA BS. Light-1" 2.54 10.59 1.99 6.00 3.09 3.09 1.10 1.10 1.84
BS. Light 1 1/4 42.4 37.2 2.6 PIPA BS. Light-1,25" 3.25 13.32 2.55 6.00 6.46 6.46 1.41 1.41 3.05
BS. Light 1 1/2 48.3 42.5 2.9 PIPA BS. Light-1,5" 4.14 15.17 3.25 6.00 10.70 10.70 1.61 1.61 4.43
BS. Light 2 60.2 54.4 2.9 PIPA BS. Light-2" 5.22 18.91 4.10 6.00 21.48 21.48 2.03 2.03 7.14
BS. Light 2 1/2 76 69.6 3.2 PIPA BS. Light-2,5" 7.32 23.88 5.75 6.00 48.58 48.58 2.58 2.58 12.78
BS. Light 3 88.7 82.3 3.2 PIPA BS. Light-3" 8.60 27.87 6.75 6.00 78.65 78.65 3.02 3.02 17.73
BS. Light 4 113.9 106.7 3.6 PIPA BS. Light-4" 12.47 35.78 9.79 6.00 189.91 189.91 3.90 3.90 33.35
PIPA BAJA LAPIS SENG LIGHT Section Outer Moment Inertia Jari jari Inertia Moment Lawa
Berat Panjang
Size OD ID t Area Perimeter Ix Iy ix iy Wx
Inchi mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
GSP. Light 3/8 17.1 13.5 1.8 PIPA GSP. Light-0,375" 0.87 5.37 0.68 6.00 0.26 0.26 0.54 0.54 0.30
GSP. Light 1/2 21.4 17.4 2 PIPA GSP. Light-0,5" 1.22 6.72 0.96 6.00 0.58 0.58 0.69 0.69 0.54
GSP. Light 3/4 26.9 22.2 2.35 PIPA GSP. Light-0,75" 1.81 8.45 1.42 6.00 1.38 1.38 0.87 0.87 1.02
GSP. Light 1 33.8 28.5 2.65 PIPA GSP. Light-1" 2.59 10.62 2.04 6.00 3.17 3.17 1.11 1.11 1.87
GSP. Light 1 1/4 42.5 37.2 2.65 PIPA GSP. Light-1,25" 3.32 13.35 2.60 6.00 6.61 6.61 1.41 1.41 3.11
GSP. Light 1 1/2 48.4 42.6 2.9 PIPA GSP. Light-1,5" 4.15 15.21 3.25 6.00 10.77 10.77 1.61 1.61 4.45
GSP. Light 2 60.2 54.4 2.9 PIPA GSP. Light-2" 5.22 18.91 4.10 6.00 21.48 21.48 2.03 2.03 7.14
GSP. Light 2 1/2 76 69.5 3.25 PIPA GSP. Light-2,5" 7.43 23.88 5.83 6.00 49.24 49.24 2.57 2.57 12.96
GSP. Light 3 88.7 82.2 3.25 PIPA GSP. Light-3" 8.72 27.87 6.85 6.00 79.75 79.75 3.02 3.02 17.98
GSP. Light 4 113.9 106.6 3.65 PIPA GSP. Light-4" 12.64 35.78 9.92 6.00 192.29 192.29 3.90 3.90 33.77
PIPA BAJA LAPIS SENG MEDIUM Section Outer Moment Inertia Jari jari Inertia Moment Lawa
Berat Panjang
Size OD ID t Area Perimeter Ix Iy ix iy Wx
Inchi mm mm mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
GSP. MED. 3/8 17.4 12.7 2.35 PIPA GSP. MED.-0,375 1.11 5.47 0.87 6.00 0.32 0.32 0.54 0.54 0.37
GSP. MED. 1/2 21.7 16.4 2.65 PIPA GSP. MED.-0,5" 1.59 6.82 1.24 6.00 0.73 0.73 0.68 0.68 0.68
GSP. MED. 3/4 27.2 21.9 2.65 PIPA GSP. MED.-0,75" 2.04 8.55 1.60 6.00 1.56 1.56 0.87 0.87 1.15
GSP. MED. 1 34.2 27.7 3.25 PIPA GSP. MED.-1" 3.16 10.74 2.48 6.00 3.83 3.83 1.10 1.10 2.24
GSP. MED. 1 1/4 42.9 36.4 3.25 PIPA GSP. MED.-1,25" 4.05 13.48 3.18 6.00 8.01 8.01 1.41 1.41 3.73
GSP. MED. 1 1/2 48.8 42.3 3.25 PIPA GSP. MED.-1,5" 4.65 15.33 3.65 6.00 12.12 12.12 1.61 1.61 4.97
GSP. MED. 2 60.8 53.5 3.65 PIPA GSP. MED.-2" 6.55 19.10 5.14 6.00 26.86 26.86 2.02 2.02 8.84
GSP. MED. 2 1/2 76.6 69.3 3.65 PIPA GSP. MED.-2,5" 8.37 24.06 6.57 6.00 55.78 55.78 2.58 2.58 14.57
GSP. MED. 3 89.5 81.4 4.05 PIPA GSP. MED.-3" 10.87 28.12 8.53 6.00 99.45 99.45 3.02 3.02 22.22
GSP. MED. 4 114.9 105.9 4.5 PIPA GSP. MED.-4" 15.61 36.10 12.25 6.00 238.18 238.18 3.91 3.91 41.46
GSP. MED. 5 140.6 130.9 4.85 PIPA GSP. MED.-5" 20.68 44.17 16.24 6.00 477.06 477.06 4.80 4.80 67.86
GSP. MED. 6 166.1 156.4 4.85 PIPA GSP. MED.-6" 24.57 52.18 19.29 6.00 799.27 799.27 5.70 5.70 96.24
GSP. MED. 8 216.3 204.7 5.8 PIPA GSP. MED.-8" 38.36 67.95 30.11 6.00 2,126.05 2,126.05 7.45 7.45 196.58
GSP. MED. 10 267.4 254.2 6.6 PIPA GSP. MED.-10" 54.08 84.01 42.45 12.00 4,600.50 4,600.50 9.22 9.22 344.09
GSP. MED. 12 318.5 304.7 6.9 PIPA GSP. MED.-12" 67.55 100.06 53.02 12.00 8,201.90 8,201.90 11.02 11.02 515.03
Besi beton polos Section Moment Inertia Jari jari Inertia Moment Lawa
Perimeter Berat Panjang
Dia. Area Ix Iy ix iy Wx
mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
P 6 mm x 12 M P6 0.28 1.88 0.22 12.00 0.01 0.01 0.15 0.15 0.02
P 8 mm x 12 M P8 0.50 2.51 0.39 12.00 0.02 0.02 0.20 0.20 0.05
P 9 mm x 12 M P9 0.64 2.83 0.50 12.00 0.03 0.03 0.23 0.23 0.07
P 10 mm x 12 M P 10 0.79 3.14 0.62 12.00 0.05 0.05 0.25 0.25 0.10
P 12 mm x 12 M P 12 1.13 3.77 0.89 12.00 0.10 0.10 0.30 0.30 0.17
P 13 mm x 12 M P 13 1.33 4.08 1.04 12.00 0.14 0.14 0.33 0.33 0.22
P 16 mm x 12 M P 16 2.01 5.03 1.58 12.00 0.32 0.32 0.40 0.40 0.40
P 19 mm x 12 M P 19 2.84 5.97 2.23 12.00 0.64 0.64 0.48 0.48 0.67
P 22 mm x 12 M P 22 3.80 6.91 2.98 12.00 1.15 1.15 0.55 0.55 1.05
P 25 mm x 12 M P 25 4.91 7.85 3.85 12.00 1.92 1.92 0.63 0.63 1.53
P 28 mm x 12 M P 28 6.16 8.80 4.83 12.00 3.02 3.02 0.70 0.70 2.16
P 32 mm x 12 M P 32 8.04 10.05 6.31 12.00 5.15 5.15 0.80 0.80 3.22
P 36 mm x 12 M P 36 10.18 11.31 7.99 12.00 8.24 8.24 0.90 0.90 4.58
Besi beton Deform Section Moment Inertia Jari jari Inertia Moment Lawa
Perimeter Berat Panjang
Dia. Area Ix Iy ix iy Wx
mm Cm2 Cm1 Kg / M M Cm4 Cm Cm3
D 10 mm x 12 M D 10 0.79 3.14 0.62 12.00 0.05 0.05 0.25 0.25 0.10
D 13 mm x 12 M D 13 1.33 4.08 1.04 12.00 0.14 0.14 0.33 0.33 0.22
D 16 mm x 12 M D 16 2.01 5.03 1.58 12.00 0.32 0.32 0.40 0.40 0.40
D 19 mm x 12 M D 19 2.84 5.97 2.23 12.00 0.64 0.64 0.48 0.48 0.67
D 22 mm x 12 M D 22 3.80 6.91 2.98 12.00 1.15 1.15 0.55 0.55 1.05
D 25 mm x 12 M D 25 4.91 7.85 3.85 12.00 1.92 1.92 0.63 0.63 1.53
D 29 mm x 12 M D 29 6.61 9.11 5.19 12.00 3.47 3.47 0.73 0.73 2.39
D 32 mm x 12 M D 32 8.04 10.05 6.31 12.00 5.15 5.15 0.80 0.80 3.22
D 36 mm x 12 M D 36 10.18 11.31 7.99 12.00 8.24 8.24 0.90 0.90 4.58
BESI PLAT STRIP Section Moment Inertia Jari jari Inertia Moment Lawa
Perimeter Berat Panjang
thick width length Area Ix Iy ix iy Wx
mm mm M Cm2 Cm1 Kg / M M Cm4 Cm Cm3
FB 3x 19 x 6 FB 3x19 0.57 44.00 0.45 6.00 0.00 0.01 0.10 0.20 0.01
FB 3x 25 x 6 FB 3x25 0.75 56.00 0.59 6.00 0.00 0.01 0.09 0.18 0.01
FB 3x 30 x 6 FB 3x30 0.90 66.00 0.71 6.00 0.00 0.01 0.08 0.16 0.01
FB 4x 19 x 6 FB 4x19 0.76 46.00 0.60 6.00
FB 4x 25 x 6 FB 4x25 1.00 58.00 0.79 6.00
FB 4x 30 x 6 FB 4x30 1.20 68.00 0.94 6.00
FB 4x 38 x 6 FB 4x38 1.52 84.00 1.19 6.00
FB 5x 19 x 6 FB 5x19 0.95 48.00 0.75 6.00
FB 5x 25 x 6 FB 5x25 1.25 60.00 0.98 6.00
FB 5x 30 x 6 FB 5x30 1.50 70.00 1.18 6.00
FB 5x 38 x 6 FB 5x38 1.90 86.00 1.49 6.00
FB 5x 50 x 6 FB 5x50 2.50 110.00 1.96 6.00
FB 6x 150 x 6 FB 6x150 9.00 312.00 7.07 6.00
FB 8x 38 x 6 FB 8x38 3.04 92.00 2.39 6.00
FB 9x 125 x 6 FB 9x125 11.25 268.00 8.83 6.00
FB 9x 150 x 6 FB 9x150 13.50 318.00 10.60 6.00
Moment Lawan
Wy
Cm3
26.70 203.37
36.48 221.09
46.91 284.02
75.05 376.41
112.34 473.34
160.08 596.44
291.77 863.46
450.15 1,120.33
776.09 1,634.74
1,120.33 2,056.63
Moment Lawan
Wy
Cm3
3.63 32.06
4.43 76.85
4.03 78.73
5.09 88.15
6.29 104.64 UNP 100x5 0.38 0.0432498
10.69 162.23
12.73 161.98
18.36 207.45
19.81 241.35
24.16 281.35
36.75 398.37
36.82 440.76
53.78 526.37
Moment Lawan
Wy
Cm3
0.40 5.32
0.63 6.73
1.05 10.85
0.90 8.15
1.60 10.97
2.14 14.48
2.68 17.92
2.71 16.36
3.39 20.27
3.34 18.25
4.18 22.63
5.03 26.93
6.02 27.34
7.23 32.58
8.48 35.41
9.83 38.23
11.48 44.35
11.28 41.06
13.17 47.64
15.07 54.15
12.83 43.88
17.13 57.92
21.67 65.46
24.40 73.31
27.13 81.08
26.74 72.99
33.47 90.50
52.98 119.87
130.32
135.97
107.22
141.63
164.23
203.63
274.28
362.00
447.88
565.63
Moment Lawan
Wy
Cm3
0.80 9.79
1.81 12.43
13.86
19.77
17.33
24.76
34.17
27.09
37.42
29.80 C 150x50x20x2,3
41.19
33.05
45.71
56.00
Moment Lawan
Wy
Cm3
0.70 7.83
1.22 10.43
2.28 15.39
3.99 20.83
5.45 24.58
9.22 32.66
19.34 54.71
28.45 68.04
52.53 96.15
87.84 130.08
133.66 166.10
268.74 252.50
470.26 355.17
744.39 469.72
1,003.39 565.83
1,499.30 739.84
Moment Lawan
Wy
Cm3
0.81 9.85
4.68 37.27
2.73 19.64
4.95 27.41
6.88 32.83
12.00 44.76
24.23 71.78
36.58 91.65
70.25 134.51
118.70 183.16
192.72 250.99
390.71 382.61
714.84 563.72
1,175.19 775.23
1,605.48 946.32
2,367.40 1,219.12
Moment Lawan
Wy
Cm3
0.17 3.12
0.30 4.10
0.54 5.71
1.01 8.37
2.40 14.46
1.75 12.40
3.05 15.31
3.39 16.12
2.40 13.62
4.43 19.48
7.16 24.63
6.35 23.21
11.76 31.41
17.82 40.58
36.93 65.28
56.24 80.32
92.36 109.07
Moment Lawan
Wy
Cm3
11.46 30.45
12.89 34.61
17.90 40.67
32.75 57.38
41.00 73.11
62.69 90.09
80.90 118.79
88.85 107.00
97.83 118.52
115.26 141.34
139.22 145.40
196.58 180.66
268.74 252.50
344.09 254.70
515.03 318.14
733.83 406.45
Moment Lawan
Wy
Cm3
0.65 7.23
1.11 9.39
2.14 14.44
3.59 18.56
4.80 21.35
8.55 30.15
14.15 38.57
21.57 50.13
40.70 72.85
67.23 96.45
95.33 114.56
Moment Lawan
Wy
Cm3
0.70 8.17
1.02 8.41
1.84 11.96
3.05 15.31
4.43 19.48
7.14 24.59
12.78 34.47
17.73 40.48
33.35 58.76
Moment Lawan
Wy
Cm3
0.30 4.08
0.54 5.74
1.02 8.54
1.87 12.21
3.11 15.63
4.45 19.52
7.14 24.59
12.96 34.99
17.98 41.09
33.77 59.54
Moment Lawan
Wy
Cm3
0.37 5.23
0.68 7.47 17.40 Hollow circle relationships:
1.15 9.63 ----------------------------
2.24 14.88 A= 111.11 A = 3.14159 / 4 * (d^2 - di^2)
3.73 19.07 I= 3,222.55 I = 3.14159 / 64 * (d^4 - di^4)
4.97 21.90 Z= 370.41 Z = 3.14159 / (32 * d) * (d^4 - di^4)
8.84 30.87 J= 6,445.09 J = 3.14159 / 32 * (d^4 - di^4)
14.57 39.40 12.7 k= 5.39 k = sqrt((d^2 + di^2) / 16)
22.22 51.21 y= 8.70 y=d/2
41.46 73.51 W= 370.41 W=I/y
67.86 97.42 i= 5.39 i = ( I / A )^0,5
96.24 115.72 wi = 87.22 kg/m wi = rho * A
196.58 180.66 fy = 210 mpa
344.09 254.70 s= 21,000 kgcm2
515.03 318.14
Moment Lawan
Wy
Cm3
0.02 2.66
0.05 4.74
0.07 5.99
0.10 7.40
0.17 10.65
0.22 12.50
0.40 18.94
0.67 26.71
1.05 35.81
1.53 46.24
2.16 58.00
3.22 75.76
4.58 95.88
Moment Lawan
Wy
Cm3
0.10 7.40
0.22 12.50
0.40 18.94
0.67 26.71
1.05 35.81
1.53 46.24
2.39 62.22
3.22 75.76
4.58 95.88
Moment Lawan
Wy
Cm3
0.01 2.68
0.00 3.53
0.00 4.24
3.58
4.71
5.65
7.16
4.47
5.89
7.06
8.95
11.78
42.39
14.32
52.99
63.59