42 17 1 PB
42 17 1 PB
ABSTRACT
Short circuit phase to grounding and phase to phase were problems that may emerged in the
power transformer operation at substation. Short circuit caused a lot of detriments, in the
electrical transmission system and consumers. This fault could be eliminated by using
electrical safety equipments that put in transformer. Over current relay was one of the
electrical safety equipments that operated with Circuit Breaker (CB). The fault caused by
short circuit would produced electrical current that exceed of current relay setting and time
setting has been reach by the protection relay,then protection relay will send trip signal to the
Circuit Breaker changed from Normally Cloce (NC) Condition to Normally Open (NO)
condition. This new condition would eliminated risks in the electrical systems.
Key words: current, over current relay, relay setting, short circuit, transformer.
PENDAHULUAN
Transformator merupakan peralatan yang sangat
vital dalam penyaluran sistem tenaga listrik karena
transformator
merupakan
peralatan
yang
menyalurkan energi listrik langsung ke konsumen
baik konsumen tegangan tinggi, tegangan menengah
maupun tegangan rendah. Dalam sistem penyaluran
tidak menutup kemungkinan terjadi gangguan
terutama gangguan yang disebabkan oleh alam.
Gangguan yang sering terjadi antara lain kawat
penghantar putus, kerusakan pada pembangkit,
gangguan pada saluran transmisi akibat petir serta
gangguan hubung singkat. Dengan adanya gangguan
yang tidak dapat diprediksi maka diperlukan suatu
peralatan pengaman (sistem proteksi) yang tepat dan
Relai Pengaman
Relai pengaman adalah suatu piranti baik elektrik
maupun magnetik yang dirancang untuk mendeteksi
suatu kondisi ketidaknormalan pada peralatan sistem
tenaga listrik yang tidak diinginkan. Jika kondisi
abnormal tersebut terjadi maka relai pengaman
26
sistem yang
secepatnya.
terganggu
serta
memisahkan
t TMS (Td ) x
I / I S
(1)
Deskripsi
0-100
Definit time
Standart inverse
0,14
0,02
Very inverse
13,5
Extremely inverse
80
120
27
Gambar 1.
1
Ia aIb a 2 Ic
3
(2)
Ia
1
Ia a 2 Ib aIc
3
Ia
1
Ia Ib Ic
3
(3)
(4)
1
1
Ia aIb a2Ic Ia1 Ia
3
3
(5)
1
1
Ia2 (Iaa2IbaIc) Ia2 Ia
3
3
(6)
1
Ia Ib Ic Ia0 1 Ia
3
3
(7)
Ia1
Ia0
1
Ia
3
dan Ib = - Ic
sehingga:
Ia1 Ia 2 Ia 0
Ia = 0
Va0
1 1 1 Va
V 1 1 a a2 V
a1 3
B
Va2
1 a2 a VB
(8)
(11)
(12)
I a1
dimana:
Va0 + Va1 + Va2 = Ea (Z0 + Z1 + Z2) Ia1
(9)
sehingga
Ia
E
Z0 Z1 Z2
3xE
Z0 Z1 Z2
(13)
rangkaian
Mengingat:
Maka diperoleh: I
a1
Ea
Z1 Z 2
(10)
METODE PENELITIAN
Penelitian
ini
dilakukan
dengan
cara
mengumpulkan data-data spesifikasi transformator
daya dan setting relai arus lebih, kemudian
melakukan pengamatan dan pengambilan data
Gardu Induk. Berdasarkan data-data yang ada,
dilakukan analisa dan perhitungan besar arus
gangguan terhadap relai proteksi sehingga relai arus
bekerja dan mentripkan pemutus tenaga / CB
(Circuit Breaker).
Parameter Dasar
j 1
a 0,5 0,5 j 3
1 1 1
A 1 a2 a
1 a a2
4. Penyulang Arjuna
5. Penyulang Oplet
6. Penyulang Tractor
2
360
Et
Sbase
Vbase
30
=1
= 60 MVA
= 20 kV
Lokasi
Merk/Type Relai
Ratio CT
Inom
Iset
Iprim
Td
Iinst
P. Jangka
MCGG52
300/5
300
0,05
2220
P. Pensil
MCGG52
300/5
300
0,05
2220
P. Bima
MCGG52
300/5
300
0,05
2220
P. Arjuna
MCGG52
300/5
300
0,05
2220
P. Oplet
MCGG52
300/5
300
0,05
2220
P. Tractor
MCGG52
300/5
300
0,05
2220
Lokasi
Merk/Type Relai
Ratio CT
Inom
Iset
Iprim
Td
Iinst
P. Jangka
MCGG52
300/5
1.35
81
0.08
Blok
P. Pensil
MCGG52
300/5
1.35
81
0.08
Blok
P. Bima
MCGG52
300/5
1.35
81
0.08
Blok
P. Arjuna
MCGG52
300/5
1.35
81
0.08
Blok
P. Oplet
MCGG52
300/5
1.35
81
0.08
Blok
P. Tractor
MCGG52
300/5
1.25
81
0.08
Blok
Lokasi
Merk
Media
Ratio CT
Imax
Incoming 20 kV
Goldstar
Vacuum
2000/5
2000
P. Jangka
ABB
SF6
300/5
300
P. Pensil
Fuji
Vacuum
300/5
300
P. Bima
ABB
SF6
300/5
300
P. Arjuna
ABB
SF6
300/5
300
P. Oplet
ABB
SF6
300/5
300
P. Tractor
Goldstar
Vacuum
300/5
300
31
Zbase
Ibase
Vbase
Ia
Ib
Ic
3
6 , 667
Sbase 3
3Sbase 3103
1,732x103 Ampere
Vbase
Ia 0
A Ia 1
Ia 2
0
0,088 6,72 i
0,088 6,72 i
Nilai Impedansi
Ztotal1pu = 0,129 + 1,687i x 10-3 pu
Ib
Ifault = Ib
= -0,088 6,72 i pu
If
Ib = 0
= Ifault . Ibase
= -152,443 1,164i x 104 Ampere
Ic = 0
Ia1
= -Ic
Et
Ztotal 1 pu Ztotal 2 pu Ztotal 0 pu
= 11.640 Ampere
Besar arus gangguan fasa-fasa ke tanah sebesar
11.640 Ampere.
= 2,577 - 0,026i
Ia2 = Ia1
= 2,577 0,026i
Sisi 150 kV
Ia0 = Ia1
= 2,577 0,026i
Ia
Ia 0
Ib A Ia 1
Ic
Ia 2
7 ,731 0 ,077 i
pu
0
= 1,2 x 231
= 277,2 Ampere
Dipilih 300 Ampere
Ia = Ia.Ibase
300 x
= 13.390 Ampere
Besar arus gangguan satu fasa ke tanah sebesar
13.390 Ampere.
1
RatioCT
300 x
1
300 / 5
= 5 Ampere
Perhitungan gangguan fasa fasa
Tap relai
Ia0 = 0
Ia = 0
Ia1
= 5 / In relai = 1
Et
Ztotal1 pu Ztotal 2 pu = 3,88 0,051i pu
t TMS ( Td ) x
I / I S
0,14
11640 / 300 0 , 02 1
2000 x
( Td )
0 , 55
1 , 844
1
RatioCT
2000 x
1
2000 / 5
= 5 Ampere
0 ,3
t TMS (Td ) x
I / I S
= 0,1 x 1000
0 ,9 TMS (Td ) x
= 100 Ampere
Dipilih 120 Ampere
= 0,2 x 1650
= 330 Ampere
0 ,14
/ 120
0 , 02
400 x
400 x
1,3
3 , 2319
TMS ( Td )
= 2 Ampere
1000
0 , 02
1
120 x
300 / 5
/ 2000
0 ,9
0 , 23
3,9047
TMS (Td )
1
120 x
RatioCT
I / I S
0 ,14
11640
t TMS (Td ) x
1
RatioCT
1
2000 / 5
= 1 Ampere
0 ,4
Sisi 20 kV
t TMS ( Td ) x
0,7 TMS(Td)x
k
/ IS
0,14
11640/ 4000,02 1
= 1,2 x 1650
TMS (Td )
= 1980 Ampere
Dipilih 2000 Ampere
33
0 ,7
0 ,3
2 , 0074819
KESIMPULAN
Dari uraian di atas dapat diambil beberapa
kesimpulan sebagai berikut :
1. Besar arus gangguan satu fasa ke tanah yang
terjadi pada saluran kabel 20 kV menuju
incoming 20 kV sebesar 13.390 Ampere dan
gangguan fasa-fasa sebesar 11.640 Ampere
sehingga arus gangguan hubung singkat fasa-fasa
yang digunakan dalam perhitungan setting relai
proteksi untuk memperoleh sensitivitas dan
kehandalan relai, diharapkan dengan arus
gangguan terkecil relai proteksi dapat
mendeteksi gangguan tersebut.
DAFTAR PUSTAKA
PT. PLN (Persero) P3B Jawa Bali. 2005a. Buku
Petunjuk Operasi dan Pemeliharaan Pemutus
Tenaga. Badan Penerbit PLN. Jakarta.
PT. PLN (Persero) P3B Jawa Bali. 2005b. Modul
Pelatihan Pengaman Transformator. Badan Penerbit
PLN. Jakarta.
34