Geoteknik
Punya orang
Rumus
Lf =
(26-3)
Keterangan :
Lf : Load Factor
A : parameter dari bentuk saluran
Circular conduit,
A = 1,43
Horizontal elliptical (HE), A = 1,34
Vertical elliptical (VE), A = 1,02
(26-4)
Keterangan :
p : projection rasio
K : rasio tekanan lateral aktif unit terhadap tekanan
vertikal unit
Cc
: koefisien beban untuk projecting conduit
Bedding
of
N
0.3
0.217
0.743
Immermissible
1.310
0.5
0.413
0.856
Ordinary
0..84
0.7
0..594
0.811
First Class
0.707
0.9
0.655
0.678
Concrete Cradle
0.505
1.0
0.638
0.638
Type of pipe
Horizontal
Elliptical
(HE)
Vertical
Elliptical
(VE)
Value of
m
Value of
x
Type
bedding
Value of
N
0.3
0.146
Ordinary
(Class C)
0.763
0.5
0.268
0.7
0.369
First Class
(Class B)
0.630
0.9
0.421
0.3
0.238
Ordinary
(Class C)
0.615
0.5
0.457
0.7
0.639
First Class
(Class B)
0.516
0.9
0.718
Example
Dimisalkan elliptical concrete pipe dipasang positive
projecting conduit vertical (VE)
Diameter horizontal luar nya adalah 5.08 ft, dan
diameter vertical nya 7.42 ft
Pipa tersebut diberikan class B bedding.
Puncak pipa berada 5.2 feet di atas tanah dasar dan
rasio penurunan nya +0.6. tinggi timbunan di atas
pipa adalah 28 feet dan berat tanahnya 120 pcf.
Hitunglah beban pada pipa dan syarat minimum
bearing strength dengan safety factor 1.2, 0.01 crack
strength
Load
calculation data :
H =
Bc =
P =
rsd =
28 ft
H/Bc = 5.5
5.08 ft
Cc
= 8.5 (Fig 25-13)
5.2/5.08 = 1
120 pcf
+0.6
Pers. 25-11
q=
Lf =
Pers 26-4
Pers 26-3
required
three-edge strength =
D load strength
Dimana:
Terima