Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket
URAIAN
U P A H
Mandor
Kepala Tukang
Operator Alat/Mesin
Tukang Batu
Tukang Besi
Tukang Cat
Tukang Gali
Tukang Kayu
Tukang Las
Tukang Pipa
Tukang Alumunium
Penjaga
Pekerja
HRG. SAT/JAM
6,160.00
7,520.00
8,000.00
6,800.00
6,800.00
6,800.00
6,800.00
6,800.00
6,800.00
6,800.00
8,000.00
4,800.00
4,800.00
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
URAIAN
Excavator
Buldozer
Molen
Dump Truk
Mesin Las
Alat Sambung Pipa PE
Alat Tes Tekan Pipa
Stampler
Wheel Loeder
AMP
Generator Set
Asphalt Finiser
Tandem Roller
Tyred Roller
HRG SATUAN/JAM
272,000.00
520,000.00
32,000.00
218,400.00
35,000.00
50,000.00
20,000.00
20,000.00
265,520.00
3,576,480.00
276,000.00
241,600.00
200,000.00
247,200.00
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
URAIAN
Tanah Tambun
Pasir Urug
Pasir Saring
Pasir Kuarsa
Pasir Pasang
Pasir Beton
Kerikil Sungai
Sirtu Klas A (Halus)
Sirtu Klas B (Kasar)
Batu Gunung 15-20 cm
Kerikil 5/7 Cm
Kerikil 3/5 Cm
Kerikil 2/3 Cm
Kerikil 1/2 Cm
Split Halus (Abu Batu)
Batu Bata
Paving Block Abu-abu
Paving Block Warna
Canstein Block (15x30x40 cm)
Kayu Lokal Klas II
Kayu Bekesting (Kayu Klas III)
Papan Bekesting
Ijuk
Semen PC (50 Kg)
Semen Warna (50 Kg)
Besi Beton
Baja Profil
Kawat Beton
Besi Strip
Kawat Bronjong (25 m)
Pagar BRC (120x240 cm)
Kawat Duri (25 m')
Paku
Paku Seng
Seng Gelombang BJLS 0,25
Seng Plat 25 cm
Genteng Metal
Tripleks 3 mm x 120 mm x 240 mm
Lem Kayu
Playwood tebal 9 mm
Bambu ( 10-15 x 6 m )
Plamir
Profil Alluminium
Sekrup Fixer
Sealant
Profil Kaca
Cat Tembok
Cat Waterproof
Cat Besi
Cat Kayu
Cat Atap Seng
Minyak Cat
Minyak Bekisting
Menie
Amplas
Aspal
SATUAN
M
M
M
kg
M
M
M
M
M
M
M
M
M
M
M
Bh
Bh
Bh
Bh
M
M
M
Kg.
Zak
Zak
Kg
Kg
Kg
Kg
Roll
Lbr
Roll
Kg
Kg
Lbr
Lbr
Lbr
Lbr
Ltr
Lbr
Btg
Kg
M
Bh
Tube
M
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Lbr
Kg
No.
57
58
59
60
61
URAIAN
Tegel Keramik Uk. 30x30 cm
Tegel Keramik Uk. 20x20 cm
Kaporit
Soda Ash
Asam Sulfat
SATUAN
Buah
Buah
Kg
Kg
Kg
URAIAN
a. Pipa GIP (Medium SII)
Pipa 12"
Pipa 10"
Pipa 8"
Pipa 6"
Pipa 4"
Pipa 3"
Pipa 2"
b. Pipa PVC S-10
Pipa 12" RR
Pipa 10" RR
Pipa 8" RR
Pipa 6" RR
Pipa 4" RR
Pipa 3" RR
Pipa 2" RR
c. Pipa PVC S-12,5
Pipa 12" RR
Pipa 10" RR
Pipa 8" RR
Pipa 6" RR
Pipa 4" RR
Pipa 3" RR
Pipa 2" RR
d. Pipa PE S8-SDR17 (PN10)
Pipa 12" (315 mm)
Pipa 10" (250 mm)
Pipa 8" (200 mm)
Pipa 6" (160 mm)
Pipa 4" (110 mm)
Pipa 3" (90 mm)
Pipa 2" (63 mm)
e. Accessories Pipa
Gate Valve Double Flanged CI 2"
Gate Valve Double Flanged CI 3"
Gate Valve Double Flanged CI 4"
Gate Valve Double Flanged CI 6"
Gate Valve Double Flanged CI 8"
Gate Valve Double Flanged CI 10"
Gate Valve Double Flanged CI 12"
Stop Kran 100 mm
Stop Kran 75 mm
Stop Kran 50 mm
Stop Kran 20 mm
Check Valve (Non Return Valve) 4"
SATUAN
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
buah
buah
buah
buah
buah
buah
buah
unit
unit
unit
unit
unit
No.
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
URAIAN
Check Valve (Non Return Valve) 6"
Check Valve (Non Return Valve) 8"
Check Valve (Non Return Valve) 10"
Check Valve (Non Return Valve) 12"
DF. Water Meter 2"
DF. Water Meter 3"
DF. Water Meter 4"
DF. Water Meter 6"
DF. Water Meter 8"
DF. Water Meter 10"
DF. Water Meter 12"
Air Relief Valve 25 mm
Flanged Air Relief Valve 50 mm
Air Vent GIP 3"
All Flanged Tee PVC 4" x 4"
All Flanged Tee PVC 3" x 3"
All Flanged Tee PVC 3" x 2"
All Flanged Tee CI 12" X 12"
All Flanged Tee CI 12" X 8"
All Flanged Tee CI 12" X 2"
All Flanged Tee CI 12" x 12"
All Flanged Tee CI 10" x 10"
All Flanged Tee CI 8" x 8"
All Flanged Tee CI 6" x 6"
All Flanged Tee CI 6" x 4"
All Flanged Tee CI 4" x 4"
All Flanged Tee CI 4" x 3"
All Flanged Tee CI 4" x 2"
All Flanged Tee CI 3" x 2"
All Flanged Tee CI 2" x 2"
All Flanged Tee Y Cl 12" X 12"
Socket Tee PVC (All RR) 6" x 6"
Socket Tee PVC (All RR) 6" x 4"
Socket Tee PVC (All RR) 4" x 4"
Socket Tee PVC (All RR) 4" x 3"
Socket Tee PVC (All RR) 4" x 2"
Socket Tee PVC (All RR) 3" X 3"
Socket Tee PVC (All RR) 3" X 2"
Socket Tee PVC (All RR) 2" X 2"
Baut Moor 5/8" x 3"
Baut Moor 5/8" x 4"
Blind Flanged 12"
Blind Flanged 8"
Clem Besi Plat 4" X 2 mm
Dop PVC 2"
Dop PVC 3"
Double Flanged Bend CI 12" X 11,25
Double Flanged Bend CI 12" X 22,5
Double Flanged Bend CI 12" X 45
Double Flanged Bend CI 12" X 90
Double Flanged Bend CI 8" x 22,5
Double Flanged Bend CI 8" x 45
Double Flanged Bend CI 8" x 90
Double Flanged Bend CI 6" x 22,5
SATUAN
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
No.
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
URAIAN
Double Flanged Bend CI 6" x 45
Double Flanged Bend CI 6" x 90
Double Flanged Bend CI 4" x 11,5
Double Flanged Bend CI 4" x 22,5
Double Flanged Bend CI 4" x 45
Double Flanged Bend CI 4" x 90
Double Flanged Bend CI 3" x 22,5
Double Flanged Bend CI 3" x 45
Double Flanged Bend CI 3" x 90
Double Flanged Bend CI 2" x 22,5
Double Flanged Bend CI 2" x 45
Double Flanged Bend CI 2" x 90
Double Flanged Pipe GIP 3" x 60 cm.
Double Flanged Pipe GIP 3" x 80 cm.
Double Flanged Pipe GIP 3" x 100 cm.
Double Flanged Pipe GIP 3" x 120 cm.
Double Flanged Pipe GIP 3" x 200 cm.
Double Flanged Pipe GIP 4" x 60 cm.
Double Flanged Pipe GIP 4" x 80 cm.
Double Flanged Pipe GIP 4" x 100 cm.
Double Flanged Pipe GIP 4" x 120 cm.
Double Flanged Pipe GIP 4" x 180 cm.
Flanged Pipe GIP 3" x 60 cm.
Flanged Pipe GIP 3" x 100 cm.
Flanged Pipe GIP 3" x 200 cm.
Flanged Pipe GIP 4" x 60 cm.
Flanged Pipe GIP 4" x 100 cm.
Flanged Pipe GIP 4" x 200 cm.
Flanged Pipe GIP 6" x 60 cm.
Flanged Pipe GIP 6" x 80 cm.
Flanged Pipe GIP 6" x 100 cm.
Flanged Pipe GIP 6" x 200 cm.
Double Socket Bend CI for PVC 6" x 11,25
Double Socket Bend CI for PVC 6" x 22,5
Double Socket Bend CI for PVC 6" x 45
Double Socket Bend CI for PVC 6" x 90
Flanged Air Relief Valve 2"
Bend Doble Socet PVC 12" X 11,25
Bend Doble Socet PVC 12" X 22,5
Bend Doble Socet PVC 12" X 45
Bend Doble Socet PVC 12" X 90
Bend Doble Socet PVC 8" x 22,5
Bend Doble Socet PVC 8" x 45
Bend Doble Socet PVC 8" x 90
Bend Doble Socet PVC 6" x 22,5
Bend Doble Socet PVC 6" x 45
Bend Doble Socet PVC 6" x 90
Bend Doble Socet PVC 4" x 11,5
Bend Doble Socet PVC 4" x 22,5
Bend Doble Socet PVC 4" x 45
Bend Doble Socet PVC 4" x 90
Bend Doble Socet PVC 3" x 22,5
Bend Doble Socet PVC 3" x 45
Bend Doble Socet PVC 3" x 90
SATUAN
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
No.
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
URAIAN
Bend Doble Socet PVC 2" x 22,5
Bend Doble Socet PVC 2" x 45
Bend Doble Socet PVC 2" x 90
Flanged Socket PVC RRJ 2"
Flanged Socket PVC RRJ 3"
Flanged Socket PVC RRJ 4"
Flanged Socket PVC RRJ 6"
Flanged Socket PVC RRJ 8"
Flanged Socket PVC RRJ 10"
Flanged Socket PVC RRJ 12"
Flanged Spigot PVC 2"
Flanged Spigot PVC 3"
Flanged Spigot PVC 4"
Flanged Spigot PVC 6"
Flanged Spigot PVC 8"
Flanged Spigot PVC 12"
Flanged Steel PN 10 2"
Flanged Steel PN 10 3"
Flanged Steel PN 10 4"
Flanged Steel PN 10 6"
Flanged Steel PN 10 8"
Flanged Steel PN 10 10"
Flanged Steel PN 10 12"
Flanged Strainer CI 3"
Flanged Strainer CI 4"
Flanged Strainer CI 6"
Fleksible Joint "Tosen" 4
Fleksible Joint "Tosen" 6
Fleksible Joint "Tosen" 8
Fleksible Joint "Tosen" 10
Fleksible Joint "Tosen" 12
Manhole 80 x 80 Cm.
Paking Karet 2"
Paking Karet 3"
Paking Karet 4"
Paking Karet 6"
Paking Karet 8"
Paking Karet 10"
Paking Karet 12"
Piet Kran Baal Valve Dia 3/4 "
DF Pipa GIP 3" x 60 cm.
DF Pipa GIP 3" x 100 cm.
Pressure Reducing Valve 6"
Repair Socket PVC 2"
Socket Repair PVC 6"
Rubber Expansiont Joint 6"
Rubber Water Stop 30 Cm
Socket GIP 2"
Socket GIP 3"
Socket GIP 4"
Socket GIP 6"
Socket Reducer PVC (All RR) 3" x 2"
Socket Reducer PVC (All RR) 4" x 3"
Socket Reducer PVC (All RR) 4" x 2"
SATUAN
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
unit
buah
buah
buah
buah
buah
buah
buah
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
No.
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228
URAIAN
Socket Reducer PVC (All RR) 6" x 3"
Socket Reducer PVC (All RR) 6" x 4"
Socket Reducer PVC (All RR) 12" x 8"
Socket Spigot Bend PVC 12" X 90
Socket Spigot Bend PVC 12" X 45
Socket Spigot Bend PVC 12" X 22,5
Socket Spigot Bend PVC 12" X 11,25
Socket Spigot Bend PVC 8" x 22,5
Socket Spigot Bend PVC 8" x 45
Socket Spigot Bend PVC 8" x 90
Socket Spigot Bend PVC 6" x 22,5
Socket Spigot Bend PVC 6" x 45
Socket Spigot Bend PVC 6" x 90
Socket Spigot Bend PVC (S-10) 4" x 22,5
Socket Spigot Bend PVC (S-10) 4" x 45
Socket Spigot Bend PVC (S-10) 4" x 90
Socket Spigot Bend PVC ( S-10) 3" x 90
Socket Spigot Bend PVC ( S-10) 3" x 45
Socket Spigot Bend PVC ( S-10) 3" x 22,5
Socket Spigot Bend PVC ( S-10) 2" x 90
Socket Spigot Bend PVC ( S-10) 2" x 45
Socket Spigot Bend PVC ( S-10) 2" x 22,5
Tangki Fiberglass 2 m
Tutup Manhole 0,80 x 0,80
Tutup Manhole 1 x 0,80
Socket Reducer HDPE 10" x 8"
Socket Reducer HDPE 8" x 6"
Socket Reducer HDPE 6" x 4"
Socket Reducer HDPE 4" x 3"
Socket Reducer HDPE 3" x 2"
Elbow HDPE 10" x 90
Elbow HDPE 8" x 90
Elbow HDPE 6" x 90
Elbow HDPE 4" x 90
Elbow HDPE 3" x 90
Elbow HDPE 2" x 90
Tee HDPE 90 10"
Tee HDPE 90 8"
Tee HDPE 90 6"
Tee HDPE 90 4"
Tee HDPE 90 3"
Tee HDPE 90 2"
Bend HDPE 90 10"
Bend HDPE 90 8"
Bend HDPE 90 6"
Bend HDPE 90 4"
Bend HDPE 90 3"
Bend HDPE 90 2"
Bend HDPE 45 10"
Bend HDPE 45 8"
Bend HDPE 45 6"
Bend HDPE 45 4"
Bend HDPE 45 3"
Bend HDPE 45 2"
SATUAN
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
unit
unit
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
No.
URAIAN
229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245
Mengetahui/ Menyetujui :
SATUAN
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
JOHNY POSUMAH
DIREKTUR
HERU BASKORO
PIMPINAN TEKNIK
HRG. SAT/HARI
49,280.00 O/Hari
60,160.00 O/Hari
64,000.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
64,000.00 O/Hari
38,400.00 O/Hari
38,400.00 O/Hari
HRG SATUAN/HARI
2,176,000.00 /Hari
4,160,000.00 /Hari
256,000.00 /Hari
1,747,200.00 /Hari
280,000.00 /Hari
400,000.00 /Hari
160,000.00 /Hari
160,000.00 /Hari
2,124,160.00 /Hari
28,611,840.00 /Hari
2,208,000.00 /Hari
1,932,800.00 /Hari
1,600,000.00 /Hari
1,977,600.00 /Hari
HARGA SATUAN
43,600.00
124,000.00
126,000.00
3,600.00
126,000.00
124,000.00
209,440.00
70,400.00
64,000.00
120,000.00
170,800.00
203,280.00
203,280.00
215,600.00
153,440.00
640.00
3,200.00
3,600.00
20,000.00
2,640,000.00
1,440,000.00
1,440,000.00
30,000.00
54,000.00
100,000.00
9,200.00
11,600.00
13,600.00
11,600.00
500,000.00
200,000.00
144,000.00
13,480.00
20,000.00
38,000.00
38,000.00
36,000.00
48,000.00
20,000.00
78,800.00
12,000.00
16,000.00
64,000.00
600.00
72,000.00
108,000.00
12,480.00
52,000.00
28,000.00
25,600.00
28,000.00
10,000.00
9,600.00
19,200.00
3,600.00
7,600.00
HARGA SATUAN
4,800.00
2,400.00
16,000.00
8,000.00
6,000.00
HARGA SATUAN
1,098,900.00
822,112.50
553,162.50
410,850.00
252,862.50
175,312.50
105,600.00
549,656.25
344,561.25
222,255.00
142,436.25
67,361.25
44,797.50
22,151.25
448,428.75
281,737.50
180,551.25
115,871.25
54,243.75
37,372.50
17,902.50
643,830.00
404,827.50
260,370.00
166,815.00
79,942.50
53,542.50
26,400.00
536,250.00
1,029,600.00
1,470,150.00
2,722,500.00
4,158,000.00
4,989,600.00
6,897,000.00
701,250.00
412,500.00
207,900.00
99,000.00
2,640,000.00
HARGA SATUAN
3,300,000.00
3,960,000.00
4,752,000.00
5,702,400.00
1,980,000.00
2,673,000.00
3,366,000.00
4,752,000.00
6,336,000.00
9,900,000.00
23,760,000.00
472,725.00
660,000.00
354,750.00
440,137.50
392,040.00
372,438.00
2,970,000.00
2,574,000.00
2,148,300.00
3,341,250.00
2,227,500.00
1,485,000.00
990,000.00
919,050.00
851,400.00
589,875.00
568,425.00
453,750.00
206,250.00
2,937,000.00
811,800.00
704,880.00
436,425.00
396,000.00
326,700.00
261,360.00
231,660.00
158,400.00
6,600.00
9,900.00
668,250.00
536,250.00
37,125.00
20,625.00
28,875.00
1,905,750.00
1,914,000.00
1,922,250.00
1,930,500.00
1,254,000.00
1,298,517.00
1,363,725.00
660,000.00
HARGA SATUAN
683,430.00
717,750.00
618,750.00
605,880.00
531,630.00
519,750.00
504,900.00
470,250.00
443,025.00
332,268.75
345,559.50
354,420.00
474,210.00
565,290.00
701,910.00
747,450.00
1,157,310.00
393,492.00
479,028.00
607,332.00
650,100.00
906,708.00
407,880.00
590,040.00
1,045,440.00
556,875.00
789,800.00
1,488,575.00
896,775.00
1,173,150.00
1,394,250.00
2,610,300.00
1,128,600.00
1,138,500.00
1,207,800.00
1,326,600.00
1,263,900.00
1,188,000.00
1,254,000.00
1,443,750.00
2,068,275.00
354,750.00
399,300.00
470,250.00
194,700.00
231,247.50
254,925.00
84,150.00
89,100.00
96,525.00
104,775.00
53,707.50
61,132.50
68,805.00
HARGA SATUAN
27,472.50
29,700.00
33,577.50
106,672.50
146,850.00
193,710.00
357,307.50
575,767.50
590,535.00
905,850.00
99,330.00
136,950.00
174,322.50
341,880.00
532,290.00
791,917.50
66,825.00
89,100.00
123,750.00
178,200.00
237,600.00
285,120.00
356,400.00
948,750.00
1,237,500.00
1,530,375.00
1,069,200.00
1,336,500.00
1,603,800.00
1,924,560.00
2,309,472.00
371,250.00
19,965.00
23,595.00
35,392.50
49,500.00
78,375.00
92,812.50
107,250.00
66,000.00
341,550.00
500,940.00
49,500,000.00
78,375.00
412,500.00
1,435,500.00
321,750.00
41,250.00
57,750.00
69,300.00
189,750.00
136,620.00
218,790.00
210,375.00
HARGA SATUAN
354,750.00
425,700.00
930,600.00
2,910,600.00
2,613,600.00
2,116,620.00
1,782,000.00
736,817.40
862,705.80
992,296.80
394,020.00
461,340.00
530,640.00
181,170.00
195,030.00
216,810.00
173,250.00
153,450.00
135,630.00
102,712.50
94,347.00
84,150.00
4,950,000.00
371,250.00
701,250.00
536,250.00
301,125.00
136,125.00
78,375.00
61,875.00
1,204,500.00
655,875.00
410,850.00
185,625.00
130,350.00
57,750.00
1,267,200.00
779,625.00
490,875.00
222,750.00
130,350.00
57,750.00
2,195,283.75
901,807.50
635,992.50
248,242.50
153,202.50
66,206.25
2,084,527.50
861,093.75
503,538.75
209,467.50
133,402.50
60,637.50
HARGA SATUAN
1,138,500.00
812,625.00
519,750.00
309,375.00
264,000.00
161,700.00
1,833,356.25
676,046.25
423,967.50
275,013.75
179,932.50
110,013.75
280,788.75
143,632.50
59,606.25
20,377.50
13,571.25
HERU BASKORO
PIMPINAN TEKNIK
VOL.
0.012
0.020
0.007
m3
kg
m3
0.100
0.100
0.010
0.005
Oh
Oh
Oh
Oh
6.667
0.333
Oh
Oh
6.667
0.333
Oh
Oh
NO.
URAIAN PEKERJAAN
VOL.
Pekerjaan Tanah
1
0.750
0.025
Oh
Oh
0.900
0.045
Oh
Oh
1.000
0.032
Oh
Oh
1.500
0.060
Oh
Oh
0.330
0.010
Oh
Oh
1 M3 Urugan Kembali
Tenaga
Pekerja
Mandor
0.250
0.008
Oh
Oh
0.500
0.050
Oh
Oh
NO.
URAIAN PEKERJAAN
10
1 M3 Urugan Pasir
Bahan
Pasir urug
Tenaga
Pekerja
Mandor
VOL.
1.200
M3
0.300
0.010
Oh
Oh
1.200
M3
0.250
0.025
Oh
Oh
1.200
M2
0.150
0.015
Oh
Oh
0.803
0.737
0.581
0.545
0.360
0.304
0.245
0.165
M3
M3
M3
M3
M3
M3
M3
M3
0.138
0.138
0.113
0.113
0.088
0.088
0.088
0.063
M3
M3
M3
M3
M3
M3
M3
M3
0.523
0.468
M3
M3
1 M3 Urugan Sirtu
Bahan
Sirtu
Tenaga
Pekerja
Mandor
NO.
URAIAN PEKERJAAN
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
4
200 mm (8")
150 mm (6")
100 mm (4")
75 mm (3")
50 mm (2")
25 mm (1")
VOL.
0.383
0.383
0.207
0.179
0.154
0.140
M3
M3
M3
M3
M3
M3
0.523
0.468
0.383
0.383
0.207
0.179
0.154
0.140
M3
M3
M3
M3
M3
M3
M3
M3
1.000
1.000
1.000
Ls.
Btg
Set
4.000
1.500
0.750
0.050
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
1.013
0.101
0.608
0.061
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
0.675
0.068
0.405
0.041
hk
hk
hk
hk
NO.
URAIAN PEKERJAAN
Pemasangan Pipa PVC 200 mm (8")
8
VOL.
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
0.450
0.045
0.270
0.027
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
0.300
0.030
0.180
0.018
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
0.225
0.023
0.135
0.014
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
0.169
0.017
0.101
hk
hk
hk
NO.
12
URAIAN PEKERJAAN
Mandor
0.010
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
0.127
0.013
0.076
0.008
hk
hk
hk
hk
1.000
m'
5.652
1.000
1.000
94.200
m2
Set
Btg
cm
0.683
1.139
0.114
0.034
hk
hk
hk
hk
1.000
m'
4.710
1.000
1.000
78.500
m2
Set
Btg
cm
0.456
0.759
0.076
0.023
hk
hk
hk
hk
1.000
m'
3.768
m2
15
VOL.
NO.
URAIAN PEKERJAAN
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor
VOL.
1.000
1.000
62.800
Set
Btg
cm
0.304
0.506
0.051
0.015
hk
hk
hk
hk
1.000
m'
2.826
1.000
1.000
47.100
m2
Set
Btg
cm
0.203
0.338
0.034
0.010
hk
hk
hk
hk
1.000
m'
1.884
1.000
1.000
31.400
m2
Set
Btg
cm
0.135
0.225
0.023
0.007
hk
hk
hk
hk
1.000
m'
1.413
1.000
1.000
23.550
m2
Set
Btg
cm
0.101
0.169
0.017
0.005
hk
hk
hk
hk
NO.
URAIAN PEKERJAAN
1.000
m'
0.942
1.000
1.000
15.700
m2
Set
Btg
cm
0.076
0.127
0.013
0.004
hk
hk
hk
hk
1.000
m'
0.110
1.000
1.000
10.990
m2
Set
Btg
cm
0.057
0.095
0.009
0.003
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
4.000
1.500
0.750
0.050
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
22
VOL.
NO.
23
URAIAN PEKERJAAN
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor
3.600
1.350
0.675
0.045
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
3.240
1.215
0.608
0.041
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
2.592
0.972
0.486
0.032
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
1.944
0.729
0.365
0.024
hk
hk
hk
hk
1.000
m'
VOL.
NO.
URAIAN PEKERJAAN
27
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor
1.000
1.000
1.000
Ls.
Btg
Set
0.300
0.030
0.180
0.018
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
0.300
0.030
0.180
0.018
hk
hk
hk
hk
1.000
m'
1.000
1.000
1.000
Ls.
Btg
Set
0.300
0.030
0.180
0.018
hk
hk
hk
hk
1.000
m'
1.200
4.040
0.485
m3
Zak
m3
1.500
0.750
0.075
0.075
Oh
Oh
Oh
Oh
VOL.
NO.
URAIAN PEKERJAAN
1 M Pasangan Bronjong
Bahan
Batu Kali
Kawat Bronjong
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
VOL.
1.200
3.260
0.520
m3
Zak
m3
1.500
0.750
0.075
0.075
Oh
Oh
Oh
Oh
1.200
0.432
m3
kg
0.780
0.390
0.039
0.039
Oh
Oh
Oh
Oh
1.200 M
0.333 Rool
0.100
0.200
4.500
0.075
Oh
Oh
Oh
Oh
70.000 Buah
0.379 Zak
0.038 kg
0.300
0.100
0.010
Oh
Oh
Oh
NO.
URAIAN PEKERJAAN
Mandor
VOL.
0.015
Oh
70.000 Buah
0.230 Zak
0.043 kg
0.300
0.100
0.010
0.015
Oh
Oh
Oh
Oh
0.170
0.017
Zak
m3
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
0.104
0.020
Zak
m3
0.200
0.150
0.015
0.010
Oh
Oh
Oh
Oh
0.286
0.023
Zak
m3
0.250
0.020
Oh
Oh
Pekerjaan Plesteran
1
NO.
URAIAN PEKERJAAN
Kepala Tukang
Mandor
VOL.
0.020
0.010
Oh
Oh
0.174
0.028
Zak
m3
0.250
0.020
0.020
0.013
Oh
Oh
Oh
Oh
0.186
0.018
Zak
m3
0.260
0.200
0.020
0.013
Oh
Oh
Oh
Oh
0.141
0.021
Zak
m3
0.260
0.200
0.020
0.013
Oh
Oh
Oh
Oh
0.086
0.016
Zak
m3
0.150
0.070
0.007
0.008
Oh
Oh
Oh
Oh
NO.
URAIAN PEKERJAAN
VOL.
0.035
Zak
0.040
0.080
0.008
0.002
Oh
Oh
Oh
Oh
175.000
0.300
0.050
kg
m3
m3
15.000
5.000
0.800
0.500
Oh
Oh
Oh
Oh
1.000
M2
5.520
0.592
0.750
215.000
Zak
M3
M3
Liter
Pekerjaan Beton
1
1.650
0.275
0.028
0.083
4.940
0.621
0.740
215.000
Oh
Oh
Oh
Oh
Zak
M3
M3
Liter
NO.
URAIAN PEKERJAAN
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 M3 Beton K-225
Bahan
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
1 M3 Beton K-250
Bahan
Semen PC
Pasir Beton
Split 2/3
Air
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
VOL.
1.650
0.275
0.028
0.083
Oh
Oh
Oh
Oh
7.420
0.499
0.776
Zak
M3
M3
1.650
0.275
0.028
0.083
Oh
Oh
Oh
Oh
7.680
0.494
0.770
215.000
Zak
M3
M3
Liter
1.650
0.275
0.028
0.083
Oh
Oh
Oh
Oh
10.500
0.150
Kg
Kg
0.070
0.070
0.007
0.004
Oh
Oh
Oh
Oh
0.200
M3
NO.
URAIAN PEKERJAAN
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton (Polos atau Ulir)
Kawat Beton
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
VOL.
1.500
0.400
157.500
2.250
6.720
0.540
0.810
Kg
Ltr
Kg
Kg
zak
M3
M3
5.300
0.275
1.300
1.050
0.262
0.265
Oh
Oh
Oh
Oh
Oh
Oh
0.270
2.000
0.600
210.000
3.000
6.720
0.540
0.810
M3
Kg
Ltr
Kg
Kg
zak
M3
M3
5.650
0.275
1.560
1.400
0.323
0.283
Oh
Oh
Oh
Oh
Oh
Oh
1 M3 Dinding, Kolom & Plat Beton Bertulang K-225 (150 kg besi + Bekisting)
Bahan
Kayu Bekesting (Kayu Klas III)
0.240 M3
Paku Biasa 2" - 5"
3.200 Kg
Minyak Bekisting
1.600 Ltr
Besi Beton (Polos atau Ulir)
157.500 Kg
Kawat Beton
2.250 Kg
Semen PC
6.720 zak
Pasir Beton
0.540 M3
Koral Beton (Kerikil)
0.810 M3
Balok Kayu Kls II
0.160 M3
Playwood tebal 9 mm
2.800 Lbr
Dolken kayu galam 8 - 10 panjang 4 m
24.000 Btg
NO.
URAIAN PEKERJAAN
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
VOL.
5.300
0.275
1.300
1.050
0.262
0.265
Oh
Oh
Oh
Oh
Oh
Oh
M3
Kg
Ltr
Kg
Kg
zak
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
Pekerjaan Pengecatan
1
0.400
0.220
1.000
0.100
kg
Ltr
lbr
kg
0.250
0.038
0.038
0.013
Oh
Oh
Oh
Oh
NO.
URAIAN PEKERJAAN
Bahan
Cat meni besi
Minyak cat
Amplas besi
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
VOL.
1.640
0.440
0.500
kg
Ltr
lbr
0.500
0.750
0.075
0.025
Oh
Oh
Oh
Oh
1.000
M2
0.400
0.440
kg
Ltr
0.200
0.075
0.008
0.010
Oh
Oh
Oh
Oh
0.436
0.016
1.000
kg
kg
lbr
0.050
0.075
0.008
0.003
Oh
Oh
Oh
Oh
1.100 M'
2.000 Bh
0.060 Tube
0.043
0.043
0.004
Oh
Oh
Oh
NO.
URAIAN PEKERJAAN
Mandor
VOL.
0.002
Oh
4.400
14.600
M'
Bh
0.085
0.085
0.009
0.004
Oh
Oh
Oh
Oh
4.400 M'
4.500 M'
0.270 Tube
0.085
0.085
0.009
0.005
Oh
Oh
Oh
Oh
0.035
M3
0.800
2.000
0.200
0.040
Oh
Oh
Oh
Oh
0.064
M3
1.000
3.000
0.300
0.300
Oh
Oh
Oh
Oh
NO.
URAIAN PEKERJAAN
VOL.
0.020
0.030
0.300
1.000
M3
Kg
Ltr
Lbr
1.000
3.000
0.300
0.300
Oh
Oh
Oh
Oh
1.100
15.000
0.800
M3
Kg
Ltr
4.000
12.000
1.200
0.200
Oh
Oh
Oh
Oh
0.012
1.500
M3
Ltr
0.100
0.100
0.001
0.005
Oh
Oh
Oh
Oh
0.012
0.100
M3
Ltr
0.150
0.250
0.025
0.075
Oh
Oh
Oh
Oh
NO.
10
11
12
13
URAIAN PEKERJAAN
VOL.
0.023
0.150
M3
Ltr
0.200
0.300
0.030
0.010
Oh
Oh
Oh
Oh
0.027
0.200
M3
Ltr
0.250
0.350
0.035
0.013
Oh
Oh
Oh
Oh
0.007
0.050
M3
Ltr
0.100
0.200
0.025
0.005
Oh
Oh
Oh
Oh
0.011
0.050
M3
Ltr
0.110
0.220
0.022
0.005
Oh
Oh
Oh
Oh
NO.
14
15
16
17
18
URAIAN PEKERJAAN
1 M2 Pasang Lisplang Ukur. 2 x ( 2 x 20 cm )
Bahan
Kayu Papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
VOL.
0.009
0.060
M3
Ltr
0.100
0.100
0.010
0.050
Oh
Oh
Oh
Oh
0.015
0.060
M3
Ltr
0.150
0.250
0.025
0.075
Oh
Oh
Oh
Oh
25.000
Bh
0.150
0.075
0.008
0.008
Oh
Oh
Oh
Oh
25.000
0.160
0.032
Bh
Zak
M3
0.400
0.200
0.020
0.002
Oh
Oh
Oh
Oh
NO.
URAIAN PEKERJAAN
Genteng Pelentong
Semen PC
Pasir Pasing
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
19
20
21
22
VOL.
4.000
0.160
0.032
Bh
Zak
M3
0.400
0.200
0.020
0.002
Oh
Oh
Oh
Oh
0.500
0.120
Lbr
Kg
0.140
0.075
0.008
0.008
Oh
Oh
Oh
Oh
2.400
6.000
Lbr
Kg
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
2.100
6.000
Lbr
Kg
0.084
0.125
0.013
0.004
Oh
Oh
Oh
Oh
2.100
Lbr
NO.
URAIAN PEKERJAAN
Paku
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
23
24
VOL.
0.300
Kg
0.200
0.100
0.010
0.010
Oh
Oh
Oh
Oh
0.700
0.020
Lbr
Kg
0.150
0.070
0.008
0.006
Oh
Oh
Oh
Oh
0.300
4.000
Bh
Kg
0.150
0.070
0.008
0.006
Oh
Oh
Oh
Oh
1.100
0.010
Bh
Kg
0.030
0.070
0.007
0.002
Oh
Oh
Oh
Oh
11.500
Lbr
Pekerjaan Langit-Langit
1
1 M2 Langit-Langit Akustik 30 x 30 cm
Bahan
Akustik Ukuran 30 x 30 cm
NO.
URAIAN PEKERJAAN
Paku 2" - 2,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
VOL.
0.050
Kg
0.060
0.120
0.012
0.003
Oh
Oh
Oh
Oh
0.360
0.030
Lbr
Kg
0.070
0.100
0.010
0.004
Oh
Oh
Oh
Oh
0.375
0.030
Lbr
Kg
0.070
0.100
0.010
0.004
Oh
Oh
Oh
Oh
0.035
0.030
1.000
Jam
Jam
Ls
0.090
0.900
Jam
Jam
36.000
0.110
Bh
Kg
NO.
URAIAN PEKERJAAN
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
VOL.
0.400
0.200
0.020
0.002
Oh
Oh
Oh
Oh
2.500
0.015
0.035
Bh
Kg
Zak
0.400
0.200
0.020
0.002
Oh
Oh
Oh
Oh
0.150
0.020
0.100
0.030
1.000
M3
M3
M3
M3
M'
0.360
0.025
0.110
1.100
1.100
M3
M3
M3
M
M
0.560
0.030
0.140
1.400
1.400
M3
M3
M3
M
M
NO.
URAIAN PEKERJAAN
Keramik Uk.30x30 cm
Semen PC
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Mengetahui/ Menyetujui :
CV. WAYA BULA
VOL.
12.000
0.196
0.045
0.026
Bh
Zak
M3
Zak
0.250
0.125
0.013
0.013
Oh
Oh
Oh
Oh
1.000
0.100
1.000
Phn
Kg
Ls
0.030
0.050
0.005
Oh
Oh
Oh
Manado, 2 Januari 2
NO.
URAIAN PEKERJAAN
JOHNY POSUMAH
DIREKTUR
VOL.
AN PEKERJAAN
HARGA SATUAN
Rp
Rp
Rp
JUMLAH HARGA
2,640,000
13,480
2,640,000
31,680.00
269.60
18,480.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
3,840.00
5,440.00
601.60
246.40
60,557.60
605.58
61,160.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
256,012.80
16,410.24
272,423.04
2,724.23
275,140.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
256,012.80
16,410.24
272,423.04
2,724.23
275,140.00
1%
HARGA SATUAN
JUMLAH HARGA
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
28,800.00
1,232.00
30,032.00
300.32
30,330.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
34,560.00
2,217.60
36,777.60
367.78
37,140.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
38,400.00
1,576.96
39,976.96
399.77
40,370.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
57,600.00
2,956.80
60,556.80
605.57
61,160.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
12,672.00
492.80
13,164.80
131.65
13,290.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
9,600.00
410.67
10,010.67
100.11
10,110.00
Rp
Rp
Jumlah
19,200.00
2,464.00
21,664.00
38,400
49,280
1%
HARGA SATUAN
Biaya Umum
Hrg Satuan Pek.
Rp
JUMLAH HARGA
216.64
21,880.00
124,000
148,800.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
11,520.00
492.80
160,812.80
1,608.13
162,420.00
Rp
70,400
84,480.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
9,600.00
1,232.00
95,312.00
953.12
96,260.00
Rp
12,500
15,000.00
Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
5,760.00
739.20
21,499.20
214.99
21,710.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
37,140
37,140
37,140
30,330
30,330
30,330
30,330
30,330
29,800.00
27,300.00
21,500.00
16,500.00
10,900.00
9,200.00
7,400.00
5,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
162,420
162,420
162,420
162,420
162,420
162,420
162,420
162,420
22,300.00
22,300.00
18,200.00
18,200.00
14,200.00
14,200.00
14,200.00
10,100.00
Rp
Rp
10,110
10,110
5,200.00
4,700.00
1%
HARGA SATUAN
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
10,110
10,110
10,110
10,110
10,110
10,110
3,800.00
3,800.00
2,000.00
1,800.00
1,500.00
1,400.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
21,880
21,880
21,880
21,880
21,880
21,880
21,880
21,880
11,400.00
10,200.00
8,300.00
8,300.00
4,500.00
3,900.00
3,300.00
3,000.00
Rp
Rp
Rp
3,500
37,500
20,000
3,500.00
37,500.00
20,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
347,220
153,600.00
81,600.00
45,120.00
2,464.00
343,784.00
3,437.84
347,220.00
57,800.00
Rp
Rp
Rp
3,500
30,000
15,000
3,500.00
30,000.00
15,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
133,750
38,880.00
5,508.00
36,547.20
2,993.76
132,428.96
1,324.29
133,750.00
22,200.00
Rp
Rp
Rp
3,500
25,000
7,500
3,500.00
25,000.00
7,500.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
25,920.00
3,672.00
24,364.80
1,995.84
91,952.64
919.53
92,870.00
1%
37.50
30.00
25.00
HARGA SATUAN
JUMLAH HARGA
Rp
92,870
15,400.00
Rp
Rp
Rp
2,000
10,000
6,500
2,000.00
10,000.00
6,500.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
56,350
17,280.00
2,448.00
16,243.20
1,330.56
55,801.76
558.02
56,350.00
9,300.00
Rp
Rp
Rp
1,000
6,500
5,000
1,000.00
6,500.00
5,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
37,740
11,520.00
1,632.00
10,828.80
887.04
37,367.84
373.68
37,740.00
6,200.00
Rp
Rp
Rp
750
3,500
3,500
750.00
3,500.00
3,500.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
26,660
8,640.00
1,224.00
8,121.60
665.28
26,400.88
264.01
26,660.00
4,400.00
Rp
Rp
Rp
500
2,500
1,500
500.00
2,500.00
1,500.00
Rp
Rp
Rp
38,400
54,400
60,160
6,480.00
918.00
6,091.20
1%
9.38
6.25
3.13
2.21
2.25
10
HARGA SATUAN
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
18,670
Rp
Rp
Rp
JUMLAH HARGA
498.96
18,488.16
184.88
18,670.00
3,100.00
250
1,750
1,000
250.00
1,750.00
1,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
13,620
4,860.00
688.50
4,568.40
374.22
13,491.12
134.91
13,620.00
2,200.00
Rp
Rp
Rp
Rp
10,440
25,000
95,000
1,500
59,006.88
25,000.00
95,000.00
141,300.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
421,230
26,244.00
61,965.00
6,852.60
1,696.46
417,064.94
4,170.65
421,230.00
70,200.00
Rp
Rp
Rp
Rp
10,440
20,000
65,000
1,500
49,172.40
20,000.00
65,000.00
117,750.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
316,428
17,496.00
41,310.00
4,568.40
1,130.98
316,427.78
3,164.28
319,590.00
52,700.00
Rp
10,440
1%
39,337.92
1.67
93.75
62.50
HARGA SATUAN
Rp
Rp
Rp
JUMLAH HARGA
15,000
45,000
1,500
15,000.00
45,000.00
94,200.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
236,542
11,664.00
27,540.00
3,045.60
753.98
236,541.50
2,365.42
238,900.00
39,400.00
Rp
Rp
Rp
Rp
10,440
6,000
30,000
1,500
29,503.44
6,000.00
30,000.00
70,650.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
166,470
7,776.00
18,360.00
2,030.40
502.66
164,822.50
1,648.22
166,470.00
27,700.00
Rp
Rp
Rp
Rp
10,440
4,000
12,500
1,500
19,668.96
4,000.00
12,500.00
47,100.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
103,400
5,184.00
12,240.00
1,353.60
335.10
102,381.66
1,023.82
103,400.00
17,200.00
Rp
Rp
Rp
Rp
10,440
4,000
8,500
1,500
14,751.72
4,000.00
8,500.00
35,325.00
Rp
Rp
Rp
Rp
38,400
54,400
60,160
49,280
3,888.00
9,180.00
1,015.20
251.33
1%
41.67
30.00
12.50
8.33
HARGA SATUAN
JUMLAH HARGA
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
76,911
76,911.25
769.11
77,680.00
12,800.00
Rp
Rp
Rp
Rp
10,440
3,000
7,000
1,500
9,834.48
3,000.00
7,000.00
23,550.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
54,135
2,916.00
6,885.00
761.40
188.50
54,135.38
541.35
54,670.00
9,000.00
Rp
Rp
Rp
Rp
10,440
1,500
5,000
1,500
1,147.36
1,500.00
5,000.00
16,485.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
32,196
2,187.00
5,163.75
571.05
141.37
32,195.53
321.96
32,510.00
5,300.00
Rp
Rp
Rp
20,000
37,500
20,000
20,000.00
37,500.00
20,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
363,880
153,600.00
81,600.00
45,120.00
2,464.00
360,284.00
3,602.84
363,880.00
60,600.00
Rp
Rp
Rp
15,000
30,000
15,000
15,000.00
30,000.00
15,000.00
1%
6.82
4.69
37.50
30.00
HARGA SATUAN
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
317,650
Rp
Rp
Rp
JUMLAH HARGA
138,240.00
73,440.00
40,608.00
2,217.60
314,505.60
3,145.06
317,650.00
52,900.00
12,500
25,000
7,500
12,500.00
25,000.00
7,500.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
276,790
124,416.00
66,096.00
36,547.20
1,995.84
274,055.04
2,740.55
276,790.00
46,100.00
Rp
Rp
Rp
8,000
9,500
6,500
8,000.00
9,500.00
6,500.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
209,310
99,532.80
52,876.80
29,237.76
1,596.67
207,244.03
2,072.44
209,310.00
34,800.00
Rp
Rp
Rp
1%
5,000
6,500
5,000
5,000.00
6,500.00
5,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
155,470
74,649.60
39,657.60
21,928.32
1,197.50
153,933.02
1,539.33
155,470.00
25,900.00
25.00
9.38
6.25
HARGA SATUAN
Rp
Rp
Rp
JUMLAH HARGA
4,000
3,500
3,500
4,000.00
3,500.00
3,500.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
36,220
11,520.00
1,632.00
10,828.80
887.04
35,867.84
358.68
36,220.00
6,000.00
Rp
Rp
Rp
3,000
2,500
1,500
3,000.00
2,500.00
1,500.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
32,180
11,520.00
1,632.00
10,828.80
887.04
31,867.84
318.68
32,180.00
5,300.00
Rp
Rp
Rp
2,500
2,000
1,000
2,500.00
2,000.00
1,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
30,670
11,520.00
1,632.00
10,828.80
887.04
30,367.84
303.68
30,670.00
5,100.00
Rp
Rp
Rp
120,000
54,000
126,000
144,000.00
218,160.00
61,110.00
Rp
Rp
Rp
Rp
38,400
54,400
60,160
49,280
57,600.00
40,800.00
4,512.00
3,696.00
1%
3.13
2.21
1.67
HARGA SATUAN
JUMLAH HARGA
Jumlah
Biaya Umum
Hrg Satuan Pek.
529,878.00
5,298.78
535,170.00
Rp
Rp
Rp
120,000
54,000
126,000
144,000.00
176,040.00
65,520.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
57,600.00
40,800.00
4,512.00
3,696.00
492,168.00
4,921.68
497,080.00
Rp
Rp
120,000
126,000
144,000.00
54,432.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
29,952.00
21,216.00
2,346.24
1,921.92
253,868.16
2,538.68
256,400.00
Rp
Rp
120,000
500,000
144,000.00
166,650.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
3,840.00
10,880.00
270,720.00
3,696.00
599,786.00
5,997.86
605,780.00
Rp
Rp
Rp
640
54,000
126,000
44,800.00
20,466.00
4,788.00
Rp
Rp
Rp
38,400
54,400
60,160
11,520.00
5,440.00
601.60
1%
HARGA SATUAN
JUMLAH HARGA
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
739.20
88,354.80
883.55
89,230.00
Rp
Rp
Rp
640
54,000
126,000
44,800.00
12,420.00
5,418.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
11,520.00
5,440.00
601.60
739.20
80,938.80
809.39
81,740.00
Rp
Rp
54,000
126,000
9,201.60
2,142.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
7,680.00
8,160.00
902.40
492.80
28,578.80
285.79
28,860.00
Rp
Rp
54,000
126,000
5,616.00
2,520.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
7,680.00
8,160.00
902.40
492.80
25,371.20
253.71
25,620.00
Rp
Rp
54,000
126,000
15,422.40
2,898.00
Rp
Rp
38,400
54,400
9,600.00
1,088.00
1%
HARGA SATUAN
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
Rp
JUMLAH HARGA
1,203.20
492.80
30,704.40
307.04
31,010.00
54,000
126,000
9,374.40
3,528.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
9,600.00
1,088.00
1,203.20
616.00
25,409.60
254.10
25,660.00
Rp
Rp
54,000
126,000
10,044.00
2,268.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
9,984.00
10,880.00
1,203.20
640.64
35,019.84
350.20
35,370.00
Rp
Rp
54,000
126,000
7,635.60
2,646.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
9,984.00
10,880.00
1,203.20
640.64
32,989.44
329.89
33,310.00
Rp
Rp
54,000
126,000
4,665.60
2,016.00
Rp
Rp
Rp
Rp
38,400
54,400
60,160
49,280
5,760.00
3,808.00
421.12
394.24
1%
HARGA SATUAN
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
JUMLAH HARGA
17,064.96
170.65
17,230.00
54,000
1,890.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
1,536.00
4,352.00
481.28
98.56
8,357.84
83.58
8,440.00
Rp
Rp
Rp
7,600
126,000
1,440,000
1,330,000.00
37,800.00
72,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
2,384,170
576,000.00
272,000.00
48,128.00
24,640.00
2,360,568.00
23,605.68
2,384,170.00
23,840.00
Rp
Rp
Rp
Rp
54,000
124,000
209,440
100
298,080.00
73,408.00
157,080.00
21,500.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
63,360.00
14,960.00
1,684.48
4,090.24
634,162.72
6,341.63
640,500.00
Rp
Rp
Rp
Rp
266,760.00
76,968.57
154,985.60
21,500.00
54,000
124,000
209,440
100
1%
HARGA SATUAN
JUMLAH HARGA
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
63,360.00
14,960.00
1,684.48
4,090.24
604,308.89
6,043.09
610,350.00
Rp
Rp
Rp
54,000
124,000
209,440
400,680.00
61,822.86
162,432.36
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
63,360.00
14,960.00
1,684.48
4,090.24
709,029.93
7,090.30
716,120.00
Rp
Rp
Rp
Rp
54,000
124,000
203,280
100
414,720.00
61,291.43
156,450.31
21,500.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
63,360.00
14,960.00
1,684.48
4,090.24
738,056.46
7,380.56
745,430.00
Rp
Rp
9,200
13,600
96,600.00
2,040.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek. 10 Kg
Hrg Satuan Pek. 1 Kg
2,688.00
3,808.00
421.12
197.12
105,754.24
1,057.54
106,810.00
10,681.00
Rp
288,000.00
1,440,000
1%
HARGA SATUAN
Rp
Rp
Rp
Rp
Rp
Rp
Rp
JUMLAH HARGA
13,480
9,600
9,200
13,600
54,000
124,000
209,440
20,220.00
3,840.00
1,449,000.00
30,600.00
362,880.00
66,960.00
169,646.40
Rp
38,400
Rp
54,400
Rp
54,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
203,520.00
14,960.00
70,720.00
57,120.00
15,761.92
13,059.20
2,766,287.52
27,662.88
2,793,950.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,440,000
13,480
9,600
9,200
13,600
54,000
124,000
209,440
388,800.00
26,960.00
5,760.00
1,932,000.00
40,800.00
362,880.00
66,960.00
169,646.40
Rp
38,400
Rp
54,400
Rp
54,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
216,960.00
14,960.00
84,864.00
76,160.00
19,431.68
13,946.24
3,420,128.32
34,201.28
3,454,320.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
345,600.00
43,136.00
15,360.00
1,449,000.00
30,600.00
362,880.00
66,960.00
169,646.40
422,400.00
220,640.00
288,000.00
1,440,000
13,480
9,600
9,200
13,600
54,000
124,000
209,440
2,640,000
78,800
12,000
1%
HARGA SATUAN
JUMLAH HARGA
Rp
38,400
Rp
54,400
Rp
54,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
203,520.00
14,960.00
70,720.00
57,120.00
15,761.92
13,059.20
3,789,363.52
37,893.64
3,827,250.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,440,000
13,480
9,600
9,200
13,600
54,000
124,000
209,440
2,640,000
78,800
12,000
460,800.00
43,136.00
15,360.00
1,932,000.00
40,800.00
362,880.00
66,960.00
169,646.40
369,600.00
220,640.00
192,000.00
Rp
38,400
Rp
54,400
Rp
54,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
243,840.00
14,960.00
89,760.00
76,160.00
20,033.28
15,671.04
4,334,246.72
43,342.47
4,377,580.00
Rp
Rp
Rp
Rp
65,000
10,000
3,600
16,000
26,000.00
2,200.00
3,600.00
1,600.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
9,600.00
2,040.00
2,286.08
640.64
47,966.72
479.67
48,440.00
1%
HARGA SATUAN
Rp
Rp
Rp
JUMLAH HARGA
19,200
10,000
3,600
31,488.00
4,400.00
1,800.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
104,460
19,200.00
40,800.00
4,512.00
1,232.00
103,432.00
1,034.32
104,460.00
10,440.00
Rp
Rp
28,000
10,000
11,200.00
4,400.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
7,680.00
4,080.00
481.28
492.80
28,334.08
283.34
28,610.00
Rp
Rp
Rp
12,480
16,000
3,600
5,441.28
256.00
3,600.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
1,920.00
4,080.00
481.28
147.84
15,926.40
159.26
16,080.00
Rp
Rp
Rp
64,000
600
72,000
70,400.00
1,200.00
4,320.00
Rp
Rp
Rp
38,400
64,000
60,160
1,651.20
2,752.00
258.69
1%
HARGA SATUAN
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
Rp
JUMLAH HARGA
103.49
80,685.38
806.85
81,490.00
64,000
600
281,600.00
8,760.00
Rp
38,400
Rp
64,000
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
3,264.00
5,440.00
511.36
206.98
299,782.34
2,997.82
302,780.00
Rp
Rp
Rp
64,000
108,000
72,000
281,600.00
486,000.00
19,440.00
Rp
38,400
Rp
64,000
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
3,264.00
5,440.00
541.44
246.40
796,531.84
7,965.32
804,490.00
Rp
2,640,000
92,400.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
30,720.00
108,800.00
12,032.00
1,971.20
245,923.20
2,459.23
248,380.00
Rp
2,640,000
168,960.00
38,400
54,400
60,160
49,280
38,400.00
163,200.00
18,048.00
14,784.00
403,392.00
4,033.92
Rp
Rp
Rp
Rp
Jumlah
Biaya Umum
1%
HARGA SATUAN
JUMLAH HARGA
407,420.00
Rp
Rp
Rp
Rp
2,640,000
13,480
20,000
120,000
51,744.00
404.40
6,000.00
120,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
38,400.00
163,200.00
18,048.00
14,784.00
412,580.40
4,125.80
416,700.00
Rp
Rp
Rp
2,640,000
11,600
13,480
2,904,000.00
174,000.00
10,784.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
153,600.00
652,800.00
72,192.00
9,856.00
3,977,232.00
39,772.32
4,017,000.00
Rp
Rp
2,640,000
13,480
31,680.00
20,220.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
3,840.00
5,440.00
60.16
246.40
61,486.56
614.87
62,100.00
Rp
Rp
2,640,000
13,480
31,680.00
1,348.00
38,400
54,400
60,160
49,280
5,760.00
13,600.00
1,504.00
3,696.00
57,588.00
Rp
Rp
Rp
Rp
Jumlah
1%
HARGA SATUAN
JUMLAH HARGA
Biaya Umum
Hrg Satuan Pek.
575.88
58,160.00
Rp
Rp
2,640,000
13,480
60,720.00
2,022.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
7,680.00
16,320.00
1,804.80
492.80
89,039.60
890.40
89,920.00
Rp
Rp
2,640,000
13,480
71,280.00
2,696.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
9,600.00
19,040.00
2,105.60
616.00
105,337.60
1,053.38
106,390.00
Rp
Rp
2,640,000
13,480
19,008.00
674.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
3,840.00
10,880.00
1,504.00
246.40
36,152.40
361.52
36,510.00
Rp
Rp
2,640,000
13,480
29,040.00
674.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
4,224.00
11,968.00
1,323.52
246.40
47,475.92
474.76
47,950.00
1%
HARGA SATUAN
Rp
Rp
JUMLAH HARGA
2,640,000
13,480
22,704.00
808.80
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
3,840.00
5,440.00
601.60
2,464.00
35,858.40
358.58
36,210.00
Rp
Rp
2,640,000
13,480
38,280.00
808.80
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
5,760.00
13,600.00
1,504.00
3,696.00
63,648.80
636.49
64,280.00
Rp
2,250
56,250.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
5,760.00
4,080.00
481.28
394.24
66,965.52
669.66
67,630.00
Rp
Rp
Rp
2,250
54,000
126,000
56,250.00
8,640.00
4,032.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
15,360.00
10,880.00
1,203.20
98.56
96,463.76
964.64
97,420.00
1%
HARGA SATUAN
Rp
Rp
Rp
JUMLAH HARGA
2,250
54,000
126,000
9,000.00
8,640.00
4,032.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
15,360.00
10,880.00
1,203.20
98.56
49,213.76
492.14
49,700.00
Rp
Rp
37,500
25,000
18,750.00
3,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
5,376.00
4,080.00
481.28
394.24
32,081.52
320.82
32,400.00
Rp
Rp
25,000
12,500
60,000.00
75,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
3,225.60
6,800.00
782.08
197.12
146,004.80
1,460.05
147,460.00
Rp
Rp
25,000
12,500
52,500.00
75,000.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
3,225.60
6,800.00
782.08
197.12
138,504.80
1,385.05
139,880.00
Rp
36,000
75,600.00
1%
0.48
2.08
HARGA SATUAN
Rp
JUMLAH HARGA
13,480
4,044.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
7,680.00
5,440.00
601.60
492.80
93,858.40
938.58
94,790.00
Rp
Rp
38,000
13,480
26,600.00
269.60
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
5,760.00
3,808.00
481.28
295.68
37,214.56
372.15
37,580.00
Rp
Rp
38,000
13,480
11,400.00
53,920.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
5,760.00
3,808.00
481.28
295.68
75,664.96
756.65
76,420.00
Rp
Rp
35,000
13,480
38,500.00
134.80
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
1,152.00
3,808.00
421.12
73.92
44,089.84
440.90
44,530.00
Rp
17,500
201,250.00
1%
HARGA SATUAN
Rp
JUMLAH HARGA
13,480
674.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
2,304.00
6,528.00
721.92
147.84
211,625.76
2,116.26
213,740.00
Rp
Rp
55,000
13,480
19,800.00
404.40
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
2,688.00
5,440.00
601.60
172.48
29,106.48
291.06
29,390.00
Rp
Rp
55,000
13,480
20,625.00
404.40
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
2,688.00
5,440.00
601.60
172.48
29,931.48
299.31
30,230.00
272,000.00
1,747,200.00
1,000.00
9,520.00
52,416.00
1,000.00
6,160.00
4,800.00
554.40
4,320.00
67,810.40
678.10
68,480.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
Rp
3,600
126,000
129,600.00
13,860.00
1%
HARGA SATUAN
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
Rp
Rp
JUMLAH HARGA
15,360.00
10,880.00
1,203.20
98.56
171,001.76
1,710.02
172,710.00
20,000
126,000
54,000
50,000.00
1,890.00
1,890.00
Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
15,360.00
10,880.00
1,203.20
98.56
81,321.76
813.22
82,130.00
Rp
30,330
Rp
162,420
Rp
497,080
Rp
4,377,580
Rp
200,000
Jumlah
Biaya Umum
Hrg Satuan Pek.
4,549.50
3,248.40
49,708.00
131,327.40
200,000.00
388,833.30
3,888.33
392,720.00
Rp
30,330
Rp
162,420
Rp
497,080
Rp
33,310
Rp
8,440
Jumlah
Biaya Umum
Hrg Satuan Pek.
10,918.80
4,060.50
54,678.80
36,641.00
9,284.00
115,583.10
1,155.83
116,730.00
Rp
30,330
Rp
162,420
Rp
497,080
Rp
33,310
Rp
8,440
Jumlah
Biaya Umum
Hrg Satuan Pek.
16,984.80
4,872.60
69,591.20
46,634.00
11,816.00
149,898.60
1,498.99
151,390.00
1%
HARGA SATUAN
JUMLAH HARGA
4,800
54,000
126,000
100,000
57,600.00
10,584.00
5,670.00
2,600.00
38,400
54,400
60,160
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
9,600.00
6,800.00
782.08
616.00
94,252.08
942.52
95,190.00
Rp
Rp
Rp
85,000
6,000
2,000
85,000.00
600.00
2,000.00
Rp
38,400
Rp
54,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
1,152.00
2,720.00
246.40
91,718.40
917.18
92,630.00
1%
HARGA SATUAN
HERU BASKORO
PIMPINAN TEKNIK
JUMLAH HARGA
1%
:
:
Lokasi
Tahun Anggaran
No. Paket
:
:
:
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Plesteran 1pc:4ps
Acian
Pengecatan
Begel pipa 75 MM
Nepel Drat PVC 1/2 INCH
Elbow PVC 1/2 INCH
Socket Drat PVC 1/2 INCH
Stop Kran Kuningan 1/2 INCH
Pipa PVC 1/2 INCH
Tee-Stuck PVC 1/2 INCH
Mata Kran Vernekel 1/2 INCH
TBA uk. Sedang
Tegel Keramik 20/25
Biaya Pemasangan Pipa & Acc
VOL.
0.3000
0.1000
0.0500
1.7000
1.7000
1.2000
1.0000
1.0000
2.0000
5.0000
0.0050
6.0000
1.0000
2.0000
1.0000
2.2000
1.0000
m3
m3
m3
m2
m2
m2
bh
bh
bh
bh
bh
m1
bh
bh
pcs
m2
ls
1
2
URAIAN PEKERJAAN
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
VOL.
2.4000
0.1400
m3
m3
3
4
5
6
7
8
9
10
11
12
13
0.3200
1.5000
6.4000
11.2000
12.0000
10.0000
2.0000
4.0000
72.0000
5.0000
1.0000
m3
m2
m2
m2
m1
bh
bh
bh
bh
bh
ls
1.0000
m1
1
2
3
4
5
6
7
8
9
10
11
12
13
URAIAN PEKERJAAN
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Tiang Penyangga Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pasangan Batu, 1pc:4ps
Plesteran 1pc:4ps
Pengecatan
Pipa GIP 100 MM
Flanged GIP 100 MM
Flanged Socket 100 MM
Elbow GIP 100 MM
Bout 18 MM
Packing Karet MM
Erection
VOL.
2.4000
0.1400
0.3200
1.5000
6.4000
11.2000
12.0000
10.0000
2.0000
4.0000
72.0000
5.0000
1.0000
m3
m3
m3
m2
m2
m2
m1
bh
bh
bh
bh
bh
ls
1.0000
m1
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
URAIAN PEKERJAAN
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Tiang Penyangga Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pasangan Batu, 1pc:4ps
Plesteran 1pc:4ps
Pengecatan
Pipa GIP 75 MM
Flanged GIP 75 MM
Flanged Socket 75 MM
Elbow GIP 75 MM
Bout 18 MM
Packing Karet MM
Erection
VOL.
2.4000
0.1400
0.3200
1.5000
6.4000
11.2000
12.0000
10.0000
2.0000
4.0000
72.0000
5.0000
1.0000
m3
m3
m3
m2
m2
m2
m1
bh
bh
bh
bh
bh
ls
1.0000
m1
URAIAN PEKERJAAN
1
2
3
4
5
6
7
8
9
10
VOL.
2.5200
1.5000
0.7400
5.2500
6.0000
2.0000
2.0000
16.0000
2.0000
1.0000
m3
m3
m3
kg
m1
bh
bh
bh
bh
ls
1.0000
m1
URAIAN PEKERJAAN
VOL.
1
2
3
4
5
6
7
8
9
10
1.6200
1.5000
0.5400
5.2500
6.0000
2.0000
2.0000
16.0000
2.0000
1.0000
m3
m3
m3
kg
m1
bh
bh
bh
bh
ls
1.0000
m1
URAIAN PEKERJAAN
1
2
3
4
5
6
7
8
9
10
VOL.
1.4500
0.9000
0.4200
5.2500
6.0000
2.0000
2.0000
16.0000
2.0000
1.0000
m3
m3
m3
kg
m1
bh
bh
bh
bh
ls
1.0000
m1
Analisa lumpsum : 1 UNIT, PENGAD-PEMAS PENUTUP CHAMBER-MANHOLE PLAT EZER 3 MM, Uk. 70
Satuan : unit
NO.
1
2
3
4
5
6
URAIAN PEKERJAAN
VOL.
0.8000
2.8000
2.0000
7.0000
3.0000
1.0000
m2
m1
bh
pcs
pcs
ls
1
2
3
4
5
6
URAIAN PEKERJAAN
Besi 12 mm
Besi Siku 3.50.50 mm
Hengsel besi
Angker/handdel besi 16 mm, pjg 30 cm
Kunci/Gembok Kuningan
Erection & pengelasan
VOL.
16.8000
1.4000
2.0000
7.0000
3.0000
1.0000
kg
m1
bh
pcs
pcs
ls
Analisa lumpsum : 1 UNIT, BAK CHAMBER PAS. 1/2 BATA, Uk. 80x80x120 CM
Satuan : unit
NO.
1
2
3
4
5
6
7
URAIAN PEKERJAAN
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan
VOL.
3.2400
0.1000
0.0810
3.8000
8.8000
8.8000
4.2000
m3
m3
m3
m2
m2
m2
m2
Analisa lumpsum : 1 UNIT, BAK CHAMBER PAS. 1/2 BATA, Uk. 80x150x120 CM
Satuan : unit
NO.
1
2
3
4
5
6
7
URAIAN PEKERJAAN
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan
VOL.
5.4000
0.1400
0.0967
6.9600
16.8000
16.8000
8.0000
m3
m3
m3
m2
m2
m2
m2
1
2
3
URAIAN PEKERJAAN
Pipa GIP 75 mm
Angker besi 12 mm, pjg 30 cm
Erection & pengelasan
VOL.
1.0000
2.0000
1.0000
m1
pcs
ls
1
2
3
4
URAIAN PEKERJAAN
Galian Tanah
Tiang pipa GIP dia. 2"
Kawat duri
Erection
VOL.
0.1000
6.0000
64.0000
1.0000
m3
m1
m1
ls
1.0000
m1
1
2
3
4
5
6
7
8
9
10
11
12
13
URAIAN PEKERJAAN
VOL.
1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2
NO.
1
2
3
4
5
6
7
8
9
10
11
12
13
URAIAN PEKERJAAN
VOL.
1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
URAIAN PEKERJAAN
VOL.
1.0000
1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000
bh
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2
1
2
3
4
5
URAIAN PEKERJAAN
VOL.
1.0000
1.0000
1.0000
6.0000
32.0000
bh
bh
m1
bh
bh
6
7
8
9
10
11
12
13
14
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000
bh
ls
m3
m3
m3
m2
m2
m2
m2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
URAIAN PEKERJAAN
VOL.
1.0000
1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000
bh
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2
1
2
3
4
5
6
7
8
9
URAIAN PEKERJAAN
VOL.
1.0000
1.0000
4.0000
16.0000
2.0000
1.0000
3.2400
0.1000
0.1300
bh
m1
bh
bh
bh
ls
m3
m3
m3
10
11
12
13
3.8000
8.8000
8.8000
4.2000
m2
m2
m2
m2
1
2
3
4
5
6
7
8
9
10
11
12
13
URAIAN PEKERJAAN
VOL.
1.0000
1.0000
4.0000
16.0000
2.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2
1
2
3
4
5
6
7
8
9
10
11
12
13
URAIAN PEKERJAAN
Air Valve 75 mm
Pipa GIP 75 MM
Flanged GIP 75 MM
Bout 16 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan
VOL.
1.0000
1.0000
4.0000
16.0000
2.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2
1
2
URAIAN PEKERJAAN
Angker besi 22 mm
Erection & pengelasan
VOL.
17.0500
1.0000
kg
ls
1
2
3
4
5
URAIAN PEKERJAAN
Pintu Air
Besi Siku 3.50.50 mm
Angker/handdel besi 16 mm, pjg 30 cm
Erection & pengelasan
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
VOL.
1.0000
5.6000
8.0000
1.0000
0.0360
Unit
m1
pcs
ls
m3
1
2
3
4
5
URAIAN PEKERJAAN
Mengetahui/ Menyetujui :
CV. WAYA BULA
JOHNY POSUMAH
DIREKTUR
VOL.
1.0000
0.5700
1.8000
1.8000
1.0000
unit
m3
m2
m2
ls
Manado, 2 Januari
MPSUM
HARGA SATUAN
30,330.00
610,350.00
2,793,950.00
25,660.00
8,440.00
16,080.00
65,000.00
6,000.00
6,500.00
7,000.00
37,500.00
3,997.00
10,000.00
45,000.00
5,000.00
95,190.00
350,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
30,330.00 Rp
610,350.00 Rp
9,099.00
61,035.00
139,697.50
43,622.00
14,348.00
19,296.00
65,000.00
6,000.00
13,000.00
35,000.00
187.50
23,982.00
10,000.00
90,000.00
5,000.00
209,418.00
350,000.00
1,094,685.00
10,946.85
1,105,631.85
JUMLAH HARGA
72,792.00
85,449.00
2,793,950.00
497,080.00
25,660.00
16,080.00
433,400.00
192,400.00
385,800.00
350,000.00
9,000.00
15,000.00
1,000,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
894,064.00
745,620.00
164,224.00
180,096.00
5,200,800.00
1,924,000.00
771,600.00
1,400,000.00
648,000.00
75,000.00
1,000,000.00
13,161,645.00
131,616.45
13,293,261.45
1,107,771.79 Rp
1,107,771.79
Jumlah
Biaya Umum
Hrg Satuan Pek.
HARGA SATUAN
30,330.00
610,350.00
2,793,950.00
497,080.00
25,660.00
16,080.00
266,700.00
133,600.00
209,200.00
300,000.00
7,500.00
12,000.00
850,000.00
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
72,792.00
85,449.00
894,064.00
745,620.00
164,224.00
180,096.00
3,200,400.00
1,336,000.00
418,400.00
1,200,000.00
540,000.00
60,000.00
850,000.00
9,747,045.00
97,470.45
9,844,515.45
820,376.29 Rp
820,376.29
Jumlah
Biaya Umum
Hrg Satuan Pek.
HARGA SATUAN
30,330.00
610,350.00
2,793,950.00
497,080.00
25,660.00
16,080.00
184,900.00
96,200.00
158,500.00
250,000.00
7,500.00
9,000.00
750,000.00
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
72,792.00
85,449.00
894,064.00
745,620.00
164,224.00
180,096.00
2,218,800.00
962,000.00
317,000.00
1,000,000.00
540,000.00
45,000.00
750,000.00
7,975,045.00
79,750.45
8,054,795.45
671,232.95 Rp
671,232.95
Jumlah
Biaya Umum
Hrg Satuan Pek.
HARGA SATUAN
40,370.00
497,080.00
162,420.00
7,600.00
433,400.00
192,400.00
385,800.00
7,500.00
15,000.00
500,000.00
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
101,732.40
745,620.00
120,190.80
39,900.00
2,600,400.00
384,800.00
771,600.00
120,000.00
30,000.00
500,000.00
5,414,243.20
54,142.43
5,468,385.63
911,397.61 Rp
911,397.61
Jumlah
Biaya Umum
Hrg Satuan Pek.
HARGA SATUAN
JUMLAH HARGA
40,370.00
497,080.00
162,420.00
7,600.00
266,700.00
133,600.00
209,200.00
7,500.00
12,000.00
400,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
65,399.40
745,620.00
87,706.80
39,900.00
1,600,200.00
267,200.00
418,400.00
120,000.00
24,000.00
400,000.00
3,768,426.20
37,684.26
3,806,110.46
634,351.74 Rp
634,351.74
Jumlah
Biaya Umum
Hrg Satuan Pek.
HARGA SATUAN
40,370.00
497,080.00
162,420.00
7,600.00
184,900.00
96,200.00
158,500.00
6,500.00
9,000.00
300,000.00
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
58,536.50
447,372.00
68,216.40
39,900.00
1,109,400.00
192,400.00
317,000.00
104,000.00
18,000.00
300,000.00
2,654,824.90
26,548.25
2,681,373.15
446,895.52 Rp
446,895.52
Jumlah
Biaya Umum
Hrg Satuan Pek.
185,000.00
19,000.00
40,000.00
3,500.00
55,000.00
150,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
148,000.00
53,200.00
80,000.00
24,500.00
165,000.00
150,000.00
620,700.00
6,207.00
626,907.00
BESI 12 MM
HARGA SATUAN
9,200.00
19,000.00
40,000.00
3,500.00
55,000.00
150,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
154,560.00
26,600.00
80,000.00
24,500.00
165,000.00
150,000.00
600,660.00
6,006.60
606,666.60
98,269.20
61,035.00
226,309.95
310,612.00
225,808.00
74,272.00
67,536.00
1,063,842.15
10,638.42
1,074,480.57
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
163,782.00
85,449.00
270,174.97
568,910.40
431,088.00
141,792.00
128,640.00
1,789,836.37
17,898.36
1,807,734.73
HARGA SATUAN
JUMLAH HARGA
184,900.00 Rp
3,500.00 Rp
75,000.00 Rp
Jumlah
Rp
Biaya Umum
Rp
Hrg Satuan Pek.
Rp
HARGA SATUAN
30,330.00
111,400.00
7,200.00
80,000.00
184,900.00
7,000.00
75,000.00
266,900.00
2,669.00
269,569.00
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
3,033.00
668,400.00
460,800.00
80,000.00
1,212,233.00
12,122.33
1,224,355.33
122,435.53 Rp
122,435.53
Jumlah
Biaya Umum
Hrg Satuan Pek.
50 MM + CHAMBER
HARGA SATUAN
5,132,100.00
433,400.00
192,400.00
7,500.00
15,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
00 MM + CHAMBER
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,132,100.00
433,400.00
1,154,400.00
240,000.00
60,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
8,320,645.70
83,206.46
8,403,852.16
HARGA SATUAN
3,635,200.00
266,700.00
133,600.00
7,500.00
12,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
1,069,200.00
2,940,300.00
433,400.00
192,400.00
7,500.00
15,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
919,500.00
1,587,700.00
266,700.00
133,600.00
7,500.00
3,635,200.00
266,700.00
801,600.00
240,000.00
48,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
6,292,245.70
62,922.46
6,355,168.16
1,069,200.00
2,940,300.00
433,400.00
1,154,400.00
240,000.00
60,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
7,198,045.70
71,980.46
7,270,026.16
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
919,500.00
1,587,700.00
266,700.00
801,600.00
240,000.00
12,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
490,000.00
1,111,900.00
184,900.00
96,200.00
6,500.00
9,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
2,851,200.00
266,700.00
133,600.00
7,500.00
15,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
48,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
5,164,245.70
51,642.46
5,215,888.16
490,000.00
1,111,900.00
184,900.00
577,200.00
208,000.00
36,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
3,908,745.70
39,087.46
3,947,833.16
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
2,851,200.00
266,700.00
534,400.00
120,000.00
30,000.00
100,000.00
98,269.20
61,035.00
363,213.50
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
1,539,648.00
354,941.17
162,000.00
7,500.00
12,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
1,078,240.00
184,900.00
96,200.00
6,500.00
9,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
310,612.00
225,808.00
74,272.00
67,536.00
5,103,045.70
51,030.46
5,154,076.16
1,539,648.00
354,941.17
648,000.00
120,000.00
24,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
3,987,334.87
39,873.35
4,027,208.22
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,078,240.00
184,900.00
384,800.00
104,000.00
18,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
3,070,685.70
30,706.86
3,101,392.56
HARGA SATUAN
Rp
9,200
Rp
80,000
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
HARGA SATUAN
5,000,000.00
19,000.00
3,500.00
150,000.00
2,793,950.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
5,000,000.00
106,400.00
28,000.00
150,000.00
100,582.20
Rp
Rp
Rp
5,284,400.00
52,844.00
5,337,244.00
HARGA SATUAN
1,500,000.00
610,350.00
25,660.00
8,440.00
60,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.
JUMLAH HARGA
Rp
Rp
Rp
Rp
Rp
1,500,000.00
347,899.50
46,188.00
15,192.00
60,000.00
Rp
Rp
Rp
1,909,279.50
19,092.80
1,928,372.30
HERU BASKORO
PIMPINAN TEKNIK
156,860
80,000
236,860
2,368.60
239,229
1%
Lampiran 1
:
:
Lokasi
Tahun Anggaran
No. Paket
NO.
1
URAIAN PEKERJAAN
HARGA
per 1 M'
3
Rp 1,098,900.00
Rp
822,112.50
Rp
553,162.50
Rp
410,850.00
Rp
252,862.50
Rp
175,312.50
Rp
105,600.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
549,656.25
344,561.25
222,255.00
142,436.25
67,361.25
44,797.50
22,151.25
Rp
Rp
Rp
Rp
448,428.75
281,737.50
180,551.25
115,871.25
NO.
1
URAIAN PEKERJAAN
HARGA
per 1 M'
3
Mengetahui/ Menyetujui :
CV. WAYA BULA
JOHNY POSUMAH
DIREKTUR
Rp
Rp
Rp
54,243.75
37,372.50
17,902.50
Rp
Rp
Rp
Rp
Rp
Rp
Rp
643,830.00
404,827.50
260,370.00
166,815.00
79,942.50
53,542.50
26,400.00
ASURANSI %
ONGKOS KIRIM
JLH HARGA
per 1 M'
4
per 1 M'
5
per 1 M'
6
Rp
Rp
Rp
Rp
Rp
Rp
Rp
32,967.00
24,663.38
16,594.88
12,325.50
7,585.88
5,259.38
3,168.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
27,472.50
20,552.81
13,829.06
10,271.25
6,321.56
4,382.81
2,640.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,159,300.00
867,300.00
583,500.00
433,400.00
266,700.00
184,900.00
111,400.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
16,489.69
10,336.84
6,667.65
4,273.09
2,020.84
1,343.93
664.54
Rp
Rp
Rp
Rp
Rp
Rp
Rp
13,741.41
8,614.03
5,556.38
3,560.91
1,684.03
1,119.94
553.78
Rp
Rp
Rp
Rp
Rp
Rp
Rp
579,800.00
363,500.00
234,400.00
150,200.00
71,000.00
47,200.00
23,300.00
Rp
Rp
Rp
Rp
13,452.86
8,452.13
5,416.54
3,476.14
Rp
Rp
Rp
Rp
11,210.72
7,043.44
4,513.78
2,896.78
Rp
Rp
Rp
Rp
473,000.00
297,200.00
190,400.00
122,200.00
ASURANSI %
ONGKOS KIRIM
JLH HARGA
per 1 M'
4
per 1 M'
5
per 1 M'
6
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,627.31 Rp
1,121.18 Rp
537.08 Rp
19,314.90
12,144.83
7,811.10
5,004.45
2,398.28
1,606.28
792.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,356.09 Rp
934.31 Rp
447.56 Rp
16,095.75
10,120.69
6,509.25
4,170.38
1,998.56
1,338.56
660.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HERU BASKORO
PIMPINAN TEKNIK
57,200.00
39,400.00
18,800.00
679,200.00
427,000.00
274,600.00
175,900.00
84,300.00
56,400.00
27,800.00
Lampiran 2
No.
URAIAN PEKERJAAN
HARGA PABRIK
ONGKOS KIRIM
(a)
(b)
(c)
(e)
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
536,250.00
1,029,600.00
1,470,150.00
2,722,500.00
4,158,000.00
4,989,600.00
6,897,000.00
207,900.00
99,000.00
2,640,000.00
3,300,000.00
3,960,000.00
4,752,000.00
5,702,400.00
1,980,000.00
2,673,000.00
3,366,000.00
4,752,000.00
6,336,000.00
9,900,000.00
23,760,000.00
472,725.00
660,000.00
354,750.00
440,137.50
392,040.00
372,438.00
2,970,000.00
2,574,000.00
2,148,300.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
26,812.50
51,480.00
73,507.50
136,125.00
207,900.00
249,480.00
344,850.00
10,395.00
4,950.00
132,000.00
165,000.00
198,000.00
237,600.00
285,120.00
99,000.00
133,650.00
168,300.00
237,600.00
316,800.00
495,000.00
1,188,000.00
23,636.25
33,000.00
17,737.50
22,006.88
19,602.00
18,621.90
148,500.00
128,700.00
107,415.00
No.
(a)
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
URAIAN PEKERJAAN
(b)
All Flanged Tee CI 12" x 12"
All Flanged Tee CI 10" x 10"
All Flanged Tee CI 8" x 8"
All Flanged Tee CI 6" x 6"
All Flanged Tee CI 6" x 4"
All Flanged Tee CI 4" x 4"
All Flanged Tee CI 4" x 3"
All Flanged Tee CI 4" x 2"
All Flanged Tee CI 3" x 2"
All Flanged Tee CI 2" x 2"
All Flanged Tee Y Cl 12" X 12"
Socket Tee PVC (All RR) 6" x 6"
Socket Tee PVC (All RR) 6" x 4"
Socket Tee PVC (All RR) 4" x 4"
Socket Tee PVC (All RR) 4" x 3"
Socket Tee PVC (All RR) 4" x 2"
Socket Tee PVC (All RR) 3" X 3"
Socket Tee PVC (All RR) 3" X 2"
Socket Tee PVC (All RR) 2" X 2"
Baut Moor 5/8" x 3"
Baut Moor 5/8" x 4"
Blind Flanged 12"
Blind Flanged 8"
Clem Besi Plat 4" X 2 mm
Dop PVC 2"
Dop PVC 3"
Bend Doble Socet PVC 12" X 11,25
Bend Doble Socet PVC 12" X 22,5
Bend Doble Socet PVC 12" X 45
Bend Doble Socet PVC 12" X 90
Bend Doble Socet PVC 8" x 22,5
Bend Doble Socet PVC 8" x 45
Bend Doble Socet PVC 8" x 90
Bend Doble Socet PVC 6" x 22,5
Bend Doble Socet PVC 6" x 45
Bend Doble Socet PVC 6" x 90
Bend Doble Socet PVC 4" x 11,5
Bend Doble Socet PVC 4" x 22,5
Bend Doble Socet PVC 4" x 45
Bend Doble Socet PVC 4" x 90
Bend Doble Socet PVC 3" x 22,5
Bend Doble Socet PVC 3" x 45
Bend Doble Socet PVC 3" x 90
Bend Doble Socet PVC 2" x 22,5
Bend Doble Socet PVC 2" x 45
Bend Doble Socet PVC 2" x 90
Double Flanged Pipe GIP 3" x 60 cm.
Double Flanged Pipe GIP 3" x 80 cm.
Double Flanged Pipe GIP 3" x 100 cm.
Double Flanged Pipe GIP 3" x 120 cm.
Double Flanged Pipe GIP 3" x 200 cm.
Double Flanged Pipe GIP 4" x 60 cm.
Double Flanged Pipe GIP 4" x 80 cm.
HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
ONGKOS KIRIM
(c)
3,341,250.00 Rp
2,227,500.00 Rp
1,485,000.00 Rp
990,000.00 Rp
919,050.00 Rp
851,400.00 Rp
589,875.00 Rp
568,425.00 Rp
453,750.00 Rp
206,250.00 Rp
2,937,000.00 Rp
811,800.00 Rp
704,880.00 Rp
436,425.00 Rp
396,000.00 Rp
326,700.00 Rp
261,360.00 Rp
231,660.00 Rp
158,400.00 Rp
6,600.00 Rp
9,900.00 Rp
668,250.00 Rp
536,250.00 Rp
37,125.00 Rp
20,625.00 Rp
28,875.00 Rp
1,152,000.00 Rp
1,216,000.00 Rp
1,400,000.00 Rp
2,005,600.00 Rp
344,000.00 Rp
387,200.00 Rp
456,000.00 Rp
188,800.00 Rp
224,240.00 Rp
247,200.00 Rp
81,600.00 Rp
86,400.00 Rp
93,600.00 Rp
101,600.00 Rp
52,080.00 Rp
59,280.00 Rp
66,720.00 Rp
26,640.00 Rp
28,800.00 Rp
32,560.00 Rp
474,210.00 Rp
565,290.00 Rp
701,910.00 Rp
747,450.00 Rp
1,157,310.00 Rp
393,492.00 Rp
479,028.00 Rp
(e)
167,062.50
111,375.00
74,250.00
49,500.00
45,952.50
42,570.00
29,493.75
28,421.25
22,687.50
10,312.50
146,850.00
40,590.00
35,244.00
21,821.25
19,800.00
16,335.00
13,068.00
11,583.00
7,920.00
330.00
495.00
33,412.50
26,812.50
1,856.25
1,031.25
1,443.75
57,600.00
60,800.00
70,000.00
100,280.00
17,200.00
19,360.00
22,800.00
9,440.00
11,212.00
12,360.00
4,080.00
4,320.00
4,680.00
5,080.00
2,604.00
2,964.00
3,336.00
1,332.00
1,440.00
1,628.00
23,710.50
28,264.50
35,095.50
37,372.50
57,865.50
19,674.60
23,951.40
No.
URAIAN PEKERJAAN
(a)
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
(b)
Double Flanged Pipe GIP 4" x 100 cm.
Double Flanged Pipe GIP 4" x 120 cm.
Double Flanged Pipe GIP 4" x 180 cm.
Flanged Pipe GIP 3" x 60 cm.
Flanged Pipe GIP 3" x 100 cm.
Flanged Pipe GIP 3" x 200 cm.
Flanged Pipe GIP 4" x 60 cm.
Flanged Pipe GIP 4" x 100 cm.
Flanged Pipe GIP 4" x 200 cm.
Flanged Pipe GIP 6" x 60 cm.
Flanged Pipe GIP 6" x 80 cm.
Flanged Pipe GIP 6" x 100 cm.
Flanged Pipe GIP 6" x 200 cm.
Double Socket Bend CI for PVC 6" x 11,25
Double Socket Bend CI for PVC 6" x 22,5
Double Socket Bend CI for PVC 6" x 45
Double Socket Bend CI for PVC 6" x 90
Flanged Air Relief Valve 2"
Flanged Socket PVC RRJ 2"
Flanged Socket PVC RRJ 3"
Flanged Socket PVC RRJ 4"
Flanged Socket PVC RRJ 6"
Flanged Socket PVC RRJ 8"
Flanged Socket PVC RRJ 10"
Flanged Socket PVC RRJ 12"
Flanged Spigot PVC 2"
Flanged Spigot PVC 3"
Flanged Spigot PVC 4"
Flanged Spigot PVC 6"
Flanged Spigot PVC 8"
Flanged Spigot PVC 12"
Flanged Steel PN 10 2"
Flanged Steel PN 10 3"
Flanged Steel PN 10 4"
Flanged Steel PN 10 6"
Flanged Steel PN 10 8"
Flanged Steel PN 10 10"
Flanged Steel PN 10 12"
Flanged Strainer CI 3"
Flanged Strainer CI 4"
Flanged Strainer CI 6"
Fleksible Joint "Tosen" 4
Fleksible Joint "Tosen" 6
Fleksible Joint "Tosen" 8
Fleksible Joint "Tosen" 10
Fleksible Joint "Tosen" 12
Manhole 80 x 80 Cm.
Paking Karet 2"
Paking Karet 3"
Paking Karet 4"
Paking Karet 6"
Paking Karet 8"
Paking Karet 10"
HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
ONGKOS KIRIM
(c)
607,332.00 Rp
650,100.00 Rp
906,708.00 Rp
407,880.00 Rp
590,040.00 Rp
1,045,440.00 Rp
556,875.00 Rp
789,800.00 Rp
1,488,575.00 Rp
896,775.00 Rp
1,173,150.00 Rp
1,394,250.00 Rp
2,610,300.00 Rp
1,128,600.00 Rp
1,138,500.00 Rp
1,207,800.00 Rp
1,326,600.00 Rp
1,263,900.00 Rp
106,672.50 Rp
146,850.00 Rp
193,710.00 Rp
357,307.50 Rp
575,767.50 Rp
590,535.00 Rp
905,850.00 Rp
99,330.00 Rp
136,950.00 Rp
174,322.50 Rp
341,880.00 Rp
532,290.00 Rp
791,917.50 Rp
66,825.00 Rp
89,100.00 Rp
123,750.00 Rp
178,200.00 Rp
237,600.00 Rp
285,120.00 Rp
356,400.00 Rp
948,750.00 Rp
1,237,500.00 Rp
1,530,375.00 Rp
1,069,200.00 Rp
1,336,500.00 Rp
1,603,800.00 Rp
1,924,560.00 Rp
2,309,472.00 Rp
371,250.00 Rp
19,965.00 Rp
23,595.00 Rp
35,392.50 Rp
49,500.00 Rp
78,375.00 Rp
92,812.50 Rp
(e)
30,366.60
32,505.00
45,335.40
20,394.00
29,502.00
52,272.00
27,843.75
39,490.00
74,428.75
44,838.75
58,657.50
69,712.50
130,515.00
56,430.00
56,925.00
60,390.00
66,330.00
63,195.00
5,333.63
7,342.50
9,685.50
17,865.38
28,788.38
29,526.75
45,292.50
4,966.50
6,847.50
8,716.13
17,094.00
26,614.50
39,595.88
3,341.25
4,455.00
6,187.50
8,910.00
11,880.00
14,256.00
17,820.00
47,437.50
61,875.00
76,518.75
53,460.00
66,825.00
80,190.00
96,228.00
115,473.60
18,562.50
998.25
1,179.75
1,769.63
2,475.00
3,918.75
4,640.63
No.
URAIAN PEKERJAAN
(a)
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
(b)
Paking Karet 12"
Piet Kran Baal Valve Dia 3/4 "
DF Pipa GIP 3" x 60 cm.
DF Pipa GIP 3" x 100 cm.
Pressure Reducing Valve 6"
Repair Socket PVC 2"
Socket Repair PVC 6"
Rubber Expansiont Joint 6"
Rubber Water Stop 30 Cm
Socket GIP 2"
Socket GIP 3"
Socket GIP 4"
Socket GIP 6"
Socket Reducer PVC (All RR) 3" x 2"
Socket Reducer PVC (All RR) 4" x 3"
Socket Reducer PVC (All RR) 4" x 2"
Socket Reducer PVC (All RR) 6" x 3"
Socket Reducer PVC (All RR) 6" x 4"
Socket Reducer PVC (All RR) 12" x 8"
Socket Spigot Bend PVC 12" X 90
Socket Spigot Bend PVC 12" X 45
Socket Spigot Bend PVC 12" X 22,5
Socket Spigot Bend PVC 12" X 11,25
Socket Spigot Bend PVC 8" x 22,5
Socket Spigot Bend PVC 8" x 45
Socket Spigot Bend PVC 8" x 90
Socket Spigot Bend PVC 6" x 22,5
Socket Spigot Bend PVC 6" x 45
Socket Spigot Bend PVC 6" x 90
Socket Spigot Bend PVC (S-10) 4" x 22,5
Socket Spigot Bend PVC (S-10) 4" x 45
Socket Spigot Bend PVC (S-10) 4" x 90
Socket Spigot Bend PVC ( S-10) 3" x 90
Socket Spigot Bend PVC ( S-10) 3" x 45
Socket Spigot Bend PVC ( S-10) 3" x 22,5
Socket Spigot Bend PVC ( S-10) 2" x 90
Socket Spigot Bend PVC ( S-10) 2" x 45
Socket Spigot Bend PVC ( S-10) 2" x 22,5
Tangki Fiberglass 2 m
Tutup Manhole 0,80 x 0,80
Tutup Manhole 1 x 0,80
Socket Reducer HDPE 10" x 8"
Socket Reducer HDPE 8" x 6"
Socket Reducer HDPE 6" x 4"
Socket Reducer HDPE 4" x 3"
Socket Reducer HDPE 3" x 2"
Elbow HDPE 10" x 90
Elbow HDPE 8" x 90
Elbow HDPE 6" x 90
Elbow HDPE 4" x 90
Elbow HDPE 3" x 90
Elbow HDPE 2" x 90
Tee HDPE 90 10"
HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
(c)
107,250.00
66,000.00
341,550.00
500,940.00
49,500,000.00
78,375.00
412,500.00
1,435,500.00
321,750.00
41,250.00
57,750.00
69,300.00
189,750.00
136,620.00
218,790.00
210,375.00
354,750.00
425,700.00
930,600.00
2,910,600.00
2,613,600.00
2,116,620.00
1,782,000.00
736,817.40
862,705.80
992,296.80
394,020.00
461,340.00
530,640.00
181,170.00
195,030.00
216,810.00
173,250.00
153,450.00
135,630.00
102,712.50
94,347.00
84,150.00
4,000,000.00
371,250.00
701,250.00
536,250.00
301,125.00
136,125.00
78,375.00
61,875.00
1,204,500.00
655,875.00
410,850.00
185,625.00
130,350.00
57,750.00
1,267,200.00
ONGKOS KIRIM
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
(e)
5,362.50
3,300.00
17,077.50
25,047.00
2,475,000.00
3,918.75
20,625.00
71,775.00
16,087.50
2,062.50
2,887.50
3,465.00
9,487.50
6,831.00
10,939.50
10,518.75
17,737.50
21,285.00
46,530.00
145,530.00
130,680.00
105,831.00
89,100.00
36,840.87
43,135.29
49,614.84
19,701.00
23,067.00
26,532.00
9,058.50
9,751.50
10,840.50
8,662.50
7,672.50
6,781.50
5,135.63
4,717.35
4,207.50
200,000.00
18,562.50
35,062.50
26,812.50
15,056.25
6,806.25
3,918.75
3,093.75
60,225.00
32,793.75
20,542.50
9,281.25
6,517.50
2,887.50
63,360.00
No.
(a)
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
URAIAN PEKERJAAN
(b)
Tee HDPE 90 8"
Tee HDPE 90 6"
Tee HDPE 90 4"
Tee HDPE 90 3"
Tee HDPE 90 2"
Bend HDPE 90 10"
Bend HDPE 90 8"
Bend HDPE 90 6"
Bend HDPE 90 4"
Bend HDPE 90 3"
Bend HDPE 90 2"
Bend HDPE 45 10"
Bend HDPE 45 8"
Bend HDPE 45 6"
Bend HDPE 45 4"
Bend HDPE 45 3"
Bend HDPE 45 2"
Stub End HDPE 10"
Stub End HDPE 8"
Stub End HDPE 6"
Stub End HDPE 4"
Stub End HDPE 3"
Stub End HDPE 2"
Flange HDPE 10"
Flange HDPE 8"
Flange HDPE 6"
Flange HDPE 4"
Flange HDPE 3"
Flange HDPE 2"
Cap/Dop HDPE 8"
Cap/Dop HDPE 6"
Cap/Dop HDPE 4"
Cap/Dop HDPE 3"
Cap/Dop HDPE 2"
Mengetahui/ Menyetujui :
CV. WAYA BULA
JOHNY POSUMAH
DIREKTUR
HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
ONGKOS KIRIM
(c)
779,625.00 Rp
490,875.00 Rp
222,750.00 Rp
130,350.00 Rp
57,750.00 Rp
2,195,283.75 Rp
901,807.50 Rp
635,992.50 Rp
248,242.50 Rp
153,202.50 Rp
66,206.25 Rp
2,084,527.50 Rp
861,093.75 Rp
503,538.75 Rp
209,467.50 Rp
133,402.50 Rp
60,637.50 Rp
1,138,500.00 Rp
812,625.00 Rp
519,750.00 Rp
309,375.00 Rp
264,000.00 Rp
161,700.00 Rp
1,833,356.25 Rp
676,046.25 Rp
423,967.50 Rp
275,013.75 Rp
179,932.50 Rp
110,013.75 Rp
280,788.75 Rp
143,632.50 Rp
59,606.25 Rp
20,377.50 Rp
13,571.25 Rp
(e)
38,981.25
24,543.75
11,137.50
6,517.50
2,887.50
109,764.19
45,090.38
31,799.63
12,412.13
7,660.13
3,310.31
104,226.38
43,054.69
25,176.94
10,473.38
6,670.13
3,031.88
56,925.00
40,631.25
25,987.50
15,468.75
13,200.00
8,085.00
91,667.81
33,802.31
21,198.38
13,750.69
8,996.63
5,500.69
14,039.44
7,181.63
2,980.31
1,018.88
678.56
Manado, 2 J
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
ASURANSI
JML HARGA
(f)
(g)
16,087.50
30,888.00
44,104.50
81,675.00
124,740.00
149,688.00
206,910.00
6,237.00
2,970.00
79,200.00
99,000.00
118,800.00
142,560.00
171,072.00
59,400.00
80,190.00
100,980.00
142,560.00
190,080.00
297,000.00
712,800.00
14,181.75
19,800.00
10,642.50
13,204.13
11,761.20
11,173.14
89,100.00
77,220.00
64,449.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
579,100.00
1,111,900.00
1,587,700.00
2,940,300.00
4,490,600.00
5,388,700.00
7,448,700.00
224,500.00
106,900.00
2,851,200.00
3,564,000.00
4,276,800.00
5,132,100.00
6,158,500.00
2,138,400.00
2,886,800.00
3,635,200.00
5,132,100.00
6,842,800.00
10,692,000.00
25,660,800.00
510,500.00
712,800.00
383,100.00
475,300.00
423,400.00
402,200.00
3,207,600.00
2,779,900.00
2,320,100.00
ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
(f)
100,237.50
66,825.00
44,550.00
29,700.00
27,571.50
25,542.00
17,696.25
17,052.75
13,612.50
6,187.50
88,110.00
24,354.00
21,146.40
13,092.75
11,880.00
9,801.00
7,840.80
6,949.80
4,752.00
198.00
297.00
20,047.50
16,087.50
1,113.75
618.75
866.25
34,560.00
36,480.00
42,000.00
60,168.00
10,320.00
11,616.00
13,680.00
5,664.00
6,727.20
7,416.00
2,448.00
2,592.00
2,808.00
3,048.00
1,562.40
1,778.40
2,001.60
799.20
864.00
976.80
14,226.30
16,958.70
21,057.30
22,423.50
34,719.30
11,804.76
14,370.84
JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
(g)
3,608,500.00
2,405,700.00
1,603,800.00
1,069,200.00
992,500.00
919,500.00
637,000.00
613,800.00
490,000.00
222,700.00
3,171,900.00
876,700.00
761,200.00
471,300.00
427,600.00
352,800.00
282,200.00
250,100.00
171,000.00
7,100.00
10,600.00
721,700.00
579,100.00
40,000.00
22,200.00
31,100.00
1,244,100.00
1,313,200.00
1,512,000.00
2,166,000.00
371,500.00
418,100.00
492,400.00
203,900.00
242,100.00
266,900.00
88,100.00
93,300.00
101,000.00
109,700.00
56,200.00
64,000.00
72,000.00
28,700.00
31,100.00
35,100.00
512,100.00
610,500.00
758,000.00
807,200.00
1,249,800.00
424,900.00
517,300.00
ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
(f)
18,219.96
19,503.00
27,201.24
12,236.40
17,701.20
31,363.20
16,706.25
23,694.00
44,657.25
26,903.25
35,194.50
41,827.50
78,309.00
33,858.00
34,155.00
36,234.00
39,798.00
37,917.00
3,200.18
4,405.50
5,811.30
10,719.23
17,273.03
17,716.05
27,175.50
2,979.90
4,108.50
5,229.68
10,256.40
15,968.70
23,757.53
2,004.75
2,673.00
3,712.50
5,346.00
7,128.00
8,553.60
10,692.00
28,462.50
37,125.00
45,911.25
32,076.00
40,095.00
48,114.00
57,736.80
69,284.16
11,137.50
598.95
707.85
1,061.78
1,485.00
2,351.25
2,784.38
JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
(g)
655,900.00
702,100.00
979,200.00
440,500.00
637,200.00
1,129,000.00
601,400.00
852,900.00
1,607,600.00
968,500.00
1,267,000.00
1,505,700.00
2,819,100.00
1,218,800.00
1,229,500.00
1,304,400.00
1,432,700.00
1,365,000.00
115,200.00
158,500.00
209,200.00
385,800.00
621,800.00
637,700.00
978,300.00
107,200.00
147,900.00
188,200.00
369,200.00
574,800.00
855,200.00
72,100.00
96,200.00
133,600.00
192,400.00
256,600.00
307,900.00
384,900.00
1,024,600.00
1,336,500.00
1,652,800.00
1,154,700.00
1,443,400.00
1,732,100.00
2,078,500.00
2,494,200.00
400,900.00
21,500.00
25,400.00
38,200.00
53,400.00
84,600.00
100,200.00
ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
(f)
3,217.50
1,980.00
10,246.50
15,028.20
1,485,000.00
2,351.25
12,375.00
43,065.00
9,652.50
1,237.50
1,732.50
2,079.00
5,692.50
4,098.60
6,563.70
6,311.25
10,642.50
12,771.00
27,918.00
87,318.00
78,408.00
63,498.60
53,460.00
22,104.52
25,881.17
29,768.90
11,820.60
13,840.20
15,919.20
5,435.10
5,850.90
6,504.30
5,197.50
4,603.50
4,068.90
3,081.38
2,830.41
2,524.50
120,000.00
11,137.50
21,037.50
16,087.50
9,033.75
4,083.75
2,351.25
1,856.25
36,135.00
19,676.25
12,325.50
5,568.75
3,910.50
1,732.50
38,016.00
JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
(g)
115,800.00
71,200.00
368,800.00
541,000.00
53,460,000.00
84,600.00
445,500.00
1,550,300.00
347,400.00
44,500.00
62,300.00
74,800.00
204,900.00
147,500.00
236,200.00
227,200.00
383,100.00
459,700.00
1,005,000.00
3,143,400.00
2,822,600.00
2,285,900.00
1,924,500.00
795,700.00
931,700.00
1,071,600.00
425,500.00
498,200.00
573,000.00
195,600.00
210,600.00
234,100.00
187,100.00
165,700.00
146,400.00
110,900.00
101,800.00
90,800.00
4,320,000.00
400,900.00
757,300.00
579,100.00
325,200.00
147,000.00
84,600.00
66,800.00
1,300,800.00
708,300.00
443,700.00
200,400.00
140,700.00
62,300.00
1,368,500.00
ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
(f)
23,388.75
14,726.25
6,682.50
3,910.50
1,732.50
65,858.51
27,054.23
19,079.78
7,447.28
4,596.08
1,986.19
62,535.83
25,832.81
15,106.16
6,284.03
4,002.08
1,819.13
34,155.00
24,378.75
15,592.50
9,281.25
7,920.00
4,851.00
55,000.69
20,281.39
12,719.03
8,250.41
5,397.98
3,300.41
8,423.66
4,308.98
1,788.19
611.33
407.14
JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
HERU BASKORO
PIMPINAN TEKNIK
(g)
841,900.00
530,100.00
240,500.00
140,700.00
62,300.00
2,370,900.00
973,900.00
686,800.00
268,100.00
165,400.00
71,500.00
2,251,200.00
929,900.00
543,800.00
226,200.00
144,000.00
65,400.00
1,229,500.00
877,600.00
561,300.00
334,100.00
285,100.00
174,600.00
1,980,000.00
730,100.00
457,800.00
297,000.00
194,300.00
118,800.00
303,200.00
155,100.00
64,300.00
22,000.00
14,600.00
:
:
Lokasi
Tahun Anggaran
No. Paket
:
:
:
No.
Satuan
Volume
I.
1
2
3
4
II.
PEKERJAAN PERSIAPAN
Sewa direksi keet & gudang
Pengobatan/P3K, Keselamatan Kerja
Papan nama proyek
Pengukuran, Pas. Bauwplank
Ls
Ls
Bh
1.00
1.00
1.00
M1
30.00
M3
M3
M3
0.90
0.35
0.16
M3
M2
M2
3.37
5.42
5.42
M1
M1
Unit
Unit
Bh
6.00
6.00
1.00
1.00
4.00
1
2
3
4
5
6
7
8
9
10
III.
Unit
Unit
Unit
Bh
M1
1.00
1.00
1.00
1.00
20.00
M2
5.42
M3
M3
M3
15.64
2.61
1.51
M3
M3
M3
M2
M2
1.21
9.52
1.56
79.08
79.08
M1
M1
M1
M1
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Bh
M1
M
M
M2
12.00
12.00
6.00
12.00
1.00
2.00
4.00
6.00
2.00
6.00
8.00
6.00
6.00
2.00
3.00
1.00
1.00
24.00
3.20
2.40
3.20
1
2
3
4
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22 Tangki Clorinasi
Unit
1.00
M2
M2
M1
M1
29.45
49.63
13.00
32.00
M1
M1
60.00
60.00
1
2
3
4
5
M1
M
M
M
M
M1
3,000.00
1,306.80
270.00
918.00
918.00
3,000.00
1
2
3
4
5
6
7
c. Accessories Pipa
Gate Valve 6" + Acc (terpasang)
Flanged Steel PN 10 6"
Bend HDPE 45 6"
Single Air Valve 6" dgn chamber lengkap
Wash Out 6" dgn chamber lengkap
Jembatan Pipa
Block Beton Bertulang Penahan Pipa camp. 1:2:3
1
2
3
4
IV.
Unit
Bh
Bh
Unit
Unit
M1
M
1.00
20.00
7.00
1.00
1.00
12.00
0.98
V.
PEKERJAAN AKHIR
1 Pembersihan akhir, Laporan-laporan
2 Pengetesan Pipa/Jaringan
Ls
Ls
1.00
1.00
Terbilang :
SATU MILYAR DUA PULUH LIMA JUTA EMPAT RATUS RIBU RUPIAH.
Mengetahui/ Menyetujui :
CV. WAYA BULA
JOHNY POSUMAH
DIREKTUR
Manado, 2
HERU B
PIMPINA
:
:
Lokasi
Tahun Anggaran
:
:
Uraian Pekerjaan
I.
PEKERJAAN PERSIAPAN
II.
III.
IV.
V.
PEKERJAAN AKHIR
Terbilang :
SATU MILYAR DUA PULUH LIMA JUTA EMPAT RATUS RIBU RUPIAH.
Mengetahui/ Menyetujui :
CV. WAYA BULA
Manado, 2
JOHNY POSUMAH
DIREKTUR
HERU B
PIMPINA
ARGA
Harga
Satuan
( Rp. )
e
Jumlah
Harga
( Rp. )
f
2,000,000.00
1,500,000.00
500,000.00
61,160.00
5,834,800.00
2,000,000.00
1,500,000.00
500,000.00
1,834,800.00
30,330.00
10,110.00
162,420.00
18,933,105.84
56,619.18
27,418.32
3,538.50
25,662.36
497,080.00
33,310.00
8,440.00
1,901,444.60
1,675,159.60
180,540.20
45,744.80
461,100.00
120,400.00
2,940,300.00
224,500.00
192,400.00
16,712,497.26
2,766,600.00
722,400.00
2,940,300.00
224,500.00
769,600.00
626,907.00
5,337,244.00
606,666.60
269,569.00
122,435.53
626,907.00
5,337,244.00
606,666.60
269,569.00
2,448,710.66
48,440.00
262,544.80
262,544.80
30,330.00
10,110.00
162,420.00
93,188,740.59
746,002.50
474,361.20
26,387.10
245,254.20
640,500.00
3,827,250.00
610,350.00
33,310.00
8,440.00
41,464,161.00
775,005.00
36,435,420.00
952,146.00
2,634,154.80
667,435.20
461,100.00
283,900.00
122,200.00
71,000.00
2,940,300.00
1,587,700.00
192,400.00
133,600.00
266,900.00
761,200.00
500,000.00
388,000.00
475,300.00
1,074,480.57
626,907.00
239,228.60
269,569.00
122,435.53
96,260.00
162,420.00
21,710.00
42,665,516.83
5,533,200.00
3,406,800.00
733,200.00
852,000.00
2,940,300.00
3,175,400.00
769,600.00
801,600.00
533,800.00
4,567,200.00
4,000,000.00
2,328,000.00
2,851,800.00
2,148,961.14
1,880,721.00
239,228.60
269,569.00
2,938,452.79
308,032.00
389,808.00
69,472.00
1,928,372.30
1,928,372.30
16,080.00
48,440.00
116,730.00
122,435.53
8,313,060.26
473,556.00
2,404,077.20
1,517,490.00
3,917,937.06
808,231,434.61
461,100.00
27,666,000.00
27,666,000.00
30,330.00
162,420.00
10,110.00
21,880.00
210,700.00
744,955,464.00
39,635,244.00
43,853,400.00
9,280,980.00
20,085,840.00
632,100,000.00
2,940,300.00
192,400.00
543,800.00
5,154,076.16
7,270,026.16
820,376.29
2,793,950.00
35,609,970.61
2,940,300.00
3,848,000.00
3,806,600.00
5,154,076.16
7,270,026.16
9,844,515.45
2,746,452.85
6,000,000.00
2,500,000.00
3,500,000.00
2,500,000.00
3,500,000.00
Jumlah
PPn 10%
Total
Dibulatkan
Rp
Rp
Rp
Rp
HERU BASKORO
PIMPINAN TEKNIK
932,188,081.04
93,218,808.10
1,025,406,889.14
1,025,400,000.00
S DAN HARGA
Jumlah
Harga
( Rp. )
5,834,800.00
18,933,105.84
93,188,740.59
808,231,434.61
6,000,000.00
Jumlah
PPn 10%
Total
Dibulatkan
Rp
Rp
Rp
Rp
932,188,081.04
93,218,808.10
1,025,406,889.14
1,025,400,000.00
HERU BASKORO
PIMPINAN TEKNIK
Lokasi
Tahun Anggaran
No. Paket
NO.
JENIS PEKERJAAN
BOBOT
(%)
I.
PEKERJAAN PERSIAPAN
0.63
II.
2.03
III.
10.00
IV.
86.70
V.
PEKERJAAN AKHIR
0.64
WAKTU PELAKS
1
0.31
0.31
1.00
10
1.00
1.00
1.00
1.00
1.00
1.00
1.00
1.00
5.10
5.10
5.10
5.10
5.10
5.10
100.00
0.31
1.31
1.00
1.00
6.10
6.10
6.10
6.10
6.10
6.10
0.31
1.63
2.63
3.62
9.72
15.82
21.92
28.02
34.12
40.22
Mengetahui/ Menyetujui :
CV. WAYA BULA
JOHNY POSUMAH
DIREKTUR
AKSANAAN ( KURVA S )
PROSEN
TASE
12
13
14
15
16
17
18
19
20
21
22
KETERANGAN
100
Waktu Pelaksanaan :
90
0.51
0.51
70
0.51
60Masa Pemeliharaan :
50180 (seratus delapan
1.00
5.10
5.10
5.10
5.10
5.10
5.10
5.10
5.10
5.10
5.10
5.10
30
20
0.32
0.32
10
0
20
10
0
6.10
5.61
5.61
5.61
5.61
5.10
5.10
5.10
5.10
5.10
5.42
0.32
46.32
51.93
57.54
63.15
68.76
73.86
78.96
84.06
89.16
94.26
99.68
100.00
HERU BASKORO
PIMPINAN TEKNIK
SKEMA TENAGA
Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket
NO.
URAIAN
1
10
11
12
13
14
15
Pekerja
16
16
16
16
32
32
32
32
38
38
38
38
45
Mandor
Tukang
Kepala Tukang
Penjaga
14
14
23
23
23
23
44
44
44
44
51
51
51
51
61
JUMLAH
Mengetahui/ Menyetujui :
CV. WAYA BULA
JOHNY POSUMAH
DIREKTUR
KETERANGAN
16
17
18
19
20
21
22
45
45
45
25
25
15
12 Waktu Pelaksanaan :
150 (Seratus lima
Masa Pemeliharaan :
180 (seratus delapan
61
61
61
32
32
22
19
HERU BASKORO
PIMPINAN TEKNIK
SKEMA BAHAN
Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket
NO.
JENIS PEKERJAAN
1
Mengetahui/ Menyetujui :
10
11
12
13
14
15
16
JOHNY POSUMAH
DIREKTUR
KETERANGAN
17
18
19
20
21
22
Waktu Pelaksanaan :
150 (Seratus lima
puluh) Hari Kalender
Masa Pemeliharaan :
180 (seratus delapan
puluh) Hari kalender
Dibuat oleh :
HERU BASKORO
PIMPINAN TEKNIK
METODE PELAKSANAAN
Satker
Pekerjaan
Lokasi
Tahun Anggaran
I.
Pendahuluan
Dengan dibuatnya Metode Pelaksanaan Pekerjaan ini, pekerjaan bisa dilaksanakan dengan teratur,
pekerjaan sesuai spesifikasi teknis, yang mencakup antara lain adalah Kuatitas, Kualitas, Ekonomi
yang tersedia pada alokasi paket pekerjaan ini bisa diselesaikan 100 % sesuai jangka waktu yang ter
II.
Pekerjaan Persiapan
Pengukuran, Pemasangan Patok, Pembersihan lokasi yang akan dilaksanakan pekerjaan, Mobilisasi
Material, Pemasangan Papan Nama Pengenal Proyek, Pembuatan Kantor Direksi, Gudang &
dimulainya pekerjaan atau yag biasa disebut Foto dokumentasi 0%.
Pekerjaan persiapan dilaksanakan secepatnya setelah dikeluarkan Surat Perintah Mulai Kerja ole
tersedia dalam pelaksanaan bisa dimanfaatkan sedemikian rupa sesuai jadual kerja yang telah dibua
III.
c. Material yang digunakan harus disetujui oleh direksi. Baru digunakan untuk pekerjaan yang dimaks
d. Pekerjaan pipa dan accessories pada pembuatan Bangunan Penangkap dan Reservoar harus
pelaksanaan dari direksi.
IV.
5 Sebelum pipa dipasang dalam lubang galian dibagian bawah galian terlebih dahulu diuru
juga dibagian samping dan atas pipa ditimbunkan pasir, diatas pasir baru lah ditimbun den
6 Maksud dari timbunan pasir dibagian selimut pipa, agar pipa tidak mudah pecah apabila
diakibatkan dari beban luar.
7 Setelah dilakukan secara berkesinambungan sampai pemasangan pipa selesai sepanjan
lelang.
8 Pada titik tertentu perlu dipasangkan accessories sesusi dalam gambar atau kebutuha
Reducer PVC, Single Air Valve, Wash Out, dll
9 Setelah pipa HDPE serta accessories terpasang semuanya kemudian dilakukan pemer
kuantitas pekerjaan yaitu panjang pemasangan pipa dan accesoriesnya.
10 Setelah pemasangan pipa HDPE serta accessories terpasang semuanya dan telah
dilakukan pengujian pipa atau test tekanan dan uji kebocoran untuk diketahui kualitasnya,
perbaikan.
11 Di ambil foto untuk laporan dokumentasi setiap pelaksanaan pekerjaan sedang berlangsu
telah selesai dilaksanakan disebut foto 100 %.
V.
PEKERJAAN AKHIR
1 Melakukan pembersihan akhir pada lokasi dimana telah dilaksanakan pekerjaan agar
mengganggu lalu lintas umum.
2 Demikian Metode Pelaksanaan ini dibuat sebagai dasar sementara dalam pelaksanaan
adanya metoda pelaksanaan ini bisa menjadi acuan dalam melaksanakan pekerjaan, pek
tepat mutu dan kuantitas terpenuhi agar pembangunan dapat bermanfaat bagi kita semua.
Mengetahui/ Menyetujui :
CV. WAYA BULA
JOHNY POSUMAH
DIREKTUR
AN
HERU BASKORO
PIMPINAN TEKNIK
SPESIFIKASI TEKNIS
PIPA HDPE PE 100 (MRS 100)
UNTUK AIR BERSIH BERTEKANAN
STANDARD SNI 06-4829-2005/ISO 4427.96
Satker
Pekerjaan
Lokasi
Tahun Anggaran
ND
(INCH)
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
7"
8"
9"
10"
12"
14"
16"
18"
20"
24"
28"
32"
36"
40"
48"
OD
(MM)
20
25
32
40
50
63
75
90
110
125
160
180
200
225
250
315
355
400
450
500
630
710
800
900
1000
1200
PE 80
S-8, SDR-17
TEBAL (MM)
3.0
3.8
4.5
5.4
6.6
7.4
9.5
10.7
11.9
13.4
14.8
18.7
21.1
23.7
26.7
29.6
37.2
42.1
47.4
53.5
59.3
PE 100
Tegangan
Mpa
4.6
4.5
4.4
4.3
4.2
4.1
4.0
Waktu Kegagalan
Minimum (jam)
165
219
283
394
533
727
1000
Jenis Bahan
PE 100
PE 80
Mengetahui/ Menyetujui :
CV. WAYA BULA
JOHNY POSUMAH
DIREKTUR
Tegangan
Mpa
5.5
5.4
5.3
5.2
5.1
5.0
Manado, 2 Januar
HERU BASKOR
PIMPINAN TEK
KET.
PE 100
Waktu Kegagalan
Minimum (jam)
165
233
332
476
688
1000
HERU BASKORO
PIMPINAN TEKNIK
MATA
PROSENTASE
URAIAN
PEMBAYARAN
TOTAL %
Mengetahui/ Menyetujui :
JOHNY POSUMAH
DIREKTUR
DISUBKONTRAKKAN
PROSENTASE DARI
HARGA PENAWARAN
0.00
Dibuat oleh :
HERU BASKORO
PIMPINAN TEKNIK
METODE PELAKSANAAN
Satker
Pekerjaan
Lokasi
Tahun Anggaran
I.
Pendahuluan
Dengan dibuatnya Metode Pelaksanaan Pekerjaan ini, pekerjaan bisa dilaksanakan dengan ter
urutan pekerjaan sesuai spesifikasi teknis, yang mencakup antara lain adalah Kuatitas, Kualitas, E
arti dana yang tersedia pada alokasi paket pekerjaan ini bisa diselesaikan 100 % sesuai jangka wa
Pekerjaan persiapan dilaksanakan secepatnya setelah dikeluarkan Surat Perintah Mulai Kerja ole
tersedia dalam pelaksanaan bisa dimanfaatkan sedemikian rupa sesuai jadual kerja yang telah dib
Pada bagian pengambilan sumber air dipasang screen aluminium # 1 cm sebagai pen
masuk kesumber air, selain itu juga perlu dibuatkan saluran air hujan untuk mengalihkan ali
agar air kotor dari liar tidak masuk kemata air tersebut, kemudian juga dibuat bak chamb
ibuat dari pas. 1/2 bata uk.60x60x100 cm).
Ada juga pekerjaan lainnya yang termasuk pada pekerjaan bangunan broncaptering ad
udara, pembuatan chamber lengkap dgn accesoriesnya, serta pembuatan tangga angker dg
setelah pekerjaan lantai kerja selesai maka menunggu beton mengeras maka disiapka
kemudian dilakukan Pemotongan Besi sesuai ukuran yang tertera pada gambar, kemud
2 setelah sesesai kemudian mulai pemasangan / merakit besi tersebut dan diperkuat / diikat d
3 Setelah pekerjaan diatas selesai dilanjutkan dengan cor beton bertulang pada dinding da
dengan bestek yang ada. Pada saat pengecoran berlangsung direksi dan pengawas harus
sampel Cor Beton akan diperiksa oleh laboratorium Dinas Pekerjaan Umum Sulawesi Utara
Material yang digunakan harus disetujui oleh direksi. Barulah kemudian digunakan untuk pe
Pengecetan dinding tembok bidang yang luas akan digunakan kuas roll sedangkan pada b
kuas biasa 3 inci.
Apabila kualitas cat belum maksimal maka akan dilakukan pengecetan kembali
Bagian dalam dan luar sebelum dicat harus digosok dengan amplas kemudian dicat dasar p
luar mengunakan cat dinding dan dinding bagian dalam mengunakan cat waterproofing Pro
secara baik
Pengencatan bagian Besi mengunakan cat khusus besi atau sesuai dengan petunjuk Direk
dengan terlebih dahulu membersihkan permukaan besi dari kotoran dan karat agar cat dapa
6
7
8
9
1
2
3
4
5
Urugan Tanah
Semua pekerjaan urugan harus dilaksanakan lapis demi lapis secara horizontal dan dipadatkan.Te
dan selama proses pemadatan, harus dibasahi dengan air untuk mendapatkan hasil pemadatan y
Pemadatan harus dilakukan dengan alat pemadat mekanis (compactor) dan untuk pekerjaan yang
roller dan sebagainya, dengan kapasitas yang sesuai.Tanah harus dipisahkan terlebih dahulu dari
membahayakan, misalnya dapat merusak permukaan beton atau pun lapisan finishing yang lain, P
mencapai peil yang ditetapkan dan diratakan sampai nantinya tidak akan timbul cacat-cacat seper
bergelombang dan sebagainya.
Urugan Pasir
Pada prinsipnya urugan pasir dilakukan sama dengan proses yang dilakukan pada urugan dengan
Pengadaan dan Pemasangan Pipa HDPE Uk 75 mm (S8, SDR 17)
1 Setelah dikeluarkannya SPMK maka proses pengadaan pipa sudah bisa dilaksanakan deng
pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya
2 Proses pengadaan pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya dan akan dila
melampaui target waktu yang dijadwalkan agar pekerjaan pemasangan bisa dilaksanakan s
3 Pipa yang akan kami diadakan adalah Pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya
disyaratkan.
4 Sesuai jadwal yang kami buat proses pengadaan pipa diperkirakan selama 1,5 bulan sud
toleransi hambatan, jika lebih cepat dalam pelaksanaannya lebih baik.
5 Pipa yang akan kami diadakan kemudian diinventarisir jumlahnya dan diperiksa kualita
kemudian akan dilakukan pemasangan.
7 Setelah pengadaan kami telah laksanakan maka kami siap melaksanakan pemasangan jar
mm dan Accesoriesnya.
8 Diawali dengan proses galian tanah pada jalur yang akan dipasang jaringan pipa sesua
jasa / direksi pekerjaan dan telah mendapat persetujuan atau ijin dari pemerintah setempat.
9 Galian tanah dilaksanakan sedemikian rupa agar tidak mengganggu lalu lintas atau masyara
10 Setelah galian tanah sudah dilaksanakan dan panjang mencukupi untuk dilakukan pema
diperintahkan untuk melaksanakan pemasangan pipa dan sebagian tetap melaksanakan pe
Setelah galian tanah sudah dilaksanakan dan panjang mencukupi untuk dilakukan pema
diperintahkan untuk melaksanakan pemasangan pipa dan sebagian tetap melaksanakan pe
11 Pemasangan pipa PVC dilakukan dengan sambungan karet pacing perlu diperhatikan pad
hati jangan sampai dikemudian sambungan bisa bocor oleh sebab itu pada saat akan dipas
dahulu pipa dibersihkan dari kotoran dibagian ujung pipa yang akan disambungkan.
12 Sebelum pipa dipasang dalam lubang galian dibagian bawah galian terlebih dahulu diurugk
juga dibagian samping dan atas pipa ditimbunkan pasir, diatas pasir baru lah ditimbun deng
13 Maksud dari timbunan pasir dibagian selimut pipa, agar pipa tidak mudah pecah apabila te
diakibatkan dari beban luar.
15 Pada titik tertentu perlu dipasangkan accessories sesusi dalam gambar atau kebutuhan dil
50 mm, Flange socket, Band 90 o dan 45 o dia. 75 mm dan 50 mm.
18 Di ambil foto untuk laporan dokumentasi setiap pelaksanaan pekerjaan sedang berlangsun
telah selesai dilaksanakan disebut foto ; 0%, 25%, 50%, 75% dan 100 %.
V. PEKERJAAN AKHIR
1 Melakukan pembersihan akhir pada lokasi dimana telah dilaksanakan pekerjaan agar kemb
mengganggu lalu lintas umum.
2 Setelah seluruh bagian selesai dibuat maka dilakukan pengetasan dengan disaksikan oleh d
terkait lainnya
3 Pembuatan laporan-laporan dibuat harian, mingguan dan bulanan serta foto dokumentasi 0
dan melengkapi adminstrasi-adminstrasi proyek.
4 Demikian Metoda Pelaksanaan ini dibuat sebagai dasar sementara dalam pelaksanaan pek
adanya metoda pelaksanaan ini bisa menjadi acuan dalam melaksanakan pekerjaan, peker
tepat mutu dan kuantitas terpenuhi agar pembangunan dapat bermanfaat bagi kita semua.
Mengetahui/ Menyetujui :
CV. WAYA BULA
JOHNY POSUMAH
DIREKTUR
Manado, 2 Janu
Dibuat ole
HERU BASK
PIMPINAN TE
AN
P JARINGAN PERPIPAAN
nakan dengan teratur, tertata sesuai dengan urut uatitas, Kualitas, Ekonomis dan Tetap Waktu dalam
% sesuai jangka waktu yang tersedia.
0%
diperhatikan pada waktu pemasangan harus hati da saat akan dipasangkan pada sambungan terlebih
mbungkan.
HERU BASKORO
PIMPINAN TEKNIK