HARGA SATUAN UPAH, SEWA PERALATAN & BAHAN

Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PERPIPAAN
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)
: 32

A. UPAH TENAGA KERJA


No.
A.
1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN
U P A H
Mandor
Kepala Tukang
Operator Alat/Mesin
Tukang Batu
Tukang Besi
Tukang Cat
Tukang Gali
Tukang Kayu
Tukang Las
Tukang Pipa
Tukang Alumunium
Penjaga
Pekerja

HRG. SAT/JAM
6,160.00
7,520.00
8,000.00
6,800.00
6,800.00
6,800.00
6,800.00
6,800.00
6,800.00
6,800.00
8,000.00
4,800.00
4,800.00

O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam
O/Jam

B. SEWA PERALATAN/ MESIN


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

URAIAN
Excavator
Buldozer
Molen
Dump Truk
Mesin Las
Alat Sambung Pipa PE
Alat Tes Tekan Pipa
Stampler
Wheel Loeder
AMP
Generator Set
Asphalt Finiser
Tandem Roller
Tyred Roller

HRG SATUAN/JAM
272,000.00
520,000.00
32,000.00
218,400.00
35,000.00
50,000.00
20,000.00
20,000.00
265,520.00
3,576,480.00
276,000.00
241,600.00
200,000.00
247,200.00

/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam
/Jam

C. HARGA BAHAN/MATERIAL BANGUNAN


No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56

URAIAN
Tanah Tambun
Pasir Urug
Pasir Saring
Pasir Kuarsa
Pasir Pasang
Pasir Beton
Kerikil Sungai
Sirtu Klas A (Halus)
Sirtu Klas B (Kasar)
Batu Gunung 15-20 cm
Kerikil 5/7 Cm
Kerikil 3/5 Cm
Kerikil 2/3 Cm
Kerikil 1/2 Cm
Split Halus (Abu Batu)
Batu Bata
Paving Block Abu-abu
Paving Block Warna
Canstein Block (15x30x40 cm)
Kayu Lokal Klas II
Kayu Bekesting (Kayu Klas III)
Papan Bekesting
Ijuk
Semen PC (50 Kg)
Semen Warna (50 Kg)
Besi Beton
Baja Profil
Kawat Beton
Besi Strip
Kawat Bronjong (25 m)
Pagar BRC (120x240 cm)
Kawat Duri (25 m')
Paku
Paku Seng
Seng Gelombang BJLS 0,25
Seng Plat 25 cm
Genteng Metal
Tripleks 3 mm x 120 mm x 240 mm
Lem Kayu
Playwood tebal 9 mm
Bambu ( 10-15 x 6 m )
Plamir
Profil Alluminium
Sekrup Fixer
Sealant
Profil Kaca
Cat Tembok
Cat Waterproof
Cat Besi
Cat Kayu
Cat Atap Seng
Minyak Cat
Minyak Bekisting
Menie
Amplas
Aspal

SATUAN
M
M
M
kg
M
M
M
M
M
M
M
M
M
M
M
Bh
Bh
Bh
Bh
M
M
M
Kg.
Zak
Zak
Kg
Kg
Kg
Kg
Roll
Lbr
Roll
Kg
Kg
Lbr
Lbr
Lbr
Lbr
Ltr
Lbr
Btg
Kg
M
Bh
Tube
M
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Lbr
Kg

No.
57
58
59
60
61

URAIAN
Tegel Keramik Uk. 30x30 cm
Tegel Keramik Uk. 20x20 cm
Kaporit
Soda Ash
Asam Sulfat

SATUAN
Buah
Buah
Kg
Kg
Kg

D. HARGA PENGADAAN PIPA GIP-PVC-PE & ACCESSORIES


No.
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
11
12

URAIAN
a. Pipa GIP (Medium SII)
Pipa 12"
Pipa 10"
Pipa 8"
Pipa 6"
Pipa 4"
Pipa 3"
Pipa 2"
b. Pipa PVC S-10
Pipa 12" RR
Pipa 10" RR
Pipa 8" RR
Pipa 6" RR
Pipa 4" RR
Pipa 3" RR
Pipa 2" RR
c. Pipa PVC S-12,5
Pipa 12" RR
Pipa 10" RR
Pipa 8" RR
Pipa 6" RR
Pipa 4" RR
Pipa 3" RR
Pipa 2" RR
d. Pipa PE S8-SDR17 (PN10)
Pipa 12" (315 mm)
Pipa 10" (250 mm)
Pipa 8" (200 mm)
Pipa 6" (160 mm)
Pipa 4" (110 mm)
Pipa 3" (90 mm)
Pipa 2" (63 mm)
e. Accessories Pipa
Gate Valve Double Flanged CI 2"
Gate Valve Double Flanged CI 3"
Gate Valve Double Flanged CI 4"
Gate Valve Double Flanged CI 6"
Gate Valve Double Flanged CI 8"
Gate Valve Double Flanged CI 10"
Gate Valve Double Flanged CI 12"
Stop Kran 100 mm
Stop Kran 75 mm
Stop Kran 50 mm
Stop Kran 20 mm
Check Valve (Non Return Valve) 4"

SATUAN
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
m
buah
buah
buah
buah
buah
buah
buah
unit
unit
unit
unit
unit

No.
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

URAIAN
Check Valve (Non Return Valve) 6"
Check Valve (Non Return Valve) 8"
Check Valve (Non Return Valve) 10"
Check Valve (Non Return Valve) 12"
DF. Water Meter 2"
DF. Water Meter 3"
DF. Water Meter 4"
DF. Water Meter 6"
DF. Water Meter 8"
DF. Water Meter 10"
DF. Water Meter 12"
Air Relief Valve 25 mm
Flanged Air Relief Valve 50 mm
Air Vent GIP 3"
All Flanged Tee PVC 4" x 4"
All Flanged Tee PVC 3" x 3"
All Flanged Tee PVC 3" x 2"
All Flanged Tee CI 12" X 12"
All Flanged Tee CI 12" X 8"
All Flanged Tee CI 12" X 2"
All Flanged Tee CI 12" x 12"
All Flanged Tee CI 10" x 10"
All Flanged Tee CI 8" x 8"
All Flanged Tee CI 6" x 6"
All Flanged Tee CI 6" x 4"
All Flanged Tee CI 4" x 4"
All Flanged Tee CI 4" x 3"
All Flanged Tee CI 4" x 2"
All Flanged Tee CI 3" x 2"
All Flanged Tee CI 2" x 2"
All Flanged Tee Y Cl 12" X 12"
Socket Tee PVC (All RR) 6" x 6"
Socket Tee PVC (All RR) 6" x 4"
Socket Tee PVC (All RR) 4" x 4"
Socket Tee PVC (All RR) 4" x 3"
Socket Tee PVC (All RR) 4" x 2"
Socket Tee PVC (All RR) 3" X 3"
Socket Tee PVC (All RR) 3" X 2"
Socket Tee PVC (All RR) 2" X 2"
Baut Moor 5/8" x 3"
Baut Moor 5/8" x 4"
Blind Flanged 12"
Blind Flanged 8"
Clem Besi Plat 4" X 2 mm
Dop PVC 2"
Dop PVC 3"
Double Flanged Bend CI 12" X 11,25
Double Flanged Bend CI 12" X 22,5
Double Flanged Bend CI 12" X 45
Double Flanged Bend CI 12" X 90
Double Flanged Bend CI 8" x 22,5
Double Flanged Bend CI 8" x 45
Double Flanged Bend CI 8" x 90
Double Flanged Bend CI 6" x 22,5

SATUAN
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

No.
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120

URAIAN
Double Flanged Bend CI 6" x 45
Double Flanged Bend CI 6" x 90
Double Flanged Bend CI 4" x 11,5
Double Flanged Bend CI 4" x 22,5
Double Flanged Bend CI 4" x 45
Double Flanged Bend CI 4" x 90
Double Flanged Bend CI 3" x 22,5
Double Flanged Bend CI 3" x 45
Double Flanged Bend CI 3" x 90
Double Flanged Bend CI 2" x 22,5
Double Flanged Bend CI 2" x 45
Double Flanged Bend CI 2" x 90
Double Flanged Pipe GIP 3" x 60 cm.
Double Flanged Pipe GIP 3" x 80 cm.
Double Flanged Pipe GIP 3" x 100 cm.
Double Flanged Pipe GIP 3" x 120 cm.
Double Flanged Pipe GIP 3" x 200 cm.
Double Flanged Pipe GIP 4" x 60 cm.
Double Flanged Pipe GIP 4" x 80 cm.
Double Flanged Pipe GIP 4" x 100 cm.
Double Flanged Pipe GIP 4" x 120 cm.
Double Flanged Pipe GIP 4" x 180 cm.
Flanged Pipe GIP 3" x 60 cm.
Flanged Pipe GIP 3" x 100 cm.
Flanged Pipe GIP 3" x 200 cm.
Flanged Pipe GIP 4" x 60 cm.
Flanged Pipe GIP 4" x 100 cm.
Flanged Pipe GIP 4" x 200 cm.
Flanged Pipe GIP 6" x 60 cm.
Flanged Pipe GIP 6" x 80 cm.
Flanged Pipe GIP 6" x 100 cm.
Flanged Pipe GIP 6" x 200 cm.
Double Socket Bend CI for PVC 6" x 11,25
Double Socket Bend CI for PVC 6" x 22,5
Double Socket Bend CI for PVC 6" x 45
Double Socket Bend CI for PVC 6" x 90
Flanged Air Relief Valve 2"
Bend Doble Socet PVC 12" X 11,25
Bend Doble Socet PVC 12" X 22,5
Bend Doble Socet PVC 12" X 45
Bend Doble Socet PVC 12" X 90
Bend Doble Socet PVC 8" x 22,5
Bend Doble Socet PVC 8" x 45
Bend Doble Socet PVC 8" x 90
Bend Doble Socet PVC 6" x 22,5
Bend Doble Socet PVC 6" x 45
Bend Doble Socet PVC 6" x 90
Bend Doble Socet PVC 4" x 11,5
Bend Doble Socet PVC 4" x 22,5
Bend Doble Socet PVC 4" x 45
Bend Doble Socet PVC 4" x 90
Bend Doble Socet PVC 3" x 22,5
Bend Doble Socet PVC 3" x 45
Bend Doble Socet PVC 3" x 90

SATUAN
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

No.
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174

URAIAN
Bend Doble Socet PVC 2" x 22,5
Bend Doble Socet PVC 2" x 45
Bend Doble Socet PVC 2" x 90
Flanged Socket PVC RRJ 2"
Flanged Socket PVC RRJ 3"
Flanged Socket PVC RRJ 4"
Flanged Socket PVC RRJ 6"
Flanged Socket PVC RRJ 8"
Flanged Socket PVC RRJ 10"
Flanged Socket PVC RRJ 12"
Flanged Spigot PVC 2"
Flanged Spigot PVC 3"
Flanged Spigot PVC 4"
Flanged Spigot PVC 6"
Flanged Spigot PVC 8"
Flanged Spigot PVC 12"
Flanged Steel PN 10 2"
Flanged Steel PN 10 3"
Flanged Steel PN 10 4"
Flanged Steel PN 10 6"
Flanged Steel PN 10 8"
Flanged Steel PN 10 10"
Flanged Steel PN 10 12"
Flanged Strainer CI 3"
Flanged Strainer CI 4"
Flanged Strainer CI 6"
Fleksible Joint "Tosen" 4
Fleksible Joint "Tosen" 6
Fleksible Joint "Tosen" 8
Fleksible Joint "Tosen" 10
Fleksible Joint "Tosen" 12
Manhole 80 x 80 Cm.
Paking Karet 2"
Paking Karet 3"
Paking Karet 4"
Paking Karet 6"
Paking Karet 8"
Paking Karet 10"
Paking Karet 12"
Piet Kran Baal Valve Dia 3/4 "
DF Pipa GIP 3" x 60 cm.
DF Pipa GIP 3" x 100 cm.
Pressure Reducing Valve 6"
Repair Socket PVC 2"
Socket Repair PVC 6"
Rubber Expansiont Joint 6"
Rubber Water Stop 30 Cm
Socket GIP 2"
Socket GIP 3"
Socket GIP 4"
Socket GIP 6"
Socket Reducer PVC (All RR) 3" x 2"
Socket Reducer PVC (All RR) 4" x 3"
Socket Reducer PVC (All RR) 4" x 2"

SATUAN
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
unit
buah
buah
buah
buah
buah
buah
buah
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

No.
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223
224
225
226
227
228

URAIAN
Socket Reducer PVC (All RR) 6" x 3"
Socket Reducer PVC (All RR) 6" x 4"
Socket Reducer PVC (All RR) 12" x 8"
Socket Spigot Bend PVC 12" X 90
Socket Spigot Bend PVC 12" X 45
Socket Spigot Bend PVC 12" X 22,5
Socket Spigot Bend PVC 12" X 11,25
Socket Spigot Bend PVC 8" x 22,5
Socket Spigot Bend PVC 8" x 45
Socket Spigot Bend PVC 8" x 90
Socket Spigot Bend PVC 6" x 22,5
Socket Spigot Bend PVC 6" x 45
Socket Spigot Bend PVC 6" x 90
Socket Spigot Bend PVC (S-10) 4" x 22,5
Socket Spigot Bend PVC (S-10) 4" x 45
Socket Spigot Bend PVC (S-10) 4" x 90
Socket Spigot Bend PVC ( S-10) 3" x 90
Socket Spigot Bend PVC ( S-10) 3" x 45
Socket Spigot Bend PVC ( S-10) 3" x 22,5
Socket Spigot Bend PVC ( S-10) 2" x 90
Socket Spigot Bend PVC ( S-10) 2" x 45
Socket Spigot Bend PVC ( S-10) 2" x 22,5
Tangki Fiberglass 2 m
Tutup Manhole 0,80 x 0,80
Tutup Manhole 1 x 0,80
Socket Reducer HDPE 10" x 8"
Socket Reducer HDPE 8" x 6"
Socket Reducer HDPE 6" x 4"
Socket Reducer HDPE 4" x 3"
Socket Reducer HDPE 3" x 2"
Elbow HDPE 10" x 90
Elbow HDPE 8" x 90
Elbow HDPE 6" x 90
Elbow HDPE 4" x 90
Elbow HDPE 3" x 90
Elbow HDPE 2" x 90
Tee HDPE 90 10"
Tee HDPE 90 8"
Tee HDPE 90 6"
Tee HDPE 90 4"
Tee HDPE 90 3"
Tee HDPE 90 2"
Bend HDPE 90 10"
Bend HDPE 90 8"
Bend HDPE 90 6"
Bend HDPE 90 4"
Bend HDPE 90 3"
Bend HDPE 90 2"
Bend HDPE 45 10"
Bend HDPE 45 8"
Bend HDPE 45 6"
Bend HDPE 45 4"
Bend HDPE 45 3"
Bend HDPE 45 2"

SATUAN
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
unit
unit
unit
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

No.

URAIAN

229
230
231
232
233
234
235
236
237
238
239
240
241
242
243
244
245

Stub End HDPE 10"


Stub End HDPE 8"
Stub End HDPE 6"
Stub End HDPE 4"
Stub End HDPE 3"
Stub End HDPE 2"
Flange HDPE 10"
Flange HDPE 8"
Flange HDPE 6"
Flange HDPE 4"
Flange HDPE 3"
Flange HDPE 2"
Cap/Dop HDPE 8"
Cap/Dop HDPE 6"
Cap/Dop HDPE 4"
Cap/Dop HDPE 3"
Cap/Dop HDPE 2"

Mengetahui/ Menyetujui :

SATUAN
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah
buah

CV. WAYA BULA

Manado, 2 Januari 2012


Dibuat oleh :

JOHNY POSUMAH
DIREKTUR

HERU BASKORO
PIMPINAN TEKNIK

UPAH, SEWA PERALATAN & BAHAN

ENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA

KAP, INFILTRASI GALERY DAN P/P JARINGAN PERPIPAAN

HRG. SAT/HARI
49,280.00 O/Hari
60,160.00 O/Hari
64,000.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
54,400.00 O/Hari
64,000.00 O/Hari
38,400.00 O/Hari
38,400.00 O/Hari

HRG SATUAN/HARI
2,176,000.00 /Hari
4,160,000.00 /Hari
256,000.00 /Hari
1,747,200.00 /Hari
280,000.00 /Hari
400,000.00 /Hari
160,000.00 /Hari
160,000.00 /Hari
2,124,160.00 /Hari
28,611,840.00 /Hari
2,208,000.00 /Hari
1,932,800.00 /Hari
1,600,000.00 /Hari
1,977,600.00 /Hari

HARGA SATUAN
43,600.00
124,000.00
126,000.00
3,600.00
126,000.00
124,000.00
209,440.00
70,400.00
64,000.00
120,000.00
170,800.00
203,280.00
203,280.00
215,600.00
153,440.00
640.00
3,200.00
3,600.00
20,000.00
2,640,000.00
1,440,000.00
1,440,000.00
30,000.00
54,000.00
100,000.00
9,200.00
11,600.00
13,600.00
11,600.00
500,000.00
200,000.00
144,000.00
13,480.00
20,000.00
38,000.00
38,000.00
36,000.00
48,000.00
20,000.00
78,800.00
12,000.00
16,000.00
64,000.00
600.00
72,000.00
108,000.00
12,480.00
52,000.00
28,000.00
25,600.00
28,000.00
10,000.00
9,600.00
19,200.00
3,600.00
7,600.00

HARGA SATUAN
4,800.00
2,400.00
16,000.00
8,000.00
6,000.00

HARGA SATUAN
1,098,900.00
822,112.50
553,162.50
410,850.00
252,862.50
175,312.50
105,600.00
549,656.25
344,561.25
222,255.00
142,436.25
67,361.25
44,797.50
22,151.25
448,428.75
281,737.50
180,551.25
115,871.25
54,243.75
37,372.50
17,902.50
643,830.00
404,827.50
260,370.00
166,815.00
79,942.50
53,542.50
26,400.00
536,250.00
1,029,600.00
1,470,150.00
2,722,500.00
4,158,000.00
4,989,600.00
6,897,000.00
701,250.00
412,500.00
207,900.00
99,000.00
2,640,000.00

HARGA SATUAN
3,300,000.00
3,960,000.00
4,752,000.00
5,702,400.00
1,980,000.00
2,673,000.00
3,366,000.00
4,752,000.00
6,336,000.00
9,900,000.00
23,760,000.00
472,725.00
660,000.00
354,750.00
440,137.50
392,040.00
372,438.00
2,970,000.00
2,574,000.00
2,148,300.00
3,341,250.00
2,227,500.00
1,485,000.00
990,000.00
919,050.00
851,400.00
589,875.00
568,425.00
453,750.00
206,250.00
2,937,000.00
811,800.00
704,880.00
436,425.00
396,000.00
326,700.00
261,360.00
231,660.00
158,400.00
6,600.00
9,900.00
668,250.00
536,250.00
37,125.00
20,625.00
28,875.00
1,905,750.00
1,914,000.00
1,922,250.00
1,930,500.00
1,254,000.00
1,298,517.00
1,363,725.00
660,000.00

HARGA SATUAN
683,430.00
717,750.00
618,750.00
605,880.00
531,630.00
519,750.00
504,900.00
470,250.00
443,025.00
332,268.75
345,559.50
354,420.00
474,210.00
565,290.00
701,910.00
747,450.00
1,157,310.00
393,492.00
479,028.00
607,332.00
650,100.00
906,708.00
407,880.00
590,040.00
1,045,440.00
556,875.00
789,800.00
1,488,575.00
896,775.00
1,173,150.00
1,394,250.00
2,610,300.00
1,128,600.00
1,138,500.00
1,207,800.00
1,326,600.00
1,263,900.00
1,188,000.00
1,254,000.00
1,443,750.00
2,068,275.00
354,750.00
399,300.00
470,250.00
194,700.00
231,247.50
254,925.00
84,150.00
89,100.00
96,525.00
104,775.00
53,707.50
61,132.50
68,805.00

HARGA SATUAN
27,472.50
29,700.00
33,577.50
106,672.50
146,850.00
193,710.00
357,307.50
575,767.50
590,535.00
905,850.00
99,330.00
136,950.00
174,322.50
341,880.00
532,290.00
791,917.50
66,825.00
89,100.00
123,750.00
178,200.00
237,600.00
285,120.00
356,400.00
948,750.00
1,237,500.00
1,530,375.00
1,069,200.00
1,336,500.00
1,603,800.00
1,924,560.00
2,309,472.00
371,250.00
19,965.00
23,595.00
35,392.50
49,500.00
78,375.00
92,812.50
107,250.00
66,000.00
341,550.00
500,940.00
49,500,000.00
78,375.00
412,500.00
1,435,500.00
321,750.00
41,250.00
57,750.00
69,300.00
189,750.00
136,620.00
218,790.00
210,375.00

HARGA SATUAN
354,750.00
425,700.00
930,600.00
2,910,600.00
2,613,600.00
2,116,620.00
1,782,000.00
736,817.40
862,705.80
992,296.80
394,020.00
461,340.00
530,640.00
181,170.00
195,030.00
216,810.00
173,250.00
153,450.00
135,630.00
102,712.50
94,347.00
84,150.00
4,950,000.00
371,250.00
701,250.00
536,250.00
301,125.00
136,125.00
78,375.00
61,875.00
1,204,500.00
655,875.00
410,850.00
185,625.00
130,350.00
57,750.00
1,267,200.00
779,625.00
490,875.00
222,750.00
130,350.00
57,750.00
2,195,283.75
901,807.50
635,992.50
248,242.50
153,202.50
66,206.25
2,084,527.50
861,093.75
503,538.75
209,467.50
133,402.50
60,637.50

HARGA SATUAN
1,138,500.00
812,625.00
519,750.00
309,375.00
264,000.00
161,700.00
1,833,356.25
676,046.25
423,967.50
275,013.75
179,932.50
110,013.75
280,788.75
143,632.50
59,606.25
20,377.50
13,571.25

Manado, 2 Januari 2012


Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

DAFTAR ANALISA SATUAN PEKERJAAN


Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket
NO.

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVIN


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
### PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P J
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)
: 32
URAIAN PEKERJAAN

VOL.

Pekerjaan Pengukuran dan Pembongkaran


1

1 M' Pengukuran dan Pemasangan Bouwplank


Bahan
Kayu 5/7
Paku Biasa 2" - 5"
Kayu Papan 3/20
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

0.012
0.020
0.007

m3
kg
m3

0.100
0.100
0.010
0.005

Oh
Oh
Oh
Oh

1 M3 Bongkaran Beton Bertulang


Tenaga
Pekerja
Mandor

6.667
0.333

Oh
Oh

1 M3 Bongkaran Dinding Batu Bata


Tenaga
Pekerja
Mandor

6.667
0.333

Oh
Oh

NO.

URAIAN PEKERJAAN

VOL.

Pekerjaan Tanah
1

1 M3 Galian Tanah Biasa sedalam 1 Meter


Tenaga
Pekerja
Mandor

0.750
0.025

Oh
Oh

1 M3 Galian Tanah Biasa sedalam 2 Meter


Tenaga
Pekerja
Mandor

0.900
0.045

Oh
Oh

1 M3 Galian Tanah Keras sedalam 1 Meter


Tenaga
Pekerja
Mandor

1.000
0.032

Oh
Oh

1 M3 Galian Tanah Cadas sedalam 1 Meter


Tenaga
Pekerja
Mandor

1.500
0.060

Oh
Oh

1 M3 Pembuangan Tanah sejauh 15 Meter


Tenaga
Pekerja
Mandor

0.330
0.010

Oh
Oh

1 M3 Urugan Kembali
Tenaga
Pekerja
Mandor

0.250
0.008

Oh
Oh

1 M3 Pemadatan Tanah (Tebal per 20 cm)


Tenaga
Pekerja
Mandor

0.500
0.050

Oh
Oh

NO.

URAIAN PEKERJAAN

10

1 M3 Urugan Pasir
Bahan
Pasir urug
Tenaga
Pekerja
Mandor

VOL.

1.200

M3

0.300
0.010

Oh
Oh

1.200

M3

0.250
0.025

Oh
Oh

1.200

M2

0.150
0.015

Oh
Oh

1m' Galian Tanah untuk Pemasangan Pipa


Pipa 300 mm (12")
Pipa 250 mm (10")
Pipa 200 mm (8")
Pipa 150 mm (6")
Pipa 100 mm (4")
Pipa 75 mm (3")
Pipa 50 mm (2")
Pipa 25 mm (1")

0.803
0.737
0.581
0.545
0.360
0.304
0.245
0.165

M3
M3
M3
M3
M3
M3
M3
M3

1m' Urugan Pasir untuk Pemasangan Pipa


Pipa 300 mm (12")
Pipa 250 mm (10")
Pipa 200 mm (8")
Pipa 150 mm (6")
Pipa 100 mm (4")
Pipa 75 mm (3")
Pipa 50 mm (2")
Pipa 25 mm (1")

0.138
0.138
0.113
0.113
0.088
0.088
0.088
0.063

M3
M3
M3
M3
M3
M3
M3
M3

1m' Urugan Tanah Kembali Pemasangan Pipa


Pipa 300 mm (12")
Pipa 250 mm (10")

0.523
0.468

M3
M3

1 M3 Urugan Sirtu
Bahan
Sirtu
Tenaga
Pekerja
Mandor

1 M2 Pemasangan Lapisan Ijuk tebal 10 cm


Bahan
Ijuk
Tenaga
Pekerja
Mandor

Pekerjaan Pemasangan Pipa PVC, GIP & HDPE


1

NO.

URAIAN PEKERJAAN
Pipa
Pipa
Pipa
Pipa
Pipa
Pipa
4

200 mm (8")
150 mm (6")
100 mm (4")
75 mm (3")
50 mm (2")
25 mm (1")

1m' Pemadatan Tanah Kembali Pemasangan Pipa


Pipa 300 mm (12")
Pipa 250 mm (10")
Pipa 200 mm (8")
Pipa 150 mm (6")
Pipa 100 mm (4")
Pipa 75 mm (3")
Pipa 50 mm (2")
Pipa 25 mm (1")
6 m' Pemasangan Pipa PVC 300 mm (12")
Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 300 mm (12")


6

6 m' Pemasangan Pipa PVC 250 mm (10)


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 250 mm (10")


7

6 m' Pemasangan Pipa PVC 200 mm (8")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

VOL.
0.383
0.383
0.207
0.179
0.154
0.140

M3
M3
M3
M3
M3
M3

0.523
0.468
0.383
0.383
0.207
0.179
0.154
0.140

M3
M3
M3
M3
M3
M3
M3
M3

1.000
1.000
1.000

Ls.
Btg
Set

4.000
1.500
0.750
0.050

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

1.013
0.101
0.608
0.061

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.675
0.068
0.405
0.041

hk
hk
hk
hk

NO.

URAIAN PEKERJAAN
Pemasangan Pipa PVC 200 mm (8")
8

6 m' Pemasangan Pipa PVC 150 mm (6")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 150 mm (6")


9

6 m' Pemasangan Pipa PVC 100 mm (4")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 100 mm (4")


10

6 m' Pemasangan Pipa PVC 75 mm (3")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 75 mm (3")


11

6 m' Pemasangan Pipa PVC 50 mm (2")


Bahan
Pelicin Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang

VOL.
1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.450
0.045
0.270
0.027

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.300
0.030
0.180
0.018

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.225
0.023
0.135
0.014

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.169
0.017
0.101

hk
hk
hk

NO.

12

URAIAN PEKERJAAN
Mandor

0.010

hk

Pemasangan Pipa PVC 50 mm (2")

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.127
0.013
0.076
0.008

hk
hk
hk
hk

1.000

m'

5.652
1.000
1.000
94.200

m2
Set
Btg
cm

0.683
1.139
0.114
0.034

hk
hk
hk
hk

1.000

m'

4.710
1.000
1.000
78.500

m2
Set
Btg
cm

0.456
0.759
0.076
0.023

hk
hk
hk
hk

Pemasangan Pipa GIP 250 mm (10")

1.000

m'

6 m' Pemasangan Pipa GIP 200 mm (8")


Bahan
Cat Menie Besi

3.768

m2

6 m' Pemasangan Pipa PVC 35 mm (1")


Bahan
Lem Pipa
Pengangkutan Pipa dari Gudang ke Lokasi Pas
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PVC 35 mm (1")


13

6 m' Pemasangan Pipa GIP 300 mm (12")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 300 mm (12")


14

15

VOL.

6 m' Pemasangan Pipa GIP 250 mm (10")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

NO.

URAIAN PEKERJAAN
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 200 mm (8")


16

6 m' Pemasangan Pipa GIP 150 mm (6")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 150 mm (6")


17

6 m' Pemasangan Pipa GIP 100 mm (4")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 100 mm (4")


18

6 m' Pemasangan Pipa GIP 75 mm (3")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

VOL.
1.000
1.000
62.800

Set
Btg
cm

0.304
0.506
0.051
0.015

hk
hk
hk
hk

1.000

m'

2.826
1.000
1.000
47.100

m2
Set
Btg
cm

0.203
0.338
0.034
0.010

hk
hk
hk
hk

1.000

m'

1.884
1.000
1.000
31.400

m2
Set
Btg
cm

0.135
0.225
0.023
0.007

hk
hk
hk
hk

1.000

m'

1.413
1.000
1.000
23.550

m2
Set
Btg
cm

0.101
0.169
0.017
0.005

hk
hk
hk
hk

NO.

URAIAN PEKERJAAN

Pemasangan Pipa GIP 75 mm (3")


19

1.000

m'

0.942
1.000
1.000
15.700

m2
Set
Btg
cm

0.076
0.127
0.013
0.004

hk
hk
hk
hk

1.000

m'

0.110
1.000
1.000
10.990

m2
Set
Btg
cm

0.057
0.095
0.009
0.003

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

4.000
1.500
0.750
0.050

hk
hk
hk
hk

Pemasangan Pipa PE 300 mm (12")

1.000

m'

6 m' Pemasangan Pipa PE 250 mm (10)


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu

1.000
1.000
1.000

Ls.
Btg
Set

6 m' Pemasangan Pipa GIP 50 mm (2")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 50 mm (2")


20

6 m' Pemasangan Pipa GIP 35 mm (1")


Bahan
Cat Menie Besi
Alat Bantu
Pengangkutan Pipa dari Gudang ke Lokasi Pemasangan
Pengelasan
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa GIP 35 mm (1")


21

22

VOL.

6 m' Pemasangan Pipa PE 300 mm (12")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

NO.

23

URAIAN PEKERJAAN
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

3.600
1.350
0.675
0.045

hk
hk
hk
hk

Pemasangan Pipa PE 250 mm (10")

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

3.240
1.215
0.608
0.041

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

2.592
0.972
0.486
0.032

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

1.944
0.729
0.365
0.024

hk
hk
hk
hk

1.000

m'

6 m' Pemasangan Pipa PE 200 mm (8")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 200 mm (8")


24

6 m' Pemasangan Pipa PE 150 mm (6")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 150 mm (6")


25

6 m' Pemasangan Pipa PE 100 mm (4")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 100 mm (4")


26

VOL.

6 m' Pemasangan Pipa PE 75 mm (3")


Bahan

NO.

URAIAN PEKERJAAN

27

Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

1.000
1.000
1.000

Ls.
Btg
Set

0.300
0.030
0.180
0.018

hk
hk
hk
hk

Pemasangan Pipa PE 75 mm (3")

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.300
0.030
0.180
0.018

hk
hk
hk
hk

1.000

m'

1.000
1.000
1.000

Ls.
Btg
Set

0.300
0.030
0.180
0.018

hk
hk
hk
hk

1.000

m'

1.200
4.040
0.485

m3
Zak
m3

1.500
0.750
0.075
0.075

Oh
Oh
Oh
Oh

6 m' Pemasangan Pipa PE 50 mm (2")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 50 mm (2")


28

VOL.

6 m' Pemasangan Pipa PE 35 mm (1")


Bahan
Alat Sambung PE
Pengangkutan Pipa dari Gudang ke Lokasi
Alat Bantu
Tenaga
Pekerja
Tukang Pipa
Kepala Tukang
Mandor

Pemasangan Pipa PE 35 mm (1")

Pekerjaan Pondasi Batu Kali


1

1 M3 Pasangan Batu Kali Camp. 1 : 3


Bahan
Batu Belah 15/20
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

NO.

URAIAN PEKERJAAN

1 M3 Pasangan Batu Kali Camp. 1 : 4


Bahan
Batu Belah 15/20
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M3 Pasangan Batu Kosong


Bahan
Batu Belah 15/20
Pasir Urug
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M Pasangan Bronjong
Bahan
Batu Kali
Kawat Bronjong
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

VOL.

1.200
3.260
0.520

m3
Zak
m3

1.500
0.750
0.075
0.075

Oh
Oh
Oh
Oh

1.200
0.432

m3
kg

0.780
0.390
0.039
0.039

Oh
Oh
Oh
Oh

1.200 M
0.333 Rool
0.100
0.200
4.500
0.075

Oh
Oh
Oh
Oh

Pekerjaan Pasangan Dinding


1

1 M2 Pasangan Batu Merah Tebal Bata, Camp 1 : 2


Bahan
Bata Bata 5 x 11 x 22
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang

70.000 Buah
0.379 Zak
0.038 kg
0.300
0.100
0.010

Oh
Oh
Oh

NO.

URAIAN PEKERJAAN
Mandor

1 M2 Pasangan Batu Merah Tebal Bata, Camp 1 : 4


Bahan
Bata Merah 5 x 11 x 22
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

VOL.
0.015

Oh

70.000 Buah
0.230 Zak
0.043 kg
0.300
0.100
0.010
0.015

Oh
Oh
Oh
Oh

0.170
0.017

Zak
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

0.104
0.020

Zak
m3

0.200
0.150
0.015
0.010

Oh
Oh
Oh
Oh

0.286
0.023

Zak
m3

0.250
0.020

Oh
Oh

Pekerjaan Plesteran
1

1 M2 Plesteran Tebal 15 mm, Camp 1 : 2


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Tebal 15 mm, Camp 1 : 4


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Tebal 20 mm, Camp 1 : 2


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu

NO.

URAIAN PEKERJAAN
Kepala Tukang
Mandor

1 M2 Plesteran Tebal 20 mm, Camp 1 : 4


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Beton Tebal 15 mm, Camp 1 : 2


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Beton Tebal 15 mm, Camp 1 : 3


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Plesteran Siar, Camp 1 : 2


Bahan
Semen PC
Pasir pasang
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

VOL.
0.020
0.010

Oh
Oh

0.174
0.028

Zak
m3

0.250
0.020
0.020
0.013

Oh
Oh
Oh
Oh

0.186
0.018

Zak
m3

0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

0.141
0.021

Zak
m3

0.260
0.200
0.020
0.013

Oh
Oh
Oh
Oh

0.086
0.016

Zak
m3

0.150
0.070
0.007
0.008

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN

1 M2 Acian dengan Saus Semen


Bahan
Semen PC
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

9 100 M2 Lapisan Aspal + Pasir


Bahan
Aspal
Pasir
Kayu bakar
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Lapisan Aspal + Pasir

VOL.

0.035

Zak

0.040
0.080
0.008
0.002

Oh
Oh
Oh
Oh

175.000
0.300
0.050

kg
m3
m3

15.000
5.000
0.800
0.500

Oh
Oh
Oh
Oh

1.000

M2

5.520
0.592
0.750
215.000

Zak
M3
M3
Liter

Pekerjaan Beton
1

1 M3 Beton Tumbuk K-125


Bahan
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Air
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 Beton Tumbuk K-100


Bahan
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Air
Tenaga

1.650
0.275
0.028
0.083

4.940
0.621
0.740
215.000

Oh
Oh
Oh
Oh

Zak
M3
M3
Liter

NO.

URAIAN PEKERJAAN
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 Beton K-225
Bahan
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 Beton K-250
Bahan
Semen PC
Pasir Beton
Split 2/3
Air
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

10 Kg Pembesian dengan Besi Polos atau Besi Ulir


Bahan
Besi Beton (Polos atau Ulir)
Kawat Beton
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 Pondasi Beton Bertulang K-225 (150 kg besi + Bekisting)


Bahan
Kayu Bekesting (Kayu Klas III)

VOL.
1.650
0.275
0.028
0.083

Oh
Oh
Oh
Oh

7.420
0.499
0.776

Zak
M3
M3

1.650
0.275
0.028
0.083

Oh
Oh
Oh
Oh

7.680
0.494
0.770
215.000

Zak
M3
M3
Liter

1.650
0.275
0.028
0.083

Oh
Oh
Oh
Oh

10.500
0.150

Kg
Kg

0.070
0.070
0.007
0.004

Oh
Oh
Oh
Oh

0.200

M3

NO.

URAIAN PEKERJAAN
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton (Polos atau Ulir)
Kawat Beton
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

1 M3 Sloof Beton Bertulang K-225 (200 kg besi + Bekisting)


Bahan
Kayu Bekesting (Kayu Klas III)
Paku Biasa 2" - 5"
Minyak Bekisting
Besi Beton (Polos atau Ulir)
Kawat Beton
Semen PC
Pasir Beton
Koral Beton (Kerikil)
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

VOL.
1.500
0.400
157.500
2.250
6.720
0.540
0.810

Kg
Ltr
Kg
Kg
zak
M3
M3

5.300
0.275
1.300
1.050
0.262
0.265

Oh
Oh
Oh
Oh
Oh
Oh

0.270
2.000
0.600
210.000
3.000
6.720
0.540
0.810

M3
Kg
Ltr
Kg
Kg
zak
M3
M3

5.650
0.275
1.560
1.400
0.323
0.283

Oh
Oh
Oh
Oh
Oh
Oh

1 M3 Dinding, Kolom & Plat Beton Bertulang K-225 (150 kg besi + Bekisting)
Bahan
Kayu Bekesting (Kayu Klas III)
0.240 M3
Paku Biasa 2" - 5"
3.200 Kg
Minyak Bekisting
1.600 Ltr
Besi Beton (Polos atau Ulir)
157.500 Kg
Kawat Beton
2.250 Kg
Semen PC
6.720 zak
Pasir Beton
0.540 M3
Koral Beton (Kerikil)
0.810 M3
Balok Kayu Kls II
0.160 M3
Playwood tebal 9 mm
2.800 Lbr
Dolken kayu galam 8 - 10 panjang 4 m
24.000 Btg

NO.

URAIAN PEKERJAAN
Tenaga
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor

VOL.

5.300
0.275
1.300
1.050
0.262
0.265

1 M3 Dinding dan Kolom Beton Bertulang K-225 (200 kg besi + Bekisting)


Bahan
Kayu Bekesting (Kayu Klas III)
0.320
Paku Biasa 2" - 5"
3.200
Minyak Bekisting
1.600
Besi Beton (Polos atau Ulir)
210.000
Kawat Beton
3.000
Semen PC
6.720
Pasir Beton
0.540
Koral Beton (Kerikil)
0.810
Balok Kayu Kls II
0.140
Playwood tebal 9 mm
2.800
Dolken kayu galam 8 - 10 panjang 4 m
16.000
Tenaga
Pekerja
6.350
Tukang Batu
0.275
Tukang Kayu
1.650
Tukang Besi
1.400
Kepala Tukang
0.333
Mandor
0.318

Oh
Oh
Oh
Oh
Oh
Oh

M3
Kg
Ltr
Kg
Kg
zak
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh

Pekerjaan Pengecatan
1

1 M3 Pek. Mencat Waterproofing


Bahan
Cat waterproofing
Minyak cat
Amplas
Plamur
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

10 M2 Pek. Mencat Menie Besi

0.400
0.220
1.000
0.100

kg
Ltr
lbr
kg

0.250
0.038
0.038
0.013

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN
Bahan
Cat meni besi
Minyak cat
Amplas besi
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

Pekerjaan Menie Besi Untuk 1 M2


3

1 M2 Pek. Mencat Besi


Bahan
Cat besi
Minyak cat
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pek. Mencat Dinding Tembok/Plafond


Bahan
Cat tembok
Plamir Tembok
Amplas
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VOL.

1.640
0.440
0.500

kg
Ltr
lbr

0.500
0.750
0.075
0.025

Oh
Oh
Oh
Oh

1.000

M2

0.400
0.440

kg
Ltr

0.200
0.075
0.008
0.010

Oh
Oh
Oh
Oh

0.436
0.016
1.000

kg
kg
lbr

0.050
0.075
0.008
0.003

Oh
Oh
Oh
Oh

Pekerjaan Kayu dan Aluminium


1

1 M Pasang Kusen Pintu dan Jendela Alluminium


Bahan
Profil Alluminium
Sekrup Fixer
Sealant
Tenaga
Pekerja
Tukang Alumunium
Kepala Tukang

1.100 M'
2.000 Bh
0.060 Tube
0.043
0.043
0.004

Oh
Oh
Oh

NO.

URAIAN PEKERJAAN
Mandor

1 M2 Pasang Pintu dan Jendela Alluminium Strip Lebar 8 cm


Bahan
Profil Alluminium
Sekrup Fixer
Tenaga
Pekerja
Tukang Alumunium
Kepala Tukang
Mandor

1 M2 Pasang Pintu Kaca Rangka Alluminium


Bahan
Pintu Alluminium
Profil Kaca
Sealant
Tenaga
Pekerja
Tukang Alumunium
Kepala Tukang
Mandor

1 M2 Pasang Pintu dan Jendela Kaca


Bahan
Kayu Papan
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Pintu dan Jendela Jalusi


Bahan
Kayu Papan
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VOL.
0.002

Oh

4.400
14.600

M'
Bh

0.085
0.085
0.009
0.004

Oh
Oh
Oh
Oh

4.400 M'
4.500 M'
0.270 Tube
0.085
0.085
0.009
0.005

Oh
Oh
Oh
Oh

0.035

M3

0.800
2.000
0.200
0.040

Oh
Oh
Oh
Oh

0.064

M3

1.000
3.000
0.300
0.300

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN

1 M2 Pasang Pintu Playwood Rangkap


Bahan
Kayu Papan
Paku Biasa " - 1"
Lem Kayu
Play Wood 4" x 3" x 4mm
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M3 Pasang Konstruksi Kuda-Kuda


Bahan
Kayu Balok
Besi Strip
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Kaso + Reng Genteng


Bahan
Kayu Balok
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Rangka Langit-Langit Ukur. 1 x 1 m


Bahan
Kayu Balok
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VOL.

0.020
0.030
0.300
1.000

M3
Kg
Ltr
Lbr

1.000
3.000
0.300
0.300

Oh
Oh
Oh
Oh

1.100
15.000
0.800

M3
Kg
Ltr

4.000
12.000
1.200
0.200

Oh
Oh
Oh
Oh

0.012
1.500

M3
Ltr

0.100
0.100
0.001
0.005

Oh
Oh
Oh
Oh

0.012
0.100

M3
Ltr

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

NO.

10

11

12

13

URAIAN PEKERJAAN

1 M2 Pasang Rangka Langit-Langit Ukur. 30 x 60 cm


Bahan
Kayu Balok
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Rangka Langit-Langit Ukur. 30 x 30 cm


Bahan
Kayu Balok
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Lisplang Ukur. 3 x 20 cm


Bahan
Kayu Papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Lisplank Ukur. 3 x 30 cm


Bahan
Kayu Papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VOL.

0.023
0.150

M3
Ltr

0.200
0.300
0.030
0.010

Oh
Oh
Oh
Oh

0.027
0.200

M3
Ltr

0.250
0.350
0.035
0.013

Oh
Oh
Oh
Oh

0.007
0.050

M3
Ltr

0.100
0.200
0.025
0.005

Oh
Oh
Oh
Oh

0.011
0.050

M3
Ltr

0.110
0.220
0.022
0.005

Oh
Oh
Oh
Oh

NO.
14

15

16

17

18

URAIAN PEKERJAAN
1 M2 Pasang Lisplang Ukur. 2 x ( 2 x 20 cm )
Bahan
Kayu Papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Lisplang Ukur. 2 x ( 3 x 20 cm )


Bahan
Kayu Papan
Paku Biasa 2" - 5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Genteng Pelentong Kecil


Bahan
Genteng Pelentong
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Genteng Bubung Pelentong


Bahan
Genteng Pelentong
Semen PC
Pasir Pasing
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Bubung Genteng Pelentong


Bahan

VOL.

0.009
0.060

M3
Ltr

0.100
0.100
0.010
0.050

Oh
Oh
Oh
Oh

0.015
0.060

M3
Ltr

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

25.000

Bh

0.150
0.075
0.008
0.008

Oh
Oh
Oh
Oh

25.000
0.160
0.032

Bh
Zak
M3

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

NO.

URAIAN PEKERJAAN
Genteng Pelentong
Semen PC
Pasir Pasing
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

19

20

21

22

1 M2 Pasang Atap Asbes Gelombang 2,5 x 0,92 x 5 mm


Bahan
Asbes Gelombang
Paku Pancing 60 x 230
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Bubung Steel Gelombang 0,92


Bahan
Bubung Steel Gelombang
Paku Sekrup 3,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Nok Steel Gelombang 1,05


Bahan
Nok Steel Gelombang
Paku Sekrup 3,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Pasang Atap Genteng Metal


Bahan
Genteng Metal

VOL.
4.000
0.160
0.032

Bh
Zak
M3

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

0.500
0.120

Lbr
Kg

0.140
0.075
0.008
0.008

Oh
Oh
Oh
Oh

2.400
6.000

Lbr
Kg

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

2.100
6.000

Lbr
Kg

0.084
0.125
0.013
0.004

Oh
Oh
Oh
Oh

2.100

Lbr

NO.

URAIAN PEKERJAAN
Paku
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

23

24

1 M2 Pasang Atap Seng Gelombang


Bahan
Seng Gelombang 3" x 6" BJLS 28
Paku Biasa 1" - 1"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M1 Pasang Atap Nok Seng


Bahan
Seng Plat 3" x 6" BJLS 28
Paku Biasa 1" - 1"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VOL.
0.300

Kg

0.200
0.100
0.010
0.010

Oh
Oh
Oh
Oh

0.700
0.020

Lbr
Kg

0.150
0.070
0.008
0.006

Oh
Oh
Oh
Oh

0.300
4.000

Bh
Kg

0.150
0.070
0.008
0.006

Oh
Oh
Oh
Oh

1.100
0.010

Bh
Kg

0.030
0.070
0.007
0.002

Oh
Oh
Oh
Oh

11.500

Lbr

Pekerjaan Langit-Langit
1

1 M2 Langit-Langit Asbes Tebal 3,5 mm


Bahan
Pelat Asbes Tebal 3,5 mm
Paku 2" - 2,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit-Langit Akustik 30 x 30 cm
Bahan
Akustik Ukuran 30 x 30 cm

NO.

URAIAN PEKERJAAN
Paku 2" - 2,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit-Langit Playwood 30 x 60 cm tebal 0,4 cm


Bahan
Playwood 4" x 8" x 4 mm
Paku 2" - 2,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 M2 Langit-Langit Playwood 60 x 120 cm tebal 0,4 cm


Bahan
Playwood 4" x 8" x 4 mm
Paku 2" - 2,5"
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

VOL.
0.050

Kg

0.060
0.120
0.012
0.003

Oh
Oh
Oh
Oh

0.360
0.030

Lbr
Kg

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

0.375
0.030

Lbr
Kg

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

0.035
0.030
1.000

Jam
Jam
Ls

0.090
0.900

Jam
Jam

36.000
0.110

Bh
Kg

Pekerjaan Drainase & Lainnya


1

1 M3 Galian Untuk Drainase Selokan dan Saluran Air


Bahan
Peralatan
Excavator
Dump Truck
Alat Bantu
Tenaga
Mandor
Pekerja

1 M2 Pasangan Paving Stone/Block


Bahan
Paving Stone Warna
Pasir Urug

NO.

URAIAN PEKERJAAN
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

VOL.

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

2.500
0.015
0.035

Bh
Kg
Zak

0.400
0.200
0.020
0.002

Oh
Oh
Oh
Oh

1 M Pembuatan Pagar BRC


Galian Tanah
Urugan Pasir
Pas. Batu Kali 1:4
Beton K 225
Pagar BRC + Tiang GIP dia. 2"

0.150
0.020
0.100
0.030
1.000

M3
M3
M3
M3
M'

1 M Saluran Air uk. 30 x 30 cm


Galian Tanah
Urugan Pasir
Pas. Batu Kali 1:4
Plesteran 1:3
Acian

0.360
0.025
0.110
1.100
1.100

M3
M3
M3
M
M

1 M Saluran Air uk. 40 x 50 cm


Galian Tanah
Urugan Pasir
Pas. Batu Kali 1:4
Plesteran 1:3
Acian

0.560
0.030
0.140
1.400
1.400

M3
M3
M3
M
M

1 M1 Pasangan Canstein 40x40x15


Bahan
Canstein
Pasir
Semen PC
Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

1 M2 Pasang Lantai Keramik Ukur. 30 x 30 cm


Bahan

NO.

URAIAN PEKERJAAN
Keramik Uk.30x30 cm
Semen PC
Pasir Pasang
Semen Warna
Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

1 Bh Penanaman Pohon Palm


Bahan
Pohon Palm t= 1,5 - 2 m
Pupuk
Tanah Humus
Tenaga
Pekerja
Tukang Kebun
Mandor

Mengetahui/ Menyetujui :
CV. WAYA BULA

VOL.
12.000
0.196
0.045
0.026

Bh
Zak
M3
Zak

0.250
0.125
0.013
0.013

Oh
Oh
Oh
Oh

1.000
0.100
1.000

Phn
Kg
Ls

0.030
0.050
0.005

Oh
Oh
Oh

Manado, 2 Januari 2

NO.

URAIAN PEKERJAAN

JOHNY POSUMAH
DIREKTUR

VOL.

AN PEKERJAAN

LOLAAN AIR MINUM PROVINSI SULAWESI UTARA


KHUSUS, KAPET
NFILTRASI GALERY DAN P/P JARINGAN PERPIPAAN

HARGA SATUAN

Rp
Rp
Rp

JUMLAH HARGA

2,640,000
13,480
2,640,000

31,680.00
269.60
18,480.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,840.00
5,440.00
601.60
246.40
60,557.60
605.58
61,160.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

256,012.80
16,410.24
272,423.04
2,724.23
275,140.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

256,012.80
16,410.24
272,423.04
2,724.23
275,140.00

1%

HARGA SATUAN

JUMLAH HARGA

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

28,800.00
1,232.00
30,032.00
300.32
30,330.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

34,560.00
2,217.60
36,777.60
367.78
37,140.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

38,400.00
1,576.96
39,976.96
399.77
40,370.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

57,600.00
2,956.80
60,556.80
605.57
61,160.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

12,672.00
492.80
13,164.80
131.65
13,290.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

9,600.00
410.67
10,010.67
100.11
10,110.00

Rp
Rp
Jumlah

19,200.00
2,464.00
21,664.00

38,400
49,280

1%

HARGA SATUAN
Biaya Umum
Hrg Satuan Pek.

Rp

JUMLAH HARGA
216.64
21,880.00

124,000

148,800.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

11,520.00
492.80
160,812.80
1,608.13
162,420.00

Rp

70,400

84,480.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

9,600.00
1,232.00
95,312.00
953.12
96,260.00

Rp

12,500

15,000.00

Rp
38,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

5,760.00
739.20
21,499.20
214.99
21,710.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

37,140
37,140
37,140
30,330
30,330
30,330
30,330
30,330

29,800.00
27,300.00
21,500.00
16,500.00
10,900.00
9,200.00
7,400.00
5,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

162,420
162,420
162,420
162,420
162,420
162,420
162,420
162,420

22,300.00
22,300.00
18,200.00
18,200.00
14,200.00
14,200.00
14,200.00
10,100.00

Rp
Rp

10,110
10,110

5,200.00
4,700.00

1%

HARGA SATUAN

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp

10,110
10,110
10,110
10,110
10,110
10,110

3,800.00
3,800.00
2,000.00
1,800.00
1,500.00
1,400.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

21,880
21,880
21,880
21,880
21,880
21,880
21,880
21,880

11,400.00
10,200.00
8,300.00
8,300.00
4,500.00
3,900.00
3,300.00
3,000.00

Rp
Rp
Rp

3,500
37,500
20,000

3,500.00
37,500.00
20,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
347,220

153,600.00
81,600.00
45,120.00
2,464.00
343,784.00
3,437.84
347,220.00
57,800.00

Rp
Rp
Rp

3,500
30,000
15,000

3,500.00
30,000.00
15,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
133,750

38,880.00
5,508.00
36,547.20
2,993.76
132,428.96
1,324.29
133,750.00
22,200.00

Rp
Rp
Rp

3,500
25,000
7,500

3,500.00
25,000.00
7,500.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

25,920.00
3,672.00
24,364.80
1,995.84
91,952.64
919.53
92,870.00

1%

37.50

30.00

25.00

HARGA SATUAN

JUMLAH HARGA

Rp

92,870

15,400.00

Rp
Rp
Rp

2,000
10,000
6,500

2,000.00
10,000.00
6,500.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
56,350

17,280.00
2,448.00
16,243.20
1,330.56
55,801.76
558.02
56,350.00
9,300.00

Rp
Rp
Rp

1,000
6,500
5,000

1,000.00
6,500.00
5,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
37,740

11,520.00
1,632.00
10,828.80
887.04
37,367.84
373.68
37,740.00
6,200.00

Rp
Rp
Rp

750
3,500
3,500

750.00
3,500.00
3,500.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
26,660

8,640.00
1,224.00
8,121.60
665.28
26,400.88
264.01
26,660.00
4,400.00

Rp
Rp
Rp

500
2,500
1,500

500.00
2,500.00
1,500.00

Rp
Rp
Rp

38,400
54,400
60,160

6,480.00
918.00
6,091.20

1%

9.38

6.25

3.13

2.21

2.25
10

HARGA SATUAN
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
18,670

Rp
Rp
Rp

JUMLAH HARGA
498.96
18,488.16
184.88
18,670.00
3,100.00

250
1,750
1,000

250.00
1,750.00
1,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
13,620

4,860.00
688.50
4,568.40
374.22
13,491.12
134.91
13,620.00
2,200.00

Rp
Rp
Rp
Rp

10,440
25,000
95,000
1,500

59,006.88
25,000.00
95,000.00
141,300.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
421,230

26,244.00
61,965.00
6,852.60
1,696.46
417,064.94
4,170.65
421,230.00
70,200.00

Rp
Rp
Rp
Rp

10,440
20,000
65,000
1,500

49,172.40
20,000.00
65,000.00
117,750.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
316,428

17,496.00
41,310.00
4,568.40
1,130.98
316,427.78
3,164.28
319,590.00
52,700.00

Rp

10,440

1%

39,337.92

1.67

93.75

62.50

HARGA SATUAN
Rp
Rp
Rp

JUMLAH HARGA

15,000
45,000
1,500

15,000.00
45,000.00
94,200.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
236,542

11,664.00
27,540.00
3,045.60
753.98
236,541.50
2,365.42
238,900.00
39,400.00

Rp
Rp
Rp
Rp

10,440
6,000
30,000
1,500

29,503.44
6,000.00
30,000.00
70,650.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
166,470

7,776.00
18,360.00
2,030.40
502.66
164,822.50
1,648.22
166,470.00
27,700.00

Rp
Rp
Rp
Rp

10,440
4,000
12,500
1,500

19,668.96
4,000.00
12,500.00
47,100.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
103,400

5,184.00
12,240.00
1,353.60
335.10
102,381.66
1,023.82
103,400.00
17,200.00

Rp
Rp
Rp
Rp

10,440
4,000
8,500
1,500

14,751.72
4,000.00
8,500.00
35,325.00

Rp
Rp
Rp
Rp

38,400
54,400
60,160
49,280

3,888.00
9,180.00
1,015.20
251.33

1%

41.67

30.00

12.50

8.33

HARGA SATUAN

JUMLAH HARGA

Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
76,911

76,911.25
769.11
77,680.00
12,800.00

Rp
Rp
Rp
Rp

10,440
3,000
7,000
1,500

9,834.48
3,000.00
7,000.00
23,550.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
54,135

2,916.00
6,885.00
761.40
188.50
54,135.38
541.35
54,670.00
9,000.00

Rp
Rp
Rp
Rp

10,440
1,500
5,000
1,500

1,147.36
1,500.00
5,000.00
16,485.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
32,196

2,187.00
5,163.75
571.05
141.37
32,195.53
321.96
32,510.00
5,300.00

Rp
Rp
Rp

20,000
37,500
20,000

20,000.00
37,500.00
20,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
363,880

153,600.00
81,600.00
45,120.00
2,464.00
360,284.00
3,602.84
363,880.00
60,600.00

Rp
Rp
Rp

15,000
30,000
15,000

15,000.00
30,000.00
15,000.00

1%

6.82

4.69

37.50

30.00

HARGA SATUAN

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
317,650

Rp
Rp
Rp

JUMLAH HARGA

138,240.00
73,440.00
40,608.00
2,217.60
314,505.60
3,145.06
317,650.00
52,900.00

12,500
25,000
7,500

12,500.00
25,000.00
7,500.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
276,790

124,416.00
66,096.00
36,547.20
1,995.84
274,055.04
2,740.55
276,790.00
46,100.00

Rp
Rp
Rp

8,000
9,500
6,500

8,000.00
9,500.00
6,500.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
209,310

99,532.80
52,876.80
29,237.76
1,596.67
207,244.03
2,072.44
209,310.00
34,800.00

Rp
Rp
Rp

1%

5,000
6,500
5,000

5,000.00
6,500.00
5,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
155,470

74,649.60
39,657.60
21,928.32
1,197.50
153,933.02
1,539.33
155,470.00
25,900.00

25.00

9.38

6.25

HARGA SATUAN
Rp
Rp
Rp

JUMLAH HARGA

4,000
3,500
3,500

4,000.00
3,500.00
3,500.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
36,220

11,520.00
1,632.00
10,828.80
887.04
35,867.84
358.68
36,220.00
6,000.00

Rp
Rp
Rp

3,000
2,500
1,500

3,000.00
2,500.00
1,500.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
32,180

11,520.00
1,632.00
10,828.80
887.04
31,867.84
318.68
32,180.00
5,300.00

Rp
Rp
Rp

2,500
2,000
1,000

2,500.00
2,000.00
1,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
30,670

11,520.00
1,632.00
10,828.80
887.04
30,367.84
303.68
30,670.00
5,100.00

Rp
Rp
Rp

120,000
54,000
126,000

144,000.00
218,160.00
61,110.00

Rp
Rp
Rp
Rp

38,400
54,400
60,160
49,280

57,600.00
40,800.00
4,512.00
3,696.00

1%

3.13

2.21

1.67

HARGA SATUAN

JUMLAH HARGA

Jumlah
Biaya Umum
Hrg Satuan Pek.

529,878.00
5,298.78
535,170.00

Rp
Rp
Rp

120,000
54,000
126,000

144,000.00
176,040.00
65,520.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

57,600.00
40,800.00
4,512.00
3,696.00
492,168.00
4,921.68
497,080.00

Rp
Rp

120,000
126,000

144,000.00
54,432.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

29,952.00
21,216.00
2,346.24
1,921.92
253,868.16
2,538.68
256,400.00

Rp
Rp

120,000
500,000

144,000.00
166,650.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,840.00
10,880.00
270,720.00
3,696.00
599,786.00
5,997.86
605,780.00

Rp
Rp
Rp

640
54,000
126,000

44,800.00
20,466.00
4,788.00

Rp
Rp
Rp

38,400
54,400
60,160

11,520.00
5,440.00
601.60

1%

HARGA SATUAN

JUMLAH HARGA

Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

739.20
88,354.80
883.55
89,230.00

Rp
Rp
Rp

640
54,000
126,000

44,800.00
12,420.00
5,418.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

11,520.00
5,440.00
601.60
739.20
80,938.80
809.39
81,740.00

Rp
Rp

54,000
126,000

9,201.60
2,142.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

7,680.00
8,160.00
902.40
492.80
28,578.80
285.79
28,860.00

Rp
Rp

54,000
126,000

5,616.00
2,520.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

7,680.00
8,160.00
902.40
492.80
25,371.20
253.71
25,620.00

Rp
Rp

54,000
126,000

15,422.40
2,898.00

Rp
Rp

38,400
54,400

9,600.00
1,088.00

1%

HARGA SATUAN
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp

JUMLAH HARGA
1,203.20
492.80
30,704.40
307.04
31,010.00

54,000
126,000

9,374.40
3,528.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

9,600.00
1,088.00
1,203.20
616.00
25,409.60
254.10
25,660.00

Rp
Rp

54,000
126,000

10,044.00
2,268.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

9,984.00
10,880.00
1,203.20
640.64
35,019.84
350.20
35,370.00

Rp
Rp

54,000
126,000

7,635.60
2,646.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

9,984.00
10,880.00
1,203.20
640.64
32,989.44
329.89
33,310.00

Rp
Rp

54,000
126,000

4,665.60
2,016.00

Rp
Rp
Rp
Rp

38,400
54,400
60,160
49,280

5,760.00
3,808.00
421.12
394.24

1%

HARGA SATUAN
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp

JUMLAH HARGA
17,064.96
170.65
17,230.00

54,000

1,890.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

1,536.00
4,352.00
481.28
98.56
8,357.84
83.58
8,440.00

Rp
Rp
Rp

7,600
126,000
1,440,000

1,330,000.00
37,800.00
72,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
2,384,170

576,000.00
272,000.00
48,128.00
24,640.00
2,360,568.00
23,605.68
2,384,170.00
23,840.00

Rp
Rp
Rp
Rp

54,000
124,000
209,440
100

298,080.00
73,408.00
157,080.00
21,500.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

63,360.00
14,960.00
1,684.48
4,090.24
634,162.72
6,341.63
640,500.00

Rp
Rp
Rp
Rp

266,760.00
76,968.57
154,985.60
21,500.00

54,000
124,000
209,440
100

1%

HARGA SATUAN

JUMLAH HARGA

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

63,360.00
14,960.00
1,684.48
4,090.24
604,308.89
6,043.09
610,350.00

Rp
Rp
Rp

54,000
124,000
209,440

400,680.00
61,822.86
162,432.36

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

63,360.00
14,960.00
1,684.48
4,090.24
709,029.93
7,090.30
716,120.00

Rp
Rp
Rp
Rp

54,000
124,000
203,280
100

414,720.00
61,291.43
156,450.31
21,500.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

63,360.00
14,960.00
1,684.48
4,090.24
738,056.46
7,380.56
745,430.00

Rp
Rp

9,200
13,600

96,600.00
2,040.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek. 10 Kg
Hrg Satuan Pek. 1 Kg

2,688.00
3,808.00
421.12
197.12
105,754.24
1,057.54
106,810.00
10,681.00

Rp

288,000.00

1,440,000

1%

HARGA SATUAN
Rp
Rp
Rp
Rp
Rp
Rp
Rp

JUMLAH HARGA

13,480
9,600
9,200
13,600
54,000
124,000
209,440

20,220.00
3,840.00
1,449,000.00
30,600.00
362,880.00
66,960.00
169,646.40

Rp
38,400
Rp
54,400
Rp
54,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

203,520.00
14,960.00
70,720.00
57,120.00
15,761.92
13,059.20
2,766,287.52
27,662.88
2,793,950.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,440,000
13,480
9,600
9,200
13,600
54,000
124,000
209,440

388,800.00
26,960.00
5,760.00
1,932,000.00
40,800.00
362,880.00
66,960.00
169,646.40

Rp
38,400
Rp
54,400
Rp
54,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

216,960.00
14,960.00
84,864.00
76,160.00
19,431.68
13,946.24
3,420,128.32
34,201.28
3,454,320.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

345,600.00
43,136.00
15,360.00
1,449,000.00
30,600.00
362,880.00
66,960.00
169,646.40
422,400.00
220,640.00
288,000.00

1,440,000
13,480
9,600
9,200
13,600
54,000
124,000
209,440
2,640,000
78,800
12,000

1%

HARGA SATUAN

JUMLAH HARGA

Rp
38,400
Rp
54,400
Rp
54,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

203,520.00
14,960.00
70,720.00
57,120.00
15,761.92
13,059.20
3,789,363.52
37,893.64
3,827,250.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,440,000
13,480
9,600
9,200
13,600
54,000
124,000
209,440
2,640,000
78,800
12,000

460,800.00
43,136.00
15,360.00
1,932,000.00
40,800.00
362,880.00
66,960.00
169,646.40
369,600.00
220,640.00
192,000.00

Rp
38,400
Rp
54,400
Rp
54,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

243,840.00
14,960.00
89,760.00
76,160.00
20,033.28
15,671.04
4,334,246.72
43,342.47
4,377,580.00

Rp
Rp
Rp
Rp

65,000
10,000
3,600
16,000

26,000.00
2,200.00
3,600.00
1,600.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

9,600.00
2,040.00
2,286.08
640.64
47,966.72
479.67
48,440.00

1%

HARGA SATUAN

Rp
Rp
Rp

JUMLAH HARGA

19,200
10,000
3,600

31,488.00
4,400.00
1,800.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.
Rp
104,460

19,200.00
40,800.00
4,512.00
1,232.00
103,432.00
1,034.32
104,460.00
10,440.00

Rp
Rp

28,000
10,000

11,200.00
4,400.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

7,680.00
4,080.00
481.28
492.80
28,334.08
283.34
28,610.00

Rp
Rp
Rp

12,480
16,000
3,600

5,441.28
256.00
3,600.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

1,920.00
4,080.00
481.28
147.84
15,926.40
159.26
16,080.00

Rp
Rp
Rp

64,000
600
72,000

70,400.00
1,200.00
4,320.00

Rp
Rp
Rp

38,400
64,000
60,160

1,651.20
2,752.00
258.69

1%

HARGA SATUAN
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp

JUMLAH HARGA
103.49
80,685.38
806.85
81,490.00

64,000
600

281,600.00
8,760.00

Rp
38,400
Rp
64,000
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,264.00
5,440.00
511.36
206.98
299,782.34
2,997.82
302,780.00

Rp
Rp
Rp

64,000
108,000
72,000

281,600.00
486,000.00
19,440.00

Rp
38,400
Rp
64,000
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,264.00
5,440.00
541.44
246.40
796,531.84
7,965.32
804,490.00

Rp

2,640,000

92,400.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

30,720.00
108,800.00
12,032.00
1,971.20
245,923.20
2,459.23
248,380.00

Rp

2,640,000

168,960.00

38,400
54,400
60,160
49,280

38,400.00
163,200.00
18,048.00
14,784.00
403,392.00
4,033.92

Rp
Rp
Rp
Rp
Jumlah
Biaya Umum

1%

HARGA SATUAN

JUMLAH HARGA

Hrg Satuan Pek.

407,420.00

Rp
Rp
Rp
Rp

2,640,000
13,480
20,000
120,000

51,744.00
404.40
6,000.00
120,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

38,400.00
163,200.00
18,048.00
14,784.00
412,580.40
4,125.80
416,700.00

Rp
Rp
Rp

2,640,000
11,600
13,480

2,904,000.00
174,000.00
10,784.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

153,600.00
652,800.00
72,192.00
9,856.00
3,977,232.00
39,772.32
4,017,000.00

Rp
Rp

2,640,000
13,480

31,680.00
20,220.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,840.00
5,440.00
60.16
246.40
61,486.56
614.87
62,100.00

Rp
Rp

2,640,000
13,480

31,680.00
1,348.00

38,400
54,400
60,160
49,280

5,760.00
13,600.00
1,504.00
3,696.00
57,588.00

Rp
Rp
Rp
Rp
Jumlah

1%

HARGA SATUAN

JUMLAH HARGA

Biaya Umum
Hrg Satuan Pek.

575.88
58,160.00

Rp
Rp

2,640,000
13,480

60,720.00
2,022.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

7,680.00
16,320.00
1,804.80
492.80
89,039.60
890.40
89,920.00

Rp
Rp

2,640,000
13,480

71,280.00
2,696.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

9,600.00
19,040.00
2,105.60
616.00
105,337.60
1,053.38
106,390.00

Rp
Rp

2,640,000
13,480

19,008.00
674.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,840.00
10,880.00
1,504.00
246.40
36,152.40
361.52
36,510.00

Rp
Rp

2,640,000
13,480

29,040.00
674.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

4,224.00
11,968.00
1,323.52
246.40
47,475.92
474.76
47,950.00

1%

HARGA SATUAN

Rp
Rp

JUMLAH HARGA

2,640,000
13,480

22,704.00
808.80

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,840.00
5,440.00
601.60
2,464.00
35,858.40
358.58
36,210.00

Rp
Rp

2,640,000
13,480

38,280.00
808.80

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

5,760.00
13,600.00
1,504.00
3,696.00
63,648.80
636.49
64,280.00

Rp

2,250

56,250.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

5,760.00
4,080.00
481.28
394.24
66,965.52
669.66
67,630.00

Rp
Rp
Rp

2,250
54,000
126,000

56,250.00
8,640.00
4,032.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

15,360.00
10,880.00
1,203.20
98.56
96,463.76
964.64
97,420.00

1%

HARGA SATUAN
Rp
Rp
Rp

JUMLAH HARGA

2,250
54,000
126,000

9,000.00
8,640.00
4,032.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

15,360.00
10,880.00
1,203.20
98.56
49,213.76
492.14
49,700.00

Rp
Rp

37,500
25,000

18,750.00
3,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

5,376.00
4,080.00
481.28
394.24
32,081.52
320.82
32,400.00

Rp
Rp

25,000
12,500

60,000.00
75,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,225.60
6,800.00
782.08
197.12
146,004.80
1,460.05
147,460.00

Rp
Rp

25,000
12,500

52,500.00
75,000.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

3,225.60
6,800.00
782.08
197.12
138,504.80
1,385.05
139,880.00

Rp

36,000

75,600.00

1%

0.48

2.08

HARGA SATUAN
Rp

JUMLAH HARGA

13,480

4,044.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

7,680.00
5,440.00
601.60
492.80
93,858.40
938.58
94,790.00

Rp
Rp

38,000
13,480

26,600.00
269.60

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

5,760.00
3,808.00
481.28
295.68
37,214.56
372.15
37,580.00

Rp
Rp

38,000
13,480

11,400.00
53,920.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

5,760.00
3,808.00
481.28
295.68
75,664.96
756.65
76,420.00

Rp
Rp

35,000
13,480

38,500.00
134.80

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

1,152.00
3,808.00
421.12
73.92
44,089.84
440.90
44,530.00

Rp

17,500

201,250.00

1%

HARGA SATUAN
Rp

JUMLAH HARGA

13,480

674.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

2,304.00
6,528.00
721.92
147.84
211,625.76
2,116.26
213,740.00

Rp
Rp

55,000
13,480

19,800.00
404.40

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

2,688.00
5,440.00
601.60
172.48
29,106.48
291.06
29,390.00

Rp
Rp

55,000
13,480

20,625.00
404.40

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

2,688.00
5,440.00
601.60
172.48
29,931.48
299.31
30,230.00

272,000.00
1,747,200.00
1,000.00

9,520.00
52,416.00
1,000.00

6,160.00
4,800.00

554.40
4,320.00
67,810.40
678.10
68,480.00

Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp

3,600
126,000

129,600.00
13,860.00

1%

HARGA SATUAN

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp

JUMLAH HARGA

15,360.00
10,880.00
1,203.20
98.56
171,001.76
1,710.02
172,710.00

20,000
126,000
54,000

50,000.00
1,890.00
1,890.00

Rp
38,400
Rp
54,400
Rp
60,160
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

15,360.00
10,880.00
1,203.20
98.56
81,321.76
813.22
82,130.00

Rp
30,330
Rp
162,420
Rp
497,080
Rp
4,377,580
Rp
200,000
Jumlah
Biaya Umum
Hrg Satuan Pek.

4,549.50
3,248.40
49,708.00
131,327.40
200,000.00
388,833.30
3,888.33
392,720.00

Rp
30,330
Rp
162,420
Rp
497,080
Rp
33,310
Rp
8,440
Jumlah
Biaya Umum
Hrg Satuan Pek.

10,918.80
4,060.50
54,678.80
36,641.00
9,284.00
115,583.10
1,155.83
116,730.00

Rp
30,330
Rp
162,420
Rp
497,080
Rp
33,310
Rp
8,440
Jumlah
Biaya Umum
Hrg Satuan Pek.

16,984.80
4,872.60
69,591.20
46,634.00
11,816.00
149,898.60
1,498.99
151,390.00

1%

HARGA SATUAN

JUMLAH HARGA

4,800
54,000
126,000
100,000

57,600.00
10,584.00
5,670.00
2,600.00

38,400
54,400
60,160
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

9,600.00
6,800.00
782.08
616.00
94,252.08
942.52
95,190.00

Rp
Rp
Rp

85,000
6,000
2,000

85,000.00
600.00
2,000.00

Rp
38,400
Rp
54,400
Rp
49,280
Jumlah
Biaya Umum
Hrg Satuan Pek.

1,152.00
2,720.00
246.40
91,718.40
917.18
92,630.00

Manado, 2 Januari 2012


Dibuat oleh :

1%

HARGA SATUAN

HERU BASKORO
PIMPINAN TEKNIK

JUMLAH HARGA

1%

DAFTAR ANALISA LUMPSUM


Satker
Pekerjaan

:
:

Lokasi
Tahun Anggaran
No. Paket

:
:
:

PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWES


PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PE
SPAM TALAWAAN KAB. MINAHASA UTARA
2012 (APBN)
32

Analisa lumpsum : 1 UNIT, PENGAD-PEMAS KRAN UMUM


Satuan : Unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Plesteran 1pc:4ps
Acian
Pengecatan
Begel pipa 75 MM
Nepel Drat PVC 1/2 INCH
Elbow PVC 1/2 INCH
Socket Drat PVC 1/2 INCH
Stop Kran Kuningan 1/2 INCH
Pipa PVC 1/2 INCH
Tee-Stuck PVC 1/2 INCH
Mata Kran Vernekel 1/2 INCH
TBA uk. Sedang
Tegel Keramik 20/25
Biaya Pemasangan Pipa & Acc

VOL.

0.3000
0.1000
0.0500
1.7000
1.7000
1.2000
1.0000
1.0000
2.0000
5.0000
0.0050
6.0000
1.0000
2.0000
1.0000
2.2000
1.0000

m3
m3
m3
m2
m2
m2
bh
bh
bh
bh
bh
m1
bh
bh
pcs
m2
ls

Analisa lumpsum : 12 M, PENGAD-PEMAS JEMBATAN PIPA GIP 150 MM


Satuan : m1
NO.

1
2

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr

VOL.

2.4000
0.1400

m3
m3

3
4
5
6
7
8
9
10
11
12
13

Tiang Penyangga Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)


Pasangan Batu, 1pc:4ps
Plesteran 1pc:4ps
Pengecatan
Pipa GIP 150 MM
Flanged GIP 150 MM
Flanged Socket 150 MM
Elbow GIP 150 MM
Bout 22 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Jembatan Pipa GIP 150 MM

0.3200
1.5000
6.4000
11.2000
12.0000
10.0000
2.0000
4.0000
72.0000
5.0000
1.0000

m3
m2
m2
m2
m1
bh
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS JEMBATAN PIPA GIP 100 MM


Satuan : m1
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Tiang Penyangga Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pasangan Batu, 1pc:4ps
Plesteran 1pc:4ps
Pengecatan
Pipa GIP 100 MM
Flanged GIP 100 MM
Flanged Socket 100 MM
Elbow GIP 100 MM
Bout 18 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Jembatan Pipa GIP 100 MM

VOL.

2.4000
0.1400
0.3200
1.5000
6.4000
11.2000
12.0000
10.0000
2.0000
4.0000
72.0000
5.0000
1.0000

m3
m3
m3
m2
m2
m2
m1
bh
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS JEMBATAN PIPA GIP 75 MM


Satuan : m1

NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Tiang Penyangga Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pasangan Batu, 1pc:4ps
Plesteran 1pc:4ps
Pengecatan
Pipa GIP 75 MM
Flanged GIP 75 MM
Flanged Socket 75 MM
Elbow GIP 75 MM
Bout 18 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Jembatan Pipa GIP 75 MM

VOL.

2.4000
0.1400
0.3200
1.5000
6.4000
11.2000
12.0000
10.0000
2.0000
4.0000
72.0000
5.0000
1.0000

m3
m3
m3
m2
m2
m2
m1
bh
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS PIPA CROSSING JALAN GIP 150 MM


Satuan : m1
NO.

URAIAN PEKERJAAN

1
2
3
4
5
6
7
8
9
10

Bongkar Jl. Aspal & Batu, Galian tanah


Pas. Batu Dasar Jalan
Pasir Urug
Aspal
Pipa GIP 150 MM
Flanged GIP 150 MM
Flanged Socket PVC 150 MM
Bout 18 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Crossing Pipa GIP 150 MM

VOL.

2.5200
1.5000
0.7400
5.2500
6.0000
2.0000
2.0000
16.0000
2.0000
1.0000

m3
m3
m3
kg
m1
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS CROSSING PIPA GIP 100 MM


Satuan : m1
NO.

URAIAN PEKERJAAN

VOL.

1
2
3
4
5
6
7
8
9
10

Bongkar Jl. Aspal & Batu, Galian tanah


Pas. Batu Dasar Jalan
Pasir Urug
Aspal
Pipa GIP 100 MM
Flanged GIP 100 MM
Flanged Socket PVC 100 MM
Bout 18 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Crossing Pipa GIP 100 MM

1.6200
1.5000
0.5400
5.2500
6.0000
2.0000
2.0000
16.0000
2.0000
1.0000

m3
m3
m3
kg
m1
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 6 M, PENGAD-PEMAS CROSSING PIPA GIP 75 MM


Satuan : m1
NO.

URAIAN PEKERJAAN

1
2
3
4
5
6
7
8
9
10

Bongkar Jl. Aspal & Batu, Galian tanah


Pas. Batu Dasar Jalan
Pasir Urug
Aspal
Pipa GIP 75 MM
Flanged GIP 75 MM
Flanged Socket PVC 75 MM
Bout 16 MM
Packing Karet MM
Erection

1 M, Pengad-Pemas Crossing Pipa GIP 75 MM

VOL.

1.4500
0.9000
0.4200
5.2500
6.0000
2.0000
2.0000
16.0000
2.0000
1.0000

m3
m3
m3
kg
m1
bh
bh
bh
bh
ls

1.0000

m1

Analisa lumpsum : 1 UNIT, PENGAD-PEMAS PENUTUP CHAMBER-MANHOLE PLAT EZER 3 MM, Uk. 70
Satuan : unit
NO.

1
2
3
4
5
6

URAIAN PEKERJAAN

Besi plat ezer 3 mm


Besi Siku 3.50.50 mm
Hengsel besi
Angker/handdel besi 16 mm, pjg 30 cm
Kunci/Gembok Kuningan
Erection & pengelasan

VOL.

0.8000
2.8000
2.0000
7.0000
3.0000
1.0000

m2
m1
bh
pcs
pcs
ls

Analisa lumpsum : 1 M, PENGAD-PEMAS BARSCREEN BESI RAM # 3 CM, BESI 12 MM


Satuan : m2
NO.

1
2
3
4
5
6

URAIAN PEKERJAAN

Besi 12 mm
Besi Siku 3.50.50 mm
Hengsel besi
Angker/handdel besi 16 mm, pjg 30 cm
Kunci/Gembok Kuningan
Erection & pengelasan

VOL.

16.8000
1.4000
2.0000
7.0000
3.0000
1.0000

kg
m1
bh
pcs
pcs
ls

Analisa lumpsum : 1 UNIT, BAK CHAMBER PAS. 1/2 BATA, Uk. 80x80x120 CM
Satuan : unit
NO.

1
2
3
4
5
6
7

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

3.2400
0.1000
0.0810
3.8000
8.8000
8.8000
4.2000

m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, BAK CHAMBER PAS. 1/2 BATA, Uk. 80x150x120 CM
Satuan : unit
NO.

1
2
3
4
5
6
7

URAIAN PEKERJAAN

Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

5.4000
0.1400
0.0967
6.9600
16.8000
16.8000
8.0000

m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, PENGAD-PEMAS PIPA UDARA GIP 75 MM


Satuan : unit
NO.

1
2
3

URAIAN PEKERJAAN

Pipa GIP 75 mm
Angker besi 12 mm, pjg 30 cm
Erection & pengelasan

VOL.

1.0000
2.0000
1.0000

m1
pcs
ls

Analisa lumpsum : 10 M, PAGAR DURI, t = 150 CM, 6 JARING


Satuan : m1
NO.

1
2
3
4

URAIAN PEKERJAAN

Galian Tanah
Tiang pipa GIP dia. 2"
Kawat duri
Erection

1 M, Pagar duri t=150 cm, 6 jaring

VOL.

0.1000
6.0000
64.0000
1.0000

m3
m1
m1
ls

1.0000

m1

Analisa lumpsum : 1 UNIT, PENGADAAN-PEMASANGAN WATER METER 150 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Water Meter 150 mm


Pipa GIP 150 MM
Flanged GIP 150 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, PENGADAAN-PEMASANGAN WATER METER 100 MM + CHAMBER


Satuan : unit

NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Water Meter 100 mm


Pipa GIP 100 MM
Flanged GIP 100 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, WASH OUT 150 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14

URAIAN PEKERJAAN

All Flange Tee GIP 150 mm


Gate Valve 150 mm
Pipa GIP 150 MM
Flanged GIP 150 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, WASH OUT 100 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5

URAIAN PEKERJAAN

All Flange Tee GIP 100 mm


Gate Valve 100 mm
Pipa GIP 100 MM
Flanged GIP 100 MM
Bout 18 MM

VOL.

1.0000
1.0000
1.0000
6.0000
32.0000

bh
bh
m1
bh
bh

6
7
8
9
10
11
12
13
14

Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, WASH OUT 75 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13
14

URAIAN PEKERJAAN

All Flange Tee GIP 75 mm


Gate Valve 75 mm
Pipa GIP 75 MM
Flanged GIP 75 MM
Bout 16 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
1.0000
6.0000
32.0000
4.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, SINGLE AIR VALVE 150 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9

URAIAN PEKERJAAN

Air Valve 150 mm


Pipa GIP 150 MM
Flanged GIP 150 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)

VOL.

1.0000
1.0000
4.0000
16.0000
2.0000
1.0000
3.2400
0.1000
0.1300

bh
m1
bh
bh
bh
ls
m3
m3
m3

10
11
12
13

Pas. Dind. 1/2 bata, 1pc:3ps


Plesteran 1pc:4ps
Acian
Pengecatan

3.8000
8.8000
8.8000
4.2000

m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, SINGLE AIR VALVE 100 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Air Valve 100 mm


Pipa GIP 100 MM
Flanged GIP 100 MM
Bout 18 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
4.0000
16.0000
2.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, SINGLE AIR VALVE 75 MM + CHAMBER


Satuan : unit
NO.

1
2
3
4
5
6
7
8
9
10
11
12
13

URAIAN PEKERJAAN

Air Valve 75 mm
Pipa GIP 75 MM
Flanged GIP 75 MM
Bout 16 MM
Packing Karet MM
Erection
Galian Tanah
Beton Tumbuk 1pc:3ps:5kr
Beton Bertulang 1pc:2ps:3kr, (besi 139.5 kg)
Pas. Dind. 1/2 bata, 1pc:3ps
Plesteran 1pc:4ps
Acian
Pengecatan

VOL.

1.0000
1.0000
4.0000
16.0000
2.0000
1.0000
3.2400
0.1000
0.1300
3.8000
8.8000
8.8000
4.2000

bh
m1
bh
bh
bh
ls
m3
m3
m3
m2
m2
m2
m2

Analisa lumpsum : 1 UNIT, ANGKER TANGGA BESI 22 mm


Satuan : unit
NO.

1
2

URAIAN PEKERJAAN

Angker besi 22 mm
Erection & pengelasan

VOL.

17.0500
1.0000

kg
ls

Analisa lumpsum : 1 UNIT, PINTU AIR TYPE 60


Satuan : unit
NO.

1
2
3
4
5

URAIAN PEKERJAAN

Pintu Air
Besi Siku 3.50.50 mm
Angker/handdel besi 16 mm, pjg 30 cm
Erection & pengelasan
Beton Bertulang 1pc:2ps:3kr, (besi 150 kg)

VOL.

1.0000
5.6000
8.0000
1.0000
0.0360

Unit
m1
pcs
ls
m3

Analisa lumpsum : 1 UNIT TANGKI CLORINASI KAP 500 LTR


Satuan : unit
NO.

1
2
3
4
5

URAIAN PEKERJAAN

Tangki fibreglass 500 ltr


Cor beton tumbuk 1:3:5
Plesteran 1:4
Acian
Pipa 1/2 inch, kran & Acc pipa

Mengetahui/ Menyetujui :
CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

VOL.

1.0000
0.5700
1.8000
1.8000
1.0000

unit
m3
m2
m2
ls

Manado, 2 Januari

MPSUM

NUM PROVINSI SULAWESI UTARA

RY DAN P/P JARINGAN PERPIPAAN

HARGA SATUAN

30,330.00
610,350.00
2,793,950.00
25,660.00
8,440.00
16,080.00
65,000.00
6,000.00
6,500.00
7,000.00
37,500.00
3,997.00
10,000.00
45,000.00
5,000.00
95,190.00
350,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

30,330.00 Rp
610,350.00 Rp

9,099.00
61,035.00
139,697.50
43,622.00
14,348.00
19,296.00
65,000.00
6,000.00
13,000.00
35,000.00
187.50
23,982.00
10,000.00
90,000.00
5,000.00
209,418.00
350,000.00
1,094,685.00
10,946.85
1,105,631.85

JUMLAH HARGA

72,792.00
85,449.00

2,793,950.00
497,080.00
25,660.00
16,080.00
433,400.00
192,400.00
385,800.00
350,000.00
9,000.00
15,000.00
1,000,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

894,064.00
745,620.00
164,224.00
180,096.00
5,200,800.00
1,924,000.00
771,600.00
1,400,000.00
648,000.00
75,000.00
1,000,000.00
13,161,645.00
131,616.45
13,293,261.45

1,107,771.79 Rp

1,107,771.79

Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

30,330.00
610,350.00
2,793,950.00
497,080.00
25,660.00
16,080.00
266,700.00
133,600.00
209,200.00
300,000.00
7,500.00
12,000.00
850,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

72,792.00
85,449.00
894,064.00
745,620.00
164,224.00
180,096.00
3,200,400.00
1,336,000.00
418,400.00
1,200,000.00
540,000.00
60,000.00
850,000.00
9,747,045.00
97,470.45
9,844,515.45

820,376.29 Rp

820,376.29

Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

30,330.00
610,350.00
2,793,950.00
497,080.00
25,660.00
16,080.00
184,900.00
96,200.00
158,500.00
250,000.00
7,500.00
9,000.00
750,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

72,792.00
85,449.00
894,064.00
745,620.00
164,224.00
180,096.00
2,218,800.00
962,000.00
317,000.00
1,000,000.00
540,000.00
45,000.00
750,000.00
7,975,045.00
79,750.45
8,054,795.45

671,232.95 Rp

671,232.95

Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

40,370.00
497,080.00
162,420.00
7,600.00
433,400.00
192,400.00
385,800.00
7,500.00
15,000.00
500,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

101,732.40
745,620.00
120,190.80
39,900.00
2,600,400.00
384,800.00
771,600.00
120,000.00
30,000.00
500,000.00
5,414,243.20
54,142.43
5,468,385.63

911,397.61 Rp

911,397.61

Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

JUMLAH HARGA

40,370.00
497,080.00
162,420.00
7,600.00
266,700.00
133,600.00
209,200.00
7,500.00
12,000.00
400,000.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

65,399.40
745,620.00
87,706.80
39,900.00
1,600,200.00
267,200.00
418,400.00
120,000.00
24,000.00
400,000.00
3,768,426.20
37,684.26
3,806,110.46

634,351.74 Rp

634,351.74

Jumlah
Biaya Umum
Hrg Satuan Pek.

HARGA SATUAN

40,370.00
497,080.00
162,420.00
7,600.00
184,900.00
96,200.00
158,500.00
6,500.00
9,000.00
300,000.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

58,536.50
447,372.00
68,216.40
39,900.00
1,109,400.00
192,400.00
317,000.00
104,000.00
18,000.00
300,000.00
2,654,824.90
26,548.25
2,681,373.15

446,895.52 Rp

446,895.52

Jumlah
Biaya Umum
Hrg Satuan Pek.

E PLAT EZER 3 MM, Uk. 70x70 cm


HARGA SATUAN

185,000.00
19,000.00
40,000.00
3,500.00
55,000.00
150,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

148,000.00
53,200.00
80,000.00
24,500.00
165,000.00
150,000.00
620,700.00
6,207.00
626,907.00

BESI 12 MM
HARGA SATUAN

9,200.00
19,000.00
40,000.00
3,500.00
55,000.00
150,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

154,560.00
26,600.00
80,000.00
24,500.00
165,000.00
150,000.00
600,660.00
6,006.60
606,666.60

98,269.20
61,035.00
226,309.95
310,612.00
225,808.00
74,272.00
67,536.00
1,063,842.15
10,638.42
1,074,480.57

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

163,782.00
85,449.00
270,174.97
568,910.40
431,088.00
141,792.00
128,640.00
1,789,836.37
17,898.36
1,807,734.73

HARGA SATUAN

JUMLAH HARGA

184,900.00 Rp
3,500.00 Rp
75,000.00 Rp
Jumlah
Rp
Biaya Umum
Rp
Hrg Satuan Pek.
Rp

HARGA SATUAN

30,330.00
111,400.00
7,200.00
80,000.00

184,900.00
7,000.00
75,000.00
266,900.00
2,669.00
269,569.00

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp

3,033.00
668,400.00
460,800.00
80,000.00
1,212,233.00
12,122.33
1,224,355.33

122,435.53 Rp

122,435.53

Jumlah
Biaya Umum
Hrg Satuan Pek.

50 MM + CHAMBER
HARGA SATUAN

5,132,100.00
433,400.00
192,400.00
7,500.00
15,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

00 MM + CHAMBER

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

5,132,100.00
433,400.00
1,154,400.00
240,000.00
60,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
8,320,645.70
83,206.46
8,403,852.16

HARGA SATUAN

3,635,200.00
266,700.00
133,600.00
7,500.00
12,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

1,069,200.00
2,940,300.00
433,400.00
192,400.00
7,500.00
15,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

919,500.00
1,587,700.00
266,700.00
133,600.00
7,500.00

3,635,200.00
266,700.00
801,600.00
240,000.00
48,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
6,292,245.70
62,922.46
6,355,168.16

1,069,200.00
2,940,300.00
433,400.00
1,154,400.00
240,000.00
60,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
7,198,045.70
71,980.46
7,270,026.16

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp

919,500.00
1,587,700.00
266,700.00
801,600.00
240,000.00

12,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

490,000.00
1,111,900.00
184,900.00
96,200.00
6,500.00
9,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

2,851,200.00
266,700.00
133,600.00
7,500.00
15,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00

48,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
5,164,245.70
51,642.46
5,215,888.16

490,000.00
1,111,900.00
184,900.00
577,200.00
208,000.00
36,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
3,908,745.70
39,087.46
3,947,833.16

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

2,851,200.00
266,700.00
534,400.00
120,000.00
30,000.00
100,000.00
98,269.20
61,035.00
363,213.50

81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

1,539,648.00
354,941.17
162,000.00
7,500.00
12,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

1,078,240.00
184,900.00
96,200.00
6,500.00
9,000.00
100,000.00
30,330.00
610,350.00
2,793,950.00
81,740.00
25,660.00
8,440.00
16,080.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

310,612.00
225,808.00
74,272.00
67,536.00
5,103,045.70
51,030.46
5,154,076.16

1,539,648.00
354,941.17
648,000.00
120,000.00
24,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
3,987,334.87
39,873.35
4,027,208.22

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,078,240.00
184,900.00
384,800.00
104,000.00
18,000.00
100,000.00
98,269.20
61,035.00
363,213.50
310,612.00
225,808.00
74,272.00
67,536.00
3,070,685.70
30,706.86
3,101,392.56

HARGA SATUAN

Rp
9,200
Rp
80,000
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp

HARGA SATUAN

5,000,000.00
19,000.00
3,500.00
150,000.00
2,793,950.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp

5,000,000.00
106,400.00
28,000.00
150,000.00
100,582.20

Rp
Rp
Rp

5,284,400.00
52,844.00
5,337,244.00

HARGA SATUAN

1,500,000.00
610,350.00
25,660.00
8,440.00
60,000.00
Jumlah
Biaya Umum
Hrg Satuan Pek.

JUMLAH HARGA

Rp
Rp
Rp
Rp
Rp

1,500,000.00
347,899.50
46,188.00
15,192.00
60,000.00

Rp
Rp
Rp

1,909,279.50
19,092.80
1,928,372.30

Manado, 2 Januari 2012


Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

156,860
80,000
236,860
2,368.60
239,229

1%

Lampiran 1

ANALISA HARGA LUMP SUM UNTUK PENGADAAN PIPA


Satker
Pekerjaan

:
:

PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PR


PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DA
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)
: 32

Lokasi
Tahun Anggaran
No. Paket
NO.
1

URAIAN PEKERJAAN

HARGA

per 1 M'
3

A Pengadaan Pipa GIP (Medium SII)


1 Pipa 12"
2 Pipa 10"
3 Pipa 8"
4 Pipa 6"
5 Pipa 4"
6 Pipa 3"
8 Pipa 2"

Rp 1,098,900.00
Rp
822,112.50
Rp
553,162.50
Rp
410,850.00
Rp
252,862.50
Rp
175,312.50
Rp
105,600.00

B Pengadaan Pipa PVC S-10


1 Pipa 12" (315 mm) RR
2 Pipa 10" (250 mm) RR
3 Pipa 8" (200 mm) RR
4 Pipa 6" (160 mm) RR
5 Pipa 4" (110 mm) RR
6 Pipa 3" (90 mm) RR
8 Pipa 2" (63 mm) RR

Rp
Rp
Rp
Rp
Rp
Rp
Rp

549,656.25
344,561.25
222,255.00
142,436.25
67,361.25
44,797.50
22,151.25

C Pengadaan Pipa PVC S-12,5


1 Pipa 12" (315 mm) RR
2 Pipa 10" (250 mm) RR
3 Pipa 8" (200 mm) RR
4 Pipa 6" (160 mm) RR

Rp
Rp
Rp
Rp

448,428.75
281,737.50
180,551.25
115,871.25

NO.
1

URAIAN PEKERJAAN

HARGA

per 1 M'
3

5 Pipa 4" (110 mm) RR


6 Pipa 3" (90 mm) RR
8 Pipa 2" (63 mm) RR
D Pengadaan Pipa PE S8-SDR17 (PN10)
1 Pipa 12" (315 mm)
2 Pipa 10" (250 mm)
3 Pipa 8" (200 mm)
4 Pipa 6" (160 mm)
5 Pipa 4" (110 mm)
6 Pipa 3" (90 mm)
8 Pipa 2" (63 mm)

Mengetahui/ Menyetujui :
CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

Rp
Rp
Rp

54,243.75
37,372.50
17,902.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp

643,830.00
404,827.50
260,370.00
166,815.00
79,942.50
53,542.50
26,400.00

UM UNTUK PENGADAAN PIPA GIP-PVC-PE

KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


PAM KAWASAN KHUSUS, KAPET
PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PERPIPAAN
KAB. MINAHASA UTARA

ASURANSI %

ONGKOS KIRIM

JLH HARGA

per 1 M'
4

per 1 M'
5

per 1 M'
6

Rp
Rp
Rp
Rp
Rp
Rp
Rp

32,967.00
24,663.38
16,594.88
12,325.50
7,585.88
5,259.38
3,168.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

27,472.50
20,552.81
13,829.06
10,271.25
6,321.56
4,382.81
2,640.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,159,300.00
867,300.00
583,500.00
433,400.00
266,700.00
184,900.00
111,400.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

16,489.69
10,336.84
6,667.65
4,273.09
2,020.84
1,343.93
664.54

Rp
Rp
Rp
Rp
Rp
Rp
Rp

13,741.41
8,614.03
5,556.38
3,560.91
1,684.03
1,119.94
553.78

Rp
Rp
Rp
Rp
Rp
Rp
Rp

579,800.00
363,500.00
234,400.00
150,200.00
71,000.00
47,200.00
23,300.00

Rp
Rp
Rp
Rp

13,452.86
8,452.13
5,416.54
3,476.14

Rp
Rp
Rp
Rp

11,210.72
7,043.44
4,513.78
2,896.78

Rp
Rp
Rp
Rp

473,000.00
297,200.00
190,400.00
122,200.00

ASURANSI %

ONGKOS KIRIM

JLH HARGA

per 1 M'
4

per 1 M'
5

per 1 M'
6

Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,627.31 Rp
1,121.18 Rp
537.08 Rp

19,314.90
12,144.83
7,811.10
5,004.45
2,398.28
1,606.28
792.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,356.09 Rp
934.31 Rp
447.56 Rp

16,095.75
10,120.69
6,509.25
4,170.38
1,998.56
1,338.56
660.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Manado, 2 Januari 2012


Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

57,200.00
39,400.00
18,800.00

679,200.00
427,000.00
274,600.00
175,900.00
84,300.00
56,400.00
27,800.00

Lampiran 2

ANALISA HARGA LUMP SUM UNTUK PENGADAAN ACCESSO


Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULA


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
### PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARING
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)
: 32

No.

URAIAN PEKERJAAN

HARGA PABRIK

ONGKOS KIRIM

(a)

(b)

(c)

(e)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30

Gate Valve Double Flanged CI 2"


Gate Valve Double Flanged CI 3"
Gate Valve Double Flanged CI 4"
Gate Valve Double Flanged CI 6"
Gate Valve Double Flanged CI 8"
Gate Valve Double Flanged CI 10"
Gate Valve Double Flanged CI 12"
Stop Kran 50 mm
Stop Kran 20 mm
Check Valve (Non Return Valve) 4"
Check Valve (Non Return Valve) 6"
Check Valve (Non Return Valve) 8"
Check Valve (Non Return Valve) 10"
Check Valve (Non Return Valve) 12"
DF. Water Meter 2"
DF. Water Meter 3"
DF. Water Meter 4"
DF. Water Meter 6"
DF. Water Meter 8"
DF. Water Meter 10"
DF. Water Meter 12"
Air Relief Valve 25 mm
Flanged Air Relief Valve 50 mm
Air Vent GIP 3"
All Flanged Tee PVC 4" x 4"
All Flanged Tee PVC 3" x 3"
All Flanged Tee PVC 3" x 2"
All Flanged Tee CI 12" X 12"
All Flanged Tee CI 12" X 8"
All Flanged Tee CI 12" X 2"

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

536,250.00
1,029,600.00
1,470,150.00
2,722,500.00
4,158,000.00
4,989,600.00
6,897,000.00
207,900.00
99,000.00
2,640,000.00
3,300,000.00
3,960,000.00
4,752,000.00
5,702,400.00
1,980,000.00
2,673,000.00
3,366,000.00
4,752,000.00
6,336,000.00
9,900,000.00
23,760,000.00
472,725.00
660,000.00
354,750.00
440,137.50
392,040.00
372,438.00
2,970,000.00
2,574,000.00
2,148,300.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

26,812.50
51,480.00
73,507.50
136,125.00
207,900.00
249,480.00
344,850.00
10,395.00
4,950.00
132,000.00
165,000.00
198,000.00
237,600.00
285,120.00
99,000.00
133,650.00
168,300.00
237,600.00
316,800.00
495,000.00
1,188,000.00
23,636.25
33,000.00
17,737.50
22,006.88
19,602.00
18,621.90
148,500.00
128,700.00
107,415.00

No.
(a)
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83

URAIAN PEKERJAAN
(b)
All Flanged Tee CI 12" x 12"
All Flanged Tee CI 10" x 10"
All Flanged Tee CI 8" x 8"
All Flanged Tee CI 6" x 6"
All Flanged Tee CI 6" x 4"
All Flanged Tee CI 4" x 4"
All Flanged Tee CI 4" x 3"
All Flanged Tee CI 4" x 2"
All Flanged Tee CI 3" x 2"
All Flanged Tee CI 2" x 2"
All Flanged Tee Y Cl 12" X 12"
Socket Tee PVC (All RR) 6" x 6"
Socket Tee PVC (All RR) 6" x 4"
Socket Tee PVC (All RR) 4" x 4"
Socket Tee PVC (All RR) 4" x 3"
Socket Tee PVC (All RR) 4" x 2"
Socket Tee PVC (All RR) 3" X 3"
Socket Tee PVC (All RR) 3" X 2"
Socket Tee PVC (All RR) 2" X 2"
Baut Moor 5/8" x 3"
Baut Moor 5/8" x 4"
Blind Flanged 12"
Blind Flanged 8"
Clem Besi Plat 4" X 2 mm
Dop PVC 2"
Dop PVC 3"
Bend Doble Socet PVC 12" X 11,25
Bend Doble Socet PVC 12" X 22,5
Bend Doble Socet PVC 12" X 45
Bend Doble Socet PVC 12" X 90
Bend Doble Socet PVC 8" x 22,5
Bend Doble Socet PVC 8" x 45
Bend Doble Socet PVC 8" x 90
Bend Doble Socet PVC 6" x 22,5
Bend Doble Socet PVC 6" x 45
Bend Doble Socet PVC 6" x 90
Bend Doble Socet PVC 4" x 11,5
Bend Doble Socet PVC 4" x 22,5
Bend Doble Socet PVC 4" x 45
Bend Doble Socet PVC 4" x 90
Bend Doble Socet PVC 3" x 22,5
Bend Doble Socet PVC 3" x 45
Bend Doble Socet PVC 3" x 90
Bend Doble Socet PVC 2" x 22,5
Bend Doble Socet PVC 2" x 45
Bend Doble Socet PVC 2" x 90
Double Flanged Pipe GIP 3" x 60 cm.
Double Flanged Pipe GIP 3" x 80 cm.
Double Flanged Pipe GIP 3" x 100 cm.
Double Flanged Pipe GIP 3" x 120 cm.
Double Flanged Pipe GIP 3" x 200 cm.
Double Flanged Pipe GIP 4" x 60 cm.
Double Flanged Pipe GIP 4" x 80 cm.

HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

ONGKOS KIRIM

(c)
3,341,250.00 Rp
2,227,500.00 Rp
1,485,000.00 Rp
990,000.00 Rp
919,050.00 Rp
851,400.00 Rp
589,875.00 Rp
568,425.00 Rp
453,750.00 Rp
206,250.00 Rp
2,937,000.00 Rp
811,800.00 Rp
704,880.00 Rp
436,425.00 Rp
396,000.00 Rp
326,700.00 Rp
261,360.00 Rp
231,660.00 Rp
158,400.00 Rp
6,600.00 Rp
9,900.00 Rp
668,250.00 Rp
536,250.00 Rp
37,125.00 Rp
20,625.00 Rp
28,875.00 Rp
1,152,000.00 Rp
1,216,000.00 Rp
1,400,000.00 Rp
2,005,600.00 Rp
344,000.00 Rp
387,200.00 Rp
456,000.00 Rp
188,800.00 Rp
224,240.00 Rp
247,200.00 Rp
81,600.00 Rp
86,400.00 Rp
93,600.00 Rp
101,600.00 Rp
52,080.00 Rp
59,280.00 Rp
66,720.00 Rp
26,640.00 Rp
28,800.00 Rp
32,560.00 Rp
474,210.00 Rp
565,290.00 Rp
701,910.00 Rp
747,450.00 Rp
1,157,310.00 Rp
393,492.00 Rp
479,028.00 Rp

(e)
167,062.50
111,375.00
74,250.00
49,500.00
45,952.50
42,570.00
29,493.75
28,421.25
22,687.50
10,312.50
146,850.00
40,590.00
35,244.00
21,821.25
19,800.00
16,335.00
13,068.00
11,583.00
7,920.00
330.00
495.00
33,412.50
26,812.50
1,856.25
1,031.25
1,443.75
57,600.00
60,800.00
70,000.00
100,280.00
17,200.00
19,360.00
22,800.00
9,440.00
11,212.00
12,360.00
4,080.00
4,320.00
4,680.00
5,080.00
2,604.00
2,964.00
3,336.00
1,332.00
1,440.00
1,628.00
23,710.50
28,264.50
35,095.50
37,372.50
57,865.50
19,674.60
23,951.40

No.

URAIAN PEKERJAAN

(a)
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136

(b)
Double Flanged Pipe GIP 4" x 100 cm.
Double Flanged Pipe GIP 4" x 120 cm.
Double Flanged Pipe GIP 4" x 180 cm.
Flanged Pipe GIP 3" x 60 cm.
Flanged Pipe GIP 3" x 100 cm.
Flanged Pipe GIP 3" x 200 cm.
Flanged Pipe GIP 4" x 60 cm.
Flanged Pipe GIP 4" x 100 cm.
Flanged Pipe GIP 4" x 200 cm.
Flanged Pipe GIP 6" x 60 cm.
Flanged Pipe GIP 6" x 80 cm.
Flanged Pipe GIP 6" x 100 cm.
Flanged Pipe GIP 6" x 200 cm.
Double Socket Bend CI for PVC 6" x 11,25
Double Socket Bend CI for PVC 6" x 22,5
Double Socket Bend CI for PVC 6" x 45
Double Socket Bend CI for PVC 6" x 90
Flanged Air Relief Valve 2"
Flanged Socket PVC RRJ 2"
Flanged Socket PVC RRJ 3"
Flanged Socket PVC RRJ 4"
Flanged Socket PVC RRJ 6"
Flanged Socket PVC RRJ 8"
Flanged Socket PVC RRJ 10"
Flanged Socket PVC RRJ 12"
Flanged Spigot PVC 2"
Flanged Spigot PVC 3"
Flanged Spigot PVC 4"
Flanged Spigot PVC 6"
Flanged Spigot PVC 8"
Flanged Spigot PVC 12"
Flanged Steel PN 10 2"
Flanged Steel PN 10 3"
Flanged Steel PN 10 4"
Flanged Steel PN 10 6"
Flanged Steel PN 10 8"
Flanged Steel PN 10 10"
Flanged Steel PN 10 12"
Flanged Strainer CI 3"
Flanged Strainer CI 4"
Flanged Strainer CI 6"
Fleksible Joint "Tosen" 4
Fleksible Joint "Tosen" 6
Fleksible Joint "Tosen" 8
Fleksible Joint "Tosen" 10
Fleksible Joint "Tosen" 12
Manhole 80 x 80 Cm.
Paking Karet 2"
Paking Karet 3"
Paking Karet 4"
Paking Karet 6"
Paking Karet 8"
Paking Karet 10"

HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

ONGKOS KIRIM

(c)
607,332.00 Rp
650,100.00 Rp
906,708.00 Rp
407,880.00 Rp
590,040.00 Rp
1,045,440.00 Rp
556,875.00 Rp
789,800.00 Rp
1,488,575.00 Rp
896,775.00 Rp
1,173,150.00 Rp
1,394,250.00 Rp
2,610,300.00 Rp
1,128,600.00 Rp
1,138,500.00 Rp
1,207,800.00 Rp
1,326,600.00 Rp
1,263,900.00 Rp
106,672.50 Rp
146,850.00 Rp
193,710.00 Rp
357,307.50 Rp
575,767.50 Rp
590,535.00 Rp
905,850.00 Rp
99,330.00 Rp
136,950.00 Rp
174,322.50 Rp
341,880.00 Rp
532,290.00 Rp
791,917.50 Rp
66,825.00 Rp
89,100.00 Rp
123,750.00 Rp
178,200.00 Rp
237,600.00 Rp
285,120.00 Rp
356,400.00 Rp
948,750.00 Rp
1,237,500.00 Rp
1,530,375.00 Rp
1,069,200.00 Rp
1,336,500.00 Rp
1,603,800.00 Rp
1,924,560.00 Rp
2,309,472.00 Rp
371,250.00 Rp
19,965.00 Rp
23,595.00 Rp
35,392.50 Rp
49,500.00 Rp
78,375.00 Rp
92,812.50 Rp

(e)
30,366.60
32,505.00
45,335.40
20,394.00
29,502.00
52,272.00
27,843.75
39,490.00
74,428.75
44,838.75
58,657.50
69,712.50
130,515.00
56,430.00
56,925.00
60,390.00
66,330.00
63,195.00
5,333.63
7,342.50
9,685.50
17,865.38
28,788.38
29,526.75
45,292.50
4,966.50
6,847.50
8,716.13
17,094.00
26,614.50
39,595.88
3,341.25
4,455.00
6,187.50
8,910.00
11,880.00
14,256.00
17,820.00
47,437.50
61,875.00
76,518.75
53,460.00
66,825.00
80,190.00
96,228.00
115,473.60
18,562.50
998.25
1,179.75
1,769.63
2,475.00
3,918.75
4,640.63

No.

URAIAN PEKERJAAN

(a)
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
180
181
182
183
184
185
186
187
188
189

(b)
Paking Karet 12"
Piet Kran Baal Valve Dia 3/4 "
DF Pipa GIP 3" x 60 cm.
DF Pipa GIP 3" x 100 cm.
Pressure Reducing Valve 6"
Repair Socket PVC 2"
Socket Repair PVC 6"
Rubber Expansiont Joint 6"
Rubber Water Stop 30 Cm
Socket GIP 2"
Socket GIP 3"
Socket GIP 4"
Socket GIP 6"
Socket Reducer PVC (All RR) 3" x 2"
Socket Reducer PVC (All RR) 4" x 3"
Socket Reducer PVC (All RR) 4" x 2"
Socket Reducer PVC (All RR) 6" x 3"
Socket Reducer PVC (All RR) 6" x 4"
Socket Reducer PVC (All RR) 12" x 8"
Socket Spigot Bend PVC 12" X 90
Socket Spigot Bend PVC 12" X 45
Socket Spigot Bend PVC 12" X 22,5
Socket Spigot Bend PVC 12" X 11,25
Socket Spigot Bend PVC 8" x 22,5
Socket Spigot Bend PVC 8" x 45
Socket Spigot Bend PVC 8" x 90
Socket Spigot Bend PVC 6" x 22,5
Socket Spigot Bend PVC 6" x 45
Socket Spigot Bend PVC 6" x 90
Socket Spigot Bend PVC (S-10) 4" x 22,5
Socket Spigot Bend PVC (S-10) 4" x 45
Socket Spigot Bend PVC (S-10) 4" x 90
Socket Spigot Bend PVC ( S-10) 3" x 90
Socket Spigot Bend PVC ( S-10) 3" x 45
Socket Spigot Bend PVC ( S-10) 3" x 22,5
Socket Spigot Bend PVC ( S-10) 2" x 90
Socket Spigot Bend PVC ( S-10) 2" x 45
Socket Spigot Bend PVC ( S-10) 2" x 22,5
Tangki Fiberglass 2 m
Tutup Manhole 0,80 x 0,80
Tutup Manhole 1 x 0,80
Socket Reducer HDPE 10" x 8"
Socket Reducer HDPE 8" x 6"
Socket Reducer HDPE 6" x 4"
Socket Reducer HDPE 4" x 3"
Socket Reducer HDPE 3" x 2"
Elbow HDPE 10" x 90
Elbow HDPE 8" x 90
Elbow HDPE 6" x 90
Elbow HDPE 4" x 90
Elbow HDPE 3" x 90
Elbow HDPE 2" x 90
Tee HDPE 90 10"

HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(c)
107,250.00
66,000.00
341,550.00
500,940.00
49,500,000.00
78,375.00
412,500.00
1,435,500.00
321,750.00
41,250.00
57,750.00
69,300.00
189,750.00
136,620.00
218,790.00
210,375.00
354,750.00
425,700.00
930,600.00
2,910,600.00
2,613,600.00
2,116,620.00
1,782,000.00
736,817.40
862,705.80
992,296.80
394,020.00
461,340.00
530,640.00
181,170.00
195,030.00
216,810.00
173,250.00
153,450.00
135,630.00
102,712.50
94,347.00
84,150.00
4,000,000.00
371,250.00
701,250.00
536,250.00
301,125.00
136,125.00
78,375.00
61,875.00
1,204,500.00
655,875.00
410,850.00
185,625.00
130,350.00
57,750.00
1,267,200.00

ONGKOS KIRIM
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(e)
5,362.50
3,300.00
17,077.50
25,047.00
2,475,000.00
3,918.75
20,625.00
71,775.00
16,087.50
2,062.50
2,887.50
3,465.00
9,487.50
6,831.00
10,939.50
10,518.75
17,737.50
21,285.00
46,530.00
145,530.00
130,680.00
105,831.00
89,100.00
36,840.87
43,135.29
49,614.84
19,701.00
23,067.00
26,532.00
9,058.50
9,751.50
10,840.50
8,662.50
7,672.50
6,781.50
5,135.63
4,717.35
4,207.50
200,000.00
18,562.50
35,062.50
26,812.50
15,056.25
6,806.25
3,918.75
3,093.75
60,225.00
32,793.75
20,542.50
9,281.25
6,517.50
2,887.50
63,360.00

No.
(a)
190
191
192
193
194
195
196
197
198
199
200
201
202
203
204
205
206
207
208
209
210
211
212
213
214
215
216
217
218
219
220
221
222
223

URAIAN PEKERJAAN
(b)
Tee HDPE 90 8"
Tee HDPE 90 6"
Tee HDPE 90 4"
Tee HDPE 90 3"
Tee HDPE 90 2"
Bend HDPE 90 10"
Bend HDPE 90 8"
Bend HDPE 90 6"
Bend HDPE 90 4"
Bend HDPE 90 3"
Bend HDPE 90 2"
Bend HDPE 45 10"
Bend HDPE 45 8"
Bend HDPE 45 6"
Bend HDPE 45 4"
Bend HDPE 45 3"
Bend HDPE 45 2"
Stub End HDPE 10"
Stub End HDPE 8"
Stub End HDPE 6"
Stub End HDPE 4"
Stub End HDPE 3"
Stub End HDPE 2"
Flange HDPE 10"
Flange HDPE 8"
Flange HDPE 6"
Flange HDPE 4"
Flange HDPE 3"
Flange HDPE 2"
Cap/Dop HDPE 8"
Cap/Dop HDPE 6"
Cap/Dop HDPE 4"
Cap/Dop HDPE 3"
Cap/Dop HDPE 2"

Mengetahui/ Menyetujui :
CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

HARGA PABRIK
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

ONGKOS KIRIM

(c)
779,625.00 Rp
490,875.00 Rp
222,750.00 Rp
130,350.00 Rp
57,750.00 Rp
2,195,283.75 Rp
901,807.50 Rp
635,992.50 Rp
248,242.50 Rp
153,202.50 Rp
66,206.25 Rp
2,084,527.50 Rp
861,093.75 Rp
503,538.75 Rp
209,467.50 Rp
133,402.50 Rp
60,637.50 Rp
1,138,500.00 Rp
812,625.00 Rp
519,750.00 Rp
309,375.00 Rp
264,000.00 Rp
161,700.00 Rp
1,833,356.25 Rp
676,046.25 Rp
423,967.50 Rp
275,013.75 Rp
179,932.50 Rp
110,013.75 Rp
280,788.75 Rp
143,632.50 Rp
59,606.25 Rp
20,377.50 Rp
13,571.25 Rp

(e)
38,981.25
24,543.75
11,137.50
6,517.50
2,887.50
109,764.19
45,090.38
31,799.63
12,412.13
7,660.13
3,310.31
104,226.38
43,054.69
25,176.94
10,473.38
6,670.13
3,031.88
56,925.00
40,631.25
25,987.50
15,468.75
13,200.00
8,085.00
91,667.81
33,802.31
21,198.38
13,750.69
8,996.63
5,500.69
14,039.44
7,181.63
2,980.31
1,018.88
678.56

Manado, 2 J

M UNTUK PENGADAAN ACCESSORIES PIPA

RJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA

ANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PERPIPAAN

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

ASURANSI

JML HARGA

(f)

(g)

16,087.50
30,888.00
44,104.50
81,675.00
124,740.00
149,688.00
206,910.00
6,237.00
2,970.00
79,200.00
99,000.00
118,800.00
142,560.00
171,072.00
59,400.00
80,190.00
100,980.00
142,560.00
190,080.00
297,000.00
712,800.00
14,181.75
19,800.00
10,642.50
13,204.13
11,761.20
11,173.14
89,100.00
77,220.00
64,449.00

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

579,100.00
1,111,900.00
1,587,700.00
2,940,300.00
4,490,600.00
5,388,700.00
7,448,700.00
224,500.00
106,900.00
2,851,200.00
3,564,000.00
4,276,800.00
5,132,100.00
6,158,500.00
2,138,400.00
2,886,800.00
3,635,200.00
5,132,100.00
6,842,800.00
10,692,000.00
25,660,800.00
510,500.00
712,800.00
383,100.00
475,300.00
423,400.00
402,200.00
3,207,600.00
2,779,900.00
2,320,100.00

ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(f)
100,237.50
66,825.00
44,550.00
29,700.00
27,571.50
25,542.00
17,696.25
17,052.75
13,612.50
6,187.50
88,110.00
24,354.00
21,146.40
13,092.75
11,880.00
9,801.00
7,840.80
6,949.80
4,752.00
198.00
297.00
20,047.50
16,087.50
1,113.75
618.75
866.25
34,560.00
36,480.00
42,000.00
60,168.00
10,320.00
11,616.00
13,680.00
5,664.00
6,727.20
7,416.00
2,448.00
2,592.00
2,808.00
3,048.00
1,562.40
1,778.40
2,001.60
799.20
864.00
976.80
14,226.30
16,958.70
21,057.30
22,423.50
34,719.30
11,804.76
14,370.84

JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(g)
3,608,500.00
2,405,700.00
1,603,800.00
1,069,200.00
992,500.00
919,500.00
637,000.00
613,800.00
490,000.00
222,700.00
3,171,900.00
876,700.00
761,200.00
471,300.00
427,600.00
352,800.00
282,200.00
250,100.00
171,000.00
7,100.00
10,600.00
721,700.00
579,100.00
40,000.00
22,200.00
31,100.00
1,244,100.00
1,313,200.00
1,512,000.00
2,166,000.00
371,500.00
418,100.00
492,400.00
203,900.00
242,100.00
266,900.00
88,100.00
93,300.00
101,000.00
109,700.00
56,200.00
64,000.00
72,000.00
28,700.00
31,100.00
35,100.00
512,100.00
610,500.00
758,000.00
807,200.00
1,249,800.00
424,900.00
517,300.00

ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(f)
18,219.96
19,503.00
27,201.24
12,236.40
17,701.20
31,363.20
16,706.25
23,694.00
44,657.25
26,903.25
35,194.50
41,827.50
78,309.00
33,858.00
34,155.00
36,234.00
39,798.00
37,917.00
3,200.18
4,405.50
5,811.30
10,719.23
17,273.03
17,716.05
27,175.50
2,979.90
4,108.50
5,229.68
10,256.40
15,968.70
23,757.53
2,004.75
2,673.00
3,712.50
5,346.00
7,128.00
8,553.60
10,692.00
28,462.50
37,125.00
45,911.25
32,076.00
40,095.00
48,114.00
57,736.80
69,284.16
11,137.50
598.95
707.85
1,061.78
1,485.00
2,351.25
2,784.38

JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(g)
655,900.00
702,100.00
979,200.00
440,500.00
637,200.00
1,129,000.00
601,400.00
852,900.00
1,607,600.00
968,500.00
1,267,000.00
1,505,700.00
2,819,100.00
1,218,800.00
1,229,500.00
1,304,400.00
1,432,700.00
1,365,000.00
115,200.00
158,500.00
209,200.00
385,800.00
621,800.00
637,700.00
978,300.00
107,200.00
147,900.00
188,200.00
369,200.00
574,800.00
855,200.00
72,100.00
96,200.00
133,600.00
192,400.00
256,600.00
307,900.00
384,900.00
1,024,600.00
1,336,500.00
1,652,800.00
1,154,700.00
1,443,400.00
1,732,100.00
2,078,500.00
2,494,200.00
400,900.00
21,500.00
25,400.00
38,200.00
53,400.00
84,600.00
100,200.00

ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(f)
3,217.50
1,980.00
10,246.50
15,028.20
1,485,000.00
2,351.25
12,375.00
43,065.00
9,652.50
1,237.50
1,732.50
2,079.00
5,692.50
4,098.60
6,563.70
6,311.25
10,642.50
12,771.00
27,918.00
87,318.00
78,408.00
63,498.60
53,460.00
22,104.52
25,881.17
29,768.90
11,820.60
13,840.20
15,919.20
5,435.10
5,850.90
6,504.30
5,197.50
4,603.50
4,068.90
3,081.38
2,830.41
2,524.50
120,000.00
11,137.50
21,037.50
16,087.50
9,033.75
4,083.75
2,351.25
1,856.25
36,135.00
19,676.25
12,325.50
5,568.75
3,910.50
1,732.50
38,016.00

JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(g)
115,800.00
71,200.00
368,800.00
541,000.00
53,460,000.00
84,600.00
445,500.00
1,550,300.00
347,400.00
44,500.00
62,300.00
74,800.00
204,900.00
147,500.00
236,200.00
227,200.00
383,100.00
459,700.00
1,005,000.00
3,143,400.00
2,822,600.00
2,285,900.00
1,924,500.00
795,700.00
931,700.00
1,071,600.00
425,500.00
498,200.00
573,000.00
195,600.00
210,600.00
234,100.00
187,100.00
165,700.00
146,400.00
110,900.00
101,800.00
90,800.00
4,320,000.00
400,900.00
757,300.00
579,100.00
325,200.00
147,000.00
84,600.00
66,800.00
1,300,800.00
708,300.00
443,700.00
200,400.00
140,700.00
62,300.00
1,368,500.00

ASURANSI
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

(f)
23,388.75
14,726.25
6,682.50
3,910.50
1,732.50
65,858.51
27,054.23
19,079.78
7,447.28
4,596.08
1,986.19
62,535.83
25,832.81
15,106.16
6,284.03
4,002.08
1,819.13
34,155.00
24,378.75
15,592.50
9,281.25
7,920.00
4,851.00
55,000.69
20,281.39
12,719.03
8,250.41
5,397.98
3,300.41
8,423.66
4,308.98
1,788.19
611.33
407.14

JML HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

Manado, 2 Januari 2012


Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

(g)
841,900.00
530,100.00
240,500.00
140,700.00
62,300.00
2,370,900.00
973,900.00
686,800.00
268,100.00
165,400.00
71,500.00
2,251,200.00
929,900.00
543,800.00
226,200.00
144,000.00
65,400.00
1,229,500.00
877,600.00
561,300.00
334,100.00
285,100.00
174,600.00
1,980,000.00
730,100.00
457,800.00
297,000.00
194,300.00
118,800.00
303,200.00
155,100.00
64,300.00
22,000.00
14,600.00

DAFTAR KUANTITAS DAN HARGA


Satker
Pekerjaan

:
:

Lokasi
Tahun Anggaran
No. Paket

:
:
:

PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SUL


PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARING
SPAM TALAWAAN KAB. MINAHASA UTARA
2012 (APBN)
32

No.

Uraian Jenis Pekerjaan

Satuan

Volume

I.
1
2
3
4
II.

PEKERJAAN PERSIAPAN
Sewa direksi keet & gudang
Pengobatan/P3K, Keselamatan Kerja
Papan nama proyek
Pengukuran, Pas. Bauwplank

Ls
Ls
Bh

1.00
1.00
1.00

M1

30.00

PEK. BANGUNAN PENANGKAP


a. Pek. Persiapan, Tanah & Pasir
1 Galian Tanah
2 Urugan Tanah Kembali
3 Urugan Pasir

M3
M3
M3

0.90
0.35
0.16

b. Pekerjaan Beton, Pasangan, Plesteran


1 Pasangan Batu 1:4
2 Plesteran 1 : 3
3 Acian

M3
M2
M2

3.37
5.42
5.42

M1
M1
Unit
Unit
Bh

6.00
6.00
1.00
1.00
4.00

1
2
3
4
5

c. Pekerjaan Pipa & Acc


Pipa GIP 6", medium SII
Pipa GIP 2", medium SII
Gate Valve 6" + Acc (terpasang)
Stop Kran 2" + Acc (terpasang)
Flanged Steel PN 10 6"

6
7
8
9
10

III.

Penutup Chamber/Manhole 70x70 Plat Eser 3 mm (lengkap)


Pintu Air Type 60
Screen Besi 12 mm (uk. 40x80)
Pipa Udara GIP 75 mm
Pagar kawat duri t=1,5 m; 6 trap

Unit
Unit
Unit
Bh
M1

1.00
1.00
1.00
1.00
20.00

d. Pekerjaan Finishing, Dll


1 Pengecetan Dinding (Waterproofing)

M2

5.42

PEK. BANGUNAN INFILTRASI GALLERY


a. Pek. Persiapan, Tanah & Pasir
1 Galian Tanah
2 Urugan Tanah Kembali
3 Urugan Pasir

M3
M3
M3

15.64
2.61
1.51

b. Pekerjaan Beton, Pasangan, Plesteran


Beton Tumbuk Lantai Kerja (K-125)
Beton Bertulang K-225 (besi 150 kg)
Rabat Beton (K-100) + flur kasar
Plesteran 1 : 3
Acian

M3
M3
M3
M2
M2

1.21
9.52
1.56
79.08
79.08

c. Pekerjaan Pipa & Acc


Pipa GIP 6", medium SII
Pipa GIP 4", medium SII
Pipa Manipul PVC 6" (S-12,5)
Pipa Lateral PVC 4" (S-12,5)
Gate Valve 6" + Acc (terpasang)
Gate Valve 4" + Acc (terpasang)
Flanged Steel PN 10 6"
Flanged Steel PN 10 4"
Elbow PVC 6"
Tee-Stuck PVC 6x4"
Elbow GIP 6"
Elbow GIP 4"
All Flange Tee 4"
Bak Chamber (80x80x120cm)
Penutup Chamber/Manhole Plat Eser 3 mm (lengkap)
Angker Tangga 22 mm
Pipa Udara GIP 75 mm
Pagar kawat duri t=1,5 m; 6 trap
Lapisan Saringan Batu
Lapisan Saringan Pasir
Lapisan Saringan Ijuk

M1
M1
M1
M1
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Bh
M1
M
M
M2

12.00
12.00
6.00
12.00
1.00
2.00
4.00
6.00
2.00
6.00
8.00
6.00
6.00
2.00
3.00
1.00
1.00
24.00
3.20
2.40
3.20

1
2
3
4
5

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

22 Tangki Clorinasi

Unit

1.00

M2
M2
M1
M1

29.45
49.63
13.00
32.00

a. Pipa GIP 6"


1 Pengadaan/pas Pipa GIP 6" Medium SII

M1
M1

60.00
60.00

1
2
3
4
5

b. Pipa HDPE 6" (gali,pasang,timbun)


Galian Tanah
Urugan Pasir
Urugan Tanah
Pemadatan Tanah
Pengadaan/pas Pipa HDPE 6" (SDR-17)

M1
M
M
M
M
M1

3,000.00
1,306.80
270.00
918.00
918.00
3,000.00

1
2
3
4
5
6
7

c. Accessories Pipa
Gate Valve 6" + Acc (terpasang)
Flanged Steel PN 10 6"
Bend HDPE 45 6"
Single Air Valve 6" dgn chamber lengkap
Wash Out 6" dgn chamber lengkap
Jembatan Pipa
Block Beton Bertulang Penahan Pipa camp. 1:2:3

1
2
3
4
IV.

d. Pekerjaan Finishing, Dll


Cat Dinding Bak Intake
Pengecetan Dinding Dalam (Waterproofing)
Saluran Air 30x30
Pagar kawat duri t=1,5 m; 6 trap
PEK. JARINGAN PIPA

Unit
Bh
Bh
Unit
Unit
M1
M

1.00
20.00
7.00
1.00
1.00
12.00
0.98

V.

PEKERJAAN AKHIR
1 Pembersihan akhir, Laporan-laporan
2 Pengetesan Pipa/Jaringan

Ls
Ls

1.00
1.00

Terbilang :
SATU MILYAR DUA PULUH LIMA JUTA EMPAT RATUS RIBU RUPIAH.

Mengetahui/ Menyetujui :
CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

Manado, 2

HERU B
PIMPINA

REKAPITULASI DAFTAR KUANTITAS DAN HA


Satker
Pekerjaan

:
:

Lokasi
Tahun Anggaran

:
:

PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SUL


PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARING
SPAM TALAWAAN KAB. MINAHASA UTARA
2012 (APBN)

Uraian Pekerjaan

I.

PEKERJAAN PERSIAPAN

II.

PEK. BANGUNAN PENANGKAP

III.

PEK. BANGUNAN INFILTRASI GALLERY

IV.

PEK. JARINGAN PIPA

V.

PEKERJAAN AKHIR

Terbilang :
SATU MILYAR DUA PULUH LIMA JUTA EMPAT RATUS RIBU RUPIAH.

Mengetahui/ Menyetujui :
CV. WAYA BULA

Manado, 2

JOHNY POSUMAH
DIREKTUR

HERU B
PIMPINA

ARGA

ROVINSI SULAWESI UTARA

N P/P JARINGAN PERPIPAAN

Harga
Satuan
( Rp. )
e

Jumlah
Harga
( Rp. )
f

2,000,000.00
1,500,000.00
500,000.00
61,160.00

5,834,800.00
2,000,000.00
1,500,000.00
500,000.00
1,834,800.00

30,330.00
10,110.00
162,420.00

18,933,105.84
56,619.18
27,418.32
3,538.50
25,662.36

497,080.00
33,310.00
8,440.00

1,901,444.60
1,675,159.60
180,540.20
45,744.80

461,100.00
120,400.00
2,940,300.00
224,500.00
192,400.00

16,712,497.26
2,766,600.00
722,400.00
2,940,300.00
224,500.00
769,600.00

626,907.00
5,337,244.00
606,666.60
269,569.00
122,435.53

626,907.00
5,337,244.00
606,666.60
269,569.00
2,448,710.66

48,440.00

262,544.80
262,544.80

30,330.00
10,110.00
162,420.00

93,188,740.59
746,002.50
474,361.20
26,387.10
245,254.20

640,500.00
3,827,250.00
610,350.00
33,310.00
8,440.00

41,464,161.00
775,005.00
36,435,420.00
952,146.00
2,634,154.80
667,435.20

461,100.00
283,900.00
122,200.00
71,000.00
2,940,300.00
1,587,700.00
192,400.00
133,600.00
266,900.00
761,200.00
500,000.00
388,000.00
475,300.00
1,074,480.57
626,907.00
239,228.60
269,569.00
122,435.53
96,260.00
162,420.00
21,710.00

42,665,516.83
5,533,200.00
3,406,800.00
733,200.00
852,000.00
2,940,300.00
3,175,400.00
769,600.00
801,600.00
533,800.00
4,567,200.00
4,000,000.00
2,328,000.00
2,851,800.00
2,148,961.14
1,880,721.00
239,228.60
269,569.00
2,938,452.79
308,032.00
389,808.00
69,472.00

1,928,372.30

1,928,372.30

16,080.00
48,440.00
116,730.00
122,435.53

8,313,060.26
473,556.00
2,404,077.20
1,517,490.00
3,917,937.06
808,231,434.61

461,100.00

27,666,000.00
27,666,000.00

30,330.00
162,420.00
10,110.00
21,880.00
210,700.00

744,955,464.00
39,635,244.00
43,853,400.00
9,280,980.00
20,085,840.00
632,100,000.00

2,940,300.00
192,400.00
543,800.00
5,154,076.16
7,270,026.16
820,376.29
2,793,950.00

35,609,970.61
2,940,300.00
3,848,000.00
3,806,600.00
5,154,076.16
7,270,026.16
9,844,515.45
2,746,452.85

6,000,000.00
2,500,000.00
3,500,000.00

2,500,000.00
3,500,000.00
Jumlah
PPn 10%
Total
Dibulatkan

Rp
Rp
Rp
Rp

Manado, 2 Januari 2012


Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

932,188,081.04
93,218,808.10
1,025,406,889.14
1,025,400,000.00

S DAN HARGA

ROVINSI SULAWESI UTARA

N P/P JARINGAN PERPIPAAN

Jumlah
Harga
( Rp. )
5,834,800.00
18,933,105.84
93,188,740.59
808,231,434.61
6,000,000.00
Jumlah
PPn 10%
Total
Dibulatkan

Rp
Rp
Rp
Rp

Manado, 2 Januari 2012


Dibuat oleh :

932,188,081.04
93,218,808.10
1,025,406,889.14
1,025,400,000.00

HERU BASKORO
PIMPINAN TEKNIK

JADWAL WAKTU PELAKSANAA


Satker
Pekerjaan

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PERPIPAAN
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)
: 32

Lokasi
Tahun Anggaran
No. Paket

NO.

JENIS PEKERJAAN

BOBOT
(%)

I.

PEKERJAAN PERSIAPAN

0.63

II.

PEK. BANGUNAN PENANGKAP

2.03

III.

PEK. BANGUNAN INFILTRASI GALLERY

10.00

IV.

PEK. JARINGAN PIPA

86.70

V.

PEKERJAAN AKHIR

0.64

WAKTU PELAKS
1

0.31

0.31

1.00

10

1.00

1.00

1.00

1.00

1.00

1.00

1.00

1.00

5.10

5.10

5.10

5.10

5.10

5.10

RENCANA KEMAJUAN (%)


RENCANA KUMULATIF (%)

100.00

0.31

1.31

1.00

1.00

6.10

6.10

6.10

6.10

6.10

6.10

0.31

1.63

2.63

3.62

9.72

15.82

21.92

28.02

34.12

40.22

Mengetahui/ Menyetujui :
CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

AKSANAAN ( KURVA S )

PROSEN
TASE

WAKTU PELAKSANAAN (MINGGU)


11

12

13

14

15

16

17

18

19

20

21

22

KETERANGAN

100

Waktu Pelaksanaan :

90

150 (seratus lima


80

puluh) Hari Kalender


0.51

0.51

0.51

70

0.51

60Masa Pemeliharaan :
50180 (seratus delapan

1.00

40puluh) Hari kalender

5.10

5.10

5.10

5.10

5.10

5.10

5.10

5.10

5.10

5.10

5.10

30
20

0.32

0.32

10
0

20
10
0

6.10

5.61

5.61

5.61

5.61

5.10

5.10

5.10

5.10

5.10

5.42

0.32

46.32

51.93

57.54

63.15

68.76

73.86

78.96

84.06

89.16

94.26

99.68

100.00

Manado, 2 Januari 2012


Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

SKEMA TENAGA
Satker
Pekerjaan

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PERPIPAAN
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)
: 32

Lokasi
Tahun Anggaran
No. Paket

NO.

WAKTU PELAKSANAAN (MINGGU)

URAIAN
1

10

11

12

13

14

15

Pekerja

16

16

16

16

32

32

32

32

38

38

38

38

45

Mandor

Tukang

Kepala Tukang

Penjaga

14

14

23

23

23

23

44

44

44

44

51

51

51

51

61

JUMLAH

Mengetahui/ Menyetujui :
CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

KETERANGAN
16

17

18

19

20

21

22

45

45

45

25

25

15

12 Waktu Pelaksanaan :
150 (Seratus lima

puluh) Hari Kalender

Masa Pemeliharaan :
180 (seratus delapan

61

61

61

32

32

22

19

puluh) Hari kalender

Manado, 2 Januari 2012


Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

SKEMA BAHAN
Satker
Pekerjaan
Lokasi
Tahun Anggaran
No. Paket

NO.

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UTARA


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PERPIPAAN
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)
: 32
WAKTU PELAKSANAAN (MINGGU)

JENIS PEKERJAAN
1

Material Alam / Galian


(Batu, Pasir, Kerikil, dll.)

Material Non Galian/Bahan Toko


(Semen, Kawat Beton, Besi, dll.)

Bahan - Bahan Lain yang di


perlukan

Mengetahui/ Menyetujui :

10

11

12

13

14

15

16

CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

KETERANGAN
17

18

19

20

21

22

Waktu Pelaksanaan :
150 (Seratus lima
puluh) Hari Kalender
Masa Pemeliharaan :
180 (seratus delapan
puluh) Hari kalender

Manado, 2 Januari 2012

Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

METODE PELAKSANAAN
Satker
Pekerjaan
Lokasi
Tahun Anggaran

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI U


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PER
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)

I.

Pendahuluan
Dengan dibuatnya Metode Pelaksanaan Pekerjaan ini, pekerjaan bisa dilaksanakan dengan teratur,
pekerjaan sesuai spesifikasi teknis, yang mencakup antara lain adalah Kuatitas, Kualitas, Ekonomi
yang tersedia pada alokasi paket pekerjaan ini bisa diselesaikan 100 % sesuai jangka waktu yang ter

II.

Pekerjaan Persiapan
Pengukuran, Pemasangan Patok, Pembersihan lokasi yang akan dilaksanakan pekerjaan, Mobilisasi
Material, Pemasangan Papan Nama Pengenal Proyek, Pembuatan Kantor Direksi, Gudang &
dimulainya pekerjaan atau yag biasa disebut Foto dokumentasi 0%.

Pekerjaan persiapan dilaksanakan secepatnya setelah dikeluarkan Surat Perintah Mulai Kerja ole
tersedia dalam pelaksanaan bisa dimanfaatkan sedemikian rupa sesuai jadual kerja yang telah dibua
III.

Pekerjaan Bangunan Penangkap dan Reservoar :


a. Pertama-tama galian tanah untuk pembuatan Bangunan Penangkap dan Reservoar dilanjutkan
lantai kerja sesuai dengan petunjuk gambar.
b. Setelah pekerjaan diatas selesai dilanjutkan dengan cor beton bertulang pada lantai dan dinding
bestek yang ada. Pada saat pengecoran berlangsung, direksi lapangan dan pengawas harus berad
cor beton pada saat pengecoran akan diperiksa oleh laboratorium Dinas PU Sulut.

c. Material yang digunakan harus disetujui oleh direksi. Baru digunakan untuk pekerjaan yang dimaks
d. Pekerjaan pipa dan accessories pada pembuatan Bangunan Penangkap dan Reservoar harus
pelaksanaan dari direksi.
IV.

Pelaksanaan Jaringan Perpipaan :

Pekerjaan Pemasangan Pipa dan Accessories


1 Setelah dikeluarkannya SPMK, dilanjutkan dengan pemesanan pipa di pabrik untuk dikirim
pemasangan pipa sudah bisa dilaksanakan. Pipa yang digunakan adalah Pipa HD
Accessoriesnya.
2 Diawali dengan proses galian tanah pada jalur yang akan dipasang jaringan pipa sesuai ya
direksi pekerjaan dan telah mendapat persetujuan atau ijin dari pemerintah setempat.
3 Setelah galian tanah sudah dilaksanakan dan panjang mencukupi untuk dilakukan pe
diperintahkan untuk melaksanakan pemasangan pipa dan sebagian tetap melaksanakan p
4 Pemasangan pipa HDPE dilakukan dengan Butt Welding HDPE perlu diperhatikan pada w
jangan sampai dikemudian sambungan bisa bocor oleh sebab itu pada saat akan dipa
dahulu pipa dibersihkan dari kotoran dibagian ujung pipa yang akan disambungkan.

5 Sebelum pipa dipasang dalam lubang galian dibagian bawah galian terlebih dahulu diuru
juga dibagian samping dan atas pipa ditimbunkan pasir, diatas pasir baru lah ditimbun den

6 Maksud dari timbunan pasir dibagian selimut pipa, agar pipa tidak mudah pecah apabila
diakibatkan dari beban luar.
7 Setelah dilakukan secara berkesinambungan sampai pemasangan pipa selesai sepanjan
lelang.
8 Pada titik tertentu perlu dipasangkan accessories sesusi dalam gambar atau kebutuha
Reducer PVC, Single Air Valve, Wash Out, dll

9 Setelah pipa HDPE serta accessories terpasang semuanya kemudian dilakukan pemer
kuantitas pekerjaan yaitu panjang pemasangan pipa dan accesoriesnya.
10 Setelah pemasangan pipa HDPE serta accessories terpasang semuanya dan telah
dilakukan pengujian pipa atau test tekanan dan uji kebocoran untuk diketahui kualitasnya,
perbaikan.

11 Di ambil foto untuk laporan dokumentasi setiap pelaksanaan pekerjaan sedang berlangsu
telah selesai dilaksanakan disebut foto 100 %.
V.

PEKERJAAN AKHIR
1 Melakukan pembersihan akhir pada lokasi dimana telah dilaksanakan pekerjaan agar
mengganggu lalu lintas umum.
2 Demikian Metode Pelaksanaan ini dibuat sebagai dasar sementara dalam pelaksanaan
adanya metoda pelaksanaan ini bisa menjadi acuan dalam melaksanakan pekerjaan, pek
tepat mutu dan kuantitas terpenuhi agar pembangunan dapat bermanfaat bagi kita semua.

Mengetahui/ Menyetujui :
CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

AN

ROVINSI SULAWESI UTARA

N P/P JARINGAN PERPIPAAN

nakan dengan teratur, tertata sesuai dengan urut - urutan


as, Kualitas, Ekonomis dan Tetap Waktu dalam arti dana
jangka waktu yang tersedia.

pekerjaan, Mobilisasi Peralatan, Tenaga Kerja & Bahan /


Direksi, Gudang & Loos dan Foto dokumentasi akan

rintah Mulai Kerja oleh Penyedia Jasa agar waktu yang


kerja yang telah dibuat.

Reservoar dilanjutkan dengan pembuatan pondasi dan

ada lantai dan dinding. Pengecoran harus sesuai dengan


pengawas harus berada di lokasi pekerjaan. Dan sample
ulut.

ekerjaan yang dimaksud.


dan Reservoar harus mengikuti gambar serta petunjuk

di pabrik untuk dikirim. Setelah pipa dikirim maka proses


an adalah Pipa HDPE dia. 75 mm & 50 mm serta

aringan pipa sesuai yang ditentukan oleh pengguna jasa /


erintah setempat.
i untuk dilakukan pemasangan maka sebagian pekerja
tetap melaksanakan pekerjaan galian.
lu diperhatikan pada waktu pemasangan harus hati - hati
pada saat akan dipasangkan pada sambungan terlebih
disambungkan.

terlebih dahulu diurugkan pasir setebal 15-20 cm begitu


baru lah ditimbun dengan tanah dan dipadatkan.

mudah pecah apabila terjadi gesekan atau getaran yang

pipa selesai sepanjang yang tercantum dalam dokumen

ambar atau kebutuhan dilapangan seperti : Gate Valve,

dian dilakukan pemeriksaan pekerjaan dan pengukuran


nya.
semuanya dan telah dilakukan pengukuran, kemudian
diketahui kualitasnya, jika ada kebocoran akan dilakukan

aan sedang berlangsung disebut foto 50% dan pekerjaan

akan pekerjaan agar kembali seperti semula dan tidak

a dalam pelaksanaan pekerjaan, harapan kami dengan


nakan pekerjaan, pekerjaan bisa terlaksana tepat waktu,
nfaat bagi kita semua.

Manado, 2 Januari 2012


Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

SPESIFIKASI TEKNIS
PIPA HDPE PE 100 (MRS 100)
UNTUK AIR BERSIH BERTEKANAN
STANDARD SNI 06-4829-2005/ISO 4427.96
Satker
Pekerjaan
Lokasi
Tahun Anggaran

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWES


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN P
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)

ND
(INCH)
1/2"
3/4"
1"
1 1/4"
1 1/2"
2"
2 1/2"
3"
4"
5"
6"
7"
8"
9"
10"
12"
14"
16"
18"
20"
24"
28"
32"
36"
40"
48"

OD
(MM)
20
25
32
40
50
63
75
90
110
125
160
180
200
225
250
315
355
400
450
500
630
710
800
900
1000
1200

PE 80

S-8, SDR-17
TEBAL (MM)
3.0
3.8
4.5
5.4
6.6
7.4
9.5
10.7
11.9
13.4
14.8
18.7
21.1
23.7
26.7
29.6
37.2
42.1
47.4
53.5
59.3

PE 100

Tegangan
Mpa
4.6
4.5
4.4
4.3
4.2
4.1
4.0

Waktu Kegagalan
Minimum (jam)
165
219
283
394
533
727
1000

Jenis Bahan

100 Jam Pada


20 C
12.4
9.0

PE 100
PE 80

Mengetahui/ Menyetujui :
CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

Tegangan
Mpa
5.5
5.4
5.3
5.2
5.1
5.0

Tegangan Uji (MPa)


165 Jam Pada
80 C
5.5
4.6

Manado, 2 Januar

HERU BASKOR
PIMPINAN TEK

UM PROVINSI SULAWESI UTARA

RY DAN P/P JARINGAN PERPIPAAN

KET.

PE 100

Waktu Kegagalan
Minimum (jam)
165
233
332
476
688
1000

ngan Uji (MPa)


1000 Jam Pada
80 C
5.0
4.0

Manado, 2 Januari 2012


Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

BAGIAN PEKERJAAN YANG DISUBKONTRA


Satker
Pekerjaan
Lokasi
Tahun Anggaran

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI U


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PERP
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)

MATA

PROSENTASE
URAIAN

PEMBAYARAN

HARGA TOTAL MATA


PEMBAYARAN (%)

============ TIDAK ADA ============

TOTAL %

Mengetahui/ Menyetujui :

CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

DISUBKONTRAKKAN

M PROVINSI SULAWESI UTARA

DAN P/P JARINGAN PERPIPAAN

PROSENTASE DARI

NAMA SUB KONTRAKTOR

HARGA PENAWARAN

(JIKA DIRASA PERLU)

0.00

Manado, 2 Januari 2012

Dibuat oleh :

HERU BASKORO
PIMPINAN TEKNIK

METODE PELAKSANAAN
Satker
Pekerjaan
Lokasi
Tahun Anggaran

I.

: PENGEMBANGAN KINERJA PENGELOLAAN AIR MINUM PROVINSI SULAWESI UT


: PEMBANGUNAN SPAM KAWASAN KHUSUS, KAPET
PEMB. BANGUNAN PENANGKAP, INFILTRASI GALERY DAN P/P JARINGAN PERP
: SPAM TALAWAAN KAB. MINAHASA UTARA
: 2012 (APBN)

Pendahuluan
Dengan dibuatnya Metode Pelaksanaan Pekerjaan ini, pekerjaan bisa dilaksanakan dengan ter
urutan pekerjaan sesuai spesifikasi teknis, yang mencakup antara lain adalah Kuatitas, Kualitas, E
arti dana yang tersedia pada alokasi paket pekerjaan ini bisa diselesaikan 100 % sesuai jangka wa

II. Pekerjaan Persiapan


Pengukuran, Pemasangan Patok, Pembersihan lokasi yang akan dilaksanakan pekerjaan, Mob
Bahan / Material, Pemasangan Papan Nama Pengenal Proyek, Pembuatan Kantor Direksi, Gud
alat Pengobatan/P3K sebagai syarat Keselamatan kerjan Foto dokumentasi akan dimulainya peke
dokumentasi 0%.

Pekerjaan persiapan dilaksanakan secepatnya setelah dikeluarkan Surat Perintah Mulai Kerja ole
tersedia dalam pelaksanaan bisa dimanfaatkan sedemikian rupa sesuai jadual kerja yang telah dib

III. Pekerjaan Broncaptering


1 Pertama galian tanah kemudian pemasangan batu 1:3 setelah selesai dilanjutkan dengan p
yang diberi lubang lateral di broncaptering serta accesoriesnya seperti Gate valve, Flange
broncaptering akan dibuat bak dari beton bertulang (besi 150 kg), setelah cor mengeras b
1:3 dan diaci dengan semen, setelah acian permukaan dinding dicat dengan cat waterproofi
2

Pada bagian pengambilan sumber air dipasang screen aluminium # 1 cm sebagai pen
masuk kesumber air, selain itu juga perlu dibuatkan saluran air hujan untuk mengalihkan ali
agar air kotor dari liar tidak masuk kemata air tersebut, kemudian juga dibuat bak chamb
ibuat dari pas. 1/2 bata uk.60x60x100 cm).

Ada juga pekerjaan lainnya yang termasuk pada pekerjaan bangunan broncaptering ad
udara, pembuatan chamber lengkap dgn accesoriesnya, serta pembuatan tangga angker dg

III. Pekerjaan Bangunan Reservoar kap. 80 M3


a Pekerjaan Tanah
a.1. Galian tanah
Galian tanah dilaksanakan seperti yag tertera dalam gambar, baik mengenai lebar, p
sebagainya, dan benar-benar waterpass. Kalau ternyata akan menimbulkan kesulit
dilaksanakan menurut gambar, Penyedia barang/jasa boleh mengajukan usul k
pelaksanaannya.Penggalian dilakukan dilakukan pada bagian-bagian yang lebih tinggi dari
Hasil-hasil galian dingkut ke tempat-tempat lain yang di setujui oleh direksi. galian tan
patok/bouwplank, pengalian harus sesuai dengan gambar dan elevasi yang tertera pada ga

a.2. Urugan Tanah


Semua pekerjaan urugan harus dilaksanakan lapis demi lapissecara horizontal dan dipada
15 cm dan selama proses pemadatan, harus dibasahi dengan air untuk mendapatkan hasil
Pemadatan harus dilakukan dengan alat pemadat mekanis (compactor) dan untuk peke
dipakai roller dan sebagainya, dengan kapasitas yang sesuai.Tanah harus dipisahkan terleb
dapat membahayakan, misalnya dapat merusak permukaan beton atau pun lapisan finishing
Pengurugan dilaksanakan sampai mencapai peil yang ditetapkan dan diratakan sampai n
cacat seperti turunnya permukaan, bergelombang dan sebagainya.

a.3. Urugan Pasir


Pada prinsipnya, pekerjaan pengurugan dengan pasir dilaksanakan sama seperti pada peng

b Pekerjaan Beton / Struktur


1 Beton bertulang tidak boleh diletakkan langsung dipermukaan tanah, kecuali jika ditetapk
kerja minimal 5 cm (1:3:5) diatas tanah sebelum tulangan beton ditempatkan.

setelah pekerjaan lantai kerja selesai maka menunggu beton mengeras maka disiapka
kemudian dilakukan Pemotongan Besi sesuai ukuran yang tertera pada gambar, kemud
2 setelah sesesai kemudian mulai pemasangan / merakit besi tersebut dan diperkuat / diikat d

3 Setelah pekerjaan diatas selesai dilanjutkan dengan cor beton bertulang pada dinding da
dengan bestek yang ada. Pada saat pengecoran berlangsung direksi dan pengawas harus
sampel Cor Beton akan diperiksa oleh laboratorium Dinas Pekerjaan Umum Sulawesi Utara

Material yang digunakan harus disetujui oleh direksi. Barulah kemudian digunakan untuk pe

5 Pelaksanaan Pembesian dilakukan foto dokumentasi 25%, 50%, 75%, 100%

c Pekerjaan pasangan, Plesteran & pengecatan


1 Pekerjaan Acian dilakukan pada bagian dinding saluran dan merupakan pekerjaan finishin
semen abu-abu dengan ketebalan 1,5 mm.
Pekerjaan pengecatan dilakukan dengan memperhatikan
2
Merek dan warna cat yang akan digunakan sesuai yang tercantum dalam kontrak atau dit
Bidang yang akan cat terlebih dahulu dibersihkan dan telah diplamur dan digosok hingga pe
3

Pengecetan dinding tembok bidang yang luas akan digunakan kuas roll sedangkan pada b
kuas biasa 3 inci.
Apabila kualitas cat belum maksimal maka akan dilakukan pengecetan kembali

Bagian dalam dan luar sebelum dicat harus digosok dengan amplas kemudian dicat dasar p
luar mengunakan cat dinding dan dinding bagian dalam mengunakan cat waterproofing Pro
secara baik

Pengencatan bagian Besi mengunakan cat khusus besi atau sesuai dengan petunjuk Direk
dengan terlebih dahulu membersihkan permukaan besi dari kotoran dan karat agar cat dapa

d. Pekerjaan Pipa & Acc Infiltrasi


1 Pipa GIP 3", medium A
2 Gate Valve 3" + Acc (terpasang)
3 Flanged Steel PN 10 3"
4 Elbow GIP 3"
5 All Flange Tee 3"

6
7
8
9

Bak Chamber (80x80x100cm)


Penutup Chamber/Manhole 70x70 Plat Eser 3 mm (lengkap)
Angker Tangga 22 mm
Pipa Udara GIP 75 mm

1
2
3
4
5

d. Pekerjaan Finishing, Dll


Pengecetan Dinding Luar
Pengecetan Dinding Dalam (Waterproofing)
Pengecetan Mani Besi
Saluran Air 30x30
Pagar BRC t=120 cm

IV. Pekerjaaan Pengadaan & Pemasangan Pipa HDPE (PE)


a Pipa HDPE uk. 100(dali, pasang, timbun)
Galian tanah
Galian tanah dilaksanakan seperti yag tertera dalam gambar, baik mengenai lebar, panjang, dalam
dan benar-benar waterpass. Kalau ternyata akan menimbulkan kesulitan-kesulitan pelaksanaan ka
gambar, Penyedia barang/jasa boleh mengajukan usul kepada direksi mengenai cara pelaksanaan
dilakukan pada bagian-bagian yang lebih tinggi dari elevasi tanah yang direncanakan. Hasil-hasil
lain yang di setujui oleh direksi. galian tanah di mulai setelah pemasangan patok/bouwplank, peng
gambar dan elevasi yang tertera pada gambar.

Urugan Tanah
Semua pekerjaan urugan harus dilaksanakan lapis demi lapis secara horizontal dan dipadatkan.Te
dan selama proses pemadatan, harus dibasahi dengan air untuk mendapatkan hasil pemadatan y
Pemadatan harus dilakukan dengan alat pemadat mekanis (compactor) dan untuk pekerjaan yang
roller dan sebagainya, dengan kapasitas yang sesuai.Tanah harus dipisahkan terlebih dahulu dari
membahayakan, misalnya dapat merusak permukaan beton atau pun lapisan finishing yang lain, P
mencapai peil yang ditetapkan dan diratakan sampai nantinya tidak akan timbul cacat-cacat seper
bergelombang dan sebagainya.

Urugan Pasir
Pada prinsipnya urugan pasir dilakukan sama dengan proses yang dilakukan pada urugan dengan
Pengadaan dan Pemasangan Pipa HDPE Uk 75 mm (S8, SDR 17)
1 Setelah dikeluarkannya SPMK maka proses pengadaan pipa sudah bisa dilaksanakan deng
pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya

2 Proses pengadaan pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya dan akan dila
melampaui target waktu yang dijadwalkan agar pekerjaan pemasangan bisa dilaksanakan s
3 Pipa yang akan kami diadakan adalah Pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya
disyaratkan.

4 Sesuai jadwal yang kami buat proses pengadaan pipa diperkirakan selama 1,5 bulan sud
toleransi hambatan, jika lebih cepat dalam pelaksanaannya lebih baik.

5 Pipa yang akan kami diadakan kemudian diinventarisir jumlahnya dan diperiksa kualita
kemudian akan dilakukan pemasangan.

7 Setelah pengadaan kami telah laksanakan maka kami siap melaksanakan pemasangan jar
mm dan Accesoriesnya.
8 Diawali dengan proses galian tanah pada jalur yang akan dipasang jaringan pipa sesua
jasa / direksi pekerjaan dan telah mendapat persetujuan atau ijin dari pemerintah setempat.

9 Galian tanah dilaksanakan sedemikian rupa agar tidak mengganggu lalu lintas atau masyara

10 Setelah galian tanah sudah dilaksanakan dan panjang mencukupi untuk dilakukan pema
diperintahkan untuk melaksanakan pemasangan pipa dan sebagian tetap melaksanakan pe

Setelah galian tanah sudah dilaksanakan dan panjang mencukupi untuk dilakukan pema
diperintahkan untuk melaksanakan pemasangan pipa dan sebagian tetap melaksanakan pe

11 Pemasangan pipa PVC dilakukan dengan sambungan karet pacing perlu diperhatikan pad
hati jangan sampai dikemudian sambungan bisa bocor oleh sebab itu pada saat akan dipas
dahulu pipa dibersihkan dari kotoran dibagian ujung pipa yang akan disambungkan.

12 Sebelum pipa dipasang dalam lubang galian dibagian bawah galian terlebih dahulu diurugk
juga dibagian samping dan atas pipa ditimbunkan pasir, diatas pasir baru lah ditimbun deng

13 Maksud dari timbunan pasir dibagian selimut pipa, agar pipa tidak mudah pecah apabila te
diakibatkan dari beban luar.

14 Setelah dilakukan secara berkesinambungan sampai pemasangan pipa selesai sepanjang


lelang khusus untuk pemasangan HDPE dia. 75 mm, 50 mm dan Accesoriesnya.

15 Pada titik tertentu perlu dipasangkan accessories sesusi dalam gambar atau kebutuhan dil
50 mm, Flange socket, Band 90 o dan 45 o dia. 75 mm dan 50 mm.

Setelah pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya terpasang semuanya k


16 pekerjaan dan pengukuran kuantitas pekerjaan yaitu panjang pemasangan pipa dan acceso

17 Setelah pemasangan pipa HDPE dia. 75 mm, 50 mm dan Accesoriesnya terpasang


pengukuran, kemudian dilakukan pengujian pipa atau test tekanan dan uji kebocoran unt
kebocoran akan dilakukan perbaikan.

18 Di ambil foto untuk laporan dokumentasi setiap pelaksanaan pekerjaan sedang berlangsun
telah selesai dilaksanakan disebut foto ; 0%, 25%, 50%, 75% dan 100 %.

V. PEKERJAAN AKHIR
1 Melakukan pembersihan akhir pada lokasi dimana telah dilaksanakan pekerjaan agar kemb
mengganggu lalu lintas umum.

2 Setelah seluruh bagian selesai dibuat maka dilakukan pengetasan dengan disaksikan oleh d
terkait lainnya

3 Pembuatan laporan-laporan dibuat harian, mingguan dan bulanan serta foto dokumentasi 0
dan melengkapi adminstrasi-adminstrasi proyek.

4 Demikian Metoda Pelaksanaan ini dibuat sebagai dasar sementara dalam pelaksanaan pek
adanya metoda pelaksanaan ini bisa menjadi acuan dalam melaksanakan pekerjaan, peker
tepat mutu dan kuantitas terpenuhi agar pembangunan dapat bermanfaat bagi kita semua.

Mengetahui/ Menyetujui :
CV. WAYA BULA

JOHNY POSUMAH
DIREKTUR

Manado, 2 Janu
Dibuat ole

HERU BASK
PIMPINAN TE

AN

INSI SULAWESI UTARA

P JARINGAN PERPIPAAN

nakan dengan teratur, tertata sesuai dengan urut uatitas, Kualitas, Ekonomis dan Tetap Waktu dalam
% sesuai jangka waktu yang tersedia.

n pekerjaan, Mobilisasi Peralatan, Tenaga Kerja &


antor Direksi, Gudang & Loos dan serta penyiapan
n dimulainya pekerjaan atau yag biasa disebut Foto

ah Mulai Kerja oleh Penyedia Jasa agar waktu yang


erja yang telah dibuat.

anjutkan dengan pek. Pasang. Pipa GIP dia. 75 mm


Gate valve, Flanged dan Elbow dia. 75 mm karena
h cor mengeras baru dilanjutkan dengan plesteran
an cat waterproofing.

cm sebagai penutup bronc supaya kotoran tidak


uk mengalihkan aliran air yang diluar dari sumber air
dibuat bak chamber untuk pengamanan gate valve

broncaptering adalah seperti ; Pemasangan pipa


n tangga angker dgn besi dia. 22 mm.

mengenai lebar, panjang, dalam, kemiringan dan


nimbulkan kesulitan-kesulitan pelaksanaan kalau
ngajukan usul kepada direksi mengenai cara
g lebih tinggi dari elevasi tanah yang direncanakan.
direksi. galian tanah di mulai setelah pemasangan
ng tertera pada gambar.

izontal dan dipadatkan.Tebal dari tiap lapis diambil


endapatkan hasil pemadatan yang maksimum.
) dan untuk pekerjaan yang besar sifatnya, dapat
s dipisahkan terlebih dahulu dari bahan-bahan yang
un lapisan finishing yang lain.
diratakan sampai nantinya tidak akan timbul cacat-

seperti pada pengurugan dengan tanah timbunan.

cuali jika ditetapkan lain, maka harus dibuat lantai


kan.

as maka disiapkan besi polos dan kawat beton,


a gambar, kemudian dibengkokkan besi tersebut,
diperkuat / diikat dengan kawat beton dengan baik.

g pada dinding dan plat. Pengecoran harus sesuai


n pengawas harus berada di lokasi pekerjaan. Dan
um Sulawesi Utara.

gunakan untuk pekerjaan yang dimaksud

0%

pekerjaan finishing untuk bahannya menggunakan

m kontrak atau ditentukan lain oleh pemilik proyek,


digosok hingga permukaannya rata dan halus.

sedangkan pada bidang yang sempit menggunakan

udian dicat dasar paling sedikit dua kali, Cat dinding


waterproofing Proses pekerjaan pengecetan harus

gan petunjuk Direksi pekerjaan, pengecatan dimulai


arat agar cat dapat melekat dengan baik.

ar, panjang, dalam, kemiringan dan sebagainya,


an pelaksanaan kalau dilaksanakan menurut
i cara pelaksanaannya.Penggalian dilakukan
akan. Hasil-hasil galian dingkut ke tempat-tempat
k/bouwplank, pengalian harus sesuai dengan

dan dipadatkan.Tebal dari tiap lapis diambil 15 cm


hasil pemadatan yang maksimum.
tuk pekerjaan yang besar sifatnya, dapat dipakai
erlebih dahulu dari bahan-bahan yang dapat
nishing yang lain, Pengurugan dilaksanakan sampai
cacat-cacat seperti turunnya permukaan,

da urugan dengan mengunakan tanah

dilaksanakan dengan memesan di pabrik atau agen

ya dan akan dilaksanakan secepatnya agar tidak


sa dilaksanakan secepatnya

an Accesoriesnya dan kualitasnya baik sesuai yang

ama 1,5 bulan sudah diperhitungkan dengan waktu

n diperiksa kualitasnya oleh pengguna jasa yang

n pemasangan jaringan pipa HDPE dia. 75 mm, 50

ingan pipa sesuai yang ditentukan oleh pengguna


merintah setempat.

intas atau masyarakat umum disekitarnya.

k dilakukan pemasangan maka sebagian pekerjan


melaksanakan pekerjaan galian.

diperhatikan pada waktu pemasangan harus hati da saat akan dipasangkan pada sambungan terlebih
mbungkan.

bih dahulu diurugkan pasir setebal 15-20 cm begitu


lah ditimbun dengan tanah dan dipadatkan.

h pecah apabila terjadi gesekan atau getaran yang

selesai sepanjang yang tercantum dalam dokumen


iesnya.

atau kebutuhan dilapangan seperti : Gate Valve dia.

ang semuanya kemudian dilakukan pemeriksaan


n pipa dan accesoriesnya.

iesnya terpasang semuanya dan telah dilakukan


uji kebocoran untuk diketahui kualitasnya, jika ada

edang berlangsung disebut foto 50% dan pekerjaan

erjaan agar kembali seperti semula dan tidak

n disaksikan oleh direksi teknis dan pihak-pihak

oto dokumentasi 0%, 25%, 50%, 75% dan 100 %.

pelaksanaan pekerjaan, harapan kami dengan


n pekerjaan, pekerjaan bisa terlaksana tepat waktu,
bagi kita semua.

Manado, 2 Januari 2012