ANALISA HARGA SATUAN MATA PEMBAYARAN

Project
Contract Package
Package Name
Location
Pay Item Number
Type Of Work
Payment unit

NO.

KOMPONEN

A.

TENAGA

1.
2.

Pekerja
Mandor

B.

: ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)


: No. 3 (Three)
: KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)
: KABUPATEN ACEH TENGAH
: 2.1
: Excavation for The Drainage Ditch and Waterways
: M3

SATUAN

(L01)
(L03)

PERKIRAAN
KUANTITAS

jam
jam

HARGA
SATUAN
(Rp.)

0.0748
0.0374

JUMLAH
HARGA
(Rp.)

7,150.00
9,500.00

534.82
355.30

JUMLAH HARGA TENAGA

890.12

JUMLAH HARGA BAHAN

BAHAN

C.

PERALATAN

1.
2.
3.

Excavator
Dump Truck
Alat Bantu

D.
E.
F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


KEUNTUNGAN
5 % x D
HARGA SATUAN PEKERJAAN ( D + E )

(E10)
(E08)

jam
jam
Ls

0.0222
0.0374
1.0000

320,462.53
241,830.76
100.00

7,114.27
9,044.47
100.00

JUMLAH HARGA PERALATAN

16,258.74
17,148.86
857.44
18,006.30

Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
dibayar dari kontrak) dan biaya-biaya lainnya.

Banda Aceh, 20 Juni 2012


PT. Perapen Prima Mandiri

Ir. Mawardi
Direktur Utama

ANALISA TEKNIS SATUAN PEKERJAAN


Type Of Work
Payment unit
Pay Item Number

No.

I.
1
2
3
4
5

II.
1
2
3
4

: Excavation for The Drainage Ditch and Waterways


: M3
: 2.1

URAIAN

KODE

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Faktor pengembangan bahan

URUTAN KERJA
Penggalian dilakukan dengan menggunakan Excavator
Selanjutnya Excavator menuangkan material hasil
galian kedalam Dump Truck
Dump Truck membuang material hasil galian keluar
lokasi jalan sejauh
Sekelompok pekerja akan merapikan hasil galian

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.

BAHAN
Tidak ada bahan yang diperlukan

2.
2.a.

ALAT
EXCAVATOR
Kapasitas Bucket
Faktor Bucket
Faktor Efisiensi alat
Waktu siklus
- Menggali / memuat
- Lain-lain

Kap. Prod. / jam =

Koefisien Alat / M3

2.b.

V x Fb x Fa x 60
Ts1 x Fh
= 1 : Q1

DUMP TRUCK
Kapasitas bak
Faktor efisiensi alat
Kecepatan rata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi
- Waktu tempuh kosong
- Muat
- Lain-lain

= (L : v1) x 60
= (L : v2) x 60
= (V : Q1) x 60

0
URAIAN ANALISA HARGA SATUAN

KOEF.

SATUAN

Tk
Fk

7.00
1.20

jam
-

0.10

Km

(E10)
V
Fb
Fa

0.800
0.90
0.75

M3
-

Ts1
T1
T2
Ts1

0.500
0.100
0.600

menit
menit
menit
menit

Q1

45.00

M3 / jam

0.0222

Jam

15.00
0.75
40.00
60.00

M3
Km/Jam
Km/Jam

0.15
0.10
20.00
0.80
21.05

menit
menit
menit
menit
menit

(E08)
V
Fa
v1
v2
Ts2
T1
T2
T3
T4
Ts2

KETERANGAN

Berlanjut ke halaman berikut

ANALISA TEKNIS SATUAN PEKERJAAN

Type Of Work
Payment unit
Pay Item Number

: Excavation for The Drainage Ditch and Waterways


: M3
: 2.1

No.

URAIAN

KODE

Kapasitas Produksi / Jam =

Koefisien Alat / M3

2.c.

3.

V x Fa x 60
Fk x Ts2

= 1 : Q2

0
URAIAN ANALISA HARGA SATUAN
Lanjutan
KOEF.

SATUAN

Q2

26.72

M3 / Jam

0.0374

Jam

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Keranjang + Sapu

KETERANGAN

Lump Sump

TENAGA
Produksi menentukan : Dump Truck
Produksi Galian / hari = Tk x Q2
Kebutuhan tenaga :
- Pekerja
- Mandor

Q2
Qt

26.72
187.05

P
M

2.00
1.00

orang
orang

0.0748
0.0374

Jam
Jam

M3/Jam
M3

Koefisien tenaga / M3 :
- Pekerja
- Mandor

= (Tk x P) : Qt
= (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN

(L01)
(L03)

Didapat Harga Satuan Pekerjaan :


Rp.

18,006.30 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan :
206.00 Hari

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
76,892.00 M3

Memakai
2 Dump Truck

LAMPIRAN 2 PENAWARAN
ANALISA HARGA SATUAN MATA PEMBAYARAN

Project
Contract Package
Package Name
Location
Pay Item Number
Type Of Work
Payment unit

NO.

: ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)


: No. 3 (Three)
: KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)
: KABUPATEN ACEH TENGAH
: 2.2
: Mortared Stonework
: M3

KOMPONEN

A.

TENAGA

1.
2.
3.

Pekerja
Tukang Batu
Mandor

B.

BAHAN

1.
2.
3.

Batu
Semen (PC)
Pasir

SATUAN

(L01)
(L02)
(L03)

(M02)
(M12)
(M01)

PERKIRAAN
KUANTITAS

jam
jam
jam

M3
Kg
M3

C.

PERALATAN

1.
2.

Conc. Mixer
Alat Bantu

D.
E.
F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


KEUNTUNGAN
5.0 % x D
HARGA SATUAN PEKERJAAN ( D + E )

Jam
Ls

HARGA
SATUAN
(Rp.)

1.9277
0.3213
0.3213

JUMLAH
HARGA
(Rp.)

7,150.00
11,500.00
9,500.00

13,783.06
3,694.95
3,052.35

JUMLAH HARGA TENAGA

20,530.36

96,400.00
1,320.00
66,400.00

104,112.00
212,520.00
32,064.56

JUMLAH HARGA BAHAN

348,696.56

98,123.55
1,000.00

31,527.10
1,000.00

JUMLAH HARGA PERALATAN

32,527.10
401,754.01
20,087.70
421,841.71

1.0800
161.0000
0.4829

0.3213
1.0000

Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
dibayar dari kontrak) dan biaya-biaya lainnya.

Banda Aceh, 20 Juni 2012


PT. Perapen Prima Mandiri

Ir. Mawardi
Direktur Utama

ANALISA TEKNIS SATUAN PEKERJAAN

Type Of Work
Payment unit
Pay Item Number

No.

I.
1
2
3
4
5
6
7

II.
1
2
3

: Mortared Stonework
: M3
: 2.2

URAIAN

URAIAN ANALISA HARGA SATUAN

KODE

ASUMSI
Menggunakan Tenaga Kerja (cara manual)
Lokasi pekerjaan : sepanjang jalan
Bahan dasar (batu, pasir dan semen) diterima
seluruhnya di lokasi pekerjaan
Jarak rata-rata Base camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Perbandingan Pasir & Semen
: - Volume Semen
: - Volume Pasir
Perbandingan Batu & Mortar :
- Batu
- Mortar (campuran semen & pasir)
Berat Jenis Bahan :
- Pasangan Batu Dengan Mortar
- Batu
- Adukan (mortar)
- Pasir
- Semen Portland
Faktor kehilangan bahan :
- Batu
- Pasir / Semen

KOEF.

SATUAN

L
Tk
Sm
Ps

25.00
7.00
20
80

KM
jam
%
%

Bt
Mr

60
40

%
%

D1
D2
D3
D4
D5
Fh1
Fh2

2.40
1.60
1.80
1.67
1.44
1.20
1.05

KETERANGAN

ton/M3
ton/M3
ton/M3
ton/M3
ton/M3
-

URUTAN KERJA
Semen, pasir dan air dicampur dan diaduk menjadi
mortar dengan menggunakan alat bantu
Batu dibersihkan dan dibasahi seluruh permukaannya
sebelum dipasang
Penyelesaian dan perapihan setelah pemasangan

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.
1.a.
1.b.

BAHAN
Batu ----->
Semen ---->

1.c.

Pasir ----->

2.
2.a.

ALAT
CONCRETE MIXER
Kapasitas Alat
Faktor Efisiensi Alat
Waktu siklus :
- Memuat
- Mengaduk
- Menuang
- Tunggu, dll.

{(Bt x D1 x 1 M3) : D2} x Fh1


Sm x {(Mr x D1 x 1 M3} : D3} x Fh2
x {D5 x (1000)}
Ps x {(Mr x D1 x 1 M3) : D4} x Fh2

(T1 + T2 + T3 + T4)

Kap. Prod. / jam =

Koefisien Alat / M3

V x Fa x 60
1000 x Ts
= 1 : Q1

(M02)
(M12)
(M12)
(M01)

(E06)
V
Fa
Ts
T1
T2
T3
T4
Ts

1.0800
0.1120
161.0000
0.4829

M3
M3
Kg
M3

500.00
0.83

liter
-

3.00
2.50
1.50
1.00
8.00

menit
menit
menit
menit
menit

Q1

3.113

M3

(E06)

0.3213

jam
Berlanjut ke halaman berikut

ANALISA TEKNIS SATUAN PEKERJAAN

Type Of Work
Payment unit
Pay Item Number

: Mortared Stonework
: M3
: 2.2

No.

2.b.

3.

URAIAN

ALAT BANTU
Diperlukan :
- Sekop
- Pacul
- Sendok Semen
- Ember Cor
- Gerobak Dorong

=
=
=
=
=

2
2
2
6
2

KODE

KOEF.

SATUAN

buah
buah
buah
buah
buah

TENAGA
Produksi Pasangan Batu dengan Mortar dalam 1 hari
Kebutuhan tenaga :

URAIAN ANALISA HARGA SATUAN


Lanjutan

- Mandor
- Tukang Batu
- Pekerja

Qt

21.79

M3

M
Tb
P

1.00
1.00
6.00

orang
orang
orang

Koefisien Tenaga / M3 :
- Mandor
- Tukang
- Pekerja

= (Tk x M) : Qt
= (Tk x Tb) : Qt
= (Tk x P) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :


Rp.

421,841.71 / M3

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan :
12.00 Hari

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
241.00 M3

(L03)
(L02)
(L01)

0.3213
0.3213
1.9277

jam
jam
jam

KETERANGAN

LAMPIRAN 2 PENAWARAN
ANALISA HARGA SATUAN MATA PEMBAYARAN

Project
Contract Package
Package Name
Location
Pay Item Number
Type Of Work
Payment unit

NO.

: ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)


: No. 3 (Three)
: KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)
: KABUPATEN ACEH TENGAH
: 2.3. 3
: Reinforced Concrete Pipe Culverts Inside Diameter (nominal 80 cm) 75 - 85 cm
: M1

KOMPONEN

SATUAN

PERKIRAAN
KUANTITAS

A.

TENAGA

1.
2.
3.

Pekerja
Tukang
Mandor

B.

BAHAN

1.
2.
3.
4.

Beton K-300
Baja Tulangan
Urugan Porus
Mat. Pilihan

C.

PERALATAN

1.
2.
3.

Tamper
Flat Bed Truck
Alat Bantu

D.
E.
F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


KEUNTUNGAN
5.0 % x D
HARGA SATUAN PEKERJAAN ( D + E )

(L01)
(L02)
(L03)

Jam
Jam
Jam

M3
Kg
M3
M3

Jam
Jam
Ls

HARGA
SATUAN
(Rp.)

16.3333
4.6667
2.3333

JUMLAH
HARGA
(Rp.)

7,150.00
11,500.00
9,500.00

116,783.10
53,667.05
22,166.35

JUMLAH HARGA TENAGA

192,616.50

1,191,672.38
12,397.50
100,000.00
25,000.00

245,722.84
281,155.46
22,050.00
38,807.50

JUMLAH HARGA BAHAN

587,735.81

38,223.09
164,585.50
1,000.00

9,494.62
80,005.01
1,000.00

JUMLAH HARGA PERALATAN

90,499.63
870,851.93
43,542.60
914,394.53

0.2062
22.6784
0.2205
1.5523

0.2484
0.4861
1.0000

Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
dibayar dari kontrak) dan biaya-biaya lainnya.

Banda Aceh, 20 Juni 2012


PT. Perapen Prima Mandiri

Ir. Mawardi
Direktur Utama

ANALISA TEKNIS SATUAN PEKERJAAN


Type Of Work
Payment unit
Pay Item Number

No.

I.
1
2
3
4
5
6
II.
1
2
3
4
5
6

III.
1.

2.
2.a.

URAIAN

ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sepanjang jalan
Diameter bagian dalam gorong-gorong
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal gorong-gorong
URUTAN KERJA
Gorong-gorong dicetak di Base Camp
Flat Bed Truck mengangkut gorong-gorong jadi
ke lapangan
Dasar gorong-gorong digali sesuai kebutuhan dan material backfill dipadatkan dengan Tamper
Tebal lapis porus pada dasar gorong-gorong pipa
Material pilihan untuk penimbunan kembali (padat)
Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu

PEMAKAIAN BAHAN, ALAT DAN TENAGA


BAHAN
Untuk mendapatkan 1 M' gorong-gorong diperlukan
- Beton K-300 = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1
- Baja Tulangan (asumsi 100kg/m3)
- Timbunan Porus = {(tp*(0.4+2*tg/100+d+0.4)*1)*1.05}
- Material Pilihan
= ((2*tg/100+d+0.3)*(0.4+2*tg/100+d+0.4)
-(22/7*(0.5*(2*tg/100+d))^2))*1*1.05
ALAT
TAMPER
Kecepatan
Efisiensi alat
Lebar pemadatan
Banyak lintasan
Tebal lapis hamparan

Kap. Prod. / Jam =

Koefisien Alat / m'


2.b.

: Reinforced Concrete Pipe Culverts Inside Diameter (nominal 80 cm) 75 - 85 cm


: M1
: 2.3. 3
URAIAN ANALISA HARGA SATUAN

v x 1000 x F ax tp x Lb x 60
n
= 1 : Q1 x Vp

Flat Bed Truck


Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh in si = (L : v1 ) x 60
- Waktutempuh kosong = (L : v2) x 60
- Muat, bongkar dan lain-lain

KODE

KOEF.

SATUAN

d
L
Tk
tg

0.80
25.00
7.00
7.50

m
Km
Jam
Cm

tp

0.12

0.2062
22.6784
0.2205
1.5523

M3
Kg
M3
M3

(EI-714)
(M39)
(EI-241)
(Vp)

(E25)
V
Fa
Lb
n
tp

0.50
0.75
0.40
6.00
0.25

Km / Jam
M
lintasan
M

Q1

6.2500

M3 / Jam

(E25)

0.2484

jam

(E08)
V
Fa

4.00
0.75

Buah

v1
v2
Ts
T1
T2
T3
Ts

KETERANGAN

Sand bedding

40.00
60.00
37.50
25.00
25.00
87.50

menit
menit
menit
menit
Berlanjut ke halaman berikut

ANALISA TEKNIS SATUAN PEKERJAAN


Type Of Work
Payment unit
Pay Item Number

: Reinforced Concrete Pipe Culverts Inside Diameter (nominal 80 cm) 75 - 85 cm


: M1
: 2.3. 3
URAIAN ANALISA HARGA SATUAN
Lanjutan

No.

URAIAN

KODE

Kapasitas Produksi / Jam =

Koefisien Alat / m'

2.c.

3.

V x Fa x 60
Ts
= 1 : Q2

KOEF.

SATUAN

Q2

2.0571

M' / Jam

(E08)

0.4861

jam

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
3 buah
- Pacul =
3 buah
- Alat-alat kecil lain

Lump Sump

TENAGA
Produksi Gorong-gorong / hari
Kebutuhan tenaga :
- Pekerja
- Tukang
- Mandor

Qt

3.00

M'

P
T
M

7.00
2.00
1.00

orang
orang
orang

Koefisien tenaga / M' :


- Pekerja
- Tukang
- Mandor

= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN

Didapat Harga Satuan Pekerjaan :


Rp.

KETERANGAN

914,394.53 / M1

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan :
2.00 hari

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
4.00 M1

(L01)
(L02)
(L03)

16.3333
4.6667
2.3333

jam
jam
jam

LAMPIRAN 2 PENAWARAN
ANALISA HARGA SATUAN MATA PEMBAYARAN

Project
Contract Package
Package Name
Location
Pay Item Number
Type Of Work
Payment unit

NO.

: ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)


: No. 3 (Three)
: KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)
: KABUPATEN ACEH TENGAH
: 2.3 (4)
: Reinforced Concrete Pipe Culverts Inside Diameter (nominal 100 cm) 95 - 105 cm
: M1

KOMPONEN

A.

TENAGA

1.
2.
3.

Pekerja
Tukang
Mandor

B.

BAHAN

1.
2.
3.
4.

Beton K-300
Baja Tulangan
Urugan Porus
Mat. Pilihan

SATUAN

PERKIRAAN
KUANTITAS

Jam
Jam
Jam

M3
Kg
M3
M3

C.

PERALATAN

1.
2.
3.

Tamper
Flat Bed Truck
Alat Bantu

D.
E.
F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


KEUNTUNGAN
5.0 % x D
HARGA SATUAN PEKERJAAN ( D + E )

Jam
Jam
Ls

HARGA
SATUAN
(Rp.)

4.6667
2.3333
1.1667

JUMLAH
HARGA
(Rp.)

7,150.00
11,500.00
9,500.00

33,366.67
26,833.33
11,083.33

JUMLAH HARGA TENAGA

71,283.33

1,191,672.38
12,397.50
100,000.00
25,000.00

345,227.49
395,117.00
31,030.00
47,785.00

JUMLAH HARGA BAHAN

819,159.49

38,223.09
164,585.50
1,000.00

11,688.62
56,386.99
1,000.00

JUMLAH HARGA PERALATAN

69,075.61
959,518.44
47,975.92
1,007,494.36

0.2897
31.8707
0.3103
1.9114

0.3058
0.3426
1.0000

Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
dibayar dari kontrak) dan biaya-biaya lainnya.

Banda Aceh, 20 Juni 2012


PT. Perapen Prima Mandiri

Ir. Mawardi
Direktur Utama

ANALISA TEKNIS SATUAN PEKERJAAN


Type Of Work
Payment unit
Pay Item Number

No.

I.
1
2
3
4
5
6
II.
1
2
3
4
5
6

III.
1.

2.
2.a.

URAIAN

ASUMSI
Pekerjaan dilakukan secara mekanik/manual
Lokasi pekerjaan : sepanjang jalan
Diameter bagian dalam gorong-gorong
Jarak rata-rata Base Camp ke lokasi pekerjaan
Jam kerja efektif per-hari
Tebal gorong-gorong
URUTAN KERJA
Gorong-gorong dicetak di Base Camp
Flat Bed Truck mengangkut gorong-gorong jadi
ke lapangan
Dasar gorong-gorong digali sesuai kebutuhan dan material backfill dipadatkan dengan Tamper
Tebal lapis porus pada dasar gorong-gorong pipa
Material pilihan untuk penimbunan kembali (padat)
Sekelompok pekerja akan melaksanakan pekerjaan
dengan cara manual dengan menggunakan alat bantu

PEMAKAIAN BAHAN, ALAT DAN TENAGA


BAHAN
Untuk mendapatkan 1 M' gorong-gorong diperlukan
- Beton K-300 = (22/7*((2*tg/100+d)/2)^2)-(22/7*(d/2)^2))*1
- Baja Tulangan (asumsi 100kg/m3)
- Timbunan Porus = {(tp*(0.4+2*tg/100+d+0.4)*1)*1.05}
- Material Pilihan
= ((2*tg/100+d+0.3)*(0.4+2*tg/100+d+0.4)
-(22/7*(0.5*(2*tg/100+d))^2))*1*1.05
ALAT
TAMPER
Kecepatan
Efisiensi alat
Lebar pemadatan
Banyak lintasan
Tebal lapis hamparan

Kap. Prod. / Jam =

Koefisien Alat / m'


2.b.

: Reinforced Concrete Pipe Culverts Inside Diameter (nominal 100 cm) 95 - 105 cm
: M1
URAIAN ANALISA HARGA SATUAN
: 2.3 (4)

v x 1000 x Fa x Lb x 60
n x tp
= 1 : Q1 x Vp

Flat Bed Truck


Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh in si = (L : v1 ) x 60
- Waktutempuh kosong = (L : v2) x 60
- Muat, bongkar dan lain-lain

KODE

KOEF.

SATUAN

d
L
Tk
tg

1.00
25.00
7.00
8.50

m
Km
Jam
Cm

tp

0.15

0.2897
31.8707
0.3103
1.9114

M3
Kg
M3
M3

(EI-714)
(M39)
(EI-241)
vp

(E25)
V
Fa
Lb
n
tp

0.50
0.75
0.40
6.00
0.25

Km / Jam
M
lintasan
M

Q1

6.2500

M3 / Jam

(E25)

0.3058

jam

6.00
0.75
40.00
60.00

Buah/M'

(E08)
V
Fa
v1
v2
Ts
T1
T2
T3
Ts

37.50
25.00
30.00
92.50

KETERANGAN

Sand bedding

menit
menit
menit
menit
Berlanjut ke halaman berikut

ANALISA TEKNIS SATUAN PEKERJAAN

Type Of Work
Payment unit
Pay Item Number

: Reinforced Concrete Pipe Culverts Inside Diameter (nominal 100 cm) 95 - 105 cm
: M1
: 2.3 (4)

Lanjutan
No.

URAIAN

KODE

Kapasitas Produksi / Jam =

Koefisien Alat / m'

2.c.

3.

V x Fa x 60
Ts
= 1 : Q2

KOEF.

SATUAN

Q2

2.9189

M' / Jam

(E08)

0.3426

jam

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop =
3 buah
- Pacul =
3 buah
- Alat-alat kecil lain

Lump Sump

TENAGA
Produksi Gorong-gorong / hari
Kebutuhan tenaga :
- Pekerja
- Tukang
- Mandor

Qt

6.00

M'

P
T
M

4.00
2.00
1.00

orang
orang
orang

Koefisien tenaga / M' :


- Pekerja
- Tukang
- Mandor

= (Tk x P) : Qt
= (Tk x T) : Qt
= (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN


Didapat Harga Satuan Pekerjaan :
Rp.

KETERANGAN

1,007,494.36 / M'

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan :
159.00 hari

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
950.00 M'

(L01)
(L02)
(L03)

4.6667
2.3333
1.1667

jam
jam
jam

LAMPIRAN 2 PENAWARAN
ANALISA HARGA SATUAN MATA PEMBAYARAN

Project
Contract Package
Package Name
Location
Pay Item Number
Type Of Work
Payment unit

NO.

: ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)


: No. 3 (Three)
: KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)
: KABUPATEN ACEH TENGAH
: 2.3.9.1
: U Ditch Type DS 1
: M1

KOMPONEN

A.

TENAGA

1.
2.

Pekerja
Mandor

B.

BAHAN

1.
2.

Beton K 250
Baja Tulangan Polos

SATUAN

(L01)
(L03)

PERKIRAAN
KUANTITAS

jam
jam

M3
Kg

C.

PERALATAN

1.
2.
3.

Trailer
Crane
Alat Bantu

D.
E.
F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN (A + B + C)


KEUNTUNGAN
5 % x D
HARGA SATUAN PEKERJAAN ( D + E )

(E10)

jam
jam
Ls

HARGA
SATUAN
(Rp.)

2.0000
0.5000

JUMLAH
HARGA
(Rp.)

7,150.00
9,500.00

14,300.00
4,750.00

JUMLAH HARGA TENAGA

19,050.00

1,008,486.44
12,397.50

326,749.61
318,404.99

JUMLAH HARGA BAHAN

645,154.60

224,844.25
302,220.25
100.00

22,484.43
33,576.67
100.00

JUMLAH HARGA PERALATAN

56,161.09
720,365.69
36,018.28
756,383.98

0.3240
25.6830

0.1000
0.1111
1.0000

Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
dibayar dari kontrak) dan biaya-biaya lainnya.

Banda Aceh, 20 Juni 2012


PT. Perapen Prima Mandiri

Ir. Mawardi
Direktur Utama

ANALISA TEKNIS SATUAN PEKERJAAN


Type Of Work
Payment unit
Pay Item Number

No.

I.
1
2
3
4
5

: U Ditch Type DS 1
: M1
: 2.3.9.1

0
URAIAN ANALISA HARGA SATUAN

URAIAN

KODE

ASUMSI
Menggunakan alat berat (cara mekanik)
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan : sedang / baik
Jam kerja efektif per-hari
Jarak rata-rata Base Camp ke lokasi pekerjaan

II.
1
2
3
4

URUTAN KERJA
Sekelompok Pekerja Merapikan dinding saluran yang digali
beton praetak Type DS 1 dicetak di base camp
beton pracetak diangkut kelokasi pekerjaan dengan menggunakan trailer
beton pracetak dipasang dan disusun dengan menggunakan crane

III.

PEMAKAIAN BAHAN, ALAT DAN TENAGA

1.
1.a
1.b

BAHAN
Beton K 250
Baja Tulangan Polos

2.
2.a

ALAT
TRAILER
Kapasitas bak sekali muat
Faktor efisiensi alat
Kecepatanrata-rata bermuatan
Kecepatan rata-rata kosong
Waktu siklus :
- Waktu tempuh isi = (L : v1 ) x 60
- Waktu tempuh kosong = (L : v2) x 60
- Lain-lain (bongkar dan muat)

Kapasitas Produksi / Jam =

Koefisien Alat / m3
2.b

= 1 : Q1

CRANE
Kapasitas
Faktor Efisiensi alat
Waktu siklus
- Waktu memuat dan membongkar
- dan lain-lain ( termasuk mengatur, menggeser dan memasang)

Kap. Prod. / jam =


Koefisien Alat / m

V x Fa x 60
Ts2
= 1 : Q2

SATUAN

Tk
L

7.00
25.00

jam
Km

M3
Kg

0.3240
25.6830

M3
Kg

15.000
0.75
40.00
60.00

M1
Km/Jam
Km/Jam

37.50
25.00
5.00
67.50

menit
menit
menit
menit

Q1

10.00

M1

(E29)

0.1000

Jam

(E07)
V2
Fa

1.00
0.75

M1
-

T1
T2
Ts2

4.00
1.00
5.00

menit
menit
menit

Q2

9.00

M1

0.1111

jam

(E29)
V
Fa
v1
v2
Ts1
T1
T2
T3
Ts1
V x Fa x 60
Ts1

KOEF.

(E07)

KETERANGAN

Berlanjut ke halaman berikut

ANALISA TEKNIS SATUAN PEKERJAAN

Type Of Work
Payment unit
Pay Item Number

: U Ditch Type DS 1
: M1
: 2.3.9.1

No.

2.c.

3.

URAIAN

0
URAIAN ANALISA HARGA SATUAN
Lanjutan
KODE

KOEF.

SATUAN

ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop
- Cangkul, dan alat bantu lainnya

KETERANGAN

Lump Sump

TENAGA
Produksi menentukan : Crane
Produksi Galian / hari = Tk x Q2
Kebutuhan tenaga :
- Pekerja
- Mandor

Q2
Qt

2.00
14.00

M1/Jam
M1

P
M

4.00
1.00

orang
orang

2.0000
0.5000

Jam
Jam

Koefisien tenaga / M3 :
- Pekerja
- Mandor

= (Tk x P) : Qt
= (Tk x M) : Qt

4.

HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT


Lihat lampiran.

5.

ANALISA HARGA SATUAN PEKERJAAN

(L01)
(L03)

Didapat Harga Satuan Pekerjaan :


Rp.

756,383.98 / M1

6.

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan :
12.00 Hari

7.

VOLUME PEKERJAAN YANG DIPERLUKAN


Volume pekerjaan :
312.00 M1

Memakai
2 Dump Truck

LAMPIRAN 2 PENAWARAN
ANALISA HARGA SATUAN MATA PEMBAYARAN

Project
Contract Package
Package Name
Location
Pay Item Number
Type Of Work
Payment unit

NO.

: ACEH RECONSTRUCTION PROJECT, ROAD SUB - PROJECT (JICA LOAN IP - 545)


: No. 3 (Three)
: KABAYAKAN - SP. KRAFT (STA. 3 + 850 - STA. 56 + 032)
: KABUPATEN ACEH TENGAH
: SS 2.4.3.b
: Perforated or porous Pipe for subsurface Drainage Work
: M1

KOMPONEN

A.

TENAGA

1.
2.
3.

Pekerja
Tukang
Mandor

SATUAN

PERKIRAAN
KUANTITAS

Jam
Jam
Jam

HARGA
SATUAN
(Rp.)

2.8000
0.7000
0.7000

JUMLAH
HARGA
(Rp.)

7,150.00
11,500.00
9,500.00
JUMLAH HARGA TENAGA

B.

BAHAN

1.
2.
3
4
5

Pipa Porous
Semen (PC)
Mortar
Pasir
Filter Stripe, dll

M'
Kg
M3
M3
Ls

1.0500
0.0900
0.0003
0.0002
1.0000

85,000.00
1,320.00
1,000,000.00
66,400.00
15,000.00

JUMLAH HARGA BAHAN


C.

PERALATAN

1.

Alat Bantu

D.
E.
F.

JUMLAH HARGA TENAGA, BAHAN DAN PERALATAN ( A + B + C )


OVERHEAD & PROFIT
5.0 % x D
HARGA SATUAN PEKERJAAN ( D + E )

Ls

1.0000

1,000.00

JUMLAH HARGA PERALATAN

Note : 1 SATUAN dapat berdasarkan atas jam operasi untuk Tenaga Kerja dan Peralatan, volume dan/atau ukuran
berat untuk bahan-bahan.
2 Biaya satuan untuk peralatan sudah termasuk bahan bakar, bahan habis dipakai dan operator.
3 Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang
dibayar dari kontrak) dan biaya-biaya lainnya.

Banda Aceh, 20 Juni 2012


PT. Perapen Prima Mandiri

Ir. Mawardi
Direktur Utama

20,020.00
8,050.00
6,650.00
34,720.00

89,250.00
118.80
300.00
13.28
15,000.00

104,682.08

1,000.00

1,000.00
140,402.08
7,020.10
147,422.18

ANALISA TEKNIS SATUAN PEKERJAAN


Type Of Work
Payment unit
Pay Item Number

: Perforated or porous Pipe for subsurface Drainage Work


: M1
: SS 2.4.3.b

No.

I.
1
2
3
4
5
6
7
II.
1
2
3
III.
1.

2.
2.b.

3.

4.
5.

URAIAN

ASUMSI
Pekerjaan dilakukan secara manual
Lokasi pekerjaan : sepanjang jalan
Kondisi Jalan terpengaruh oleh aliran air tanah
Jam kerja efektif per-hari
Diameter dalam pipa
Material penyaring terdiri dari material porus
Penyangga sambungan pipa dengan mortar

7.

Tk
d

KOEF.

SATUAN

7.00
0.10

Jam
M

1.0500
0.0003
0.0900
0.0002
1.0000

M'
M3
Kg
M3
Ls

KETERANGAN

URUTAN KERJA
Semua material diterima di lokasi pekerjaan
Pekerjaan dilakukan secara manual dengan
menggunakan alat bantu kecil
Pekerjaan galian dibayar tersendiri.
PEMAKAIAN BAHAN, ALAT DAN TENAGA
BAHAN
Diperlukan material :
- Pipa Porous
- Mortar (penyangga sambungan pipa) = 2 x (0.05x0.05x0.05)
- Semen
= 20% x Mr x Bj Mortar 1.8 T/m3
- Pasir
= 80% x Mr
- Filter stripe dan lain2 (pada sambungan)
ALAT
ALAT BANTU
Diperlukan alat-alat bantu kecil
- Sekop = 2 buah
- Pacul = 2 buah
- Alat-alat kecil lain
TENAGA
Produksi yang dapat diselesaikan / hari
Kebutuhan tenaga :
- Pekerja
- Tukang
- Mandor
Koefisien tenaga / M1 :
- Pekerja
= (Tk x P) : Qt
- Tukang
= (Tk x T) : Qt
- Mandor
= (Tk x M) : Qt
HARGA DASAR SATUAN UPAH, BAHAN DAN ALAT
Lihat lampiran.
ANALISA HARGA SATUAN PEKERJAAN
Lihat perhitungan dalam FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA
SATUAN.
Didapat Harga Satuan Pekerjaan :
Rp.

6.

KODE

147,422.00 / M'

WAKTU PELAKSANAAN YANG DIPERLUKAN


Masa Pelaksanaan :
19.00 Hari
VOLUME PEKERJAAN YANG DIPERLUKAN
Volume pekerjaan :
183.00 M'

(M25)
Mr
(M12)
(M01)
-

Lump Sump

Qt

10.00

M'

P
T
M

4.00
1.00
1.00

orang
orang
orang

2.8000
0.7000
0.7000

Jam
Jam
Jam

(L01)
(L02)
(L03)