Ismets
Ismets
Nomor Drawing
No Node
Uraian Node
Hari ke
ISMETS
LATIHAN
HAZOPS PLANT MODIFICATION
Ismets
13
Fluida yang ditangani (Reaction product, berupa campuran cairan dan gas
hidrokarbon yang flammable).
14
Ismets
Gambar
Original Design
Relief Valve
LCV
Ismets
15
Modified Design
Relief Valve
LCV
Ismets
16
Company :
Facility
:
Session
:
Node
:
Parameter :
Guide
Word
Deviation
Drawing No. :
Intention
:
Causes
Consequences
Safeguards
Risk Rank
L/M/H
Recommendations
Action
by
17
Ismets
ISMETS
26
TUGAS GRUP
Tunjuk Ketua dan
sekretaris
Buat pembagian
1.
2.
3.
4.
5.
6.
Lakukan Study
Hazops
Presentasikan
7.
8.
ISMETS
28
2 Line
6 Line
PD
8 Line
6 Line
Meter
Prover
To Closed
drain
Ismets
Bottom
Loading
Arm
Nomor Drawing
No Node
Uraian Node
Hari ke
ISMETS
HAZOPS WORKSHEET
Company
Facility
Session
Node
Parameter
Guide
Word
:
:
:
:
:
Devia
tion
Drawing No. :
Intention
:
Causes
Consequences
S = Severity, L = Likelihood,
Safeguards
S L R
Recommenda
tions
Action
by
R = Risk
32