PAKET PEKERJAAN
PEMBUATAN JEMBATAN
LOKASI KEGIATAN
KELURAHAN ANCOL
URAIAN PEKERJAAN
VOLUME
I.
PEKERJAAN PERSIAPAN
2.
Pas. Bouwplank
II.
PEKERJAAN TANAH
1.
90.44
2.
22.61
3.
III.
PEKERJAAN PASANGAN
1.
2.
3.
4.
5.
6.
28.00
6.00
47.04
0.78
26.40
2,867.04
74.80
66.00
J U M L A H .....................................................................................................
PPN 10 %..........................................................................................
JUMLAH TOTAL + PPN 10%...............................................................
DIBULATKAN .................................................................................................
LURAHAN ANCOL
RAN BIAYA
VOLUME
HARGA
SATUAN
(Rp.)
JUMLAH
B IAYA
(Rp.)
M'
35,566.00
995,848.00
995,848.00
M3
28,270.00
2,556,738.80
M3
9,420.00
212,986.20
M3
169,708.00
1,018,248.00
JUMLAH I.
JUMLAH II.
3,787,973.00
M3
552,805.00
26,003,947.20
M3
M3
Kg
M2
M2
744,434.00
744,434.00
11,149.00
54,087.00
150,400.00
581,402.95
19,653,057.60
31,964,628.96
4,045,707.60
9,926,400.00
JUMLAH III.
92,175,144.31
.....................................................................................
96,958,965.31
......................................
9,695,896.53
........................................
...........................................................
106,654,861.85
Rp
107,000,000.00
P
I.
A. Badan Pagar
D. Bowplank
II.
III.
IV.
V.
VI.
VII.
VIII.
BERAT BESI
DIAMETER
BERAT
pondasi duicker jalan mobil (besar)
Besi
a. batang 25-100
b. Cincin 12-150
c. batang 25-100
d. Cincin 12-150
Besi
a. batang 25-100
b. Cincin 12-150
c. batang 25-100
d. Cincin 12-150
PERHITUNGAN VOLUME
JEMBATAN
As.1
14.00
Panjang
As.2
As.3
11.00
3.00
Lebar
3.40
3.40
Panjang
11.00
3.00
Tinggi
1.90
1.90
Luas bwh
0.04
Tinggi
0.70
Jmlh
pondasi 0,2X0,2
luas 1
###
luas 2
luas 2
pondasi 0,2X0,2
luas 1
###
a
b
c
Panjang
11.00
11.00
11.00
a
b
c
3.00
3.00
3.00
14.00 M'
nd batu kali
Panjang
pondasi pagar
ndasi beton
Panjang
Luas bwh
pondasi pagar
Panjang
3.00
3.00
Vol
71.06
19.38
Vol
-
Vol
-
Vol
Lbr. Ats
0.70
0.70
0.40
Lbr. Bwh
0.90
0.90
2.00
Tggi Pond
1.90
1.90
0.40
0.70
0.70
0.40
0.90
0.90
2.00
1.90
1.90
0.40
Tinggi
###
Jmlh
-
Vol
-
Lebar
10.00
10.00
Tebal
0.10
0.10
Vol.
3.00
3.00
NG
(MM)
(KG)
Beton
6
0.222
8
0.392
10
0.622
Tinggi
0.40
Panjang
3.00
30.00
73.33
30.00
73.33
Pjg
11.00
3.00
11.00
3.00
Koef.
1.58
0.89
1.58
0.89
Lebar
11.00
Tinggi
0.40
Panjang
3.00
Pjg
11.00
3.00
11.00
3.00
Koef.
1.58
0.89
1.58
0.89
Lebar
11.00
bh
Beton
bh
30.00
73.33
30.00
73.33
12
0.888
Vol
13.20
13.20
Vol
521.40
195.36
521.40
195.36
Vol
13.20
13.20
Vol
521.40
195.36
521.40
195.36
As.4
total
14.00 M'
M3
M3
total
90.44 M3
total
- M3
total a
22.61 M3
total b
total a+b
- M3
22.61 M3
M3
M3
M3
Vol.
16.72 M3
16.72 M3
3.52 M3
total a
36.96 M3
4.56 M3
4.56 M3
0.96 M3
total b
total a+b
10.08 M3
47.04 M3
M3
total
M3
M3
- M3
total
6.00 M3
16
1.580
Bekisting
M3
M3
Lebar
11.00
2.00
kg
kg
kg
kg
Vol
33.00 M2
11.00
4.40 M2
37.40 M2
Panjang
3.00
Vol
33.00 M2
11.00
4.40 M2
37.40 M2
716.76 kg
1,433.52 kg
Lebar
11.00
2.00
kg
kg
kg
kg
0.20
Panjang
3.00
716.76 kg
Bekisting
M3
M3
Tinggi
716.76 kg
716.76 kg
1,433.52 kg
Tinggi
0.20