PEKERJAAN
NO
I
II
III
IV
V.
VI.
VII.
VIII.
IX.
X.
XI.
XII.
proyek.blogspot.com/
ter-Password, TIDAK DAPAT DI EDIT
JENIS PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
PEKERJAAN
Terbilang :
PERSIAPAN
TANAH DAN PASIR
PASANGAN PONDASI DAN BETON
DINDING DAN PLESTERAN
FINISHING LANTAI
PINTU & JENDELA
KUNCI DAN PENGGANTUNG
KUDA-KUDA, RANGKA ATAP DAN
PENGECATAN
INSTALASI LISTRIK DAN ARMATUR
MEUBELAIR
LAIN-LAIN
4,250,000.00
6,915,895.55
60,939,373.39
(RP)
34,153,401.50
15,902,700.00
10,716,464.25
2,214,250.00
46,350,537.65
7,078,278.45
3,130,680.00
47,000,000.00
250,000.00
- Real Cost
238,901,580.79
- PPN 10%
23,890,158.08
- JUMLAH
262,791,738.87
- DIBULATKAN
262,791,000.00
xxxxxxxxxxxxxxxxxxxxx
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
xxxxxxxxxxxxxxx
Direktur
Pimpinan Teknik
NO
CONTOH FILE
DOKUMEN TENDER PROYEK
di http://contoh-penawaranURAIAN PEKERJAAN
SATUAN
proyek.blogspot.com/
ter-Password, TIDAK DAPAT DI EDIT
HARGA
SATUAN
1.
Pembersihan Lokasi
Ls
250,000.00
2.
Ls
500,000.00
3.
Ls
(Rp.)
2,000,000.00
4.
Ls
500,000.00
5.
Ls
1,000,000.00
6.
M3
22,200.00
7.
Urugan Tanah
M3
61,875.00
8.
M3
111,550.00
9.
M3
10,645.00
10.
M3
235,470.00
11.
M3
536,025.00
12.
M3
2,719,422.40
13.
M3
4,425,682.71
14.
M3
3,182,832.40
15.
M3
4,412,009.04
16.
M3
5,247,157.71
17.
M3
502,225.00
18.
M3
4,418,225.00
19.
M2
87,537.50
20.
M2
82,175.00
21.
M2
30,675.00
22.
M2
28,275.00
23.
Acian Semen
M2
14,100.00
24.
M2
106,018.00
25.
M3
3,946,500.00
26.
M2
301,500.00
27.
M2
247,200.00
28.
M2
283,925.00
29.
Pas. Kaca 5 mm
M2
76,930.00
30.
Ls
250,000.00
31.
Bh
80,930.00
32.
Bh
28,430.00
HARGA
SATUAN
NO
URAIAN PEKERJAAN
SATUAN
33.
Bh
19,805.00
34.
Bh
18,430.00
35.
Bh
(Rp.)
18,930.00
36.
M3
3,422,100.00
37.
M3
2,863,600.00
38.
M2
57,005.00
39.
M'
40,800.00
40.
M2
54,200.00
41.
M2
27,082.50
42.
M'
11,160.00
43.
M'
29,695.00
44.
M2
10,805.00
45.
M2
10,805.00
46.
M2
33,210.00
47.
Ttk
194,860.00
48.
Ttk
194,860.00
49.
Bh
22,500.00
50.
Bh
45,000.00
51.
Bh
15,000.00
52.
Bh
25,000.00
53.
Meja Serbaguna
Bh
750,000.00
54.
Meja Kursi
Bh
600,000.00
55.
Meja Demonstrasi
Bh
800,000.00
56.
Kursi Siswa
Bh
300,000.00
57.
Bh
450,000.00
58.
Kursi Kerja
Bh
400,000.00
59.
Bh
1,750,000.00
60.
Bh
1,350,000.00
HARGA
SATUAN
NO
URAIAN PEKERJAAN
SATUAN
61.
Bh
1,000,000.00
62.
Bh
950,000.00
63.
Lemari Asam
Bh
(Rp.)
900,000.00
64.
Bh
200,000.00
65.
Kotak Sampah
Bh
75,000.00
66.
Ls
250,000.00
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
CONTOH FILE
SEKOLAH
: SMP NEGERI
xxxxxxxxxxx PROYEK
DOKUMEN
TENDER
TAHUN ANGGARAN
: 2011
di http://contoh-penawaranLOKASI
: KEC. xxxxxxxxx KAB. Xxxxxxxxxxxxxxxxx
proyek.blogspot.com/
ter-Password, TIDAK DAPAT DI EDIT
SEKOLAH MENENGAH PERTAMA
NO
JEIS PEKERJAAN
I.
1.
2.
3.
4.
5.
PEKERJAAN PERSIAPAN
Pembersihan Lokasi
Pengukuran dan Pasangan Bouwplank
Pembuatan Direksi Keet, Gudang Sementara, Air Kerj
Pembuatan Papan Nama Proyek
Administrasi dan Dokumentasi
II.
1.
2.
3.
4.
HARGA
SATUAN
JUMLAH HARGA
VOLUME SATUAN
1.00
1.00
1.00
1.00
1.00
Ls
Ls
Ls
Ls
Ls
250,000.00
(Rp.)
500,000.00
2,000,000.00
500,000.00
1,000,000.00
Jumlah
(Rp.)
250,000.00
500,000.00
2,000,000.00
500,000.00
1,000,000.00
4,250,000.00
29.64
60.00
21.97
8.89
M3
M3
M3
M3
22,200.00
61,875.00
111,550.00
10,645.00
Jumlah
658,008.00
3,712,500.00
2,450,753.50
94,634.05
6,915,895.55
III.
1.
2.
3.
4.
5.
6.
7.
8.
9.
7.41
39.67
2.85
0.34
3.03
0.64
1.79
7.50
0.69
M3
M3
M3
M3
M3
M3
M3
M3
M3
235,470.00
536,025.00
2,719,422.40
4,425,682.71
3,182,832.40
4,412,009.04
5,247,157.71
502,225.00
4,418,225.00
Jumlah
1,744,832.70
21,264,111.75
7,750,353.83
1,504,732.12
9,643,982.16
2,823,685.79
9,392,412.30
3,766,687.50
3,048,575.25
60,939,373.39
IV.
1.
2.
3.
4.
5.
10.76
183.80
56.52
367.60
424.12
M2
M2
M2
M2
M2
87,537.50
82,175.00
30,675.00
28,275.00
14,100.00
Jumlah
150.00
M2
106,018.00
Jumlah
941,903.50
15,103,765.00
1,733,751.00
10,393,890.00
5,980,092.00
34,153,401.50
15,902,700.00
15,902,700.00
HARGA
SATUAN
NO
JEIS PEKERJAAN
VI.
1.
2.
3.
4.
5.
6.
VII.
1.
2.
3.
4.
5.
JUMLAH HARGA
VOLUME SATUAN
1.06
6.15
3.66
9.73
9.90
1.00
M3
M2
M2
M2
M2
Ls
3,946,500.00
(Rp.)
301,500.00
247,200.00
283,925.00
76,930.00
250,000.00
Jumlah
(Rp.)
4,183,290.00
1,854,225.00
904,752.00
2,762,590.25
761,607.00
250,000.00
10,716,464.25
-
3.00
12.00
34.00
17.00
34.00
Bh
Bh
Bh
Bh
Bh
80,930.00
28,430.00
19,805.00
18,430.00
18,930.00
Jumlah
242,790.00
341,160.00
673,370.00
313,310.00
643,620.00
2,214,250.00
M3
M3
M2
M'
M2
M2
M'
M'
3,422,100.00
2,863,600.00
57,005.00
40,800.00
54,200.00
27,082.50
11,160.00
29,695.00
Jumlah
6,194,001.00
6,700,824.00
11,425,512.15
1,750,320.00
11,056,800.00
5,524,830.00
1,919,520.00
1,778,730.50
46,350,537.65
237.51
204.00
69.49
M2
M2
M2
10,805.00
10,805.00
33,210.00
Jumlah
2,566,295.55
2,204,220.00
2,307,762.90
7,078,278.45
10.00
3.00
3.00
10.00
2.00
2.00
Ttk
Ttk
Bh
Bh
Bh
Bh
194,860.00
194,860.00
22,500.00
45,000.00
15,000.00
25,000.00
Jumlah
1,948,600.00
584,580.00
67,500.00
450,000.00
30,000.00
50,000.00
3,130,680.00
IX.
1.
2.
3.
PEKERJAAN PENGECATAN
Pek. Pengecatan Dinding
Pek. Pengecatan Plafond
Pek. Pengecatan Kusen, Daun Pintu Panil & Jendela
X.
1.
2.
3.
4.
5.
6.
HARGA
SATUAN
NO
XI.
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
JEIS PEKERJAAN
PEKERJAAN MEUBELAIR
Meja Serbaguna
Meja Kursi
Meja Demonstrasi
Kursi Siswa
Kursi Bunder Tinggi
Kursi Kerja
Lemari Kaca Geser
Lemari Alat Peraga
Lemari Kertas Kerja
Lemari Gantung P3K
Lemari Asam
Papan Tulis Gantung
Kotak Sampah
JUMLAH HARGA
VOLUME SATUAN
20.00
2.00
1.00
2.00
40.00
4.00
3.00
1.00
1.00
1.00
1.00
1.00
2.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
750,000.00
(Rp.)
600,000.00
800,000.00
300,000.00
450,000.00
400,000.00
1,750,000.00
1,350,000.00
1,000,000.00
950,000.00
900,000.00
200,000.00
75,000.00
Jumlah
(Rp.)
15,000,000.00
1,200,000.00
800,000.00
600,000.00
18,000,000.00
1,600,000.00
5,250,000.00
1,350,000.00
1,000,000.00
950,000.00
900,000.00
200,000.00
150,000.00
47,000,000.00
1.00
Ls
250,000.00
Jumlah
250,000.00
250,000.00
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
26
26
26
26
4,250,000.00
117,911,370.44
26
26
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
40,000
40,000
40,000
17,000
4,000
40,000
40,000
40,000
40,000
45,000
40,000
40,000
25,000
451,000
45,100
45,000
20000
20000
20000
20000
20000
20000
17000
40000
40000
40000
40000
45000
40000
40000
25000
4000
40000
113,721,452.85
45,000
40000
#REF!
R E K A P I T U L A S I
KEGIATAN
PEKERJAAN
LOKASI
SUMBER DANA
TAHUN ANGGARAN
NO
:
:
:
:
:
HARGA
(Rp)
A.
PEKERJAAN PERSIAPAN
14,850,000.00
B.
#REF!
C.
#REF!
D.
E.
12,000,000.00
4,500,000.00
A.
SUB TOTAL
#REF!
B.
PPN 10 %
#REF!
C.
IMB
( A + B + C)
13,410,000.00
TOTAL
#REF!
DIBULATKAN
#REF!
Terbilang : " Satu Milyar Enam Ratus Satu Juta Enam Ratus Ribu Rupiah "
Dibuat Oleh
xxxxxxxxxxxxx
Pimpinan Teknik
NO
A.
URAIAN PEKERJAAN
SATUAN
VOL
HARGA
SATUAN
( Rp.)
PEKERJAAN PERSIAPAN
1
2
3
4
5
6
7
B.
JUMLAH
HARGA
( Rp. )
14,850,000.00
Ls
Ls
Ls
Ls
Ls
Ls
Ls
1.00
1.00
1.00
1.00
1.00
1.00
1.00
500,000.00
1,000,000.00
6,000,000.00
1,500,000.00
2,000,000.00
350,000.00
3,000,000.00
500,000.00
1,000,000.00
6,000,000.00
1,500,000.00
2,000,000.00
350,000.00
3,500,000.00
#REF!
I
1
2
3
4
M
M
M
M
103.68
34.56
79.65
23.90
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
II
1
2
PEKERJAAN PONDASI
Pasangan batu kosong / aanstamping
Pas. pondasi batu kali camp 1 : 4
M
M
13.30
61.66
#REF!
#REF!
#REF!
#REF!
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
PEKERJAAN BETON
Pekerjaan Cor Lantai Kerja 1 : 3 : 5
Pekerjaan Beton Pondasi Tapak
Pek. Lantai Beton Bertulang 1:2:3
Pek. Beton Sloof 20/25
Pek. Beton Kolom K1 30/30
Pek. Beton Kolom K2 20/30
Pek. Beton Kolom K3 20/20
Pek. Beton Kolom K4 11/20
Pek. Beton Kolom Praktis 12/12
Pek. Beton Balok B1 25/40
Pek. Beton Balok B2 20/30
Pek. Beton Balok B3 15/20
Pek. Beton Balok Ring 15/20
Pek. Beton Balok Bordes 25/20
Pek. Beton Balok Latei 12/15
Pek. Lisplank Beton
Pek. Tangga/Bordes Beton
Pekerjaan Beton Plat Level
Pekerjaan Beton Plat Meja
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
12.39
7.88
18.72
6.20
5.26
0.46
2.34
0.10
3.57
10.80
0.24
2.55
5.58
0.25
2.84
31.53
1.33
1.72
0.12
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
IV
1
2
3
4
M
M
M
M
67.89
583.69
135.78
1,109.01
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
=
=
=
=
=
=
NO
5
6
V
1
2
3
4
5
6
7
URAIAN PEKERJAAN
Pekerjaan Acian
Pek. Papan Nama Stainless Steel
HARGA
SATUAN
( Rp.)
JUMLAH
HARGA
( Rp. )
SATUAN
VOL
M
Ls
1,244.79
1.00
#REF!
1,000,000.00
#REF!
1,000,000.00
M'
M'
M
M
Set
M
M'
741.64
582.88
31.74
31.50
5.00
73.15
22.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
375,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
8,250,000.00
=
=
###
=
VI
1
2
3
4
5
PEKERJAAN ATAP
Pekerjaan Kuda-Kuda Kayu Kelas II
Pekerjaan Rangka Atap Kayu Kelas II
Pekerjaan Atap Genteng Sakura Roof
Pekerjaan Nok Genteng Sakura Roof
Pekerjaan Lisplank Kayu
M
M
M
M'
M'
6.79
172.90
172.90
64.74
9.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
VII
1
2
3
PEKERJAAN PLAFOND
Pekerjaan Pasangan rangka Plafond
Pekerjaan Plafond Tripleks 3 mm
Pekerjaan Lis Plafon Sp. 3
M
M
M'
409.94
409.94
388.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
VIII
1
2
3
PEKERJAAN KERAMIK
Pas. Keramik 40 x 40 cm polos
Pas. Keramik 20 x 20 cm KM/WC
Pas. Keramik Dinding 20 x 25 cm KM/WC/Meja Beton
M
M
M
324.20
9.50
27.90
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Psg
Psg
Bh
Bh
Psg
Psg
Psg
22.00
150.00
22.00
150.00
150.00
10.00
22.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Bh
Ls
Unit
Unit
Unit
Unit
Unit
Unit
Unit
Ttk
6.00
1.00
6.00
18.00
25.00
26.00
24.00
10.00
38.00
75.00
#REF!
350,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
350,000.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Bh
M1
M1
M1
M1
Bh
Bh
5.00
102.00
94.00
211.50
40.00
11.00
5.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
IX
1
2
3
4
5
6
7
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
=
=
=
=
=
=
=
=
=
=
=
=
NO
8
9
10
URAIAN PEKERJAAN
Pasangan Wastafel
Pasang Septic tank dan peresapan
Pasang Saluran Air Hujan
SATUAN
VOL
HARGA
SATUAN
( Rp.)
JUMLAH
HARGA
( Rp. )
Bh
Unit
M'
6.00
1.00
58.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M
M
M
1,654.73
4.50
192.20
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
XI
1
2
3
PEKERJAAN PENGECATAN
Pek. Pengecatan Tembok Dan Plafond
Pek. Pengecatan Lisplank Kayu
Pek. Pengecatan Waterproofing Lisplank Beton
C.
I
1
2
3
4
M
M
M
M
120.62
40.21
135.90
36.36
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
II
1
2
PEKERJAAN PONDASI
Pasangan batu kosong / aanstamping
Pas. pondasi batu kali camp 1 : 4
M
M
20.27
94.85
#REF!
#REF!
#REF!
#REF!
III
1
2
3
4
5
6
7
8
9
10
11
12
13
14
PEKERJAAN BETON
Pekerjaan Cor Lantai Kerja 1 : 3 : 5
Pekerjaan Beton Pondasi Tapak
Pekerjaan Sloef Beton 15/20
Pekerjaan Sloef Beton 20/30
Pekerjaan Kolom K1 40/40
Pekerjaan Kolom K3 25/25
Pekerjaan Kolom K2 30/30
Pekerjaan Kolom Praktis 12/12
Pekerjaan Balok Latei 12/15
Pekerjaan Ring Balok 15/20
Pekerjaan Ring Balok 20/30
Pekerjaan Beton Plat Level
Pekerjaan Beton Plat Meja
Pekerjaan Lisplank Beton
M
M
M
M
M
M
M
M
M
M
M
M
M
M
21.14
2.63
5.91
0.96
2.78
2.74
0.66
2.05
2.21
5.37
1.08
1.19
0.21
21.39
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
IV
1
2
3
4
5
6
M
M
M
M
M
M'
118.77
454.67
237.54
863.86
1,101.40
86.92
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
V
1
2
3
4
5
M'
M'
M
Set
M
293.08
202.70
31.74
6.00
28.24
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
=
=
#REF!
=
=
=
=
=
=
=
###
VI
1
2
3
4
PEKERJAAN ATAP
Pekerjaan Kuda-Kuda Kayu Kelas II
Pekerjaan Rangka Atap Kayu Kelas II
Pekerjaan Atap Genteng Sakura Roof
Pekerjaan Nok Genteng Sakura Roof
=
M
M
M
M'
8.15
421.78
421.78
60.47
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
NO
URAIAN PEKERJAAN
SATUAN
VOL
HARGA
SATUAN
( Rp.)
JUMLAH
HARGA
( Rp. )
=
=
=
VII
1
2
3
PEKERJAAN PLAFOND
Pekerjaan Pasangan rangka Plafond
Pekerjaan Plafond Tripleks 3 mm
Pekerjaan Lis Plafon Sp. 3
M
M
M'
384.00
384.00
361.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
VIII
1
2
3
PEKERJAAN KERAMIK
Pas. Keramik 40 x 40 cm polos
Pas. Keramik 20 x 20 cm KM/WC
Pas. Keramik Dinding 20 x 25 cm KM/WC/Meja Beton
M
M
M
253.00
16.50
15.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Psg
Psg
Bh
Bh
Bh
Psg
Psg
Psg
18.00
80.00
4.00
10.00
80.00
80.00
8.00
17.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Bh
Unit
Unit
Unit
Unit
Unit
Unit
Ttk
5.00
8.00
17.00
26.00
16.00
7.00
29.00
51.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Bh
M1
M1
M1
M1
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
M'
6.00
65.00
40.00
23.00
122.85
9.00
2.00
2.00
4.00
2.00
4.00
1.00
4.00
3.00
66.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
M
M
1,485.40
130.38
#REF!
#REF!
#REF!
#REF!
Ls
1.00
12,000,000.00
Ls
Ls
1.00
1.00
1,000,000.00
3,500,000.00
IX
1
2
3
4
5
6
7
8
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
XI
1
2
PEKERJAAN PENGECATAN
Pek. Pengecatan Tembok Dan Plafond
Pek. Pengecatan Waterproofing Lisplank Beton
D.
1
2
3
4
5
6
7
8
E.
1
2
=
=
=
=
=
=
=
=
12,000,000.00
=
=
=
12,000,000.00
4,500,000.00
1,000,000.00
3,500,000.00
NO
URAIAN PEKERJAAN
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
#REF!
0
SATUAN
VOL
HARGA
SATUAN
( Rp.)
xxxxxxxxxxxxx
Pimpinan Teknik
JUMLAH
HARGA
( Rp. )
HITUNG BESI
TELAPAK
BESI 12
BESI 16
Panjang J
Jumlah
Bh
2.6 7.666667 19.93333
1
6
6
J Bh
Hit
2 39.86667 35.39203
2
12 18.93888
54.33091
KOLOM 30 x 30
BESI 12
BESI 12
BESI 8
BEKISTING
11.11111
4 44.44444
20
4
80
1.25 75.07407 93.84259
11.11111
0.3
0.3
0.3
39.456
49.32
37.02653
125.8025
0.3 13.33333 3.333333
KOLOM 20 x 20
BESI 12
BESI 12
BESI 8
BEKISTING
16
4
64
25
2
50
0.85 107.6667 91.51667
16
0.25
0.25
0.25
56.81664
30.825
36.10882
123.7505
0.25
16
0.15
137
124.5487
261.5487
0.15
30
15
0.25
106.5312
50.35243
156.8836
0.25
18
4.500
0.12
197.28
86.45146
283.7315
0.12
30
7.500
0.15
157.824
69.20772
227.0317
0.15 26.66667
6.667
55.55556
4 222.2222
0.85 371.3704 315.6648
55.55556
0.12
0.12
SLOOF 20 x 25
BESI 12
BESI 8
BEKISTING
20
6
120
0.95 134.3333 127.6167
20
0.2
0.2
SLOOF 15 x 12
BESI 12
BESI 8
BEKISTING
55.55556
4 222.2222
0.59 371.3704 219.1085
55.55556
0.15
0.15
44.44444
4 177.7778
0.59 297.2963 175.4048
44.44444
0.15
0.15
BALOK 15 x 30
BESI 10
BESI 8
33.33333
4 133.3333
0.65 334.3333 217.3167
82.2
85.74446
167.9445
BEKISTING
33.33333
0.15
0.15
0.2
0.2
118.368
66.05592
184.4239
0.2 23.33333 11.66667
0.2
118.368
41.1
66.05592
225.5239
0.2 23.33333 5.833333
0.15
157.824
76.2458
234.0698
0.15 26.66667 6.666667
0.12
171.25
97.02245
268.2725
0.12 33.33333 16.66667
0.25
142.0416
59.95778
201.9994
0.25 21.33333 10.66667
0.15
215.2145
103.8783
319.0928
0.15 32.12121 8.030303
0.12
171.25
134.4533
4.430483
0.12 33.33333 0.483092
BALOK 15 x 20
BESI 10
BESI 8
BEKISTING
33.33333
4 133.3333
0.75 223.2222 167.4167
33.33333
0.15
0.15
BALOK 15 x 20
BESI 10
BESI 10
BESI 8
BEKISTING
33.33333
4 133.3333
33.33333
2 66.66667
0.75 223.2222 167.4167
33.33333
0.15
0.15
BALOK 15 x 15
BESI 10
BESI 8
BEKISTING
44.44444
4 177.7778
0.65 297.2963 193.2426
44.44444
0.15
0.15
PRAKTIS 12/12
BESI 10
BESI 8
BEKISTING
BESI 12
BESI 8
BEKISTING
69.44444
0.53
69.44444
4 277.7778
463.963 245.9004
0.12
0.12
26.66667
6
160
0.85 178.7778 151.9611
26.66667
0.15
0.15
RING BALOK
BESI 12
BESI 8
BEKISTING
60.60606
4 242.4242
0.65 405.0404 263.2763
60.60606
0.12
0.11
BALOK LATEI 12 x 12
BESI 12
BESI 8
BEKISTING
69.44444
4 277.7778
0.49 695.4444 340.7678
69.44444
0.12
0.12
0.555556
4 2.222222
0.49 6.555556 3.212222
1.37
1.267414
4.747346
BEKISTING
0.555556
1.8
1.8
1 0.388889
0.7
0.12
137
107.6013
4.402824
0.12 26.66667
0.48
0.12
197.28
71.55375
268.8337
0.12 21.33333 10.66667
BALOK LATEI 12 x 12
BESI 12
BESI 8
BEKISTING
55.55556
4 222.2222
0.49 556.5556 272.7122
55.55556
0.12
0.12
RING BALOK 15 x 15
BESI 12
BESI 8
BEKISTING
44.44444
5 222.2222
0.61 297.2963 181.3507
44.44444
0.12
0.12
0.48
0.48
0.48
NO.
U R A I A N
SATUAN
CONTOH F
DOKUMEN TENDE
di http://contoh-p
proyek.blogsp
SATUAN
ter-Password,
TIDAK
KET.
(Rp.)
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
27.
28.
29.
30.
31.
32.
33.
34.
35.
36.
37.
38.
Kayu Klas II
Kayu Kls. III
Kayu Terentang
Balok Kayu Borneo
Dolken Kayu Galam 8 - 10/4 m
Kayu Kamper, Papan
Batu Belah / Batu Gunung
Batu Bata
Koral Beton
Pasir Pasang
Pasir Beton
Pasir Urug
Tanah Urug
Semen
Semen Warna
Keramik 40 x 40
Keramik 30 x 30
Besi Beton
Kawat Beton
Besi Strip
Minyak Bekisting
Genteng Metal
Nok Genteng Metal
Seng Gelombang
Seng Plat
Tripleks 4 mm
Plywood Tebal 9 mm
Kaca 5 mm
Kayu Profil
Paku Biasa 2" - 5"
Paku Biasa 1/2' - 1 "
Paku Tripleks
Paku Seng
Kunci Tanam Biasa
Engsel Pintu
Engsel Jendela
Grendel
Kait Angin
M3
M3
M3
M3
Btg
M3
M3
Bh
M3
M3
M3
M3
M3
Kg
Kg
Dos
Dos
Kg
Kg
Kg
Lt
Lbr
Bh
Lbr
Lbr
Lbr
Lbr
M2
M'
Kg
Kg
Kg
Kg
Bh
Bh
Bh
Bh
Bh
2,000,000.00
1,850,000.00
1,850,000.00
1,850,000.00
25,000.00
2,000,000.00
120,000.00
600.00
85,000.00
100,000.00
100,000.00
80,000.00
40,000.00
1,250.00
3,500.00
9,600.00
4,050.00
9,000.00
17,000.00
12,500.00
17,500.00
35,000.00
15,000.00
40,000.00
60,000.00
42,500.00
75,000.00
60,000.00
4,500.00
17,000.00
17,000.00
22,500.00
22,500.00
70,000.00
17,500.00
12,500.00
7,500.00
8,000.00
6.25
11.11
HARGA SATUAN
NO.
U R A I A N
SATUAN
KET.
(Rp.)
39.
40.
41.
42.
43.
44.
45.
46.
47.
48.
49.
50.
51.
52.
53.
54.
55.
56.
57.
58.
59.
60.
61.
62.
63.
64.
65.
66.
67.
68.
Cat Meni
Plamir
Cat Dinding Dasar
Cat Dinding Penutup
Cat Kayu Dasar
Cat Kayu Penutup
Cat Atap Seng
Kawat NYYM 3 x 2.5 mm
Pipa Instalasi 1/2"
Klem PVC 1/2"
T.Dos PVC
Bok PVC
Isolatip
Stop Kontak 200 VA ex Broco
Lampu SL 18 Watt
Saklar Tunggal
Saklar Ganda
Meja Serbaguna
Meja Kursi
Meja Demonstrasi
Kursi Siswa
Kursi Bunder Tinggi
Kursi Kerja
Lemari Kaca Geser
Lemari Alat Peraga
Lemari Kertas Kerja
Lemari Gantung P3K
Lemari Asam
Papan Tulis Gantung
Kotak Sampah
Kg
Kg
Kg
Kg
Kg
Kg
Kg
M'
Ujg
Lot
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
32,500.00
10,000.00
9,000.00
12,500.00
21,000.00
32,500.00
32,500.00
5,500.00
12,000.00
2,500.00
1,500.00
1,500.00
8,000.00
22,500.00
45,000.00
15,000.00
25,000.00
750,000.00
600,000.00
800,000.00
300,000.00
450,000.00
400,000.00
1,750,000.00
1,350,000.00
1,000,000.00
950,000.00
900,000.00
200,000.00
75,000.00
Mengetahui,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
NO.
U R A I A N
SATUAN
KET.
(Rp.)
Pekerja
O/H
50,000.00
7,142.86
/ Jam
Tukang
O/H
60,000.00
8,571.43
/ Jam
Kepala Tukang
O/H
75,000.00
Mandor
O/H
55,000.00
### / Jam
7,857.14
/ Jam
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
NO.
U R A I A N
SATUAN
KET.
(Rp.)
Beton Mollen
Hari
250,000.00
Dump Truck
Hari
450,000.00
Stamper
Hari
100,000.00
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
DAFTAR ANALISA
PEKERJAAN
SEKOLAH
TAHUN ANGGARAN
LOKASI
NO
URAIAN PEKERJAAN
proyek.blogspot.com/
ter-Password,
TIDAK
DI EDIT
KOEFISIEN
SAT
HARGA DAPAT
JUMLAH
PEKERJAAN TANAH
Galian Tanah
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M3
0.400
Oh
50,000.00
Oh
Oh
0.040
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Urugan Tanah Kembali
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M3
0.192
Oh
50,000.00
Oh
Oh
0.019
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Urugan Tanah
Bahan
- Tanah Urug
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Total
9,600.00
1,045.00
10,645.00
10,645.00
Satuan : M3
1.200
M3
40,000.00
0.250
Oh
50,000.00
Oh
Oh
0.025
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Urugan Pasir
Bahan
- Pasir Urug
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
20,000.00
2,200.00
22,200.00
22,200.00
48,000.00
12,500.00
1,375.00
61,875.00
61,875.00
Satuan : M3
1.200
M3
80,000.00
0.300
Oh
50,000.00
Oh
Oh
0.010
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
96,000.00
15,000.00
550.00
111,550.00
111,550.00
PEKERJAAN PONDASI
Pas. Pondasi Batu Kali 1 Pc : 5 Ps
Bahan
- Batu Belah 15/20
- Semen Portland
- Pasir Pasang
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M3
1.100
136.000
0.544
M3
Kg
M3
120,000.00
1,250.00
100,000.00
1.500
Oh
50,000.00
1.600
Oh
60,000.00
0.060
Oh
75,000.00
0.075
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Pondasi Batu Kosong
Bahan
- Batu Belah 15/20
- Pasir Urug
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
132,000.00
170,000.00
54,400.00
75,000.00
96,000.00
4,500.00
4,125.00
536,025.00
536,025.00
Satuan : M3
1.200
0.300
M3
M3
120,000.00
80,000.00
0.780
Oh
50,000.00
0.390
Oh
60,000.00
0.039
Oh
75,000.00
0.039
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
144,000.00
24,000.00
39,000.00
23,400.00
2,925.00
2,145.00
235,470.00
235,470.00
PEKERJAAN BETON
Cor Beton Bertulang 1 Pc : 2 Ps : 3 Kr
Bahan
- Semen Portland
- Pasir Beton
- Koral Beton
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M3
232.000
0.520
0.780
Kg
M3
M3
1,250.00
100,000.00
85,000.00
1.650
Oh
50,000.00
0.250
Oh
60,000.00
0.025
Oh
75,000.00
0.080
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Cor Beton Tumbuk 1 Pc : 3 Ps : 5 Kr
Bahan
- Semen Portland
- Pasir Beton
- Koral Beton
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Total
290,000.00
52,000.00
66,300.00
82,500.00
15,000.00
1,875.00
4,400.00
512,075.00
512,075.00
Satuan : M3
218.000
0.520
0.870
Kg
M3
M3
1,250.00
100,000.00
85,000.00
1.650
Oh
50,000.00
0.250
Oh
60,000.00
0.025
Oh
75,000.00
0.080
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
272,500.00
52,000.00
73,950.00
82,500.00
15,000.00
1,875.00
4,400.00
502,225.00
502,225.00
Pembesian
Bahan
Tenaga
-
Satuan : Kg
1.050
0.015
Kg
Kg
9,000.00
17,000.00
0.007
Oh
50,000.00
0.007
Oh
60,000.00
0.0007
Oh
75,000.00
0.0003
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pasangan Bekisting Untuk Sloof
Bahan
- Kayu Terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M2
0.045
0.300
0.100
M3
Kg
Lt
1,850,000.00
17,000.00
17,500.00
0.300
Oh
50,000.00
0.260
Oh
60,000.00
0.026
Oh
75,000.00
0.005
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pasangan Bekisting Untuk Kolom
Bahan
- Kayu Terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Balok Kayu Borneo
- Plywood Tebal 9 mm
83,250.00
5,100.00
1,750.00
15,000.00
15,600.00
1,950.00
275.00
122,925.00
122,925.00
Satuan : M2
0.040
0.400
0.200
0.015
0.350
M3
Kg
Lt
M3
Lbr
1,850,000.00
17,000.00
17,500.00
1,850,000.00
75,000.00
74,000.00
6,800.00
3,500.00
27,750.00
26,250.00
Btg
25,000.00
50,000.00
15,000.00
19,800.00
2,475.00
330.00
225,905.00
225,905.00
Tenaga
-
Pekerja
Tukang
Kepala Tukang
Mandor
0.300
Oh
50,000.00
0.330
Oh
60,000.00
0.033
Oh
75,000.00
0.006
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pasangan Bekisting Untuk Balok
Bahan
- Kayu Terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Balok Kayu Borneo
- Plywood Tebal 9 mm
Satuan : M2
0.040
0.400
0.200
0.018
0.350
M3
Kg
Lt
M3
Lbr
1,850,000.00
17,000.00
17,500.00
1,850,000.00
75,000.00
74,000.00
6,800.00
3,500.00
33,300.00
26,250.00
Btg
25,000.00
50,000.00
16,000.00
19,800.00
2,475.00
330.00
232,455.00
232,455.00
Tenaga
Total
9,450.00
255.00
350.00
420.00
52.50
16.50
10,544.00
10,544.00
Pekerja
Tukang
Kepala Tukang
Mandor
0.320
Oh
50,000.00
0.330
Oh
60,000.00
0.033
Oh
75,000.00
0.006
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Satuan : M3
1.000
156.884
4.500
M3
Kg
M2
512,075.00
10,544.00
122,925.00
Total
2,719,422.40
Satuan : M3
1.000
283.732
7.500
M3
Kg
M2
512,075.00
10,544.00
122,925.00
Total
Satuan : M3
1.000
156.884
4.500
M3
Kg
M2
512,075.00
10,544.00
225,905.00
Total
Satuan : M3
1.000
227.032
6.667
M3
Kg
M2
512,075.00
10,544.00
225,905.00
Total
Satuan : M3
1.000
283.732
7.500
M3
Kg
M2
512,075.00
10,544.00
232,455.00
Total
Total
512,075.00
2,991,670.21
1,743,412.50
5,247,157.71
512,075.00
2,393,825.41
1,506,108.64
4,412,009.04
512,075.00
1,654,184.90
1,016,572.50
3,182,832.40
512,075.00
2,991,670.21
921,937.50
4,425,682.71
512,075.00
1,654,184.90
553,162.50
1.000
150.000
10.000
Satuan : M3
M3
Kg
M2
512,075.00
10,544.00
232,455.00
512,075.00
1,581,600.00
2,324,550.00
4,418,225.00
42,000.00
17,962.50
4,000.00
16,000.00
6,000.00
750.00
825.00
87,537.50
87,537.50
42,000.00
12,100.00
4,500.00
16,000.00
6,000.00
750.00
825.00
82,175.00
82,175.00
Satuan : M2
6.480
0.019
Kg
M3
1,250.00
100,000.00
0.200
Oh
50,000.00
0.150
Oh
60,000.00
0.015
Oh
75,000.00
0.010
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Plesteran 1 Pc : 5 Ps, tebal 15 mm
Bahan
- Semen Portland
- Pasir Pasang
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Total
8,100.00
1,900.00
10,000.00
9,000.00
1,125.00
550.00
30,675.00
30,675.00
Satuan : M2
4.320
0.022
Kg
M3
1,250.00
100,000.00
0.200
Oh
50,000.00
0.150
Oh
60,000.00
0.015
Oh
75,000.00
0.010
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
5,400.00
2,200.00
10,000.00
9,000.00
1,125.00
550.00
28,275.00
28,275.00
Acian Semen
Bahan
- Semen Portland
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M2
2.250
Kg
1,250.00
0.150
Oh
50,000.00
0.050
Oh
60,000.00
0.005
Oh
75,000.00
0.0075
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
2,812.5
7,500.0
3,000.0
375.0
412.5
14,100.0
14,100.0
Satuan : Bh
1.000
Bh
70,000.00
0.015
Oh
50,000.00
0.150
Oh
60,000.00
0.015
Oh
75,000.00
0.001
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Engsel Pintu
Bahan
- Engsel Pintu
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : Bh
1.000
Bh
17,500.00
0.015
Oh
50,000.00
0.150
Oh
60,000.00
0.015
Oh
75,000.00
0.001
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Engsel Jendela Kupu-kupu
Bahan
- Engsel Jendela
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Total
17,500.00
750.00
9,000.00
1,125.00
55.00
28,430.00
28,430.00
Satuan : Bh
1.000
Bh
12,500.00
0.010
Oh
50,000.00
0.100
Oh
60,000.00
0.010
Oh
75,000.00
0.001
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Grendel
Bahan
- Grendel
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
70,000.00
750.00
9,000.00
1,125.00
55.00
80,930.00
80,930.00
12,500.00
500.00
6,000.00
750.00
55.00
19,805.00
19,805.00
Satuan : Bh
1.000
Bh
7,500.00
0.015
Oh
50,000.00
0.150
Oh
60,000.00
0.015
Oh
75,000.00
0.001
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
7,500.00
750.00
9,000.00
1,125.00
55.00
18,430.00
18,430.00
Satuan : Bh
1.000
Bh
8,000.00
0.015
Oh
50,000.00
0.150
Oh
60,000.00
0.015
Oh
75,000.00
0.001
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Kaca,
Bahan
Tenaga
-
tebal 5 mm
8,000.00
750.00
9,000.00
1,125.00
55.00
18,930.00
18,930.00
Satuan : M2
Kaca 5 mm
1.100
Pekerja
Tukang
Kepala Tukang
Mandor
M2
60,000.00
0.015
Oh
50,000.00
0.150
Oh
60,000.00
0.015
Oh
75,000.00
0.001
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
66,000.00
750.00
9,000.00
1,125.00
55.00
76,930.00
76,930.00
Satuan : M2
6.930
9.800
0.022
1.300
Bh
Kg
M3
Kg
9,600.00
1,250.00
100,000.00
3,500.00
0.250
Oh
50,000.00
0.120
Oh
60,000.00
0.001
Oh
75,000.00
0.013
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Lantai
Bahan
Tenaga
Total
Keramik 30 x 30 cm
Keramik 30 x 30 cm
Semen Portland
Pasir Pasang
Semen Warna
Pekerja
Tukang
Kepala Tukang
Mandor
66,528.00
12,250.00
2,200.00
4,550.00
12,500.00
7,200.00
75.00
715.00
106,018.00
106,018.00
Satuan : M2
11.870
10.000
0.022
1.500
Bh
Kg
M3
Kg
4,050.00
1,250.00
100,000.00
3,500.00
0.260
Oh
50,000.00
0.125
Oh
60,000.00
0.001
Oh
75,000.00
0.013
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
48,073.50
12,500.00
2,200.00
5,250.00
13,000.00
7,500.00
75.00
715.00
89,313.50
89,313.50
PEKERJAAN KAYU
Pas. Kusen
Bahan
Tenaga
-
Satuan : M3
1.200
M3
2,000,000.00
6.000
Oh
50,000.00
18.000
Oh
60,000.00
2.000
Oh
75,000.00
0.300
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Pintu Panel
Bahan
- Kayu Kls. II
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M2
0.040
M3
2,000,000.00
1.000
Oh
50,000.00
2.500
Oh
60,000.00
0.250
Oh
75,000.00
0.050
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Pintu & Jendela Kaca Kayu klas. II
Bahan
- Kayu Kls. II
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
0.035
M3
2,000,000.00
0.800
Oh
50,000.00
2.000
Oh
60,000.00
0.200
Oh
75,000.00
0.040
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
70,000.00
40,000.00
120,000.00
15,000.00
2,200.00
247,200.00
247,200.00
Satuan : M3
1.100
15.000
0.800
M3
Kg
Kg
2,000,000.00
12,500.00
17,000.00
4.000
Oh
50,000.00
12.000
Oh
60,000.00
1.200
Oh
75,000.00
0.200
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Gording
Bahan
- Kayu Kls. II
- Paku Biasa 2" - 5"
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
80,000.00
50,000.00
150,000.00
18,750.00
2,750.00
301,500.00
301,500.00
Satuan : M2
Total
Pas. Konstruksi Kida-Kuda Kayu Kls. II
Bahan
- Kayu Kls. II
- Besi Strip
- Paku Biasa 2" - 5"
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
2,400,000.00
300,000.00
1,080,000.00
150,000.00
16,500.00
3,946,500.00
3,946,500.00
2,200,000.00
187,500.00
13,600.00
200,000.00
720,000.00
90,000.00
11,000.00
3,422,100.00
3,422,100.00
Satuan : M3
1.100
3.000
M3
Kg
2,000,000.00
17,000.00
2.400
Oh
50,000.00
7.200
Oh
60,000.00
0.720
Oh
75,000.00
0.120
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
2,200,000.00
51,000.00
120,000.00
432,000.00
54,000.00
6,600.00
2,863,600.00
2,863,600.00
Satuan : M2
0.012
0.150
M3
Kg
2,000,000.00
17,000.00
0.100
Oh
50,000.00
0.100
Oh
60,000.00
0.010
Oh
75,000.00
0.005
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Lisplang Kayu
Bahan
- Kayu Kls. III
- Paku Biasa 2" - 5"
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M1
0.009
0.060
M3
Kg
1,850,000.00
17,000.00
0.100
Oh
50,000.00
0.100
Oh
60,000.00
0.010
Oh
75,000.00
0.005
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. List Plafond Kayu Profil
Bahan
- List Kayu Profil
- Paku Biasa 2" - 5"
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Total
16,650.00
1,020.00
5,000.00
6,000.00
750.00
275.00
29,695.00
29,695.00
Satuan : M1
1.100
0.010
M'
Kg
4,500.00
17,000.00
0.050
Oh
50,000.00
0.050
Oh
60,000.00
0.005
Oh
75,000.00
0.003
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Jalusi Kaca Mati Kusen Kayu Kamper
Bahan
- Kayu Kamper, Papan
- Paku Biasa 1/2' - 1 "
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
24,000.00
2,550.00
5,000.00
6,000.00
750.00
275.00
38,575.00
38,575.00
4,950.00
170.00
2,500.00
3,000.00
375.00
165.00
11,160.00
11,160.00
Satuan : M2
0.060
0.150
M3
Kg
2,000,000.00
17,000.00
0.500
Oh
50,000.00
2.000
Oh
60,000.00
0.200
Oh
75,000.00
0.025
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
120,000.00
2,550.00
25,000.00
120,000.00
15,000.00
1,375.00
283,925.00
283,925.00
Satuan : M2
1.020
0.200
Lbr
Kg
35,000.00
22,500.00
0.200
Oh
50,000.00
0.100
Oh
60,000.00
0.010
Oh
75,000.00
0.001
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Nok Genteng Metal
Bahan
- Nok Genteng Metal
- Paku Seng
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M1
1.100
0.050
Bh
Kg
15,000.00
22,500.00
0.250
Oh
50,000.00
0.150
Oh
60,000.00
0.015
Oh
75,000.00
0.010
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Atap Seng Gelombang
Bahan
- Seng Gelombang 3' x 6" Bjls
- Paku Seng
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Total
16,500.00
1,125.00
12,500.00
9,000.00
1,125.00
550.00
40,800.00
40,800.00
Satuan : M2
0.700
0.020
Lbr
Kg
40,000.00
22,500.00
0.120
Oh
50,000.00
0.060
Oh
60,000.00
0.006
Oh
75,000.00
0.006
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pas. Nok Seng Gelombang
Bahan
- Seng Plat 3" x 6" Bjls 30
- Paku Seng
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
35,700.00
4,500.00
10,000.00
6,000.00
750.00
55.00
57,005.00
57,005.00
28,000.00
450.00
6,000.00
3,600.00
450.00
330.00
38,830.00
38,830.00
Satuan : M2
0.300
0.040
Lbr
Kg
60,000.00
22,500.00
0.150
Oh
50,000.00
0.070
Oh
60,000.00
0.008
Oh
75,000.00
0.006
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
18,000.00
900.00
7,500.00
4,200.00
600.00
330.00
31,530.00
31,530.00
PEKERJAAN LANGIT-LANGIT
Rangka Plafond Kayu Klas II
Bahan
- Kayu Klas II
- Paku
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M2
0.012
0.100
M3
Kg
2,000,000.00
17,000.00
0.150
Oh
50,000.00
0.250
Oh
60,000.00
0.025
Oh
75,000.00
0.075
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Plafond Tripleks (60x120) cm, tebal 4 mm
Bahan
- Tripleks 4 mm
- Paku
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
24,000.00
1,700.00
7,500.00
15,000.00
1,875.00
4,125.00
54,200.00
54,200.00
Satuan : M2
0.375
0.030
Lbr
Kg
42,500.00
22,500.00
0.070
Oh
50,000.00
0.100
Oh
60,000.00
0.010
Oh
75,000.00
0.004
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
15,937.50
675.00
3,500.00
6,000.00
750.00
220.00
27,082.50
27,082.50
PEKERJAAN PENGECATAN
Pengecatan Bidang Kayu Baru (1 lapis plamir 1 lapis cat dasar,
Satuan : M2
Bahan
- Cat Meni
0.200
Kg
32,500.00
- Plamir
0.150
Kg
10,000.00
- Cat Dasar
0.170
Kg
21,000.00
- Cat Penutup 3 x
0.350
Kg
32,500.00
Tenaga
- Pekerja
0.070
Oh
50,000.00
- Tukang
0.105
Oh
60,000.00
- Kepala Tukang
0.004
Oh
75,000.00
- Mandor
0.003
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
Pengecatan Atap Seng
Bahan
- Cat Atap Seng
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Total
6,500.00
1,500.00
3,570.00
11,375.00
3,500.00
6,300.00
300.00
165.00
33,210.00
33,210.00
Satuan : M2
0.260
Kg
32,500.00
0.070
Oh
50,000.00
0.009
Oh
60,000.00
0.006
Oh
75,000.00
0.003
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
8,450.00
3,500.00
540.00
450.00
165.00
13,105.00
13,105.00
2,000.00
900.00
3,250.00
3,500.00
540.00
450.00
165.00
10,805.00
10,805.00
PEKERJAAN SALURAN
Pasangan Saluran Pinggir Bangunan
Bahan
- Pas. Batu Bata 1 : 3
- Plesteran 1 : 3
- Pasir Urug
Tenaga
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Satuan : M1
0.220
2.200
0.030
M2
M2
M3
87,537.50
30,675.00
111,550.00
0.120
Oh
50,000.00
0.250
Oh
60,000.00
0.049
Oh
75,000.00
0.012
Oh
55,000.00
Jumlah Harga Satuan Bahan + Upah
Total
19,258.25
67,485.00
3,346.50
6,000.00
15,000.00
3,675.00
660.00
115,424.75
115,424.75
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
66,000.00
24,000.00
1,250.00
6,000.00
3,000.00
16,000.00
3,500.00
45,000.00
30,000.00
110.00
194,860.00
194,860.00
E
PROYEK
nawaran.com/
APAT DI EDIT
PEKERJAAN
0
SEKOLAH
TAHUN ANGGARAN
LOKASI
:
:
:
:
ANALISA TEKNIK
PEMBANGUNAN LABORATORIUM IPA CONTOH FILE
SEKOLAH MENENGAH PERTAMA
DOKUMEN TENDER PROYEK
SMP NEGERI xxxxxxxxxxx
di http://contoh-penawaran2011
KEC. xxxxxxxxx KAB. Xxxxxxxxxxxxxxxxx
proyek.blogspot.com/
ter-Password, TIDAK DAPAT DI EDIT
* Pekerjaan Persiapan
7.00
1.00
29.64
10.00
- Dibulatkan
8.89
20.83
- Dibulatkan
Hari
Minggu
29.64
M3
=
=
4.00
1.00
10.00
2.96
Hari
2.96
0.42
Hari
Minggu
8.89
M3
=
=
4.00
1.00
Org
Org
20.83
0.43
Hari
0.43
0.06
Hari
Minggu
21.97
M3
26.36
M3
=
=
4.00
1.00
13.33
1.65
Hari
1.65
0.24
Hari
Minggu
Org
Org
M3/ Hari
M3/ Hari
21.97
13.33
Org
Org
M3/ Hari
* Urugan Tanah
- Volume Pekerjaan
- Kebutuhan bahan
- Tanah Urug
60.00
M3
72.00
M3
=
=
4.00
1.00
16.00
3.75
Hari
3.75
0.54
Hari
Minggu
7.41
M3
=
=
8.89
2.22
M3
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
20.51
0.36
Hari
0.36
0.05
Hari
Minggu
39.67
M3
=
=
=
5,395.12
21.58
43.64
Kg
M3
M3
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
5.00
M3/ Hari
7.93
Hari
7.93
1.13
Hari
Minggu
60.00
16.00
- Dibulatkan
7.41
20.51
- Dibulatkan
39.67
5.00
Org
Org
M3/ Hari
M3/ Hari
16.84
M3
Kg
M3
M3
Kg
M3
Kg
Lt
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
2.00
M3/ Hari
8.42
Hari
8.42
1.20
Hari
Minggu
10.76
M2
=
=
=
154.62
0.43
753.20
Kg
M3
Bh
=
=
=
=
4.00
8.00
1.00
1.00
80.00
0.13
Hari
0.13
0.02
Hari
Minggu
16.84
2.00
- Dibulatkan
10.76
80.00
Org
Org
Org
Org
M2/ Hari
183.80
M2
=
=
=
1,779.18
8.27
12,866.00
Kg
M3
Bh
=
=
=
=
4.00
8.00
1.00
1.00
80.00
2.30
Hari
2.30
0.33
Hari
Minggu
56.52
M2
=
=
366.25
1.07
Kg
M3
=
=
=
=
4.00
8.00
1.00
1.00
53.33
1.06
Hari
1.06
0.15
Hari
Minggu
367.60
M2
=
=
1,588.03
8.09
Kg
M3
=
=
=
=
4.00
8.00
1.00
1.00
53.33
6.89
Hari
6.89
0.98
Hari
Minggu
183.80
80.00
- Dibulatkan
56.52
53.33
- Dibulatkan
367.60
53.33
Org
Org
Org
Org
M2/ Hari
Org
Org
Org
Org
M2/ Hari
Org
Org
Org
Org
M2/ Hari
* Acian Semen
- Volume Pekerjaan
- Kebutuhan bahan
- Semen
424.12
M2
954.27
Kg
=
=
=
=
4.00
8.00
1.00
1.00
160.00
2.65
Hari
2.65
0.38
Hari
Minggu
150.00
M2
=
=
=
=
1,470.00
1,039.50
3.30
195.00
Kg
Bh
M3
Kg
=
=
=
=
4.00
8.00
1.00
1.00
66.67
2.25
Hari
2.25
0.32
Hari
Minggu
1.06
M3
1.27
M3
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
0.44
M3/ Hari
2.39
Hari
2.39
0.34
Hari
Minggu
424.12
160.00
- Dibulatkan
150.00
66.67
- Dibulatkan
1.06
0.44
Org
Org
Org
Org
M2/ Hari
Org
Org
Org
Org
M2/ Hari
6.15
M2
0.25
M3
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
3.20
M2/ Hari
1.92
Hari
1.92
0.27
Hari
Minggu
3.66
M2
0.13
M3
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
4.00
M2/ Hari
0.92
Hari
0.92
0.13
Hari
Minggu
9.73
M2
=
=
0.58
1.46
M3
Kg
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
4.00
M2/ Hari
2.43
Hari
2.43
0.35
Hari
Minggu
6.15
3.20
- Dibulatkan
* Pas. Bingkai Daun Jendela
- Volume Pekerjaan
- Kebutuhan bahan
- Kayu Kls. II
3.66
4.00
- Dibulatkan
9.73
4.00
* Pas. Kaca 5 mm
- Volume Pekerjaan
- Kebutuhan bahan
- Kaca 5 mm
9.90
M2
10.89
M2
=
=
=
=
4.00
8.00
1.00
1.00
53.33
0.19
Hari
0.19
0.03
Hari
Minggu
3.00
Bh
3.00
Bh
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
53.33
0.06
Hari
0.06
0.01
Hari
Minggu
12.00
Bh
12.00
Bh
=
=
=
=
4.00
8.00
1.00
1.00
53.33
0.23
Hari
0.23
0.03
Hari
Minggu
9.90
53.33
- Dibulatkan
3.00
53.33
- Dibulatkan
12.00
53.33
Org
Org
Org
Org
M2/ Hari
Bh/ Hari
Org
Org
Org
Org
Bh/ Hari
34.00
Bh
34.00
Bh
=
=
=
=
4.00
8.00
1.00
1.00
80.00
0.43
Hari
0.43
0.06
Hari
Minggu
17.00
Bh
17.00
Bh
=
=
=
=
4.00
8.00
1.00
1.00
53.33
0.32
Hari
0.32
0.05
Hari
Minggu
34.00
Bh
34.00
Bh
=
=
=
=
4.00
8.00
1.00
1.00
53.33
0.64
Hari
0.64
0.09
Hari
Minggu
34.00
80.00
- Dibulatkan
17.00
53.33
- Dibulatkan
34.00
53.33
Org
Org
Org
Org
Bh/ Hari
Org
Org
Org
Org
Bh/ Hari
Org
Org
Org
Org
Bh/ Hari
1.81
M3
=
=
=
1.99
27.15
1.45
M3
Kg
Kg
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
0.67
M3/ Hari
2.72
Hari
2.72
0.39
Hari
Minggu
2.34
M3
=
=
2.57
7.02
M3
Kg
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
1.11
M3/ Hari
2.11
Hari
2.11
0.30
Hari
Minggu
200.43
M2
=
=
204.44
40.09
Lbr
Kg
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
80.00
2.51
Hari
2.51
0.36
Hari
Minggu
1.81
0.67
- Dibulatkan
2.34
1.11
- Dibulatkan
200.43
80.00
M2/ Hari
42.90
M'
=
=
47.19
2.15
Lbr
Kg
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
53.33
0.80
Hari
0.80
0.11
Hari
Minggu
204.00
M2
=
=
2.45
20.40
M3
Kg
=
=
=
=
4.00
8.00
1.00
1.00
32.00
6.38
Hari
6.38
0.91
Hari
Minggu
172.00
M'
=
=
189.20
1.72
M'
Kg
=
=
=
=
4.00
8.00
1.00
1.00
160.00
1.08
Hari
1.08
0.15
Hari
Minggu
42.90
53.33
- Dibulatkan
204.00
32.00
- Dibulatkan
172.00
160.00
M'/ Hari
Org
Org
Org
Org
M2/ Hari
Org
Org
Org
Org
M2/ Hari
59.90
M'
=
=
0.54
3.59
M3
Kg
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
80.00
0.75
Hari
0.75
0.11
Hari
Minggu
441.51
M2
=
=
88.30
44.15
114.79
Kg
Kg
Kg
=
=
=
=
4.00
8.00
1.00
1.00
60.00
7.36
Hari
7.36
1.05
Hari
Minggu
69.49
M2
=
=
=
=
13.90
10.42
11.81
24.32
Kg
Kg
Kg
Kg
=
=
=
=
4.00
8.00
1.00
1.00
60.00
1.16
Hari
1.16
0.17
Hari
Minggu
59.90
80.00
- Dibulatkan
441.51
60.00
- Dibulatkan
69.49
60.00
M2/ Hari
Org
Org
Org
Org
M2/ Hari
Org
Org
Org
Org
M2/ Hari
13.00
Ttk
=
=
=
=
=
=
156.00
26.00
6.50
52.00
26.00
26.00
M'
Ujg
Lot
Bh
Bh
Bh
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
10.67
1.22
Hari
1.22
0.17
Hari
Minggu
13.00
10.67
- Dibulatkan
Ttk/ Hari
* Pemasangan Stop Kontak 200 VA ex Broco, Lampu SL 18 Watt, Saklar Tunggal, Saklar Ganda
- Volume Pekerjaan
=
17.00
Bh
- Kebutuhan bahan
- Stop Kontak
=
3.00
Bh
- Lampu SL 18 Watt
=
10.00
Bh
- Saklar Tunggal
=
2.00
Bh
- Saklar Ganda
=
2.00
Bh
- Tenaga yang dibutuhkan
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
=
=
=
=
4.00
8.00
1.00
1.00
10.67
1.59
Hari
1.59
0.23
Hari
Minggu
17.00
10.67
Org
Org
Org
Org
Bh/ Hari
* Pengadaan Meubelair
- Volume Pekerjaan
- Kebutuhan bahan
Meja Serbaguna
Meja Kursi
Meja Demonstrasi
Kursi Siswa
Kursi Bunder Tinggi
Kursi Kerja
Lemari Kaca Geser
Lemari Alat Peraga
Lemari Kertas Kerja
Lemari Gantung P3K
Lemari Asam
Papan Tulis Gantung
Kotak Sampah
79.00
Bh
=
=
=
=
=
=
=
=
=
=
=
=
=
20.00
2.00
1.00
2.00
40.00
4.00
3.00
1.00
1.00
1.00
1.00
1.00
2.00
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
=
=
=
=
4.00
8.00
1.00
1.00
Org
Org
Org
Org
6.00
Bh/ Hari
13.17
13.17
1.88
Hari
Minggu
3.00
0.43
Hari
Minggu
* Pekerjaan Lain-Lain
79.00
6.00
Hari
Mengetahui,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
Nomor
Lampiran
: xxxxxxxxxx
: 1 (satu) berkas
xxxxxxxxx, 04 Oktober
CONTOH FILE
Kepada Yth,
DOKUMEN TENDER PROYEK
Unit Layanan Pengadaan Jasa Konstruksi
Kabupaten xxxxxxxxxxxxxxxxdi http://contoh-penawaranproyek.blogspot.com/
Di xxxxxxxxxx
ter-Password, TIDAK DAPAT DI EDIT
Perihal
7.
8.
f.
Daftar Personil Inti;
g. Jenis, kapasitas, komposisi, dan jumlah peralatan utama minimal yang d
h. Spesifikasi Teknis
Dukungan Keuangan dari Bank Pemerintah/Swasta sebesar Rp. 150.000.00
Dokumen Isian Kualifikasi;
Penawar,
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
CONTOH FILE
DOKUMEN TENDER PROYEK
di http://contoh-penawaranproyek.blogspot.com/
ter-Password, TIDAK DAPAT DI EDIT
Penawar,
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
NO.
U R A I A N
1
1
KAYU KLS. II
PAKU CAMPURAN
KERAMIK DINDING 40 x 40 CM
BATU KALI
10
TANAH TIMBUNAN
11
KERIKIL
12
PASIR PASANG
13
SEMEN
14
BATU BATA
15
Keterangan
II
3
Jangka Waktu
Pelaksanaan 60 (Enam
Puluh) Hari Kalender
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
xxxxxxxxxxxxxxx
Direktur
Pimpinan Teknik
SEKOLAH
TAHUN ANGGARAN
: 2011
LOKASI
BULAN KE NO.
U R A I A N
1
1
PEKERJA
TUKANG
KEPALA TUKANG
MANDOR
Keterangan
II
3
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
SEKOLAH
TAHUN ANGGARAN
: 2011
LOKASI
MINGGU KE NO.
U R A I A N
DUMP TRUCK
BETON MOLLEN
CONCRETE VIBRATOR
ALAT BANTU
1-7
8-14
15-21
22-28
29-35
36-42
43-49
50-56
Keterangan
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
48,770.00
573,064.00
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
#VALUE!
BOBOT
CONTOH FILE
DOKUMEN TENDER PROYEK
di http://contoh-penawaranproyek.blogspot.com/
ter-Password, TIDAK DAPAT DI EDIT
BULAN KE -
NO.
U R A I A N
1
II
1.45
1.45
PEKERJAAN PERSIAPAN
1.78
II
2.89
III
25.51
IV
14.30
6.66
6.66
VI
4.49
4.49
VII
0.93
0.93
VIII
19.40
1.94
IX
PEKERJAAN PENGECATAN
2.96
1.31
XI
PEKERJAAN MEUBELAIR
XII
PEKERJAAN LAIN-LAIN
II
Keterangan
3
1.78
100
5.10
90
10.20
10.20
7.15
7.15
80
Jangka Waktu
Pelaksanaan 60
60(Enam Puluh)
70
50
15.52
40
1.94
1.48
1.48
1.31
19.67
9.84
(%)
Hari Kalender
20
9.84
10
0.10
###
30
0.10
1.78
1.45
6.55
17.35
31.36
25.36
14.57
1.59
1.78
3.23
9.78
27.13
58.49
83.85
98.41
100.00
Dibuat Oleh,
### KONTRAKTOR PELAKSANA
#REF!
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
METODE PELAKSANAAN
PEKERJAAN
0
SEKOLAH
TAHUN ANGGARAN
LOKASI
PENGENALAN LOKASI
a
Pekerjaan Persiapan
a
Pengukuran
Untuk memulai pelaksanaan pekerjaan dilakukan pengukuran (uitzet) awal yang meliputi
pengukuran situasi, pengukuran tampang melintang dan memanjang dari permukaan tanah asli
dilokasi pekerjaan dengan menggunakan referensi dari Bench Mark yang ada atau referensi
bangunan yang ada atas petunjuk dari pihak proyek.
Pekerjaan pengukuran ini sekaligus dengan pemasangan bowplank guna mempermudah
penentuan kedalaman dasar dan puncak pondasi yang akan dilaksanakan.
Hasil dari pada pengukuran dituangkan dalam gambar yang menjadi gambar pelaksanaan sebagai
pedoman dalam pelaksanaan dan perhitungan volume sebenarnya yang akan dilaksanakan
dilapangan setelah disetujui pihak Proyek.
Jalan Masuk
Jalan masuk sebagai sarana penunjang transportasi segala kebutuhan pelaksanaan dilapangan
akan menggunakan jalan yang ada dengan memperbaiki dan memeliharanya hingga akhir
pekerjaan.
Pada Umumnya dalam pelaksanaan suatu pekerjaan atau proyek dilaksanakan sesuai rencana kerja
(Time Schedule), dengan hasil yang sangat memuaskan serta sesuai spesifikasi, apabila semua yang
menyangkut bahan, tenaga dan peralatan serta metode pelaksanaan yang telah disiapkan dengan baik
sebelum proyek dilaksanakan. Olehnya Pelaksana sudah menghitung banyaknya bahan , tenaga dan
alat yang akan digunakan sesuai dengan jenis pekerjaan, tentu saja pengadaannya disesuaikan
dengan rencana kerja yang dibuat oleh pelaksana dan disetujui oleh Pemimpin Proyek. Pembersihan
lapangan dilakukan pada seluruh lokasi pekerjaan yang meliputi pembersihan dari rumput, tunggultunggul, kayu-kayu yang terhempas oleh gelombang ditepi pantai. Semua hasil pembersihan dibuang
diluar daerah lokasi kerja sesuai petunjuk Direksi. Pengambilan Foto Dokumentasi dilakukan pada suatu
titik tetap dengan arah yang sama selama pengambilan foto sebelum pelaksanaan dimulai ( 0 % ),
sedang dalam pelaksanaan ( 50 % ) dan setelah pekerjaan selesai ( 100 % ) yang disusun dalam Album
Foto rangkap 3 (tiga) atau sesuai permintaan pihak proyek.
PEMBANGUNAN INSTALASI FARMASI/GUDANG OBAT DAN PERBEKES
PEKERJAAN PERSIAPAN, GALIAN, TIMBUNAN
1 Galian Tanah
Pekerjaan galian tanah pondasi pondasi jalur batu kali dilaksanakan setelah mendapatkan
ukuran-ukuran yang tepat dan pasti dari hasil pengukuran dan pemasangan bouwplank, tanah
hasil galian ditimbun tidak terlalu dekat dengan lubang galian supaya tanah galian tidak longsor
kembali ke lubang galian. Galian tanah pondasi digunakan tenaga manual dan peralatan
konvensional seperti cangkul, linggis dan skop. setelah pasangan pondasi selesai hasil galian
ditimbun kembali pada sisi pondasi
2 Timbunan Tanah
Pekerjaan ini dilaksanakan setelah pekerjaan sloof selesai, dengan metode pekerjan pasir
gunung ditimbun
dalam setelah
area bangunan,
pasir setebal
domatoatau
ditimbun
demigambar
lapis, lapisan
Pekerjaan
dilaksanakan
urugan tanah
sesuailapis
dengan
bestek
pertamadengan
setebalair10
cmhasil
yang
akan ditimbun
disiram dengan air sambil dipadatkan dengan
disiram
agar
tersebut
padat
menggunakan stamper tangan. begitu seterusnya sampai pada ketebalan yang direncanakan.
PEKERJAAN PASANGAN
1 Timbrisan batu kosong
Pekerjaan pondasi batu kali dan astampang batu kali dilaksanakan setelah pekerjaan galian
tanah selesai
2 Pasang pondasi camp. Pc : 4 Ps
Pekerjaan ini dilaksanakan setelah urugan pasir dan timbrisan batu kali selesai metode
pelaksanaan pekerjaan :
- Menarik benang horsiontal sebagai pedoman dalam penyusunan. Ketinggian benang
merupakan tinggi dari pasangan dan lebar benang dan lebar benang dimbil lebar pondasi
bagian atas (Ketinggian pondasi berpedoman pada papan duga/bouwplank)
- Menyiapkan batu belah, diusahakan batu belah diletakkan tidak jauh dari tempat
pemasangan.
- Mencampur spesi dengan perbandingan 1 Pc : 4 Ps + air secukupnya. Pekerjaan ini
menggunakan alat bantu berupa skop sebagai pengaduk
- Setelah spesi selesai dicampur diletakkan dibak spesi yang berada disebelah tukang batu
yang kan memasang batu belah
- Pemasangan pondasi ini dikerjakan secara manual dengan menggunakan sendok spesi
sebagai alat bantu
- Dalam pemasangan tidak boleh ada rongga diantara batu belah satu dengan yang lain
- Pemasangan dilanjutkan sampai pasangan batu belah tersusun sesuai dengan bentuk dan
ukuran yang disesuaikan dengan gambar kerja. Ketinggian pondasi harus rata dengan
benang
3 Pekerjaan
Beton Bertulang
Pekerjaan ini dilaksanakan setelah lantai kerja dengan metode pelaksanaan sebagai berikut :
a. Pekerjaan Pembesian
- Mengukur tulangan sesuai dengan panjang yang dibutuhkan, kemudian dipotong dengan
- menggunakan gunting potong atau gergaji besi
- Membuat behel, bengkokan dan kait pada tulangan sesuai dengan bentuk dan ukuran pada
gambar
- Merangkai tulangan untuk plat dan tulangan kaki pondasi yang diikat memakai kawat
beton / bendrat
b. Pekerjaan Bekisting
Membuat papan bekisting dengan cara menyambung untuk mendapatkan ukuran yang
diperlukan sesuai dengan bestek kemudian diperkuat dengan klam
Memasang papan bekisting tersebut diperkuat dengan skor hingga kokoh betul
Membersihkan kotoran - kotoran sisa bekisting
Menutup celah - celah bekisting yang masih bocor dengan kertasc semen yang relah
dibasahi terlebih dahulu
c.Pekerjaan Pengecoran
- Papan bekisting disiram air pada bagian dalam sebelum pengecoran dimulai
- Mengaduk bahan dengan campuran sesuai dengan mutu yang diinginkan, dengan Mutu
- K225
Pengecoran dilaksanakan dengan menggunakan mesin molen sebagai alat pengaduk
- Mengangkut adukan dengan ember dan kemdian dituangkan dala cetakan
- Memadatkan adukan dengan menggunakan vibrator
4 Pasangan Dinding & Plesteran
a pasangan batu bata camp. dilaksanakan setelah pekerjaan sloof selesai selesai dengan
metode pelaksanaan pekerjaan :
- Pengukuran untuk mendapatkan kelurusan dan untuk mendapatkan hasil horisiontal
menggunakan
unting
- unting
mempertahankan ketegakan pasangan
- sebaiknya
Batu bata diletakkan
dekat
dengan
lokasiuntuk
pekerjaan
- Mencampur adukan spesi dengan takaran disesauikan dengan spesifikasi yang telah
ditentukan baik campuran untuk trasram dan pasangan biasa
- Batu Bata sebelum disusun sebaiknya disiram hingga jenuh
- Batu bata disusun dengan mengikuti benang yang telah diukur sebelumnya
PEKERJAAN KERAMIK
pekerjaan ini biasanya dilaksanakan setelah pekerjaan atap dan plafond selesai Pekerjaan keramik
ini
terdiri
dari : Dinding 20 x 25 cm
- Pas.
Keramik
dengan metode pelaksanaan pekerjaan :
- Spesi dicampur dicampur sebagai bahan perekat untuk memperoleh hasil ikatan maksimal
-
Setelah saklar tunggal dihubungkan pada kabel sesuai dengan posisi yang telah ditentukan
pada gambar kerja lalu dihubungkan pada titik lampu yang sebelumnya telah dipasang
peteng.
PEK. ARSITEKTUR
Penjelasan :
Pekerjaan ini merupakan bagian akhir dari rangkaian pekerjaan yang dilakukan.
- Mengecat Dinding
- Mengecat Plafond
- Mengecat dan Vernis Listplank Kayu 3x
- Pekerjaan List Profil Beton
- Plesteran Motif Bergaris Pada Dinding Sp. 1 : 3 t = 20 mm
metode pelaksanaan
- Permukaan kayu, plafond dan tembok dibersihkan terlebih dahulu
- Cat dicampur dengan air untuk pengecetan dinding dan plafon
- Cat dicampur dengan minyak cat untuk pengecetan kayu
- Cat dilakukan pengecetan dasar pada permukaan dinding, plafond dan kayu
- Dilanjutkan dengan cat penutup
- Pek. Pengecetan Dinding Tembok Baru
- Pek. Pengecetan Plafond
- Pek. Mendempul dan Menggosok Bidang Kayu
- Pek. Menie Kosen + Daun Pintu/Jendela/Ventilasi
- Pek. Pengecetan Kosen+ Daun Pintu/Jendela/Ventilasi
- Pek. Pengecetan Bidang Kayu Dengan Politur
- Pek. Pelaburan Bidang Kayu Dengan Vernis
metode pelaksnaan
- Permukaan kayu, plafond dan tembok dibersihkan terlebih dahulu
- Cat dicampur dengan air untuk pengecetan dinding dan plafon
- Cat dicampur dengan minyak cat untuk pengecetan kayu
- Cat dilakukan pengecetan dasar pada permukaan dinding, plafond dan kayu
- Dilanjutkan dengan cat penutup
XIII ANALISA KEBUTUHAN WAKTU
Untuk dapat mencapai sasaran waktu penyelesaian Pekerjaan yang efektif dan efisien diperlukan
suatu kejelian dan ketelitian didalam menganalisa kebutuhan waktu yang ada .
XIV ANALISA JENIS KAPASITAS, JUMLAH PERALATAN
MELAKSANAKAN PEKERJAAN
Untuk jenis dan kapisatas alat menggunakan alat seperti :
- Dump Truck
- Concrete Mixer
- Concrete Vibrator
- Pompa Air
- Water Tanker
- Theodolite
- Alat Bantu
- Kamera, Meja Biro, ATK, ATM
YANG
DIBUTUHKAN
DALAM
Pimpinan Teknik
Pelaksana Lapangan
Pimpinan Admistrasi
Surveyor
Logistik
Demikian Metoda pelaksanaan ini dibuat sebagai bahan pertimbangan dan dapat menjadi acuan dalam
pelaksanaan pekerjaan dilapangan apabila perusahaan kami dipercayakan dalam mengelola pekerjaan
ini.
xxxxxxxxx, 04 Oktober 2011
Mengetahui,
xxxxxxxxxxxxxx
Dibuat Oleh:
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
#REF!
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
Pek.
Pek.
Pek.
Pek.
Pek.
Galian Tanah
Urugan Tanah Kembali
Urugan Pasir
Beton Tumbuk 1:3:5 Untuk Trotoar
Beton Cansteen 20/40
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerja
PekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaPekerjaan Pengece
SPESIFIKASI TEKNIS
Spesifikasi Terknis ditetapkan dalam dokumen pelalangan berdasarkan jenis
pekerjaan yang akan dilelangkan, dengan ketentuan :
1. Tidak mengarah kepada merk/produk tertentu, tidak menutup
kemungkinan digunakannya produksi dalam negeri;
2. Semaksimal mungkin diupayakan
menggunakan
standar nasional (SNI);
CONTOH
FILE
3. Metode Pelaksanaan harus logis, realistik dan dapat dilaksanakan;
DOKUMEN TENDER PROYEK
4. Jadwal waktu pelaksanaan harus sesuai dengan metoda pelaksanaan;
di http://contoh-penawaran5. Mencantumkan macam, jenis, kapasitas dan jumlah peralatan utama
proyek.blogspot.com/
minimal yang diperlukan
dalam pelaksanaan pekerjaan;
ter-Password,
TIDAK
DAPAT
EDIT
6. Mencantumkan
syarat-syarat
bahan
yang DI
dipergunakan
dalam
pelaksanaan pekerjaan;
7. Mencantumkan syarat-syarat pengujian bahan dan hasil produk;
8. Mencantumkan kriteria kinerja produk yang diinginkan;
9. Mencantumkan tatacara pengukuran dan tata cara pemabayaran;
10. Spesifikasi Teknis Bahan Bangunan Konstruksi :
a. Mengidentifikasi setiap jenis bahan bangunan konstruksi yang akan
digunakan untuk pekerjaan permanen maupun untuk pekerjaan
sementara atau penunjang, dan menetapkan spesifikasi teknis setiap
jenis bahan yang boleh digunakan;
b. Setiap bahan bangunan konstruksi yang digunakan sedaspat mungkin
dipilih yang paling kecil bahay dan resikonya, dan diberi penjelasan
cara penggunaan yang benar dan selamat;
c. Memberi penjelasan atas bahan bangunan yang berbahaya atau
beracun dan menjelaskan cara pengangkutan dan pembuangan
limbahnya sesuai dengan prosedur perundang-undangan yang berlaku;
d. Informasi tentang bahan bangunan dan beracun yang diterbitkan oleh
pabrik pembuatnya atau dari sumber-sumber yang berkompeten.
LINGKUP PEKERJAAN
A. PEKERJAAN PERSIAPAN
Sebelum memulai pelaksanaan pekerjaan lokasi harus dibersihkan dari
sisa-sisa bangunan, rumput, semak, akar, pohon, tanah humus dan segala
sesuatu yang tidak diperlukan
Mengadakan pengukuran kembali dengan teliti dengan disaksikan oleh
pengawas lapangan untyuk mengetahui batas-batas, ketinggian
bangunan dengan menggunakan alat ukur
Mengadakan sumber air bersih untuk keperluan pelaksanaan pekerjaan
Membuat Direksi Keet atau barak kerja yang dilengkapi dengan fasilitas
untuk direksi dan tamu-tamu antara lain :
- Meja / Kursi Kerja
- Lemari Arsip
- Meja Rapat
- Kursi Rapat
- Papan White Board
- Dispenser
- KM/WC sementara
- Komputer dan Printer
Memperhitungkan biaya dokumentasi berupa foto-foto yang diambil
secara berkala dari seluruh pelaksanaan pekerjaan
Menyediakan obat-obatan untuk pertolongan pertama pada kecelakaan.
Memperhitunkan biaya untuk keamanan.
B
PEKERJAAN KONSTRUKSI
Pekerjaan Galian Tanah
Mengupas seluruh daerah yang akan terletak di bawah lantai bangunan
dari lapisan humusnya. Hasil kupasan dibuang ketempat yang akan jauh
dari lokasi pekerjaan agar tidak mengganggu kelancaran pekerjaan.
Mengukur Elevasi permukaan tanah asli dibeberapa tempat sesuai
petunjuk direksi
Galian harus mencapai kedalaman dan lubang galian harus cukup lebar
sehingga waktu mengerjakan pasangan atau pengecoran tidak akan
terganggu dan dasar lubang pondasi rata.
Kubus beton yang dipakai selama pengecoran harus diuji kekuatan tekan
karakteristiknya dilaboratorium yang dapat disetujui Direksi dan hasilnya
dilaporkan secara tertulis kepada Direksi untuk dievaluasi. Apabila hasil
pemeriksaan menunjukkan bahwa mutu beton kurang dari nilai yang
disyaratkan, pemborong harus mengambil core sample dari bagian
bagian Konstruksi yang diragukan. Jumlah core sample untuk tiap
pemeriksaan adalah tiga buah, dan selanjutnya akan diperiksa di
laboratorium dengan persetujuan Direksi. Hasilnya akan dievaluasi Direksi
dan bila nilai yang diperoleh membahayakan konstruksi, harus dilakukan
perbaikan konstruksi tersebut atas biaya pemborong.
Semen yang digunakan adalah Portland Cemen (PC) produk dalam negeri
yang memnuhi persyaratn
Pasir Pasang untuk adukan harus terdiri dari butir-butir yang bersih dari
segala kotoran
Kerikil harus kuat, padat tahan lama dan bersih dari segala bentuk kotoran
yang dapat menurunkan mutu beton
Air harus bersih dan tidak boleh mengandung endapan lumpur, minyak
dan garam, asam,
Menggunakan alat pengaduk yang disetujui direksi
Menganyam besi beton sesuai dengan dimensi dan ukuran yang
ditentukan dalam gambar.
Semua
pembengkokan
tulangan
harus
dilakukan
sebelum
penyetelan/penempatan dan diperkenankan membengkokkan tulangan
bila sudah ditempatkan kecuali apabila hal itu terpaksa dan sudah
mendapat persetujuan direksi.
Tulangan harus ditempatkan secara teliti pada poisi sesuai rencan dan
harus dijaga jarak antara tulangan dengan bekisting untuk mendapatkan
tebal selimut beton minimal sesuai dengan gambar rencana. Sebelum
melakukan pengecoran, semua tulangan harus terlebih dahulu diperiksa
untuk memastikan ketelitian penempatannya, kebersihannya, dan untuk
mendapatkan perbaikan bila diperlukan. Tulangan yang berkarat harus
segera dibersihakan atau diganti bilamana dianggap dapat melemahkan
konstruksi. Pengecoran tidak dapat dilakukan apabila belum mendapatkan
persetujuan direksi.
Membuat cetakan (bekisting) dari bahan yang bagus yang mempunyai
permukaan yang rata dan kedap air.
Kemiringan atap dibuat sedemikian sehingga air hujan yang jatuh dapat
segera mengalir turun tanpa terjadi rembesan di sela-sela sambungan
atau susunan penutup atap.
Pekerjaan Plafond
Rangka plafond dengan dimensi dan ukuran sesuai dengan gambar
kerja/bestek dengan memperhatikan sambungan ataupun pertemuan
kayu yang lain dengan kayu lainnya.
Dipergunakan tripleks, ukuran sesuai gambar rencana untuk semua
ruangan dalam/luar gedung, bagian lain disesuaikan dan langit-langit dari
triplex dipasang tepat waterpass.
Pekerjaan Instalasi Listrik
Kabel, Stop Kontak, Saklar dan lampu harus disesuaikan dengan
persyaratan dan Setiap sambungan kabel harus dibungkus dengan isolatip
Kabel yang digunakan dalam kegiatan ini adalah kabel 2,5 mm digunakan
untuk semua pekerjaan jaringan instalasi listrik gedung, baik untuk
instalasi penerang maupun instalasi stop kontak / saklar.
Jenis lampu (baik lampu TL maupun lampu pijar) harus berspesifikasi
hemat energi.
Sesuai dengan persyaratan dalam gambar, untuk lampu pijar harus
memakai lampu holder, floursent harus dari jenis daylight dilengkapi
dengan kapasitas lampu SL 23 dan 36 watt dengan armateur. Semua
komponen didalam rumahan/housing (built in) lengkap.
Pekerjaan Akhir
Membersihkan seluruh lapangan pekerjaan dari bekas bongkaran
pekerjaan, bekas galian dan sisa-sisa matrial yang tidak digunakan lagi.
Dibuat Oleh,
xxxxxxxxxxxxx
xxxxxxxxxxxxxxx
Direktur
Pimpinan Teknik
:
:
:
:
:
pj2
Bahan + upah
- Kusen
- Bingkai
- Kaca
- Pintu
-
pj3
Bahan + upah
- Kusen
- Bingkai
- Kaca
- Pintu
-
p3
Bahan + upah
- Kusen
- Bingkai
- Kaca
-
VOLUME
SAT
18.7000
23.9000
3.8880
3.6800
m1
m1
M2
M2
20.1600
19.8200
2.4960
2.0700
m1
m1
M2
16.4200
6.7000
2.3540
2.0700
m1
m1
M2
HARGA SATUAN
(Rp)
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
m1
m1
M2
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
p1
Bahan + upah
- Kusen
- Bingkai
- Kaca
- Pintu
-
11.3000
m1
m1
M2
#REF!
#REF!
0.3900
#REF!
3.6800
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
p2
Bahan + upah
- Kusen
- Bingkai
- Kaca
- Pintu
-
j1
Bahan + upah
- Kusen
- Bingkai
- Kaca
j2
Bahan + upah
- Kusen
- Bingkai
- Kaca
j3
Bahan + upah
- Kusen
- Bingkai
- Kaca
v1
Bahan + upah
- Kusen
- Bingkai
- Kaca
-
8.7000
m1
m1
M2
#REF!
#REF!
0.1976
#REF!
2.0700
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
15.2800
16.9200
1.8492
m1
m1
M2
10.8600
11.2800
1.2328
m1
m1
M2
6.3400
5.6400
0.6164
m1
m1
M2
2.1200
m1
m1
M2
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
0.2500
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xxxxxxxxxxxxx
Pimpinan Teknik
JUMLAH
(Rp)
#REF!
#REF!
#REF!
5,520.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3,105.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3,105.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
5,520.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
3,105.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xxxxxxxxxxxxx
Pimpinan Teknik
:
:
:
:
:
pj2
Bahan + upah
- Kusen
- Bingkai
- Kaca
- Pintu
-
pj3
Bahan + upah
- Kusen
- Bingkai
- Kaca
- Pintu
-
p3
Bahan + upah
- Kusen
- Bingkai
- Kaca
-
VOLUME
SAT
18.7000
23.9000
3.8880
3.6800
m1
m1
M2
M2
11.3000
4.7000
0.3276
3.6800
m1
m1
M2
19.6600
11.9000
1.9220
4.6575
m1
m1
M2
HARGA SATUAN
(Rp)
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
m1
m1
M2
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
p1
Bahan + upah
- Kusen
- Bingkai
- Kaca
- Pintu
-
m1
m1
M2
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
p2
Bahan + upah
- Kusen
- Bingkai
- Kaca
- Pintu
-
j1
Bahan + upah
- Kusen
- Bingkai
- Kaca
j2
Bahan + upah
- Kusen
- Bingkai
- Kaca
j3
Bahan + upah
- Kusen
- Bingkai
- Kaca
v1
Bahan + upah
- Kusen
- Bingkai
- Kaca
-
v2
Bahan + upah
- Kusen
- Bingkai
- Kaca
-
m1
m1
M2
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
15.2800
16.9200
1.8492
m1
m1
M2
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
10.8600
11.2800
1.2328
m1
m1
M2
6.3400
5.6400
0.6164
m1
m1
M2
2.1200
m1
m1
M2
4.2000
4.0000
0.2392
m1
m1
M2
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
0.2500
#REF!
1,500.00
#REF!
#REF!
Jumlah harga sat. bahan + upah
=
#REF!
#REF!
#REF!
1,500.00
#REF!
#REF!
=
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
xxxxxxxxxxxxx
Pimpinan Teknik
JUMLAH
(Rp)
#REF!
#REF!
#REF!
5,520.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
5,520.00
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
6,986.25
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
-
#REF!
#REF!
#REF!
#REF!
#REF!
xxxxxxxxxxxxx
Pimpinan Teknik
SEKOLAH
TAHUN ANGGARAN
: 2011
LOKASI
NO
JENIS PEKERJAAN
PROSENTASE DARI
HARGA TOTAL MATA
PEMBAYARAN
PROSENTASE DARI
HARGA PENAWARAN
NAMA SUB
KONTRAKTOR
TOTAL
Dibuat Oleh,
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
PEKERJAAN
SEKOLAH
TAHUN ANGGARAN
: 2011
LOKASI
URAIAN PEKERJAAN
TKDN
Barang/Jasa
Barang
I. Material Langsung
II Peralatan (Barang Jadi)
A. Sub Total Barang
III. Manajemen Proyek dan
Perekayasaan
IV. Alat Kerja / Fasilitas Kerja
V. Konstruksi dan Fabrikasi
VI.Jasa Umum
B. Sub Total Jasa
C. TOTAL BIAYA (A + B)
Dibuat Oleh,
KONTRAKTOR PELAKSANA
xxxxxxxxxxxxxx
xxxxxxxxxxxxx
Direktur
xxxxxxxxxxxxxxx
Pimpinan Teknik
Gabungan