Tentukan penurunan tiang pancang berikut. Tiang beton dengan B = 0,5 m, D = 7,5 m dan Ep = 28 GPa Tanah sand Es = 100 MPa dan s = 0,3 Beban kerja = 500 kN Qt = 28 kN, Qs = 472 kN Distribusi Qs-ult = 600 kN dan friksi Qt-ult = 900 kN

Latihan (3)
METODE VESI Deformasi aksial tiang: spile = [(Qt + s Qs) D] / (Ap Ep)

Widjojo A. Prakoso

spile = [(28KN + 0,67472kN)(7,5 m)] / (0,196 m2 28106 kPa) spile = 4,710-4 m

Qt = 28 kN Qs = 472 kN s = 0,67 (karena bentuk distribusi friksi) D = 7,5 m Ap = 0,196 m2 Ep = 28 GPa

Latihan (4)
E = 100 MPa dense sand Penurunan tiang akibat tahanan ujung: stip = (Qt Cp) / (B qt-ult)

Latihan (5)
Penurunan tiang akibat tahanan friksi: sside = (Qs Cs) / (D qt-ult)
Qs = 472kN 0.16 Cs = [0.93 + 0. 6 (D/B)] Cp = [0.93 + 0.16 (15)] 0,02 = 0,031 D = 7,5 m

Latihan (6)
Penurunan tiang adalah: sbutt = spile + stip + sside spile = 4,710-4 m stip = 2 510-4 m 2,510 4 sside = 4,310-4 m sbutt = 11,510-4 m = 1,2mm

stip = (28kN 0,02) / (0,5m 4590 kPa) stip = 2,510-4 m

Qt = 28kN Cp = 0,02 B = 0,5 m qt-ult=Qt-ult/Apile=900kN/0,196m2= 4,59MPa

sside = (472kN0,031)/(7,5m4590kPa) sside = 4,310-4 m

Latihan (7)
Penurunan grup tiang pancang 4 4: Qc = 16 500 kN = 8000 kN Spacing antar tiang adalah s/B = 3

Latihan (8)
Evaluasi grup: konfigurasi: 4 4 spacing antar tiang = 1,5 m Jadi, dengan B = 0,5 m: Bgrup = (j l h ti (jumlah tiang per b i 1) baris spacing antar tiang + lebar tiang kiri + lebar tiang kanan Bgrup = (4 1) 1,5 m + 2 (0,5 m /2) Bgrup = 5,0 m

Latihan (9)
METODE VESI Penurunan tiang tunggal: stunggal = sbutt = 1,2 mm g gg Penurunan tiang tunggal: sgrup = stunggal (Bgrup / B) = 1,2 mm (5,0 m / 0,5 m) = 3,8 mm