Anda di halaman 1dari 16

URAIAN ANALISA ALAT

No.

A.
1.
2.
3.
4.

U RAIAN

KODE

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

Pw
Cp
A
W
B

KOEF.

SATUAN

ASPHALT FINISHER
72.4
HP
10.0
Ton
6.0
Tahun
1,400.0
Jam
402,600,000 Rupiah

5.

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

40,260,000

i x (1 + i)^A
(1 + i)^A - 1

0.24323

(B-C)xD
W

62,950.29

Rupiah

575.14

Rupiah

63,525.43

Rupiah

0.002 x B
W

Biaya Pasti per Jam


C.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

152,040.00

Rupiah

2.

Pelumas

95,568.00

Rupiah

17,973

50,325.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

346,156.21

Rupiah

409,681.65

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E02

URAIAN ANALISA ALAT


No.

U RAIAN

A.
1.
2.
3.
4.

5
B.
1.

KOEF.

SATUAN

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

Pw
Cp
A
W
B

Kapastas tangki aspal

Ca

850

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

13,200,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

16,478.14

Rupiah

132.00

Rupiah

16,610.14

Rupiah

H
H3

6,720.00
11,900.00

Rupiah
Rupiah

4,400.00

Rupiah

5,775

Rupiah

8,250.00

Rupiah

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

0.002 x B
W

Biaya Pasti per Jam


C.

KODE

(E+F)

ASPHALT SPRAYER
4.0
HP
850.0
Liter
5.0
Tahun
2,000.0
Jam
132,000,000 Rupiah

Liter

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms


Bahan Bakar Pemanas Aspal
= 1/1000 *Ca*Ms

2.

Pelumas

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

67,295.00

Rupiah

83,905.14

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E03

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

COMPRESSOR 4000-6500 L\M


60.0
HP
5,000.0 CPM/(L/m)
5.0
Tahun
2,000.0
Jam
85,800,000 Rupiah

8,580,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

10,710.79

Rupiah

85.80

Rupiah

10,796.59

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

100,800.00

Rupiah

2.

Pelumas

66,000.00

Rupiah

3,754

5,362.50

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

206,166.25

Rupiah

216,962.84

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E05

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

CONCRETE MIXER 0.3-0.6 M3


20.0
HP
500.0
Liter
2.0
Tahun
1,500.0
Jam
39,600,000 Rupiah

3,960,000

i x (1 + i)^A
(1 + i)^A - 1

0.59170

(B-C)xD
W

14,058.75

Rupiah

52.80

Rupiah

14,111.55

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

42,000.00

Rupiah

2.

Pelumas

26,400.00

Rupiah

2,310

Rupiah

4,620.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

105,580.00

Rupiah

119,691.55

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E06

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

Pw
Cp
A
W
B

DUMP TRUCK 3.5 TON


100.0
HP
3.5
Ton
5.0
Tahun
2,000.0
Jam
209,000,000 Rupiah

20,900,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

26,090.39

Rupiah

209.00

Rupiah

26,299.39

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

168,000.00

Rupiah

2.

Pelumas

110,000.00

Rupiah

9,144

13,062.50

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

330,456.25

Rupiah

356,755.64

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir / Mekanik
Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E08

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

DUMP TRUCK 10 TON


190.0
HP
10.0
Ton
5.0
Tahun
2,000.0
Jam
330,000,000 Rupiah

33,000,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

41,195.35

Rupiah

330.00

Rupiah

41,525.35

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

319,200.00

Rupiah

2.

Pelumas

209,000.00

Rupiah

14,438

Rupiah

20,625.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

593,512.50

Rupiah

635,037.85

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir / Mekanik
Upah Pembantu Operator / Pmb.Sopir / Pmb.Mekanik
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E09

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

Pw
Cp
A
W
B

EXCAVATOR 80-140 HP
133.0
HP
0.93
M3
5.0
Tahun
2,000.0
Jam
770,000,000 Rupiah

77,000,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

96,122.47

Rupiah

770.00

Rupiah

96,892.47

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

223,440.00

Rupiah

2.

Pelumas

146,300.00

Rupiah

33,688

Rupiah

48,125.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

481,802.50

Rupiah

578,694.97

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E10

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

GENERATOR SET
180.0
135.0
5.0
2,000.0
140,800,000

14,080,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

17,576.68

Rupiah

140.80

Rupiah

17,717.48

Rupiah

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

302,400.00

Rupiah

2.

Pelumas

198,000.00

Rupiah

6,160

Rupiah

8,800.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W
(12,5 % - 17,5 %) x B
W

3.

Perawatan dan
perbaikan =

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

545,610.00

Rupiah

563,327.48

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

KET.

E12
HP
KVA
Tahun
Jam
Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

Pw
Cp
A
W
B

MOTOR GRADER >100 HP


135.0
HP
10,800.0
5.0
Tahun
2,000.0
Jam
660,000,000 Rupiah

66,000,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

82,390.69

Rupiah

660.00

Rupiah

83,050.69

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

226,800.00

Rupiah

2.

Pelumas

148,500.00

Rupiah

28,875

Rupiah

41,250.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

475,675.00

Rupiah

558,725.69

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E13

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

Pw
Cp
A
W
B

TANDEM ROLLER 6-8 T.


82.0
HP
8.1
Ton
5.0
Tahun
2,000.0
Jam
366,300,000 Rupiah

36,630,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

45,726.83

Rupiah

366.30

Rupiah

46,093.13

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

137,760.00

Rupiah

2.

Pelumas

90,200.00

Rupiah

16,026

Rupiah

22,893.75

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

297,129.38

Rupiah

343,222.51

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E17

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

KOEF.

SATUAN

KET.

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

TIRE ROLLER 8-10 T.


100.5
HP
9.0
Ton
5.0
Tahun
2,000.0
Jam
386,100,000 Rupiah

38,610,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

48,198.55

Rupiah

386.10

Rupiah

48,584.65

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

168,840.00

Rupiah

2.

Pelumas

110,550.00

Rupiah

16,892

Rupiah

24,131.25

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

350,663.13

Rupiah

399,247.78

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

E18

URAIAN ANALISA ALAT

No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

Pw
Cp
A
W
B

VIBRATORY ROLLER 5-8 T.


82.0
HP
7.050
Ton
5.0
Tahun
2,000.0
Jam
431,200,000 Rupiah

BIAYA PASTI PER JAM KERJA


43,120,000 Rupiah

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

53,828.58

Rupiah

431.20

Rupiah

54,259.78

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

137,760.00

Rupiah

2.

Pelumas

90,200.00

Rupiah

18,865

Rupiah

26,950.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

304,025.00

Rupiah

358,284.78

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E19

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

Pw
Cp
A
W
B

CONCRETE VIBRATOR
5.5
HP
25.0
4.0
Tahun
1,000.0
Jam
21,120,000 Rupiah

2,112,000

i x (1 + i)^A
(1 + i)^A - 1

0.32923

(B-C)xD
W

6,258.09

Rupiah

42.24

Rupiah

6,300.33

Rupiah

0.002 x B
W

Biaya Pasti per Jam

KOEF.

(E+F)

Rupiah

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

11,550.00

Rupiah

2.

Pelumas

7,260.00

Rupiah

1,320

Rupiah

3,696.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

54,076.00

Rupiah

60,376.33

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E20

URAIAN ANALISA ALAT


No.

U RAIAN

KODE

A.
1.
2.
3.
4.

URAIAN PERALATAN
Jenis Peralatan
Tenaga
Kapasitas
Alat Baru
: a. Umur Ekonomis
b. Jam Kerja Dalam 1 Tahun
c. Harga Alat

B.
1.

BIAYA PASTI PER JAM KERJA


Nilai Sisa Alat
= 10 % x B

2.

Faktor Angsuran Modal

3.

Biaya Pasti per Jam :


a. Biaya Pengembalian Modal =

b. Asuransi, dll =

C.

SATUAN

WATER TANKER 3000-4500 L.


100.0
HP
4,000.0
Liter
5.0
Tahun
2,000.0
Jam
145,200,000 Rupiah

14,520,000

i x (1 + i)^A
(1 + i)^A - 1

0.27741

(B-C)xD
W

18,125.95

Rupiah

145.20

Rupiah

18,271.15

Rupiah

0.002 x B
W

Biaya Pasti per Jam

Pw
Cp
A
W
B

KOEF.

(E+F)

Rupiah
-

BIAYA OPERASI PER JAM KERJA

1.

Bahan Bakar = (12%-15%) x Pw x Ms

168,000.00

Rupiah

2.

Pelumas

110,000.00

Rupiah

6,353

Rupiah

9,075.00

Rupiah

= (2.5%-3%) x Pw x Mp

Biaya bengkel

(6.25% dan 8.75%) x B


W

3.

Perawatan dan
perbaikan =

(12,5 % - 17,5 %) x B
W

4.
5.

Operator
= ( 1 Orang / Jam ) x U1
Pembantu Operator = ( 1 Orang / Jam ) x U2

L
M

18,696.43
11,553.57

Rupiah
Rupiah

Biaya Operasi per Jam

323,677.50

Rupiah

341,948.65

Rupiah

(H+I+K+L+M)

D.

TOTAL BIAYA SEWA ALAT / JAM = ( G + P )

E.
1.
2.
3.
4.
5.
6.
7.

LAIN - LAIN
Tingkat Suku Bunga
Upah Operator / Sopir
Upah Pembantu Operator / Pmb.Sopir
Bahan Bakar Bensin
Bahan Bakar Solar
Minyak Pelumas
PPN diperhitungkan pada lembar Rekapitulasi
Biaya Pekerjaan

i
U1
U2
Mb
Ms
Mp

12.00 % / Tahun
18,696.43 Rp./Jam
11,553.57 Rp./Jam
14,000.00
Liter
14,000.00
Liter
44,000.00
Liter

KET.

E23