RENCANA ANGGRAN BIAYA

PENGADAAN JASA KONSULTASI


PEKERJAAN

: PENYUSUNAN MASTERPLAN AIR BERSIH KOTA LHOKSEUMAWE


BADAN PERENCANAAN PEMBANGUNAN DAERAH KOTA LHOKSEUMAWE
TAHUN ANGGARAN : 2013
No.
I
A

URAIAN

VOLUME

SATUAN

HARGA
SATUAN (Rp)

BIAYA LANGSUNG PERSONIL


TENAGA PROFESIONAL
1. Team Leader (Teknik Penyehatan Lingkungan)
2. Ahli Teknik Hidrolika/Hidrologi
3. Ahli Geologi
4. Ahli Sipil Struktur
5. Ahli Planologi
6. Asisten Ahli

1
1
1
1
1
4

Org
Org
Org
Org
Org
Org

x
x
x
x
x
x

4
3
3
3
3
4

Bln
Bln
Bln
Bln
Bln
Bln

4
3
3
3
3
16

OB
OB
OB
OB
OB
OB

5,000,000.00
4,000,000.00
4,000,000.00
4,000,000.00
4,000,000.00
3,500,000.00

20,000,000.00
12,000,000.00
12,000,000.00
12,000,000.00
12,000,000.00
56,000,000.00
124,000,000.00

TENAGA PENDUKUNG SURVEYOR


1. Chief Surveyor
2. Surveyor

1 Org
4 Org

x
x

2 Bln
2 Bln

2
8

OB
OB

2,800,000.00
1,800,000.00

5,600,000.00
14,400,000.00
20,000,000.00

TENAGA PENDUKUNG
1. Operator Komputer
2. Drafman (CAD Operator)
3. Sekretaris
4. Office Boy

2
1
1
1

x
x
x
x

4
4
4
4

8
4
4
4

OB
OB
OB
OB

1,200,000.00
2,000,000.00
1,500,000.00
950,000.00

9,600,000.00
8,000,000.00
6,000,000.00
3,800,000.00
27,400,000.00
171,400,000.00

Org
Org
Org
Org

Bln
Bln
Bln
Bln

Sub Total I
II
A

JUMLAH HARGA
(Rp)

BIAYA LANGSUNG NON PERSONIL


PERLENGKAPAN PENGUKURAN
1. Sewa Water Pass
2. Sewa Theodolite

40
40

Set/Bln
Set/Bln

200,000.00
150,000.00

8,000,000.00
6,000,000.00
14,000,000.00

16
1
4
4
1

Unit/Bln
Ls
Bln
Bln
Ls

300,000.00
3,000,000.00

4,800,000.00
3,000,000.00

1,900,000.00
5,000,000.00

7,600,000.00
5,000,000.00
20,400,000.00

50
190

Hari
Hari

400,000.00
100,000.00

20,000,000.00
19,000,000.00
39,000,000.00

BIAYA LABORATORIUM
1. Biaya Pemeriksaan Laboratorium

Ls

2,750,000.00

2,750,000.00
2,750,000.00

BIAYA LAPORAN
1. Seminar dan Laporan Pendahuluan
2. Seminar dan Laporan Draf Akhir
3. Seminar dan Laporan Akhir
4. Album Peta A3 dan Hasil Survei

1
1
1
1

Ls
Ls
Ls
Ls

400,000.00
500,000.00
770,000.00
8,000,000.00

400,000.00
500,000.00
770,000.00
8,000,000.00
9,670,000.00
85,820,000.00

PERALATAN KANTOR
1. Sewa Komputer & Printer
2. ATK/Fhotocopy
3. Sewa Kantor
4. Komunikasi/Telepon
5. Perlengkapan Kantor

OPERASIONAL LAPANGAN
1. Sewa Kendaraan Roda 4
2. Sewa Kendaraan Roda 2

1 Set
1 Set

x
x

4 Unit

1 Unit
2 Unit

x
x

40 Hr
40 Hr

4 Bln

50 Hr
95 Hr

Sub Total II
TOTAL (Sub Tola I + II)
PPn 10%
TOTAL
Dibulatkan

257,220,000.00
25,722,000.00
282,942,000.00
282,942,000.00

Terbilang : Dua Ratus Delapan Puluh Dua Juta Sembilan Ratus Empat Puluh Dua Ribu Rupiah,Lhokseumawe, 14 Agustus 2013
Penawar
CV. HEXAGON RAYA CONSULTANT

Ir. Cut Yusnizar


Direktris