NO

TENAGA
KERJA

HARI
KERJA

1
2
3
4
5
6
7

TUKANG
TUKANG
TUKANG
TUKANG
LADEN
LADEN
LADEN

6
6
6
6
6
6
6

UPAH PER
HARI
125,000
100,000
100,000
100,000
75,000
75,000
75,000

JUMLAH UPAH
PER HARI
750,000
600,000
600,000
600,000
450,000
450,000
450,000

JAM
LEMBUR

UPAH LEMBUR
PER JAM

18
18
18
18
18
18
18

15,000
12,500
12,500
12,500
10,000
10,000
10,000

3,900,000
8
9
10
11
12

JUMLAH UPAH
LEMBUR
270,000
225,000
225,000
225,000
180,000
180,000
180,000

1,485,000

MCC
MATRIAL
MAMIN
LAIN2
LISTRIK
LAPORAN MINGGU KEMARIN

TERIMA UANG DARI BU SUSAN


SISA UANG

JUMLAH
TOTAL
1,020,000
825,000
825,000
825,000
630,000
630,000
630,000

5,385,000
300,000
1,979,500
200,000
150,000
1,550,000
200,000

9,764,500
16,500,000

6,735,500