Compres 95 %.
Ke
lom NO.
pok
1
SATUAN
A.
1
2
3
4
5
6
7
B.
1
2
3
4
5
6
7
8
9
10
11
12
13
15
16
17
18
19
20
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
BAHAN PASIR
Pasir Urug / Tanah katel.
Pasir Pasang
Pasir Cor
Sirtu urug
Tanah Urug
Tanah grosok
Tanah taman
BAHAN BATU
Batu Kali Pecah 15/20 ( tangan )
Batu Kali/ batu Quary
Batu Kali Pecah 7/10 ( tangan )
Batu Kali Pecah 5/7 ( tangan )
Batu Kali Pecah 3/5 ( mesin )
Batu Kali Pecah 2/3 ( mesin )
Batu Kali Pecah 0.5 - 1 ( mesin )
Batu Kali Pecah 1/2 ( mesin )
Batu pecah tersaring untuk laston
Batu pecah tersaring untuk LPA
Batu pecah tersaring untuk LPB
Koral Beton 1/2
Koral Beton 2/3
Batu kerikil Granito.
Batu kerikil Traso.
Batu tempel.
Batu bata tebal 5,5 cm. Bakaran kayu
Batu bata tebal 5,5 cm. Bakaran sekem.
Batako.
BAHAN PAVING STONE.
Paving stone abu-2 tb. 6 cm (3 berlian-DT
Paving stone abu-2 tb. 6 cm (4 persegi pjn
Paving stone abu-2 tb. 6 cm (type-DT1 / S
Paving stone abu-2 tb. 6 cm (type-DT2)
Paving stone abu-2 tb. 6 cm (type-DT7)
Paving stone abu-2 tb. 8 cm (3 berlian-DT
Paving stone abu-2 tb. 8 cm (4 persegi pjn
Paving stone abu-2 tb. 8 cm (type-DT1 / S
Paving stone abu-2 tb. 8 cm (type-DT2)
Paving stone abu-2 tb. 8 cm (type-DT7)
Paving stone merah tb. 6 cm (3 berlian-D
Paving stone merah tb. 6 cm (type-DT1 /
Paving stone merah tb. 6 cm (type-segi e
Paving stone merah tb. 8 cm (3 berlian-D
Paving stone mrh tb. 8 cm (4 persegi pjng
Paving stone merah tb. 8 cm (type-DT1)
Paving stone merah tb. 8 cm (type-segi e
HARGA
SATUAN BAHAN
5
M3
M3
M3
M3
M3
M3
M3
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
74,520.00
90,684.40
93,610.00
39,100.00
39,100.00
68,310.00
59,800.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
Bh
Bh
Bh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
92,000.00
85,330.00
87,942.80
108,713.64
116,380.00
151,294.00
146,740.00
157,117.60
212,520.00
195,500.00
149,776.00
174,570.00
137,126.00
380,696.00
346,104.00
38,962.00
300.00
270.00
2,226.40
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Bj
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4
M2
M2
bh
bh
bh
bh
bh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
900.00
765.00
800.00
1,012.00
1,104.00
1,242.00
1,210.00
1,550.00
800.00
1,518.00
1,242.00
1,242.00
1,242.00
1,550.00
1,550.00
1,104.00
1,407.60
Halaman : 122
5
0.00
0.00
4,480.40
2,226.40
0.00
0.00
0.00
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
2
18
19
20
21
22
23
24
3
Paving stone / beton blok kelas I
Paving stone / beton blok kelas II
Rooster beton
Bata berongga
Hollow block 10
Hollow block 15
Hollow block 20
25
26
27
D
1
2
3
4
5
6
E
1
2
3
4
F
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
G
1
2
3
4
5
6
7
8
9
10
Conblock 10
Conblock 15
Conblock 20
BAHAN SEMEN / P.C.
Semen Gresik 50 kg
Semen Gresik 1kg
Semen warna
Semen Tiga Roda 50 kg
Semen putih ( Azano / Tiga Roda )
Semen merah
BAHAN KAPUR.
Kapur bubuk
Kapur bubuk
Kapur bubuk 1 sak.
Kapur gamping
BAHAN LANTAI.
Tegel ubin Warna 30 x 30 cm
Porselin putih 11 x 11
Porselin warna 11 x 11
Tegel Ubin Warna 40 x 40 cm
Tegel teraso 30 x 30 cm
Tegel teraso 40 x 40 cm
Tegel wafel / Badag 30 x 30 cm
Tegel keramik Granito 40 x 40 cm ( KW I
Keramic Esensa 40 x 40 cm .
Tegel keramik lis 7,5 x 25 cm ( KW I )
Tegel keramik lis 5 x20 cm ( KW I )
Tegel keramik 20x20 cm ( KW I )
Tegel keramik 25x35 cm ( KW I )
Tegel keramik 30x30 cm ( KW I )
Tegel keramik rock tile 30x30 cm ( KW I )
Tegel keramik 40x40 cm ( KW I )
Tegel keramik motif 30x30 cm
Keramik dinding 20x25 cm ( KW I )
Keramik dinding 25x35 cm ( KW I )
Vinil Oscar / sintetis Kw1
Vinil karet
Vinil oscar / sintetis motif kembang.
Marmer
Mosaik
Tera kota
BAHAN KAYU.
Kayu jati balok 6,15, 8/12. panjang 3mtr.
Kayu reng jati 2/3, 3/5 panjang 2 mtr.
Kayu jat usuk 4/6 ; 5/7 panjang 2 mtr.
Papan jati papan 2/20 ; 3/20 ; 3/30 panj.3m
Kayu Kamfer balok 8/12, 6/15
Kayu kamfer usuk 5/7
Kayu kamfer papan 2.5/20
Kayu Kamfer reng 2/3
Kayu kruing / bengkirai / kempas papan 2
Kayu kruing /bengkirai/kempas blk 8/12,6
bh
bh
bh
Rp.
Rp.
Rp.
Zak
1Kg
1Kg
Zak
Zak
M3
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M3
1Kg
1 Sak
1Kg
Rp.
Rp.
Rp.
Rp.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M2
M2
Bh
Bh
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4
M3
M3
M3
M3
M3
M3
1 Btg
M3
M3
M3
M3
Btg
M2
Lbr/ 1m'
M3
KG
M2
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
2
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
26
3
Kayu kruing / bengkirai/kempas usuk 5/7
Kayu kruing / bengkirai/kempas usuk 4/6
Kayu kruing reng 2/3
Kayu meranti balok 8/12, 6/15
Keyu meranti usuk 5/7
Kayu meranti papan 3/25/400
Kayu glugu usuk 5/7 4meter
Papan begesting (MC)
Rangka plavon kamper potongan
Rangka plavon meranti potongan
Kayu gelagar jembatan meranti.8/15 pj.4
Kayu dolken.
Kayu Sirap
Kayu Sirap
Kayu bakar.
I j u k
Gedek
BAHAN TRIPLEKS / KAYU LAPIS.
0.00
0.00
4,968.00
0.00
41,492.00
829.84
6,900.00
0.00
67,675.20
138,000.00
0.00
450,174.40
552.00
4,553.08
2,336.80
0.00
2,350.00
460.00
5,290.00
4,800.00
5,888.00
6,210.00
0.00
140,000.00
130,000.00
11,500.00
9,062.00
33,764.00
33,994.00
36,938.00
38,713.60
38,410.00
35,677.60
37,195.60
41,998.00
49,496.00
43,240.00
60,030.00
65,000.00
42,000.00
59,156.00
0.00
15,939,000.00
8,602,000.00
10,810,000.00
17,940,000.00
5,750,000.00
4,100,000.00
6,520,500.00
3,499,526.36
3,946,800.00
3,864,000.00
Halaman : 123
5
3,818,000.00
3,818,000.00
2,530,000.00
3,542,000.00
3,404,000.00
3,818,000.00
46,211.60
2,622,000.00
2,248,480.00
1,978,000.00
2,609,120.00
3,680.00
1,886.00
0.00
2,208,920.00
5,372.80
10,672.00
0.00
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Teakwood 90.210. x 4 mm
Teakwood 110.210. x 4 mm
Teakwood 122.244. x 4 mm
Triplek lapis aluminium
Triplek lapis formika
Triplek 90.210. x 3 mm
Triplek 90.210. x 4 mm
Triplek 120.240. x 2 mm
Triplek 120.240. x 3 mm
Triplek 120.240. x 5 mm
Triplek 120.240. x 6 mm
Triplek 120.240. x 9 mm
Triplek 120.240. x 12 mm
List plafond 1,5/4 profil kayu kamper
List plafond 1/5
BAHAN BESI..
Aluminium putih / silver 3"
Aluminium putih / silver 4"
Aluminium coklat / brown 3"
Aluminium coklat / brown. 4"
Aluminium slimar putih / silver 3"
Aluminium slimar coklat / brown 3"
Karet penjepit kaca / multipleks.
Hak window
Besi beton Polos diameter 5 mm
Besi beton Polos diameter 6 mm
Besi beton Polos diameter 8 mm
Besi beton Polos diameter 10 mm
Besi beton Polos diameter 12 mm
Besi beton Polos diameter 16 mm
Besi beton polos.
Besi beton Ulir.
Besi konstruksi ( WF ; H ; INP ; SIKU )
Besi lempeng / bulat / strip (Beugel)
Kawat bendrat
Kawat duri
Kawat bronjong
Kawat ikat
Kawat harmonika.
Kawat nyamuk. besi
Kawat KASA. / kawat burung.
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m'
m'
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
M1
M1
M1
M1
M1
M1
M1
Bh
Lonjor
Lonjor
Lonjor
Lonjor
Lonjor
Lonjor
Kg
Kg
Kg
Kg
Kg
M1
Kg
Kg
M1
M1
M1
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4
KG
KG
KG
KG
KG
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Ljr
Ljr
Ljr
Rol
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Ljr
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ljr
Ljr
Ljr
Ljr
Rp.
Rp.
Rp.
Rp.
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
2
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
J
1
2
3
4
5
6
7
K
1
2
3
4
3
Paku reng
Paku usuk
Paku eternit
Paku sekrup
Mur baut kuda-kuda
Mur baut kuda-kuda
Plat kuda-kuda
Mur baut gording
Paku payung
Ankur kusen
Pagar BRC 90.240 cm
Pagar BRC 120.240 cm
Besi siku 30x30x3 panjang 6 m
Besi siku 40x40x3 panjang 6 m
Besi siku 40x40x4 panjang 6 m
Kawat berduri 50 m
BAHAN PIPA BESI..
Pipa air galvanis medium 1/2"
Pipa air galvanis medium 3/4"
Pipa air galvanis medium 1"
Pipa air galvanis medium 1,25"
Pipa air galvanis medium 2"
Pipa air galvanis medium 3"
Pipa air galvanis medium 4"
BAHAN PIPA P.V.C..
Pipa PVC AW dia 1/2" 4 m
Pipa PVC AW dia 3/4" 4m
Pipa PVC AW dia 1".4m
Pipa PVC D dia 2" 4 m
65,780.00
85,468.00
81,512.00
59,800.00
62,330.00
26,910.00
41,998.00
52,992.00
54,142.00
91,908.00
89,700.00
119,600.00
126,500.00
10,350.00
3,312.00
0.00
44,640.00
55,680.00
47,040.00
59,040.00
44,640.00
47,040.00
2,400.00
11,500.00
14,926.08
29,083.04
41,084.44
62,538.84
76,566.08
124,200.00
8,740.00
11,638.00
10,530.00
10,166.00
10,764.00
6,808.00
11,220.32
13,965.60
19,044.00
17,181.00
15,675.00
Halaman : 124
5
9,779.60
10,478.80
10,478.80
15,985.00
11,891.00
29,900.00
9,384.00
2,990.00
216.20
1,679.00
240,488.00
274,712.00
82,873.60
94,116.00
102,580.00
248,630.00
0.00
64,000.00
80,270.00
105,800.00
200,422.00
269,100.00
365,332.00
608,580.00
0.00
42,166.36
27,351.60
36,340.00
52,900.00
5
6
7
8
L
1
2
3
4
5
6
7
8
9
10
M
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Ljr
Ljr
Ljr
Bh
Rp.
Rp.
Rp.
Rp.
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Mtr
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4
Bh
Bh
Bh
Bh
Lbr
M2
Lbr
M2
Bh
Bh
Lbr
Lbr
Lbr
Lbr
Lbr
M1
M1
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Ltr
Ltr
Ltr
Ltr
Ltr
Kg
Kg
Kg
Kg
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
m2
Rp.
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
2
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
O
1
3
Acustik ukuran 60 x 120 Cm.
Calsiboardt 1x1m Calsibort 5 mm
Asbes datar tebal 4 mm
Asbes datar tebal 3,5 mm
Asbes gelombang besar 225 x 110
Asbes gelombang besar Per M2
Asbes gelombang kecil 225 x 105
Asbes gelombang kecil Per M2.
Bubungan Asbes Gelombang besar
Bubungan Asbes Gelombang kecil
Seng plat BJLS 30.80.300 cm
Seng gelombang BJLS 28
Seng gelombang BJLS 30
Seng plat BJLS 28
Seng plat BJLS 30
Seng Galvalum DJLS 45 warna lebar efek
Seng Galvalum DJLS 45 polos lbr efektif
BAHAN PENGECATAN + POLITUR..
Kertas gosok
Plamur tembok
Plamur kayu " PEDANG "
Cat kayu / besi EMCO/setara
Cat tembok "wathershilt" merk Duluk ; Jot
Cat tembok "DECOLITH"
Cat tembok "PARAGON"
Cat kayu dasar
Cat tembok "ICI Catilac"
Cat meni "PEDANG"
Dempul kayu
Minyak cat / thiner B
Tinner A
Spiritus
Plitur jadi
Vernis
Lem putih " RAJAWALI "
Lem kayu aica aibon
Teer
Cherlag
BAHAN KACA.
Kaca bening 3 mm
77,740.00
336,720.00
78,200.00
6,900.00
0.00
21,620.00
24,288.00
29,578.00
34,040.00
62,100.00
71,300.00
96,600.00
110,400.00
16,100.00
20,700.00
0.00
984.40
1,058.00
2,732.40
5,032.40
1,094.80
11,996.80
7,866.00
1,812.40
3,063.60
4,370.00
8,740.00
13,570.00
11,270.00
36,018.00
Halaman : 125
5
54,970.00
15,088.00
10,782.40
9,200.00
80,012.40
29,090.40
56,810.00
19,991.60
63,093.60
48,438.00
32,200.00
78,660.00
64,400.00
62,560.00
78,660.00
103,224.00
59,800.00
0.00
4,000.00
9,196.00
10,351.84
46,432.40
54,648.00
21,620.00
20,447.00
32,117.20
31,924.00
12,420.00
19,200.40
5,888.00
14,664.80
13,340.00
35,420.00
41,593.20
8,625.00
19,320.00
7,636.00
39,100.00
0.00
37,306.00
2
3
4
5
6
7
8
9
P
1
2
3
4
5
6
7
8
9
10
Kaca bening 5 mm
Kaca raybend 5 mm
Kaca buram 5 mm
Kaca cermin 5 mm
Kaca cermin 6 mm
Kaca patri warna 5 mm
Kaca painting 5 mm
Kaca nako + rangka "NIKY"
BAHAN PENGANTUNG + KUNCI.
Kunci "ALPHA Bulat" 1 x putar
Kunci "SILINDER" 1 x putar
Kunci "ANCHOR" / UNION / Yale 2 x tan
Kunci "KUDA TERBANG" 2 x putar
Kunci tanam "ANTIK" 2 x putar
Kunci selot kuningngan panjang 25 Cm
Kunci selot kuningngan panjang 15 Cm
Kunci selot hitam panjang 25 Cm
Kunci selot hitam panjang 15 Cm
Kunci lemari 808.
m2
m2
m2
m2
m2
m2
m2
Dn
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
11
12
13
14
15
16
17
18
19
20
21
Unit
Unit
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Psg
Psg
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Unit
Unit
Unit
Unit
Unit
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Ttk
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
M1
M1
M1
Bh
Bh
Unit
Unit
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Q
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
R
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
56,396.00
65,090.00
91,080.00
126,500.00
328,900.00
325,000.00
192,280.00
16,100.00
0.00
58,420.00
47,610.00
82,800.00
121,440.00
110,400.00
100,510.00
53,820.00
14,674.00
16,872.80
6,440.00
Halaman : 126
5
100,740.00
115,000.00
15,410.00
7,562.40
12,788.00
61,097.20
8,602.00
187,000.00
25,300.00
16,399.00
6,976.36
0.00
39,790.00
27,830.00
32,752.00
331,200.00
322,000.00
13,800.00
82,800.00
111,320.00
814,660.00
11,500.00
5,750.00
365,000.00
203,669.60
989,230.00
1,766,400.00
5,899,960.00
6,489,680.00
7,138,280.00
0.00
73,600.00
11,500.00
20,240.00
27,600.00
8,740.00
10,626.00
2,300.00
2,999.20
2,336.80
17,305.20
11,040.00
15,640.00
3,261.40
3,400.32
4,979.04
18,400.00
27,600.00
73,416.00
104,880.00
20
Unit
Rp.
149,040.00
Halaman : 127
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
URAIAN TENAGA
SATUAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
MANDOR
KEPALA TUKANG GALI TANAH
KEPALA TUKANG BATU
KEPALA TUKANG KAYU
KEPALA TUKANG BESI
KEPALA TUKANG CAT
KEPALA TUKANG LISTRIK
TUKANG GALI TANAH
TUKANG BATU
TUKANG KAYU
TUKANG BESI
TUKANG CAT
TUKANG ASPAL
TUKANG PLITUR
TUKANG LISTRIK
PEKERJA TUKANG GALI TANAH.
PEMBANTU TUKANG BATU
PEMBANTU TUKANG KAYU
PEMBANTU TUKANG CAT
PEMBANTU TUKANG BESI
PEMBANTU TUKANG LISTRIK
SOPIR TRUK.
PEJAGA API
PEJAGA MALAM
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
Org / hr
UPAH PERHARI
4
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
55,000.000
44,000.000
44,000.000
44,000.000
44,000.000
44,000.000
44,000.000
44,000.000
42,000.000
42,000.000
42,000.000
42,000.000
42,000.000
42,000.000
42,000.000
31,300.000
32,750.000
32,750.000
32,750.000
32,750.000
32,750.000
32,750.000
32,750.000
40,000.000
HARGA 2008-I
81,000.00
98,570.00
101,750.00
42,500.00
42,500.00
74,250.00
65,000.00
100,000.00
92,750.00
95,590.00
118,167.00
126,500.00
164,450.00
159,500.00
170,780.00
231,000.00
212,500.00
162,800.00
189,750.00
149,050.00
413,800.00
376,200.00
42,350.00
300.00
270.00
2,420.00
900.00
1,500.00
800.00
1,100.00
1,200.00
1,350.00
1,350.00
1,700.00
800.00
1,650.00
1,350.00
1,350.00
1,350.00
1,700.00
1,750.00
1,200.00
1,530.00
4,870.00
2,420.00
5,400.00
45,100.00
902.00
7,500.00
73,560.00
150,000.00
489,320.00
600.00
4,949.00
2,540.00
700.00
500.00
5,750.00
14,200.00
6,400.00
6,750.00
148,500.00
90,000.00
12,500.00
9,850.00
36,700.00
36,950.00
40,150.00
42,080.00
41,750.00
38,780.00
40,430.00
45,650.00
53,800.00
47,000.00
65,250.00
65,000.00
64,300.00
17,325,000.00
9,350,000.00
11,750,000.00
19,500,000.00
5,887,833.00
4,168,333.00
7,087,500.00
3,803,833.00
4,290,000.00
4,200,000.00
4,150,000.00
4,150,000.00
2,750,000.00
3,850,000.00
3,700,000.00
4,150,000.00
50,230.00
2,850,000.00
2,444,000.00
2,150,000.00
2,836,000.00
4,000.00
2,050.00
2,401,000.00
5,840.00
11,600.00
71,500.00
92,900.00
88,600.00
65,000.00
67,750.00
29,250.00
45,650.00
57,600.00
58,850.00
99,900.00
97,500.00
130,000.00
137,500.00
11,250.00
3,600.00
46,500.00
58,000.00
49,000.00
61,500.00
46,500.00
49,000.00
2,500.00
12,500.00
16,224.00
31,612.00
44,657.00
67,977.00
83,224.00
135,000.00
9,500.00
12,650.00
11,700.00
11,050.00
11,700.00
7,400.00
12,196.00
15,180.00
20,700.00
18,675.00
16,500.00
10,630.00
11,390.00
11,390.00
17,375.00
12,925.00
32,500.00
10,200.00
3,250.00
235.00
1,825.00
261,400.00
298,600.00
90,080.00
102,300.00
111,500.00
270,250.00
69,800.00
87,250.00
115,000.00
217,850.00
292,500.00
397,100.00
661,500.00
45,833.00
29,730.00
39,500.00
57,500.00
84,500.00
366,000.00
85,000.00
7,500.00
23,500.00
26,400.00
32,150.00
37,000.00
67,500.00
77,500.00
105,000.00
120,000.00
17,500.00
22,500.00
1,070.00
1,150.00
2,970.00
5,470.00
1,190.00
13,040.00
8,550.00
1,970.00
3,330.00
4,750.00
9,500.00
14,750.00
12,250.00
39,150.00
59,750.00
16,400.00
11,720.00
10,000.00
86,970.00
31,620.00
61,750.00
21,730.00
68,580.00
52,650.00
35,000.00
85,500.00
70,000.00
68,000.00
85,500.00
112,200.00
65,000.00
4,150.00
9,680.00
11,252.00
50,470.00
59,400.00
23,500.00
22,225.00
34,910.00
34,700.00
13,500.00
20,870.00
6,400.00
15,940.00
14,500.00
38,500.00
45,210.00
9,375.00
21,000.00
8,300.00
42,500.00
40,550.00
61,300.00
70,750.00
99,000.00
137,500.00
357,500.00
378,500.00
209,000.00
17,500.00
63,500.00
51,750.00
90,000.00
132,000.00
120,000.00
109,250.00
58,500.00
15,950.00
18,340.00
7,000.00
109,500.00
125,000.00
16,750.00
8,220.00
13,900.00
66,410.00
9,350.00
187,000.00
27,500.00
17,825.00
7,583.00
43,250.00
30,250.00
35,600.00
360,000.00
350,000.00
15,000.00
90,000.00
121,000.00
885,500.00
12,500.00
6,250.00
375,000.00
221,380.00
1,075,250.00
1,920,000.00
6,413,000.00
7,054,000.00
7,759,000.00
80,000.00
12,500.00
22,000.00
30,000.00
9,500.00
11,550.00
2,500.00
3,260.00
2,540.00
18,810.00
12,000.00
17,000.00
3,545.00
3,696.00
5,412.00
20,000.00
30,000.00
79,800.00
114,000.00
162,000.00
61,750.00
46,310.00
46,310.00
46,000.00
46,310.00
46,310.00
46,000.00
43,130.00
43,130.00
43,130.00
43,130.00
43,130.00
43,130.00
43,130.00
43,130.00
34,500.00
34,500.00
34,500.00
34,500.00
34,500.00
34,500.00
40,250.00
34,500.00
40,250.00
19
10###
12
32,750.00 = Rp
55,000.00 = Rp
= Rp
= Rp
3,404,000.00
10,478.80
3,818,000.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
40,848.00
209.58
26,726.00
67,783.58
42,000.00
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,200.00
3,275.00
440.00
275.00
8,190.00
75,973.58
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
3,680.00
829.84
93,610.00
137,126.00
3,404,000.00
10,478.80
7,636.00
Sub total :
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,600.00
4,564.12
468.05
1,234.13
245,088.00
628.73
3,054.40
259,637.43
44,000.00
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,800.00
13,100.00
880.00
1,100.00
23,880.00
283,517.43
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Halaman : 1
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
3,275.00
2,750.00
6,025.00
6,025.00
3,680.00
829.84
6,808.00
93,610.00
137,126.00
10,478.80
Sub total :
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,600.00
1,659.68
170,200.00
468.05
1,234.13
628.73
178,790.59
44,000.00
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,800.00
9,825.00
880.00
1,100.00
20,605.00
199,395.59
@ Rp.
@ Rp.
@ Rp.
@ Rp.
1.250
0.180
0.850
1.100
35.000
0.150
0.100
0.150
30.000
0.250
2.000
0.080
0.150
0.060
Btg
m3
kg
kg
kg
m3
m3
m3
Bh
Lbr
m2
m2
Bh
Lbr
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
3,680.00
3,404,000.00
10,478.80
10,166.00
829.84
90,684.40
93,610.00
137,126.00
270.00
62,560.00
16,100.00
56,396.00
82,800.00
54,142.00
Sub total :
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,600.00
612,720.00
8,906.98
11,182.60
29,044.40
13,602.66
9,361.00
20,568.90
8,100.00
15,640.00
32,200.00
4,511.68
12,420.00
3,248.52
786,106.74
44,000.00
42,000.00
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
88,000.00
42,000.00
32,750.00
13,200.00
2,750.00
178,700.00
964,806.74
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
6,256.00
714,840.00
3,143.64
435,666.00
2,808.30
6,856.30
48,300.00
1,217,870.24
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
3,680.00
3,404,000.00
10,478.80
41,492.00
93,610.00
137,126.00
32,200.00
Sub total :
Halaman : 2
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
44,000.00
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
88,000.00
32,750.00
8,800.00
2,750.00
132,300.00
1,350,170.24
3,680.00
3,404,000.00
10,478.80
32,200.00
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
11,040.00
939,504.00
7,335.16
48,300.00
1,006,179.16
@ Rp.
@ Rp.
@ Rp.
@ Rp.
44,000.00
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
66,000.00
32,750.00
6,600.00
2,750.00
108,100.00
1,114,279.16
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
4,600.00
633,144.00
3,143.64
746,856.00
2,808.30
3,680.00
3,404,000.00
10,478.80
41,492.00
93,610.00
137,126.00
32,200.00
54,142.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
6,856.30
48,300.00
73,091.70
1,518,799.94
44,000.00
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
88,000.00
32,750.00
8,800.00
2,750.00
132,300.00
1,651,099.94
=
=
=
=
Rp
Rp
Rp
Rp
137,448.00
838.30
54,000.00
192,286.30
= Rp
= Rp
= Rp
13,200.00
82.50
13,200.00
= Rp
205,486.30
Halaman : 3
20,000.00 = Rp
5,372.80 = Rp
Sub total :
= Rp
20,000.00
1,343.20
21,343.20
@ Rp.
@ Rp.
@ Rp.
@ Rp.
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
44,000.00
44,000.00
32,750.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
11,000.00
88.00
556.75
715.00
12,359.75
33,702.95
@ Rp.
@ Rp.
@ Rp.
92,000.00
108,713.64
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
13,800.00
9,784.23
906.84
24,491.07
@ Rp.
@ Rp.
32,750.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
Rp
Rp
Rp
Rp
32,750.00
2,750.00
35,500.00
59,991.07
@ Rp.
@ Rp.
32,750.00
55,000.00
Sub total :
Total Upah
=
=
=
=
Rp
Rp
Rp
Rp
218,344.25
18,315.00
236,659.25
236,659.25
@ Rp.
@ Rp.
=
=
=
=
Rp
Rp
Rp
Rp
218,344.25
1,815.00
220,159.25
220,159.25
32,750.00
55,000.00
Sub total :
Total Upah
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
3,680.00
829.84
32,200.00
93,610.00
137,126.00
3,404,000.00
10,478.80
12,420.00
Sub total :
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,600.00
2,074.60
38,640.00
468.05
1,234.13
245,088.00
628.73
5,589.00
298,322.51
44,000.00 = Rp
8,800.00
Rp
Rp
Rp
Rp
Rp
Halaman : 4
13,100.00
880.00
1,100.00
23,880.00
322,202.51
= Rp
= Rp
8,265.10
8,265.10
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
0.400 Oh Pekerja
0.020 Oh Kepala Tukang
0.020 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
32,750.00
44,000.00
55,000.00
Sub total :
Total Upah dan Bahan
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,375.50
176.00
1,848.00
110.00
3,509.50
11,774.60
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
194,266.65
67,016.25
6,927.14
20,020.40
37,342.80
325,573.24
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
5,250.00
12,281.25
528.00
1,045.00
19,104.25
344,677.49
197,025.00
63,825.00
19
10
12
PEKERJAAN TANAH
1. 1 m3 Galian Untuk Tanah Biasa sedalam 1 m
Upah An. SNI ( Revisi ) 6.1.1
0.400 Oh Pekerja
@ Rp.
0.040 Oh Mandor
@ Rp.
Total Upah
2. 1 m3 Galian Untuk Tanah Biasa sedalam 2 m
Upah An. SNI ( Revisi ) 6.2.1
0.526 Oh Pekerja
@ Rp.
0.052 Oh Mandor
@ Rp.
Total Upah
3. 1 m3 Galian Untuk Tanah Biasa sedalam 3 m
Upah An. SNI ( Revisi ) 6.3.1
0.735 Oh Pekerja
@ Rp.
0.073 Oh Mandor
@ Rp.
Total Upah
4. 1 m3 Galian Untuk Tanah keras sedalam 1 m
Upah An. SNI ( Revisi ) 6.4.1
0.625 Oh Pekerja
@ Rp.
0.062 Oh Mandor
@ Rp.
Total Upah
5. 1 m3 Galian Untuk Tanah cadas sedalam 1 m
Upah An. SNI ( Revisi ) 6.5.1
1.250 Oh Pekerja
@ Rp.
0.125 Oh Mandor
@ Rp.
Total Upah
6. 1 m3 Galian Untuk Tanah lumpur sedalam 1 m
Upah An. SNI ( Revisi ) 6.6.1
0.825 Oh Pekerja
@ Rp.
0.082 Oh Mandor
@ Rp.
Total Upah
32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp
13,100.00
2,200.00
15,300.00
15,300.00
32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp
17,226.50
2,860.00
20,086.50
20,086.50
32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp
24,071.25
4,015.00
28,086.25
28,086.25
32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp
20,468.75
3,410.00
23,878.75
23,878.75
32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp
40,937.50
6,875.00
47,812.50
47,812.50
32,750.00 = Rp.
55,000.00 = Rp.
= Rp.
= Rp
27,018.75
4,510.00
31,528.75
31,528.75
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp
1,637.50
275.00
1,912.50
1,912.50
@ Rp.
32,750.00 = Rp.
16,899.00
Halaman : 6
55,000.00 = Rp.
Sub total :
= Rp.
Total Upah
= Rp
2,750.00
19,649.00
19,649.00
32,750.00
55,000.00
Sub total :
Total Upah
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
0.050 Oh Mandor
9. 1 m3 Urugan kembali
Upah An. SNI ( Revisi ) 6.9.1
0.192 Oh Pekerja
0.019 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
32,750.00 = Rp.
55,000.00 = Rp.
6,288.00
1,045.00
12
Sub total :
Total Upah
= Rp.
= Rp
7,333.00
7,333.00
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp
16,375.00
2,750.00
19,125.00
19,125.00
@ Rp.
74,520.00 = Rp.
Sub total :
= Rp.
89,424.00
89,424.00
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp
9,825.00
550.00
10,375.00
99,799.00
= Rp.
= Rp.
= Rp.
= Rp.
24,591.60
49,069.01
29,833.30
103,493.91
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
27,280.75
17,472.00
1,760.00
4,565.00
51,077.75
154,571.66
450,174.40 = Rp.
39,100.00 = Rp.
Sub total :
= Rp.
90,034.88
39,100.00
129,134.88
32,750.00
55,000.00
Sub total :
Total Upah
32,750.00
55,000.00
Sub total :
Total Upah + bahan
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total Upah + bahan
= Rp.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp.
@ Rp.
@ Rp.
= Rp.
4,912.50
= Rp.
825.00
= Rp.
5,737.50
= Rp 4,841,257.50
32,750.00
55,000.00
Sub total :
Total Upah + bahan
27,280.75
17,472.00
1,804.00
4,455.00
51,011.75
180,146.63
Halaman : 7
@ Rp.
@ Rp.
92,000.00
174,570.00
90,684.40
Sub total :
= Rp.
= Rp.
= Rp.
= Rp.
23,000.00
5,237.10
4,534.22
32,771.32
32,750.00 = Rp.
55,000.00 = Rp.
32,750.00
5,500.00
Sub total :
Total Upah + bahan
= Rp.
= Rp
38,250.00
71,021.32
16 1 m3 Urugan sirtu
Bahan An. SNI ( Revisi ) 6.15.1
1.200 m3 Sirtu
@ Rp.
39,100.00 = Rp.
Sub total :
= Rp.
@ Rp.
@ Rp.
= Rp.
= Rp.
= Rp.
= Rp
32,750.00
55,000.00
Sub total :
Total Upah + bahan
46,920.00
46,920.00
8,187.50
1,375.00
9,562.50
56,482.50
Halaman : 8
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
1,500.00
57,982.50
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
3,062.50
59,545.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
3,750.00
60,232.50
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
4,875.00
61,357.50
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
7,000.00
63,482.50
= Rp.
= Rp.
46,920.00
9,562.50
5 Biaya transportasi.
Sub total :
= Rp.
1,750.00 = Rp.
Total Biaya / M3
= Rp
56,482.50
8,312.50
64,795.00
Halaman : 9
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
2,013.00
58,495.50
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
4,637.50
61,120.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
5,325.00
61,807.50
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
6,675.00
63,157.50
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
9,362.50
65,845.00
= Rp.
= Rp.
= Rp.
= Rp.
= Rp
46,920.00
9,562.50
56,482.50
10,937.50
67,420.00
1.34290
1.34290
19
10### 12
12
PEKERJAAN PONDASI
1. 1 m3 Pasang pondasi batu kosong (Aanstamping)
Bahan An. SNI ( Revisi ) 6.14.1
1.200 m3 Batu belah ( 15/20 )
@ Rp.
0.300 m3 Pasir urug
@ Rp.
Upah An. SNI ( Revisi ) 6.14.2
0.780 Oh Pekerja
0.390 Oh Tukang batu
0.039 Oh Kepala tukang
0.039 Oh Mandor
92,000.00 = Rp
74,520.00 = Rp
Sub total :
= Rp
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
25,545.00
16,380.00
1,716.00
2,145.00
45,786.00
178,542.00
@ Rp.
@ Rp.
@ Rp.
92,000.00
829.84
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
110,400.00
325,297.28
28,474.90
464,172.18
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
545,262.18
@ Rp.
@ Rp.
@ Rp.
92,000.00
829.84
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
101,200.00
221,567.28
38,722.24
361,489.52
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
442,579.52
@ Rp.
@ Rp.
@ Rp.
92,000.00
829.84
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
101,200.00
194,597.48
36,228.42
332,025.90
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
413,115.90
Halaman : 11
@ Rp.
@ Rp.
@ Rp.
=
=
=
=
Rp
Rp
Rp
Rp
101,200.00
167,627.68
43,981.93
312,809.61
32,750.00 = Rp
42,000.00 = Rp
49,125.00
25,200.00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
110,400.00
22,356.00
132,756.00
@ Rp.
@ Rp.
92,000.00
829.84
90,684.40
Sub total :
@ Rp.
@ Rp.
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
Rp
Rp
Rp
Rp
2,640.00
4,125.00
81,090.00
393,899.61
@ Rp.
@ Rp.
@ Rp.
92,000.00
829.84
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
101,200.00
135,263.92
47,155.89
283,619.81
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
364,709.81
@ Rp.
@ Rp.
@ Rp.
92,000.00
829.84
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
101,200.00
112,858.24
49,332.31
263,390.55
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
344,480.55
@ Rp.
@ Rp.
@ Rp.
92,000.00
829.84
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
101,200.00
97,091.28
50,873.95
249,165.23
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
330,255.23
Halaman : 12
@ Rp.
@ Rp.
@ Rp.
92,000.00
829.84
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
101,200.00
75,515.44
50,873.95
227,589.39
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
308,679.39
=
=
=
=
Rp
Rp
Rp
Rp
101,200.00
103,089.94
31,602.00
49,332.31
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
92,000.00
450,174.40
138,000.00
90,684.40
Sub total :
Upah An. SNI ( Revisi ) 6.9.2
1.500 Oh Pekerja
0.600 Oh Tukang batu
0.060 Oh Kepala tukang
0.075 Oh Mandor
= Rp
285,224.25
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
49,125.00
25,200.00
2,640.00
4,125.00
81,090.00
366,314.25
92,000.00
450,174.40
138,000.00
90,684.40
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
101,200.00
76,529.65
23,460.00
30,832.70
232,022.34
32,750.00
42,000.00
35,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
52,500.00
33,000.00
2,100.00
4,125.00
91,725.00
323,747.34
92,000.00
829.84
450,174.40
90,684.40
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
101,200.00
129,455.04
14,405.58
52,959.69
298,020.31
32,750.00
42,000.00
35,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
52,500.00
33,000.00
2,100.00
4,125.00
91,725.00
389,745.31
92,000.00
829.84
450,174.40
90,684.40
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
101,200.00
50,620.24
66,175.64
44,616.72
262,612.60
32,750.00
42,000.00
35,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
52,500.00
33,000.00
2,100.00
4,125.00
91,725.00
354,337.60
92,000.00
829.84
450,174.40
90,684.40
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
101,200.00
34,023.44
58,972.85
47,427.94
241,624.23
32,750.00
42,000.00
35,000.00
55,000.00
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
49,125.00
25,200.00
2,100.00
4,125.00
80,550.00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Total upah+bahan :
= Rp
322,174.23
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
8,740.00
829.84
93,610.00
137,126.00
10,764.00
Sub total :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
655,500.00
167,627.68
29,955.20
67,191.74
8,611.20
928,885.82
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
35,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
98,250.00
35,700.00
2,975.00
8,250.00
145,175.00
1,074,060.82
@ Rp.
@ Rp.
@ Rp.
92,000.00 = Rp
829.84 = Rp
93,610.00 = Rp
41,400.00
232,355.20
42,124.50
Halaman : 14
@ Rp.
137,126.00 = Rp
91,874.42
Sub total :
= Rp
407,754.12
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
35,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
77,945.00
12,600.00
1,050.00
4,400.00
95,995.00
503,749.12
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,415.88
8,799.34
20,568.90
50,205.32
393,300.00
9,687.60
122,176.00
1,257.46
529.92
2,207.04
610,147.46
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
32,750.00
28,140.00
2,345.00
2,750.00
65,985.00
676,132.46
676,132.46
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,192.32
5,961.60
17,140.75
40,662.16
301,530.00
7,534.80
103,086.00
1,257.46
529.92
@ Rp.
32,750.00
42,000.00
35,000.00
55,000.00
Sub total :
Total upah+bahan :
Jadi harga 1 Meter Tiang pancang ukuran 35 x 35 Cm2
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
9,196.00 = Rp
Sub total :
= Rp
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,839.20
480,734.21
26,200.00
21,000.00
1,750.00
2,200.00
51,150.00
531,884.21
531,884.21
Halaman : 15
Halaman : 13
19
10### 3
12
829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
Sub total :
= Rp
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
418,919.44
829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
Sub total :
= Rp
163,478.48
43,996.70
128,898.44
336,373.62
Sub total :
Total upah+bahan :
2. 1 m3 Membuat beton tumbuk, 1 Pc : 3 Ps : 6 Kr
Bahan An. SNI ( Revisi ) 6.2.1
197.000 Kg Semen portland
@ Rp.
0.470 m3 Pasir beton
@ Rp.
0.940 m3 Koral beton
@ Rp.
Upah An. SNI ( Revisi ) 6.2.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
406,411.12
829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
Sub total :
= Rp
143,562.32
53,357.70
119,299.62
316,219.64
Sub total :
Total upah+bahan :
3. 1 m3 Membuat beton tumbuk, 1 Pc : 4 Ps : 6 Kr
Bahan An. SNI ( Revisi ) 6.3.1
173.000 Kg Semen portland
@ Rp.
0.570 m3 Pasir beton
@ Rp.
0.870 m3 Koral beton
@ Rp.
Upah An. SNI ( Revisi ) 6.3.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor
=
=
=
=
=
=
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
386,257.14
=
=
=
=
Rp
Rp
Rp
Rp
9,045.26
2,433.86
5,964.98
17,444.10
= Rp
= Rp
= Rp
2,701.88
525.00
55.00
Halaman : 32
55,000.00 = Rp
= Rp
= Rp
220.00
3,501.88
20,945.97
Sub total :
Total upah+bahan :
4. 1 m2 Membuat lantai kerja beton tumbuk, 1 Pc : 3 Ps : 5 Kr tebal 5 Cm
Bahan An. SNI ( Revisi ) 6.4.1
10.900 Kg Semen portland
@ Rp.
829.84
0.026 m3 Pasir beton
@ Rp.
93,610.00
0.044 m3 Koral beton
@ Rp.
137,126.00
Sub total :
Upah An. SNI ( Revisi ) 6.4.2
0.08250 Oh Pekerja
@ Rp.
32,750.00
0.01250 Oh Tukang batu
@ Rp.
42,000.00
0.00125 Oh Kepala tukang
@ Rp.
44,000.00
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
0.00400 Oh Mandor
@ Rp.
Sub total :
Total upah+bahan :
BETON BERTULANG.
5. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 3 Kr
180,905.12
48,677.20
119,299.62
348,881.94
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
Sub total :
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
430,537.20
829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
Sub total :
= Rp
232,355.20
42,124.50
123,413.40
397,893.10
Sub total :
Total upah+bahan :
6. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 4 Kr
Bahan An. SNI ( Revisi ) 6.6.1
280.000 Kg Semen portland
@ Rp.
0.450 m3 Pasir beton
@ Rp.
0.900 m3 Koral beton
@ Rp.
Upah An. SNI ( Revisi ) 6.6.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
467,930.60
829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
Sub total :
= Rp
292,103.68
52,421.60
95,988.20
440,513.48
Sub total :
Total upah+bahan :
7. 1 m3 Membuat beton bertulang, 1 Pc : 2 Ps : 2.5 Kr
Bahan An. SNI ( Revisi ) 6.7.1
352.000 Kg Semen portland
@ Rp.
0.560 m3 Pasir beton
@ Rp.
0.700 m3 Koral beton
@ Rp.
Upah An. SNI ( Revisi ) 6.7.2
1.650 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.080 Oh Mandor
=
=
=
=
=
=
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
8. 1 m3 Membuat campuran beton bertulang, 1 Pc : 1.5 Ps : 3 Kr
Bahan An. SNI ( Revisi ) 6.8.1
357.000 Kg Semen portland
@ Rp.
829.84
0.420 m3 Pasir beton
@ Rp.
93,610.00
0.840 m3 Koral beton
@ Rp.
137,126.00
Sub total :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
537,968.10
=
=
=
=
Rp
Rp
Rp
Rp
296,252.88
39,316.20
115,185.84
450,754.92
Halaman : 33
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
520,792.42
=
=
=
=
Rp
Rp
Rp
Rp
320,318.24
43,996.70
95,988.20
460,303.14
=
=
=
=
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
192,522.88
48,677.20
119,299.62
360,499.70
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
9. 1 m3 Membuat campuran beton bertulang, 1 Pc : 1.5 Ps : 2.5 Kr
Bahan An. SNI ( Revisi ) 6.9.1
386.000 Kg Semen portland
@ Rp.
829.84
0.470 m3 Pasir beton
@ Rp.
93,610.00
0.700 m3 Koral beton
@ Rp.
137,126.00
Sub total :
Upah An. SNI ( Revisi ) 6.9.2
1.650 Oh Pekerja
@ Rp.
32,750.00
0.250 Oh Tukang batu
@ Rp.
42,000.00
0.025 Oh Kepala tukang
@ Rp.
44,000.00
0.080 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
= Rp
= Rp
70,037.50
530,340.64
=
=
=
=
Rp
Rp
Rp
Rp
397,493.36
34,635.70
101,473.24
533,602.30
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
603,639.80
829.84
93,610.00
137,126.00
41,250.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
365,129.60
46,805.00
109,700.80
101,475.00
623,110.40
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
693,147.90
829.84 = Rp
93,610.00 = Rp
278,826.24
50,549.40
Halaman : 34
111,072.06
42,500.00
482,947.70
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
@ Rp.
@ Rp.
137,126.00 = Rp
42,500.00 = Rp
Sub total :
= Rp
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
54,037.50
10,500.00
1,100.00
4,400.00
70,037.50
552,985.20
829.84 = Rp
93,610.00 = Rp
137,126.00 = Rp
Sub total :
= Rp
510,351.60
48,677.20
71,305.52
630,334.32
Sub total :
Total upah+bahan :
13. 1 m3 Membuat beton bertulang 1 Pc : 1 Ps : 1 Kr
Bahan An. SNI ( Revisi ) 6.17.1
615.000 Kg Semen portland
@ Rp.
0.520 m3 Pasir beton
@ Rp.
0.520 m3 Koral beton
@ Rp.
Upah An. SNI ( Revisi ) 6.17.2
2.000 Oh Pekerja
0.350 Oh Tukang batu
0.035 Oh Kepala tukang
1.000 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
65,500.00
14,700.00
1,540.00
55,000.00
136,740.00
767,074.32
829.84
93,610.00
137,126.00
65,000.00
=
=
=
=
Rp
Rp
Rp
Rp
331,936.00
44,932.80
109,700.80
78,000.00
Sub total :
Total upah+bahan :
14. 1 m3 Membuat beton kedap air dengan storox - 100
Bahan An. SNI ( Revisi ) 6.18.1
400.000 Kg Semen portland
@ Rp.
0.480 m3 Pasir beton
@ Rp.
0.800 m3 Koral beton 2/3
@ Rp.
1.200 Kg Storox - 100
@ Rp.
=
=
=
=
=
=
Sub total :
Upah An. SNI ( Revisi ) 6.18.2
2.000 Oh Pekerja
0.350 Oh Tukang batu
0.035 Oh Kepala tukang
1.000 Oh Mandor
= Rp
564,569.60
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
65,500.00
14,700.00
1,540.00
55,000.00
136,740.00
701,309.60
8,740.00 = Rp
10,764.00 = Rp
Sub total :
= Rp
9,177.00
161.46
9,338.46
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
PEMBESIAN.
15 1 Kg Pembesian dengan besi polos
Bahan An. SNI ( Revisi ) 6.25.1
1.050 Kg Besi beton ( polos )
0.015 Kg Kawat beton
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Halaman : 35
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp.
@ Rp.
11,638.00 = Rp
10,764.00 = Rp
Sub total :
= Rp
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
42,000.00
55,000.00
229.25
294.00
29.40
16.50
569.15
12,950.51
9,100.00 = Rp
10,764.00 = Rp
Sub total :
= Rp
9,555.00
107.64
9,662.64
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
42,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
163.75
210.00
21.00
16.50
411.25
10,073.89
8,750.00 = Rp
10,764.00 = Rp
Sub total :
= Rp
8,925.00
8,665.02
17,590.02
Sub total :
Total upah+bahan :
17 1 Kg Jaring kawat baja
Bahan An. SNI ( Revisi ) 6.27.1
1.020 Kg Besi jaring kawat baja
0.805 Kg Kawat beton
Upah An. SNI ( Revisi ) 6.27.2
0.025 Oh Pekerja
0.025 Oh Tukang besi
0.0025 Oh Kepala tukang
0.0015 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
BEKISTING.
18 1 m2 Pasang bekisting untuk pondasi
=
=
=
=
=
=
12,219.90
161.46
12,381.36
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
229.25
294.00
30.80
16.50
570.55
9,909.01
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
818.75
1,050.00
105.00
82.50
2,056.25
19,646.27
2,622,000.00
10,478.80
5,888.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
104,880.00
3,143.64
588.80
108,612.44
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
9,825.00
10,920.00
1,092.00
275.00
22,112.00
130,724.44
Halaman : 36
2,622,000.00
10,478.80
5,888.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
117,990.00
3,143.64
588.80
121,722.44
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
9,825.00
10,920.00
1,092.00
275.00
22,112.00
143,834.44
2,622,000.00
10,478.80
5,888.00
3,542,000.00
119,600.00
3,680.00
Sub total :
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
104,880.00
4,191.52
1,177.60
53,130.00
41,860.00
7,360.00
212,599.12
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
9,825.00
13,860.00
1,386.00
330.00
25,401.00
238,000.12
2,622,000.00
10,478.80
5,888.00
3,542,000.00
119,600.00
3,680.00
Sub total :
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
104,880.00
4,191.52
1,177.60
63,756.00
41,860.00
7,360.00
223,225.12
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
13,860.00
1,386.00
330.00
26,056.00
249,281.12
2,622,000.00 = Rp
10,478.80 = Rp
104,880.00
4,191.52
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
0.200
0.015
0.350
6.000
Ltr
m3
Lbr
Btg
Minyak bekisting
@ Rp.
Balok kayu borneo
@ Rp.
Plywood tebal 9 mm
@ Rp.
Dolken kayu galam 8- @ Rp.
5,888.00
3,542,000.00
119,600.00
3,680.00
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
1,177.60
53,130.00
41,860.00
22,080.00
117,070.00
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
13,860.00
1,386.00
330.00
26,056.00
143,126.00
2,622,000.00
10,478.80
5,888.00
3,542,000.00
119,600.00
3,680.00
35,000.00
Sub total :
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
78,660.00
4,191.52
1,177.60
70,840.00
41,860.00
11,040.00
140,000.00
192,900.00
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
13,860.00
1,386.00
330.00
26,056.00
218,956.00
2,622,000.00
10,478.80
5,888.00
3,542,000.00
119,600.00
3,680.00
Sub total :
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
78,660.00
4,191.52
883.20
53,130.00
41,860.00
7,360.00
186,084.72
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
13,860.00
1,386.00
330.00
26,056.00
212,140.72
2,622,000.00
10,478.80
3,680.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
69,220.80
6,287.28
1,840.00
77,348.08
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
2,100.00
210.00
385.00
7,607.50
84,955.58
524,400.00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
PONDASI BETON
1.500
0.400
150.000
2.250
323.000
0.520
0.780
Kg
Ltr
Kg
Kg
Kg
m3
m3
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
15,718.20
2,355.20
1,311,000.00
24,219.00
71,305.52
48,677.20
106,958.28
2,104,633.40
32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
127,725.00
14,700.00
43,680.00
44,100.00
10,780.00
9,075.00
250,060.00
2,354,693.40
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
707,940.00
20,957.60
3,532.80
2,622,000.00
32,292.00
268,038.32
48,677.20
106,958.28
3,810,396.20
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
158,837.50
14,700.00
65,520.00
58,800.00
14,564.00
9,350.00
321,771.50
4,132,167.70
Sub total :
Upah An. SNI ( Revisi ) 6.38.2
3.900 Oh Pekerja
0.350 Oh Tukang batu
1.040 Oh Tukang kayu
1.050 Oh Tukang besi
0.245 Oh Kepala tukang
0.165 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Sloof
31 1 m3 Membuat sloof beton bertulang ( 300 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00
2.000 Kg Paku biasa 2" - 5"
@ Rp.
10,478.80
0.600 Ltr Minyak bekisting
@ Rp.
5,888.00
300.000 Kg Besi beton polos
@ Rp.
8,740.00
3.000 Kg Kawat beton
@ Rp.
10,764.00
323.000 Kg Semen portland
@ Rp.
829.84
0.520 m3 Pasir beton
@ Rp.
93,610.00
0.780 m3 Koral beton
@ Rp.
137,126.00
Sub total :
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja
@ Rp.
32,750.00
0.350 Oh Tukang batu
@ Rp.
42,000.00
1.560 Oh Tukang kayu
@ Rp.
42,000.00
1.400 Oh Tukang besi
@ Rp.
42,000.00
0.331 Oh Kepala tukang
@ Rp.
44,000.00
0.170 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
32 1 m3 Membuat sloof beton bertulang ukuran 20 x 30 Cm dengan besi 5 dia 19 mm + beugel dia 8 mm .
Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00 = Rp
2.000 Kg Paku biasa 2" - 5"
@ Rp.
10,478.80 = Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
262
0.600
179.859
81.656
3.000
323.000
0.520
0.780
Ltr
Kg
Kg
Kg
Kg
m3
m3
Minyak bekisting
Besi beton polos dia 16
Besi begel polos dia 6
Kawat beton
Semen portland
Pasir beton
Koral beton
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
5,888.00
8,740.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
3,532.80
1,571,967.66
713,676.24
32,292.00
268,038.32
48,677.20
106,958.28
3,474,040.10
32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
158,837.50
14,700.00
65,520.00
56,700.00
14,564.00
9,350.00
319,671.50
3,793,711.60
Sub total :
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja
0.350 Oh Tukang batu
1.560 Oh Tukang kayu
1.350 Oh Tukang besi
0.331 Oh Kepala tukang
0.170 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
707,940.00
20,957.60
Halaman : 39
33 1 m3 Membuat sloof beton bertulang ukuran 20 x 30 Cm dengan besi 5 dia 16 mm + beugel dia 6 mm .
Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00 = Rp
707,940.00
2.000
0.600
127.505
45.745
3.000
323.000
0.520
0.780
Kg
Ltr
Kg
Kg
Kg
Kg
m3
m3
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
10,478.80
5,888.00
8,740.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
20,957.60
3,532.80
1,114,389.33
399,808.15
32,292.00
268,038.32
48,677.20
106,958.28
2,702,593.68
32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
158,837.50
14,700.00
65,520.00
56,700.00
14,564.00
9,350.00
319,671.50
3,022,265.18
Sub total :
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja
0.350 Oh Tukang batu
1.560 Oh Tukang kayu
1.350 Oh Tukang besi
0.331 Oh Kepala tukang
0.170 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
34 1 m3 Membuat sloof beton bertulang ukuran 15 x 20 Cm dengan besi 4 dia 12 mm + beugel dia 6mm .
Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00 = Rp
2.000 Kg Paku biasa 2" - 5"
@ Rp.
10,478.80 = Rp
0.600 Ltr Minyak bekisting
@ Rp.
5,888.00 = Rp
114.419 Kg Besi beton polos dia 12 @ Rp.
8,740.00 = Rp
35.631 Kg Besi begel polos dia 6 @ Rp.
8,740.00 = Rp
3.000 Kg Kawat beton
@ Rp.
10,764.00 = Rp
323.000 Kg Semen portland
@ Rp.
829.84 = Rp
0.520 m3 Pasir beton
@ Rp.
93,610.00 = Rp
0.780 m3 Koral beton
@ Rp.
137,126.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja
@ Rp.
32,750.00 = Rp
0.350 Oh Tukang batu
@ Rp.
42,000.00 = Rp
1.560 Oh Tukang kayu
@ Rp.
42,000.00 = Rp
1.350 Oh Tukang besi
@ Rp.
42,000.00 = Rp
0.331 Oh Kepala tukang
@ Rp.
44,000.00 = Rp
0.170 Oh Mandor
@ Rp.
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
35 1 m3 Membuat sloof beton bertulang ukuran 15 x 20 Cm dengan besi 4 dia 10 mm + kegesting .
Bahan An. SNI ( Revisi ) 6.39.1
0.270 m3 Kayu terentang/Meranti @ Rp.
10,478.80 = Rp
2.000 Kg Paku biasa 2" - 5"
@ Rp.
5,888.00 = Rp
0.600 Ltr Minyak bekisting
@ Rp.
8,740.00 = Rp
79.387 Kg Besi beton polos dia 10 @ Rp.
8,740.00 = Rp
35.631 Kg Besi begel polos dia 6 @ Rp.
8,740.00 = Rp
3.000 Kg Kawat beton
@ Rp.
10,764.00 = Rp
323.000 Kg Semen portland
@ Rp.
829.84 = Rp
0.520 m3 Pasir beton
@ Rp.
93,610.00 = Rp
0.780 m3 Koral beton
@ Rp.
137,126.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.39.2
4.850 Oh Pekerja
@ Rp.
32,750.00 = Rp
0.350 Oh Tukang batu
@ Rp.
42,000.00 = Rp
1.560 Oh Tukang kayu
@ Rp.
42,000.00 = Rp
1.300 Oh Tukang besi
@ Rp.
42,000.00 = Rp
0.331 Oh Kepala tukang
@ Rp.
44,000.00 = Rp
0.170 Oh Mandor
@ Rp.
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
Kolom
36 1 m3 Membuat kolom beton bertulang ( 300 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.40.1
707,940.00
20,957.60
3,532.80
1,000,020.31
311,414.94
32,292.00
268,038.32
48,677.20
106,958.28
2,499,831.45
158,837.50
14,700.00
65,520.00
56,700.00
14,564.00
9,350.00
319,671.50
2,819,502.95
2,829.28
11,776.00
5,244.00
693,844.13
311,414.94
32,292.00
268,038.32
48,677.20
106,958.28
1,481,074.14
158,837.50
14,700.00
65,520.00
54,600.00
14,564.00
9,350.00
317,571.50
1,798,645.64
0.400
4.000
2.000
300.000
4.500
323.000
0.520
0.780
0.015
3.500
20.000
m3
Kg
Ltr
Kg
Kg
Kg
m3
m3
m3
Lbr
Btg
Kayu terentang/Meranti
Paku biasa 2" - 5"
Minyak bekisting
Besi beton polos
Kawat beton
Semen portland
Pasir beton
Koral beton
Balok kayu borneo
Plywood tebal 9 mm
Dolken kayu galam 8
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
137,126.00
3,542,000.00
119,600.00
3,680.00
Sub total :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,048,800.00
41,915.20
11,776.00
2,622,000.00
48,438.00
268,038.32
48,677.20
106,958.28
53,130.00
418,600.00
73,600.00
4,741,933.00
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
239,075.00
14,700.00
138,600.00
88,200.00
25,080.00
13,750.00
519,405.00
5,261,338.00
Halaman : 41
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,244.00
104.79
30,030.64
2,447.20
1,345.50
3,243.26
561.66
1,234.13
44,211.19
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,965.00
840.00
840.00
880.00
264.00
165.00
4,954.00
49,165.19
= Rp
60.61 = Rp
49,165.19
2,979,901.90
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
5,244.00
104.79
20,102.00
2,447.20
2,691.00
3,319.36
561.66
1,234.13
35,704.14
= Rp
= Rp
= Rp
1,965.00
840.00
840.00
@ Rp.
@ Rp.
@ Rp.
42,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
= Rp
60.61 = Rp
840.00
264.00
165.00
4,914.00
40,618.14
40,618.14
2,461,865.59
Halaman : 42
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Balok
39 1 m3 Membuat balok beton bertulang ( 200 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.41.1
0.320 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00
3.200 Kg Paku biasa 2" - 5"
@ Rp.
10,478.80
1.600 Ltr Minyak bekisting
@ Rp.
5,888.00
200.000 Kg Besi beton polos
@ Rp.
8,740.00
3.000 Kg Kawat beton
@ Rp.
10,764.00
323.000 Kg Semen portland
@ Rp.
829.84
0.520 m3 Pasir beton
@ Rp.
93,610.00
0.780 m3 Koral beton
@ Rp.
137,126.00
0.140 m3 Balok kayu borneo
@ Rp.
3,542,000.00
2.800 Lbr Plywood tebal 9 mm
@ Rp.
119,600.00
16.000 Btg Dolken kayu galam 8 @ Rp.
3,680.00
Sub total :
Upah An. SNI ( Revisi ) 6.41.2
5.960 Oh Pekerja
@ Rp.
32,750.00
0.350 Oh Tukang batu
@ Rp.
42,000.00
2.800 Oh Tukang kayu
@ Rp.
42,000.00
1.400 Oh Tukang besi
@ Rp.
42,000.00
0.455 Oh Kepala tukang
@ Rp.
44,000.00
0.208 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
40 1 m3 Membuat balok beton bertulang ( 150 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.42.1
0.320 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00
0.003 Kg Paku biasa 2" - 5"
@ Rp.
10,478.80
0.020 Ltr Minyak bekisting
@ Rp.
5,888.00
150.000 Kg Besi beton polos
@ Rp.
8,740.00
2.250 Kg Kawat beton
@ Rp.
10,764.00
323.000 Kg Semen portland
@ Rp.
829.84
0.520 m3 Pasir beton
@ Rp.
93,610.00
0.780 m3 Koral beton
@ Rp.
137,126.00
0.120 m3 Balok kayu borneo
@ Rp.
3,542,000.00
2.800 Lbr Plywood tebal 9 mm
@ Rp.
119,600.00
16.000 Btg Dolken kayu galam 8 @ Rp.
3,680.00
Sub total :
Upah An. SNI ( Revisi ) 6.42.2
5.800 Oh Pekerja
@ Rp.
32,750.00
0.350 Oh Tukang batu
@ Rp.
42,000.00
2.800 Oh Tukang kayu
@ Rp.
42,000.00
1.050 Oh Tukang besi
@ Rp.
42,000.00
0.420 Oh Kepala tukang
@ Rp.
44,000.00
0.185 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
839,040.00
33,532.16
9,420.80
1,748,000.00
32,292.00
268,038.32
48,677.20
106,958.28
495,880.00
334,880.00
58,880.00
3,975,598.76
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
195,190.00
14,700.00
117,600.00
58,800.00
20,020.00
11,440.00
417,750.00
4,393,348.76
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
839,040.00
31.44
117.76
1,311,000.00
24,219.00
268,038.32
48,677.20
106,958.28
425,040.00
334,880.00
58,880.00
3,416,882.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
189,950.00
14,700.00
117,600.00
44,100.00
18,480.00
10,175.00
395,005.00
3,811,887.00
8,740.00 = Rp
31.44
174.80
30,030.64
Halaman : 43
437.00
0.050
5.500
0.009
0.015
Kg
Kg
m3
m3
Kawat beton
Semen portland
Pasir beton
Koral beton
@ Rp.
@ Rp.
@ Rp.
@ Rp.
10,764.00
829.84
93,610.00
137,126.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
538.20
4,564.12
842.49
2,056.89
38,675.58
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00
0.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
4,200.00
1,386.00
1,386.00
1,452.00
550.00
0.00
8,974.00
47,649.58
= Rp
60.61 = Rp
47,649.58
2,888,040.83
Sub total :
Upah An. SNI ( Revisi ) 6.46.2
0.100 Oh Pekerja
0.033 Oh Tukang batu
0.033 Oh Tukang kayu
0.033 Oh Tukang besi
0.010 Oh Kepala tukang
0.005 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
7,866.00
209.58
20,836.16
2,447.20
538.20
4,564.12
842.49
2,056.89
39,360.64
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
1,386.00
1,386.00
1,386.00
440.00
275.00
8,148.00
47,508.64
= Rp
60.61 = Rp
47,508.64
2,879,498.43
2,622,000.00
10,478.80
5,888.00
8,740.00
10,764.00
829.84
93,610.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
@ Rp.
@ Rp.
@ Rp.
@ Rp.
137,126.00
3,542,000.00
119,600.00
3,680.00
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
629,280.00
33,532.16
9,420.80
1,311,000.00
24,219.00
268,038.32
48,677.20
Halaman : 44
106,958.28
566,720.00
334,880.00
88,320.00
3,421,045.76
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
42,000.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
183,400.00
14,700.00
110,880.00
44,100.00
17,600.00
10,615.00
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
0.780
0.160
2.800
24.000
m3
m3
Lbr
Btg
Koral beton
Balok kayu borneo
Plywood tebal 9 mm
Dolken kayu galam 8
Sub total :
Total upah+bahan :
44 1 m3 Membuat tangga beton bertulang ( 200 Kg besi + bekisting )
Bahan An. SNI ( Revisi ) 6.44.1
0.250 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00
3.000 Kg Paku biasa 2" - 5"
@ Rp.
10,478.80
1.200 Ltr Minyak bekisting
@ Rp.
5,888.00
200.000 Kg Besi beton polos
@ Rp.
8,740.00
3.000 Kg Kawat beton
@ Rp.
10,764.00
323.000 Kg Semen portland
@ Rp.
829.84
0.520 m3 Pasir beton
@ Rp.
93,610.00
0.780 m3 Koral beton
@ Rp.
137,126.00
0.105 m3 Balok kayu borneo
@ Rp.
3,542,000.00
2.500 Lbr Plywood tebal 9 mm
@ Rp.
119,600.00
14.000 Btg Dolken kayu galam 8 @ Rp.
3,680.00
Sub total :
Upah An. SNI ( Revisi ) 6.44.2
5.600 Oh Pekerja
@ Rp.
32,750.00
0.350 Oh Tukang batu
@ Rp.
42,000.00
2.300 Oh Tukang kayu
@ Rp.
42,000.00
1.400 Oh Tukang besi
@ Rp.
42,000.00
0.405 Oh Kepala tukang
@ Rp.
44,000.00
0.202 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
= Rp
= Rp
381,295.00
3,802,340.76
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
655,500.00
31,436.40
7,065.60
1,748,000.00
32,292.00
268,038.32
48,677.20
106,958.28
371,910.00
299,000.00
51,520.00
3,620,397.80
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
183,400.00
14,700.00
96,600.00
58,800.00
17,820.00
11,110.00
382,430.00
4,002,827.80
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Halaman : 45
Plat Lantai
45 1 m2 Membuat plat lantai tebal 12 Cm dengan besi polos diameter 10 mm , pembagi 8 mm.
Bahan An. SNI ( Revisi ) 6.42.1
0.0384 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00 = Rp
0.0000 Kg Paku biasa 2" - 5"
@ Rp.
10,478.80 = Rp
0.192 Ltr Minyak bekisting
@ Rp.
5,888.00 = Rp
5.690 Kg Besi beton polos 10 mm & @ Rp.
8,740.00 = Rp
0.225 Kg Kawat beton
@ Rp.
10,764.00 = Rp
38.760 Kg Semen portland
@ Rp.
829.84 = Rp
0.062 m3 Pasir beton
@ Rp.
93,610.00 = Rp
0.094 m3 Koral beton
@ Rp.
137,126.00 = Rp
0.014 m3 Balok kayu borneo
@ Rp.
3,542,000.00 = Rp
0.350 Lbr Plywood tebal 9 mm
@ Rp.
119,600.00 = Rp
3.500 Btg Dolken kayu galam 8 @ Rp.
32,750.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.42.2
0.696 Oh Pekerja
@ Rp.
32,750.00 = Rp
0.042 Oh Tukang batu
@ Rp.
42,000.00 = Rp
0.336 Oh Tukang kayu
@ Rp.
42,000.00 = Rp
0.126 Oh Tukang besi
@ Rp.
42,000.00 = Rp
0.050 Oh Kepala tukang
@ Rp.
42,000.00 = Rp
0.022 Oh Mandor
@ Rp.
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
Biaya pembuatan plat lantai per 1 M2 tebal 12 Cm dengan besi dia 10 - 12
dan besi polos dia 8 - 15
= Rp
Analog biaya / M3. =
459,598.25
x
8.33 = Rp
46 1 m2 Membuat plat lantai tebal 12 Cm dengan besi polos diameter 12 mm , pembagi 10 mm.
Bahan An. SNI ( Revisi ) 6.42.1
0.0384 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00 = Rp
0.2500 Kg Paku biasa 2" - 5"
@ Rp.
10,478.80 = Rp
0.192 Ltr Minyak bekisting
@ Rp.
5,888.00 = Rp
9.700 Kg Besi beton polos 10 mm & @ Rp.
8,740.00 = Rp
0.225 Kg Kawat beton
@ Rp.
10,764.00 = Rp
38.760 Kg Semen portland
@ Rp.
829.84 = Rp
0.062 m3 Pasir beton
@ Rp.
93,610.00 = Rp
0.094 m3 Koral beton
@ Rp.
137,126.00 = Rp
100,684.80
0.00
1,130.50
49,730.60
2,421.90
32,164.60
5,841.26
12,834.99
51,004.80
41,860.00
114,625.00
412,298.45
22,794.00
1,764.00
14,112.00
5,292.00
2,116.80
1,221.00
47,299.80
459,598.25
459,598.25
3,828,453.44
100,684.80
2,619.70
1,130.50
84,778.00
2,421.90
32,164.60
5,841.26
12,834.99
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
3,542,000.00
119,600.00
32,750.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
51,004.80
41,860.00
114,625.00
449,965.55
32,750.00
42,000.00
42,000.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
22,794.00
1,764.00
14,112.00
5,292.00
2,116.80
1,221.00
47,299.80
497,265.35
= Rp
8.33 = Rp
497,265.35
4,142,220.38
Sub total :
Total upah+bahan :
Biaya pembuatan plat lantai per 1 M2 tebal 12 Cm dengan besi dia 12 - 15
dan besi polos dia 10 - 15
Analog biaya / M3. =
497,265.35
x
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
47 1 m2 Membuat plat lantai tebal 12 Cm dengan besi polos diameter 10 mm jarak 15 , pembagi 10 mm.
arak 15 rangkap atas bawah ( doble wappening)
Bahan An. SNI ( Revisi ) 6.42.1
0.0384 m3 Kayu terentang/Meranti @ Rp.
2,622,000.00 = Rp
0.2500 Kg Paku biasa 2" - 5"
@ Rp.
10,478.80 = Rp
0.192 Ltr Minyak bekisting
@ Rp.
5,888.00 = Rp
15.893 Kg Besi beton polos 10 mm @ Rp.
8,740.00 = Rp
0.225 Kg Kawat beton
@ Rp.
10,764.00 = Rp
38.760 Kg Semen portland
@ Rp.
829.84 = Rp
0.062 m3 Pasir beton
@ Rp.
93,610.00 = Rp
0.094 m3 Koral beton
@ Rp.
137,126.00 = Rp
0.014 m3 Balok kayu borneo
@ Rp.
3,542,000.00 = Rp
0.350 Lbr Plywood tebal 9 mm
@ Rp.
119,600.00 = Rp
3.500 Btg Dolken kayu galam 8 @ Rp.
32,750.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.42.2
0.696 Oh Pekerja
@ Rp.
32,750.00 = Rp
0.042 Oh Tukang batu
@ Rp.
42,000.00 = Rp
0.336 Oh Tukang kayu
@ Rp.
42,000.00 = Rp
0.126 Oh Tukang besi
@ Rp.
42,000.00 = Rp
0.050 Oh Kepala tukang
@ Rp.
42,000.00 = Rp
0.022 Oh Mandor
@ Rp.
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
Biaya pembuatan plat lantai per 1 M2 tebal 12 Cm penulangan rangkap dengan besi dia 10 - 15
dan besi polos dia 8 - 15 (doble wappening) atas bawah.
= Rp
Analog biaya / M3. =
551,392.17
x
8.33 = Rp
"Halaman : 46
100,684.80
2,619.70
1,130.50
138,904.82
2,421.90
32,164.60
5,841.26
12,834.99
51,004.80
41,860.00
114,625.00
504,092.37
22,794.00
1,764.00
14,112.00
5,292.00
2,116.80
1,221.00
47,299.80
551,392.17
551,392.17
4,593,096.79
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
"Halaman : 47
218.000
0.520
0.870
An. SNI ( Revisi ) 6.1.2
1.650
0.250
0.025
0.080
418,919.44
1
0.0300
33.3333
1.0000
0.0600
16.6667
3.72
1
0.0121
82.6446
307
1
69.44
0.01440
1.00000
1.00000
0.01500
66.66667
8.33333
0.320
40.00
8.00
320.00
8.33
4.65
323.00
8.33
6.6667
5.8824
3.44
2.25
5.69
6.6667
5.8824
3.44
2.25
5.69
1.600
323
0.520
0.780
0.120
1.200
5.000
5.800
0.350
2.800
1.050
0.420
0.185
8.33
8.33333
0.320
1.600
40.00
8.00
320.00
8.33
4.65
323
0.520
0.780
323.00
0.120
1.200
5.000
8.33
5.800
0.350
2.800
1.050
0.420
0.185
6.67
5.7267
5.7267
###
8.33333
0.320
6.6667
5.8824
1.600
40.00
8.00
320.00
8.33
0.03
323.00
323
0.520
0.780
0.120
1.200
5.000
8.33
5.800
0.350
2.800
1.050
0.420
0.185
13.33
15.8933
19
10 ### 3
12
PEKERJAAN PASANGAN
1. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 1 Ps
Bahan An. SNI ( Revisi ) 6.1.1
140.000 Bh Bata merah 5 x 11 x 22 @ Rp.
55.600 Kg Semen portland
@ Rp.
0.056 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.1.2
0.650 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.030 Oh Mandor
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
21,287.50
8,400.00
880.00
1,650.00
32,217.50
125,434.93
482,442.04
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
42,000.00
31,450.94
6,892.01
80,342.95
Sub total :
Total upah+bahan /m2:
Total per : M3
2. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.2.1
140.000 Bh Bata merah 5 x 11 x 22 @ Rp.
37.900 Kg Semen portland
@ Rp.
0.076 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.2.2
0.640 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.030 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
20,960.00
8,400.00
880.00
1,650.00
31,890.00
112,232.95
431,665.19
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
42,000.00
23,849.60
7,254.75
73,104.35
Sub total :
Total upah+bahan :
Total per : M3
3. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Ps
Bahan An. SNI ( Revisi ) 6.3.1
140.000 Bh Bata merah 5 x 11 x 22 @ Rp.
28.740 Kg Semen portland
@ Rp.
0.080 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.3.2
0.640 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.030 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
20,960.00
8,400.00
880.00
1,650.00
31,890.00
104,994.35
403,824.44
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
42,000.00
22,032.25
8,433.65
72,465.90
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
Total per : M3
4. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 4 Ps
Bahan An. SNI ( Revisi ) 6.4.1
140.000 Bh Bata merah 5 x 11 x 22 @ Rp.
26.550 Kg Semen portland
@ Rp.
0.093 m3 Pasir pasang
@ Rp.
=
=
=
=
=
=
=
42,000.00
46,139.10
5,078.33
93,217.43
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
21,287.50
8,400.00
880.00
1,650.00
32,217.50
104,683.40
402,628.47
300.00 = Rp
42,000.00
@ Rp.
@ Rp.
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
21,287.50
8,400.00
880.00
1,650.00
32,217.50
99,533.01
382,819.27
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
42,000.00
13,808.54
11,063.50
66,872.03
Sub total :
Total upah+bahan :
Total per : M3
6. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 6 Ps
Bahan An. SNI ( Revisi ) 6.6.1
140.000 Bh Bata merah 5 x 11 x 22 @ Rp.
16.640 Kg Semen portland
@ Rp.
0.122 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.6.2
0.650 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.030 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
21,287.50
8,400.00
880.00
1,650.00
32,217.50
99,089.53
381,113.59
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
42,000.00
7,468.56
2,357.79
12,379.80
64,206.15
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
21,287.50
8,400.00
880.00
1,650.00
32,217.50
96,423.65
370,860.19
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
21,000.00
23,069.55
2,675.19
46,744.74
Sub total :
Total upah+bahan :
Total per : M3
7. 1 m2 Pasangan bata merah tebal 1 bata, 1 Pc : 3 Kp : 10 Ps
Bahan An. SNI ( Revisi ) 6.7.1
140.0000 Bh Bata merah 5 x 11 x 22 @ Rp.
300.00
9.0000 Kg Semen portland
@ Rp.
829.84
0.0260 m3 Pasir pasang
@ Rp.
90,684.40
0.0275 m3 Kapur pasang
@ Rp.
450,174.40
Sub total :
Upah An. SNI ( Revisi ) 6.7.2
0.650 Oh Pekerja
@ Rp.
32,750.00
0.200 Oh Tukang batu
@ Rp.
42,000.00
0.020 Oh Kepala tukang
@ Rp.
44,000.00
0.030 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
Total per : M3
8. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 1 Ps
Bahan An. SNI ( Revisi ) 6.8.1
70.000 Bh Bata merah 5 x 11 x 22 @ Rp.
27.800 Kg Semen portland
@ Rp.
0.030 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.8.2
0.320 Oh Pekerja
0.100 Oh Tukang batu
0.010 Oh Kepala tukang
0.015 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
4,200.00
440.00
825.00
15,945.00
62,689.74
482,228.78
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
21,000.00
15,725.47
3,446.01
40,171.48
Sub total :
Total upah+bahan :
Total per : M3
9. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.9.1
70.000 Bh Bata merah 5 x 11 x 22 @ Rp.
18.950 Kg Semen portland
@ Rp.
0.038 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.9.2
0.320 Oh Pekerja
0.100 Oh Tukang batu
0.010 Oh Kepala tukang
0.015 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
=
=
=
=
=
=
=
16,065.70
9,249.81
67,315.51
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
10,480.00
4,200.00
440.00
825.00
Sub total :
Total upah+bahan :
Total per : M3
10. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
Bahan An. SNI ( Revisi ) 6.10.1
70.000 Bh Bata merah 5 x 11 x 22 @ Rp.
14.370 Kg Semen portland
@ Rp.
0.040 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.10.2
0.320 Oh Pekerja
0.100 Oh Tukang batu
0.010 Oh Kepala tukang
0.015 Oh Mandor
= Rp
= Rp
= Rp
15,945.00
56,116.48
431,665.19
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
21,000.00
11,924.80
3,627.38
36,552.18
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
4,200.00
440.00
825.00
15,945.00
52,497.18
403,824.44
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
21,000.00
9,543.16
4,534.22
35,077.38
Sub total :
Total upah+bahan :
Total per : M3
11. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
Bahan An. SNI ( Revisi ) 6.4.1
70.000 Bh Bata merah 5 x 11 x 22 @ Rp.
11.500 Kg Semen portland
@ Rp.
0.050 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.4.2
0.320 Oh Pekerja
0.100 Oh Tukang batu
0.010 Oh Kepala tukang
0.015 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
4,200.00
440.00
825.00
15,945.00
51,022.38
392,479.85
Halaman : 18
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
21,000.00
8,032.85
4,624.90
33,657.76
Sub total :
Total upah+bahan :
Total per : M3
=
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
4,200.00
440.00
825.00
15,945.00
49,602.76
381,559.66
300.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
21,000.00
6,904.27
5,531.75
33,436.02
Sub total :
Total upah+bahan :
Total per : M3
13. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 6 Ps
Bahan An. SNI ( Revisi ) 6.13.1
70.000 Bh Bata merah 5 x 11 x 22 @ Rp.
8.320 Kg Semen portland
@ Rp.
0.0610 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.13.2
0.320 Oh Pekerja
0.100 Oh Tukang batu
0.010 Oh Kepala tukang
0.015 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
Total per : M3
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
4,200.00
440.00
825.00
15,945.00
49,381.02
379,853.98
300.00 = Rp
829.84 = Rp
21,000.00
5,393.96
@ Rp.
Sub total :
@ Rp.
@ Rp.
@ Rp.
@ Rp.
90,684.40 = Rp
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
Total per : M3
15. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Kp : 5 Ps
Bahan An. SNI ( Revisi ) 6.15.1
70.0000 Bh Bata merah 5 x 11 x 22 @ Rp.
300.00
4.5000 Kg Semen portland
@ Rp.
829.84
0.0130 m3 Pasir pasang
@ Rp.
90,684.40
0.0137 m3 Kapur padam
@ Rp.
450,174.40
Sub total :
Upah An. SNI ( Revisi ) 6.15.2
0.325 Oh Pekerja
@ Rp.
32,750.00
0.100 Oh Tukang batu
@ Rp.
42,000.00
0.010 Oh Kepala tukang
@ Rp.
44,000.00
0.015 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
Total per : M3
16. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 1 Ps
Bahan An. SNI ( Revisi ) 6.16.1
70.0000 Bh Bata merah 5 x 11 x 22 @ Rp.
300.00
0.0180 Kg Semen merah / bata me @ Rp.
829.84
0.0180 m3 Pasir pasang
@ Rp.
90,684.40
0.0180 m3 Kapur padam
@ Rp.
450,174.40
Sub total :
Upah An. SNI ( Revisi ) 6.16.2
0.320 Oh Pekerja
@ Rp.
32,750.00
0.100 Oh Tukang batu
@ Rp.
42,000.00
0.010 Oh Kepala tukang
@ Rp.
44,000.00
0.015 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
Total per : M3
17. 1 m2 Pasangan bata merah tebal 1/2 bata, 1 Kp : 1 Sm : 2 Ps
Bahan An. SNI ( Revisi ) 6.17.1
70.0000 Bh Bata merah 5 x 11 x 22 @ Rp.
300.00
0.0140 Kg Semen merah / bata me @ Rp.
829.84
0.0280 m3 Pasir pasang
@ Rp.
90,684.40
0.0140 m3 Kapur padam
@ Rp.
450,174.40
Sub total :
Upah An. SNI ( Revisi ) 6.17.2
0.320 Oh Pekerja
@ Rp.
32,750.00
0.100 Oh Tukang batu
@ Rp.
42,000.00
0.010 Oh Kepala tukang
@ Rp.
44,000.00
0.015 Oh Mandor
@ Rp.
55,000.00
Sub total :
Total upah+bahan :
Total per : M3
18 1 m2 Pasangan dinding conblock ( CB. 20 )
Bahan An. SNI ( Revisi ) 6.21.1
12.5000 Bh Concrete block ( CB. 20
14.0500 Kg Semen portland
0.0040 m3 Pasir beton
0.0420 m3 Pasir pasang
3.8700 Kg Besi beton polos 8 m
0.0060 Kg Paku biasa 2" - 5"
0.0010 m3 Kayu terentang
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
4,968.00
829.84
93,610.00
90,684.40
8,740.00
10,478.80
2,622,000.00
816.16
27,210.12
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
4,200.00
440.00
825.00
15,945.00
43,155.12
331,962.46
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
21,000.00
3,734.28
1,178.90
6,167.39
32,080.57
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,643.75
4,200.00
440.00
825.00
16,108.75
48,189.32
370,687.05
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
21,000.00
14.94
1,632.32
8,103.14
30,750.40
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
4,200.00
440.00
825.00
15,945.00
46,695.40
359,195.35
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
21,000.00
11.62
2,539.16
6,302.44
29,853.22
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
4,200.00
440.00
825.00
15,945.00
45,798.22
352,294.02
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
62,100.00
11,659.25
374.44
3,808.74
33,823.80
62.87
2,622.00
@ Rp.
@ Rp.
10,764.00 = Rp
137,126.00 = Rp
Sub total :
= Rp
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
12,117.50
6,594.00
308.00
721.60
1,017.50
20,758.60
136,218.26
4,480.40 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
161,294.40
10,621.95
3,173.95
175,090.31
Sub total :
Total upah+bahan :
19 1 m2 Pasangan dinding roster/terawang ( 12 x 11 x 24 ) cm
Bahan An. SNI ( Revisi ) 6.25.1
36.0000 Bh Roster/terawang
@ Rp.
12.8000 Kg Semen portland
@ Rp.
0.0350 m3 Pasir pasang
@ Rp.
@ Rp.
@ Rp.
@ Rp.
@ Rp.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
9,825.00
4,200.00
440.00
825.00
15,290.00
190,380.31
2,226.40 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
178,112.00
19,625.72
51,690.11
71,315.82
Sub total :
Total upah+bahan :
20 1 m2 Pasangan bata berongga ( 5 x 11 x 24 ) cm
Bahan An. SNI ( Revisi ) 6.26.1
80.0000 Bh Bata berongga
@ Rp.
23.6500 Kg Semen portland
@ Rp.
0.5700 m3 Pasir pasang
@ Rp.
Upah An. SNI ( Revisi ) 6.26.2
0.3200 Oh Pekerja
0.1500 Oh Tukang batu
0.0150 Oh Kepala tukang
0.0150 Oh Mandor
@ Rp.
@ Rp.
@ Rp.
@ Rp.
=
=
=
=
=
=
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
6,300.00
660.00
825.00
18,265.00
89,580.82
373,253.43
10,672.00
3,404,000.00
10,478.80
3,312.00
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
16,008.00
47,656.00
125.75
9.94
63,799.68
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
2,100.00
220.00
110.00
5,705.00
69,504.68
Sub total :
Total upah+bahan :
Total per : M3
27. 1 m2 Pasangan dinding anyaman bambu, rangka kayu
Bahan An. SNI ( Revisi ) 6.27.1
1.5000 M2 Bilik bambu
@ Rp.
0.0140 M3 Kayu meranti 5/7
@ Rp.
0.0120 Kg Paku
@ Rp.
0.0030 m3 List kayu 2/4
@ Rp.
=
=
=
=
=
=
=
322.92
685.63
115,459.66
@ Rp.
@ Rp.
@ Rp.
@ Rp.
Sub total :
Total upah+bahan :
3.84615
###
###
3.84615
###
###
3.84615
###
###
3.84615
###
###
3.84615
###
###
3.84615
###
###
3.84615
###
###
55.60
140.000
64.030
0.059
0.650
0.200
0.020
0.030
7.69231
###
8.33333
7.69231
###
73104
7.69231
###
7.69231
###
7.69231
###
7.69231
###
31890
104994
52497
7.69231
###
7.69231
###
7.69231
###
7.69231
###
4.16667
###
4.54545
###
18
10###
12
PEKERJAAN PLESTERAN
1. 1 m2 Plesteran, 1 Pc : 1 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.1.1
12.920 Kg Semen portland
0.013 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.1.2
0.200 Oh Pekerja
0.150 Oh Tukang batu
0.015 Oh Kepala tukang
0.010 Oh Mandor
@ Rp
@ Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
25,960.43
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
7,070.24
1,541.63
8,611.87
Sub total :
Total upah+bahan :
2. 1 m2 Plesteran, 1 Pc : 2 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.2.1
8.520 Kg Semen portland
0.017 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.2.2
0.200 Oh Pekerja
0.150 Oh Tukang batu
0.015 Oh Kepala tukang
0.010 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
22,671.87
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
5,377.36
1,723.00
7,100.37
Sub total :
Total upah+bahan :
3. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.3.1
6.480 Kg Semen portland
0.019 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.3.2
0.200 Oh Pekerja
0.150 Oh Tukang batu
0.015 Oh Kepala tukang
0.010 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
@ Rp
@ Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
21,160.37
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
4,315.17
1,813.69
6,128.86
Sub total :
Total upah+bahan :
4. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.4.1
5.200 Kg Semen portland
0.020 m3 Pasir pasang
=
=
=
=
=
=
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
20,188.86
Halaman : 22
@ Rp
@ Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
3,584.91
1,995.06
5,579.97
@ Rp
@ Rp
32,750.00 = Rp
42,000.00 = Rp
6,550.00
6,300.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
10,721.53
1,178.90
11,900.43
@ Rp
@ Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
@ Rp
@ Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
@ Rp
@ Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
19,199.55
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
2,389.94
2,176.43
4,566.36
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
18,626.36
829.84
450,174.40
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
4,779.88
1,350.52
1,178.90
7,309.30
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
21,369.30
Halaman : 23
829.84
450,174.40
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
1,526.91
1,575.61
1,269.58
4,372.10
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
18,432.10
=
=
=
=
Rp
Rp
Rp
Rp
1,832.29
1,890.73
997.53
4,720.55
Sub total :
Total upah+bahan :
8. 1 m2 Plesteran, 1 Pc : 0.5 Kp : 3 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.8.1
5.760 Kg Semen portland
@ Rp
0.003 m3 Kapur Padam
@ Rp
0.013 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.8.2
0.200 Oh Pekerja
0.150 Oh Tukang batu
0.015 Oh Kepala tukang
0.010 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
3,053.81
2,085.74
5,139.55
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
=
=
=
=
=
=
660.00
550.00
14,060.00
19,639.97
1M3 KAPUR
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
829.84
450,174.40
90,684.40
Sub total :
0,006
18371
1
0
0
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
18,780.55
829.84
450,174.40
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
2,290.36
2,363.42
634.79
5,288.56
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
19,348.56
829.84
450,174.40
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
1,597.44
990.38
1,723.00
4,310.83
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
18,370.83
Halaman : 24
138,000.00
450,174.40
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
1,242.00
4,051.57
816.16
6,109.73
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
20,169.73
138,000.00
450,174.40
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
966.00
3,151.22
1,360.27
5,477.49
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
550.00
14,060.00
19,537.49
Sub total :
Total upah+bahan :
11 1 m2 Plesteran, 1 Pc : 3 Kp : 5 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.9.1
2.760 Kg Semen portland
@ Rp
0.005 m3 Kapur Padam
@ Rp
0.007 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.9.2
0.200 Oh Pekerja
0.150 Oh Tukang batu
0.015 Oh Kepala tukang
0.010 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
@ Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
8,400.00
880.00
825.00
18,292.50
29,775.00
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
7,169.82
2,297.34
9,467.16
Sub total :
Total upah+bahan :
14. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.14.1
8.640 Kg Semen portland
0.025 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.14.2
0.250 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.0125 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
8,400.00
880.00
687.50
18,155.00
27,622.16
Halaman : 25
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
5,753.56
2,418.25
8,171.81
Sub total :
Total upah+bahan :
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
8,400.00
880.00
687.50
18,155.00
26,326.81
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
4,779.88
2,660.08
7,439.95
Sub total :
Total upah+bahan :
16. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.16.1
5.760 Kg Semen portland
0.029 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.16.2
0.250 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.0125 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
@ Rp
@ Rp
8,187.50
8,400.00
880.00
687.50
18,155.00
25,594.95
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
4,071.75
2,720.53
6,792.28
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
17. 1 m2 Plesteran, 1 Pc : 6 Ps, tebal 20 mm
Bahan An. SNI ( Revisi ) 6.17.1
4.907 Kg Semen portland
0.030 m3 Pasir pasang
9,426.98
2,055.51
11,482.50
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
8,400.00
880.00
687.50
18,155.00
24,947.28
@ Rp
@ Rp
@ Rp
138,000.00
450,174.40
90,684.40
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
1,242.00
4,051.57
1,632.32
6,925.89
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,733.33
8,400.00
880.00
733.33
18,746.67
25,672.56
Halaman : 26
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
11,783.73
2,569.39
14,353.12
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
9,825.00
8,400.00
880.00
715.00
19,820.00
34,173.12
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
8,962.27
2,871.67
11,833.94
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
9,825.00
8,400.00
880.00
715.00
19,820.00
31,653.94
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
7,191.95
3,022.81
10,214.76
Sub total :
Total upah+bahan :
21. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.21.1
8.667 Kg Semen portland
0.033 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.21.2
0.300 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.0130 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
@ Rp
@ Rp
9,825.00
8,400.00
880.00
715.00
19,820.00
30,034.76
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
5,974.85
3,325.09
9,299.94
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
22. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 25 mm
Bahan An. SNI ( Revisi ) 6.22.1
7.200 Kg Semen portland
0.037 m3 Pasir pasang
=
=
=
=
=
=
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
9,825.00
8,400.00
880.00
715.00
19,820.00
29,119.94
Halaman : 27
25702
@ Rp
@ Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
10,500.00
1,100.00
825.00
22,905.00
40,128.74
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
10,754.73
3,446.01
14,200.73
Sub total :
Total upah+bahan :
24. 1 m2 Plesteran, 1 Pc : 3 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.24.1
12.960 Kg Semen portland
0.038 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.24.2
0.320 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.0150 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
10,480.00
10,500.00
1,100.00
825.00
22,905.00
37,105.73
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
8,630.34
3,627.38
12,257.71
Sub total :
Total upah+bahan :
25. 1 m2 Plesteran, 1 Pc : 4 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.25.1
10.400 Kg Semen portland
0.040 m3 Pasir pasang
Upah An. SNI ( Revisi ) 6.25.2
0.320 Oh Pekerja
0.250 Oh Tukang batu
0.025 Oh Kepala tukang
0.0150 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
@ Rp
@ Rp
10,480.00
10,500.00
1,100.00
825.00
22,905.00
35,162.71
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
7,169.82
3,990.11
11,159.93
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
10,480.00
10,500.00
1,100.00
825.00
22,905.00
34,064.93
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
5,866.97
1,904.37
7,771.34
Sub total :
Total upah+bahan :
28. 1 m2 Berapen, 1 Pc : 5 Ps, tebal 15 mm
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
27. 1 m2 Berapen, 1 Pc : 5 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.27.1
7.070 Kg Semen portland
0.021 m3 Pasir pasang
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
26. 1 m2 Plesteran, 1 Pc : 5 Ps, tebal 30 mm
Bahan An. SNI ( Revisi ) 6.26.1
8.640 Kg Semen portland
0.044 m3 Pasir pasang
=
=
=
=
=
=
14,140.47
3,083.27
17,223.74
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
2,940.00
308.00
440.00
8,600.50
16,371.84
28436
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
2,940.00
308.00
440.00
8,600.50
15,391.43
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
7,717.51
1,541.63
9,259.15
Sub total :
Total upah+bahan :
29. 1 m2 Plesteran beton, 1 Pc : 2 Ps, tebal 15 mm
Bahan An. SNI ( Revisi ) 6.29.1
9.300 Kg Semen portland
@ Rp
0.017 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.29.2
0.260 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.0130 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
8,515.00
8,400.00
880.00
715.00
18,510.00
27,769.15
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
5,866.97
1,723.00
7,589.97
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
@ Rp
@ Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,515.00
8,400.00
880.00
715.00
18,510.00
26,099.97
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
414.92
181.37
596.29
Sub total :
Total upah+bahan :
31. 1 m2 Plesteran skoning, 1 Pc : 2 Ps
Bahan An. SNI ( Revisi ) 6.31.1
0.500 Kg Semen portland
0.002 m3 Pasir pasang
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
4,705.19
2,085.74
6,790.93
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,866.75
1,596.00
1,672.00
110.00
5,244.75
5,841.04
6,900.00
829.84
90,684.40
200.37
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
993.60
4,713.49
1,027.76
3,005.49
9,740.34
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
14,737.50
8,400.00
88.00
1,375.00
24,600.50
34,340.84
Sub total :
Total upah+bahan :
32. 1 m2 Plesteran granito, 1 Pc warna : 2 Granito, tebal 10 mm
Bahan An. SNI ( Revisi ) 6.32.1
0.144 Kg Pc warna
@ Rp
5.680 Kg Semen portland
@ Rp
0.011 m3 Pasir pasang
@ Rp
15.000 Kg Batu granito
@ Rp
Sub total :
Upah An. SNI ( Revisi ) 6.32.2
0.450 Oh Pekerja
@ Rp
0.200 Oh Tukang batu
@ Rp
0.002 Oh Kepala tukang
@ Rp
0.025 Oh Mandor
@ Rp
Sub total :
Total upah+bahan :
33. 1 m2 Plesteran Teraso, 1 Pc warna : 2 batu teraso, tebal 10 mm
=
=
=
=
=
=
@ Rp
@ Rp
@ Rp
@ Rp
6,900.00
829.84
90,684.40
182.16
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
993.60
4,713.49
1,027.76
2,094.84
8,829.69
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
14,737.50
8,400.00
88.00
1,375.00
24,600.50
33,430.19
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
3,584.91
1,450.95
5,035.86
Sub total :
Upah An. SNI ( Revisi ) 6.33.2
0.450 Oh Pekerja
0.200 Oh Tukang batu
0.002 Oh Kepala tukang
0.025 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
4,200.00
44.00
825.00
13,256.50
18,292.36
Halaman : 30
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
3,584.91
1,450.95
5,035.86
Sub total :
Total upah+bahan :
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
2,940.00
308.00
440.00
8,600.50
13,636.36
829.84 = Rp
= Rp
1,867.14
1,867.14
42,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
4,200.00
550.00
4,750.00
6,617.14
Sub total :
Total upah+bahan :
36 1 m' Benangan
Bahan
2 Kg Semen portland
@ Rp
Sub total :
Upah
0 Oh Tukang batu
0 Oh Mandor
@ Rp
@ Rp
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Halaman : 31
1650
9,900.00
Sak kapua
KG - Pc a
m3 pasir a
Rp
Rp
Rp
0.00 =
0.00 =
0.00 =
Rp :
Rp :
Rp :
0.00
0.00
0.00
19
10### 3
12
PEKERJAAN KAYU
KUSEN PINTU + JENDELA
15,939,000.00 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
196,500.00
840,000.00
88,000.00
16,500.00
1,141,000.00
18,673,900.00
5,750,000.00 = Rp
Sub total :
= Rp
6,900,000.00
6,900,000.00
Sub total :
Total upah+bahan :
2. 1 m3 Pasang kusen pintu & jendela kayu kamper
Bahan An. SNI ( Revisi ) 6.2.1
1.200 m3 Kayu kamper, balok
@ Rp
Upah An. SNI ( Revisi ) 6.2.2
6.000 Oh Pekerja
18.000 Oh Tukang kayu
2.000 Oh Kepala tukang
0.300 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3. 1 m3 Pasang kusen pintu & jendela kayu borneo ( Kruwing , kempas , Meranti batu )
Bahan An. SNI ( Revisi ) 6.3.1
1.200 m3 Kayu borneo, balok
@ Rp
3,864,000.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.3.2
6.000 Oh Pekerja
@ Rp
32,750.00 = Rp
18.000 Oh Tukang kayu
@ Rp
42,000.00 = Rp
2.000 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.300 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
17,532,900.00
17,532,900.00
196,500.00
756,000.00
88,000.00
16,500.00
1,057,000.00
7,957,000.00
4,636,800.00
4,636,800.00
196,500.00
756,000.00
88,000.00
16,500.00
1,057,000.00
5,693,800.00
PEKERJAAN PINTU
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
11,462.50
44,100.00
4,620.00
990.00
61,172.50
296,434.44
3,946,800.00 = Rp
142,084.80
Halaman : 48
523.94
142,608.74
Sub total :
Total upah+bahan :
6. 1 m2 Pasang pintu klamp kayu borneo
Bahan An. SNI ( Revisi ) 6.6.1
0.036 m3 Kayu borneo papan
@ Rp
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
@ Rp
Sub total :
234,738.00
523.94
235,261.94
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
10,478.80 = Rp
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
11,462.50
44,100.00
4,620.00
990.00
61,172.50
203,781.24
@ Rp
17,940,000.00 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
32,750.00
105,000.00
11,000.00
2,750.00
151,500.00
869,100.00
6,520,500.00 = Rp
Sub total :
= Rp
260,820.00
260,820.00
Sub total :
Total upah+bahan :
8. 1 m2 Pasang pintu panil kayu kamper
Bahan An. SNI ( Revisi ) 6.8.1
0.040 m3 Kayu kamper, papan
Upah An. SNI ( Revisi ) 6.8.2
1.000 Oh Pekerja
2.500 Oh Tukang kayu
0.250 Oh Kepala tukang
0.050 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
32,750.00
105,000.00
11,000.00
2,750.00
151,500.00
412,320.00
17,940,000.00 = Rp
Sub total :
= Rp
627,900.00
627,900.00
Sub total :
Total upah+bahan :
9. 1 m2 Pasang pintu & jendela kaca kayu jati
Bahan An. SNI ( Revisi ) 6.9.1
0.035 m3 Kayu jati, papan
@ Rp
Upah An. SNI ( Revisi ) 6.9.2
0.800 Oh Pekerja
2.000 Oh Tukang kayu
0.200 Oh Kepala tukang
0.040 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
26,200.00
84,000.00
8,800.00
2,200.00
121,200.00
749,100.00
6,520,500.00 = Rp
Sub total :
= Rp
228,217.50
228,217.50
Sub total :
Total upah+bahan :
10. 1 m2 Pasang pintu & jendela kaca kayu kamper
Bahan An. SNI ( Revisi ) 6.10.1
0.035 m3 Kayu kamper, papan
@ Rp
=
=
=
=
=
=
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
26,200.00
84,000.00
8,800.00
2,200.00
121,200.00
349,417.50
Halaman : 49
3,946,800.00 = Rp
Sub total :
= Rp
138,138.00
138,138.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
26,200.00
84,000.00
8,800.00
2,200.00
121,200.00
259,338.00
17,940,000.00 = Rp
Sub total :
= Rp
1,148,160.00
1,148,160.00
32,750.00 = Rp
42,000.00 = Rp
44,000.00 = Rp
32,750.00
126,000.00
13,200.00
Sub total :
Total upah+bahan :
12. 1 m2 Pasang pintu & jendela jalusi kayu jati
Bahan An. SNI ( Revisi ) 6.12.1
0.064 m3 Kayu jati, papan
@ Rp
Upah An. SNI ( Revisi ) 6.12.2
1.000 Oh Pekerja
3.000 Oh Tukang kayu
0.300 Oh Kepala tukang
@ Rp
@ Rp
@ Rp
717,600.00
717,600.00
=
=
=
=
=
=
0.300 Oh Mandor
@ Rp
55,000.00 = Rp
= Rp
= Rp
16,500.00
188,450.00
1,336,610.00
6,520,500.00 = Rp
Sub total :
= Rp
417,312.00
417,312.00
Sub total :
Total upah+bahan :
13. 1 m2 Pasang pintu & jendela jalusi kayu kamper
Bahan An. SNI ( Revisi ) 6.13.1
0.064 m3 Kayu kamper, papan
@ Rp
Upah An. SNI ( Revisi ) 6.13.2
1.000 Oh Pekerja
3.000 Oh Tukang kayu
0.300 Oh Kepala tukang
0.500 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
32,750.00
126,000.00
13,200.00
27,500.00
199,450.00
616,762.00
17,940,000.00
10,478.80
8,625.00
81,512.00
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
351,624.00
314.36
2,587.50
81,512.00
436,037.86
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
550,137.86
6,520,500.00 = Rp
10,478.80 = Rp
127,801.80
314.36
Halaman : 50
2,587.50
81,512.00
212,215.66
Sub total :
Total upah+bahan :
14. 1 m2 Pasang pintu plywood rangkap, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.14.1
0.0196 m3 Kayu jati, papan
@ Rp
0.030 Kg Paku biasa 1/2" - 1"
@ Rp
0.300 Lt Lem kayu
@ Rp
1.000 Lbr Plywood 4' x 3' x 4 mm @ Rp
Upah An. SNI ( Revisi ) 6.14.2
0.600 Oh Pekerja
2.000 Oh Tukang kayu
0.200 Oh Kepala tukang
0.030 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
8,625.00 = Rp
81,512.00 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
326,315.66
17,940,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
1,076,400.00
1,571.82
1,077,971.82
Sub total :
Total upah+bahan :
=
=
=
=
=
=
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
16,375.00
84,000.00
8,800.00
1,375.00
110,550.00
1,188,521.82
6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
391,230.00
1,571.82
392,801.82
Sub total :
Total upah+bahan :
17. 1 m2 Pasang jalusi mati kusen kayu kamper
Bahan An. SNI ( Revisi ) 6.17.1
0.060 m3 Kayu kamper, papan
@ Rp
0.150 Kg Paku biasa 1/2" - 1"
@ Rp
Upah An. SNI ( Revisi ) 6.17.2
=
=
=
=
=
=
0.500
2.000
0.200
0.025
Oh
Oh
Oh
Oh
Pekerja
Tukang kayu
Kepala tukang
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
16,375.00
84,000.00
8,800.00
1,375.00
110,550.00
503,351.82
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
77,357.28
314.36
2,587.50
81,512.00
161,771.14
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
275,871.14
17,940,000.00 = Rp
351,624.00
Halaman : 51
3,143.64
2,587.50
81,512.00
438,867.14
Sub total :
Total upah+bahan :
18. 1 m2 Pasang pintu plywood rangkap,rangka kayu borneo
Bahan An. SNI ( Revisi ) 6.18.1
0.0196 m3 Kayu borneo, papan
@ Rp
3,946,800.00
0.030 Kg Paku biasa 1/2" - 1"
@ Rp
10,478.80
0.300 Lt Lem kayu
@ Rp
8,625.00
1.000 Lbr Plywood 4' x 3' x 4 mm @ Rp
81,512.00
Sub total :
Upah An. SNI ( Revisi ) 6.18.2
0.600 Oh Pekerja
@ Rp
32,750.00
2.000 Oh Tukang kayu
@ Rp
42,000.00
0.200 Oh Kepala tukang
@ Rp
44,000.00
0.030 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
19. 1 m2 Pasang pintu teakwood rangkap, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.19.1
0.0196 m3 Kayu jati, papan
@ Rp
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
10,478.80 = Rp
8,625.00 = Rp
81,512.00 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
552,967.14
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
127,801.80
3,143.64
2,587.50
81,512.00
215,044.94
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
19,650.00
84,000.00
8,800.00
1,650.00
114,100.00
329,144.94
17,940,000.00
10,478.80
8,625.00
81,512.00
62,330.00
Sub total :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
351,624.00
3,143.64
6,900.00
81,512.00
31,165.00
474,344.64
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
26,200.00
105,000.00
11,000.00
2,200.00
144,400.00
618,744.64
Sub total :
Total upah+bahan :
20. 1 m2 Pasang pintu teakwood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.20.1
0.0196 m3 Kayu kamper, papan
@ Rp
6,520,500.00
0.300 Kg Paku biasa 1/2" - 1"
@ Rp
10,478.80
0.300 Lt Lem kayu
@ Rp
8,625.00
1.000 Lbr Teakwood 4' x 8' x 4 mm@ Rp
81,512.00
Sub total :
Upah An. SNI ( Revisi ) 6.20.2
0.600 Oh Pekerja
@ Rp
32,750.00
2.000 Oh Tukang kayu
@ Rp
42,000.00
0.200 Oh Kepala tukang
@ Rp
44,000.00
0.030 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
21. 1 m2 Pasang pintu plywood & formika, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.21.1
0.0196 m3 Kayu jati, papan
@ Rp
0.300 Kg Paku biasa 1/2" - 1"
@ Rp
0.800 Lt Lem kayu
@ Rp
1.000 Lbr Plywood 4' x 8' x 4 mm @ Rp
0.500 Lbr Formica 4' x 3'
@ Rp
Upah An. SNI ( Revisi ) 6.21.2
0.800 Oh Pekerja
2.500 Oh Tukang kayu
0.250 Oh Kepala tukang
0.040 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
0.80
2.10
###
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
127,801.80
3,143.64
6,900.00
81,512.00
31,165.00
250,522.44
= Rp
= Rp
= Rp
26,200.00
105,000.00
11,000.00
Halaman : 52
2,200.00
144,400.00
394,922.44
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
0.040 Oh Mandor
@ Rp
Sub total :
Total upah+bahan :
55,000.00 = Rp
= Rp
= Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
351,624.00
3,143.64
6,900.00
40,756.00
31,165.00
433,588.64
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
26,200.00
105,000.00
11,000.00
2,200.00
144,400.00
577,988.64
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
127,801.80
3,143.64
6,900.00
40,756.00
17,710.00
31,165.00
227,476.44
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
26,200.00
105,000.00
11,000.00
2,200.00
144,400.00
371,876.44
17,940,000.00
10,478.80
8,625.00
62,330.00
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
351,624.00
3,143.64
10,350.00
124,660.00
489,777.64
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
32,750.00
109,200.00
11,440.00
2,750.00
156,140.00
645,917.64
6,520,500.00 = Rp
10,478.80 = Rp
8,625.00 = Rp
127,801.80
3,143.64
10,350.00
24. 1 m2 Pasang pintu teakwood & formika, rangka kayu kamper ( dipolitur )
Bahan An. SNI ( Revisi ) 6.24.1
0.0196 m3 Kayu kamper, papan
@ Rp
6,520,500.00
0.300 Kg Paku biasa 1/2" - 1"
@ Rp
10,478.80
0.800 Lt Lem kayu
@ Rp
8,625.00
0.500 Lbr Teakwood 4' x 8' x 4 mm@ Rp
81,512.00
0.500 Lt Politur
@ Rp
35,420.00
0.500 Lbr Formica 4' x 8'
@ Rp
62,330.00
Sub total :
Upah An. SNI ( Revisi ) 6.24.2
0.800 Oh Pekerja
@ Rp
32,750.00
2.500 Oh Tukang kayu
@ Rp
42,000.00
0.250 Oh Kepala tukang
@ Rp
44,000.00
0.040 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
25. 1 m2 Pasang pintu formika double, rangka kayu jati
Bahan An. SNI ( Revisi ) 6.25.1
0.0196 m3 Kayu jati, papan
@ Rp
0.300 Kg Paku biasa 1/2" - 1"
@ Rp
1.200 Lt Lem kayu
@ Rp
2.000 Lbr Formica 4' x 8'
@ Rp
Upah An. SNI ( Revisi ) 6.25.2
1.000 Oh Pekerja
2.600 Oh Tukang kayu
0.260 Oh Kepala tukang
0.050 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
62,330.00 = Rp
= Rp
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
@ Rp
@ Rp
@ Rp
@ Rp
124,660.00
265,955.44
Halaman : 53
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
32,750.00
109,200.00
11,440.00
2,750.00
156,140.00
422,095.44
15,939,000.00
10,166.00
10,478.80
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
17,532,900.00
152,490.00
8,383.04
17,693,773.04
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
131,000.00
504,000.00
52,800.00
11,000.00
698,800.00
18,392,573.04
5,750,000.00
10,166.00
10,478.80
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
6,325,000.00
152,490.00
8,383.04
6,485,873.04
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
131,000.00
504,000.00
52,800.00
11,000.00
698,800.00
7,184,673.04
=
=
=
=
Rp
Rp
Rp
Rp
4,250,400.00
152,490.00
8,383.04
4,411,273.04
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
131,000.00
504,000.00
52,800.00
11,000.00
698,800.00
5,110,073.04
3,542,000.00
10,166.00
10,478.80
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
3,896,200.00
152,490.00
8,383.04
4,057,073.04
Halaman : 54
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
131,000.00
504,000.00
52,800.00
11,000.00
698,800.00
4,755,873.04
Sub total :
Total upah+bahan :
KUDA KUDA
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
PASANG USUK.
4,100,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
4,200.00
440.00
275.00
8,190.00
58,961.82
= Rp
= Rp
= Rp
45,816.00
1,571.82
47,387.82
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
4,200.00
440.00
275.00
8,190.00
55,577.82
3,404,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
40,848.00
1,571.82
42,419.82
Sub total :
Total upah+bahan :
32. 1 m2 Pasang kaso + reng genteng kodok kayu kruwing / bengkirai / kempas.
Bahan An. SNI ( Revisi ) 6.32.1
0.012 m3 Ky. kruw/beng/kempas, @ Rp
3,818,000.00
0.150 Kg Paku biasa 2" - 5"
@ Rp
10,478.80
Sub total :
Upah An. SNI ( Revisi ) 6.32.2
0.100 Oh Pekerja
@ Rp
32,750.00
0.100 Oh Tukang kayu
@ Rp
42,000.00
0.010 Oh Kepala tukang
@ Rp
44,000.00
0.005 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
33 1 m2 Pasang kaso + reng genteng kodok kayu meranti.
Bahan An. SNI ( Revisi ) 6.32.1
0.012 m3 Kayu meranti, usuk
@ Rp
0.150 Kg Paku biasa 2" - 5"
@ Rp
Upah An. SNI ( Revisi ) 6.32.2
0.100 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.005 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
4,200.00
440.00
275.00
8,190.00
50,609.82
10,810,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
151,340.00
1,571.82
152,911.82
32,750.00 = Rp
3,275.00
Halaman : 55
4,200.00
440.00
275.00
8,190.00
161,101.82
Sub total :
Total upah+bahan :
34 1 m2 Pasang kaso + reng genteng munier kayu jati
Bahan An. SNI ( Revisi ) 6.33.1
0.014 m3 Kayu jati, balok / usuk. @ Rp
0.150 Kg Paku biasa 2" - 5"
@ Rp
Upah An. SNI ( Revisi ) 6.33.2
0.100 Oh Pekerja
=
=
=
=
=
=
@ Rp
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
@ Rp
@ Rp
@ Rp
42,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
49,200.00
1,571.82
50,771.82
4,100,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
36 1 m2 Pasang kaso + reng genteng beton kayu kruwing / bengkirai / kempas.
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
57,400.00
1,571.82
58,971.82
3,275.00
4,200.00
440.00
275.00
8,190.00
67,161.82
3,818,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
4,200.00
440.00
275.00
8,190.00
63,213.82
3,404,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
47,656.00
1,571.82
49,227.82
Sub total :
Total upah+bahan :
37 1 m2 Pasang kaso + reng genteng beton kayu meranti.
Bahan An. SNI ( Revisi ) 6.35.1
0.014 m3 Kayu meranti, usuk
@ Rp
0.150 Kg Paku biasa 2" - 5"
@ Rp
Upah An. SNI ( Revisi ) 6.35.2
0.100 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.005 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
4,200.00
440.00
275.00
8,190.00
57,417.82
4,100,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
676,500.00
2,095.76
678,595.76
Sub total :
Total upah+bahan :
38 1 m2 Pasang kaso + reng atap sirap kayu kamper
Bahan An. SNI ( Revisi ) 6.36.1
0.165 m3 Kayu kamper, usuk 5/7. @ Rp
0.200 Kg Paku biasa 2" - 5"
@ Rp
Upah An. SNI ( Revisi ) 6.36.2
0.120 Oh Pekerja
0.120 Oh Tukang kayu
0.012 Oh Kepala tukang
0.006 Oh Mandor
=
=
=
=
=
=
53,452.00
1,571.82
55,023.82
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,930.00
5,040.00
528.00
330.00
9,828.00
688,423.76
Halaman : 56
= Rp
= Rp
= Rp
629,970.00
2,095.76
632,065.76
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,930.00
5,040.00
528.00
330.00
9,828.00
641,893.76
= Rp
= Rp
= Rp
129,720.00
1,047.88
130,767.88
=
=
=
=
=
=
4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
151,405.38
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
Rp
Rp
Rp
Rp
Rp
Rp
4,100,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
42 1 m2 Pasang rangka langit-langit ( 1.00 x 1.00 ) m, kayu kamper potongan 5/7 2 meter.
Bahan An. SNI ( Revisi ) 6.39.1
0.012 m3 Kayu kamper 5/7 - 2 mtr.@ Rp
2,248,480.00 = Rp
0.100 Kg Paku biasa 2" - 5"
@ Rp
10,478.80 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.39.2
0.150 Oh Pekerja
@ Rp
32,750.00 = Rp
0.250 Oh Tukang kayu
@ Rp
42,000.00 = Rp
0.025 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.075 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
49,200.00
1,047.88
50,247.88
4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
70,885.38
26,981.76
1,047.88
28,029.64
4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
48,667.14
Halaman : 57
45,816.00
1,047.88
46,863.88
4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
67,501.38
40,848.00
1,047.88
41,895.88
4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
62,533.38
23,736.00
1,047.88
24,783.88
4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
45,421.38
= Rp
= Rp
= Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
12,600.00
1,320.00
550.00
21,020.00
271,221.82
Halaman : 58
Rp
Rp
Rp
94,300.00
1,571.82
95,871.82
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
12,600.00
1,320.00
550.00
21,020.00
116,891.82
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
248,630.00
1,571.82
250,201.82
48 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu kamper potongan panjang 2 mtr.- 5/7
Bahan An. SNI ( Revisi ) 6.42.1
0.023 m3 Kayu kamper, potongan @ Rp
2,248,480.00 = Rp
0.150 Kg Paku biasa 2" - 5"
@ Rp
10,478.80 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.42.2
0.200 Oh Pekerja
@ Rp
32,750.00 = Rp
0.300 Oh Tukang kayu
@ Rp
42,000.00 = Rp
0.030 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
49 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu kruwing , bemgkirai / kempas.
Bahan An. SNI ( Revisi ) 6.43.1
0.023 m3 Ky. kruw/beng/kempas, @ Rp
3,818,000.00 = Rp
0.150 Kg Paku biasa 2" - 5"
@ Rp
10,478.80 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.43.2
0.200 Oh Pekerja
@ Rp
32,750.00 = Rp
0.300 Oh Tukang kayu
@ Rp
42,000.00 = Rp
0.030 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
50 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu Meranti panjang 4 meter - 5/7.
Bahan An. SNI ( Revisi ) 6.43.1
0.023 m3 Kayu meranti 5/7 - 4 mtr@ Rp
3,404,000.00 = Rp
0.150 Kg Paku biasa 2" - 5"
@ Rp
10,478.80 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.43.2
0.200 Oh Pekerja
@ Rp
32,750.00 = Rp
0.300 Oh Tukang kayu
@ Rp
42,000.00 = Rp
0.030 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
51 1 m2 Pasang rangka langit-langit ( 30 x 60 ) cm, kayu Meranti potongan panjang 2 meter - 5/7.
Bahan An. SNI ( Revisi ) 6.43.1
0.023 m3 Kayu meranti 5/7 - 2 mtr@ Rp
1,978,000.00 = Rp
51,715.04
1,571.82
53,286.86
6,550.00
12,600.00
1,320.00
550.00
21,020.00
74,306.86
87,814.00
1,571.82
89,385.82
6,550.00
12,600.00
1,320.00
550.00
21,020.00
110,405.82
78,292.00
1,571.82
79,863.82
6,550.00
12,600.00
1,320.00
550.00
21,020.00
100,883.82
45,494.00
@ Rp
Sub total :
10,478.80 = Rp
= Rp
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
52 1 m2 Pasang rangka langit-langit ( 30 x 30 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.44.1
0.027 m3 Kayu jati, balok
@ Rp
10,810,000.00
0.200 Kg Paku biasa 2" - 5"
@ Rp
10,478.80
Sub total :
Upah An. SNI ( Revisi ) 6.44.2
0.250 Oh Pekerja
@ Rp
32,750.00
0.350 Oh Tukang kayu
@ Rp
42,000.00
0.035 Oh Kepala tukang
@ Rp
44,000.00
0.0125 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
12,600.00
1,320.00
550.00
21,020.00
68,085.82
= Rp
= Rp
= Rp
291,870.00
2,095.76
293,965.76
=
=
=
=
=
=
8,187.50
14,700.00
1,540.00
687.50
25,115.00
319,080.76
Rp
Rp
Rp
Rp
Rp
Rp
PASANG LISPLANG
@ Rp
@ Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
1,571.82
47,065.82
Halaman : 59
110,700.00
2,095.76
112,795.76
8,187.50
14,700.00
1,540.00
687.50
25,115.00
137,910.76
60,708.96
2,095.76
62,804.72
8,187.50
14,700.00
1,540.00
687.50
25,115.00
87,919.72
103,086.00
2,095.76
105,181.76
8,187.50
14,700.00
Halaman : 60
1,540.00
687.50
25,115.00
130,296.76
@ Rp
@ Rp
17,940,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
8,400.00
1,100.00
275.00
13,050.00
142,741.94
6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
46,947.60
523.94
47,471.54
Sub total :
Total upah+bahan :
57 1 m' Pasang lisplang ukuran ( 3 x 20 ) cm, kayu kamper
Bahan An. SNI ( Revisi ) 6.48.1
0.0072 m3 Kayu kamper, papan
@ Rp
0.050 Kg Paku biasa 2" - 5"
@ Rp
Upah An. SNI ( Revisi ) 6.48.2
0.100 Oh Pekerja
0.200 Oh Tukang kayu
0.025 Oh Kepala tukang
0.0050 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
8,400.00
1,100.00
275.00
13,050.00
60,521.54
= Rp
= Rp
= Rp
27,489.60
523.94
28,013.54
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
8,400.00
1,100.00
275.00
13,050.00
41,063.54
17,940,000.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
197,340.00
523.94
197,863.94
Sub total :
Total upah+bahan :
58 1 m' Pasang lisplang ukuran ( 3 x 20 ) cm, kayu meranti.
Bahan An. SNI ( Revisi ) 6.48.1
0.0072 m3 Kayu meranti, papan
@ Rp
3,818,000.00
0.050 Kg Paku biasa 2" - 5"
@ Rp
10,478.80
Sub total :
Upah An. SNI ( Revisi ) 6.48.2
0.100 Oh Pekerja
@ Rp
32,750.00
0.200 Oh Tukang kayu
@ Rp
42,000.00
0.025 Oh Kepala tukang
@ Rp
44,000.00
0.0050 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
59 1 m' Pasang lisplang ukuran ( 3 x 30 ) cm, kayu jati
Bahan An. SNI ( Revisi ) 6.49.1
0.011 m3 Kayu jati, papan
@ Rp
0.050 Kg Paku biasa 2" - 5"
@ Rp
Upah An. SNI ( Revisi ) 6.49.2
0.110 Oh Pekerja
0.220 Oh Tukang kayu
0.022 Oh Kepala tukang
0.005 Oh Mandor
=
=
=
=
=
=
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,602.50
9,240.00
968.00
275.00
14,085.50
211,949.44
Halaman : 61
6,520,500.00 = Rp
10,478.80 = Rp
Sub total :
= Rp
71,725.50
523.94
72,249.44
Sub total :
Total upah+bahan :
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
129,168.00
523.94
129,691.94
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
61 1 m' Pasang lisplang ukuran ( 3 x 30 ) cm, kayu meranti.
Bahan An. SNI ( Revisi ) 6.50.1
0.011 m3 Kayu kamper, meranti. @ Rp
3,818,000.00
0.050 Kg Paku biasa 2" - 5"
@ Rp
10,478.80
Sub total :
Upah An. SNI ( Revisi ) 6.50.2
0.110 Oh Pekerja
@ Rp
32,750.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,602.50
9,240.00
968.00
275.00
14,085.50
86,334.94
= Rp
= Rp
= Rp
41,998.00
523.94
42,521.94
= Rp
3,602.50
@ Rp
@ Rp
@ Rp
42,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
=
=
=
=
=
=
4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
115,813.48
= Rp
= Rp
= Rp
55,361.00
628.73
55,989.73
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
10,500.00
1,100.00
4,125.00
20,637.50
76,627.23
6,520,500.00 = Rp
56,076.30
Halaman : 62
628.73
56,705.03
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
@ Rp
Sub total :
94,547.25
628.73
95,175.98
Rp
Rp
Rp
Rp
Rp
Rp
= Rp
= Rp
= Rp
9,240.00
968.00
275.00
14,085.50
56,607.44
@ Rp
@ Rp
@ Rp
@ Rp
10,478.80 = Rp
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
65 1 m' Pasang lisplang ukuran 2 x ( 2 x 20 ) cm, kayu meranti.
Bahan An. SNI ( Revisi ) 6.52.1
0.0086 m3 Kayu kamper, papan
@ Rp
3,818,000.00
0.060 Kg Paku biasa 2" - 5"
@ Rp
10,478.80
Sub total :
Upah An. SNI ( Revisi ) 6.52.2
0.100 Oh Pekerja
@ Rp
32,750.00
0.100 Oh Tukang kayu
@ Rp
42,000.00
0.010 Oh Kepala tukang
@ Rp
44,000.00
0.050 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
4,200.00
440.00
2,750.00
10,665.00
67,370.03
= Rp
= Rp
= Rp
32,834.80
628.73
33,463.53
=
=
=
=
=
=
3,275.00
4,200.00
440.00
2,750.00
10,665.00
44,128.53
Rp
Rp
Rp
Rp
Rp
Rp
34,731.84
628.73
35,360.57
3,275.00
4,200.00
@ Rp
@ Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
440.00
2,750.00
10,665.00
46,025.57
5,750,000.00
6,520,500.00
10,478.80
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
112,125.00
45,643.50
1,047.88
158,816.38
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
18,900.00
1,980.00
4,125.00
29,917.50
188,733.88
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
10,478.80 = Rp
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
67 1 m2 Pasang rangka dan dinding pemisah kayu meranti.
Bahan An. SNI ( Revisi ) 6.54.1
0.0195 m3 Kayu meranti, balok
@ Rp
3,542,000.00
0.007 m3 Kayu meranti, papan
@ Rp
3,818,000.00
0.100 Kg Paku biasa 2" - 5"
@ Rp
10,478.80
Sub total :
Upah An. SNI ( Revisi ) 6.54.2
0.150 Oh Pekerja
@ Rp
32,750.00
0.450 Oh Tukang kayu
@ Rp
42,000.00
0.045 Oh Kepala tukang
@ Rp
44,000.00
0.075 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
68 1 m2 Pasang dinding pemisah tripleks 4mm
Bahan An. SNI ( Revisi ) 6.56.1
0.0195 m3 Kayu kamper, balok
0.007 m3 Kayu kamper, papan
0.100 Kg Paku biasa 2" - 5"
0.560 Lt Lem kayu
1.000 Lbr Tripleks 4' x 8' x 4 mm
Upah An. SNI ( Revisi ) 6.56.2
0.200 Oh Pekerja
0.600 Oh Tukang kayu
0.060 Oh Kepala tukang
0.010 Oh Mandor
75,348.00
27,627.60
Halaman : 63
1,047.88
104,023.48
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
18,900.00
1,980.00
4,125.00
29,917.50
133,940.98
=
=
=
=
Rp
Rp
Rp
Rp
69,069.00
26,726.00
1,047.88
96,842.88
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
18,900.00
1,980.00
4,125.00
29,917.50
126,760.38
5,750,000.00
6,520,500.00
10,478.80
19,320.00
91,908.00
Sub total :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
112,125.00
45,643.50
1,047.88
10,819.20
91,908.00
149,418.58
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
25,200.00
2,640.00
550.00
34,940.00
184,358.58
Sub total :
Total upah+bahan :
68 1 m2 Pasang dinding pemisah teakwood rangkap, rangka kayu kamper
Bahan An. SNI ( Revisi ) 6.56.1
0.0195
0.007
0.100
0.560
1.000
m3
m3
Kg
Lt
Lbr
5,750,000.00
6,520,500.00
10,478.80
19,320.00
81,512.00
Sub total :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
112,125.00
45,643.50
1,047.88
10,819.20
81,512.00
139,022.58
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
25,200.00
2,640.00
550.00
34,940.00
173,962.58
Halaman : 64
Rp
Rp
Rp
Rp
Rp
Rp
112,125.00
45,643.50
1,047.88
10,819.20
62,330.00
119,840.58
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
25,200.00
2,640.00
550.00
34,940.00
154,780.58
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
15,939,000.00
10,478.80
15,985.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
111,573.00
1,047.88
2,397.75
115,018.63
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
19,650.00
75,600.00
7,920.00
1,650.00
104,820.00
219,838.63
10,350.00 = Rp
= Rp
10,867.50
10,867.50
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
687.75
882.00
88.00
55.00
1,712.75
12,580.25
3,312.00 = Rp
= Rp
3,477.60
3,477.60
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
687.75
882.00
88.00
55.00
1,712.75
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007..
= Rp
5,190.35
Halaman : 65
43750
19
10###
12
= Rp
= Rp
= Rp
14,927.00
104.79
15,031.79
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
982.50
2,940.00
308.00
82.50
4,313.00
19,344.79
= Rp
= Rp
= Rp
12,397.00
150.88
12,547.88
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
982.50
2,940.00
308.00
82.50
4,313.00
16,860.88
= Rp
= Rp
= Rp
16,596.80
150.88
16,747.68
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
982.50
2,940.00
308.00
82.50
4,313.00
21,060.68
= Rp
= Rp
= Rp
11,860.64
150.88
12,011.52
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
982.50
2,940.00
308.00
82.50
4,313.00
16,324.52
Halaman : 66
= Rp
= Rp
= Rp
10,120.00
150.88
10,270.88
= Rp
982.50
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
42,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
10,750.00 = Rp
15,088.00 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
62,350.00
754.40
63,104.40
Rp
Rp
Rp
Rp
Rp
Rp
1,965.00
4,200.00
440.00
165.00
6,770.00
69,874.40
39,500.00 = Rp
15,088.00 = Rp
Sub total :
= Rp
59,250.00
754.40
60,004.40
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
8. 1 m2 Pasang langit-langit plywood ( 30 x 60 ) cm, tebal 4 mm
Bahan An. SNI ( Revisi ) 6.8.1
0.360 Lbr Plywood 4' x 8' x 4 mm @ Rp
65,780.00
0.030 Kg Paku
@ Rp
15,088.00
Sub total :
Upah An. SNI ( Revisi ) 6.8.2
0.070 Oh Pekerja
@ Rp
32,750.00
0.100 Oh Tukang kayu
@ Rp
42,000.00
0.010 Oh Kepala tukang
@ Rp
44,000.00
0.0035 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
2,940.00
308.00
82.50
4,313.00
14,583.88
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,965.00
4,200.00
440.00
165.00
6,770.00
66,774.40
= Rp
= Rp
= Rp
23,680.80
452.64
24,133.44
=
=
=
=
=
=
2,292.50
4,200.00
440.00
192.50
7,125.00
31,258.44
Rp
Rp
Rp
Rp
Rp
Rp
Halaman : 67
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
= Rp
= Rp
= Rp
72,151.92
452.64
72,604.56
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
2,292.50
4,200.00
440.00
192.50
7,125.00
79,729.56
75,158.25
452.64
75,610.89
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
11 1 m2 Pasang langit-langit tripleks ( 60 x 120 ) cm, tebal 6 mm
Bahan An. SNI ( Revisi ) 6.13.1
0.375 Lbr Teakwood 4' x 8' x 4 mm@ Rp
89,700.00
0.030 Kg Paku
@ Rp
15,088.00
Sub total :
Upah An. SNI ( Revisi ) 6.13.2
0.070 Oh Pekerja
@ Rp
32,750.00
0.100 Oh Tukang kayu
@ Rp
42,000.00
0.010 Oh Kepala tukang
@ Rp
44,000.00
0.0035 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
12 1 m2 Pasang langit-langit lat kayu jati
Bahan An. SNI ( Revisi ) 6.14.1
0.024 m3 Kayu jati, papan
0.010 Kg Paku
0.050 Kg Paku sekrup
Upah An. SNI ( Revisi ) 6.14.2
0.200 Oh Pekerja
0.600 Oh Tukang kayu
0.060 Oh Kepala tukang
0.010 Oh Mandor
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
2,292.50
4,200.00
440.00
192.50
7,125.00
82,735.89
= Rp
= Rp
= Rp
33,637.50
452.64
34,090.14
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
2,292.50
4,200.00
440.00
192.50
7,125.00
41,215.14
@ Rp
@ Rp
@ Rp
17,940,000.00
9,779.60
15,985.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
430,560.00
97.80
799.25
431,457.05
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
25,200.00
2,640.00
550.00
34,940.00
466,397.05
Halaman : 68
@ Rp
@ Rp
@ Rp
6,500,000.00
9,779.60
15,985.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
156,000.00
97.80
799.25
156,897.05
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
25,200.00
2,640.00
550.00
34,940.00
191,837.05
@ Rp
@ Rp
@ Rp
6,520,500.00
9,779.60
15,985.00
Sub total :
=
=
=
=
Rp
Rp
Rp
Rp
156,492.00
97.80
799.25
157,389.05
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
25,200.00
2,640.00
550.00
34,940.00
192,329.05
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Sub total :
Total upah+bahan :
14 1 m2 Pasang langit-langit lat kayu kamper
Bahan An. SNI ( Revisi ) 6.16.1
0.024 m3 Kayu kamper, papan
0.010 Kg Paku
0.050 Kg Paku sekrup
Upah An. SNI ( Revisi ) 6.16.2
0.200 Oh Pekerja
0.600 Oh Tukang kayu
0.060 Oh Kepala tukang
0.010 Oh Mandor
Sub total :
Total upah+bahan :
15 1 m2 Pasang langit-langit soft board
Bahan An. SNI ( Revisi ) 6.17.1
35,000.00 = Rp
216.20 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
19,650.00
4,200.00
440.00
165.00
24,455.00
38,867.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
45,000.00
2,094.84
750.00
59,250.00
107,094.84
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
21,000.00
2,200.00
412.50
28,525.00
135,619.84
Halaman : 69
10,350.00 = Rp
9,779.60 = Rp
Sub total :
= Rp
11,385.00
97.80
11,482.80
Sub total :
Total upah+bahan :
16 1 m2 Pasang langit-langit akustik 60 x 120 cm + rangka alluminium
Bahan An. SNI ( Revisi ) 6.18.1
3.600 m' Profil alluminium T
@ Rp
12,500.00
0.150 Kg Kawat seng polos
@ Rp
13,965.60
1.000 Bh Ramset/dinabolt
@ Rp
750.00
1.500 Lbr Akustik arm strong 60x @ Rp
39,500.00
Sub total :
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja
@ Rp
32,750.00
0.500 Oh Tukang kayu
@ Rp
42,000.00
0.050 Oh Kepala tukang
@ Rp
44,000.00
0.0075 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
1,637.50
2,100.00
220.00
165.00
4,122.50
15,605.30
115,000.00 = Rp
15,985.00 = Rp
Sub total :
= Rp
41,860.00
1,758.35
43,618.35
Sub total :
Total upah+bahan :
18 1 m2 Pasang langit-langit gypsum board, tebal 9 mm
Bahan An. SNI ( Revisi ) 6.24.1
0.364 Lbr Gypsum board ( 120x24 @ Rp
0.110 Kg Paku sekrup
@ Rp
Upah An. SNI ( Revisi ) 6.24.2
0.100 Oh Pekerja
0.050 Oh Tukang kayu
0.005 Oh Kepala tukang
0.0050 Oh Mandor
12,250.00
2,162.00
14,412.00
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
2,100.00
220.00
275.00
5,870.00
49,488.35
Halaman : 70
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
1,094.80 = Rp
= Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
3,300.00
352.00
440.00
9,004.50
36,374.50
2,150.00 = Rp
= Rp
53,750.00
53,750.00
Sub total :
Total upah+bahan :
2. 1 m2 Pasang atap genteng kodok/glazzur
Bahan An. SNI ( Revisi ) 6.2.1
25.000 Bh Genteng kodok
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
3,300.00
352.00
440.00
9,004.50
62,754.50
= Rp
= Rp
39,000.00
39,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
2,640.00
2,640.00
440.00
10,632.50
49,632.50
7,866.00 = Rp
= Rp
94,392.00
94,392.00
Sub total :
Total upah+bahan :
3. 1 m2 Pasang atap genteng plenthong super/besar ex kanmuri
Bahan An. SNI ( Revisi ) 6.3.1
12.000 Bh Genteng plenthong supe@ Rp
3,250.00
Sub total :
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja
@ Rp
32,750.00
0.060 Oh Tukang kayu
@ Rp
44,000.00
0.060 Oh Kepala tukang
@ Rp
44,000.00
0.008 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
4
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
2,640.00
2,640.00
440.00
10,632.50
105,024.50
64,335.60
Sub total :
Total upah+bahan :
5
=
=
=
=
=
=
27,370.00
27,370.00
=
=
=
=
=
=
Sub total :
@ Rp
= Rp
64,335.60
32,750.00 = Rp
4,912.50
Halaman : 71
2,640.00
2,640.00
440.00
10,632.50
74,968.10
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
44,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
1,812.40 = Rp
= Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
2,640.00
2,640.00
440.00
10,632.50
55,942.50
1,058.00 = Rp
= Rp
26,450.00
26,450.00
Sub total :
Total upah+bahan :
7
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
2,640.00
2,640.00
440.00
10,632.50
37,082.50
3,500.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
17,500.00
6,638.72
2,901.90
27,040.62
Sub total :
Total upah+bahan :
8
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
13,100.00
8,800.00
880.00
110.00
22,890.00
49,930.62
7,000.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
35,000.00
6,638.72
2,901.90
44,540.62
Sub total :
Total upah+bahan :
9
=
=
=
=
=
=
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
13,100.00
8,800.00
880.00
110.00
22,890.00
67,430.62
Halaman : 72
8,250.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
33,000.00
6,638.72
2,901.90
42,540.62
Sub total :
Total upah+bahan :
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
45,310.00
45,310.00
0.400
0.200
0.020
0.002
Oh
Oh
Oh
Oh
Pekerja
Tukang kayu
Kepala tukang
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
43,700.00
6,638.72
2,901.90
53,240.62
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
13,100.00
8,800.00
880.00
110.00
22,890.00
76,130.62
5,032.40 = Rp
9,779.60 = Rp
Sub total :
= Rp
55,356.40
293.39
55,649.79
32,750.00
44,000.00
55,000.00
2,750.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
4,400.00
550.00
27.50
11,527.50
67,177.29
Halaman : 73
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
7,500.00
9,779.60
829.84
90,684.40
6,900.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
26,250.00
488.98
8,962.27
2,901.90
1,725.00
40,328.15
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
13,100.00
8,800.00
880.00
1,100.00
23,880.00
64,208.15
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
15 1 m2 Pasang atap asbes gelombang besar.
Bahan An. SNI ( Revisi ) 6.8.1
13,100.00
8,800.00
880.00
110.00
22,890.00
54,280.62
Rp
Rp
Rp
Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
21,850.00
6,638.72
2,901.90
31,390.62
=
=
=
=
Sub total :
Total upah+bahan :
13,100.00
8,800.00
880.00
110.00
22,890.00
65,430.62
29,090.40 = Rp
15,985.00 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,585.00
3,300.00
352.00
440.00
8,677.00
45,503.68
19,991.60 = Rp
15,985.00 = Rp
Sub total :
= Rp
23,989.92
1,918.20
25,908.12
Sub total :
Total upah+bahan :
16 1 m2 Pasang atap asbes gelombang kecil.
Bahan An. SNI ( Revisi ) 6.9.1
1.200 M2 Asbes glmbg
@ Rp
0.120 Kg Paku pancing 60 x 230 @ Rp
Upah An. SNI ( Revisi ) 6.9.2
0.140 Oh Pekerja
0.075 Oh Tukang kayu
0.008 Oh Kepala tukang
0.008 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,585.00
3,300.00
352.00
440.00
8,677.00
34,585.12
63,093.60 = Rp
50.00 = Rp
Sub total :
= Rp
63,093.60
200.00
63,293.60
Sub total :
Total upah+bahan :
17 1 m1 Pasang BUBUNGAN asbes gelombang besar
Bahan An. SNI ( Revisi ) 6.9.1
1.000 Bh Nok asbes gel.besar@ Rp
4.000 Bh skrup kayu/paku pa @ Rp
Upah An. SNI ( Revisi ) 6.9.2
0 Oh Pekerja
0 Oh Tukang kayu
0 Oh Kepala tukang
0 Oh Mandor
=
=
=
=
=
=
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
163.75
4,840.00
88.00
825.00
5,916.75
69,210.35
Halaman : 74
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
34,908.48
1,918.20
36,826.68
48,438.00 = Rp
50.00 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
19 1 m2 Pasang atap seng Galvalum type DJLS 45 Warna
Bahan An. SNI
1 M2 1 M! SENG GALVALUM
103,224.00
( Lebar efektif 73 Cm.) @ Rp
4.000 Bh Paku rifet
@ Rp
300.00
Sub total :
Upah An. SNI
@ Rp
32,750.00
0 Oh Pekerja
@ Rp
44,000.00
0 Oh Tukang kayu
@ Rp
55,000.00
0 Oh Mandor
1 Ls Biaya mekanik/pera @ Rp
2,650.00
Sub total :
Total upah+bahan :
20 1 m2 Pasang atap seng Galvalum type DJLS 45 Warna
Bahan An. SNI
=
=
=
=
=
=
48,438.00
200.00
48,638.00
Rp
Rp
Rp
Rp
Rp
Rp
163.75
4,840.00
88.00
825.00
5,916.75
54,554.75
= Rp
= Rp
= Rp
141,416.88
1,200.00
142,616.88
= Rp
= Rp
= Rp
Rp
= Rp
= Rp
687.75
484.00
220.00
2,650.00
4,041.75
146,658.63
1 M2 1 M! SENG GALVALUM
( Lebar efektif 73 Cm.) @ Rp
4.000 Bh Paku rifet
@ Rp
59,800.00 = Rp
300.00 = Rp
Sub total :
= Rp
81,926.00
1,200.00
83,126.00
32,750.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
2,650.00
Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
687.75
484.00
220.00
2,650.00
4,041.75
87,167.75
100,000.00
Rp
300.00 = Rp
Sub total :
= Rp
115,000.00
1,200.00
116,200.00
32,750.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
2,750.00
Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
687.75
484.00
220.00
2,750.00
4,141.75
120,341.75
Halaman : 75
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
0.00 = Rp
9,779.60 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
5,436.50
11,000.00
1,100.00
440.00
17,976.50
19,932.42
78,660.00
9,779.60
9,779.60
3,946,800.00
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
31,464.00
586.78
488.98
15,787.20
48,326.96
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,093.75
11,000.00
1,100.00
330.00
16,523.75
64,850.71
78,660.00 = Rp
9,779.60 = Rp
Sub total :
= Rp
55,062.00
195.59
55,257.59
Sub total :
Total upah+bahan :
23 1 m' Pasang nok sirap
Bahan An. SNI ( Revisi ) 6.37.1
0.400 Lbr Seng plat 3" x 6" bjls 28 @ Rp
0.060 Kg Paku biasa 1/2" - 1"
@ Rp
0.050 Kg Paku biasa 2" - 5"
@ Rp
0.004 m3 Kayu borneo, papan teb @ Rp
Upah An. SNI ( Revisi ) 6.37.2
0.125 Oh Pekerja
0.250 Oh Tukang kayu
0.025 Oh Kepala tukang
0.006 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
0.00
1,955.92
1,955.92
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,930.00
2,640.00
264.00
330.00
7,164.00
62,421.59
78,660.00 = Rp
9,779.60 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
64,400.00 = Rp
78,660.00 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
3,930.00
2,640.00
264.00
330.00
7,164.00
53,817.20
64,400.00 = Rp
78,660.00 = Rp
Sub total :
= Rp
19,320.00
3,146.40
22,466.40
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
45,080.00
1,573.20
46,653.20
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
4,912.50
3,080.00
352.00
330.00
8,674.50
32,663.68
Halaman : 76
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
23,598.00
391.18
23,989.18
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
3,080.00
352.00
330.00
8,674.50
31,140.90
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Halaman : 77
19
10###
12
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
10,530.00 = Rp
12,420.00 = Rp
= Rp
11,583.00
993.60
12,576.60
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
196.50
2,520.00
264.00
16.50
2,997.00
15,573.60
275,000.00 = Rp
= Rp
275,000.00
275,000.00
Sub total :
Total upah+bahan :
2. 1 m2 Pasang pintu besi baja
Bahan An. SNI ( Revisi ) 6.2.1
1.000 m2 Pintu besi baja
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
42,000.00
32,750.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
27,300.00
21,287.50
2,860.00
1,760.00
53,207.50
328,207.50
265,000.00 = Rp
= Rp
265,000.00
265,000.00
Sub total :
Total upah+bahan :
3. 1 m2 Pasang jendela besi
Bahan An. SNI ( Revisi ) 6.3.1
1.000 m2 Jendela besi
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
42,000.00
32,750.00
44,000.00
55,000.00
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
44,100.00
34,387.50
4,620.00
288.75
83,396.25
348,396.25
16,750.00 = Rp
= Rp
192,625.00
192,625.00
42,000.00
32,750.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
50,400.00
39,300.00
528.00
33.00
90,261.00
282,886.00
19,044.00 = Rp
9,779.60 = Rp
3,499,526.36 = Rp
20,948.40
195.59
6,299.15
Halaman : 78
27,443.14
Sub total :
Total upah+bahan :
5
@ Rp
@ Rp
@ Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
4
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Sub total :
Upah An. SNI ( Revisi ) 6.13.2
0.100 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.0005 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
= Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
4,400.00
440.00
27.50
8,142.50
35,585.64
@ Rp
@ Rp
@ Rp
17,181.00 = Rp
9,779.60 = Rp
3,499,526.36 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
4,400.00
440.00
27.50
8,142.50
33,536.34
15,675.00 = Rp
9,779.60 = Rp
3,499,526.36 = Rp
Sub total :
= Rp
17,242.50
195.59
6,299.15
23,737.24
Sub total :
Total upah+bahan :
7
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
8
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
4,400.00
440.00
27.50
8,142.50
31,879.74
1 m2 Pasang pagar kawat dari besi siku tinggi 1,5 m dan panjang 3m tidak termasuk pondasi setempat.
Bahan
@ Rp
15,686.00 = Rp
12 m1 m' besi L 40 . 40 . 5
@ Rp
6,808.00 = Rp
34 m1 m'kawat duri
Sub total :
= Rp
Upah Pekerjaan mengelas diperhitungkan.
Ongkos kerja diperhitungkan
Sub total :
Total upah+bahan :
Harga per M2 pagar kawat :=
=
=
=
=
=
=
18,899.10
195.59
6,299.15
25,393.84
Rp
= Rp
= Rp
= Rp
254,457.60 :
10,350.00 = Rp
Sub total :
Total upah+bahan :
11 1 m2 Pintu Rolling bahan dari Aluminium.
Bahan
1 M2 Pintu dari aluminium
@ Rp
Sub total :
27,500.00
45,000.00
72,500.00
254,457.60
56,546.13
Rp
= Rp
= Rp
= Rp
113,850.00
70,000.00
95,000.00
278,850.00
Halaman : 79
85,000.00
65,000.00
65,000.00
343,850.00
255,000.00 = Rp
= Rp
Rp
= Rp
= Rp
293,250.00
293,250.00
52,500.00
52,500.00
345,750.00
240,488.00 = Rp
= Rp
Rp
= Rp
276,561.20
276,561.20
25,000.00
25,000.00
Rp
= Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
181,957.60
231,472.00
413,429.60
Total upah+bahan :
13 1 m2 Pintu Besi B.R.C.
Bahan
1 M2 pagar besi BRC.
@ Rp
Sub total :
= Rp
301,561.20
240,488.00 = Rp
= Rp
= Rp
264,536.80
264,536.80
60,000.00
= Rp
= Rp
= Rp
5,000.00
65,000.00
329,536.80
240,488.00 = Rp
= Rp
= Rp
264,536.80
45,000.00
309,536.80
60,000.00
= Rp
= Rp
= Rp
5,000.00
65,000.00
374,536.80
Sub total :
Total upah+bahan :
14 1 m2 Pagar Besi B.R.C.
Bahan
@ Rp
1 M2 pagar besi BRC.
1 M2 Rangka besi besi pintu diameter 2 incs.
Sub total :
Upah Biaya pasang / Upah diperhitungkan.
Biaya transfotasi (relatif) jarak
jauh dekatnya.
Sub total :
Total upah+bahan :
Halaman : 80
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
0.104
0.104
0.001
0.0001
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
44,640.00 = Rp
= Rp
49,104.00
49,104.00
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
3,406.00
4,368.00
44.00
2.75
7,820.75
56,924.75
55,680.00 = Rp
= Rp
61,248.00
61,248.00
32,750.00
42,000.00
44,000.00
55,000.00
3,406.00
4,368.00
44.00
2.75
7,820.75
69,068.75
Sub total :
Total upah+bahan :
0.104
0.104
0.001
0.0001
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
0.104
0.104
0.001
0.0001
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
47,040.00 = Rp
= Rp
51,744.00
51,744.00
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
3,406.00
4,368.00
44.00
2.75
7,820.75
59,564.75
59,040.00 = Rp
= Rp
64,944.00
64,944.00
32,750.00
42,000.00
44,000.00
55,000.00
3,406.00
4,368.00
44.00
2.75
7,820.75
72,764.75
Sub total :
Total upah+bahan :
0.104
0.104
0.001
0.0001
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Halaman : 81
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
19 1 Bh. Pasang pintu aluminium 2,75" putih ( Silver) UKURAN 0.80 X 2.00 Mtr.
( pintu isian kaca bening 5mm dan multipleks 9 mm).
Bahan An. SNI ( Revisi ) 6.9.1
44,640.00
6 M1 Slimar Aluminium putih 2@ Rp
2,400.00
15 M1 Karet penjepit kaca/ tripl @ Rp
@ Rp
15,410.00
1 set Engsel.
@ Rp
58,420.00
1 Bh Kunci
@ Rp
56,396.00
1 M2 Kaca bening 5 mm
@ Rp
119,600.00
1 M2 Multipleks 9 mm
1 Ls Paku Skrup
@ Rp
7,500.00
Sub total :
koefisen tenaga ditambah 35 % dari anlisa untuk 1 M2 pembuatan pintu aluminium.
Upah
1.418 Oh Pekerja
@ Rp
32,750.00
1.418 Oh Tukang besi
@ Rp
44,000.00
0.142 Oh Kepala tukang besi
@ Rp
44,000.00
0.0070 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
= Rp
Rp
Rp
Rp
Rp
Rp
Rp
= Rp
279,000.00
36,000.00
15,410.00
58,420.00
36,093.44
148,304.00
7,500.00
580,727.44
=
=
=
=
=
=
46,423.13
62,370.00
6,237.00
386.10
115,416.23
696,143.67
Rp
Rp
Rp
Rp
Rp
Rp
20 1 Bh. Pasang pintu aluminium 2,75" coklat ( Brown) UKURAN 0.80 X 2.00 Mtr.
( pintu isian kaca bening 5mm dan multipleks 9 mm).
Bahan An. SNI ( Revisi ) 6.9.1
47,040.00 = Rp
6 M1 Slimar Aluminium coklat @ Rp
2,400.00
Rp
15 M1 Karet penjepit kaca/ tripl @ Rp
@ Rp
13,800.00
Rp
1 set Engsel.
@ Rp
58,420.00
Rp
1 Bh Kunci
@ Rp
56,396.00
Rp
1 M2 Kaca bening 5 mm
@ Rp
119,600.00
Rp
1 M2 Multipleks 9 mm
1 Ls Paku Skrup
@ Rp
7,500.00
Rp
Sub total :
= Rp
koefisen tenaga ditambah 30 % dari anlisa untuk 1 M2 pembuatan pintu aluminium karena
pintu ini ukuran 80 x 200 Cm.dan ada ambang tengah.
Upah
1.418 Oh Pekerja
@ Rp
32,750.00 = Rp
1.418 Oh Tukang besi
@ Rp
44,000.00 = Rp
0.142 Oh Kepala tukang besi
@ Rp
44,000.00 = Rp
0.0070 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
21 1M2 Pasang daun jendela aluminium 2" putih ( Silver) UKURAN 1.00 X 1.00 Mtr.
( Jendela isian kaca 5mm).
294,000.00
36,000.00
13,800.00
58,420.00
36,093.44
148,304.00
7,500.00
594,117.44
46,423.13
62,370.00
6,237.00
386.10
115,416.23
709,533.67
1.050
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
44,640.00 = Rp
2,400.00
Rp
7,562.40
Rp
11,500.00
Rp
56,396.00
Rp
= Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
22 1Bh Pasang daun jendela aluminium 2" putih ( Silver) UKURAN 0.50 X 0.60 Mtr.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
44,640.00 = Rp
2 M1 Slimar Aluminium putih 2@ Rp
2,400.00
Rp
4 M1 Karet penjepit kaca/ tripl @ Rp
@ Rp
7,562.40
Rp
1 set Engsel jendela.
@ Rp
11,500.00
Rp
1 Bh Hak window .
@ Rp
56,396.00
Rp
0 M2 Kaca bening 5 mm
Sub total :
= Rp
Upah
1.050
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
34,387.50
46,200.00
4,620.00
286.00
85,493.50
390,125.29
Halaman : 82
98,208.00
10,560.00
7,562.40
11,500.00
16,918.80
144,749.20
Rp
Rp
Rp
Rp
Rp
Rp
34,387.50
46,200.00
4,620.00
286.00
85,493.50
230,242.70
23 1Bh Pasang daun jendela aluminium 2" putih ( Silver) UKURAN 0.50 X 0.50 Mtr.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
44,640.00 = Rp
2 M1 Slimar Aluminium putih 2@ Rp
2,400.00
Rp
4 M1 Karet penjepit kaca/ tripl @ Rp
@ Rp
7,562.40
Rp
1 set Engsel jendela.
@ Rp
11,500.00
Rp
1 Bh Hak window .
@ Rp
56,396.00
Rp
0 M2 Kaca bening 5 mm
Sub total :
= Rp
89,280.00
9,600.00
7,562.40
11,500.00
14,099.00
132,041.40
Sub total :
Total upah+bahan :
Upah
1.050
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
214,272.00
20,400.00
7,562.40
11,500.00
50,897.39
304,631.79
Rp
Rp
Rp
Rp
Rp
Rp
34,387.50
46,200.00
4,620.00
286.00
85,493.50
217,534.90
24 1M2 Pasang daun jendela aluminium 2" coklat (Brown) UKURAN 1.00 X 1.00 Mtr.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
47,040.00 = Rp
5 M1 Slimar Aluminium coklat @ Rp
2,400.00
Rp
9 M1 Karet penjepit kaca/ tripl @ Rp
@ Rp
7,562.40
Rp
1 set Engsel jendela.
@ Rp
11,500.00
Rp
1 Bh Hak window .
@ Rp
56,396.00
Rp
1 M2 Kaca bening 5 mm
Sub total :
= Rp
225,792.00
20,400.00
7,562.40
11,500.00
50,897.39
316,151.79
Sub total :
Total upah+bahan :
Upah
1.050
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
34,387.50
44,100.00
4,620.00
286.00
83,393.50
399,545.29
Halaman : 83
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
25 1Bh Pasang daun jendela aluminium 2" coklat (Brown) UKURAN 50 X 60 Cm.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
47,040.00 = Rp
2 M1 Slimar Aluminium coklat @ Rp
2,400.00
Rp
4 M1 Karet penjepit kaca/ tripl @ Rp
@ Rp
7,562.40
Rp
1 set Engsel jendela.
@ Rp
11,500.00
Rp
1 Bh Hak window .
@ Rp
56,396.00
Rp
0 M2 Kaca bening 5 mm
Sub total :
= Rp
Upah
1.050
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
42,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
34,387.50
44,100.00
4,410.00
286.00
83,183.50
233,212.70
26 1Bh. Pasang daun jendela aluminium 2" coklat (Brown) UKURAN 50 X 50 Cm.
( Jendela isian kaca 5mm).
Bahan An. SNI ( Revisi ) 6.3.1
47,040.00 = Rp
2 M1 Slimar Aluminium coklat @ Rp
2,400.00
Rp
4 M1 Karet penjepit kaca/ tripl @ Rp
@ Rp
7,562.40
Rp
1 set Engsel jendela.
@ Rp
11,500.00
Rp
1 Bh Hak window .
@ Rp
56,396.00
Rp
0 M2 Kaca bening 5 mm
Sub total :
= Rp
94,080.00
9,600.00
7,562.40
11,500.00
14,099.00
136,841.40
Sub total :
Total upah+bahan :
Upah
1.050
1.050
0.105
0.0052
Oh
Oh
Oh
Oh
Pekerja
Tukang besi
Kepala tukang besi
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
32,750.00
42,000.00
42,000.00
55,000.00
=
=
=
=
=
=
103,488.00
10,560.00
7,562.40
11,500.00
16,918.80
150,029.20
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
34,387.50
44,100.00
4,410.00
286.00
83,183.50
220,024.90
Halaman : 84
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
8,602.00 = Rp
10,478.80 = Rp
3,818,000.00 = Rp
4,301.00
157.18
36,652.80
Sub total :
Upah An. SNI ( Revisi ) 6.18.2
0.150 Oh Pekerja
0.400 Oh Tukang kayu
0.025 Oh Kepala tukang
### Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
20
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
4,912.50
16,800.00
1,100.00
68.75
22,881.25
63,992.23
Rp
Rp
Rp
Rp
Rp
Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
78,660.00 = Rp
32,750.00 = Rp
6,500.00 = Rp
= Rp
23,598.00
3,275.00
3,250.00
30,123.00
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
10,500.00
1,100.00
68.75
16,581.25
46,704.25
77,740.00
6,500.00
3,750.00
2,750.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
= Rp
19,435.00
3,250.00
1,312.50
2,062.50
26,060.00
4,500.00
30,560.00
Halaman : 85
77,740.00
6,500.00
3,750.00
2,750.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
= Rp
19,435.00
3,250.00
1,312.50
2,062.50
26,060.00
4,500.00
30,560.00
7,500.00 = Rp
= Rp
375.00
375.00
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Upah
LUMSUM
Total upah+bahan :
39,330.00
491.25
72,542.00
112,363.25
1,310.00
16,800.00
1,100.00
68.75
19,278.75
131,642.00
LUMSUM
=
=
=
=
=
=
44,794.56
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
Upah
=
=
=
=
=
=
78,660.00 = Rp
32,750.00 = Rp
3,818,000.00 = Rp
Sub total :
= Rp
41,110.98
= Rp :
Sub total :
Total upah+bahan :
= Rp
PEKERJAAN PENGECATAN
Pemersihan Cat
0.150
0
0
0.0025
Oh
Oh
Oh
Oh
Pekerja
Tukang cat
Kepala tukang
Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
0.00
0.00
137.50
5,050.00
5,425.00
3,750.00 = Rp
= Rp
187.50
187.50
Sub total :
Total upah+bahan :
2. 1 m2 Mencuci bidang permukaan tembok yang pernah dicat
Bahan An. SNI ( Revisi ) 6.2.1
0.050 Kg S a b u n
@ Rp
Sub total :
Upah An. SNI ( Revisi ) 6.2.2
0.150 Oh Pekerja
@ Rp
0 Oh Tukang cat
@ Rp
0 Oh Kepala tukang
@ Rp
0.0025 Oh Mandor
@ Rp
Sub total :
Total upah+bahan :
3. 1 m2 Mengerok karat cat lama permukaan baja dengan cara manual
Bahan An. SNI ( Revisi ) 6.3.1
0.050 Kg S a b u n
@ Rp
Sub total :
Upah An. SNI ( Revisi ) 6.3.2
0.150 Oh Pekerja
@ Rp
0 Oh Tukang cat
@ Rp
0 Oh Kepala tukang
@ Rp
0.0025 Oh Mandor
@ Rp
Sub total :
Total upah+bahan :
4. 1 m2 Menyabun permukaan tembok lama
Bahan An. SNI ( Revisi ) 6.4.1
0.050 Kg S a b u n
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
0.00
0.00
137.50
5,050.00
5,237.50
3,750.00 = Rp
= Rp
187.50
187.50
4,912.50
0.00
0.00
137.50
5,050.00
5,237.50
3,750.00 = Rp
= Rp
187.50
187.50
@ Rp
32,750.00 = Rp
@ Rp
@ Rp
@ Rp
44,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
= Rp
= Rp
4,912.50
Halaman : 86
0.00
0.00
137.50
5,050.00
5,237.50
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Upah An. SNI ( Revisi ) 6.4.2
0.150 Oh Pekerja
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
0 Oh Tukang cat
0 Oh Kepala tukang
0.0025 Oh Mandor
Sub total :
Total upah+bahan :
5. 1 m2 Mengerok karat atau cat lama permukaan baja dengan pancar pasir ( sanblasting )
dengan tingkat kebersihan Sa 2.5%
Bahan UNTUK 10 m2 'An. SNI ( Revisi ) 6.5.1
40.000 Kg Pasir silika
@ Rp
25.00 = Rp
10.000 Ltr B B M
@ Rp
3,250.00 = Rp
Sub total :
= Rp
Alat An. SNI ( Revisi ) 6.5.2 PER 10 M2.
Sewa / hari
Kompressor, blasting pot@ Rp
250,000.00 = Rp
selang dan nozle
Sub total :
= Rp
Upah An. SNI ( Revisi ) 6.5.3
1.600 Oh Pekerja
@ Rp
32,750.00 = Rp
1.600 Oh Tukang cat
@ Rp
44,000.00 = Rp
0.800 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.500 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Untuk 10 M2 Total upah+bahan :
= Rp
Untuk 1 M2
6. 1 m2 Mendempul dan menggosok kayu
Bahan An. SNI ( Revisi ) 6.6.1 Per 10M2
0.080 Kg Dempul jati
@ Rp
1,000.00
32,500.00
33,500.00
250,000.00
250,000.00
52,400.00
70,400.00
35,200.00
27,500.00
185,500.00
435,500.00
= Rp
43,550.00
19,200.40 = Rp
1,536.03
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
5,888.00 = Rp
2,500.00 = Rp
= Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
1,310.00
1,760.00
176.00
137.50
3,383.50
5,062.29
10,351.84 = Rp
32,117.20 = Rp
46,432.40 = Rp
= Rp
1,552.78
5,459.92
7,893.51
14,906.21
Sub total :
Total upah+bahan :
=
=
=
=
=
=
117.76
25.00
1,678.79
Cat KAYU
7. 1 m2 Pengecatan bidang kayu lama
Bahan An. SNI ( Revisi ) 6.7.1
0.150 Kg Plamir
0.170 Kg Cat dasar
0.170 Kg Cat penutup
Upah An. SNI ( Revisi ) 6.7.2
0.070 Oh Pekerja
0.075 Oh Tukang cat
0.0075 Oh Kepala tukang
0.0025 Oh Mandor
.
@ Rp
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
2,292.50
3,300.00
330.00
137.50
6,060.00
20,966.21
Halaman : 87
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
2,484.00
1,552.78
5,459.92
12,072.42
21,569.12
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
2,292.50
396.00
264.00
137.50
3,090.00
24,659.12
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
2,484.00
1,552.78
5,459.92
16,251.34
25,748.04
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
2,292.50
594.00
176.00
137.50
3,200.00
28,948.04
35,420.00 = Rp
= Rp
12,751.20
12,751.20
32,750.00 = Rp
44,000.00 = Rp
1,310.00
2,772.00
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
44,000.00 = Rp
55,000.00 = Rp
= Rp
= Rp
2,772.00
137.50
6,991.50
19,742.70
35,420.00 = Rp
35,420.00 = Rp
2,250.00 = Rp
= Rp
5,313.00
13,176.24
4,500.00
17,676.24
32,750.00 = Rp
44,000.00 = Rp
44,000.00 = Rp
0.00
2,640.00
704.00
Halaman : 88
137.50
3,481.50
21,157.74
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
0.0025 Oh Mandor
@ Rp
Sub total :
Total upah+bahan :
55,000.00 = Rp
= Rp
= Rp
39,100.00
13,340.00
19,200.40
2,500.00
4,000.00
750.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
78,200.00
13,340.00
15,360.32
3,750.00
8,000.00
1,500.00
120,150.32
35,420.00 = Rp
44,000.00 = Rp
= Rp
14,168.00
1,760.00
15,928.00
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
81,875.00
132,000.00
13,200.00
22,000.00
249,075.00
385,153.32
38,515.33
7,636.00 = Rp
= Rp
2,672.60
2,672.60
Sub total : C
Untuk 10 M2 Total upah+bahan :
Untuk 1 M2 Total upah+bahan :
13 1 m2 Pelaburan bidang kayu dengan cat residu dan ter
Bahan An. SNI ( Revisi ) 6.12.1
0.350 Ltr Residu atau ter
@ Rp
Sub total :
Upah An. SNI ( Revisi ) 6.12.2
0.100 Oh Pekerja
0.000 Oh Tukang cat
0.0000 Oh Kepala tukang
0.0060 Oh Mandor
.
@ Rp
@ Rp
@ Rp
@ Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,275.00
0.00
0.00
330.00
3,605.00
6,277.60
41,593.20
19,200.40
4,000.00
4,500.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
6,238.98
960.02
400.00
45.00
445.00
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
Rp
Rp
Rp
Rp
5,240.00
7,040.00
704.00
137.50
Sub total :
Upah An. SNI ( Revisi ) 6.13.2
0.160 Oh Pekerja
0.160 Oh Tukang cat
0.0160 Oh Kepala tukang
0.0025 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
=
=
=
=
=
=
=
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
=
=
=
=
=
=
=
Sub total :
Total upah+bahan :
= Rp
= Rp
13,121.50
13,566.50
Halaman : 89
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Cat TEMBOK
Cat BARU.
14. 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.100 Kg Plamir
@ Rp
9,196.00
0.250 Lbr Ampelas
@ Rp
4,000.00
0.020 Bh Kuwas / roll
@ Rp
6,500.00
0.100 Kg Cat dasar
@ Rp
20,447.00
0.260 Kg Cat penutup 2x
@ Rp
20,447.00
Sub total :
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja
@ Rp
32,750.00
0.063 Oh Tukang cat
@ Rp
44,000.00
0.0063 Oh Kepala tukang
@ Rp
44,000.00
0.0025 Oh Mandor
@ Rp
55,000.00
.
Sub total :
Total upah+bahan :
15 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.100 Kg Plamir
@ Rp
9,196.00
0.250 Lbr Ampelas
@ Rp
4,000.00
0.020 Bh Kuwas / roll
@ Rp
6,500.00
0.100 Kg Cat dasar
@ Rp
31,924.00
0.260 Kg Cat penutup 2x
@ Rp
31,924.00
Sub total :
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja
@ Rp
32,750.00
0.063 Oh Tukang cat
@ Rp
44,000.00
0.0063 Oh Kepala tukang
@ Rp
44,000.00
0.0025 Oh Mandor
@ Rp
55,000.00
.
Sub total :
Total upah+bahan :
16 1 m2 Pengecatan tembok baru ( 1x plamir , 1x cat dasar, 2x cat penutup )
Bahan An. SNI ( Revisi ) 6.14.1
0.100 Kg Plamir
@ Rp
9,196.00
0.250 Lbr Ampelas
@ Rp
4,000.00
0.020 Bh Kuwas / roll
@ Rp
6,500.00
0.100 Kg Cat dasar
@ Rp
54,648.00
0.260 Kg Cat penutup 2x
@ Rp
54,648.00
Sub total :
Upah An. SNI ( Revisi ) 6.14.2
0.020 Oh Pekerja
@ Rp
32,750.00
0.063 Oh Tukang cat
@ Rp
44,000.00
0.0063 Oh Kepala tukang
@ Rp
44,000.00
0.0025 Oh Mandor
@ Rp
55,000.00
.
Sub total :
Total upah+bahan :
Rp
Rp
Rp
Rp
Rp
Rp
919.60
1,000.00
130.00
2,044.70
5,316.22
9,410.52
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
655.00
2,772.00
277.20
137.50
3,841.70
13,252.22
Rp
Rp
Rp
Rp
Rp
Rp
919.60
1,000.00
130.00
3,192.40
8,300.24
13,542.24
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
655.00
2,772.00
277.20
137.50
3,841.70
17,383.94
Watershild
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
919.60
1,000.00
130.00
5,464.80
14,208.48
21,722.88
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
655.00
2,772.00
277.20
137.50
3,841.70
25,564.58
Cat LAMA.
17 1 m2 Pengecatan tembok lama ( Ngamplas, 1x cat dasar, 2x cat penutup )
Cat Paragon /Decolith
Bahan An. SNI ( Revisi ) 6.14.1
0.010 Kg Plamir
@ Rp
9,196.00 = Rp
91.96
0.120 Lbr Ampelas
@ Rp
4,000.00 = Rp
480.00
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Halaman : 90
0.033 Bh Kuwas / roll
@ Rp
6,500.00 = Rp
216.67
0.110 Kg Cat dasar
@ Rp
20,447.00 = Rp
2,249.17
0.220 Kg Cat penutup 2x
@ Rp
20,447.00 = Rp
4,498.34
Sub total :
= Rp
7,536.14
Upah An. SNI ( Revisi ) 6.14.2
0.028 Oh Pekerja
@ Rp
32,750.00 = Rp
917.00
0.042 Oh Tukang cat
@ Rp
44,000.00 = Rp
1,848.00
@ Rp
@ Rp
Sub total :
Total upah+bahan :
44,000.00 = Rp
55,000.00 = Rp
= Rp
= Rp
Rp
Rp
Rp
Rp
Rp
Rp
91.96
480.00
216.67
3,511.64
7,023.28
11,323.55
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
917.00
1,848.00
184.80
137.50
3,087.30
14,410.85
Watershild
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
91.96
480.00
216.67
6,011.28
12,022.56
18,822.47
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
917.00
1,848.00
184.80
137.50
3,087.30
21,909.77
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
400.00
187.50
600.00
82.80
682.80
@ Rp
@ Rp
@ Rp
32,750.00 = Rp
44,000.00 = Rp
44,000.00 = Rp
@ Rp
55,000.00 = Rp
= Rp
= Rp
4,912.50
44.00
4.40
Halaman : 91
137.50
5,098.40
5,781.20
@ Rp
@ Rp
@ Rp
@ Rp
4,000.00
750.00
300,000.00
552.00
Sub total :
0.0025 Oh Mandor
.
Sub total :
Total upah+bahan :
184.80
137.50
3,087.30
10,623.44
= Rp
= Rp
= Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
600.00
165.60
765.60
1,310.00
220.00
22.00
137.50
1,689.50
2,455.10
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
54,000.00
1,725.00
55,725.00
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
655.00
8,800.00
88.00
137.50
9,680.50
65,405.50
12,420.00 = Rp
6,500.00 = Rp
= Rp
1,242.00
130.00
1,372.00
Sub total :
Total upah+bahan :
45,000.00 = Rp
8,625.00 = Rp
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
655.00
8,800.00
880.00
550.00
10,885.00
12,257.00
12,420.00 = Rp
6,500.00 = Rp
750,000.00 = Rp
= Rp
1,242.00
65.00
1,500.00
1,565.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
982.50
13,200.00
1,320.00
825.00
16,327.50
17,892.50
Halaman : 92
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,242.00
1,525.00
65.00
900.00
1,050.00
58.88
600.00
5,440.88
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,310.00
22,000.00
2,200.00
1,375.00
26,885.00
32,325.88
= Rp
= Rp
= Rp
13,929.72
65.00
13,994.72
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
=
=
=
=
Rp
Rp
Rp
Rp
655.00
8,800.00
88.00
137.50
Sub total :
Total upah+bahan :
= Rp
= Rp
9,680.50
23,675.22
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
5,107.56
7,893.51
65.00
3,714.59
11,673.10
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,310.00
17,600.00
176.00
275.00
19,361.00
31,034.10
28 1 m2 Pengecatan permukaan baja lapis seng ( galbani ) secara semprot ( airless spray )
sistem 1 lapis cat mutakhir dengan tebal 200 um
Bahan An. SNI ( Revisi ) 6.25.1
0.300 Kg Cat dasar
@ Rp
46,432.40 = Rp
Peralatan Lumsum
= Rp
Sub total :
= Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
13,929.72
3,000.00
16,929.72
Halaman : 93
655.00
8,800.00
880.00
550.00
10,885.00
27,814.72
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Halaman : 94
### harga
52,500.00 upah
### harga
52,500.00 upah
55,000.00
9,500.00
65,000.00
55,000.00
9,500.00
0
0
1.050
1.050
0.105
0.0052
0.840
0.840
0.084
0.0042
5410,38
5,250.00
21,909.77
27,159.77
19
10###
12
4,800.00
829.84
90,684.40
6,900.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
31,824.00
6,771.49
2,085.74
2,070.00
42,751.24
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
5,040.00
528.00
687.50
14,443.00
57,194.24
2,350.00
829.84
90,684.40
6,900.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
26,320.00
6,937.46
2,085.74
4,140.00
39,483.20
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
5,040.00
528.00
687.50
14,443.00
53,926.20
6,210.00
829.84
90,684.40
6,900.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
38,812.50
7,302.59
1,949.71
2,070.00
50,134.81
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
5,040.00
528.00
687.50
1,750.00
16,193.00
66,327.81
5,888.00
829.84
90,684.40
6,900.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
65,945.60
8,298.40
1,949.71
4,140.00
80,333.71
Halaman : 95
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
8,515.00
5,250.00
550.00
687.50
1,750.00
16,752.50
97,086.21
Sub total :
Upah An. SNI ( Revisi ) 6.4.2
0.250 Oh Pekerja
0.120 Oh Tukang batu
0.012 Oh Kepala tukang
0.0125 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
2
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
3
@ Rp
@ Rp
@ Rp
@ Rp
Lumsum
Sub total :
Total upah+bahan :
5
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
Lumsum
Sub total :
Total upah+bahan :
1
0
6
11
22,400.00
829.84
90,684.40
6,900.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
140,000.00
8,132.43
1,949.71
2,070.00
152,152.15
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
5,040.00
528.00
687.50
14,443.00
166,595.15
20,800.00
829.84
90,684.40
6,900.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
130,000.00
8,298.40
1,949.71
2,070.00
142,318.11
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,515.00
5,250.00
572.00
687.50
15,024.50
157,342.61
22,108.84
829.84
90,684.40
6,900.00
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
65,000.00
6,796.39
4,080.80
2,070.00
77,947.19
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
5,040.00
528.00
687.50
1,750.00
16,193.00
94,140.19
Sub total :
Upah An. SNI ( Revisi ) 6.9.2
0.250 Oh Pekerja
0.120 Oh Tukang batu
0.012 Oh Kepala tukang
0.0125 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
7
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
8
@ Rp
@ Rp
@ Rp
@ Rp
Lumsum
Sub total :
Total upah+bahan :
Halaman : 96
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
1
0
3
0
@ Rp
@ Rp
@ Rp
@ Rp
Lumsum
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
10 1 m2 Pasang TRASO cor ditempat nat kuningan
Bahan An. SNI ( Revisi ) 6.31.1
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,245.97
10,194.58
8,615.02
4,500.00
6,900.00
31,455.58
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
29,475.00
3,780.00
396.00
247.50
2,250.00
36,148.50
67,604.08
8.190
45000
0
1800
0.0036
12.285
0.095
2.000
1.000
m3
Kg
m3
m1
Kg
@ Rp
@ Rp
###
@ Rp
@ Rp
380,696.00
829.84
90,684.40
7,500.00
6,900.00
Sub total :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,370.51
10,194.58
8,615.02
15,000.00
6,900.00
42,080.11
@ Rp
32,750.00
@ Rp
42,000.00
@ Rp
44,000.00
@ Rp
55,000.00
Sub total :
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
29,475.00
3,780.00
396.00
247.50
2,500.00
36,398.50
78,478.61
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
45,310.00
705.36
199.51
552.00
46,766.87
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
2,947.50
3,780.00
396.00
2,475.00
9,598.50
56,365.37
11500 = Rp
829.84 = Rp
90,684.40 = Rp
45,310.00
881.71
249.38
Halaman : 97
690.00
47,131.09
@ Rp
6,900.00 = Rp
= Rp
Sub total :
Upah An. SNI ( Revisi ) 6.37.2
0.090 Oh Pekerja
0.090 Oh Tukang batu
0.009 Oh Kepala tukang
0.0045 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
2,947.50
3,780.00
396.00
247.50
7,371.00
54,502.09
33,764.00
829.84
552.00
90,684.40
6,900.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
35,452.20
6,185.54
2,167.21
3,808.74
2,415.00
50,028.70
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,187.50
5,040.00
528.00
687.50
14,443.00
64,471.70
@ Rp
@ Rp
@ Rp
@ Rp
=
=
=
=
Rp
Rp
Rp
Rp
38,784.90
6,185.54
2,167.21
3,808.74
Sub total :
Total upah+bahan :
13 1 m2 Pasang lantai keramik 20 x 20 cm
Bahan An. SNI ( Revisi ) 6.42.1
1.050 m2 Ubin keramik 10x20 cm
7.454 Kg Semen portland
3.926 Kg Kapur bubuk
0.0420 m3 Pasir pasang
0.350 Kg Semen warna
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
36,938.00
829.84
552.00
90,684.40
8.190
JANGAN DIHAPUS
1
0
1
0
@ Rp
6,900.00 = Rp
= Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
7,205.00
5,040.00
528.00
687.50
13,460.50
66,476.90 60,731.00
38,410.00
829.84
552.00
90,684.40
6,900.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
40,330.50
6,185.54
2,167.21
3,808.74
1,380.00
53,872.00
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
7,205.00
4,200.00
528.00
687.50
12,620.50
66,492.50
Halaman : 98
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
40,649.28
6,185.54
2,167.21
3,808.74
2,070.00
54,880.78
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
7,205.00
5,040.00
528.00
687.50
13,460.50
68,341.28 61,751.00
42,000.00
829.84
552.00
90,684.40
6,900.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
44,100.00
6,185.54
2,167.21
3,808.74
2,070.00
58,331.50
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
7,205.00
5,040.00
528.00
687.50
13,460.50
71,792.00
195,000.00 = Rp
19,320.00 = Rp
Sub total :
= Rp
204,750.00
6,762.00
211,512.00
Sub total :
Total upah+bahan :
14 1 m2 Pasang lantai keramik 40 x 40 cm
Bahan An. SNI ( Revisi ) 6.47.1
1.050 M2 Ubin keramik 40 x 40 C
7.454 Kg Semen portland
3.926 Kg Kapur bubuk
0.0420 m3 Pasir pasang
0.200 Kg Semen warna
Upah An. SNI ( Revisi ) 6.47.2
0.220 Oh Pekerja
0.100 Oh Tukang batu
0.012 Oh Kepala tukang
0.013 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
17 1 m2 Pasang lantai karpet 100% wool
Bahan An. SNI ( Revisi ) 6.52.1
1.050 m2 Feltex carpet 100% T-2 @ Rp
0.350 Kg Lem vinyl
@ Rp
Upah An. SNI ( Revisi ) 6.52.2
0.170 Oh Pekerja
0.170 Oh Tukang
0.017 Oh Kepala tukang
0.0085 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
2,070.00
53,016.40
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
5,567.50
7,140.00
748.00
467.50
13,923.00
225,435.00
1
0
1
0
1
0
155,000.00 = Rp
19,320.00 = Rp
Sub total :
= Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
5,567.50
7,140.00
748.00
467.50
13,923.00
183,435.00
Halaman : 99
192,500.00 = Rp
19,320.00 = Rp
Sub total :
= Rp
202,125.00
11,592.00
213,717.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
21,287.50
14,700.00
1,540.00
1,787.50
39,315.00
253,032.00
375.00
829.84
552.00
90,684.40
6,900.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
31,125.00
5,749.55
1,309.07
1,632.32
3,450.00
43,265.93
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
7,205.00
8,400.00
880.00
687.50
17,172.50
60,438.43
395.00
829.84
552.00
90,684.40
6,900.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
32,785.00
5,749.55
1,309.07
1,632.32
3,450.00
44,925.93
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
7,205.00
8,400.00
880.00
687.50
17,172.50
62,098.43
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
39,055.38
5,749.55
1,309.07
1,632.32
2,760.00
50,506.31
Sub total :
Total upah+bahan :
20 1 m2 Pasang dinding porselin 11 x 11 cm, putih
Bahan An. SNI ( Revisi ) 6.58.1
83.000 Bh Porselin 11x11 cm
@ Rp
6.929 Kg Semen portland
@ Rp
2.372 Kg Kapur bubuk
@ Rp
0.0180 m3 Pasir pasang
@ Rp
0.500 Kg Semen warna
@ Rp
Sub total :
Upah An. SNI ( Revisi ) 6.58.2
0.220 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.013 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
21 1 m2 Pasang dinding porselin 11 x 11 cm, warna
Bahan An. SNI ( Revisi ) 6.59.1
83.000 Bh Porselin 11x11 cm, warn@ Rp
6.929 Kg Semen portland
@ Rp
2.372 Kg Kapur bubuk
@ Rp
0.0180 m3 Pasir pasang
@ Rp
0.500 Kg Semen warna
@ Rp
Sub total :
Upah An. SNI ( Revisi ) 6.59.2
0.220 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.013 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
22 1 m2 Pasang dinding keramik 20 x 25 cm
Bahan An. SNI ( Revisi ) 6.69.1
1.050 M2 Keramik 20 x 25 cm
6.929 Kg Semen portland
2.372 Kg Kapur bubuk
0.0180 m3 Pasir pasang
0.400 Kg Semen warna
162,750.00
6,762.00
169,512.00
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
37,195.60
829.84
552.00
90,684.40
6,900.00
Sub total :
1
1
0
1
1
0
1
0
Halaman : 100
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
8,122.00
8,400.00
880.00
550.00
17,952.00
68,458.31
41,998.00
829.84
552.00
90,684.40
6,900.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
44,097.90
5,749.55
1,309.07
1,632.32
1,725.00
54,513.83
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
7,532.50
8,400.00
880.00
550.00
17,362.50
71,876.33
65,000.00
1,750.00
829.84
90,684.40
6,900.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
66,300.00
3,500.00
10,323.21
2,267.11
2,760.00
85,150.32
32,750.00
42,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
23,580.00
27,300.00
2,860.00
1,925.00
55,665.00
140,815.32
59,156.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
62,113.80
10,323.21
2,267.11
74,704.12
Sub total :
Total upah+bahan :
23 1 m2 Pasang dinding keramik 20 x 35 cm
Bahan An. SNI ( Revisi ) 6.69.1
1.050 M2 Keramik 20 x 35 cm
6.929 Kg Semen portland
2.372 Kg Kapur bubuk
0.0180 m3 Pasir pasang
0.250 Kg Semen warna
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
24 1 m2 Pasang dinding marmer
Bahan An. SNI ( Revisi ) 6.70.1
1.020 m2 Marmer
2.000 Bh Paku pancing 60x230
12.440 Kg Semen portland
0.0250 m3 Pasir pasang
0.400 Kg Semen warna
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
25 1 m2 Pasang dinding bata pelapis 7 x 3 x 24 cm
Bahan An. SNI ( Revisi ) 6.71.1
1.050 M2 Bata pelapis dinding
@ Rp
12.440 Kg Semen portland
@ Rp
0.0250 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.71.2
0.220 Oh Pekerja
0.200 Oh Tukang batu
0.020 Oh Kepala tukang
0.013 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
7,205.00
8,400.00
880.00
715.00
17,200.00
91,904.12
Halaman : 101
59,156.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
62,113.80
10,323.21
2,267.11
74,704.12
32,750.00 = Rp
42,000.00 = Rp
7,205.00
7,560.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
0.620
0.500
0.050
0.025
1
0
0.050
65763
@ Rp
@ Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
836.00
660.00
16,261.00
90,965.12
@ Rp
@ Rp
@ Rp
50,400.00
9,750.62
3,173.95
63,324.57
@ Rp
@ Rp
@ Rp
@ Rp
48,000.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
7,205.00
7,560.00
836.00
660.00
16,261.00
79,585.57
25,000.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
= Rp
26,250.00
9,750.62
3,173.95
39,174.57
Sub total :
Total upah+bahan :
28 1 m2 Pasang dinding batu tempel hitam
Bahan An. SNI ( Revisi ) 6.74.1
1.050 m2 Batu tempel hitam
11.750 Kg Semen portland
0.0350 m3 Pasir pasang
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
29 1 m2 Pasang lantai vinyl oscar / xsintetis 30 x 30 cm KL 1
Bahan An. SNI ( Revisi ) 6.75.1
11.050 Bh Vinyl oscar/sintetist 30 @ Rp
4,479.28
0.350 Kg Lem vinyl
@ Rp
19,320.00
Sub total :
Upah An. SNI ( Revisi ) 6.75.2
0.150 Oh Pekerja
@ Rp
32,750.00
0.150 Oh Tukang
@ Rp
42,000.00
0.015 Oh Kepala tukang
@ Rp
44,000.00
0.0075 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
7,205.00
7,560.00
836.00
660.00
16,261.00
55,435.57
= Rp
= Rp
= Rp
49,496.00
6,762.00
56,258.00
=
=
=
=
=
=
4,912.50
6,300.00
660.00
412.50
12,285.00
68,543.00
Rp
Rp
Rp
Rp
Rp
Rp
Halaman : 102
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
3,913.12 = Rp
19,320.00 = Rp
Sub total :
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
4,912.50
6,300.00
660.00
412.50
12,285.00
62,287.00
5,432.58 = Rp
19,320.00 = Rp
Sub total :
= Rp
60,030.00
6,762.00
66,792.00
32,750.00 = Rp
4,912.50
Sub total :
Total upah+bahan :
78. 1 m2 Pasang lantai vinyl motif kembang 30 x 30 cm
Bahan An. SNI ( Revisi ) 6.78.1
11.050 Bh Vinyl mtf kembang 30x3 @ Rp
0.350 Kg Lem vinyl
@ Rp
Upah An. SNI ( Revisi ) 6.78.2
0.150 Oh Pekerja
@ Rp
=
=
=
=
=
=
43,240.00
6,762.00
50,002.00
0.150 Oh Tukang
0.015 Oh Kepala tukang
0.0075 Oh Mandor
@ Rp
@ Rp
@ Rp
42,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
6,300.00
660.00
412.50
12,285.00
79,077.00
Halaman : 103
1 m2 Pasang PAVING STONE Abu abu TYPE S.( DT -1 ) EX Dinoyo / UPS. tebal 6 Cm.
Bahan An. SNI ( Revisi )
36 Bj Paving type "S"
@ Rp
800.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
1 m2 Pasang PAVING STONE Abu abu TYPE S.( DT -1 ) EX Dinoyo / UPS. tebal 8 Cm.
Bahan An. SNI ( Revisi )
36 Bj Paving type "S"
@ Rp
1550.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
1 m2 Pasang PAVING STONE warna merah TYPE S.( DT -1 ) EX Dinoyo / UPS. tebal 6 Cm
Bahan An. SNI ( Revisi )
36 Bj Paving type "S"
@ Rp
1242.000 = Rp
28,800.00
9,016.92
37,816.92
8,122.00
8,400.00
880.00
550.00
17,952.00
55,768.92
55,800.00
9,016.92
64,816.92
8,122.00
8,400.00
880.00
550.00
17,952.00
82,768.92
44,712.00
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
74,520.00 = Rp
= Rp
9,016.92
53,728.92
32,750.00
42,000.00
44,000.00
55,000.00
8,122.00
8,400.00
880.00
550.00
17,952.00
71,680.92
Sub total :
Total upah+bahan :
4
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1 m2 Pasang PAVING STONE warna merah TYPE S.( DT -1 ) EX Dinoyo / UPS. tebal 8 Cm
Bahan An. SNI ( Revisi )
36 Bj Paving type "S"
@ Rp
1104.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
39,744.00
9,016.92
48,760.92
8,122.00
8,400.00
880.00
550.00
17,952.00
66,712.92
Halaman : 103
1 m2 Pasang PAVING STONE Abu abu TYPE tiga berlian EX Dinoyo / UPS. tebal 6 Cm
Bahan An. SNI ( Revisi )
35 Bj Paving type "Tiga berlia @ Rp
900.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
1 m2 Pasang PAVING STONE Abu abu TYPE tiga berlian EX Dinoyo / UPS. tebal 8 Cm
Bahan An. SNI ( Revisi )
35 Bj Paving type "Tiga berlia @ Rp
1242.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
1 m2 Pasang PAVING STONE Warna Merah TYPE tiga berlian EX Dinoyo / UPS. tebal 6 Cm
Bahan An. SNI ( Revisi )
35 Bj Paving type "Tiga berlia @ Rp
1242.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
1 m2 Pasang PAVING STONE Warna Merah TYPE tiga berlian EX Dinoyo / UPS. tebal 8 Cm
Bahan An. SNI ( Revisi )
31,500.00
9,016.92
40,516.92
8,122.00
8,400.00
880.00
550.00
17,952.00
58,468.92
43,470.00
9,016.92
52,486.92
8,122.00
8,400.00
880.00
550.00
17,952.00
70,438.92
43,470.00
9,016.92
52,486.92
8,122.00
8,400.00
880.00
550.00
17,952.00
70,438.92
@ Rp
@ Rp
@ Rp
@ Rp
1550.000 = Rp
74,520.00 = Rp
Sub total :
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
54,250.00
9,016.92
63,266.92
8,122.00
8,400.00
880.00
550.00
17,952.00
81,218.92
Halaman : 104
1 m2 Pasang PAVING STONE Abu abu TYPE segi empat EX Dinoyo / UPS. tebal 6 Cm
Bahan An. SNI ( Revisi )
46 Bj Paving type "Segi empat@ Rp
765.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
10 1 m2 Pasang PAVING STONE Abu abu TYPE segi empat EX Dinoyo / UPS. tebal 8 Cm
Bahan An. SNI ( Revisi )
46 Bj Paving type "Ssgi empat@ Rp
1210.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
11 1 m2 Pasang PAVING STONE warna merah TYPE segi empat EX Dinoyo / UPS. tebal 8 Cm
Bahan An. SNI ( Revisi )
46 Bj Paving type "Ssgi empat@ Rp
1550.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
12 1 m2 Pasang PAVING STONE Warna merah TYPE segi enam EX Dinoyo / UPS. tebal 6 Cm
Bahan An. SNI ( Revisi )
26 Bj Paving type "Ssgi ENAM@ Rp
1242.000 = Rp
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
Sub total :
= Rp
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
35,190.00
9,016.92
44,206.92
8,122.00
8,400.00
880.00
550.00
17,952.00
62,158.92
80111
55,660.00
9,016.92
64,676.92
8,122.00
8,400.00
880.00
550.00
17,952.00
82,628.92
71,300.00
9,016.92
80,316.92
8,122.00
8,400.00
880.00
550.00
17,952.00
98,268.92
32,292.00
9,016.92
41,308.92
8,122.00
8,400.00
880.00
550.00
17,952.00
59,260.92
18502
Halaman : 105
13 1 m2 Pasang PAVING STONE Warna merah TYPE segi enam EX Dinoyo / UPS. tebal 8 Cm
Bahan An. SNI ( Revisi )
26 Bj Paving type "Ssgi ENAM@ Rp
1407.600 = Rp
36,597.60
0.121 m3 Pasir urug 10 Cm.
@ Rp
74,520.00 = Rp
9,016.92
Sub total :
= Rp
45,614.52
Upah An. SNI ( Revisi )
0.248 Oh Pekerja
@ Rp
32,750.00 = Rp
8,122.00
0.200 Oh Tukang batu
@ Rp
42,000.00 = Rp
8,400.00
0.020 Oh Kepala tukang
@ Rp
44,000.00 = Rp
880.00
0.010 Oh Mandor
@ Rp
55,000.00 = Rp
550.00
Sub total :
= Rp
17,952.00
Total upah+bahan :
= Rp
63,566.52
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
=
=
=
=
Rp
Rp
Rp
Rp
70,000.00
4,534.22
1,450.00
75,984.22
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
440.00
13,950.00
89,934.22
=
=
=
=
Rp
Rp
Rp
Rp
68,750.00
24.90
1,250.00
70,024.90
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
6,300.00
660.00
440.00
13,950.00
83,974.90
Halaman : 106
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
12,500.00 = Rp
70,000.00 = Rp
Sub total :
= Rp
12,500.00
2,100.00
14,600.00
32,750.00 = Rp
1,965.00
42,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
@ Rp
@ Rp
14,000.00 = Rp
70,000.00 = Rp
Sub total :
= Rp
14,000.00
2,100.00
16,100.00
32,750.00 = Rp
42,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
1,965.00
630.00
440.00
3,035.00
19,135.00
@ Rp
@ Rp
@ Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
630.00
440.00
3,035.00
17,635.00
18,000.00 = Rp
70,000.00 = Rp
Sub total :
= Rp
18,000.00
2,100.00
20,100.00
32,750.00 = Rp
42,000.00 = Rp
55,000.00 = Rp
Sub total :
= Rp
Total upah+bahan :
= Rp
1,965.00
630.00
440.00
3,035.00
23,135.00
@ Rp
@ Rp
@ Rp
Halaman : 107
JANGAN DIHAPUS
11.380
11.3800
11
11
11
11
11.380
11.3800
11.380
11.3800
9
9
9
9
7718
9
9
9
9
19
10### 3
12
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
110,400.00 = Rp
Sub total :
= Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,965.00
25,200.00
2,640.00
275.00
30,080.00
140,480.00
82,800.00 = Rp
Sub total :
= Rp
82,800.00
82,800.00
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
Rp
Rp
Rp
Rp
Rp
Rp
1,965.00
25,200.00
2,640.00
275.00
30,080.00
112,880.00
58,420.00 = Rp
Sub total :
= Rp
58,420.00
58,420.00
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
=
=
=
=
=
=
110,400.00
110,400.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
163.75
21,000.00
220.00
137.50
21,521.25
79,941.25
47,610.00 = Rp
Sub total :
= Rp
47,610.00
47,610.00
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
163.75
21,000.00
220.00
13.75
21,397.50
69,007.50
@ Rp
15,410.00 = Rp
Sub total :
= Rp
15,410.00
15,410.00
@ Rp
32,750.00 = Rp
Rp
Rp
Rp
Rp
Rp
491.25
Halaman : 108
6,300.00
660.00
41.25
7,492.50
22,902.50
7,562.40 = Rp
7,562.40
D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.
@ Rp
@ Rp
@ Rp
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
=
=
=
=
=
Sub total :
Upah An. SNI ( Revisi ) 6.6.2
0.010 Oh Pekerja
0.100 Oh Tukang kayu
0.010 Oh Kepala tukang
0.0005 Oh Mandor
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
327.50
4,200.00
440.00
27.50
4,995.00
12,557.40
6,976.36 = Rp
Sub total :
= Rp
6,976.36
6,976.36
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
Rp
Rp
Rp
Rp
Rp
Rp
327.50
4,200.00
440.00
27.50
4,995.00
11,971.36
16,399.00 = Rp
Sub total :
= Rp
16,399.00
16,399.00
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
491.25
6,300.00
660.00
41.25
7,492.50
23,891.50
187,000.00 = Rp
Sub total :
= Rp
187,000.00
187,000.00
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,637.50
21,000.00
2,200.00
137.50
24,975.00
211,975.00
100,510.00 = Rp
Sub total :
= Rp
100,510.00
100,510.00
Halaman : 109
D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
7,562.40
Rp
Rp
Rp
Rp
Rp
Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
= Rp
Rp
Rp
Rp
Rp
Rp
Rp
655.00
8,400.00
880.00
55.00
9,990.00
110,500.00
53,820.00 = Rp
Sub total :
= Rp
53,820.00
53,820.00
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
655.00
8,400.00
880.00
55.00
9,990.00
63,810.00
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
14,674.00 = Rp
Sub total :
= Rp
Rp
Rp
Rp
Rp
Rp
Rp
655.00
8,400.00
880.00
55.00
9,990.00
24,664.00
16,872.80 = Rp
Sub total :
= Rp
16,872.80
16,872.80
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
655.00
8,400.00
880.00
55.00
9,990.00
26,862.80
100,740.00 = Rp
Sub total :
= Rp
100,740.00
100,740.00
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,637.50
21,000.00
2,200.00
137.50
24,975.00
125,715.00
Halaman : 110
21,250.00 = Rp
Sub total :
= Rp
21,250.00
21,250.00
D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
14,674.00
14,674.00
Rp
Rp
Rp
Rp
Rp
Rp
327.50
4,200.00
440.00
27.50
4,995.00
26,245.00
115,000.00 = Rp
Sub total :
= Rp
115,000.00
115,000.00
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,965.00
25,200.00
2,640.00
165.00
29,970.00
144,970.00
@ Rp
6,440.00 = Rp
Sub total :
= Rp
6,440.00
6,440.00
@ Rp
@ Rp
32,750.00 = Rp
42,000.00 = Rp
818.75
10,500.00
@ Rp
@ Rp
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
Rp
Rp
Rp
Rp
1,100.00
68.75
12,487.50
18,927.50
37,306.00 = Rp
Sub total :
= Rp
41,036.60
41,036.60
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
491.25
6,300.00
660.00
41.25
7,492.50
48,529.10
@ Rp
56,396.00 = Rp
Sub total :
= Rp
62,035.60
62,035.60
@ Rp
@ Rp
32,750.00 = Rp
42,000.00 = Rp
Rp
Rp
Rp
Rp
491.25
6,300.00
Halaman : 111
660.00
41.25
7,492.50
69,528.10
65,090.00 = Rp
Sub total :
= Rp
71,599.00
71,599.00
D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.
@ Rp
@ Rp
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
491.25
6,300.00
660.00
41.25
7,492.50
79,091.50
91,080.00 = Rp
Sub total :
= Rp
100,188.00
100,188.00
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
818.75
10,500.00
1,100.00
68.75
12,487.50
112,675.50
126,500.00 = Rp
Sub total :
= Rp
139,150.00
139,150.00
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
491.25
6,300.00
660.00
41.25
7,492.50
146,642.50
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
328,900.00 = Rp
Sub total :
= Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
491.25
6,300.00
660.00
41.25
7,492.50
369,282.50
Halaman : 112
192,280.00 = Rp
Sub total :
= Rp
211,508.00
211,508.00
D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
361,790.00
361,790.00
Rp
Rp
Rp
Rp
Rp
Rp
491.25
6,300.00
660.00
41.25
7,492.50
219,000.50
325,000.00 = Rp
Sub total :
= Rp
357,500.00
357,500.00
32,750.00
42,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
491.25
6,300.00
660.00
41.25
7,492.50
364,992.50
D:\Bud D:\Budi\DataBudi\ANALISA-07A\SNI.07-A.wk4\2007.
Halaman : 113
7 3
19
10 1
12
PEKERJAAN SANITAIR
1. Memasang 1 buah kloset duduk/monoblok
Bahan An. SNI ( Revisi ) 6.1.1
1.000 Bh Kloset duduk/monoblok @ Rp
6.000 % Perlengkapan CLOSED
Upah An. SNI ( Revisi ) 6.1.2
3.300 Oh Pekerja
1.100 Oh Tukang batu
0.001 Oh Kepala tukang
0.1600 Oh Mandor
814,660.00 = Rp
= Rp
Sub total :
=
Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
108,075.00
48,400.00
44.00
8,800.00
165,319.00
1,028,858.60
111,320.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
=
Rp
111,320.00
4,979.04
906.84
117,205.88
Sub total :
Total upah+bahan :
2. Memasang 1 buah kloset jongkok porselen
Bahan An. SNI ( Revisi ) 6.2.1
1.000 Bh Kloset jongkok porselen @ Rp
6.000 Kg Semen portland
@ Rp
0.010 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.2.2
1.000 Oh Pekerja
1.500 Oh Tukang batu
0.150 Oh Kepala tukang
0.160 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
32,750.00
66,000.00
6,600.00
8,800.00
114,150.00
231,355.88
82,800.00
300.00
829.84
90,684.40
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
82,800.00
2,100.00
4,979.04
906.84
7,985.88
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
32,750.00
66,000.00
13,200.00
6,050.00
118,000.00
125,985.88
203,669.60 = Rp
Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
=
Rp
203,669.60
61,100.88
4,979.04
90,684.40
360,433.92
Sub total :
Total upah+bahan :
3. Memasang 1 buah kloset jongkok teraso
Bahan An. SNI ( Revisi ) 6.3.1
1.000 Bh Kloset jongkok teraso
7.000 Bh Bata merah 5 x 11 x 22
6.000 Kg Semen portland
0.010 m3 Pasir pasang
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
=
=
=
=
=
=
@ Rp
@ Rp
@ Rp
32,750.00 = Rp
44,000.00 = Rp
44,000.00 = Rp
@ Rp
55,000.00 = Rp
=
Rp
=
Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
0.100 Oh Mandor
Sub total :
Total upah+bahan :
5. Memasang 1 buah wastafel
Bahan An. SNI ( Revisi ) 6.5.1
1.000 Bh Wastafel
@ Rp
12.000 % Perlengkapan washtafel
814,660.00
48,879.60
863,539.60
365,000.00 = Rp
= Rp
32,750.00
44,000.00
4,400.00
Halaman : 114
5,500.00
86,650.00
447,083.92
365,000.00
43,800.00
@ Rp
@ Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
=
Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
6,550.00
63,800.00
6,600.00
5,500.00
82,450.00
586,913.44
75,000.00 = Rp
829.84 = Rp
90,684.40 = Rp
Sub total :
=
Rp
75,000.00
4,979.04
90,684.40
170,663.44
Sub total :
Total upah+bahan :
6. Memasang 1 buah bak mandi teraso volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.6.1
1.000 Bh Bak teraso
@ Rp
6.000 Kg Semen portland
@ Rp
0.010 m3 Pasir pasang
@ Rp
Upah An. SNI ( Revisi ) 6.6.2
2.100 Oh Pekerja
0.750 Oh Tukang batu
0.070 Oh Kepala tukang
0.110 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
68,775.00
33,000.00
3,080.00
6,050.00
110,905.00
281,568.44
145,000.00 = Rp
= Rp
Sub total :
=
Rp
145,000.00
26,100.00
171,100.00
Sub total :
Total upah+bahan :
7. Memasang 1 buah bak mandi fiberglass volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.7.1
1.000 Bh Bak fiberglass
@ Rp
18.000 % Perlengkapan bak fiber
Upah An. SNI ( Revisi ) 6.7.2
1.800 Oh Pekerja
2.700 Oh Tukang batu
0.540 Oh Kepala tukang
0.110 Oh Mandor
=
=
=
=
=
=
@ Rp
@ Rp
@ Rp
@ Rp
=
=
=
=
=
=
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
58,950.00
118,800.00
23,760.00
6,050.00
207,560.00
378,660.00
300.00
829.84
90,684.40
460.00
1,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
120.00
99,580.80
27,205.32
165,600.00
6,000.00
198,805.32
Halaman : 115
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
196,500.00
132,000.00
13,200.00
16,500.00
358,200.00
557,005.32
1,250,000.00 = Rp
= Rp
Sub total :
=
Rp
1,250,000.00
250,000.00
1,500,000.00
Sub total :
Total upah+bahan :
8. Memasang 1 buah bak mandi batu bata volume 0.3 m3
Bahan An. SNI ( Revisi ) 6.8.1
0.400 m3 Batu bata
@ Rp
### Kg Semen portland
@ Rp
0.300 m3 Pasir pasang
@ Rp
### Bh Porselen ( 11x11 ) cm @ Rp
6.000 Kg Semen nat
@ Rp
Sub total :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
4,979.04
90,684.40
504,463.44
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
0.00
3,300.00
33,000.00
13,750.00
50,050.00
Total upah+bahan :
9. Memasang 1 buah badtub fiber glass.
Bahan An. SNI ( Revisi ) 6.9.1
1.000 m3 Badkip
20.000 % Perlengkapan badkip
Upah An. SNI ( Revisi ) 6.9.2
0.000 Oh Pekerja
0.075 Oh Tukang batu
0.750 Oh Kepala tukang
0.250 Oh Mandor
@ Rp
Rp
1,550,050.00
575,000.00 = Rp
= Rp
Sub total :
=
Rp
575,000.00
115,000.00
690,000.00
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
0.00
3,300.00
33,000.00
13,750.00
50,050.00
740,050.00
345,000.00
8,740.00
2,622,000.00
37,195.60
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
310,500.00
1,573,200.00
655,500.00
185,978.00
15,000.00
2,740,178.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
114,625.00
198,000.00
39,600.00
49,500.00
401,725.00
3,141,903.00
Sub total :
Total upah+bahan :
10. Membuat 1 buah bak beton volume 1 m3 air
Bahan An. SNI ( Revisi ) 6.10.1
0.900 m3 Beton 1 : 1.5 : 2.5
@ Rp
### Kg Besi beton
@ Rp
0.250 m3 Kayu cetakan
@ Rp
5.000 m2 Keramic 20 x 25
@ Rp
1.000 Ls Perlengkapan
Sub total :
Upah An. SNI ( Revisi ) 6.10.2
3.500 Oh Pekerja
4.500 Oh Tukang batu
0.900 Oh Kepala tukang
0.900 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
98,250.00
198,000.00
39,600.00
49,500.00
385,350.00
400,290.80
24,288.00
300.00
829.84
90,684.40
74,520.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
26,716.80
8.10
3,252.97
5,894.49
1,788.48
37,660.84
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
4,585.00
3,080.00
308.00
385.00
8,358.00
46,018.84
29,578.00
300.00
829.84
90,684.40
=
=
=
=
Rp
Rp
Rp
Rp
32,535.80
165.00
8,547.35
5,531.75
Sub total :
Total upah+bahan :
14. Memasang 1 m' pipa beton, 15 - 20 cm
Bahan An. SNI ( Revisi ) 6.14.1
1.100 Bh Pipa beton
0.027 m3 Batu bata
3.920 Kg Semen portland
0.065 m3 Pasir pasang
0 m3 Pasir urug
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
@ Rp
@ Rp
@ Rp
@ Rp
13,340.00
1,600.80
14,940.80
Halaman : 116
0 m3 Pasir urug
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
74,520.00 = Rp
=
Rp
5,141.88
51,921.78
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
12,445.00
8,360.00
836.00
1,045.00
22,686.00
74,607.78
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
43.50
36,512.96
6,347.91
9,598.82
13,984.00
5,616.60
72,103.79
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
5,458.33
44,660.00
66.00
880.00
51,064.33
123,168.12
Halaman : 117
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
75.00
63,897.68
11,788.97
2,742.52
22,724.00
8,424.90
109,653.07
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
46,505.00
20,680.00
2,068.00
3,905.00
73,158.00
182,811.07
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
111.30
94,601.76
16,685.93
4,525.16
42,389.00
11,233.20
169,546.35
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
70,740.00
31,680.00
3,168.00
5,940.00
4,400.00
115,928.00
285,474.35
16,000.00 = Rp
= Rp
Sub total :
=
Rp
19,200.00
5,600.00
24,800.00
Sub total :
Total upah+bahan :
16. Memasang 1 buah bak kontrol pas. batu bata ( 30x30 ) cm, tinggi 35 cm
Bahan An. SNI ( Revisi ) 6.16.1
0.145 m3 Batu bata
@ Rp
300.00
44.000 Kg Semen portland
@ Rp
829.84
0.070 m3 Pasir pasang
@ Rp
90,684.40
0.070 m3 Batu kerikil
@ Rp
137,126.00
1.600 Kg Besi beton
@ Rp
8,740.00
0.060 m3 Pasir beton
@ Rp
93,610.00
Sub total :
Upah An. SNI ( Revisi ) 6.16.2
0.167 Oh Pekerja
@ Rp
32,750.00
1.015 Oh Tukang batu
@ Rp
44,000.00
0.0015 Oh Kepala tukang
@ Rp
44,000.00
0.016 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
17. Memasang 1 buah bak kontrol pas. batu bata ( 45x45 ) cm, tinggi 50 cm
Bahan An. SNI ( Revisi ) 6.17.1
0.250 m3 Batu bata
@ Rp
300.00
77.000 Kg Semen portland
@ Rp
829.84
0.130 m3 Pasir pasang
@ Rp
90,684.40
0.020 m3 Batu kerikil
@ Rp
137,126.00
2.600 Kg Besi beton
@ Rp
8,740.00
0.090 m3 Pasir beton
@ Rp
93,610.00
Sub total :
Upah An. SNI ( Revisi ) 6.17.2
1.420 Oh Pekerja
@ Rp
32,750.00
0.470 Oh Tukang batu
@ Rp
44,000.00
0.047 Oh Kepala tukang
@ Rp
44,000.00
0.071 Oh Mandor
@ Rp
55,000.00
Sub total :
Total upah+bahan :
18. Memasang 1 buah bak kontrol pas. batu bata ( 60x60 ) cm, tinggi 65 cm
Bahan An. SNI ( Revisi ) 6.18.1
0.371 m3 Batu bata
@ Rp
300.00
114.000 Kg Semen portland
@ Rp
829.84
0.184 m3 Pasir pasang
@ Rp
90,684.40
0.033 m3 Batu kerikil
@ Rp
137,126.00
4.850 Kg Besi beton
@ Rp
8,740.00
0.120 m3 Pasir beton
@ Rp
93,610.00
Sub total :
Upah An. SNI ( Revisi ) 6.18.2
2.160 Oh Pekerja
@ Rp
32,750.00
0.720 Oh Tukang batu
@ Rp
44,000.00
0.072 Oh Kepala tukang
@ Rp
44,000.00
0.108 Oh Mandor
@ Rp
55,000.00
0.100 Oh Tukang gali
@ Rp
44,000.00
Sub total :
Total upah+bahan :
19. Memasang 1 m' pipa galvanis 1/2"
Bahan An. SNI ( Revisi ) 6.19.1
1.200 m' Pipa galvanis
35
% Perlengkapan
Upah An. SNI ( Revisi ) 6.19.2
@ Rp
0.054
0.090
0.009
0.027
Oh Pekerja
Oh Tukang batu
Oh Kepala tukang
Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
1,768.50
3,960.00
396.00
1,485.00
7,609.50
32,409.50
20,067.50 = Rp
= Rp
Sub total :
=
Rp
24,081.00
7,023.63
31,104.63
Sub total :
Total upah+bahan :
20. Memasang 1 m' pipa galvanis 3/4"
Bahan An. SNI ( Revisi ) 6.20.1
1.200 m' Pipa galvanis
35
% Perlengkapan
@ Rp
=
=
=
=
=
=
Halaman : 118
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
1,768.50
3,960.00
396.00
1,485.00
7,609.50
38,714.13
26,450.00 = Rp
= Rp
Sub total :
=
Rp
31,740.00
9,257.50
40,997.50
Sub total :
Total upah+bahan :
21. Memasang 1 m' pipa galvanis 1"
Bahan An. SNI ( Revisi ) 6.21.1
1.200 m' Pipa galvanis
35
% Perlengkapan
Upah An. SNI ( Revisi ) 6.21.2
0.054 Oh Pekerja
0.090 Oh Tukang batu
0.009 Oh Kepala tukang
0.027 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
1,768.50
3,960.00
396.00
1,485.00
7,609.50
48,607.00
50,105.50 = Rp
= Rp
Sub total :
=
Rp
60,126.60
17,536.93
77,663.53
Sub total :
Total upah+bahan :
22. Memasang 1 m' pipa galvanis 1,25"
Bahan An. SNI ( Revisi ) 6.22.1
1.200 m' Pipa galvanis
35
% Perlengkapan
Upah An. SNI ( Revisi ) 6.22.2
0.108 Oh Pekerja
0.180 Oh Tukang batu
0.018 Oh Kepala tukang
0.0054 Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
@ Rp
3,537.00
7,920.00
792.00
297.00
12,546.00
90,209.53
67,275.00 = Rp
= Rp
Sub total :
=
Rp
80,730.00
23,546.25
104,276.25
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
@ Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
3,537.00
7,920.00
792.00
297.00
12,546.00
116,822.25
91,333.00 = Rp
= Rp
Sub total :
=
Rp
109,599.60
31,966.55
141,566.15
Sub total :
Total upah+bahan :
24. Memasang 1 m' pipa galvanis 3"
Bahan An. SNI ( Revisi ) 6.24.1
1.200 m' Pipa galvanis
35
% Perlengkapan
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
23. Memasang 1 m' pipa galvanis 2"
Bahan An. SNI ( Revisi ) 6.23.1
1.200 m' Pipa galvanis
35
% Perlengkapan
=
=
=
=
=
=
=
=
=
=
=
=
@ Rp
@ Rp
32,750.00 = Rp
44,000.00 = Rp
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
=
Rp
Total upah+bahan :
=
Rp
@ Rp
10,541.59 = Rp
= Rp
Sub total :
=
Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
1,179.00
2,640.00
264.00
99.00
4,182.00
20,521.46
6,837.90 = Rp
= Rp
=
Rp
8,205.48
2,393.27
10,598.75
32,750.00
44,000.00
44,000.00
55,000.00
Rp
Rp
Rp
Rp
Rp
Rp
1,179.00
2,640.00
264.00
99.00
4,182.00
14,780.75
9,085.00 = Rp
= Rp
=
Rp
10,902.00
3,179.75
14,081.75
Sub total :
Total upah+bahan :
27. Memasang 1 m' pipa PVC tipe AW 1"
Bahan An. SNI ( Revisi ) 6.27.1
1.200 m' Pipa PVC
35
% Perlengkapan
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
@ Rp
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,179.00
2,640.00
264.00
99.00
4,182.00
18,263.75
13,225.00 = Rp
= Rp
Sub total :
=
Rp
15,870.00
4,628.75
20,498.75
Sub total :
Total upah+bahan :
28 Memasang 1 m' pipa PVC tipe D 2"
Bahan An. SNI ( Revisi ) 6.29.1
1.200 m' Pipa PVC
35
% Perlengkapan
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,179.00
2,640.00
264.00
99.00
4,182.00
24,680.75
Halaman : 120
19,435.00 = Rp
= Rp
Sub total :
=
Rp
23,322.00
6,802.25
30,124.25
Sub total :
Total upah+bahan :
=
=
=
=
=
=
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
12,649.91
3,689.56
16,339.46
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
=
=
=
=
=
=
4,421.25
9,900.00
Halaman : 119
990.00
374.00
15,685.25
157,251.40
32,750.00 = Rp
1,179.00
@ Rp
@ Rp
@ Rp
44,000.00 = Rp
44,000.00 = Rp
55,000.00 = Rp
Sub total :
=
Rp
Total upah+bahan :
=
Rp
@ Rp
84,180.00 = Rp
= Rp
Sub total :
=
Rp
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
2,652.75
5,940.00
594.00
225.50
9,412.25
139,891.25
265,000.00 = Rp
75,000.00 = Rp
Sub total :
=
Rp
265,000.00
75,000.00
340,000.00
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
982.50
13,200.00
1,320.00
82.50
15,585.00
355,585.00
115,000.00
55,000.00
829.84
90,684.40
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
115,000.00
55,001.00
849.84
90,684.45
261,535.29
32,750.00
44,000.00
44,000.00
55,000.00
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
1,637.50
22,000.00
2,200.00
137.50
25,975.00
287,510.29
Sub total :
Total upah+bahan :
32 Memasang 1 buah bak cuci piring teraso
Bahan An. SNI ( Revisi ) 6.34.1
1.000 Bh Bak cuci teraso
1.000 set Water drain + assesorie
20.000 Kg Semen portland
0.050 m3 Pasir pasang
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
@ Rp
@ Rp
@ Rp
@ Rp
Sub total :
Total upah+bahan :
Halaman : 121
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
@ Rp
35,000.00 = Rp
2,500.00 = Rp
Sub total :
=
Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
34 Memasang 1 buah floor drain
Bahan An. SNI ( Revisi ) 6.36.1
1.000 Bh Floor drain
@ Rp
Sub total :
101,016.00
29,463.00
130,479.00
Rp
Rp
Rp
Rp
Rp
Rp
Sub total :
Total upah+bahan :
=
=
=
=
=
=
2,640.00
264.00
99.00
4,182.00
34,306.25
=
=
=
=
=
=
35,000.00
62.50
35,062.50
Rp
Rp
Rp
Rp
Rp
Rp
327.50
4,400.00
440.00
275.00
5,442.50
40,505.00
15,000.00 = Rp
=
Rp
15,000.00
15,000.00
0.010
0.100
0.010
0.005
Oh Pekerja
Oh Tukang batu
Oh Kepala tukang
Oh Mandor
@ Rp
@ Rp
@ Rp
@ Rp
32,750.00
44,000.00
44,000.00
55,000.00
Sub total :
Total upah+bahan :
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
327.50
4,400.00
440.00
275.00
5,442.50
20,442.50
Volume
13
4
3
29
1
0
2
2
1
5
20
1
Uraian pekerjaan
@ Rp
M3 Galian tanah
M3Urug kembali tanah (1@ Rp
M3 Pasang batu bata 1: @ Rp
@ Rp
M2 Plesteran 1:2
@ Rp
Beton tumbuk 1:2:3.
M3 Beton bertulang 123 @ Rp
@ Rp
Kerikil keringan
@ Rp
M3 Pasir saringan
M' Pasang pipa besi O 2 @ Rp
M' Pasang pipa PVC O @ Rp
@ Rp
Kg Ijuk Saringan
@ Rp
Alat - alat bantu
D:\Budi\DataBudi\ANALISA-2008\SNI.08-A.wk4\2008.
Harga satuan.
20,086.50
7,333.00
431,665.19
22,671.87
430,537.20
2,819,502.95
137,126.00
90,684.40
35,000.00
139,891.25
5,372.80
35,000.00
Jumlah
Jumlah harga
=
=
=
=
=
=
=
=
=
=
=
=
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
261,124.50
29,332.00
1,294,995.58
657,484.28
301,376.04
563,900.59
205,689.00
181,368.80
35,000.00
699,456.25
107,456.00
35,000.00
4,372,183.04
Halaman : 122
2,725,178.00