Anda di halaman 1dari 45

DAFTAR HARGA UPAH DAN BAHAN

KOTA KULON PROGO


TAHUN 2016

DAFTAR UPAH DAN BAHAN

NO

JENIS UPAH/BAHAN

HARGA SATUAN

I
1
2
3
4
5
6
7
8
9
10
11
12

UPAH
Pekerja
Pekerja terlatih ( Pekerjaan Khusus )
Tukang batu
Tukang kayu
Tukang besi
Tukang Cat
Tukang Las
Kepala tukang batu
Kepala tukang kayu
Kepala tukang besi
Kepala tukang cat
Mandor

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

60,000.00
68,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
71,000.00
71,000.00
71,000.00
71,000.00
71,500.00

I.
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN BETON & PASANGAN


Batu kali
Batu bata
Pasir kasar/ jagungan
Koral Beton
Kerikil Alam
Pasir Beton
Pasir pasang
Pasir urug
Sirtu
Tanah urug biasa
Semen Portland
Semen Warna

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

157,500.00
800.00
500.00
100,000.00
140,000.00
140,000.00
110,000.00
65,000.00
140,000.00
70,000.00
1,300.00
2,250.00

II
1
2
3
4
5
6
7
8
9
10
11
III.

BAHAN KAYU
Papan Kayu kls. I
Balok Kayu kls. I
Papan Kayu kls. II
Balok Kayu kls. II
Papan Kayu kls. III
Balok Kayu kls. III
Papan Kayu bekisting
Balok Kayu bekisting
Dolkin / Perancah Dia. 10 cm - 4 m'
Triplek ( 120x 240) 6 mm
Triplek ( 120x 240) 9 mm
BAHAN BESI

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,400,000.00
4,400,000.00
3,000,000.00
2,500,000.00
2,500,000.00
2,300,000.00
1,600,000.00
1,600,000.00
20,000.00
66,000.00
210,000.00

1
2
3
4
5
6
7
8

Besi beton ulir


Besi beton Polos
Kawat beton
Paku 1 - 3 cm
Paku 2 - 5 cm
Paku 4 - 6 cm
Paku 10 cm
Paku seng

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

9,000.00
9,000.00
12,000.00
12,000.00
12,000.00
12,000.00
12,000.00
30,000.00

IV.
1
2
3
4
5
6
7
8
9
10
11

BAHAN FINISHING
Amplas
Plamir Kayu
Minyak cat
Meny kayu
Cat kayu mutu menengah
Cat kayu mutu tinggi
Cat tembok menengah
Cat tembok luar mutu tinggi ( Wathersealt)
Plamir tembok
Politur
Kuas Cat

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

4,000.00
22,750.00
15,000.00
22,500.00
56,290.00
64,000.00
22,000.00
64,615.38
15,000.00
15,000.00
15,000.00

V.
1
2
3
4
5
6
7
8
9
10
11
12
13
14

BAHAN LANTAI & DINDING


Keramik Cating 25/33
Keramik lantai
Keramik Dinding
Granit Tile 40 x 40 Exs. Granito Tile
Batu Palimbanan
Batu Templek
Batu Andesit bakar
Terakota "Classico Tile"
Guiding Block "Dot Tile"
Paving Block 20 x 20, t = 6 cm, K - 225
Grass Block, K - 225
Kansteen
Koral Sikat
Lis Beton
Batu Koral Sikat Merah
Batu Koral Sikat Putih

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

87,000.00
87,000.00
84,000.00
155,000.00
166,750.00
105,000.00
166,750.00
181,875.00
327,030.00
156,000.00
123,750.00
60,000.00
4,500.00
4,501.00
45,000.00
55,000.00

VI.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

ALAT BANTU
Sewa Wales
Mesin gergaji
Mata gergaji
Mesin bor
Mata bor
Mesin potong plat
Mesin gerinda potong
Mata gerinda potong
Gerinda seleb
Mata gerinda seleb
Gas Asetilin
Oksigen
HCL
KWH Listrk
kawat las

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

1,500,000.00
10,000.00
45,000.00
10,000.00
95,000.00
9,000.00
4,500.00
117,000.00
325,000.00
13,000.00
156,000.00
84,500.00
10,000.00
1,700.00
175,000.00

16
17
18
19
20
21
22
23
24
25
26
27
28

Mesil las
solar
olie
Oli Hidrolis
Gemuk
Sewa Stamper
Sewa mesin Serut
Sewa mesin Profil
Listrik
Beton Molen
Alat pemadat/pibrator
Air Bersih
Minyak Begisting

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.

14,300.00
4,500.00
35,700.00
45,000.00
4,000.00
10,000.00
7,500.00
7,500.00
1,800.00
30,000.00
20,000.00
100.00
1,000.00

SATUAN
4

/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari
/ hari

/ m3
/ bh
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ Kg
/ kg

/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ m3
/ Btg
/ lbr
/ lbr

/ kg
/ kg
/ kg
/ kg
/ kg
/ kg
/ kg
/ kg

/ lbr
/ kg
/ ltr
/ kg
/ kg
/ kg
/ kg
/ kg
/ kg
/ ltr
/ Bh.

/ m
/ m
/ m
/ m
/ m
/ m
/ m
/ m
/ m
/ m
/ m
/ bh
/ kg
/ kg
krg
krg

/ bulan
/ jam
/ Bh.
/ Jam
/ Bh.
/ Jam
/ Jam
/ Bh.
/ Bh.
/ Bh.
/ Btl
/ Btl
/ Ltr
/ Kwh
/ Dos 5 Kg

/ Jam
/ Ltr
/ Ltr
/ Ltr
/ Ltr
Jam
Jam
Jam
Kwh
Jam
Jam
/ Ltr
/ Ltr

REKAP RENCANA ANGGARAN DAN BIAYA


KEGIATAN
PEKERJAAN
LOKASI
TAHUN

:
:
:
:

PERENCANAAN TAMAN DRPRD KULON PROGO


REHABILITASI TAMAN DPRD KULON PROGO
JL. SUGIMAN, WATES, KULON PROGO
2016

NO

REKAP PEKERJAAN

JUMLAH HARGA

1
2
2.A
2.B
3
3.A
3.B
4
4.A
4.B
5
5.1
5.2
5.3
5.4
5.5
5.6
5.7

PEKERJAAN PERSIAPAN
PEKERJAAN GALIAN DAN URUGAN
TAMAN A (TIMUR)
TAMAN C (BARAT)
PEKERJAAN PASANGAN DAN PONDASI
TAMAN A (TIMUR)
TAMAN B (BARAT)
PEKERJAAN BETON
TAMAN A (TIMUR)
TAMAN B (BARAT)
PEKERJAAN TAMAN
TAMAN A (TIMUR)
TAMAN B
TAMAN C (BARAT)
TAMAN D
TAMAN E
TAMAN F
TAMAN G

Rp

13,500,000.00

Rp
Rp

955,176.72
3,892,346.21

Rp
Rp

5,035,346.50
15,099,120.37

Rp
Rp

4,223,760.32
5,430,059.67

Rp
Rp
Rp
Rp
Rp
Rp
Rp

7,841,093.67
5,220,660.50
22,567,118.37
1,814,248.62
25,956,363.00
2,032,985.07
10,920,615.00

Rp

5,000,000.00

TOTAL

Rp

129,488,894.04

PPN 10%

Rp

12,948,889.40

JUMLAH TOTAL

Rp

142,437,783.44

DIBULATKAN

Rp

142,437,783.00

3 PEKERJAAN PEMBERSIHAN KEMBALI

195,000,000.00
(52,562,217.00)

RENCANA ANGGARAN DAN BIAYA


NAMA PROYEK
PEKERJAAN
LOKASI
TAHUN

: PERENCANAAN TAMAN DPRD KULON PROGO


: REHABILITASI TAMAN DPRD WATES, KULON PROGO
: JL SUGIMAN, WATES, KULON PROGO, YOGYAKARTA
: 2016

NO URAIAN PEKERJAAN

VOLUME

SAT.

HARGA SATUAN
JUMLAH HARGA (Rp)
(Rp)

I
a
b

PEKERJAAN PERSIAPAN
Pembersihan Lahan
Mobilisasi Alat dan Bahan

1.000
1.000

ls
ls

Rp 3,500,000.00 Rp
Rp 10,000,000.00 Rp
SUB TOTAL I
Rp

3,500,000.00
10,000,000.00
13,500,000.00

II
A
1
2
3

PEKERJAAN GALIAN DAN URUGAN


TAMAN A (TIMUR)
Galian pondasi (20x35 cm)
Urugan Tanah Biasa
Urugan tanah bekas galian pondasi

1.884
7.346
0.565

m3

Rp
51,466.25 Rp
Rp
115,503.05 Rp
Rp
17,155.42 Rp
SUB TOTAL II
Rp

96,946.98
848,535.05
9,694.70
955,176.72

B
1
2
3

TAMAN C (BARAT)
Galian pondasi (20x35 cm)
Urugan Tanah Biasa
Urugan kembali bekas galian pondasi

2.526
32.461
0.758

m3
m3
m3

Rp
51,466.25
Rp
115,503.05
Rp
17,155.42
SUB TOTAL III

Rp
Rp
Rp
Rp

129,983.16
3,749,364.74
12,998.32
3,892,346.21

III
A
1
2
3
4

PEKERJAAN PASANGAN DAN PONDASI


TAMAN A (TIMUR)
Pek. Pasangan Pondasi Batu Belah
Pek. Pasangan Dinding 1/2 bata
Pek. Plesteran dinding bata
Pas. Rollag Bata

1.076
27.618
32.400
0.250

m3
m2
m2
m1

Rp
523,655.55
Rp
106,419.50
Rp
46,982.54
Rp
41,422.49
SUB TOTAL IV

Rp
Rp
Rp
Rp
Rp

563,662.83
2,939,093.75
1,522,234.30
10,355.62
5,035,346.50

B
1
2
3
4
5
6
7
8

TAMAN C (BARAT)
Pek. Pasangan Pondasi Batu Belah
Pek. Pasangan Dinding 1/2 bata
Pek. Plesteran dinding bata
Pas. Rollag bata
Pek. Pasangan Talud
Pek. Plesteran talud
Suling sulingan
Sponengan Talud

2.165
33.996
43.296
0.250
3.577
0.863
11.700
10.790

m3
m2
m2
m1
m3
m3
bh
m1

Rp
523,655.55
Rp
106,419.50
Rp
46,982.54
Rp
41,422.49
Rp
523,655.55
Rp
46,982.54
Rp
500,000.00
Rp
50,000.00
SUB TOTAL V

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,133,609.53
3,617,837.32
2,034,156.05
10,355.62
1,873,115.90
40,545.93
5,850,000.00
539,500.00
15,099,120.37

IV
A
1
2

PEKERJAAN BETON
TAMAN A (TIMUR)
Sloof (15x15 cm)
Kolom praktis (15x15 cm)

0.605
0.135

m3
m3

Rp 5,377,533.00 Rp
Rp 7,168,878.00 Rp
SUB TOTAL VI
Rp

3,255,961.79
967,798.53
4,223,760.32

B
1
2

TAMAN C (BARAT)
Sloof (15x15 cm)
Kolom praktis (15x15 cm)

0.812
0.149

m3
m3

Rp 5,377,533.00 Rp
Rp 7,168,878.00 Rp
SUB TOTAL VII
Rp

4,365,481.29
1,064,578.38
5,430,059.67

V
A

PEKERJAAN TAMAN
TAMAN A

m3
m3

A.1 SOFTSCAPES
TANAMAN PERDU
1 Rumput Gajah Mini
2 Tri Color
3 Lili Paris
A.2
1
2
3

HARDSCAPES
Border Taman
Pasangan Kansteein Baru
Galian Untuk Tanah Humus

B TAMAN B
B.1 SOFTSCAPES
TANAMAN PERDU
1 Melati Jasmine
2 Akalifa
3 Rumput Jepang
TANAMAN POHON
4 Pucuk Merah
B.2 HARDSCAPES
1 Galian untuk Tanah humus t = 10cm

C TAMAN C
C.1 SOFTSCAPES
TANAMAN PERDU
1 Rumput Gajah Mini
2 Tri Color
3 Lili Paris
4 Brokoli Kuning
5 Hanjuang

C.2
1
2
3

HARDSCAPES
Border Taman
Pasangan Kansteein Baru
Galian Tanah Humus t = 10cm

D TAMAN D
D.1 SOFTSCAPES
TANAMAN PERDU
1 Rumput Gajah Mini
2 Agave
D.2
1
2
3

HARDSCAPES
Border Taman
Pasangan Kansteein baru
Galian tanah humus

101.732
48.000
78.000

m2
bh
bh

Rp
Rp
Rp

55,000.00 Rp
35,000.00 Rp
3,500.00 Rp

0.127
1.400
4.341

m3
m1
m3

Rp
106,419.50
Rp
60,000.00
Rp
45,000.00
SUB TOTAL VIII

14.000
34.000
84.269

bh
bh
m2

1.000

8.427

5,595,260.00
1,680,000.00
273,000.00

Rp
Rp
Rp
Rp

13,488.67
84,000.00
195,345.00
7,841,093.67

Rp
Rp
Rp

10,000.00 Rp
7,000.00 Rp
50,000.00 Rp

140,000.00
238,000.00
4,213,450.00

btg

Rp

250,000.00 Rp

250,000.00

m3

Rp

45,000.00 Rp

379,210.50

SUB TOTAL IX

Rp

5,220,660.50

104.653
84.000
112.000
122.000
151.000

m2
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp

55,000.00
35,000.00
3,500.00
12,000.00
75,000.00

Rp
Rp
Rp
Rp
Rp

5,755,893.00
2,940,000.00
392,000.00
1,464,000.00
11,325,000.00

0.127
3.430
10.465

m3
m1
m3

Rp
106,419.50
Rp
60,000.00
Rp
45,000.00
SUB TOTAL X

Rp
Rp
Rp
Rp

13,488.67
205,800.00
470,936.70
22,567,118.37

17.532
11.000

m2
bh

Rp
Rp

55,000.00 Rp
50,000.00 Rp

964,265.50
550,000.00

0.127
3.460
1.753

m3
m1
m3

Rp
106,419.50
Rp
60,000.00
Rp
45,000.00
SUB TOTAL XI

Rp
Rp
Rp
Rp

13,488.67
207,600.00
78,894.45
1,814,248.62

E TAMAN E
E.1 SOFTSCAPES
TANAMAN PERDU
1 Rumput Gajah Mini
2 Melati mini
3 Brokoli Kuning
E.2 HARDSCAPES
3 Batu Koral Sikat Putih
4 Batu Koral Sikat Merah
5 Tempat duduk taman
6 Galian untuk pasang Koral t = 5 cm
7 Galian untuk tanah humus
E TAMAN F
E.1 SOFTSCAPES
TANAMAN PERDU
1 Rumput Gajah Mini
2 Agave
E.2
1
2
3

HARDSCAPES
Border Taman
Pasangan Kansteein Baru
Galian Untuk Tanah Humus

F TAMAN G
F.1 SOFTSCAPES
TANAMAN PERDU
1 Rumput Gajah Mini
2 Brokoli Kuning
3 Airis
4 Bromelia
5 Sambang Dara
6 Tri Colour
7 Ararea

1
2

HARDSCAPES
Pasang Grassblock
Galian Tanah Humus t =10 cm

VI PEKERJAAN PEMBERSIHAN
1 Pekerjaan Pembersihan Kembali

184.552
142.000
71.000

m2
bh
bh

Rp
Rp
Rp

55,000.00 Rp
15,000.00 Rp
12,000.00 Rp

10,150,360.00
2,130,000.00
852,000.00

6.000
6.000
16.000
2.400
18.455

krg
krg
unit
m3
m3

Rp
125,000.00
Rp
120,000.00
Rp
650,000.00
Rp
51,466.25
Rp
45,000.00
SUB TOTAL XII

21.551
11.000

m2
bh

Rp
Rp

0.127
3.120
2.155

m3
m1
m3

Rp
106,419.50
Rp
60,000.00
Rp
45,000.00
SUB TOTAL XIII

Rp
Rp
Rp
Rp

13,488.67
187,200.00
96,980.40
2,032,985.07

86.893
50.000
10.000
46.000
9.000
19.000
40.000

m2
bh
bh
bh
bh
bh
bh

Rp
Rp
Rp
Rp
Rp
Rp
Rp

Rp
Rp
Rp
Rp
Rp
Rp
Rp

4,779,115.00
600,000.00
100,000.00
3,450,000.00
180,000.00
665,000.00
800,000.00

2.800
8.689

m2
m3

Rp
123,750.00 Rp
Rp
45,000.00 Rp
SUB TOTAL XIV Rp

346,500.00
391,018.50
10,920,615.00

1.000

ls

Rp 5,000,000.00 Rp
SUB TOTAL XV
Rp

5,000,000.00
5,000,000.00

Rp
Rp
Rp
Rp
Rp
Rp

750,000.00
720,000.00
10,400,000.00
123,519.00
830,484.00
25,956,363.00

55,000.00 Rp
50,000.00 Rp

1,185,316.00
550,000.00

55,000.00
12,000.00
10,000.00
75,000.00
20,000.00
35,000.00
20,000.00

RENCANA ANGGARAN BIAYA


KEGIATAN
PEKERJAAN
LOKASI
TAHUN

:
:
:
:

PENATAAN RUANG TERBUKA HIJAU (RTH)


REHABILITASI TAMAN DPRD KULON PROGO
KOTA WATES, KULON PROGO
2016

NO
URAIAN PEKERJAAN
1
a
b
c
d

VOLUME SATUAN HARGA SATUAN

PEKERJAAN PERSIAPAN
Mobilisasi bahan dan peralatan
Pembersihan Lahan
Pemberian Tanah Subur
Pemberian Pupuk Kompos

JUMLAH HARGA
Rp0.00
Rp0.00
Rp0.00
Rp0.00

JUMLAH I
2 PEKERJAAN TAMAN
2.1.
VIEW A
HARDSCAPES
a Pasang batu alam

TAMAN A

Rp0.00
a
b
c

SOFTSCAPES
Tanaman Lili Paris
Tanaman Sambang Dara
Tanaman Tri Color

bh
bh
bh

Rp5,000.00
Rp7,500.00

Rp0.00
Rp0.00
Rp0.00
Rp0.00

JUMLAH II
2.2 TAMAN B
HARDSCAPES
Rp0.00
Rp0.00
a
b
c

SOFTSCAPES
Tanaman Brokoli Kuning
Tanaman Irish Kuning
Tanaman Sambang Dara

Rp8,000.00

Rp0.00
Rp0.00
Rp0.00

JUMLAH III
2.3 TAMAN C (BARAT)
HARDSCAPES
Rp0.00
a
b
c
d

SOFTSCAPES
Tanaman Pucuk Merah
Tanaman Brokoli Kuning
Tanaman Sambang Dara
Tanaman Lili Paris

bh
bh
bh
bh

Rp250,000.00

Rp5,000.00
JUMLAH IV

Rp0.00
Rp0.00
Rp0.00
Rp0.00

2.4. TAMAN D
HARDSCAPES
Rp0.00
Rp0.00
a
b
c
d
e

SOFTSCAPES
Tanaman Lili Paris
Tanaman Pucuk Merah
Tanaman Brokoli Kuning
Tanaman Bayam Merah
Tanaman Tri Color

bh
bh
bh
bh
bh

Rp5,000.00
Rp250,000.00
Rp8,000.00
Rp7,500.00
JUMLAH V

Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00

2.5. TAMAN E
HARDSCAPES
Rp0.00
Rp0.00
a
b
c
d
e
f

SOFTSCAPES
Tanaman Landep
Tanaman Kucai Mini
Tanaman Irish Kuning
Tanaman Sambang Dara
Tanaman Brokoli Kuning
Tanaman Lili Paris

bh
bh
bh
bh
bh
bh

Rp8,000.00
Rp5,000.00
JUMLAH VI

Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00

2.6. TAMAN F
HARDSCAPES
Rp0.00
Rp0.00
a
b
c
d

SOFTSCAPES
Tanaman Tri Color
Tanaman Lili Paris
Tanaman Pakis Hutan
Tanaman Sambang Dara

bh
bh
bh
bh

Rp7,500.00
Rp5,000.00

Rp0.00
Rp0.00
Rp0.00
Rp0.00

JUMLAH VII
2.7. TAMAN DEPAN KANTOR BAWAH
HARDSCAPES
Rp0.00
Rp0.00
a
b

SOFTSCAPES
Tanaman Pucuk Merah
Tanaman Brokoli Kuning

bh
bh
bh
bh
bh

Rp250,000.00
Rp8,000.00

Rp0.00
Rp0.00
Rp0.00
Rp0.00
Rp0.00

JUMLAH VIII
2.8. TAMAN G (BELAKANG BANGUNAN)
HARDSCAPES
Rp0.00
Rp0.00
a
b

SOFTSCAPES
Tanaman Pucuk Merah
Tanaman Brokoli Kuning

bh
bh

Rp250,000.00
Rp8,000.00
JUMLAH IX

Rp0.00
Rp0.00
Rp0.00

ANA ANGGARAN BIAYA

DAFTAR ANALISA HARGA SATUAN UPAH DAN BAHAN


1m2 Bongkaran Lantai
Tenaga
0.485 Hari
0.050 Hari

Pekerja
Mandor

Rp.
Rp.
Jumlah (I)
Overhead 10%
Jumlah Total

60,000.00
71,500.00

29,100.00
3,575.00
32,675.00
3,267.50
35,942.50

1m2 Pembersihan Lahan


Tenaga
0.100 Hari
0.050 Hari

Pekerja
Mandor

Rp.
Rp.
Jumlah (I)
Overhead 10%
Jumlah Total

60,000.00
71,500.00

6,000.00
3,575.00
9,575.00
957.50
10,532.50

Rp.
Rp.
Jumlah (I)
Overhead 10%
Jumlah Total

60,000.00
71,500.00

45,000.00
1,787.50
46,787.50
4,678.75
51,466.25

Rp.
Rp.
Jumlah (I)
Overhead 10%
Jumlah Total

60,000.00
71,500.00

54,000.00
3,217.50
57,217.50
5,721.75
62,939.25

pasir urug

Rp.
Jumlah (I)

65,000.00

78,000.00
78,000.00

Pekerja
Mandor

Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

60,000.00
71,500.00

18,000.00
715.00
18,715.00
96,715.00
9,671.50
106,386.50

Tanah Urug Biasa

Rp.

70,000.00

84,000.00

1m3 Galian Tanah Biasa sedalam 1 m


Tenaga
0.750 Hari
Pekerja
0.025 Hari
Mandor

1m3 Galian Tanah Biasa sedalam 2 m


Tenaga
0.900 Hari
Pekerja
0.045 Hari
Mandor

1m3 Urugan Pasir


Bahan
1.200 M
Tenaga
0.300 Hari
0.010 Hari

1m3 Urugan Tanah


Bahan
1.200 M

Jumlah (I)

84,000.00

Tenaga
0.300 Oh
0.010 Oh

Pekerja
Mandor

1m3 Memasang Batu Belah Campuran 1 Pc : 4 Ps


Bahan
1.200 M
Batu Kali
163.000 Kg
Semen Portland
0.520 M
pasir pasang
Tenaga

Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Rp.
Jumlah (I)

60,000.00
71,500.00

18,000.00
715.00
18,715.00
102,715.00
10,271.50
112,986.50

157,500.00
1,300.00
110,000.00

189,000.00
211,900.00
57,200.00
458,100.00

1.500
0.750
0.075
0.075

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

60,000.00
65,000.00
71,000.00
71,500.00

90,000.00
48,750.00
5,325.00
5,362.50
149,437.50
607,537.50
60,753.75
668,291.25

1m3 Pasangan Bata Campuran 1 Pc : 4 Ps


Bahan
70.000 M
Batu bata
11.500 Kg
Semen Portland
0.043 M
Pasir Pasang

Rp.
Rp.
Rp.
Jumlah (I)

800.00
1,300.00
110,000.00

56,000.00
14,950.00
4,730.00
75,680.00

60,000.00
65,000.00
71,000.00
71,500.00

18,000.00
6,500.00
710.00
3,575.00
28,785.00
104,465.00
10,446.50
114,911.50

1,300.00
110,000.00

10,108.80
2,530.00
12,638.80

60,000.00
65,000.00
71,000.00
71,500.00

18,000.00
9,750.00
1,065.00
1,072.50
29,887.50
42,526.30
4,252.63
46,778.93

1,300.00
110,000.00

8,112.00
2,640.00
10,752.00

60,000.00
65,000.00
71,000.00
71,500.00

18,000.00
9,750.00
1,065.00
1,072.50
29,887.50
40,639.50
4,063.95
44,703.45

1,300.00

4,225.00
4,225.00

60,000.00
65,000.00
71,000.00
71,500.00

12,000.00
6,500.00
710.00
715.00
19,925.00
24,150.00
2,415.00
26,565.00

Tenaga
0.300
0.100
0.010
0.050

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1m2 Plesteran 1 Pc : 3 Ps tebal 15 mm.


Bahan
7.776 Kg
Semen Portland
0.023 M
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Jumlah (I)

Tenaga
0.300
0.150
0.015
0.015

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

1m2 Plesteran 1 Pc : 4 Ps tebal 15 mm.


Bahan
6.240 Kg
Semen Portland
0.024 M
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Jumlah (I)

Tenaga
0.300
0.150
0.015
0.015

Hari
Hari
Hari
Hari

1m2 Memasang Acian


Bahan
3.250 Kg

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Semen Portland

Rp.
Jumlah (I)

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Tenaga
0.200
0.100
0.010
0.010

Hari
Hari
Hari
Hari

1 m3 Membuat Lantai kerja beton mutu fc=14,5 (K175) slum(12-2) cm. Wc=0,66
Bahan
326.000 Kg
Semen Portland
Rp.
0.543 m
Pasir Beton
Rp.
0.762 m
Koral Beton
Rp.
215.000 liter
Air Bersih
Rp.
Jumlah (I)
Tenaga
1.650 Hari
Pekerja
Rp.
0.275 Hari
Tukang batu
Rp.
0.280 Hari
Kepala Tukang batu
Rp.
0.8300 Hari
Mandor
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total
1 m3 Membuat beton mutu fc=16,9 (K200) slum(12-2) cm. Wc=0,61
Bahan
352.000 Kg
Semen Portland
0.522 m
Pasir Beton
0.764 m
Koral Beton
215.000 liter
Air Bersih

Rp.
Rp.
Rp.
Rp.
Jumlah (I)

1,300.00
140,000.00
100,000.00
100.00

423,800.00
76,000.00
76,222.22
21,500.00
597,522.22

60,000.00
65,000.00
71,000.00
71,500.00

99,000.00
17,875.00
19,880.00
59,345.00
196,100.00
793,622.22
79,362.22
872,984.44

1,300.00
140,000.00
100,000.00
100.00

457,600.00
73,100.00
76,370.37
21,500.00
628,570.37

60,000.00
65,000.00
71,000.00
71,500.00

99,000.00
17,875.00
19,880.00
59,345.00
196,100.00
824,670.37
82,467.04
907,137.41

1,600,000.00
12,000.00
9,000.00
12,000.00
1,300.00
140,000.00
100,000.00

4,800.00
240.00
32,400.00
600.00
7,150.00
1,260.00
1,500.00

Tenaga
1.650
0.275
0.280
0.830

1 m3 Sloof Praktis
Bahan
0.003
0.020
3.600
0.050
5.500
0.009
0.015

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

m
Kg
Ltr
m
Lbr
Btg

Papan Kayu bekisting


Paku 2 - 5 cm
Besi beton ulir
Kawat beton
Semen Portland
Pasir Beton
Koral Beton

Rp.
Rp.
Rp.
Rp.

Jumlah (I)

47,950.00

Tenaga
0.297
0.033
0.033
0.033
0.010
0.015

Hari
Hari
Hari
Hari
Hari
Oh

Pekerja
Tukang batu
Tukang kayu
Tukang kayu
Kepala Tukang batu
Mandor

10 Kg Pekerjaan Pembesian
Bahan
10.500 Kg
Besi beton ulir
0.150 m
Kawat beton

Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

60,000.00
65,000.00
65,000.00
65,000.00
71,000.00
71,500.00

17,820.00
2,145.00
2,164.50
2,164.50
710.00
1,072.50
26,076.50
74,026.50
7,402.65
81,429.15

Rp.
Rp.
Jumlah (I)

9,000.00
12,000.00

94,500.00
1,800.00
96,300.00

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)

60,000.00
65,000.00
71,000.00
71,500.00

4,200.00
4,550.00
497.00
286.00
9,533.00
105,833.00

Tenaga
0.070
0.070
0.007
0.004

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala Tukang batu
Mandor

1 m3 Begisting Pelat
Bahan
0.040 m
0.400 Kg
0.200 Ltr
0.015 m
0.350 Lbr
6.000 Btg

Papan Kayu bekisting


Paku 2 - 5 cm
Minyak Begisting
Balok Kayu kls. II
Triplek ( 120x 240) 9 mm
Dolkin / Perancah Dia. 10 cm - 4 m'

Overhead 10%
Jumlah Total
Harga Satuan Per 1 Kg

10,583.30
116,416.30
11,641.63

Rp.
Rp.
Rp.
Rp.

64,000.00
4,800.00
200.00
37,500.00
73,500.00
120,000.00

1,600,000.00
12,000.00
1,000.00
2,500,000.00
210,000.00
20,000.00

Jumlah (I)

300,000.00

Tenaga
0.660
0.330
0.033
0.033

Hari
Hari
Hari
Oh

Pekerja
Tukang kayu
Kepala Tukang Kayu
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

60,000.00
65,000.00
71,000.00
71,500.00

39,600.00
21,450.00
2,343.00
2,359.50
65,752.50
365,752.50
36,575.25
402,327.75

1 Unit Kursi Taman


Bahan
0.081 m
2.424 Kg
1.715 m2

Beton K - 200
Besi Ulir
Begisting

Rp.
Rp.
Rp.
Jumlah
Harga Satuan

907,137.41
11,641.63
402,327.75

73,478.13
28,218.85
689,992.09
791,689.07
791,689.07

1 m3 Membuat Plat Beton


Bahan
1.000 m
16.834 Kg
13.989 m2

Beton K - 200
Besi Ulir
Begisting

Rp.
Rp.
Rp.
Jumlah
Harga Satuan

907,137.41
11,641.63
402,327.75

907,137.41
195,970.14
5,628,282.24
6,731,389.79
6,731,389.79

1 m2 Memasang Granit Lantai


Bahan
1.1000 M2
Granit
11.7500 Kg
Semen portland
0.0350 m
Pasir pasang

Rp.
Rp.
Rp.
Jumlah (I)

190,000.00
1,300.00
110,000.00

209,000.00
15,275.00
3,850.00
228,125.00

60,000.00
65,000.00
71,000.00
71,500.00

15,000.00
8,125.00
923.00
929.50
24,977.50
253,102.50
25,310.25
278,412.75

166,750.00
1,300.00
110,000.00

183,425.00
15,275.00
3,850.00
202,550.00

60,000.00
65,000.00
71,000.00
71,500.00

37,200.00
22,750.00
2,485.00
2,145.00
64,580.00
267,130.00
26,713.00
267,130.00

166,750.00
1,300.00
110,000.00

183,425.00
13,000.00
4,950.00
201,375.00

60,000.00
65,000.00
71,000.00
71,500.00

15,000.00
8,125.00
9,230.00
929.50
33,284.50
234,659.50
23,465.95
258,125.45

166,750.00
1,300.00
110,000.00

183,425.00
15,275.00
3,850.00
202,550.00

60,000.00
65,000.00
71,000.00
71,500.00

37,200.00
22,750.00
2,485.00
2,145.00
64,580.00
267,130.00
26,713.00
267,130.00

105,000.00
1,300.00
110,000.00

115,500.00
15,275.00
3,850.00

Tenaga
0.2500
0.1250
0.0130
0.0130

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 m2 Memasang Dinding Batu Palimbanan


Bahan
1.1000 M2
Batu Palimbanan
11.7500 Kg
Semen portland
0.0350 m
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Rp.
Jumlah (I)

Tenaga
0.6200
0.3500
0.0350
0.0300

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 m2 Memasang Lantai Batu Andesit Bakar


Bahan
1.1000 M2
Batu Andesit bakar
10.0000 Kg
Semen portland
0.0450 m
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Harga Satuan

Rp.
Rp.
Rp.
Jumlah (I)

Tenaga
0.2500
0.1250
0.1300
0.0130

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 m2 Memasang Dinding Batu Andesit Bakar


Bahan
1.1000 M2
Batu Andesit bakar
11.7500 Kg
Semen portland
0.0350 m
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Rp.
Jumlah (I)

Tenaga
0.6200
0.3500
0.0350
0.0300

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 m2 Memasang Lantai Batu Templek


Bahan
1.1000 M2
Batu Templek
11.7500 Kg
Semen portland
0.0350 m
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Harga Satuan

Rp.
Rp.
Rp.

Jumlah (I)

134,625.00

Tenaga
0.2600
0.1300
0.1300
0.0130

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 m2 Memasang Dinding Batu Templek


Bahan
1.1000 M2
Batu Templek
11.7500 Kg
Semen portland
0.0350 m
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Rp.
Jumlah (I)

60,000.00
65,000.00
71,000.00
71,500.00

15,600.00
8,450.00
9,230.00
929.50
34,209.50
168,834.50
16,883.45
185,717.95

105,000.00
1,300.00
110,000.00

115,500.00
15,275.00
3,850.00
134,625.00

60,000.00
65,000.00
71,000.00
71,500.00

37,200.00
22,750.00
2,485.00
2,145.00
64,580.00
199,205.00
19,920.50
219,125.50

87,000.00
1,300.00
2,250.00
110,000.00

95,700.00
12,740.00
2,925.00
4,950.00
116,315.00

60,000.00
65,000.00
71,000.00
71,500.00

15,000.00
8,125.00
923.00
929.50
24,977.50
141,292.50
14,129.25
155,421.75

181,875.00
1,300.00
110,000.00

200,062.50
12,740.00
4,950.00
217,752.50

60,000.00
65,000.00
71,000.00
71,500.00

15,000.00
8,125.00
923.00
929.50
24,977.50
242,730.00
24,273.00
267,003.00

327,030.00
1,300.00
110,000.00

359,733.00
13,000.00
4,950.00
377,683.00

60,000.00
65,000.00

15,000.00
8,125.00

Tenaga
0.6200
0.3500
0.0350
0.0300

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 m2 Memasang Keramik Dekoratif


Bahan
1.1000 M2
Keramik lantai
9.8000 Kg
Semen portland
1.3000
Semen Warna
0.0450 m
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Rp.
Rp.
Jumlah (I)

Tenaga
0.2500
0.1250
0.0130
0.0130

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 m2 Memasang Terakota (Classico Tile)


Bahan
1.1000 M2
Terakota "Classico Tile"
9.8000 Kg
Semen portland
0.0450 m
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Rp.
Jumlah (I)

Tenaga
0.2500
0.1250
0.0130
0.0130

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 m2 Memasang Guiding Block (Dot Tile)


Bahan
1.1000 M2
Guiding Block "Dot Tile"
10.0000 Kg
Semen portland
0.0450 m
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Rp.
Jumlah (I)

Tenaga
0.2500 Hari
0.1250 Hari

Pekerja
Tukang batu

Rp.
Rp.

0.0130 Hari
0.0130 Hari

Kepala tukang batu


Mandor

1 m2 Memasang Paving block


Bahan
1.1000 M2
Paving Block 20 x 20, t = 6 cm, K - 225
0.0500 m
Pasir Urug

Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Jumlah (I)

71,000.00
71,500.00

923.00
929.50
24,977.50
402,660.50
40,266.05
442,926.55

156,000.00
65,000.00

171,600.00
3,250.00
174,850.00

60,000.00
65,000.00
71,000.00
71,500.00

30,000.00
16,250.00
1,775.00
1,787.50
49,812.50
224,662.50
22,466.25
247,128.75

123,750.00
110,000.00

136,125.00
5,500.00
141,625.00

60,000.00
65,000.00
71,000.00
71,500.00

30,000.00
16,250.00
1,775.00
1,787.50
49,812.50
191,437.50
19,143.75
210,581.25

4,500.00
1,300.00
110,000.00
10,000.00

75,000.15
305.50
3,850.00
5,000.00
84,155.65

60,000.00
65,000.00
71,000.00
71,500.00

37,200.00
22,750.00
2,485.00
2,145.00
64,580.00
148,735.65
14,873.57
163,609.22

60,000.00
1,300.00
110,000.00

120,000.00
28,049.58
6,611.00
154,660.58

60,000.00
65,000.00
71,000.00
71,500.00

28,830.00
9,763.00
1,065.00
1,608.75
41,266.75
195,927.33
19,592.73
215,520.06

Tenaga
0.5000
0.2500
0.0250
0.0250

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

1 m2 Memasang Grass Block


Bahan
1.1000 M2
Grass Block, K - 225
0.0500 m
Pasir pasang

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Rp.
Rp.
Jumlah (I)

Tenaga
0.5000
0.2500
0.0250
0.0250

1 m2 Koral Sikat
Bahan
16.6667
0.2350
0.0350
0.5000

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Kg
Kg
m3
ltr

Koral Sikat
Semen Portland
Pasir pasang
HCL

Rp.
Rp.
Rp.
Rp.
Jumlah (I)

Hari
Hari
Hari
Hari

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Kansteen
Semen Portland
Pasir pasang

Rp.
Rp.
Rp.
Jumlah (I)

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

Tenaga
0.6200
0.3500
0.0350
0.0300

1 m' Memasang Kansteen


Bahan
2.0000 Bh
21.5766 Kg
0.0601 m3
Tenaga
0.4805
0.1502
0.0150
0.0225

Hari
Hari
Hari
Hari

1 m' Pekerjaan Lis Beton


Bahan
2.0000 Bh
21.5766 Kg
0.0601 m3

Lis Beton
Semen Portland
Pasir pasang

Rp.
Rp.
Rp.
Jumlah (I)

Pekerja
Tukang batu
Kepala tukang batu
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

4,501.00
1,300.00
110,000.00

9,002.00
28,049.58
6,611.00
43,662.58

60,000.00
65,000.00
71,000.00
71,500.00

28,830.00
9,763.00
1,065.00
1,608.75
41,266.75
84,929.33
8,492.93
93,422.26

Tenaga
0.4805
0.1502
0.0150
0.0225

Hari
Hari
Hari
Hari

1 m2 Pengecatan tembok baru ( 1 lapis plair), 1 lapis cat dasar, 2 lapis cat penutup
Bahan
0.1000 Kg
Plamir tembok
Rp.
0.1000 Kg
Cat tembok luar mutu tinggi ( Wathersealt) Rp.
0.2600 Kg
Cat tembok luar mutu tinggi ( Wathersealt) Rp.

15,000.00
64,615.38
64,615.38

Jumlah (I)

1,500.00
6,461.54
16,800.00
24,761.54

Tenaga
0.0200
0.0630
0.0060
0.0030

Hari
Hari
Hari
Hari

Pekerja
Tukang cat
Kepala tukang cat
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

1 m2 Pengecatan tembok Lama ( 1 lapis plair), 1 lapis cat dasar, 2 lapis cat penutup
Bahan
0.1200 Kg
Cat tembok luar mutu tinggi ( Wathersealt) Rp.
0.1800 Kg
Cat tembok luar mutu tinggi ( Wathersealt) Rp.

60,000.00
65,000.00
71,000.00
71,500.00

1,200.00
4,095.00
426.00
214.50
5,935.50
30,697.04
3,069.70
33,766.74

64,615.38
64,615.38

7,753.85
11,630.77

Jumlah (I)

19,384.61

Tenaga
0.0280
0.0420
0.0042
0.0030

Hari
Hari
Hari
Hari

Pekerja
Tukang cat
Kepala tukang cat
Mandor

Rp.
Rp.
Rp.
Rp.
Jumlah (II)
Jumlah (I) + (II)
Overhead 10%
Jumlah Total

60,000.00
65,000.00
71,000.00
71,500.00

1,680.00
2,730.00
298.20
214.50
4,922.70
24,307.31
2,430.73
26,738.05

RUPIAH
0.00

NILAI TERBILANG RAB

CV. ARAMCO

Alamat : BTN Olat Rarang Desa Lab Sumbawa Kec. Lab. Badas -Sumbawa

JANGKA WAKTU PELAKSANAAN


###
KEGIATAN
PEKERJAAN
LOKASI
TAHUN

:
:
:
:
:

#REF!
PENATAAN RUANG TERBUKA HIJAU (RTH)
REHABILITASI TAMAN DPRD KULON PROGO
KOTA WATES, KULON PROGO
2016

Chart Title
MASA PELAKSANAAN

JUMLAH
NO.
PEM
B.

URAIAN PEKERJAAN

KUANTITAS

HARGA

BOBOT

( Rp. )
c
d
###
###
###
###
###
###
###
###
###
###
###
a
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
###
0
0
###
###
###
###
###
###

Pemberian Tanah Subur


Pemberian Pupuk Kompos
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Pasang batu alam
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0
SOFTSCAPES
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
Rencana Pekerjaan Minggu ini %
Rencana Komulatif Pekerjaan Minggu ini %
Realisasi Pekerjaan Minggu ini %
Realisasi Komulatif Pekerjaan Minggu ini %
Deviasi + / -

0.00
#REF!
#REF!
#REF!
#REF!

0.00
###
###

BULAN KE I

BULAN KE II

BULAN KE III

BULAN KE IV

MINGGU KE

MINGGU KE

MINGGU KE

MINGGU KE

0.00
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF! ###
#REF! ###

#REF!
#REF!

#REF!
#REF!

#REF!
#REF!
#REF!
0.00

###
###
###
0.00

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

###
###
###
###
###
###
###

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF! ###
#REF! ###
#REF! ###

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

###
###
###
###

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF! ###

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
0.00

###
###
###
###
###
###
###
###
0.00

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
0.00
#REF!

###
###
0.00
###

#REF!
#REF!
0.00
#REF!

#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

MASA
PEMELIHARAAN
4

#REF!
#REF!
#REF!
#REF!

###

#REF! ###

#REF! #REF!

#REF!

#REF!
#REF!
#REF!

#REF!

#REF!
#REF!

#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!

#REF!
#REF!
#REF!

#REF!

#REF!
#REF!
#REF!

#REF!
#REF!
#REF!
#REF!
#REF!

#REF!

#REF!

#REF!

#REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF! #REF!
#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

#REF!

Mataram, 17 Januari 2013


Dibuat oleh,
CV. ARAMCO

M. NAGIB USMAN
Direktur

#REF!

NO
I

ITEM PEKERJAAN

URAIAN PERHITUNGAN

PERSIAPAN

II GALIAN & URUGAN


A TAMAN A (TIMUR)
1 Galian pondasi (20x35 cm)

2 Urugan Tanah Biasa

3 Urugan tanah bekas galian pondasi


B TAMAN C (BARAT)
1 Galian pondasi (20x35 cm)

2 Urugan Tanah Biasa

3 Urugan kembali bekas galian pondasi


III PEKERJAAN PASANGAN & PONDASI
A TAMAN A (TIMUR)
1 Pek. Pasangan Pondasi Batu Belah

2 Pek. Pasangan Dinding 1/2 bata

- Panjang Pondasi
- Lebar
- Tinggi Galian

=
=
=

26.91
0.20
0.35

- Luas Area x Panjang


0.273 x
26.91

7.346

- 1/3 dari galian

0.56511

- Panjang Pondasi
- Lebar
- Tinggi Galian

=
=
=

36.08
0.20
0.35

- Luas Area x Panjang


0.8997 x
36.08

32.461176

- 1/3 dari galian

0.75768

- Panjang
x Lebar
x Tinggi
26.91 x
0.20 x
0.20 =

1.0764

- Panjang

x Tinggi

Pek. Pasangan Dinding 1/2 Bata utk tempat duduk

3 Pek. Plesteran

26.91 x

0.60

16.146

- Panjang
x Tinggi
19.12 x
0.60

11.472

- Panjang
x Tinggi
27.00 x
0.60

32.4

0.25

2.1648

- Panjang
x Tinggi
36.08 x
0.6

21.648

- Panjang
x Tinggi
20.58 x
0.6

12.348

- Panjang
x Tinggi
36.08 x
0.6

43.296

0.25

- Panjang
x Lebar
x Tinggi
26.91 x
0.15 x
0.15 =

0.605475

4 Pek. Pondasi Rollag Tangga


B TAMAN C (BARAT)
1 Pek. Pasangan Pondasi Batu Belah

2 Pek. Pasangan Dinding 1/2 bata

Pek. Pasangan Dinding 1/2 Bata utk tempat duduk

3 Pek. Plesteran

4 Pek. Pondasi Rollag Tangga


IV PEKERJAAN BETON
A TAMAN A (TIMUR)
1 Sloof (15x15 cm)

2 Kolom praktis (15x15 cm)

B TAMAN C (BARAT)
1 Sloof (15x15 cm)

2 Kolom praktis (15x15 cm)

- Panjang
x Lebar
36.08 x
0.30

x Tinggi
x
0.20

- Panjang
x Lebar
x Tinggi
x
0.60 x
0.15 x
0.15 x

- Panjang
x Lebar
x Tinggi
36.08 x
0.15 x
0.15 =
- Panjang
x Lebar
x Tinggi
x
0.60 x
0.15 x
0.15 x

Jumlah
10

0.8118
Jumlah
11

V PEKERJAAN TAMAN
A TAMAN A
A.1 SOFTSCAPES
TANAMAN PERDU
1 Rumput Gajah Mini
2 Galian Tanah Subur t = 10 cm
B TAMAN B
B.1 SOFTSCAPES
TANAMAN PERDU
1 Tanaman Rumput Jepang
2 Tanaman Akalipa
3 Tanaman Melati Jasmine
TANAMAN POHON
4 Pucuk Merah
C TAMAN C
1 Rumput Gajah Mini
2 Galian Tanah Humus

D
1
2
3

E
1
2
3

TAMAN D
Rumput Gajah Mini
AGAVE
Galian Tanah Humus t=10 cm

TAMAN F
Rumput Gajah Mini
AGAVE
Galian Untuk Tanah Humus t=10cm

G TAMAN G
1 Rumput Gajah Mini

- Luas
- Panjang
x tinggi
43.41 x

101.732 m2

0.1 =

4.341 m3

=
=
=

84.269 m2
34 bh
14 bh

1.00 btg

104.6526 m2

0.1 =

10.46526 m3

=
=

17.5321 m2
11 bh

- Luas area x Tinggi


17.5321 x
0.1 =

1.75321 m3

- Luas

- Luas
- panjang
x tinggi
104.6526 x

- Luas

- Luas

=
=

21.5512 m2
11 bh

- Luas Area x Tinggi


21.5512 x
0.1 =

2.15512 m3

- Luas

VOLUME

1.884 m3

m3

7.346 m3

m3

0.565 m3

m
m
m

2.526 m3

m3

32.461 m3

m3

0.758 m3

m3

1.076 m3
27.618 m2

m3

m3
32.400 m2
m2
m1

0.250 m1

2.165 m3
m3
33.996 m2
m2

m2

43.296 m2
m2
m1

0.250 m1

0.605 m3
m3
0.135 m3

0.812 m3
m3
0.149 m3

101.732 m2
4.341 m3

84.269 m2
34.000 bh
14.000 bh
1.000 btg

104.653 m2
10.465 m3

17.532 m2
11.000 bh
1.753 m3

21.551 m2
11.000 bh
2.155 m3

1 1 m3 Galian tanah biasa sedalam 1 meter


0.750
OH
Pekerja
TENAGA
0.025
OH
Mandor

Rp
Rp

60,000.00
71,500.00
JUMLAH
Overheat+Profit 10%
HARGA SATUAN

2 Mengurug Kembali
No

Uraian

Kode

Satuan

Koefisien

L.01
L.04

oh
oh

0.2000
0.0100

1
A
1
2

2
Tenaga
Pekerja
Mandor

B
1

Bahan

Peralatan

D
E
F

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )


Overhead + Profit
Harga Satuan Pekerjaan ( D + E )

Jumlah Harga Tenaga Kerja

0.0100

Jumlah Harga Bahan

Jumlah Harga Peralatan


10.00%

3 1 m3 Urugan kembali
Mengurug kembali 1 m3 galian dihitung dari 1/3 kali dari indeks pekerjaan galian
HARGA SATUAN

4 1 m3 Pondasi batu belah 1PC : 3 KP : 10 PP (putih)


BAHAN

TENAGA

1.200
61.000
0.147
0.492
1.500
0.750
0.075
0.075

m3
Kg
m3
m3
OH
OH
OH
OH

Batu belah 15 cm/20 cm (putih)


PC
Kapur pasang
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

135,900.00
1,275.00
160,000.00
126,500.00
60,000.00
65,000.00
71,000.00
71,500.00
JUMLAH
Overheat + Profit 10%
HARGA SATUAN

5 1 m2 Dinding Bata merah tebal 1/2 bata 1PC : 3 KP : 10PP


BAHAN

70.000
4.500
0.015

bh
kg
m3

Batu bata
PC
Kapur pasang

Rp
Rp
Rp

800.00
1,275.00
160,000.00

BAHAN

TENAGA

0.050
0.300
0.100
0.010
0.015

m3
OH
OH
OH
OH

Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp
Rp

126,500.00
60,000.00
65,000.00
71,000.00
71,500.00
JUMLAH
Overheat + Profit 10%
HARGA SATUAN

6 1 m2 Plesteran , 1PC : 3PP tebal 15 mm


BAHAN

TENAGA

7.776
0.023
0.300
0.150
0.015
0.015

kg
m3
OH
OH
OH
OH

PC
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Rp

1,275.00
126,500.00
60,000.00
65,000.00
71,000.00
71,500.00
JUMLAH
Overheat + Profit 10%
HARGA SATUAN

7 1 m3 Beton mutu f'c = 7,4 Mpa (K 100), slump (12 2) cm, w/c = 0,87
BAHAN

TENAGA

247.000
0.621
0.740
215.000
1.650
0.275
0.028
0.083

kg
m3
m3
liter
OH
OH
OH
OH

PC
Pasir beton
Kerikil beton
Air
Pekerja
Tukang batu
Kepala Tukang
Mandor

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

1,275.00
138,000.00
177,100.00
2,530.00
60,000.00
65,000.00
71,000.00
71,500.00
JUMLAH
Overheat + profit 10%
HARGA SATUAN

8 Memasang Rollag Bata Campuran 1PC : 3PP


No

Uraian

Kode
3

Satuan

1
A
1
2
3
4

2
Tenaga
Pekerja
Tukang batu
Kepala tukang
Mandor

B
1
2
3

Bahan
Bata merah
Portland Cement
Pasir Pasang

Peralatan

Jumlah Harga Tenaga, Bahan dan Peralatan ( A + B + C )

Koefisien

oh
oh
oh
oh

0.0900
0.0300
0.0030
0.0045
Jumlah Harga Tenaga Kerja

bh
kg
m3

17.0000
4.9425
0.0137

Jumlah Harga Bahan

Jumlah Harga Peralatan

E
F

Overhead + Profit
Harga Satuan Pekerjaan ( D + E )

10.00%

1 m3 Sloof Beton mutu f'c = 19,3 Mpa, uk. 15x15 cm, tul. 4 12 mm, begel 8 - 20 cm
1.00
m3
Beton mutu f'c = 19,3 Mpa (K225), slump (1
1,385,469.48
210.22
kg
Besi beton
17,456.67
3.33
m2
Bekisting untuk sloof (3x pakai)
83,185.20
0.25
m3
Membongkar bekisting
180,000.00
JUMLAH
DIBULATKAN
1 m3 Kolom Beton mutu f'c = 19,3 Mpa, uk. 12X12 cm, tul. 4 12 mm, begel 8 - 15 cm
1.00
m3
Beton mutu f'c = 19,3 Mpa (K225), slump (1
1,385,469.48
283.89
kg
Besi beton
17,456.67
4.27
m2
Bekisting untuk kolom (3x Pakai)
185,544.10
0.20
m3
Membongkar bekisting
180,000.00
JUMLAH
DIBULATKAN
1 m3 Urugan tanah
BAHAN
1.200
0.250
TENAGA
0.025

m3
OH
OH

Tanah urug
Pekerja
Mandor

Rp
Rp
Rp

80,000.00
17,456.67
185,544.10
JUMLAH
Overheat + Profit 10%
HARGA SATUAN

Rp
Rp
Rp
Rp
Rp

SNI : 2835:2008
45,000.00
1,787.50
46,787.50
4,678.75
51,466.25

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

60,000
71,500
Jumlah Harga Tenaga Kerja

12,000.00
715.00
12,715.00

70,000
Jumlah Harga Bahan

700.00
700.00

Jumlah Harga Peralatan


13,415

SNI : 2835:2008
Rp

17,155.42

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

SNI : 2836:2008
163,080.00
77,775.00
23,520.00
62,238.00
90,000.00
48,750.00
5,325.00
5,362.50
476,050.50
47,605.05
523,655.55

Rp
Rp
Rp

SNI : 6897:2008
56,000.00
5,737.50
2,400.00

13,415.00
1,341.50
14,756.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

6,325.00
18,000.00
6,500.00
710.00
1,072.50
96,745.00
9,674.50
106,419.50

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

SNI : 2837:2008
9,914.40
2,909.50
18,000.00
9,750.00
1,065.00
1,072.50
42,711.40
4,271.14
46,982.54

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

SNI : 7394:2008
314,925.00
85,658.57
131,054.00
543,950.00
99,000.00
17,875.00
1,988.00
5,934.50
1,200,385.07
120,038.51
1,320,423.58

Harga Satuan
(Rp)
6

Jumlah
(Rp)
7

60,000
65,000
71,000
71,500
Jumlah Harga Tenaga Kerja

5,400.00
1,950.00
213.00
321.75
7,884.75

1,200
1,425
170,000
Jumlah Harga Bahan

20,400.00
7,043.06
2,329.00
29,772.06

Jumlah Harga Peralatan

37,656.81

37,657

begel 8 - 20 cm
Rp
1,385,469.48
Rp
3,669,779.96
Rp
277,284.00
Rp
45,000.00
Rp
5,377,533.44
Rp

5,377,533.00

m, begel 8 - 15 cm
Rp
1,385,469.48
Rp
4,955,754.65
Rp
791,654.83
Rp
36,000.00
Rp
7,168,878.96
Rp
7,168,878.00

Rp
Rp
Rp
Rp
Rp
Rp

SNI : 2835:2008
96,000.00
4,364.17
4,638.60
105,002.77
10,500.28
115,503.05

3,765.68
41,422.49

NO
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

URAIAN
Pekerja
Mandor
Tukang batu
Kepala tukang batu
Tukang kayu
Kepala tukang kayu
Tukang Besi
Kepala Tukang Besi
Tukang cat
Kepala tukang cat
Tukang gypsum
Tukang Aluminium
Kepala Tukang Aluminium
Tukang Las
Kepala Tukang Las
Tukang Listrik
Kepala Tukang Listrik

SATUAN
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr
Hr

HARGA
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

45,000.00
65,000.00
55,000.00
57,000.00
55,000.00
57,000.00
55,000.00
57,000.00
55,000.00
57,000.00
55,000.00
55,000.00
57,000.00
55,000.00
57,000.00
55,000.00
57,000.00

Anda mungkin juga menyukai