URAIAN
SATUAN
Btg
Kg
M3
M3
M3
Kg
Kg
Oh
Oh
Oh
Oh
Dibulatkan
A-02 1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
- Dolken Kayu 8-10 / 400 cm
Btg
- Semen Portland
Kg
- Seng Gelombang BJLS-30
Lbr
- Pasir beton
M3
- Koral Beton 2/3
M3
- Kayu balok terentang
M3
- Paku Biasa 2" - 5"
Kg
- Meni Besi
Kg
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
A-03 1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
- Dolken Kayu 8-10 / 400 cm
Btg
- Semen Portland
Kg
- Kawat Duri
Kg
- Pasir beton
M3
- Koral Beton 2/3
M3
- Paku Biasa 2" - 5"
Kg
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
A-04 1 M2 Pengukuran Dan Pasang Bouwplank
- Kayu kaso 5/7
- Paku Biasa 2" - 5"
- Kayu papan albasia
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
VOLUME
1.2500
2.5000
0.0050
0.0090
0.0720
0.0600
0.4000
0.4000
0.2000
0.0200
0.0200
HARGA SATUAN
(Rp)
28,000.00
1,406.00
255,400.00
211,100.00
2,640,000.00
23,400.00
8,100.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
35,000.00
3,515.00
1,277.00
1,899.90
190,080.00
1,404.00
3,240.00
16,800.00
13,000.00
1,500.00
1,600.00
269,315.90
269,316.00
1.2500
2.5000
1.2000
0.0050
0.0090
0.0720
0.0600
0.4500
0.4000
0.2000
0.0200
0.0200
28,000.00
1,406.00
62,900.00
255,400.00
211,100.00
2,640,000.00
23,400.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00
35,000.00
3,515.00
75,480.00
1,277.00
1,899.90
190,080.00
1,404.00
13,680.00
16,800.00
13,000.00
1,500.00
1,600.00
355,235.90
355,236.00
1.0000
2.0000
2.5000
0.0050
0.0090
0.0600
0.3000
0.2000
0.0200
0.0200
28,000.00
1,406.00
63,500.00
255,400.00
211,100.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00
28,000.00
2,812.00
158,750.00
1,277.00
1,899.90
1,404.00
12,600.00
13,000.00
1,500.00
1,600.00
222,842.90
222,843.00
M3
Kg
M3
Oh
Oh
Oh
Oh
0.0120
0.0200
0.0070
0.1000
0.1000
0.0100
0.0050
1,870,500.00
23,400.00
2,071,700.00
42,000.00
65,000.00
75,000.00
80,000.00
22,446.00
468.00
14,501.90
4,200.00
6,500.00
750.00
400.00
49,265.90
49,266.00
No.
URAIAN
SATUAN
VOLUME
1.2500
0.1800
0.8500
1.1000
35.0000
0.1500
0.1000
0.1500
30.0000
0.2500
2.0000
0.0800
0.1500
0.0600
2.0000
2.0000
1.0000
0.3000
0.0500
HARGA SATUAN
(Rp)
28,000.00
2,640,000.00
23,400.00
26,800.00
1,406.00
233,400.00
255,400.00
211,100.00
775.00
15,815.00
35,900.00
87,400.00
94,500.00
140,000.00
42,000.00
65,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
35,000.00
475,200.00
19,890.00
29,480.00
49,210.00
35,010.00
25,540.00
31,665.00
23,250.00
3,953.75
71,800.00
6,992.00
14,175.00
8,400.00
84,000.00
130,000.00
65,000.00
22,500.00
4,000.00
1,135,065.75
1,135,066.00
Btg
M3
Kg
Kg
M3
M3
Lbr
Oh
Oh
Oh
Oh
1.7000
0.2100
0.3000
10.5000
0.0300
0.0500
1.5000
1.0000
2.0000
0.2000
0.0500
28,000.00
2,640,000.00
23,400.00
1,406.00
255,400.00
211,100.00
62,900.00
42,000.00
65,000.00
75,000.00
80,000.00
47,600.00
554,400.00
7,020.00
14,763.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
927,350.00
927,350.00
Btg
M3
Kg
Kg
M3
M3
Lbr
Oh
Oh
Oh
Oh
1.2500
0.1860
0.3000
18.0000
0.0300
0.0500
1.5000
1.0000
2.0000
0.2000
0.0500
28,000.00
2,640,000.00
23,400.00
1,406.00
255,400.00
211,100.00
62,900.00
42,000.00
65,000.00
75,000.00
80,000.00
35,000.00
491,040.00
7,020.00
25,308.00
7,662.00
10,555.00
94,350.00
42,000.00
130,000.00
15,000.00
4,000.00
861,935.00
861,935.00
No.
URAIAN
SATUAN
Oh
Oh
0.1000
0.0500
HARGA SATUAN
(Rp)
42,000.00
80,000.00
HARGA
(Rp)
4,200.00
4,000.00
8,200.00
8,200.00
M3
M3
M3
Oh
Oh
0.1500
0.0900
0.0100
1.0000
0.0500
205,500.00
196,000.00
233,400.00
42,000.00
80,000.00
30,825.00
17,640.00
2,334.00
42,000.00
4,000.00
96,799.00
96,799.00
Oh
Oh
6.6670
0.3330
42,000.00
80,000.00
280,014.00
26,640.00
306,654.00
306,654.00
Oh
Oh
Dibulatkan
A-12 1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
- Panel Beton Pracetak
Lbr
- Kolom Beton Pracetak
Btg
- Pasir Beton
M3
- Koral 2/3
M3
- Semen abu - abu
Kg
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
A-13 1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
- Kawat ram ayam
Lbr
- Besi siku L 50.50.5
Kg
- Besi pelat (1,2 x 3) mm
Kg
- Baut
bh
- Semen Portland
Kg
- Pasir beton
M3
- Koral Beton 2/3
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
VOLUME
6.6670
0.0330
42,000.00
80,000.00
280,014.00
2,640.00
282,654.00
282,654.00
0.9860
0.5250
0.0740
0.1460
45.0000
0.3750
0.1250
0.0120
0.0190
199,200.00
264,000.00
255,400.00
211,100.00
1,406.00
42,000.00
65,000.00
75,000.00
80,000.00
196,411.20
138,600.00
18,899.60
30,820.60
63,270.00
15,750.00
8,125.00
900.00
1,520.00
474,296.40
474,296.00
0.4340
6.7860
0.0424
4.0000
2.5000
0.0050
0.0090
0.3750
0.1250
0.0120
0.0190
14,900.00
18,300.00
18,300.00
600.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
6,466.60
124,183.80
775.92
2,400.00
3,515.00
1,277.00
1,899.90
15,750.00
8,125.00
900.00
1,520.00
166,813.22
166,813.00
No.
URAIAN
SATUAN
Lbr
Kg
Kg
M3
M3
Oh
Oh
Oh
Oh
VOLUME
0.4340
2.0000
2.5000
0.0050
0.0090
0.3750
0.1250
0.0120
0.0190
HARGA SATUAN
(Rp)
171,300.00
1,406.00
63,500.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
74,344.20
2,812.00
158,750.00
1,277.00
1,899.90
15,750.00
8,125.00
900.00
1,520.00
265,378.10
265,378.00
btng
kg
org
org
org
org
1.0000
0.2500
0.2500
0.0170
0.0020
0.0130
25,000.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00
25,000.00
5,850.00
10,500.00
1,105.00
150.00
1,040.00
43,645.00
43,645.00
btng
org
org
1.2500
0.5000
0.0250
25,000.00
42,000.00
80,000.00
31,250.00
21,000.00
2,000.00
54,250.00
54,250.00
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
Oh
Oh
0.4000
0.0400
42,000.00
80,000.00
16,800.00
3,200.00
20,000.00
20,000.00
Oh
Oh
0.5260
0.0520
42,000.00
80,000.00
22,092.00
4,160.00
26,252.00
26,252.00
Oh
Oh
0.7350
0.0730
42,000.00
80,000.00
30,870.00
5,840.00
36,710.00
36,710.00
Oh
Oh
0.6250
0.0620
42,000.00
80,000.00
26,250.00
4,960.00
31,210.00
31,210.00
Oh
Oh
0.8230
0.0830
42,000.00
80,000.00
34,566.00
6,640.00
41,206.00
41,206.00
Oh
Oh
0.0500
0.0050
42,000.00
80,000.00
2,100.00
400.00
2,500.00
2,500.00
Oh
Oh
0.5160
0.0500
42,000.00
80,000.00
21,672.00
4,000.00
25,672.00
25,672.00
Oh
Oh
0.1920
0.0190
42,000.00
80,000.00
8,064.00
1,520.00
9,584.00
9,584.00
Oh
Oh
0.5000
0.0500
42,000.00
80,000.00
21,000.00
4,000.00
25,000.00
25,000.00
M3
Oh
Oh
1.2000
0.3000
0.0100
175,300.00
42,000.00
80,000.00
210,360.00
12,600.00
800.00
223,760.00
223,760.00
No.
URAIAN
SATUAN
m2
Oh
Oh
VOLUME
1.2000
0.1500
0.0150
HARGA SATUAN
(Rp)
22,000.00
42,000.00
80,000.00
HARGA
(Rp)
26,400.00
6,300.00
1,200.00
33,900.00
33,900.00
M3
Oh
Oh
1.2000
0.2500
0.0250
203,500.00
42,000.00
80,000.00
244,200.00
10,500.00
2,000.00
256,700.00
256,700.00
M3
Oh
Oh
1.2000
0.2500
0.0250
89,200.00
42,000.00
80,000.00
107,040.00
10,500.00
2,000.00
119,540.00
119,540.00
M3
M3
M3
Oh
Oh
0.2750
0.0300
0.0500
1.0000
0.1000
205,500.00
172,600.00
175,300.00
42,000.00
80,000.00
56,512.50
5,178.00
8,765.00
42,000.00
8,000.00
120,455.50
120,456.00
URAIAN
SATUAN
M3
Kg
M3
Oh
Oh
Oh
Oh
Pasir Urug
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
HARGA SATUAN
(Rp)
1.1000
202.0000
0.4850
1.5000
0.6000
0.0600
0.0750
205,500.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
226,050.00
284,012.00
113,199.00
63,000.00
39,000.00
4,500.00
6,000.00
735,761.00
735,761.00
M3
Kg
M3
Oh
Oh
Oh
Oh
1.1000
163.0000
0.5200
1.5000
0.6000
0.0600
0.0750
205,500.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
226,050.00
229,178.00
121,368.00
63,000.00
39,000.00
4,500.00
6,000.00
689,096.00
689,096.00
M3
Kg
M3
Oh
Oh
Oh
Oh
Dibulatkan
C-04 1 M3 Pasang Pondasi Batu Kosong (aanstamping)
- Batu Belah
M3
-
VOLUME
M3
Oh
Oh
Oh
Oh
1.1000
136.0000
0.5440
1.5000
0.6000
0.0600
0.0750
205,500.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
226,050.00
191,216.00
126,969.60
63,000.00
39,000.00
4,500.00
6,000.00
656,735.60
656,736.00
1.2000
205,500.00
246,600.00
0.3000
0.7800
0.3900
0.0390
0.0390
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00
52,590.00
32,760.00
25,350.00
2,925.00
3,120.00
363,345.00
Dibulatkan
C-05 1 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan
- Besi Beton
Kg
75.0000
- Semen Portland
Kg
202.0000
- Pasir Beton
m3
0.3200
- Koral Beton 2/3
m3
0.4900
- Kawat Beton
Kg
0.8000
- Batu Belah
m3
0.4500
- Pekerja
Oh
3.0000
- Tukang Batu
Oh
0.8500
- Kepala Tukang
Oh
0.0850
- Mandor
Oh
0.1500
Jumlah
Dibulatkan
363,345.00
16,500.00
1,406.00
255,400.00
211,100.00
27,700.00
205,500.00
42,000.00
65,000.00
75,000.00
80,000.00
1,237,500.00
284,012.00
81,728.00
103,439.00
22,160.00
92,475.00
126,000.00
55,250.00
6,375.00
12,000.00
2,020,939.00
2,020,939.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
C-06 1 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)
- Batu Belah
M3
0.4500
205,500.00
- Semen Portland
Kg
280.0000
1,406.00
- Pasir Beton
M3
0.4500
255,400.00
- Koral Beton
M3
0.6700
211,100.00
- Pekerja
Oh
2.3800
42,000.00
- Tukang Batu
Oh
0.3000
65,000.00
- Kepala Tukang
Oh
0.0300
75,000.00
- Mandor
Oh
0.0800
80,000.00
Jumlah
Dibulatkan
C-07 1 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah
- Batu Belah
M3
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
C-08 1 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang
- Pasir Urug
M3
- Pasir Beton
M3
- Koral Beton
M3
- Semen Portland
Kg
- Besi Beton
Kg
- Kawat Beton
Kg
- Kayu balok terentang
M3
- Paku
Kg
- Minyak Bekisting
Ltr
- Plamir Tembok
Kg
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
C-09 1 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang
- Pasir Urug
M3
- Pasir Beton
M3
- Koral Beton
M3
- Semen Portland
Kg
- Besi Beton
Kg
- Kawat Beton
Kg
- Kayu balok terentang
M3
- Paku
Kg
- Minyak Bekisting
Ltr
- Plamir Tembok
Kg
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
HARGA
(Rp)
92,475.00
393,680.00
114,930.00
141,437.00
99,960.00
19,500.00
2,250.00
6,400.00
870,632.00
870,632.00
0.4500
202.0000
0.3200
0.4900
3.0000
0.8500
0.0850
0.1500
205,500.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
92,475.00
284,012.00
81,728.00
103,439.00
126,000.00
55,250.00
6,375.00
12,000.00
761,279.00
761,279.00
0.0190
0.0940
0.1500
60.5000
45.0000
0.9000
0.0320
0.1200
0.0900
0.2400
1.0000
0.6700
0.0670
0.0500
175,300.00
255,400.00
211,100.00
1,406.00
16,500.00
27,700.00
2,640,000.00
23,400.00
55,000.00
25,000.00
42,000.00
65,000.00
75,000.00
80,000.00
3,330.70
24,007.60
31,665.00
85,063.00
742,500.00
24,930.00
84,480.00
2,808.00
4,950.00
6,000.00
42,000.00
43,550.00
5,025.00
4,000.00
1,104,309.30
1,104,309.00
0.0160
0.0800
0.1250
49.0000
34.5000
0.7000
0.0270
0.1200
0.0900
0.2000
0.8000
0.5000
0.0500
0.0400
175,300.00
255,400.00
211,100.00
1,406.00
16,500.00
27,700.00
2,640,000.00
23,400.00
55,000.00
25,000.00
42,000.00
65,000.00
75,000.00
80,000.00
2,804.80
20,432.00
26,387.50
68,894.00
569,250.00
19,390.00
71,280.00
2,808.00
4,950.00
5,000.00
33,600.00
32,500.00
3,750.00
3,200.00
864,246.30
864,246.00
No.
URAIAN
SATUAN
VOLUME
0.0149
0.0738
0.1178
47.4925
45.0000
0.9000
0.0320
0.1200
0.0900
0.2400
1.0000
0.6700
0.0670
0.0500
HARGA SATUAN
(Rp)
175,300.00
255,400.00
211,100.00
1,406.00
16,500.00
27,700.00
2,640,000.00
23,400.00
55,000.00
25,000.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
2,614.60
18,845.97
24,857.03
66,774.46
742,500.00
24,930.00
84,480.00
2,808.00
4,950.00
6,000.00
42,000.00
43,550.00
5,025.00
4,000.00
1,073,335.05
1,073,335.00
0.1170
0.0400
0.0020
1,078,774.00
42,000.00
80,000.00
126,216.56
1,680.00
160.00
128,056.56
128,057.00
3.3200
0.0700
0.2000
0.3500
42,000.00
75,000.00
80,000.00
160,690.00
139,440.00
5,250.00
16,000.00
56,241.50
216,931.50
216,932.00
18.3700
6.06
2.20
1.00
2.0000
0.2000
2.0000
14,100.00
16,500.00
23,600.00
65,000.00
42,000.00
80,000.00
26,325.00
259,017.00
99,990.00
51,920.00
65,000.00
84,000.00
16,000.00
52,650.00
628,577.00
628,577.00
D-02
D-03
D-04
D-05
URAIAN
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr
- Semen Portland
- Pasir Beton
- Batu Pecah Mesin 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr
- Semen Portland
- Pasir Beton
- Batu Pecah Mesin 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk 1pc:2ps:3kr
- Semen Portland
- Pasir Beton
- Batu Pecah Mesin 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Tiang Pancang Beton Prestressed
- Semen Portland
- Pasir Beton
- Batu Pecah Mesin 2/3
- Rapidrant
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr
- Semen Portland
- Pasir Beton
- Batu Pecah Mesin 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
SATUAN
VOLUME
HARGA SATUAN
(Rp)
Kg
M3
M3
Oh
Oh
Oh
Oh
218.0000
0.5200
0.8700
1.6500
0.2500
0.0250
0.0800
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
Kg
M3
M3
Oh
Oh
Oh
Oh
197.0000
0.4700
0.9400
1.6500
0.2500
0.0250
0.0800
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
Kg
M3
M3
Oh
Oh
Oh
Oh
336.0000
0.5400
0.8100
2.0000
0.3500
0.0350
1.0000
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
Kg
M3
M3
Gln
Oh
Oh
Oh
Oh
440.0000
0.5000
0.8000
2.4600
1.6500
0.2500
0.0250
0.0800
1,406.00
255,400.00
211,100.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
Kg
M3
M3
Oh
Oh
Oh
Oh
291.0000
0.4700
0.9300
2.0000
0.3500
0.0350
1.0000
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
No.
D-06
D-07
D-08
D-09
D-10
URAIAN
1 M Memasang PVC Waterstop Lebar 200 mm
- Waterstop Lebar 200 mm
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 Kg Pembesian Dengan Besi Polos/ulir
- Besi Beton ( Polos / Ulir )
- Kawat Beton
- Pekerja
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Pondasi
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Pasang Bekisting Untuk Sloof
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Kolom
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
SATUAN
VOLUME
HARGA SATUAN
(Rp)
M
Oh
Oh
Oh
Oh
1.0500
0.0500
0.0350
0.0035
0.0020
57,900.00
42,000.00
65,000.00
75,000.00
80,000.00
Kg
Kg
Oh
Oh
Oh
Oh
1.0500
0.0150
0.0070
0.0070
0.0007
0.0003
16,500.00
27,700.00
42,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Oh
Oh
Oh
Oh
0.0400
0.3000
2,850,000.00
23,400.00
55,000.00
42,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Oh
Oh
Oh
Oh
0.0450
0.3000
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0400
0.4000
0.3000
0.2600
0.0260
0.0050
0.3000
0.2600
0.0260
0.0050
0.0150
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060
2,850,000.00
23,400.00
55,000.00
42,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00
No.
D-11
D-12
D-13
D-14
URAIAN
1 M2 Pasang Bekesting Untuk Balok
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Lantai
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Tangga
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-225
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Air
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
SATUAN
VOLUME
HARGA SATUAN
(Rp)
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0400
0.4000
0.0180
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060
2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.3000
0.3300
0.0330
0.0060
2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh
0.0300
0.4000
0.1500
0.0150
0.3500
2.0000
0.3200
0.3300
0.0330
0.0060
2,850,000.00
23,400.00
55,000.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
75,000.00
80,000.00
Kg
m3
M3
ltr
Oh
Oh
Oh
Oh
388.0000
0.6500
0.6500
215.0000
6.0000
1.0000
0.1000
0.3000
1,406.00
255,400.00
211,100.00
3.00
42,000.00
65,000.00
75,000.00
80,000.00
No.
D-15
D-16
D-17
D-17r1
D-17r2
URAIAN
1 M3 Membuat Beton Cor Mutu K-275
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Air
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
SATUAN
Kg
M3
M3
ltr
Oh
Oh
Oh
Oh
Dibulatkan
1 M3 Pondasi Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Besi Beton
Kg
- Kawat Beton
Kg
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton 2/3
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Tukang Kayu
Oh
- Tukang Besi
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
Oh
Oh
Oh
Oh
Oh
Oh
VOLUME
HARGA SATUAN
(Rp)
400.0000
0.4000
0.8200
215.0000
6.0000
1.0000
0.1000
0.3000
1,406.00
255,400.00
211,100.00
3.00
42,000.00
65,000.00
75,000.00
80,000.00
0.2000
1.5000
150.0000
2.2500
323.0000
0.5200
0.7800
3.9000
0.3500
1.0400
1.0500
0.2450
0.1650
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
0.2700
2.0000
0.6000
200.0000
3.0000
323.0000
0.5200
0.7800
4.8500
0.3500
1.5600
1.4000
0.3310
0.1700
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
1 M3 Sloof Beton Tulang 15/20 (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.2700
- Paku Biasa 2" - 5"
Kg
2.0000
- Minyak Bekisting
Ltr
0.6000
- Besi Beton
Kg
150.0000
- Kawat Beton
Kg
3.0000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Pekerja
Oh
4.8500
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
1.5600
- Tukang Besi
Oh
1.4000
- Kepala Tukang
Oh
0.3310
- Mandor
Oh
0.1700
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
- Kayu papan terentang
M3
0.2700
- Paku Biasa 2" - 5"
Kg
2.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
180.0000
- Kawat Beton
Kg
3.0000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Pekerja
Oh
4.8500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
42,000.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Tukang Batu
Oh
0.3500
Tukang Kayu
Oh
1.5600
Tukang Besi
Oh
1.4000
Kepala Tukang
Oh
0.3310
Mandor
Oh
0.1700
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/30 (150 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
150.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Pekerja
Oh
4.8500
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
1.5600
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.3310
75,000.00
- Mandor
Oh
0.1700
80,000.00
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia.16 8-15
- Kayu papan terentang
M3
0.2700
2,850,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Pekerja
Oh
4.8500
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
1.5600
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.3310
75,000.00
- Mandor
Oh
0.1700
80,000.00
Jumlah
Dibulatkan
1 M3 Sloof Beton Tulang 20/40 (240 kg besi + bekisting) Struktur bertingkat
- Kayu papan terentang
M3
0.2700
- Paku Biasa 2" - 5"
Kg
2.0000
- Minyak Bekisting
Ltr
0.6000
- Besi Beton
Kg
240.0000
- Kawat Beton
Kg
3.0000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Pekerja
Oh
4.8500
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
1.5600
- Tukang Besi
Oh
1.4000
- Kepala Tukang
Oh
0.3310
- Mandor
Oh
0.1700
Jumlah
D-18
Dibulatkan
1 M3 Kolom Beton Tulang (120 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
M3
Kg
Ltr
Kg
Kg
0.4000
4.0000
2.0000
120.0000
1.8000
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
No.
URAIAN
-
D-18r
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
Plywood Tebal 9 mm
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
SATUAN
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
VOLUME
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
Dibulatkan
1 M3 Kolom Beton Tulang 20/20 (140 kg besi + bekisting) 4dia. 12 8-15
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
140.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 15/20 (180 kg besi + bekisting) 4dia.12 8-15
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
180.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1500
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (175 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
175.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
HARGA SATUAN
(Rp)
1,406.00
255,400.00
211,100.00
2,640,000.00
235,000.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (210 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
210.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang Praktis 12/12 (260 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
260.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
1 M3 Kolom Beton Tulang 20/20 (210 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
210.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 20/30 (230 kg besi + bekisting) Struktur bertingkat 6dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
230.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
No.
URAIAN
-
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
MultiPlek 9 mm 120 x 240
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
SATUAN
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
VOLUME
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
HARGA SATUAN
(Rp)
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
1 M3 Kolom Beton Tulang 20/40 (250 kg besi + bekisting) Struktur bertingkat
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
2.0000
55,000.00
- Besi Beton
Kg
250.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 30/30 (175 kg besi + bekisting) Struktur bertingkat 8dia.16, 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
175.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang 30/30 (210 kg besi + bekisting) Struktur bertingkat 10dia.16, 8-15
- Kayu papan terentang
M3
0.4000
2,850,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
210.0000
16,500.00
- Kawat Beton
Kg
1.8000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1500
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
3.5000
151,100.00
- Dolken -8-10/4m
Btg
20.0000
28,000.00
- Pekerja
Oh
7.3000
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
3.3000
65,000.00
- Tukang Besi
Oh
2.1000
65,000.00
- Kepala Tukang
Oh
0.5700
75,000.00
- Mandor
Oh
0.2500
80,000.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
Jumlah
Dibulatkan
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
D-19
D-20
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
140.0000
2.1000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
150.0000
2.4000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
No.
URAIAN
- Mandor
Jumlah
Dibulatkan
SATUAN
Oh
VOLUME
0.2500
HARGA SATUAN
(Rp)
80,000.00
No.
URAIAN
D-21
D-22
D-23
SATUAN
Dibulatkan
1 M3 Kolom Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (250 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
VOLUME
HARGA SATUAN
(Rp)
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
180.0000
2.7000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
200.0000
3.0000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
0.4000
4.0000
2.0000
250.0000
3.7500
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
No.
URAIAN
SATUAN
D-24
D-25
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M3 Kolom Beton Tulang (300 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang (120 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
VOLUME
Oh
Oh
Oh
Oh
Oh
Oh
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
HARGA SATUAN
(Rp)
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.4000
4.0000
2.0000
300.0000
4.5000
323.0000
0.5200
0.7800
0.1500
3.5000
20.0000
7.3000
0.3500
3.3000
2.1000
0.5700
0.2500
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.3200
3.2000
1.6000
120.0000
1.8000
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
No.
D-26
D-26
URAIAN
SATUAN
VOLUME
0.3200
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080
Dibulatkan
1 M3 Balok Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12, 8-15
- Kayu papan terentang
M3
0.3200
- Paku Biasa 2" - 5"
Kg
3.2000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
180.0000
- Kawat Beton
Kg
2.2500
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
0.1400
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
- Dolken -8-10/4m
Btg
16.0000
- Pekerja
Oh
5.9600
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
2.8000
- Tukang Besi
Oh
1.4000
- Kepala Tukang
Oh
0.4550
- Mandor
Oh
0.2080
Jumlah
HARGA SATUAN
(Rp)
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
1 M3 Balok Beton Tulang 15/20 sofi-sofi, ring balk + balok poratl (180 kg besi + bekisting) 4dia. 12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
180.0000
16,500.00
- Kawat Beton
Kg
2.2500
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 15/30 (190 kg besi + bekisting) Struktur bertingkat 4dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
No.
URAIAN
-
Besi Beton
Kawat Beton
Semen Portland
Pasir Beton
Koral Beton 2/3
Kayu Balok Terentang
MultiPlek 9 mm 120 x 240
Dolken -8-10/4m
Pekerja
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
SATUAN
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
VOLUME
190.0000
2.2500
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
0.3500
2.8000
1.4000
0.4550
0.2080
HARGA SATUAN
(Rp)
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
D-27
1 M3 Balok Beton Tulang 20/40 (200 kg besi + bekisting) Struktur bertingkat 7dia.16+2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
200.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 20/30 (175 kg besi + bekisting) Struktur bertingkat 5dia. 16, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
Besi Beton
Kg
175.0000
16,500.00
- Kawat Beton
Kg
3.0000
55,000.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
No.
URAIAN
-
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
SATUAN
Oh
Oh
Oh
Oh
VOLUME
2.8000
1.4000
0.4550
0.2080
HARGA SATUAN
(Rp)
65,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
1 M3 Balok Beton Tulang 25/55 (140 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
140.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Tulang 30/60 (110 kg besi + bekisting) Struktur bertingkat 8dia.16 +2dia.12, 8-15
- Kayu papan terentang
M3
0.3200
2,850,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
23,400.00
- Minyak Bekisting
Ltr
55,000.00
- Besi Beton
Kg
110.0000
16,500.00
- Kawat Beton
Kg
3.0000
27,700.00
- Semen Portland
Kg
323.0000
1,406.00
- Pasir Beton
M3
0.5200
255,400.00
- Koral Beton 2/3
M3
0.7800
211,100.00
- Kayu Balok Terentang
M3
0.1400
2,640,000.00
- MultiPlek 9 mm 120 x 240
Lbr
2.8000
151,100.00
- Dolken -8-10/4m
Btg
16.0000
28,000.00
- Pekerja
Oh
5.9600
42,000.00
- Tukang Batu
Oh
0.3500
65,000.00
- Tukang Kayu
Oh
2.8000
65,000.00
- Tukang Besi
Oh
1.4000
65,000.00
- Kepala Tukang
Oh
0.4550
75,000.00
- Mandor
Oh
0.2080
80,000.00
Jumlah
Dibulatkan
1 M3 Balok Beton Lintel 11/11 (300 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
300.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
No.
URAIAN
SATUAN
VOLUME
Dibulatkan
1 M3 Balok Beton Lintel 11/15 (234 kg besi + bekisting) 4dia.10 8-15
- Kayu papan terentang
M3
0.4000
- Paku Biasa 2" - 5"
Kg
4.0000
- Minyak Bekisting
Ltr
- Besi Beton
Kg
234.0000
- Kawat Beton
Kg
1.8000
- Semen Portland
Kg
323.0000
- Pasir Beton
M3
0.5200
- Koral Beton 2/3
M3
0.7800
- Kayu Balok Terentang
M3
- MultiPlek 9 mm 120 x 240
Lbr
- Dolken -8-10/4m
Btg
20.0000
- Pekerja
Oh
7.3000
- Tukang Batu
Oh
0.3500
- Tukang Kayu
Oh
3.3000
- Tukang Besi
Oh
2.1000
- Kepala Tukang
Oh
0.5700
- Mandor
Oh
0.2500
Jumlah
D-28
Dibulatkan
1 M3 Balok Beton Tulang (230 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- MultiPlek 9 mm 120 x 240
- Dolken -8-10/4m
- Pekerja
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
0.3200
3.2000
1.6000
230.0000
3.4500
323.0000
0.5200
0.7800
0.1400
2.8000
16.0000
5.9600
HARGA SATUAN
(Rp)
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
No.
URAIAN
-
D-29
D-30
SATUAN
Tukang Batu
Tukang Kayu
Tukang Besi
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M3 Tangga Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Besi Beton
- Kawat Beton
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Kayu Balok Terentang
- Plywood Tebal 9 mm
- Dolken -8-10/4m
- Pekerja
- Tukang Batu
- Tukang Kayu
- Tukang Besi
- Kepala Tukang
- Mandor
Jumlah
VOLUME
Oh
Oh
Oh
Oh
Oh
0.3500
2.8000
1.4000
0.4550
0.2080
HARGA SATUAN
(Rp)
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.2500
3.0000
1.2000
200.0000
3.0000
323.0000
0.5200
0.7800
0.1050
2.5000
14.0000
5.6000
0.3500
2.3000
1.4000
0.4050
0.2020
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
1.0000
10.0000
90.0000
914,882.00
431,850.00
18,566.00
1.0000
10.0000
77.5000
914,882.00
431,850.00
18,566.00
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 10 cm (90 kg besi + bekisting)
- Beton tulang ad. 1Pc : 2Ps : 3Kr
M3
- Pasang Bekisting untuk lantai
M2
- Besi Beton Polos
Kg
Jumlah
Dibulatkan
1 M3 Lisplang Beton Tulang T= 8 cm (77,5 kg besi + bekisting)
- Beton tulang ad. 1Pc : 2Ps : 3Kr
M3
- Pasang Bekisting untuk lantai
M2
- Besi Beton Polos
Kg
Jumlah
Dibulatkan
D-31
914,882.00
431,850.00
18,566.00
914,882.00
431,850.00
18,566.00
Dibulatkan
D-32
D-33
914,882.00
431,850.00
18,566.00
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 15 cm (90 kg besi + bekisting)
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
- Pasang Bekisting untuk lantai
M2
6.6700
- Besi Beton Polos
Kg
90.0000
Jumlah
Dibulatkan
914,882.00
431,850.00
18,566.00
No.
D-34
D-35
D-36
D-37
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
914,882.00
431,850.00
18,566.00
M3
Kg
Kg
Kg
Kg
M3
M3
Oh
Oh
Oh
Oh
Oh
Oh
0.0020
0.0100
3.0000
0.0450
4.0000
0.0060
0.0090
0.0600
0.0200
0.0200
0.0200
0.0060
0.0030
2,850,000.00
23,400.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Kg
Kg
Kg
M3
M3
Oh
Oh
Oh
Oh
Oh
Oh
0.0030
0.0200
3.6000
0.0500
5.5000
0.0090
0.0150
0.1000
0.0330
0.0330
0.0330
0.0100
0.0050
2,850,000.00
23,400.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
M3
Kg
Ltr
M3
Lbr
Btg
Buah
Oh
Oh
Oh
Oh
0.0300
0.4000
0.2000
0.0200
0.3500
3.0000
4.0000
0.3200
0.0330
0.0330
0.0060
2,850,000.00
1,406.00
55,000.00
2,640,000.00
151,100.00
28,000.00
2,500.00
42,000.00
65,000.00
75,000.00
80,000.00
No.
URAIAN
D-38
D-39
D-40
SATUAN
M3
Kg
Ltr
Kg
Kg
Kg
M3
M3
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
Dibulatkan
1 M3 Dinding Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Besi Beton
Kg
- Kawat Beton
Kg
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton 2/3
M3
- Kayu Balok Terentang
M3
- Plywood Tebal 9 mm
Lbr
- Dolken -8-10/4m
Btg
- Pekerja
Oh
- Tukang Batu
Oh
- Tukang Kayu
Oh
- Tukang Besi
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 M3 Dinding Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
- Paku Biasa 2" - 5"
Kg
- Minyak Bekisting
Ltr
- Besi Beton
Kg
- Kawat Beton
Kg
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton 2/3
M3
VOLUME
HARGA SATUAN
(Rp)
0.3200
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1200
2.8000
32.0000
5.3000
0.3500
1.3000
1.0500
0.2650
0.2650
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
0.2400
3.2000
1.6000
150.0000
2.2500
323.0000
0.5200
0.7800
0.1600
2.8000
24.0000
5.6000
0.3500
2.6400
1.0500
0.4000
0.1930
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
0.2500
3.0000
1.2000
200.0000
3.0000
323.0000
0.5200
0.7800
2,850,000.00
23,400.00
55,000.00
16,500.00
27,700.00
1,406.00
255,400.00
211,100.00
No.
URAIAN
-
D-41
D-42
D-43
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-300
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-200
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-250
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
SATUAN
VOLUME
M3
Lbr
Btg
Oh
Oh
Oh
Oh
Oh
Oh
0.1050
2.8000
14.0000
5.6500
0.3500
1.5600
1.4000
0.3230
0.2830
HARGA SATUAN
(Rp)
2,640,000.00
151,100.00
28,000.00
42,000.00
65,000.00
65,000.00
65,000.00
75,000.00
80,000.00
Kg
M3
M3
Oh
Oh
Oh
Oh
413.0000
0.4256
0.6807
1.6500
0.2750
0.0280
0.0830
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
Kg
M3
M3
Oh
Oh
Oh
Oh
352.0000
0.4569
0.6873
1.6500
0.2750
0.0280
0.0830
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
Kg
M3
M3
Oh
Oh
Oh
Oh
384.0000
0.4325
0.6927
1.6500
0.2750
0.0280
0.0830
1,406.00
255,400.00
211,100.00
42,000.00
65,000.00
75,000.00
80,000.00
JAAN BETON
HARGA
(Rp)
306,508.00
132,808.00
183,657.00
69,300.00
16,250.00
1,875.00
6,400.00
716,798.00
716,798.00
276,982.00
120,038.00
198,434.00
69,300.00
16,250.00
1,875.00
6,400.00
689,279.00
689,279.00
472,416.00
137,916.00
170,991.00
84,000.00
22,750.00
2,625.00
80,000.00
970,698.00
970,698.00
618,640.00
127,700.00
168,880.00
38,622.00
69,300.00
16,250.00
1,875.00
6,400.00
1,047,667.00
1,047,667.00
409,146.00
120,038.00
196,323.00
84,000.00
22,750.00
2,625.00
80,000.00
914,882.00
914,882.00
HARGA
(Rp)
60,795.00
2,100.00
2,275.00
262.50
160.00
65,592.50
65,593.00
17,325.00
415.50
294.00
455.00
52.50
24.00
18,566.00
18,566.00
114,000.00
7,020.00
12,600.00
16,900.00
1,950.00
400.00
152,870.00
152,870.00
128,250.00
7,020.00
12,600.00
16,900.00
1,950.00
400.00
167,120.00
167,120.00
114,000.00
9,360.00
39,600.00
52,885.00
56,000.00
12,600.00
21,450.00
2,475.00
480.00
308,850.00
308,850.00
HARGA
(Rp)
114,000.00
9,360.00
47,520.00
52,885.00
56,000.00
12,600.00
21,450.00
2,475.00
480.00
316,770.00
316,770.00
114,000.00
9,360.00
11,000.00
39,600.00
52,885.00
168,000.00
12,600.00
21,450.00
2,475.00
480.00
431,850.00
431,850.00
85,500.00
9,360.00
8,250.00
39,600.00
52,885.00
56,000.00
13,440.00
21,450.00
2,475.00
480.00
289,440.00
289,440.00
545,528.00
166,010.00
137,215.00
645.00
252,000.00
65,000.00
7,500.00
24,000.00
1,197,898.00
1,197,898.00
HARGA
(Rp)
562,400.00
102,160.00
173,102.00
645.00
252,000.00
65,000.00
7,500.00
24,000.00
1,186,807.00
1,186,807.00
570,000.00
35,100.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
163,800.00
22,750.00
67,600.00
68,250.00
18,375.00
13,200.00
4,248,004.00
4,248,004.00
769,500.00
46,800.00
33,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
5,441,279.00
5,441,279.00
769,500.00
46,800.00
33,000.00
2,475,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
4,616,279.00
4,616,279.00
769,500.00
46,800.00
2,970,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
HARGA
(Rp)
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
5,078,279.00
5,078,279.00
769,500.00
46,800.00
2,475,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
4,583,279.00
4,583,279.00
769,500.00
46,800.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
5,408,279.00
5,408,279.00
769,500.00
46,800.00
33,000.00
3,960,000.00
83,100.00
454,138.00
132,808.00
164,658.00
203,700.00
22,750.00
101,400.00
91,000.00
24,825.00
13,600.00
6,101,279.00
6,101,279.00
1,140,000.00
93,600.00
110,000.00
1,980,000.00
49,860.00
HARGA
(Rp)
454,138.00
132,808.00
164,658.00
396,000.00
822,500.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,646,664.00
6,646,664.00
1,140,000.00
93,600.00
2,310,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,573,014.00
6,573,014.00
1,140,000.00
93,600.00
2,970,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,233,014.00
7,233,014.00
1,140,000.00
93,600.00
2,887,500.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
HARGA
(Rp)
6,225,664.00
6,225,664.00
1,140,000.00
93,600.00
3,465,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,803,164.00
6,803,164.00
1,140,000.00
93,600.00
4,290,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,628,164.00
7,628,164.00
1,140,000.00
93,600.00
3,465,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,728,014.00
7,728,014.00
1,140,000.00
93,600.00
3,795,000.00
49,860.00
HARGA
(Rp)
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,058,014.00
8,058,014.00
1,140,000.00
93,600.00
110,000.00
4,125,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,498,014.00
8,498,014.00
1,140,000.00
93,600.00
2,887,500.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,150,514.00
7,150,514.00
1,140,000.00
93,600.00
3,465,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
HARGA
(Rp)
7,728,014.00
7,728,014.00
1,140,000.00
93,600.00
110,000.00
3,300,000.00
49,860.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,673,014.00
7,673,014.00
1,140,000.00
93,600.00
110,000.00
2,310,000.00
58,170.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
6,691,324.00
6,691,324.00
1,140,000.00
93,600.00
110,000.00
2,475,000.00
66,480.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
HARGA
(Rp)
20,000.00
6,864,634.00
6,864,634.00
HARGA
(Rp)
1,140,000.00
93,600.00
110,000.00
2,970,000.00
74,790.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,367,944.00
7,367,944.00
1,140,000.00
93,600.00
110,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,706,254.00
7,706,254.00
1,140,000.00
93,600.00
110,000.00
4,125,000.00
103,875.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
HARGA
(Rp)
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,552,029.00
8,552,029.00
1,140,000.00
93,600.00
110,000.00
4,950,000.00
124,650.00
454,138.00
132,808.00
164,658.00
396,000.00
528,850.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
9,397,804.00
9,397,804.00
912,000.00
74,880.00
88,000.00
1,980,000.00
49,860.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
5,693,859.00
5,693,859.00
HARGA
(Rp)
912,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,201,324.00
6,201,324.00
912,000.00
74,880.00
2,970,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,608,324.00
6,608,324.00
912,000.00
74,880.00
2,970,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,608,324.00
6,608,324.00
912,000.00
74,880.00
-
HARGA
(Rp)
3,135,000.00
62,325.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,773,324.00
6,773,324.00
912,000.00
74,880.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,959,099.00
6,959,099.00
912,000.00
74,880.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
6,959,099.00
6,959,099.00
912,000.00
74,880.00
2,887,500.00
165,000.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
HARGA
(Rp)
182,000.00
91,000.00
34,125.00
16,640.00
6,628,499.00
6,628,499.00
912,000.00
74,880.00
2,310,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
5,969,099.00
5,969,099.00
912,000.00
74,880.00
1,815,000.00
83,100.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
5,474,099.00
5,474,099.00
1,140,000.00
93,600.00
4,950,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
8,288,164.00
HARGA
(Rp)
8,288,164.00
1,140,000.00
93,600.00
3,861,000.00
49,860.00
454,138.00
132,808.00
164,658.00
560,000.00
306,600.00
22,750.00
214,500.00
136,500.00
42,750.00
20,000.00
7,199,164.00
7,199,164.00
912,000.00
74,880.00
88,000.00
3,795,000.00
95,565.00
454,138.00
132,808.00
164,658.00
369,600.00
423,080.00
448,000.00
250,320.00
HARGA
(Rp)
22,750.00
182,000.00
91,000.00
34,125.00
16,640.00
7,554,564.00
7,554,564.00
712,500.00
70,200.00
66,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
277,200.00
377,750.00
392,000.00
235,200.00
22,750.00
149,500.00
91,000.00
30,375.00
16,160.00
6,575,339.00
6,575,339.00
914,882.00
4,318,500.00
1,670,940.00
6,904,322.00
6,904,322.00
914,882.00
4,318,500.00
1,438,865.00
6,672,247.00
6,672,247.00
914,882.00
3,597,310.50
2,042,260.00
6,554,452.50
6,554,453.00
914,882.00
3,597,310.50
2,413,580.00
6,925,772.50
6,925,773.00
914,882.00
3,597,310.50
2,413,580.00
6,925,772.50
6,925,773.00
914,882.00
2,880,439.50
1,670,940.00
5,466,261.50
5,466,262.00
HARGA
(Rp)
914,882.00
2,880,439.50
2,135,090.00
5,930,411.50
5,930,412.00
5,700.00
234.00
49,500.00
1,246.50
5,624.00
1,532.40
1,899.90
2,520.00
1,300.00
1,300.00
1,300.00
450.00
240.00
72,846.80
72,847.00
8,550.00
468.00
59,400.00
1,385.00
7,733.00
2,298.60
3,166.50
4,200.00
2,145.00
2,145.00
2,145.00
750.00
400.00
94,786.10
94,786.00
85,500.00
562.40
11,000.00
52,800.00
52,885.00
84,000.00
10,000.00
13,440.00
2,145.00
2,475.00
480.00
315,287.40
315,287.00
HARGA
(Rp)
912,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
316,800.00
423,080.00
896,000.00
222,600.00
22,750.00
84,500.00
68,250.00
19,875.00
21,200.00
6,438,864.00
6,438,864.00
684,000.00
74,880.00
88,000.00
2,475,000.00
62,325.00
454,138.00
132,808.00
164,658.00
422,400.00
423,080.00
672,000.00
235,200.00
22,750.00
171,600.00
68,250.00
30,000.00
15,440.00
6,196,529.00
6,196,529.00
712,500.00
70,200.00
66,000.00
3,300,000.00
83,100.00
454,138.00
132,808.00
164,658.00
HARGA
(Rp)
277,200.00
423,080.00
392,000.00
237,300.00
22,750.00
101,400.00
91,000.00
24,225.00
22,640.00
6,574,999.00
6,574,999.00
580,678.00
108,704.63
143,688.73
69,300.00
17,875.00
2,100.00
6,640.00
928,986.36
928,986.00
494,912.00
116,685.88
145,096.07
69,300.00
17,875.00
2,100.00
6,640.00
852,608.94
852,609.00
539,904.00
110,460.50
146,221.93
69,300.00
17,875.00
2,100.00
6,640.00
892,501.43
892,501.00
URAIAN
SATUAN
Semen Portland
Kg
Pasir Pasang
M3
Pekerja
Oh
Tukang Batu
Oh
Kepala Tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan
E-05 1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps
- Bata Merah
Bh
- Semen Portland
Kg
- Pasir Pasang
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
VOLUME
140.0000
32.9500
0.0910
0.6500
0.2000
0.0200
0.0300
HARGA SATUAN
(Rp)
775.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
108,500.00
46,327.70
21,239.40
27,300.00
13,000.00
1,500.00
2,400.00
220,267.10
220,267.00
140.0000
26.5500
0.0930
0.6500
0.2000
0.0200
0.0300
775.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
108,500.00
37,329.30
21,706.20
27,300.00
13,000.00
1,500.00
2,400.00
211,735.50
211,736.00
140.0000
22.2000
0.1020
0.6500
0.2000
0.0200
0.0300
775.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
108,500.00
31,213.20
23,806.80
27,300.00
13,000.00
1,500.00
2,400.00
207,720.00
207,720.00
70.0000
775.00
54,250.00
14.3700
0.0400
0.3200
0.1000
0.0100
0.0150
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
20,204.22
9,336.00
13,440.00
6,500.00
750.00
1,200.00
105,680.22
105,680.00
70.0000
11.5000
0.0430
0.3200
0.1000
0.0100
0.0150
775.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
54,250.00
16,169.00
10,036.20
13,440.00
6,500.00
750.00
1,200.00
102,345.20
102,345.00
No.
URAIAN
SATUAN
VOLUME
70.0000
9.6800
0.0450
0.3200
0.1000
0.0100
0.0150
775.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
54,250.00
13,610.08
10,503.00
13,440.00
6,500.00
750.00
1,200.00
100,253.08
100,253.00
36.0000
12.8000
0.0350
0.3000
0.1000
0.0100
0.0150
14,800.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
532,800.00
17,996.80
8,169.00
12,600.00
6,500.00
750.00
1,200.00
580,015.80
580,016.00
36.0000
11.0000
0.0350
0.3000
0.1000
0.0100
0.0150
14,800.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
532,800.00
15,466.00
8,169.00
12,600.00
6,500.00
750.00
1,200.00
577,485.00
577,485.00
36.0000
12.8000
0.0350
0.3000
0.1000
0.0100
0.0150
Dibulatkan
E-10 1 M2 Pasang Dinding Batako Besar Pres uk. 8x20x30 adk. 1pc:4ps
- Batako
bh
13.0000
- PC
kg
12.0000
- Pasir Pasang
M3
0.0380
- Pekerja
Oh
0.3000
- Tukang Batu
Oh
0.1000
- Kepala Tukang
Oh
0.0100
- Mandor
Oh
0.0150
Jumlah
Dibulatkan
HARGA SATUAN
(Rp)
14,800.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
532,800.00
17,996.80
8,169.00
12,600.00
6,500.00
750.00
1,200.00
580,015.80
580,016.00
2,400.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
31,200.00
16,872.00
8,869.20
12,600.00
6,500.00
750.00
1,200.00
46,791.20
46,791.00
No.
URAIAN
SATUAN
Bh
Kg
m3
Kg
Oh
Oh
Oh
Oh
VOLUME
12.5000
13.5000
0.0480
1.9500
0.3500
0.1500
0.0150
0.0170
HARGA SATUAN
(Rp)
5,000.00
1,406.00
233,400.00
16,500.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
62,500.00
18,981.00
11,203.20
32,175.00
14,700.00
9,750.00
1,125.00
1,360.00
151,794.20
151,794.00
Bh
Kg
m3
Kg
Oh
Oh
Oh
Oh
12.5000
10.4500
0.0380
1.9500
0.3200
0.1200
0.0120
0.0150
4,000.00
1,406.00
233,400.00
16,500.00
42,000.00
65,000.00
75,000.00
80,000.00
50,000.00
14,692.70
8,869.20
32,175.00
13,440.00
7,800.00
900.00
1,200.00
129,076.90
129,077.00
Bh
Kg
m3
Kg
Oh
Oh
Oh
Oh
12.5000
7.5000
0.0270
1.9500
0.3200
0.1200
0.0120
0.0150
3,000.00
1,406.00
233,400.00
16,500.00
42,000.00
65,000.00
75,000.00
80,000.00
37,500.00
10,545.00
6,301.80
32,175.00
13,440.00
7,800.00
900.00
1,200.00
109,861.80
109,862.00
Bh
Kg
M3
M3
Kg
kg
M3
kg
M3
Oh
Oh
Oh
Oh
Oh
12.5000
14.0500
0.0040
0.0420
3.8700
0.0060
0.0010
0.0300
0.0050
0.3700
0.1570
0.0070
0.0164
0.0185
5,000.00
1,406.00
255,400.00
233,400.00
16,500.00
23,400.00
2,850,000.00
27,700.00
211,100.00
42,000.00
65,000.00
75,000.00
75,000.00
80,000.00
62,500.00
19,754.30
1,021.60
9,802.80
63,855.00
140.40
2,850.00
831.00
1,055.50
15,540.00
10,205.00
525.00
1,230.00
1,480.00
190,790.60
190,791.00
No.
URAIAN
SATUAN
HARGA SATUAN
(Rp)
HARGA
(Rp)
Bh
Kg
M3
M3
Kg
kg
M3
kg
M3
Oh
Oh
Oh
Oh
Oh
12.5000
10.4600
0.0030
0.0320
0.8700
0.0040
0.0010
0.0200
0.0040
0.3400
0.1300
0.0070
0.0137
0.0170
4,000.00
1,406.00
255,400.00
233,400.00
16,500.00
23,400.00
2,850,000.00
27,700.00
211,100.00
42,000.00
65,000.00
75,000.00
75,000.00
80,000.00
50,000.00
14,706.76
766.20
7,468.80
14,355.00
93.60
2,850.00
554.00
844.40
14,280.00
8,450.00
525.00
1,027.50
1,360.00
117,281.26
117,281.00
Bh
Kg
M3
M3
Kg
kg
M3
kg
M3
Oh
Oh
Oh
Oh
Oh
12.5000
10.4600
0.0030
0.0320
0.8700
0.0040
0.0010
0.0200
0.0040
0.3400
0.1300
0.0070
0.0137
0.0170
3,000.00
1,406.00
255,400.00
233,400.00
16,500.00
23,400.00
2,850,000.00
27,700.00
211,100.00
42,000.00
65,000.00
75,000.00
75,000.00
80,000.00
37,500.00
14,706.76
766.20
7,468.80
14,355.00
93.60
2,850.00
554.00
844.40
14,280.00
8,450.00
525.00
1,027.50
1,360.00
104,781.26
Dibulatkan
E-17 1 M2 Dinding Keramik Corak 10 x 20 cm Setara Mulia
- Keramik Corak 10 x 20 cm
m2
- Semen abu-abu
Kg
- Pasir pasang
M3
- Semen warna
Kg
- Pekerja
Oh
- Tukang batu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
E-18 1 M2 Dinding Keramik polos 10 x 20 cm Setara Mulia
- Keramik 10 x 20 cm
m2
- Semen abu-abu
Kg
- Pasir pasang
M3
- Semen warna
Kg
- Pekerja
Oh
- Tukang batu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
VOLUME
104,781.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
56,000.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
56,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
108,782.30
108,782.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
54,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
54,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
107,282.30
107,282.00
No.
URAIAN
SATUAN
VOLUME
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
HARGA SATUAN
(Rp)
62,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
62,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
115,282.30
115,282.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
54,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
54,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
107,282.30
107,282.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
54,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
54,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
107,282.30
107,282.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
62,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
62,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
115,282.30
115,282.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
53,000.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
53,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
105,782.30
105,782.00
No.
URAIAN
SATUAN
VOLUME
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
HARGA SATUAN
(Rp)
58,000.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
58,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
110,782.30
110,782.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
56,800.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
56,800.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
109,582.30
109,582.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
65,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
65,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
118,282.30
118,282.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
72,200.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
72,200.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
124,982.30
124,982.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
64,400.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
64,400.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
117,182.30
117,182.00
No.
URAIAN
SATUAN
VOLUME
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
HARGA SATUAN
(Rp)
75,200.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
75,200.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
127,982.30
127,982.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
64,400.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
64,400.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
117,182.30
117,182.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
72,900.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
72,900.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
125,682.30
125,682.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
75,200.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
75,200.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
127,982.30
127,982.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
68,900.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
68,900.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
121,682.30
121,682.00
No.
URAIAN
SATUAN
VOLUME
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
HARGA SATUAN
(Rp)
76,600.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
76,600.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
129,382.30
129,382.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
72,500.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
72,500.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
125,282.30
125,282.00
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
77,000.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
77,000.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
129,782.30
129,782.00
M2
Bh
Kg
M3
Kg
Oh
Oh
Oh
Oh
1.0200
2.0000
12.4400
0.0250
1.5000
0.7200
0.6500
0.0650
0.0350
550,000.00
900.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
561,000.00
1,800.00
17,490.64
5,835.00
23,550.00
30,240.00
42,250.00
4,875.00
2,800.00
689,840.64
689,841.00
M2
Kg
M3
Oh
Oh
Oh
Oh
1.0500
11.7500
0.0350
0.6200
0.3500
0.0350
0.0300
96,600.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
101,430.00
16,520.50
8,169.00
26,040.00
22,750.00
2,625.00
2,400.00
179,934.50
179,935.00
No.
URAIAN
SATUAN
M2
Kg
M3
Kg
Oh
Oh
Oh
Oh
VOLUME
HARGA SATUAN
(Rp)
1.0000
8.0000
0.0180
0.0130
0.1875
0.3750
0.0450
0.0188
Dibulatkan
E-40 1 M2 Wall paper
- Wall paper
M2
1.0500
- Lem
Kg
0.2500
- Pekerja
Oh
0.3500
- Tukang batu
Oh
0.1750
- Kepala tukang
Oh
0.0170
- Mandor
Oh
0.0020
Jumlah
Dibulatkan
E-41 1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
- Paku Biasa 2" - 5"
Kg
0.1500
- Lem Kayu
Ltr
0.5600
- Teakwood 120 x 240 x 0,4 cm
Lbr
0.8600
- Pekerja
Oh
0.1500
- Tukang Kayu
Oh
0.4500
- Kepala Tukang
Oh
0.0450
- Mandor
Oh
0.0080
Jumlah
Dibulatkan
E-42 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
- Paku Biasa 2" - 5"
Kg
0.1500
- Lem Kayu
Ltr
0.5600
- Plywood 120 x 240 x 9 mm
Lbr
0.8600
- Pekerja
Oh
0.2000
- Tukang Kayu
Oh
0.6000
- Kepala Tukang
Oh
0.0600
- Mandor
Oh
0.0100
Jumlah
Dibulatkan
E-43 1 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
- Paku Biasa 2" - 5"
Kg
0.1500
- Lem Kayu
Ltr
0.5600
- Triplek (120x240x0,4) cm
Lbr
0.8600
- Pekerja
Oh
0.2000
- Tukang Kayu
Oh
0.6000
- Kepala Tukang
Oh
0.0600
- Mandor
Oh
0.0100
Jumlah
Dibulatkan
63,300.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
63,300.00
11,248.00
4,201.20
204.10
7,875.00
24,375.00
3,375.00
1,504.00
116,082.30
116,082.00
55,700.00
35,700.00
42,000.00
65,000.00
75,000.00
80,000.00
58,485.00
8,925.00
14,700.00
11,375.00
1,275.00
160.00
94,920.00
94,920.00
5,692,600.00
23,800.00
23,900.00
131,700.00
42,000.00
65,000.00
75,000.00
80,000.00
159,392.80
3,570.00
13,384.00
113,262.00
6,300.00
29,250.00
3,375.00
640.00
329,173.80
329,174.00
5,692,600.00
23,800.00
23,900.00
235,000.00
42,000.00
65,000.00
75,000.00
80,000.00
159,392.80
3,570.00
13,384.00
202,100.00
8,400.00
39,000.00
4,500.00
800.00
431,146.80
431,147.00
5,692,600.00
23,800.00
23,900.00
64,400.00
42,000.00
65,000.00
75,000.00
80,000.00
159,392.80
3,570.00
13,384.00
55,384.00
8,400.00
39,000.00
4,500.00
800.00
284,430.80
284,431.00
No.
URAIAN
SATUAN
VOLUME
0.4150
0.1500
0.3640
0.1100
4.0000
0.0720
0.1250
0.1000
0.0500
0.0050
0.0050
Dibulatkan
E-44 1 M2 Dinding Pemisah Gypsum t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
- Hollow 2/4 Zincromate
Btg
0.1500
- Gypsum
Lbr
0.3640
- Paku GRC
kg
0.1100
- Ramset / dina bolt
Bh
4.0000
- Cotton plaster
Bh
0.0720
- Compoun
Zak
0.1250
- Pekerja
Oh
0.1000
- Tukang kayu
Oh
0.0500
- Kepala tukang
Oh
0.0050
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
E-45 1 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
- Hollow 2/4 Zincromate
Btg
0.1500
- Plywood 120 x 240, 9 mm
Lbr
0.3640
- Paku
kg
0.1100
- Ramset / dina bolt
Bh
4.0000
- Pekerja
Oh
0.1000
- Tukang kayu
Oh
0.0500
- Kepala tukang
Oh
0.0050
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
E-46 1 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
- Hollow 2/4 Zincromate
Btg
0.1500
- Teakwood ( 120 x 240 x 4 ) mm
Lbr
0.3640
- Paku
kg
0.1100
- Ramset / dina bolt
Bh
4.0000
- Pekerja
Oh
0.1000
- Tukang kayu
Oh
0.0500
- Kepala tukang
Oh
0.0050
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
HARGA SATUAN
(Rp)
29,200.00
22,600.00
67,500.00
35,000.00
7,200.00
23,900.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
12,118.00
3,390.00
24,570.00
3,850.00
28,800.00
1,720.80
9,375.00
4,200.00
3,250.00
375.00
400.00
92,048.80
92,049.00
29,200.00
22,600.00
79,800.00
35,000.00
7,200.00
23,900.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00
12,118.00
3,390.00
29,047.20
3,850.00
28,800.00
1,720.80
9,375.00
4,200.00
3,250.00
375.00
400.00
96,526.00
96,526.00
29,200.00
22,600.00
235,000.00
23,800.00
7,200.00
42,000.00
65,000.00
75,000.00
80,000.00
12,118.00
3,390.00
85,540.00
2,618.00
28,800.00
4,200.00
3,250.00
375.00
400.00
140,691.00
140,691.00
29,200.00
22,600.00
131,700.00
23,800.00
7,200.00
42,000.00
65,000.00
75,000.00
80,000.00
12,118.00
3,390.00
47,938.80
2,618.00
28,800.00
4,200.00
3,250.00
375.00
400.00
103,089.80
103,090.00
No.
URAIAN
SATUAN
VOLUME
36.0000
11.0000
0.0350
0.3000
0.1000
0.0100
0.0150
HARGA SATUAN
(Rp)
22,000.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
792,000.00
15,466.00
8,169.00
12,600.00
6,500.00
750.00
1,200.00
836,685.00
836,685.00
1.5000
0.0140
0.0112
0.0030
0.1000
0.0500
0.0050
0.0020
22,700.00
3,356,800.00
23,800.00
5,280,000.00
42,000.00
65,000.00
75,000.00
80,000.00
34,050.00
46,995.20
266.56
15,840.00
4,200.00
3,250.00
375.00
160.00
105,136.76
105,137.00
URAIAN
SATUAN
VOLUME
8.5200
0.0170
0.2000
0.1500
0.0150
0.0100
HARGA SATUAN
(Rp)
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
11,979.12
3,967.80
8,400.00
9,750.00
1,125.00
800.00
36,021.92
36,022.00
6.4800
0.0190
0.2000
0.1500
0.0150
0.0100
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
9,110.88
4,434.60
8,400.00
9,750.00
1,125.00
800.00
33,620.48
33,620.00
5.2000
0.0200
0.2000
0.1500
0.0150
0.0100
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
7,311.20
4,668.00
8,400.00
9,750.00
1,125.00
800.00
32,054.20
32,054.00
10.8000
0.0260
0.2500
0.2000
0.0200
0.0125
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
15,184.80
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
47,253.20
47,253.00
8.6800
0.0280
0.2500
0.2000
0.0200
0.0125
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
12,204.08
6,535.20
10,500.00
13,000.00
1,500.00
1,000.00
44,739.28
44,739.00
7.2900
0.0260
0.2500
0.2000
0.0200
0.0125
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
10,249.74
6,068.40
10,500.00
13,000.00
1,500.00
1,000.00
42,318.14
Dibulatkan
1 M2 Plesteran adk. 1pc:5ps tebal 15 mm + Acian
42,318.00
- Semen Portland
Kg
4.3200
1,406.00
6,073.92
- Pasir Pasang
M3
0.0220
233,400.00
5,134.80
- Pekerja
Oh
0.2000
42,000.00
8,400.00
- Tukang Batu
Oh
0.1500
65,000.00
9,750.00
- Kepala Tukang
Oh
0.0150
75,000.00
1,125.00
- Mandor
Jumlah
Oh
0.0100
80,000.00
800.00
31,283.72
Dibulatkan
31,284.00
No.
URAIAN
SATUAN
VOLUME
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
7,972.02
5,368.20
6,300.00
4,550.00
525.00
640.00
25,355.22
25,355.00
9.3000
0.0180
0.2600
0.2000
0.0200
0.0130
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
13,075.80
4,201.20
10,920.00
13,000.00
1,500.00
1,040.00
43,737.00
43,737.00
7.0700
0.0210
0.2600
0.2000
0.0200
0.0130
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
9,940.42
4,901.40
10,920.00
13,000.00
1,500.00
1,040.00
41,301.82
41,302.00
0.5000
0.0130
0.0800
0.4000
0.0400
0.0040
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
703.00
3,034.20
3,360.00
26,000.00
3,000.00
320.00
36,417.20
36,417.00
Kg
Oh
Oh
Oh
Oh
Dibulatkan
F-12 1 M2 Plesteran Siar adk. 1pc : 2ps batu belah
- Semen Portland
Kg
- Pasir Pasang
M3
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
5.6700
0.0230
0.1500
0.0700
0.0070
0.0080
HARGA SATUAN
(Rp)
4.0000
0.1430
0.1070
0.0105
0.0105
1,406.00
42,000.00
65,000.00
75,000.00
80,000.00
5,624.00
6,006.00
6,955.00
787.50
840.00
20,212.50
20,213.00
6.3400
0.0120
0.3000
0.1500
0.0150
0.0150
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
8,914.04
2,800.80
12,600.00
9,750.00
1,125.00
1,200.00
36,389.84
36,390.00
No.
URAIAN
SATUAN
VOLUME
4.3200
0.0160
0.1500
0.0700
0.0070
0.0080
HARGA SATUAN
(Rp)
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
6,073.92
3,734.40
6,300.00
4,550.00
525.00
640.00
21,823.32
21,823.00
URAIAN
SATUAN
Bh
Oh
Oh
Oh
Oh
25.0000
0.1500
0.0750
0.0080
0.0080
HARGA SATUAN
(Rp)
1,900.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
47,500.00
6,300.00
4,875.00
600.00
640.00
59,915.00
59,915.00
Bh
Kg
M3
Oh
Oh
Oh
Oh
5.0000
8.0000
0.0320
0.4000
0.2000
0.0200
0.0020
6,000.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
30,000.00
11,248.00
7,468.80
16,800.00
13,000.00
1,500.00
160.00
80,176.80
80,177.00
Lbr
Kg
Oh
Oh
Oh
Oh
Dibulatkan
G-04 1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m
- Asbes gelombang
- Paku seng
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
) x 4 mm
Lbr
Kg
Oh
Oh
Oh
Oh
Dibulatkan
G-05 1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m
- Asbes gelombang
- Paku seng
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
) x 4 mm
Lbr
Kg
Oh
Oh
Oh
Oh
Dibulatkan
G-06 1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m
- Asbes gelombang
- Paku seng
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
) x 4 mm
Lbr
Kg
Oh
Oh
Oh
Oh
Dibulatkan
VOLUME
0.6000
0.0500
0.1400
0.0670
0.0070
0.0070
100,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
60,000.00
1,190.00
5,880.00
4,355.00
525.00
560.00
72,510.00
72,510.00
0.3500
0.1200
0.1400
0.0700
0.0070
0.0070
80,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
28,000.00
2,856.00
5,880.00
4,550.00
525.00
560.00
42,371.00
42,371.00
0.4200
0.1200
0.1400
0.0700
0.0070
0.0070
73,300.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
30,786.00
2,856.00
5,880.00
4,550.00
525.00
560.00
45,157.00
45,157.00
0.4400
0.1200
0.1400
0.0670
0.0070
0.0070
65,900.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
28,996.00
2,856.00
5,880.00
4,355.00
525.00
560.00
43,172.00
43,172.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
0.5100
0.1200
0.1400
0.0670
0.0070
0.0070
58,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
29,835.00
2,856.00
5,880.00
4,355.00
525.00
560.00
44,011.00
44,011.00
0.8000
0.1200
0.1400
0.0670
0.0070
0.0070
42,300.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
33,840.00
2,856.00
5,880.00
4,355.00
525.00
560.00
48,016.00
48,016.00
Lbr
Bh
Oh
Oh
Oh
Oh
2.1000
6.0000
0.0840
0.1250
0.0130
0.0040
38,100.00
800.00
42,000.00
65,000.00
75,000.00
80,000.00
80,010.00
4,800.00
3,528.00
8,125.00
975.00
320.00
97,758.00
97,758.00
bh
Kg
Oh
Oh
Oh
Oh
11.0000
0.0300
0.2000
0.1000
0.0100
0.0100
8,500.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00
93,500.00
702.00
8,400.00
6,500.00
750.00
800.00
110,652.00
110,652.00
bh
Oh
Oh
Oh
Oh
18.0000
0.1500
0.0750
0.0080
0.0080
2,700.00
42,000.00
65,000.00
75,000.00
80,000.00
48,600.00
6,300.00
4,875.00
600.00
640.00
61,015.00
61,015.00
bh
Oh
Oh
Oh
Oh
18.0000
0.1500
0.0750
0.0080
0.0080
4,000.00
42,000.00
65,000.00
75,000.00
80,000.00
72,000.00
6,300.00
4,875.00
600.00
640.00
84,415.00
84,415.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
m2
Kg
Oh
Oh
Oh
Oh
1.0200
0.2000
0.2000
0.1000
0.0100
0.0010
203,100.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00
207,162.00
4,680.00
8,400.00
6,500.00
750.00
80.00
227,572.00
227,572.00
Bh
Kg
Kg
M3
Kg
Oh
Oh
Oh
Oh
3.5000
0.0500
10.8000
0.0320
1.0000
0.4000
0.2000
0.0200
0.0200
10,500.00
23,400.00
1,406.00
233,400.00
15,700.00
42,000.00
65,000.00
75,000.00
80,000.00
36,750.00
1,170.00
15,184.80
7,468.80
15,700.00
16,800.00
13,000.00
1,500.00
1,600.00
109,173.60
109,174.00
Lbr
Kg
Oh
Oh
Oh
Oh
1.1000
0.0500
0.2500
0.1500
0.0150
0.0130
138,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
152,350.00
1,190.00
10,500.00
9,750.00
1,125.00
1,040.00
175,955.00
175,955.00
Lbr
Kg
Oh
Oh
Oh
Oh
0.7000
0.0200
0.1200
0.0600
0.0060
0.0060
83,100.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
58,170.00
476.00
5,040.00
3,900.00
450.00
480.00
68,516.00
68,516.00
Lbr
Kg
Oh
Oh
Oh
Oh
0.3000
0.0400
0.1500
0.0700
0.0080
0.0060
37,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
11,250.00
952.00
6,300.00
4,550.00
600.00
480.00
24,132.00
24,132.00
M2
Oh
Oh
Oh
Oh
1.0500
0.1500
0.0500
0.0050
0.0080
19,600.00
42,000.00
65,000.00
75,000.00
80,000.00
20,580.00
6,300.00
3,250.00
375.00
640.00
31,145.00
31,145.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
Lbr
Kg
Oh
Oh
Oh
Oh
1.0500
0.0200
0.1500
0.7500
0.0080
0.0060
140,600.00
20,000.00
42,000.00
65,000.00
75,000.00
80,000.00
147,630.00
400.00
6,300.00
48,750.00
600.00
480.00
204,160.00
204,160.00
Lbr
Kg
Oh
Oh
Oh
Oh
1.0500
0.0200
0.1500
0.7500
0.0080
0.0060
164,700.00
20,000.00
42,000.00
65,000.00
75,000.00
80,000.00
172,935.00
400.00
6,300.00
48,750.00
600.00
480.00
229,465.00
229,465.00
M2
Kg
Oh
Oh
Oh
Oh
1.2000
0.0400
0.1000
1.0000
0.0100
0.0100
75,000.00
20,000.00
42,000.00
65,000.00
75,000.00
80,000.00
90,000.00
800.00
4,200.00
65,000.00
750.00
800.00
161,550.00
161,550.00
M2
kg
Oh
Oh
Oh
Oh
0.3300
0.0500
0.1000
0.2000
0.0200
0.0050
67,500.00
35,000.00
42,000.00
65,000.00
75,000.00
80,000.00
22,275.00
1,750.00
4,200.00
13,000.00
1,500.00
400.00
43,125.00
43,125.00
M'
Kg
Oh
Oh
Oh
Oh
4.0000
0.0526
0.0840
0.1250
0.0130
0.0040
4,000.00
20,000.00
42,000.00
65,000.00
75,000.00
80,000.00
16,000.00
1,052.00
3,528.00
8,125.00
975.00
320.00
30,000.00
30,000.00
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
1.1000
0.0100
0.0300
0.0700
0.0070
0.0015
24,750.00
238.00
1,260.00
4,550.00
525.00
120.00
31,443.00
31,443.00
1.1000
0.0100
0.0300
0.0700
0.0070
0.0015
19,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
21,450.00
238.00
1,260.00
4,550.00
525.00
120.00
28,143.00
28,143.00
Lbr
Kg
Oh
Oh
Oh
Oh
1.5000
0.0500
0.0600
0.1000
0.0100
0.0030
Dibulatkan
H-04 1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
- Profil Alluminium "T"
M
3.6000
- Kawat 4 mm
Kg
0.1500
- Ramset / dina bolt
Bh
1.0500
- Akustik 600 x 1200
Lbr
1.5000
- Pekerja
Oh
0.1500
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0500
- Mandor
Oh
0.0075
Jumlah
Dibulatkan
H-05 1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
- Kayu Balok Borneo Super
M3
0.0230
- Paku biasa 2" - 5"
Kg
0.0600
- Teakwood 120 cm x 240 cm x 0,4 cm
Lbr
0.3900
- Pekerja
Oh
0.2700
- Tukang kayu
Oh
0.4000
- Kepala tukang
Oh
0.0400
- Mandor
Oh
0.0135
Jumlah
Dibulatkan
22,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
132,800.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
199,200.00
1,190.00
2,520.00
6,500.00
750.00
240.00
210,400.00
210,400.00
12,200.00
28,200.00
7,200.00
132,800.00
42,000.00
65,000.00
75,000.00
80,000.00
43,920.00
4,230.00
7,560.00
199,200.00
6,300.00
32,500.00
3,750.00
600.00
298,060.00
298,060.00
2,640,000.00
23,400.00
131,700.00
42,000.00
65,000.00
75,000.00
80,000.00
60,720.00
1,404.00
51,363.00
11,340.00
26,000.00
3,000.00
1,080.00
154,907.00
154,907.00
No.
URAIAN
SATUAN
VOLUME
Dibulatkan
2,640,000.00
23,400.00
129,100.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
60,720.00
1,404.00
50,349.00
11,340.00
26,000.00
3,000.00
1,080.00
153,893.00
153,893.00
0.0230
0.0600
0.3900
0.2700
0.4000
0.0400
0.0135
Dibulatkan
H-08 1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
- Hollow 2/4 Zincromate
Btg
0.1500
- Gypsum board ( 120 x 240 x 9 ) mm
Lbr
0.3640
- Paku gypsum
kg
0.1100
- Ramset / dina bolt
Bh
4.0000
- Cotton plaster
Bh
0.0720
- Compoun
Zak
0.1250
- Pekerja
Oh
0.1000
- Tukang kayu
Oh
0.0500
- Kepala tukang
Oh
0.0050
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
H-09 1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
- Hollow 2/4 Zincromate
Btg
- GRC ( 120 x 240 x 4 ) mm
Lbr
- Paku GRC
kg
- Ramset / dina bolt
Bh
- Cotton plaster
Bh
- Compoun
Zak
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
HARGA SATUAN
(Rp)
2,640,000.00
23,800.00
64,400.00
42,000.00
65,000.00
75,000.00
80,000.00
60,720.00
1,428.00
25,116.00
11,340.00
26,000.00
3,000.00
1,080.00
128,684.00
128,684.00
29,200.00
22,600.00
79,800.00
17,500.00
7,200.00
15,000.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00
12,118.00
3,390.00
29,047.20
1,925.00
28,800.00
1,080.00
9,375.00
4,200.00
3,250.00
375.00
400.00
93,960.20
93,960.00
0.4150
0.1500
0.3640
0.1100
4.0000
0.0720
0.1250
0.1000
0.0500
0.0050
0.0050
29,200.00
22,600.00
67,500.00
35,000.00
7,200.00
15,000.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00
12,118.00
3,390.00
24,570.00
3,850.00
28,800.00
1,080.00
9,375.00
4,200.00
3,250.00
375.00
400.00
91,408.00
91,408.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
2,640,000.00
23,800.00
79,800.00
17,500.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
60,720.00
1,428.00
31,122.00
1,925.00
11,340.00
26,000.00
3,000.00
1,080.00
136,615.00
136,615.00
0.0230
0.0600
0.3900
0.1100
0.2700
0.4000
0.0400
0.0135
2,640,000.00
23,800.00
67,500.00
35,000.00
42,000.00
65,000.00
75,000.00
80,000.00
60,720.00
1,428.00
26,325.00
3,850.00
11,340.00
26,000.00
3,000.00
1,080.00
133,743.00
133,743.00
M
Kg
Oh
Oh
Oh
Oh
1.0500
0.0100
0.0500
0.0500
0.0050
0.0030
29,400.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
30,870.00
238.00
2,100.00
3,250.00
375.00
240.00
37,073.00
37,073.00
M
Kg
Oh
Oh
Oh
Oh
1.0500
0.1500
0.0500
0.0500
0.0050
0.0030
8,500.00
12,500.00
42,000.00
65,000.00
75,000.00
80,000.00
8,925.00
1,875.00
2,100.00
3,250.00
375.00
240.00
16,765.00
16,765.00
M
Kg
Oh
Oh
Oh
Oh
1.0500
0.0100
0.0434
0.0500
0.0050
0.0030
1,500.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
1,575.00
238.00
1,822.80
3,250.00
375.00
240.00
7,500.80
7,500.00
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
345,000.00
- Semen portland
- Pasir pasang
- Semen warna
Kg
M3
Kg
9.8000
0.0215
1.3000
1,406.00
233,400.00
15,700.00
- Pekerja
- Tukang batu
Oh
Oh
0.2500
0.1200
42,000.00
65,000.00
- Kepala tukang
- Mandor
Oh
Oh
0.0120
0.0125
75,000.00
80,000.00
Dibulatkan
I-02 1 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza
- Granito 30 x 30 cm
m2
1.0500
322,800.00
Jumlah
- Semen portland
- Pasir pasang
- Semen warna
Kg
M3
Kg
10.0000
0.0215
1.5000
1,406.00
233,400.00
15,700.00
- Pekerja
- Tukang batu
Oh
Oh
0.2600
0.1250
42,000.00
65,000.00
- Kepala tukang
- Mandor
Oh
Oh
0.0125
0.0130
75,000.00
80,000.00
Jumlah
Dibulatkan
I-03 1 M Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza
- Plint granito 10 x 40 cm
Bh
2.6500
27,600.00
- Semen portland
- Pasir pasang
- Semen warna
Kg
M3
Kg
1.2000
0.0030
0.1000
1,406.00
233,400.00
15,700.00
- Pekerja
- Tukang batu
Oh
Oh
0.0600
0.0300
42,000.00
65,000.00
- Kepala tukang
- Mandor
Oh
Oh
0.0030
0.0030
75,000.00
80,000.00
Jumlah
Dibulatkan
I-04 1 M Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza
- Plint granito 10 x 30 cm
Bh
3.3300
25,900.00
- Semen portland
- Pasir pasang
- Semen warna
Kg
M3
Kg
1.6500
0.0032
0.1000
1,406.00
233,400.00
15,700.00
- Pekerja
- Tukang batu
Oh
Oh
0.0900
0.0900
42,000.00
65,000.00
- Kepala tukang
- Mandor
Oh
Oh
0.0090
0.0045
75,000.00
80,000.00
1.0000
56,000.00
Jumlah
Dibulatkan
I-05 1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
- Keramik corak 10 x 20 cm
m2
- Semen portland
- Pasir pasang
- Semen warna
Kg
M3
Kg
8.0000
0.0215
0.0130
1,406.00
233,400.00
15,700.00
- Pekerja
- Tukang batu
Oh
Oh
0.2500
0.1200
42,000.00
65,000.00
- Kepala tukang
- Mandor
Oh
Oh
0.0120
0.0125
75,000.00
80,000.00
Jumlah
Dibulatkan
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
1.0000
62,500.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
Dibulatkan
I-07 1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
- Keramik polos 30 x 30 cm
m2
1.0000
53,000.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
Dibulatkan
I-08 1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
- Keramik corak 30 x 30 cm
m2
1.0000
58,000.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
Dibulatkan
I-09 1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
- Keramik polos 40 x 40 cm
m2
1.0000
56,800.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
1.0000
65,500.00
Dibulatkan
I-10 1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
- Keramik corak 40 x 40 cm
m2
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
Dibulatkan
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
1.0000
72,200.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
1.0000
75,200.00
Dibulatkan
I-12 1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
- Keramik corak 20 x 20 cm
m2
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
Dibulatkan
I-13 1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
- Keramik polos 30 x 30 cm
m2
1.0000
68,900.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
Dibulatkan
I-14 1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
- Keramik corak 30 x 30 cm
M2
1.0000
76,600.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
1.0000
72,500.00
Dibulatkan
I-15 1 M2 Lantai Keramik polos 40 x 40 cm setara Roman
- Keramik polos 40 x 40 cm
m2
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
Dibulatkan
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
1.0000
77,000.00
- Semen portland
- Pasir pasang
Kg
M3
8.0000
0.0215
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0130
0.2500
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0125
80,000.00
m2
1.0600
550,000.00
- Semen portland
- Pasir pasang
Kg
M3
8.1900
0.0450
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.6500
0.7000
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.3500
0.0350
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0350
80,000.00
Dibulatkan
I-17 1 M2 Lantai Marmer
- Marmer
Dibulatkan
I-18 1 M2 Lantai Parquet Jati
- Parquet jati
M2
1.0500
375,400.00
- Lem vinyl
- Pekerja
Kg
Oh
0.6000
0.6500
44,000.00
42,000.00
- Tukang
- Kepala tukang
Oh
Oh
0.3500
0.0350
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0325
80,000.00
Bh
Kg
M3
2.6500
1.2000
0.0030
4,000.00
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.1000
0.0600
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.0300
0.0030
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0030
80,000.00
Bh
Kg
M3
3.5000
1.6500
0.0032
3,500.00
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.1000
0.0900
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.0900
0.0090
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0045
80,000.00
Dibulatkan
I-19 1 M Plint Keramik ukuran (10 x 40) cm
Dibulatkan
I-20 1 M Plint Keramik ukuran (10 x 30) cm
Dibulatkan
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
0.0024
8,724,300.00
- Paku
- Pekerja
Kg
Oh
0.0500
0.1200
23,800.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1200
0.0120
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0060
80,000.00
- Plint keramik
- Semen abu-abu
- Pasir pasang
Bh
Kg
M3
5.3000
1.1400
0.0030
3,000.00
1,406.00
233,400.00
- Semen warna
- Pekerja
Kg
Oh
0.0250
0.0900
15,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.0900
0.0090
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0050
80,000.00
- Karpet
- Lem
- Pekerja
M2
Kg
Oh
1.0500
0.3500
0.1700
353,500.00
35,700.00
42,000.00
- Tukang batu
- Kepala tukang
Oh
Oh
0.1700
0.0170
65,000.00
75,000.00
- Mandor
Jumlah
Oh
0.0085
80,000.00
M2
Kg
1.050
81,100.00
233,400.00
- Mandor
Jumlah
Oh
Dibulatkan
I-22 1 M' Plint keramik ukuran (10 x 20) cm
Dibulatkan
I-23 1 M2 Lantai karpet
Dibulatkan
I-24 1 M2 Paving block natural 8 cm
Oh
Oh
Oh
0.100
0.2500
0.5000
0.0250
0.00250
42,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
I-25 1 M2 Paving block warna 8 cm
- Paving block warna
- Pasir pasang
- Pekerja
- Tukang batu
M2
Kg
- Kepala tukang
- Mandor
Jumlah
Oh
Oh
Oh
Oh
1.050
0.100
0.2500
0.5000
0.0250
0.00250
108,600.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
I-26 1 M2 Paving block natural 6 cm
- Paving block natural
- Pasir pasang
- Pekerja
- Tukang batu
M2
Kg
- Kepala tukang
- Mandor
Oh
Oh
Jumlah
Dibulatkan
Oh
Oh
1.050
0.100
0.2500
0.5000
0.0250
0.00250
76,000.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
M2
- Pasir pasang
- Pekerja
Kg
Oh
- Tukang batu
- Kepala tukang
Oh
Oh
- Mandor
Jumlah
Oh
1.050
0.100
0.2500
0.5000
0.0250
0.00250
86,000.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
I-28 1 M2 Grass Block 20 x 20
- Grass block
- Pasir pasang
- Pekerja
Bh
Kg
Oh
- Tukang batu
- Kepala tukang
Oh
Oh
- Mandor
Jumlah
Oh
26.250
0.100
0.2500
0.5000
0.0250
0.00250
9,700.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
I-29 1 M2 Grass Block 30 x 30
- Grass block
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
Bh
Kg
Oh
Oh
Oh
Oh
11.670
0.100
0.2500
0.5000
0.0250
0.00250
22,500.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
62,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
99,170.20
99,170.00
53,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
89,670.20
89,670.00
58,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
94,670.20
94,670.00
56,800.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
93,470.20
93,470.00
65,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
102,170.20
102,170.00
HARGA
(Rp)
72,200.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
108,870.20
108,870.00
75,200.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
111,870.20
111,870.00
68,900.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
105,570.20
105,570.00
76,600.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
113,270.20
113,270.00
72,500.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
109,170.20
109,170.00
HARGA
(Rp)
77,000.00
11,248.00
5,018.10
204.10
10,500.00
7,800.00
900.00
1,000.00
113,670.20
113,670.00
583,000.00
11,515.14
10,503.00
10,205.00
29,400.00
22,750.00
2,625.00
2,800.00
672,798.14
672,798.00
394,170.00
26,400.00
27,300.00
22,750.00
2,625.00
2,600.00
475,845.00
475,845.00
10,600.00
1,687.20
700.20
1,570.00
2,520.00
1,950.00
225.00
240.00
19,492.40
19,492.00
12,250.00
2,319.90
746.88
1,570.00
3,780.00
5,850.00
675.00
360.00
27,551.78
27,552.00
HARGA
(Rp)
20,938.32
1,190.00
5,040.00
7,800.00
900.00
480.00
36,348.32
36,348.00
15,900.00
1,602.84
700.20
392.50
3,780.00
5,850.00
675.00
400.00
29,300.54
29,301.00
371,175.00
12,495.00
7,140.00
11,050.00
1,275.00
680.00
403,815.00
403,815.00
85,155.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
153,570.00
153,570.00
114,030.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
182,445.00
182,445.00
79,800.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
148,215.00
148,215.00
HARGA
(Rp)
90,300.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
158,715.00
158,715.00
254,625.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
323,040.00
323,040.00
262,575.00
23,340.00
10,500.00
32,500.00
1,875.00
200.00
330,990.00
330,990.00
URAIAN
SATUAN
VOLUME
1.2000
6.0000
18.0000
2.0000
0.3000
HARGA SATUAN
(Rp)
8,633,700.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
10,360,440.00
252,000.00
1,170,000.00
150,000.00
24,000.00
11,956,440.00
11,956,440.00
1.2000
6.0000
18.0000
2.0000
0.3000
5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00
6,831,120.00
252,000.00
1,170,000.00
150,000.00
24,000.00
8,427,120.00
8,427,120.00
1.2000
6.0000
18.0000
2.0000
0.3000
5,280,000.00
42,000.00
65,000.00
75,000.00
80,000.00
6,336,000.00
252,000.00
1,170,000.00
150,000.00
24,000.00
7,932,000.00
7,932,000.00
0.0400
0.0500
1.0000
2.5000
0.2500
0.0500
8,633,700.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00
345,348.00
1,170.00
42,000.00
162,500.00
18,750.00
4,000.00
573,768.00
573,768.00
0.0400
0.0500
1.0000
2.5000
0.2500
0.0500
5,692,600.00
23,400.00
42,000.00
65,000.00
75,000.00
80,000.00
227,704.00
1,170.00
42,000.00
162,500.00
18,750.00
4,000.00
456,124.00
456,124.00
0.0350
0.8000
2.0000
0.2000
0.0400
5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00
199,241.00
33,600.00
130,000.00
15,000.00
3,200.00
381,041.00
381,041.00
No.
URAIAN
SATUAN
VOLUME
M3
Oh
Oh
Oh
Oh
Dibulatkan
J-08 1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
0.0350
0.8000
2.0000
0.2000
0.0400
Dibulatkan
J-12 1 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
- Paku Biasa " - 1"
Kg
- Lem Kayu
Ltr
- Teakwood 4 mm
Lbr
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
5,595,800.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
195,853.00
33,600.00
130,000.00
15,000.00
3,200.00
377,653.00
377,653.00
0.0640
1.0000
3.0000
0.3000
0.5000
Dibulatkan
J-09 1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0196
- Paku Biasa " - 1"
Kg
0.0300
- Lem Kayu
Ltr
0.3000
- Triplek 120 x 240 x 0,4 cm
Lbr
1.0000
- Pekerja
Oh
0.6000
- Tukang Kayu
Oh
2.0000
- Kepala Tukang
Oh
0.2000
- Mandor
Oh
0.0300
Jumlah
Dibulatkan
J-10 1 M2 Jalusi Mati Kusen Kayu kamper Medan
- Kayu Papan Kamper Medan
M3
- Paku Biasa " - 1"
Kg
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
J-11 1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
- Kayu Papan Borneo Super
M3
- Paku Biasa " - 1"
Kg
- Lem Kayu
Ltr
- Triplek 120 x 240 x 0,4 cm
Lbr
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
HARGA SATUAN
(Rp)
5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00
364,326.40
42,000.00
195,000.00
22,500.00
40,000.00
663,826.40
663,826.00
5,692,600.00
23,800.00
23,900.00
64,400.00
42,000.00
65,000.00
75,000.00
80,000.00
111,574.96
714.00
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
356,458.96
356,459.00
0.0600
0.1500
0.5000
2.0000
0.2000
0.0250
5,692,600.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
341,556.00
3,570.00
21,000.00
130,000.00
15,000.00
2,000.00
513,126.00
513,126.00
0.0196
0.0300
0.3000
1.0000
0.6000
2.0000
0.2000
0.0300
5,595,800.00
23,800.00
23,900.00
64,400.00
42,000.00
65,000.00
75,000.00
80,000.00
109,677.68
714.00
7,170.00
64,400.00
25,200.00
130,000.00
15,000.00
2,400.00
354,561.68
354,562.00
0.0196
0.3000
0.3000
1.0000
0.6000
2.0000
0.2000
0.0300
5,692,600.00
23,800.00
23,900.00
131,700.00
42,000.00
65,000.00
75,000.00
80,000.00
111,574.96
7,140.00
7,170.00
131,700.00
25,200.00
130,000.00
15,000.00
2,400.00
430,184.96
430,185.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
5,692,600.00
23,800.00
23,900.00
64,400.00
132,900.00
42,000.00
65,000.00
75,000.00
80,000.00
111,574.96
7,140.00
19,120.00
64,400.00
66,450.00
33,600.00
162,500.00
18,750.00
3,200.00
486,734.96
486,735.00
5,692,600.00
23,800.00
23,900.00
131,700.00
238,100.00
42,000.00
65,000.00
75,000.00
80,000.00
111,574.96
7,140.00
19,120.00
131,700.00
119,050.00
33,600.00
162,500.00
18,750.00
3,200.00
606,634.96
606,635.00
M3
Kg
Kg
Oh
Oh
Oh
Oh
1.1000
15.0000
0.8000
4.0000
12.0000
1.2000
0.2000
5,692,600.00
26,800.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
6,261,860.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,736,900.00
7,736,900.00
M3
Kg
Kg
Oh
Oh
Oh
Oh
Dibulatkan
J-17 1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
- Kayu balok Borneo super
m3
- Paku Biasa 2" - 5"
Kg
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
HARGA
(Rp)
1.1000
15.0000
0.8000
4.0000
12.0000
1.2000
0.2000
5,280,000.00
26,800.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
5,808,000.00
402,000.00
19,040.00
168,000.00
780,000.00
90,000.00
16,000.00
7,283,040.00
7,283,040.00
0.0120
0.1500
0.1000
0.1000
0.0100
0.0050
5,280,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
63,360.00
3,570.00
4,200.00
6,500.00
750.00
400.00
78,780.00
78,780.00
No.
URAIAN
SATUAN
VOLUME
Dibulatkan
HARGA
(Rp)
0.0140
0.1500
0.1000
0.1000
0.0100
0.0050
5,280,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
73,920.00
3,570.00
4,200.00
6,500.00
750.00
400.00
89,340.00
89,340.00
0.0072
0.0500
0.1000
0.2000
0.0200
0.0050
5,823,400.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
41,928.48
1,190.00
4,200.00
13,000.00
1,500.00
400.00
62,218.48
62,218.00
0.0110
0.0500
0.1100
0.2200
0.0220
0.0050
5,692,600.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
62,618.60
1,190.00
4,620.00
14,300.00
1,650.00
400.00
84,778.60
84,779.00
M'
Oh
Oh
Oh
Oh
1.0500
0.0210
0.0210
0.0020
0.0010
29,400.00
42,000.00
65,000.00
75,000.00
80,000.00
30,870.00
882.00
1,365.00
150.00
80.00
33,347.00
33,347.00
M3
Lbr
Kg
Lbr
Bh
Bh
Oh
Oh
Oh
Oh
0.1050
5.0000
2.0000
2.0000
4.0000
4.0000
0.3000
1.3000
0.1300
0.0130
Dibulatkan
J-23 1 M2 Rangka Langit-langit (1,00 x 1,00) m, Kayu borneo super
- Kayu Borneo super
m
0.0120
Paku 5 s.d. 7 cm
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Jumlah
HARGA SATUAN
(Rp)
kg
Oh
Oh
Oh
Oh
0.1000
0.1500
0.2500
0.0250
0.0750
5,280,000.00
64,400.00
23,800.00
5,000.00
21,000.00
31,500.00
42,000.00
65,000.00
75,000.00
80,000.00
554,400.00
322,000.00
47,600.00
10,000.00
84,000.00
126,000.00
12,600.00
84,500.00
9,750.00
1,040.00
1,251,890.00
172,436.64
172,437.00
2,640,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
31,680.00
2,380.00
6,300.00
16,250.00
1,875.00
6,000.00
64,485.00
64,485.00
No.
URAIAN
SATUAN
VOLUME
HARGA SATUAN
(Rp)
HARGA
(Rp)
2,640,000.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
40,656.00
4,760.00
6,300.00
19,500.00
2,250.00
6,000.00
79,466.00
79,466.00
2,640,000.00
42,000.00
65,000.00
75,000.00
80,000.00
10,560.00
4,200.00
13,000.00
1,500.00
400.00
29,660.00
29,660.00
m
Kg
Kg
Oh
Oh
Oh
Oh
1.1000
15.0000
3.0000
2.4000
7.2000
0.7200
0.1200
5,692,600.00
26,800.00
23,800.00
42,000.00
65,000.00
75,000.00
80,000.00
6,261,860.00
402,000.00
71,400.00
100,800.00
468,000.00
54,000.00
9,600.00
7,367,660.00
7,367,660.00
m2
m3
Kg
m3
Oh
Oh
Oh
Oh
1.1000
0.0140
0.0120
0.0030
0.1000
0.0500
0.0050
0.0050
22,700.00
2,640,000.00
23,800.00
10,000.00
42,000.00
65,000.00
75,000.00
80,000.00
24,970.00
36,960.00
285.60
30.00
4,200.00
3,250.00
375.00
400.00
70,470.60
70,471.00
URAIAN
SAT
Kg
Kg
Oh
Oh
Oh
Oh
VOLUME
1.1000
0.0800
0.0600
0.0060
0.0060
0.0003
HARGA SAT
(Rp)
24,000.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
26,400.00
2,432.00
2,520.00
390.00
450.00
24.00
32,216.00
32,216.00
m'
m'
jam
Oh
Oh
Oh
Oh
0.0100
0.0010
0.0080
0.0010
0.00001
0.00001
0.00005
7,150.0000
55,000.0000
100,000.0000
42,000.0000
65,000.0000
75,000.0000
80,000.0000
71.50
55.00
800.00
42.00
0.65
0.75
4.00
973.90
974.00
kg
ltr
ltr
jam
org
org
org
org
0.0400
0.0300
0.0040
0.0170
0.0040
0.0020
0.0002
0.0002
23,600.00
7,150.00
55,000.00
100,000.00
42,000.00
65,000.00
75,000.00
80,000.00
944.00
214.50
220.00
1,700.00
168.00
130.00
15.00
16.00
2,463.50
2,464.00
M2
Oh
Oh
Oh
Oh
1.0000
1.0500
1.5000
0.1050
0.0052
306,600.00
42,000.00
65,000.00
75,000.00
80,000.00
306,600.00
44,100.00
97,500.00
7,875.00
416.00
456,491.00
456,491.00
m2
Oh
Oh
Oh
Oh
Dibulatkan
1.0000
1.0500
1.0500
0.1050
0.0052
211,800.00
42,000.00
65,000.00
75,000.00
80,000.00
211,800.00
44,100.00
68,250.00
7,875.00
416.00
332,441.00
332,441.00
Page 88
No.
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
m'
Oh
Oh
Oh
Oh
11.5000
1.2000
1.2000
0.0120
0.0006
5,500.00
42,000.00
65,000.00
75,000.00
80,000.00
63,250.00
50,400.00
78,000.00
900.00
48.00
192,598.00
192,598.00
M2
kg
M2
Oh
Oh
Oh
Oh
1.1000
0.0200
0.0018
0.1000
0.1000
0.0100
0.0050
35,900.00
23,800.00
5,692,600.00
42,000.00
65,000.00
75,000.00
80,000.00
39,490.00
476.00
10,246.68
4,200.00
6,500.00
750.00
400.00
62,062.68
62,063.00
m'
Kg
M3
Kg
Oh
Oh
Oh
Oh
1.0500
0.0150
0.0096
0.2500
0.1500
0.4000
0.0250
0.0013
20,801.00
23,800.00
5,595,800.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00
21,841.05
357.00
53,719.68
7,600.00
6,300.00
26,000.00
1,875.00
104.00
117,796.73
117,797.00
m'
Kg
M3
Kg
Oh
Oh
Oh
Oh
Dibulatkan
K-10 1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm
- Seng plat 3' x 6' BJLS 30
m'
- Paku biasa " - 1"
Kg
- Kayu papan borneo super
kg
- Besi strip
Kg
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1.0500
0.0150
0.0190
0.3000
0.2000
0.4000
0.0250
0.0013
20,801.00
23,800.00
5,595,800.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00
21,841.05
357.00
106,320.20
9,120.00
8,400.00
26,000.00
1,875.00
100.00
174,013.25
174,013.00
1.0500
0.1000
0.0190
0.5000
0.1500
0.3000
0.0300
0.0080
20,801.00
23,800.00
5,595,800.00
26,800.00
42,000.00
65,000.00
75,000.00
80,000.00
21,841.05
2,380.00
106,320.20
13,400.00
6,300.00
19,500.00
2,250.00
640.00
172,631.25
172,631.00
Page 89
No.
URAIAN
SAT
K-11
m'
bh
m'
Oh
Oh
Oh
Oh
Dibulatkan
K-12 1 m' Pasang kusen pintu/jendela alluminium warna 4"
- Alumunium profil warna 4"
- Skrup fixer
- Sealant
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-13 1 m' Pasang kusen pintu/jendela alluminium natural 3"
- Alumunium profil natural 3"
- Skrup fixer
- Sealant
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-14 1 m' Pasang kusen pintu/jendela alluminium warna 3"
- Alumunium profil warna 3"
- Skrup fixer
- Sealant
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-15 1 m2 Pintu alluminium strip lebar 8 cm
- Alumunium profil 4" natural
- Alumunium strip 6mm
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
VOLUME
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
HARGA SAT
(Rp)
151,100.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
166,210.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
179,301.50
179,302.00
m'
bh
m'
Oh
Oh
Oh
Oh
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
163,000.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
179,300.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
192,391.50
192,392.00
m'
bh
m'
Oh
Oh
Oh
Oh
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
81,000.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
89,100.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
102,191.50
102,192.00
m'
bh
m'
Oh
Oh
Oh
Oh
1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021
102,000.00
250.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
112,200.00
500.00
7,500.00
1,806.00
2,795.00
322.50
168.00
125,291.50
125,292.00
m'
m2
Oh
Oh
Oh
Oh
Dibulatkan
4.4000
1.0500
0.0850
0.0850
0.0085
0.0042
151,100.00
171,800.00
42,000.00
65,000.00
75,000.00
80,000.00
664,840.00
180,390.00
3,570.00
5,525.00
637.50
336.00
855,298.50
855,299.00
Page 90
No.
URAIAN
SAT
m'
m'
tube
Oh
Oh
Oh
Oh
Dibulatkan
1 m2 Rangka jendela besi square tube (5 x 5) cm
- Besi square tube
- Besi lis kaca (1 x 1) cm
- Pengelasan
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
4.4000
4.5000
0.2700
0.0850
0.0850
0.0085
0.0050
HARGA SAT
(Rp)
151,100.00
12,200.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
664,840.00
54,900.00
2,025.00
3,570.00
5,525.00
637.50
400.00
731,897.50
731,898.00
m'
m'
tube
Oh
Oh
Oh
Oh
4.4000
4.5000
0.2700
0.0850
0.0850
0.0085
0.0050
163,000.00
12,200.00
7,500.00
42,000.00
65,000.00
75,000.00
80,000.00
717,200.00
54,900.00
2,025.00
3,570.00
5,525.00
637.50
400.00
784,257.50
784,258.00
m2
bh
m'
Oh
Oh
Oh
Oh
Dibulatkan
K-19 1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
- Besi siku L 30.30.3
Kg
- Baja pelat
Kg
- kawat las
Kg
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
K-20
VOLUME
1.1000
10.0000
7.0000
0.2000
0.2000
0.0200
0.0010
300,000.00
250.00
5,500.00
42,000.00
65,000.00
75,000.00
80,000.00
330,000.00
2,500.00
38,500.00
8,400.00
13,000.00
1,500.00
80.00
393,980.00
393,980.00
15.0000
32.8000
0.0500
0.2000
0.2000
0.0200
0.0010
24,000.00
24,000.00
23,600.00
42,000.00
65,000.00
75,000.00
80,000.00
360,000.00
787,200.00
1,180.00
8,400.00
13,000.00
1,500.00
80.00
1,171,360.00
1,171,360.00
M
Kg
Cm
Oh
Oh
Oh
Oh
Dibulatkan
4.7600
4.5220
20.0000
0.6500
0.6500
0.0650
0.0320
7,300.00
24,000.00
2,464.00
42,000.00
65,000.00
75,000.00
80,000.00
34,748.00
108,528.00
49,280.00
27,300.00
42,250.00
4,875.00
2,560.00
269,541.00
269,541.00
Page 91
No.
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
K-21
M2
Oh
Oh
Oh
Oh
1.0000
1.0500
1.0500
0.1050
0.0052
501,700.00
42,000.00
65,000.00
75,000.00
80,000.00
501,700.00
44,100.00
68,250.00
7,875.00
416.00
622,341.00
622,341.00
M2
Oh
Oh
Oh
Oh
1.0000
0.3500
0.3500
0.0350
0.0018
537,300.00
42,000.00
65,000.00
75,000.00
80,000.00
537,300.00
14,700.00
22,750.00
2,625.00
144.00
577,519.00
Dibulatkan
577,519.00
Page 92
1 UNIT Pasang partisi Alumunium, Daun partisi Multiplek rangka kayu Kamper
Bahan
7.6200
m'
Kusen Alumunium Natural Uk 4" + upah 20%
1.3500
lbr
Multiplek 9 mm
0.0300
m3
Kayu papan kamper medan
11.7000
m'
List kayu profil 1 cm
0.1000
kg
Paku biasa " - 1"
0.2500
kg
Lem putih FOX
4.0000
bh
Grendel jendela 2"
2.0000
bh
Handle partisi
1.5400
m2
Cat kayu
4.8600
m2
Cat tembok
181,320.00
151,100.00
5,823,400.00
8,900.00
23,800.00
23,900.00
5,500.00
33,000.00
39,790.00
17,608.00
1,381,658.40
203,985.00
174,702.00
104,130.00
2,380.00
5,975.00
22,000.00
66,000.00
61,276.60
85,574.88
2,107,681.88
42,000.00
65,000.00
75,000.00
80,000.00
12,600.00
84,500.00
9,750.00
1,040.00
107,890.00
2,215,571.88
181,320.00
118,560.00
111,000.00
15,000.00
33,000.00
7,100.00
150,848.70
2,175,840.00
640,224.00
200,910.00
30,000.00
66,000.00
14,200.00
150,848.70
3,278,022.700
181,320.00
118,560.00
111,000.00
356,459.00
2,556,612.00
320,112.00
183,150.00
598,851.12
15,000.00
33,000.00
7,100.00
21,000.00
5,500.00
126,500.00
152,993.70
15,000.00
33,000.00
14,200.00
31,500.00
5,500.00
126,500.00
152,993.70
4,037,418.820
181,320.00
111,000.00
356,459.00
1,269,240.00
41,070.00
598,851.12
21,000.00
5,500.00
126,500.00
95,458.06
31,500.00
5,500.00
126,500.00
95,458.06
2,168,119.176
181,320.00
118,560.00
111,000.00
15,000.00
33,000.00
7,100.00
186,233.40
2,801,394.00
640,224.00
283,050.00
30,000.00
66,000.00
14,200.00
186,233.40
4,021,101.400
Jumlah I
Tenaga
0.3000
1.3000
0.1300
0.0130
Oh
Oh
Oh
Oh
Pekerja Terampil
Tukang kayu Terampil
Kepla Tukang Kayu
Mandor
Jumlah II
Jumlah I + II
1 UNIT Pek. Kusen Jendela Alumunium uk. 2 X 1,50 M' ( 3 lubang ) dgn 2 Daun Jendela
Bahan
12.0000
m'
Profil aluminium 4" natural + upah 20%
5.4000
m'
Profil daun jendela alm. + upah 20%
1.8100
m2
Kaca polos 5 mm
2.0000
ps
Engsel jendela 3"
2.0000
bh
Slot Handle jendela
2.0000
bh
Hak Kait angin jendela biasa
0.0000
ls
Acesories ( 5 % )
1 UNIT Pek. Kusen Pintu Jendela Alumunium uk. 2,2 X 2,70 M' ( 2 lb. Jendela + 1 lb. Pintu )
Bahan
14.1000
m'
Profil aluminium 4" natural + upah 20%
2.7000
m'
Profil daun jendela alm. + upah 20%
1.6500
m2
Kaca polos 5 mm
1.6800
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.0000
ps
Engsel jendela 3"
1.0000
bh
Slot Handle jendela
2.0000
bh
Hak Kait angin jendela biasa
1.5000
ps
Engsel pintu 4"
1.0000
bh
Grendel pintu 2"
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
Bahan
15.4500
m'
Profil aluminium 4" natural + upah 20%
5.4000
m'
Profil daun jendela alm. + upah 20%
2.5500
m2
Kaca polos 5 mm
2.0000
ps
Engsel jendela 3"
2.0000
bh
Slot Handle jendela
2.0000
bh
Hak Kait angin jendela biasa
0.0000
ls
Acesories ( 5 % )
Page 93
K (2)
10
11
12
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
Bahan
17.5500
m'
Profil aluminium 4" natural + upah 20%
5.4000
m'
Profil daun jendela alm. + upah 20%
2.4000
m2
Kaca polos 5 mm
1.6800
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
2.0000
ps
Engsel jendela 3"
2.0000
bh
Slot Handle jendela
2.0000
bh
Hak Kait angin jendela biasa
1.5000
ps
Engsel pintu 4"
1.0000
bh
Grendel pintu 2"
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
181,320.00
118,560.00
111,000.00
356,459.00
3,182,166.00
640,224.00
266,400.00
598,851.12
15,000.00
33,000.00
7,100.00
21,000.00
5,500.00
126,500.00
204,439.50
30,000.00
66,000.00
14,200.00
31,500.00
5,500.00
126,500.00
204,439.50
5,165,780.620
181,320.00
111,000.00
356,459.00
1,613,748.00
72,150.00
973,133.07
21,000.00
51,600.00
126,500.00
132,951.55
31,500.00
51,600.00
126,500.00
132,951.55
3,001,582.624
181,320.00
111,000.00
356,459.00
1,595,616.00
77,700.00
1,047,989.46
21,000.00
51,600.00
126,500.00
136,065.27
31,500.00
51,600.00
126,500.00
136,065.27
3,066,970.733
181,320.00
111,000.00
356,459.00
1,949,190.00
118,770.00
598,851.12
21,000.00
51,600.00
126,500.00
133,340.56
31,500.00
51,600.00
126,500.00
133,340.56
3,009,751.676
181,320.00
35,000.00
60,236.60
924,732.00
280,000.00
60,236.60
1,264,968.600
181,320.00
111,000.00
37,596.00
725,280.00
26,640.00
37,596.00
789,516.000
181,320.00
111,000.00
43,461.00
815,940.00
53,280.00
43,461.00
912,681.000
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
Bahan
8.9000
m'
Profil aluminium 4" natural + upah 20%
0.6500
m2
Kaca polos 5 mm
2.7300
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
1.0000
ps
spagnolet tanam
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
Bahan
8.8000
m'
Profil aluminium 4" natural + upah 20%
0.7000
m2
Kaca polos 5 mm
2.9400
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
1.0000
ps
spagnolet tanam
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
Bahan
10.7500
m'
Profil aluminium 4" natural + upah 20%
1.0700
m2
Kaca polos 5 mm
1.6800
m2
Daun pintu panel Multiplek 9 mm
rangka ky. Kamper Medan/Kruing
1.5000
ps
Engsel pintu 4"
1.0000
ps
spagnolet tanam
1.0000
bh
Kunci tanam 2 slaagh (Royal)
0.0000
ls
Acesories ( 5 % )
Page 94
K (2)
13
14
181,320.00
111,000.00
62,018.40
1,160,448.00
79,920.00
62,018.40
1,302,386.400
181,320.00
111,000.00
80,575.80
1,504,956.00
106,560.00
80,575.80
1,692,091.800
Page 95
K (2)
URAIAN
SAT
L-01
Bh
Oh
Oh
Oh
Oh
L-02
L-03
L-04
L-05
L-06
Dibulatkan
1 Buah Pasang Kunci Tanam Biasa
- Kunci tanam biasa
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Bh
Oh
Oh
Oh
Oh
Dibulatkan
335,900.00
42,000.00
65,000.00
75,000.00
80,000.00
HARGA
(Rp)
335,900.00
2,520.00
39,000.00
4,500.00
240.00
382,160.00
1.0000
0.0100
0.5000
0.0100
0.0050
165,300.00
42,000.00
65,000.00
75,000.00
80,000.00
165,300.00
420.00
32,500.00
750.00
400.00
199,370.00
199,370.00
1.0000
0.0050
0.5000
0.0050
0.0025
94,500.00
42,000.00
65,000.00
75,000.00
80,000.00
94,500.00
210.00
32,500.00
375.00
200.00
127,785.00
127,785.00
Bh
Oh
Oh
Oh
Oh
Dibulatkan
1 Buah Pasang Engsel Jendela Kupu-kupu
- Engsel jendela
Bh
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 Buah Pasang Kait Angin
- Kait angin
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
1.0000
0.0600
0.6000
0.0600
0.0030
HARGA SAT
(Rp)
382,160.00
Dibulatkan
1 Buah Pasang Kunci Tanam Kamar Mandi
- Kunci tanam km mandi
Bh
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 Buah Pasang Engsel Pintu
- Engsel pintu
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
VOLUME
1.0000
0.0150
0.1500
0.0150
0.0008
21,000.00
42,000.00
65,000.00
75,000.00
80,000.00
21,000.00
630.00
9,750.00
1,125.00
64.00
32,569.00
32,569.00
1.0000
0.0100
0.1000
0.0100
0.0005
15,000.00
42,000.00
65,000.00
75,000.00
80,000.00
15,000.00
420.00
6,500.00
750.00
40.00
22,710.00
22,710.00
Bh
Oh
Oh
Oh
Oh
1.0000
0.0150
0.1500
0.0150
0.0008
3,550.00
42,000.00
65,000.00
75,000.00
80,000.00
3,550.00
630.00
9,750.00
1,125.00
64.00
15,119.00
15,119.00
No.
L-07
L-08
L-09
L-10
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
1.0000
0.0500
0.5000
0.0500
0.0025
420,000.00
42,000.00
65,000.00
75,000.00
80,000.00
420,000.00
2,100.00
32,500.00
3,750.00
200.00
458,550.00
458,550.00
1.0000
0.0500
0.5000
0.0500
0.0025
205,400.00
42,000.00
65,000.00
75,000.00
80,000.00
205,400.00
2,100.00
32,500.00
3,750.00
200.00
243,950.00
243,950.00
M2
Oh
Oh
Oh
Oh
1.1000
0.0150
0.1500
0.0150
0.0008
87,400.00
42,000.00
65,000.00
75,000.00
80,000.00
96,140.00
630.00
9,750.00
1,125.00
60.00
107,705.00
107,705.00
M2
Oh
Oh
Oh
Oh
1.1000
0.0150
0.1500
0.0150
0.0008
111,000.00
42,000.00
65,000.00
75,000.00
80,000.00
122,100.00
630.00
9,750.00
1,125.00
64.00
133,669.00
133,669.00
M. PEKERJAAN SANITASI
No.
M-01
M-02
M-03
M-04
M-05
URAIAN
1 Buah Closet jongkok Porselen Standar
Closet jongkok
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 Buah Urinoir
Urinoir
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 30 % harga urinoir
Jumlah
Dibulatkan
1 Buah Wastafel
wastafel standar
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 12 % harga wastafel
Jumlah
Dibulatkan
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
bh
Kg
m3
org
org
org
org
1.00
6.00
0.01
1.0000
1.5000
1.5000
0.1600
188,200.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
188,200.00
8,436.00
2,334.00
42,000.00
97,500.00
112,500.00
12,800.00
463,770.00
463,770.00
bh
Kg
m3
org
org
org
org
lot
1.00
6.00
0.01
1.0000
1.0000
0.1000
0.0010
0.3000
1,773,400.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
1,773,400.00
1,773,400.00
8,436.00
2,334.00
42,000.00
65,000.00
7,500.00
80.00
532,020.00
2,430,770.00
2,430,770.00
unit
Kg
m3
org
org
org
org
lot
1.00
6.00
0.01
1.2000
1.4500
0.1500
0.1000
0.1200
1,012,700.00
1,406.00
233,400.00
42,000.00
65,000.00
75,000.00
80,000.00
1,773,400.00
1,012,700.00
8,436.00
2,334.00
50,400.00
94,250.00
11,250.00
8,000.00
212,808.00
1,400,178.00
1,400,178.00
1.00
1.8000
2.7000
0.5400
0.1100
0.1800
255,300.00
42,000.00
65,000.00
75,000.00
80,000.00
255,300.00
255,300.00
75,600.00
175,500.00
40,500.00
8,800.00
45,954.00
601,654.00
601,654.00
1.10
25.00
10.300
0.061
0.069
0.3800
0.1900
0.0190
0.0190
61,700.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00
67,870.00
19,375.00
14,481.80
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
159,314.90
159,315.00
No.
M-06
M-07
M-08
M-09
M-10
URAIAN
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
186.00
114.000
0.184
0.033
4.850
0.120
2.1600
0.7200
0.0720
0.1080
0.1000
775.00
1,406.00
233,400.00
211,100.00
16,500.00
255,400.00
42,000.00
65,000.00
75,000.00
80,000.00
42,000.00
144,150.00
160,284.00
42,945.60
6,966.30
80,025.00
30,648.00
90,720.00
46,800.00
5,400.00
8,640.00
4,200.00
620,778.90
620,779.00
53.00
44.000
0.070
0.070
1.600
0.060
3.2000
1.0150
0.0015
0.0160
775.00
1,406.00
233,400.00
211,100.00
16,500.00
255,400.00
42,000.00
65,000.00
75,000.00
80,000.00
41,075.00
61,864.00
16,338.00
14,777.00
26,400.00
15,324.00
134,400.00
65,975.00
112.50
1,280.00
377,545.50
377,546.00
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
10,025.00
42,000.00
65,000.00
75,000.00
80,000.00
12,030.00
12,030.00
1,512.00
3,900.00
450.00
144.00
4,210.50
22,246.50
22,247.00
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
15,800.00
42,000.00
65,000.00
75,000.00
80,000.00
18,960.00
18,960.00
1,512.00
3,900.00
450.00
144.00
6,636.00
31,602.00
31,602.00
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
26,475.00
42,000.00
65,000.00
75,000.00
80,000.00
31,770.00
31,770.00
1,512.00
3,900.00
450.00
144.00
11,119.50
48,895.50
48,896.00
No.
M-11
M-12
M-13
M-14
M-15
M-16
URAIAN
1 M' Pipa PVC 2" (AW)
Pipa pvc 2"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC 4" (AW)
Pipa pvc 4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC 3/4" (AW)
Pipa pvc 3/4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 Buah Bak Cuci piring Stainless steel
Bak cuci stainless steel + asesoris lengkap
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 Buah Kran 1/2" - 3/4"
Kran air
Seal tape
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 Buah Floor Drain
Floor drain
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
m'
org
org
org
org
lot
1.2000
0.0360
0.0600
0.0060
0.0018
0.3500
27,675.00
42,000.00
65,000.00
75,000.00
80,000.00
31,770.00
33,210.00
1,512.00
3,900.00
450.00
144.00
11,119.50
50,335.50
50,336.00
m'
org
org
org
org
lot
1.2000
0.0810
0.1350
0.0135
0.0041
0.3500
86,975.00
42,000.00
65,000.00
75,000.00
80,000.00
104,370.00
104,370.00
3,402.00
8,775.00
1,012.50
328.00
36,529.50
154,417.00
154,417.00
m'
org
org
org
org
lot
1.2000
0.0810
0.1350
0.0135
0.0041
0.3500
13,050.00
42,000.00
65,000.00
75,000.00
80,000.00
15,660.00
15,660.00
3,402.00
8,775.00
1,012.50
328.00
5,481.00
34,658.50
34,659.00
bh
org
org
org
org
1.0000
0.0300
0.3000
0.0300
0.0015
397,800.00
42,000.00
65,000.00
75,000.00
80,000.00
397,800.00
1,260.00
19,500.00
2,250.00
120.00
420,930.00
420,930.00
bh
bh
org
org
org
org
1.0000
0.0250
0.0100
0.1000
0.0100
0.0050
40,900.00
4,200.00
42,000.00
65,000.00
75,000.00
80,000.00
40,900.00
105.00
420.00
6,500.00
750.00
400.00
49,075.00
49,075.00
bh
org
org
org
org
1.0000
0.0100
0.1000
0.0100
0.0050
66,600.00
42,000.00
65,000.00
75,000.00
80,000.00
66,600.00
420.00
6,500.00
750.00
400.00
74,670.00
74,670.00
No.
M-17
M-18
M-19
M-20
M-21
URAIAN
1 M' Grafel beton U 20 cm -60 cm
Pipa beton U
Bata merah
P.C (50 gk)
Pasir pasang
Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC
Perlengkapan 35 % harga talang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M' Saluran Air Limbah Buis Beton 60 cm
Buis beton 60 cm
Bata merah
P.C (50 gk)
Pasir pasang
Pasir urug
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 M' Pasang Talang Seng Datar
Seng pelat 3" x 6"
Paku
Kayu kelas II
Meni besi
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 Buah Closet Duduk
Closet duduk
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 6 % harga closet
Jumlah
Dibulatkan
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
bh
bh
zak
m3
m3
org
org
org
org
1.1000
12.0000
0.1030
0.0305
0.0345
0.0100
0.1000
0.0100
0.0050
44,300.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00
48,730.00
9,300.00
144.82
7,118.70
6,047.85
420.00
6,500.00
750.00
400.00
79,411.37
79,411.00
m'
lot
org
org
org
org
1.05000
0.3500
0.1500
0.4000
0.0250
0.0013
60,000.00
63,000.00
42,000.00
65,000.00
75,000.00
80,000.00
63,000.00
22,050.00
6,300.00
26,000.00
1,875.00
100.00
119,325.00
119,325.00
bh
bh
zak
m3
m3
org
org
org
org
1.10
25.00
0.206
0.061
0.069
0.3800
0.1900
0.0190
0.0190
130,900.00
775.00
1,406.00
233,400.00
175,300.00
42,000.00
65,000.00
75,000.00
80,000.00
143,990.00
19,375.00
289.64
14,237.40
12,095.70
15,960.00
12,350.00
1,425.00
1,520.00
221,242.74
221,243.00
lbr
kg
m3
kg
org
org
org
org
0.50000
0.01500
0.00960
0.2500
0.1500
0.4000
0.0250
0.0013
20,801.00
23,400.00
2,850,000.00
30,400.00
42,000.00
65,000.00
75,000.00
80,000.00
10,400.50
351.00
27,360.00
7,600.00
6,300.00
26,000.00
1,875.00
100.00
79,986.50
79,987.00
bh
org
org
org
org
lot
1.00
3.3000
1.1000
0.0010
0.1600
0.0600
1,724,700.00
42,000.00
65,000.00
75,000.00
80,000.00
1,724,700.00
1,724,700.00
138,600.00
71,500.00
75.00
12,800.00
103,482.00
2,051,157.00
2,051,157.00
No.
M-22
M-23
M-24
URAIAN
1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass kapasitas 1 m3
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 6 % harga bak
Jumlah
Dibulatkan
1 Unit Septictank 2x1,50x1,50 m + Rembesan
Galian tanah
Pasir urug
lantai kerja
Pas bata adk 1pc : 3ps
Pelat beton K-225
Plesteran adk 1pc : 3ps
Pipa PVC 4" jenis AW
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas ijuk
Urugan kerikil 3/5
Pipa PVC 4" berlubang jenis AW
Urugan dan perataan tanah
Jumlah
Dibulatkan
1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian tanah
Pasir urug
lantai kerja
Pas bata adk 1pc : 3ps
Pelat beton K-225
Plesteran adk 1pc : 3ps
Pipa PVC 4" jenis AW
Pipa GIP 1 1/2"
Galian tanah untuk rembesan
Pas ijuk
Urugan kerikil 3/5
Pipa PVC 4" berlubang jenis AW
Urugan dan perataan tanah
Jumlah
Dibulatkan
SAT
VOLUME
HARGA SAT
(Rp)
HARGA
(Rp)
bh
org
org
org
org
lot
1.00
3.3000
1.1000
0.0010
0.1600
0.0600
1,316,400.00
42,000.00
65,000.00
75,000.00
80,000.00
1,316,400.00
1,316,400.00
138,600.00
71,500.00
75.00
12,800.00
78,984.00
1,618,359.00
1,618,359.00
m3
m3
m3
m2
m3
m2
m'
m'
m3
kg
m3
m'
m3
4.500
0.214
2.250
15.000
0.300
15.000
5.400
5.000
3.375
5.400
1.050
9.000
1.125
26,252.00
175,300.00
716,798.00
220,267.10
6,438,864.00
41,301.82
256,800.00
46,750.00
20,000.00
23,400.00
205,000.00
36,700.00
34,584.00
118,134.00
37,514.20
1,612,795.50
3,304,006.50
1,931,659.20
619,527.30
1,386,720.00
233,750.00
67,500.00
126,360.00
215,250.00
330,300.00
38,907.00
10,022,423.70
10,022,424.00
m3
m3
m3
m2
m3
m2
m'
m'
m3
kg
m3
m'
m3
2.250
0.107
1.125
7.500
0.150
7.500
9.000
2.500
1.688
2.700
0.525
9.000
0.563
20,000.00
175,300.00
716,798.00
220,267.10
6,438,864.00
41,301.82
256,800.00
46,750.00
20,000.00
23,400.00
205,000.00
36,700.00
34,584.00
45,000.00
18,757.10
806,397.75
1,652,003.25
965,829.60
309,763.65
2,311,200.00
116,875.00
33,760.00
63,180.00
107,625.00
330,300.00
19,470.79
6,780,162.14
6,780,162.00
N-02
N-03
N-04
N-05
N-06
URAIAN
SAT
VOLUME
HARGA SAT
HARGA
0.0500
0.1500
0.0025
35,600.00
42,000.00
80,000.00
1,780.00
6,300.00
200.00
8,280.00
8,280.00
0.0800
0.0200
0.0100
0.0400
0.0400
0.0040
0.0025
35,800.00
38,400.00
29,600.00
42,000.00
65,000.00
75,000.00
80,000.00
2,864.00
768.00
296.00
1,680.00
2,600.00
300.00
200.00
8,708.00
8,708.00
0.1500
0.1700
0.1700
0.0700
0.0750
0.0075
0.0025
25,000.00
30,000.00
41,700.00
42,000.00
65,000.00
75,000.00
80,000.00
3,750.00
5,100.00
7,089.00
2,940.00
4,875.00
562.50
200.00
24,516.50
24,517.00
0.2000
0.1500
0.1700
0.3500
0.0700
0.1050
0.0040
0.0025
30,400.00
25,000.00
30,000.00
41,700.00
42,000.00
65,000.00
75,000.00
80,000.00
6,080.00
3,750.00
5,100.00
14,595.00
2,940.00
6,825.00
300.00
200.00
39,790.00
39,790.00
0.1500
0.3720
2.0000
0.0600
0.0160
0.0025
48,000.00
112,700.00
5,000.00
65,000.00
75,000.00
80,000.00
7,200.00
41,924.40
10,000.00
3,900.00
1,200.00
200.00
64,424.40
64,424.00
0.3500
0.1000
0.0060
8,100.00
42,000.00
80,000.00
2,835.00
4,200.00
480.00
7,515.00
7,515.00
No.
N-07
N-08
N-09
N-10
URAIAN
1 M2 Pengecatan Tembok Baru Setara ICI
- Plamir tembok
- Cat dasar
- Cat penutup 2x setara ICI
- Pekerja
- Tukang cat
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Pengecatan Tembok Lama Setara ICI
- Cat dasar
- Cat penutup 2 x
- Pekerja
- Tukang cat
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
1 M2 Pengecatan Plafond ( 3x ) Setara ICI
- Cat tembok setara ICI
- Plamir tembok
- Rol cat
- Steger werk
- Ampelas
- Pekerja
- Tukang cat
- Kepala tukang
- Mandor
Jumlah
SAT
Kg
Kg
Kg
Oh
Oh
Oh
Oh
VOLUME
0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025
HARGA SAT
25,000.00
30,000.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00
2,500.00
3,000.00
19,500.00
840.00
4,095.00
472.50
200.00
30,607.50
30,608.00
Kg
Kg
Oh
Oh
Oh
Oh
0.1200
0.1800
0.0280
0.0420
0.0042
0.0025
30,000.00
75,000.00
42,000.00
65,000.00
75,000.00
80,000.00
3,600.00
13,500.00
1,176.00
2,730.00
315.00
200.00
21,521.00
21,521.00
Kg
Kg
Bh
Ls
Lbr
Oh
Oh
Oh
Oh
0.2000
0.1600
0.0100
1.0000
0.5000
0.2000
0.3000
0.0300
0.0100
75,000.00
25,000.00
32,500.00
1,000.00
5,000.00
42,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex
15,000.00
4,000.00
325.00
1,000.00
2,500.00
8,400.00
19,500.00
2,250.00
800.00
53,775.00
53,775.00
Kg
0.2000
25,000.00
5,000.00
- Plamir tembok
Kg
0.1600
25,000.00
4,000.00
- Rol cat
Bh
0.0100
32,500.00
325.00
- Steger werk
Ls
1.0000
1,000.00
1,000.00
- Ampelas
Lbr
0.5000
5,000.00
2,500.00
- Pekerja
Oh
0.2000
42,000.00
8,400.00
- Tukang cat
Oh
0.3000
65,000.00
19,500.00
- Kepala tukang
Oh
0.0300
75,000.00
2,250.00
- Mandor
Jumlah
Oh
0.0100
80,000.00
800.00
43,775.00
Dibulatkan
N-10-r' 1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
- Cat tembok setara Vinilex
- Plamir tembok
- Rol cat
- Steger werk
- Ampelas
- Pekerja
- Tukang cat
- Kepala tukang
- Mandor
Jumlah
43,775.00
Kg
Kg
Bh
Ls
Lbr
Oh
Oh
Oh
Oh
0.1300
0.1100
0.1000
0.6700
0.3300
0.1300
0.2000
0.0200
0.0100
25,000.00
25,000.00
32,500.00
1,000.00
5,000.00
42,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
N-11
HARGA
1 M2 Memasang Wallpaper
- Wallpaper
- Lem Perekat
- Pekerja
- Tukang cat
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
3,250.00
2,750.00
3,250.00
670.00
1,650.00
5,460.00
13,000.00
1,500.00
800.00
32,330.00
32,330.00
m2
Kg
Oh
Oh
Oh
Oh
1.2000
0.2500
0.3500
0.1750
0.0170
0.0017
55,700.00
35,700.00
42,000.00
65,000.00
75,000.00
80,000.00
66,840.00
8,925.00
14,700.00
11,375.00
1,275.00
136.00
103,251.00
103,251.00
No.
N-12
N-13
N-14
N-15
URAIAN
SAT
VOLUME
HARGA SAT
30,400.00
16,000.00
42,000.00
65,000.00
75,000.00
80,000.00
3,040.00
160.00
840.00
13,000.00
1,500.00
800.00
19,340.00
19,340.00
30,400.00
16,000.00
2,069,800.00
42,000.00
65,000.00
75,000.00
80,000.00
3,040.00
160.00
4,139.60
10,500.00
14,625.00
1,687.50
600.00
34,752.10
Dibulatkan
1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
- Cat besi setara ICI
Kg
0.3000
- Pekerja
Oh
0.0060
- Tukang cat
Oh
0.0600
- Kepala tukang
Oh
0.0120
- Mandor
Oh
0.0060
Jumlah
Dibulatkan
1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
- Plamir tembok
Kg
- Cat dasar
Kg
- Cat penutup 2x setara vinilex
Kg
- Pekerja
Oh
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
N-15r' 1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
- Plamir tembok
Kg
- Cat dasar
Kg
- Cat penutup 3x setara vinilex
Kg
- Pekerja
Oh
- Tukang cat
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
34,752.00
67,700.00
42,000.00
65,000.00
75,000.00
80,000.00
20,310.00
252.00
3,900.00
900.00
480.00
25,842.00
25,842.00
0.1000
0.1000
0.2600
0.0200
0.0630
0.0063
0.0025
25,000.00
30,000.00
25,000.00
42,000.00
65,000.00
75,000.00
80,000.00
2,500.00
3,000.00
6,500.00
840.00
4,095.00
472.50
200.00
17,607.50
17,608.00
0.1000
0.1000
0.3900
0.0300
0.0945
0.0095
0.0038
25,000.00
30,000.00
25,000.00
42,000.00
65,000.00
75,000.00
80,000.00
Dibulatkan
N-16
HARGA
2,500.00
3,000.00
9,750.00
1,260.00
6,142.50
712.50
304.00
23,669.00
23,669.00
Kg
Kg
Oh
Oh
Oh
Oh
0.1200
0.1800
0.0280
0.0420
0.0042
0.0025
30,000.00
25,000.00
42,000.00
65,000.00
75,000.00
80,000.00
3,600.00
4,500.00
1,176.00
2,730.00
315.00
200.00
12,521.00
12,521.00
URAIAN
KOEF
SAT.
Pupuk kandang
Furadan
Pohon pelindung
Pekerja
Mandor
Jumlah
0.0800
0.0010
1.0000
0.0250
0.0025
krg
kg
btng
org
org
25,000.00
24,000.00
25,000.00
42,000.00
80,000.00
0.0800
0.0010
1.0000
0.0250
0.0025
krg
kg
btng
org
org
25,000.00
24,000.00
50,000.00
42,000.00
80,000.00
0.0400
0.0010
1.0000
0.0200
0.0020
krg
kg
btng
org
org
25,000.00
24,000.00
10,000.00
42,000.00
80,000.00
0.0400
0.5000
0.0400
0.0040
krg
m2
org
org
25,000.00
15,000.00
42,000.00
80,000.00
Dibulatkan
O-02
Pupuk kandang
Furadan
Bambu krisik/jepang
Pekerja
Mandor
Jumlah
Dibulatkan
O-03
Pupuk kandang
Furadan
Pohon perdu
Pekerja
Mandor
Jumlah
Dibulatkan
O-04
Pupuk kandang
Rumput gajah mini
Pekerja
Mandor
Jumlah
Dibulatkan
HARGA (Rp)
2,000.00
24.00
25,000.00
1,050.00
200.00
28,274.00
28,274.00
2,000.00
24.00
50,000.00
1,050.00
200.00
53,274.00
53,274.00
1,000.00
24.00
10,000.00
840.00
160.00
12,024.00
12,024.00
1,000.00
7,500.00
1,680.00
320.00
10,500.00
10,500.00
NO
URAIAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
Mandor
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Besi
Kepala Tukang Cat
Kepala Tukang Listrik
Kepala Tukang
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Tukang Cat
Tukang Listrik
Tukang Pipa
Tukang Plitur
Tukang Taman
Tukang
Pembantu Tukang
Pekerja Biasa
Penjaga Malam
Sopir
Operator
Mekanik
Pembantu Sopir
Pembantu Operator
Pembantu Mekanik
SATUAN
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
Org/hr
UPAH (Rp.)
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
80,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
75,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
65,000.00
42,000.00
42,000.00
42,000.00
65,000.00
75,000.00
65,000.00
42,000.00
50,000.00
42,000.00
UPAH
KETERANGAN
NO
MATERIAL
A.
SAT
HARGA (Rp)
Pasir Urug
Tanah Urug Pilihan
Sirtu
Pasir Teras
Pasir Pasang Kali
Pasir Beton
Abu Batu
Batu Gosok ( Apung )
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah Pondasi
Batu Bronjol ( Untuk Bronjong )
Batu Koral Beton Kali
Batu Tempel Hitam
Batu Pinggir Beton 10 x 20 x 35
Batu Pinggir Beton 15 x 35 x 50 ( K-225 )
Batu Telor
Batako Kecil 8 x 10 x 20
Batako Besar 8 x 20 x 30
Con Blok 8 x 20 x 40
Bata Merah Bakar kelas I
Bata Merah Bakar kelas II
Bata Merah Oven ( Klingker )
Roster Beton 20 x 20
Roster Beton 30 x 30
Grass Blok 20 x 20
Grass Blok 30 x 30
Paving Blok Natural 8 cm
Paving Blok Warna 8 cm
Paving Blok Natural 6 cm
Paving Blok Warna 6 cm
Canstin Paving Blok
Semen PC /50 kg
m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
m3
bh
bh
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m1
zak
36
37
38
39
40
41
42
43
44
45
46
47
48
Semen Putih
Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm
Readymix Beton K500, Tanpa Pompa ( Selang )
Readymix Beton K400, Tanpa Pompa ( Selang )
Readymix Beton K350, Tanpa Pompa ( Selang )
Readymix Beton K300, Tanpa Pompa ( Selang )
Readymix Beton K225, Tanpa Pompa ( Selang )
Readymix Beton K175, Tanpa Pompa ( Selang )
Kapur Pasang / Kapur Tembok
Kapur Sirih
Semen Warna
Tanah liat
Air
zak
bh
m3
m3
m3
m3
m3
m3
m3
kg
kg
m3
ltr
Page 110
175,300.00
89,200.00
203,500.00
174,200.00
233,400.00
255,400.00
259,000.00
29,600.00
223,600.00
211,100.00
205,000.00
196,000.00
205,500.00
180,800.00
172,600.00
96,600.00
14,100.00
73,700.00
97,800.00
2,000.00
2,400.00
5,400.00
775.00
675.00
1,800.00
14,800.00
15,500.00
9,700.00
22,500.00
81,100.00
108,600.00
76,000.00
86,000.00
34,900.00
70,300.00
1,406.00
92,700.00
58,900.00
1,105,000.00
903,500.00
877,500.00
925,000.00
850,000.00
825,000.00
353,300.00
18,300.00
15,700.00
31,300.00
3.00
BHN
NO
MATERIAL
49
50
51
52
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
SAT
Formite/spacer
HARGA (Rp)
Hollow/Con Blok 8 x 20 x 40
Hollow/Con Blok 8 x 15 x 40
Hollow/Con Blok 8 x 10 x 40
bh
bh
bh
bh
2,500.00
5,000.00
4,000.00
3,000.00
kg
lt
lt
kg
lt
kg
kg
lt
kg
kg
ml
bh
bh
bh
5 lt
kg
m3
m3
bh
bh
bks
bks
lt
kg
kg
kg
kg
lt
kg
lt
lt
kg
kg
kg
lbr
kg
kg
kg
lbr
kg
kg
kg
lt
lt
bh
25,000.00
120,000.00
75,000.00
25,000.00
75,000.00
20,000.00
30,000.00
40,000.00
90,000.00
185,000.00
70,000.00
62,500.00
32,500.00
8,500.00
10,000.00
25,000.00
29,000.00
382,600.00
370,000.00
16,000.00
22,000.00
5,200.00
5,500.00
15,000.00
110,000.00
34,200.00
37,700.00
37,700.00
35,800.00
48,000.00
112,700.00
19,500.00
23,900.00
21,400.00
30,800.00
52,500.00
39,200.00
35,800.00
5,000.00
24,400.00
30,400.00
40,900.00
41,700.00
44,000.00
76,300.00
Page 111
BHN
NO
MATERIAL
SAT
HARGA (Rp)
46
47
48
49
50
Cat Bron
Karet lis
Minyak cat
Glass beet
Residu
kg
bh
kg
kg
lt
67,700.00
3,300.00
38,400.00
50,100.00
8,100.00
C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
bt
bt
bt
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bt
bt
m1
m1
m1
m1
m1
m1
m1
m3
m3
m1
m1
m3
m3
m3
bt
kg
m2
m2
m2
17,700.00
25,000.00
37,200.00
7,094,450.00
5,280,000.00
5,595,800.00
5,692,600.00
5,823,400.00
6,363,600.00
6,645,300.00
8,633,700.00
8,724,300.00
2,658,000.00
20,772,000.00
22,188,400.00
13,625,400.00
12,736,100.00
2,069,800.00
1,870,500.00
2,071,700.00
22,600.00
28,000.00
8,900.00
10,000.00
14,300.00
17,200.00
29,400.00
160,100.00
122,500.00
2,772,000.00
3,356,800.00
2,500.00
3,300.00
4,000.00
2,850,000.00
2,640,000.00
139,500.00
23,400.00
22,000.00
537,300.00
351,200.00
D
1
2
m2
lbr
17,400.00
62,400.00
Page 112
BHN
NO
MATERIAL
3
4
5
6
7
8
9
10
11
12
SAT
HARGA (Rp)
Cornice Coumpound
List gypsum
m2
m2
lbr
lbr
kg
lbr
bh
lbr
zak
m'
22,500.00
19,500.00
79,800.00
83,800.00
12,500.00
132,800.00
15,000.00
67,500.00
75,000.00
8,500.00
E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr
61,700.00
64,400.00
56,200.00
92,000.00
166,600.00
119,000.00
19,800.00
22,700.00
34,200.00
55,700.00
151,100.00
195,000.00
255,400.00
323,900.00
235,000.00
140,000.00
129,100.00
131,700.00
127,200.00
114,700.00
128,200.00
57,900.00
89,200.00
133,400.00
170,000.00
132,900.00
238,100.00
F
1
2
3
4
5
6
7
8
9
10
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
3,400.00
2,400.00
3,400.00
2,800.00
3,600.00
3,400.00
5,700.00
6,300.00
3,200.00
2,500.00
Page 113
BHN
NO
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
MATERIAL
SAT
Tegel Badak PC 30 x 30
Poslin 11 x 11 Warna Standar DN
Poslin 11 x 11 Warna khusus DN
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia
Keramik 20 x 25 Dinding KM KW I DN Corak Mulia
Keramik 30 x 30 KWI DN Putih Polos Mulia
Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 40 x 40 KWI DN Putih Polos Mulia
Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Putih Polos Roman
Keramik 20 x 25 Dinding KM KW I DN Corak Roman
Keramik 20 x 25 KW I DN Putih Polos Roman
Keramik 30 x 30 KW I DN Polos Roman
Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman
Keramik 40 x 40 KW I DN Polos Roman
Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman
Vinyl Lantai Standar
Karpet Kelas Baik LN
Karpet Kelas Sedang LN
Parquet Jati
Stairnosing Keramik 10/20
Stairnosing Fiber
Taraso Kerang 30 x 30
Plin Taraso 10 x 30
Granit Alam LN Ukuran Besar
Granit Alam LN Ukuran Kecil
Granit Alam DN Ukuran Besar
Granit Alam DN Ukuran Kecil
Granito Tile Essenza Ukuran 40 x 40 Polis
Granito Tile Essenza Ukuran 30 x 30
Granito Tile Essenza Ukuran 40 x 40 UnPolis
Marmer
Marmer Alam Lampung Ukuran Besar
Marmer Alam Lampung Ukuran kecil
Marmer Alam Citatah Ukuran Besar
Marmer Alam Citatah Ukuran Kecil
Marmer Sintetis
Granito Tile Essenza 60 x 60 Polis
Granito Tile Essenza 60 x 60 UnPolis
Batu Tempel Hitam
Bata Karawang
Campuran untuk Kedap Air ( AM )
Plint keramik 10 x 20
Plint keramik 10 x 25
Page 114
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m
m2
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
ltr
bh
bh
HARGA (Rp)
4,100.00
63,300.00
67,300.00
54,500.00
56,000.00
62,500.00
54,500.00
62,500.00
53,000.00
58,000.00
56,800.00
65,500.00
64,400.00
72,200.00
75,200.00
72,900.00
75,200.00
72,900.00
68,900.00
76,600.00
72,500.00
77,000.00
56,000.00
1,025,500.00
353,500.00
375,400.00
13,700.00
25,000.00
31,800.00
13,500.00
1,848,400.00
1,612,900.00
1,331,100.00
1,299,400.00
345,000.00
322,800.00
204,900.00
550,000.00
550,200.00
345,700.00
340,800.00
237,600.00
157,900.00
358,100.00
231,800.00
96,500.00
600.00
37,600.00
3,000.00
3,250.00
BHN
NO
MATERIAL
SAT
HARGA (Rp)
61
62
63
64
65
66
67
68
Plint keramik 10 x 30
Plint keramik 10 x 40
Plint keramik 15 x 30
Plint keramik 15 x 40
Plint granito 10 x 30
Plint granito 10 x 40
Plint granito 15 x 30
Plint granito 15 x 40
bh
bh
bh
bh
bh
bh
bh
bh
3,500.00
4,000.00
4,500.00
5,250.00
25,900.00
27,600.00
31,100.00
41,300.00
G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
m1
m1
m1
m1
m1
m1
stk
stk
stk
stk
stk
stk
stk
stk
kg
44,300.00
56,400.00
74,200.00
49,200.00
61,700.00
80,900.00
94,300.00
130,900.00
299,800.00
298,500.00
9,600.00
12,700.00
16,800.00
22,800.00
17,400.00
H
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
kg
kg
m2
m2
kg
kg
kg
kg
kg
kg
kg
kg
m1
kg
kg
m2
m2
m2
m2
m2
m2
kg
m2
m2
16,500.00
20,700.00
171,300.00
185,000.00
24,000.00
23,900.00
18,300.00
21,600.00
19,200.00
10,600.00
27,700.00
63,500.00
1,000.00
28,200.00
41,400.00
13,400.00
15,300.00
14,900.00
32,100.00
35,900.00
28,600.00
23,600.00
51,900.00
38,700.00
Page 115
BHN
NO
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
MATERIAL
SAT
Timah
Timah Hitam
Ram nyamuk Alumunium
Plat Srip 2 x 30 mm ( 6 m1 )
Plat Srip 3 x 30 mm ( 6 m1 )
Plat Strip
Besi Strip
Plat Alumunium 0.2 mm
Plat Alumunium 0.3 mm
Plat Alumunium 0.4 mm
Plat Alumunium 0.5 mm
Plat Alumunium 0.6 mm
Plat Alumunium 0.1 mm
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 3 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 3 " )
Daun Jendela Alumunium Natural ( tanpa kaca dan accessories )
Daun Jendela Alumunium Warna ( tanpa kaca dan accessories )
Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )
Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )
Handle Alumunium ( Tarikan Pintu Alumunium )
Kait Angin Alumunium
Karet Asisoris Kusen / Pintu Alumunium
Jalusi Alluminium
Sunscreen Almunium
Seng Plat BJLS 30 60 cm ( 100 m1 )
Seng Plat BJLS 30 90 cm ( 100 m1 )
Plat Besi Tipis 1 mm
Plat Besi Tipis 0.5 mm
Plat Besi 2 mm s/d 5 mm
Plat Besi 6 mms/d 10 mm
Plat Besi 10 mm keatas
Kabel presstressed polos
Jaring Kawat Baja
Lem Kuning ( Aibond )
Lem Fox
Lem Vinyl
Besi Strip Kaca Nako
Profil alumunium "T"
Besi Hallow ( 2 x 4 x 4) cm (400cm)
Besi Hallow ( 4 x 4) cm (400 cm)
Besi Rail Pengamanan
Jendela Besi
Jendela Besi tahan api
Pintu gulung besi
Pintu Roliing Door
Jendela nako kaca ryben + tralis 6 klips
Jendela nako kaca ryben + tralis 7 klips
Jendela nako kaca ryben + tralis 8 klips
Jendela nako kaca ryben + tralis 10 klips
Page 116
kg
kg
m2
bt
bt
bt
kg
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m2
m2
m2
m2
bh
ps
m1
m'
m2
roll
roll
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m1
btg
btg
kg
m2
m2
m2
m2
set
set
set
set
HARGA (Rp)
46,300.00
43,300.00
32,400.00
33,000.00
33,100.00
18,200.00
26,800.00
89,800.00
110,500.00
141,400.00
143,100.00
171,800.00
56,300.00
151,100.00
163,000.00
81,000.00
102,000.00
98,800.00
148,800.00
211,800.00
207,500.00
345,200.00
104,500.00
7,500.00
35,000.00
380,200.00
1,581,500.00
2,080,100.00
16,800.00
17,700.00
14,100.00
14,100.00
14,700.00
26,700.00
28,900.00
35,700.00
23,900.00
44,000.00
11,000.00
12,200.00
22,600.00
29,200.00
459,300.00
390,200.00
501,700.00
501,700.00
306,600.00
170,000.00
200,000.00
230,000.00
290,000.00
BHN
NO
MATERIAL
SAT
HARGA (Rp)
76
77
78
79
80
81
set
set
set
set
set
set
120,000.00
140,000.00
170,000.00
210,000.00
230,000.00
300,000.00
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
BAHAN KACA
Kaca Polos 2 mm ( ASAHI )
Kaca Polos 3 mm ( ASAHI )
Kaca Polos 5 mm ( ASAHI )
Kaca Polos 8 mm ( ASAHI )
Kaca Rayband 5 mm ( ASAHI )
Kaca Rayband 8 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )
Kaca cermin 5 mm
Kaca cermin 6 mm
Kaca cermin 8 mm
Kaca Patri Lokal Terpasang ( ASAHI )
Kaca Patri Ex Luar Negeri Terpasang
Kaca 6 mm Gravver
Glass Block DN 20 x 20 ( Kedawung )
Glass Block DN 20 x 20 Ex LN
Sealant
Jendela Nako
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
kg
bh
69,000.00
87,400.00
111,000.00
183,100.00
148,700.00
323,400.00
627,000.00
150,500.00
186,400.00
234,300.00
1,621,100.00
3,425,700.00
1,263,900.00
22,000.00
125,700.00
211,800.00
109,200.00
J
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
kg
kg
kg
bh
bh
kg
kg
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
kg
bh
23,800.00
23,400.00
20,000.00
1,600.00
900.00
57,100.00
21,700.00
7,500.00
71,800.00
15,900.00
9,300.00
5,300.00
800.00
7,200.00
600.00
300.00
35,000.00
17,500.00
250.00
K
1
2
3
BAHAN PERPIPAAN
Besi Pipa Untuk Hydrant BSP 1"
Besi Pipa Untuk Hydrant BSP 1.25"
Besi Pipa Untuk Hydrant BSP 1.5"
bt
bt
bt
166,700.00
210,200.00
298,000.00
Page 117
BHN
NO
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
MATERIAL
SAT
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
Page 118
HARGA (Rp)
351,800.00
439,300.00
595,000.00
869,600.00
1,423,400.00
172,300.00
227,900.00
365,800.00
573,100.00
772,400.00
109,100.00
159,400.00
181,500.00
259,300.00
280,500.00
326,400.00
467,400.00
672,100.00
849,900.00
920,300.00
6,300.00
8,600.00
16,700.00
19,800.00
20,700.00
22,700.00
51,200.00
60,400.00
75,900.00
118,600.00
40,100.00
52,200.00
63,200.00
79,900.00
105,900.00
110,700.00
167,100.00
205,100.00
347,900.00
640,000.00
818,300.00
22,500.00
27,800.00
40,500.00
58,500.00
60,200.00
75,800.00
126,300.00
145,700.00
256,800.00
BHN
NO
MATERIAL
SAT
HARGA (Rp)
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
tb
gl
m1
m1
m1
m1
m1
m1
m1
4,400.00
4,700.00
4,900.00
7,200.00
9,500.00
13,500.00
15,800.00
26,400.00
29,700.00
34,000.00
89,900.00
10,100.00
4,200.00
36,700.00
53,500.00
57,900.00
65,700.00
74,700.00
83,600.00
92,500.00
L
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
BAHAN SANITAIR
Stop Kran 3/4" KIT
Stop Kran 1" KIT
Stop Kran 1 1/2" KIT
Stop Kran 2" KIT
Stop Kran 2 1/2" KIT
Stop Kran 3" KIT
Check Valve 1/2"
Double Neple 1/2"
Water Mur 1/2"
Gate walve 1/2"
Saringan Air Lt. KM Stainless Steel
Apooer Bath Tube
Kran Stainless Lokal Kait
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2"
Kran Tembok ITAP dia. 1/2"
Kran Bebek Sun Eui 1/2"
Kran Bebek ITAP 1/2"
Kran Panas Dingin San Eui Standard
Bath Cape Washteren
Tempat Sabun Poslin
Wastafel Lengkap TOTO LW 230
Wastafel Lengkap INA
Closet Jongkok Poslin Warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
unit
bh
unit
unit
unit
unit
unit
103,900.00
124,200.00
208,000.00
267,900.00
713,200.00
830,300.00
86,400.00
32,400.00
40,200.00
55,500.00
66,600.00
267,800.00
46,100.00
221,000.00
134,800.00
86,900.00
40,900.00
144,600.00
51,500.00
228,400.00
2,098,700.00
46,300.00
1,012,700.00
699,900.00
205,600.00
188,200.00
2,032,900.00
Page 119
BHN
NO
MATERIAL
SAT
HARGA (Rp)
28
29
30
31
32
33
34
35
36
unit
unit
bh
unit
lbr
bh
bh
bh
btng
1,724,700.00
910,800.00
1,272,100.00
1,773,400.00
495,900.00
397,800.00
1,272,300.00
1,650,200.00
60,000.00
M
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
bh
bh
bh
bh
bh
bh
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
m2
bh
m2
m2
m2
m2
m2
33,100.00
47,100.00
100,000.00
140,600.00
164,700.00
77,200.00
111,100.00
62,900.00
83,100.00
73,300.00
65,900.00
58,500.00
42,300.00
78,500.00
97,200.00
80,000.00
487,100.00
283,600.00
19,600.00
1,900.00
2,700.00
2,300.00
7,500.00
4,800.00
10,500.00
203,100.00
172,700.00
138,500.00
80,900.00
105,300.00
100,800.00
83,900.00
88,700.00
96,700.00
8,500.00
26,400.00
112,400.00
142,200.00
139,300.00
145,100.00
Page 120
BHN
NO
MATERIAL
SAT
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
m2
lbr
lbr
m1
m1
m1
m1
bh
m1
bh
HARGA (Rp)
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
N
1
2
3
4
5
6
7
8
9
10
11
12
13
BAHAN MEKANIKAL
Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW )
Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW )
Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW )
Presure Tank kap. 500 liter lengkap
Hydran Box dlm Gedung ( Lengkap )
Fire House 1.5 x 30 m + nose
Exhose Fan H 360 W 60 x 60 cm
Exhose Fan H 380 W CFM 55 x 55 cm
Exhose Fan H 100 W 40 x 40 cm
AC Split 3 PK Setara TOSHIBA
AC Split 2 PK Setara TOSHIBA
AC Split 1 PK Setara TOSHIBA
Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1 BTU
71,396,400.00
O
1
2
3
4
5
6
7
8
9
10
11
12
BAHAN ELEKTRIKAL
Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' )
ROLL
ROLL
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
102,700.00
151,700.00
6,600.00
7,600.00
4,900.00
10,900.00
7,600.00
6,300.00
15,400.00
20,700.00
11,800.00
13,700.00
Page 121
2,700.00
4,000.00
7,500.00
10,700.00
10,000.00
3,000.00
4,500.00
6,000.00
7,500.00
38,100.00
37,500.00
75,000.00
21,000.00
16,400.00
34,500.00
22,000.00
11,000.00
7,200.00
2,200.00
1,700.00
7,200.00
216,358,900.00
591,647,100.00
36,997,300.00
6,854,400.00
4,866,100.00
6,862,900.00
5,491,100.00
1,092,600.00
30,791,800.00
21,926,500.00
5,174,100.00
4,200,000.00
BHN
NO
MATERIAL
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
SAT
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
unt
unt
unt
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
ttk
ttk
Page 122
HARGA (Rp)
18,600.00
17,600.00
119,700.00
26,500.00
29,700.00
12,000.00
19,300.00
23,800.00
14,500.00
19,200.00
18,500.00
20,400.00
25,800.00
35,500.00
41,900.00
841,900.00
2,182,600.00
153,500.00
204,800.00
222,600.00
468,800.00
55,100.00
106,000.00
521,100.00
23,800.00
26,300.00
23,800.00
87,700.00
144,900.00
87,800.00
179,600.00
61,200.00
29,700.00
35,200.00
41,800.00
37,900.00
40,600.00
41,300.00
8,300.00
6,500.00
144,000.00
306,900.00
306,900.00
67,900.00
147,400.00
307,600.00
221,700.00
738,000.00
101,500.00
65,100.00
423,700.00
296,100.00
BHN
NO
MATERIAL
SAT
HARGA (Rp)
P
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
bh
bh
bh
bh
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ps
bh
bh
ps
ps
bh
bh
bh
ps
ps
ps
m1
unt
unt
unt
unt
unt
bh
m1
m1
lbr
lbr
m1
410,900.00
408,600.00
126,500.00
864,300.00
193,100.00
335,900.00
165,300.00
207,300.00
54,400.00
102,700.00
586,600.00
85,200.00
94,500.00
46,800.00
51,600.00
49,800.00
5,500.00
7,100.00
29,000.00
32,200.00
31,500.00
33,000.00
21,000.00
15,000.00
13,700.00
9,100.00
420,000.00
597,500.00
200,000.00
205,400.00
255,500.00
19,500.00
43,500.00
53,500.00
86,900.00
50,100.00
57,900.00
Q
1
2
3
4
5
6
kg
kg
kg
ton
ton
ton
12,459.00
12,459.00
10,890.00
1,348,300.00
1,200,200.00
1,666,900.00
R
1
2
unit
unit
172,600.00
243,800.00
Page 123
BHN
NO
MATERIAL
SAT
HARGA (Rp)
3
4
5
6
7
8
9
10
11
unit
unit
unit
unit
unit
unit
unit
unit
unit
718,500.00
1,100,200.00
1,890,700.00
4,961,500.00
7,878,000.00
27,151,200.00
15,702,700.00
172,052,500.00
5,195,300.00
S
1
2
3
4
5
6
bh
bh
bh
bh
bh
bh
1,172,500.00
1,316,400.00
1,954,200.00
255,300.00
118,500.00
161,100.00
T
1
2
3
4
5
6
7
8
9
10
ALAT TUKANG
Palu 0.5 kg
Cangkul
Singkup
Sekrop
Pengki
Linggis
Rool Meter 30 meter ( Bahan Plastik )
Rool Meter 5 meter ( Bahan Besi )
Selang Plastik untuk Water Pas dia. 0.5 cm
Water Pas Alumunium 60 cm
bh
bh
bh
bh
bh
bh
bh
bh
m
bh
39,300.00
24,500.00
41,400.00
50,100.00
12,300.00
41,700.00
101,000.00
37,800.00
1,600.00
88,200.00
U
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
lt
m3
lt
lt
lt
lt
lt
15 kg
15.1 kg btl
btl
kg
ltr
Gln
kg
kg
kg
bh
18,000.00
151,100.00
28,435.00
7,150.00
7,800.00
3,300.00
55,000.00
104,600.00
88,900.00
66,400.00
19,400.00
40,500.00
15,700.00
35,600.00
2,400.00
11,100.00
1,400.00
V
1
2
BAHAN PAGAR
Panel Beton Pracetak
Kolom Beton Pracetak
lbr
btg
199,200.00
264,000.00
Page 124
BHN
NO
B.
1
2
3
4
5
6
7
8
9
10
MATERIAL
SAT
BIDANG PERTAMANAN
Aglonema
Bambu krisik/jepang
Furadan
Kompos/pupuk kandang
M atoa (2 m)
Palm (botol, ekor tupai, putri, dll) tinggi 2 m
Philo
Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m
Pohon perdu (kaca piring, puring, mawar, melati, dll)
Rumput gajah mini
batang
batang
kg
karung
batang
batang
batang
batang
batang
m2
HARGA (Rp)
50,000.00
50,000.00
24,000.00
25,000.00
40,000.00
100,000.00
75,000.00
25,000.00
10,000.00
15,000.00
Page 125
BHN
URAIAN PEKERJAAN
A.
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
PEKERJAAN PERSIAPAN
1 M' Pagar Sementara Dari Kayu Tinggi 2 m
1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
1 M2 Pengukuran Dan Pasang Bouwplank
1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester
1 M2 Pembuatan Gudang Semen dan Alat-alat
1 M2 Pembuatan Bedeng Buruh
1 M2 Membersihkan Lapangan dan Perataan
1M2 Pembuatan Jalan Sementara
1 M3 Bongkaran Beton Bertulang
1 M3 Bongkaran Dinding Tembok Bata Merah
1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
1 M2 Pagar BRC lengkap dengan tiang
1 M2 Steiger Werk / perancah dari Bambu
1 M' Cerucuk Bambu
1
2
3
4
5
6
7
8
9
10
11
12
13
14
PEKERJAAN TANAH
1 M3 Galian Tanah Biasa sedalam 1 m
1 M3 Galian Tanah Biasa Sedalam 2 m
1 M3 Galian Tanah Biasa Sedalam 3 m
1 M3 Galian Tanah Keras Sedalam 1 m
1 M3 Galian Tanah Lumpur Sedalam 1 m
1 M2 Pekerjaan Stripping Setinggi 10 cm
1 M3 Pembuangan Tanah sejauh 150 m
1 M3 Urugan Kembali
1 M3 Pemadatan Tanah
1 M3 Urugaan Pasir
1 M2 Pemasangan Lapisan Ijuk Tebal 10 cm
1 M3 Urugan Sirtu
1 M3 Urugan Tanah Pilihan
1 M2 Pembuatan jalan sementara, tebal 25 cm
B.
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
D.
1
2
3
4
5
PEKERJAAN PONDASI
1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
1 M3 Pasang Pondasi Batu Kosong (aanstamping)
1 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan
1 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)
1 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah
1 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang
1 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang
1 M' Pembuatan Tiang Pancang40 cm, Beton Tulang
1 M' Memancang Tiang Pancang Beton Tulang
1 Buah Memotong Tiang Pancang (40x40) cm Beton Tulang
1 M' Menyambung Tiang Pancang Beton Bertulang
PEKERJAAN BETON
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr
1 M3 Membuat Beton Tumbuk 1pc:2ps:3kr
1 M3 Membuat Tiang Pancang Beton Prestressed
1 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr
Page 126
HRGST
NO
6
7
8
9
10
11
12
13
14
15
16
17
URAIAN PEKERJAAN
1 M Memasang PVC Waterstop Lebar 200 mm
1 Kg Pembesian Dengan Besi Polos/ulir
1 M2 Pasang Bekesting Untuk Pondasi
1 M2 Pasang Bekisting Untuk Sloof
1 M2 Pasang Bekesting Untuk Kolom
1 M2 Pasang Bekesting Untuk Balok
1 M2 Pasang Bekesting Untuk Lantai
1 M2 Pasang Bekesting Untuk Tangga
1 M3 Membuat Beton Cor Mutu K-225
1 M3 Membuat Beton Cor Mutu K-275
1 M3 Pondasi Beton Tulang (150 kg besi + bekisting)
1 M3 Sloof Beton Tulang (200 kg besi + bekisting)
1 M3 Sloof Beton Tulang 15/20 (150 kg besi + bekisting)
1 M3 Sloof Beton Tulang 15/20 (180 kg besi + bekisting) 4dia. 12 ring 8-15
1 M3 Sloof Beton Tulang 20/30 (150 kg besi + bekisting) Struktur bertingkat 4dia.16 8-15
1 M3 Sloof Beton Tulang 20/30 (200 kg besi + bekisting) Struktur bertingkat 6dia.16 8-15
1 M3 Sloof Beton Tulang 20/40 (240 kg besi + bekisting) Struktur bertingkat
19
20
21
22
23
24
25
26
Page 127
HRGST
NO
URAIAN PEKERJAAN
Page 128
HRGST
NO
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
F.
URAIAN PEKERJAAN
1 M2 Dinding Keramik corak 20 x 20 cm setara Mulia
1 M2 Dinding Keramik polos 20 x 20 cm Setara Mulia
1 M2 Dinding Keramik polos 20 x 25 cm Setara Mulia
1 M2 Dinding Keramik Corak 20 x 25 cm Setara Mulia
1 M2 Dinding Keramik Polos 30 x 30 cm Setara Mulia
1 M2 Dinding Keramik Corak 30 x 30 cm Setara Mulia
1 M2 Dinding Keramik Polos 40 x 40 cm Setara Mulia
1 M2 Dinding Keramik Corak 40 x 40 cm Setara Mulia
1 M2 Dinding Keramik Corak 10 x 20 cm Setara Roman
1 M2 Dinding Keramik polos 10 x 20 cm Setara Roman
1 M2 Dinding Keramik corak 20 x 20 cm setara Roman
1 M2 Dinding Keramik polos 20 x 20 cm Setara Roman
1 M2 Dinding Keramik polos 20 x 25 cm Setara Roman
1 M2 Dinding Keramik Corak 20 x 25 cm Setara Roman
1 M2 Dinding Keramik Polos 30 x 30 cm Setara Roman
1 M2 Dinding Keramik Corak 30 x 30 cm Setara Roman
1 M2 Dinding Keramik Polos 40 x 40 cm Setara Roman
1 M2 Dinding Keramik Corak 40 x 40 cm Setara Roman
1 M2 Dinding Marmer
1 M2 Dinding Batu Tempel Hitam
1 M2 Dinding Porselen (11 x 11) cm
1 M2 Wall paper
1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah GRC t = 4 mm + rangka besi hollow
1 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow
1 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow
1 M2 Pasang Dinding Glass Block 20 x 20 adk 1pc : 4ps
1 M2 Pasang Dinding anyaman bambu, rangka kayu
23
24
25
26
27
28
29
1
2
3
4
5
6
7
8
9
10
11
PEKERJAAN ATAP
1 M2 Pasang Atap Genteng Palentong
1 M2 Pasang Genteng Bubung Palentong
1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm
1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm
1 M Pasang Nok Stel Gelombang 1,05 m
1 M2 Pasang Atap Genteng Beton
1 M2 Pasang Atap Genteng Murando Natural
17
18
19
20
21
22
G.
Page 129
HRGST
NO
12
13
14
15
16
17
18
19
20
21
22
H.
1
2
3
4
5
6
7
8
9
10
11
12
13
I.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
URAIAN PEKERJAAN
1 M2 Pasang Atap Genteng Murando Glazur
1 M2 Pasang Atap Genteng Metal
1 M Pasang Nok Genteng Beton
1 M Pasang Nok Genteng Metal
1 M2 Pasang Atap Seng Gelombang
1 M2 Pasang Atap Nok Seng
1 M2 Pasang Alluminium Foil / Sisalation
1 M2 Pasang Atap Alluminium Natural
1 M2 Pasang Atap Alluminium warna
1 M2 Pasang Nok Alluminium
1 M' Pasang Lisplank GRC ukuran 30 cm
1 M' Pasang Nok Pinggir
PEKERJAAN LANGIT-LANGIT
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm
1 M2 Langit-langit Akustik ( 60 x 120 ) cm
1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow
1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow
1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super
1 M List Langit-langit Kayu Profil 10 cm
1 M List Langit-langit Gypsum 10 cm
1 M List Langit-langit Kayu 1/4 cm
PEKERJAAN LANTAI
1 M2 Lantai Ubin Granito ukuran 40 x 40 cm Setara Essenza
1 M2 Lantai Ubin Granito ukuran 30 x 30 cm Setara Essenza
1 M Plint Ubin Granito ukuran 10 x 40 cm Setara Essenza
1 M Plint Ubin Granito ukuran 10 x 30 cm Setara Essenza
1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia
1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman
1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
1 M2 Lantai Keramik polos 40 x 40 cm setara Roman
1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman
1 M2 Lantai Marmer
1 M2 Lantai Parquet Jati
1 M Plint Keramik ukuran (10 x 40) cm
1 M Plint Keramik ukuran (10 x 30) cm
1 M' Plint kayu kamper Samarinda (2 x 10) cm
1 M' Plint keramik ukuran (10 x 20) cm
1 M2 Lantai karpet
1 M2 Paving block natural 8 cm
1 M2 Paving block warna 8 cm
1 M2 Paving block natural 6 cm
1 M2 Paving block warna 6 cm
1 M2 Grass Block 20 x 20
1 M2 Grass Block 30 x 30
Page 130
HRGST
NO
J.
URAIAN PEKERJAAN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
PEKERJAAN KAYU
1 M3 Kusen Pintu & jendela kayu Kamper Samarinda
1 M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing
1 M3 Kusen Pintu & jendela kayu Borneo Super
1 M2 Pintu Panel Kayu Kamper Samarinda
1 M2 Pintu Panel Kayu Kamper Medan/Kruing
1 M2 Pintu & Jendela Kaca Kayu Kamper Medan
1 M2 Pintu & Jendela Kaca Kayu Borneo
1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
1 M2 Jalusi Mati Kusen Kayu kamper Medan
1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
1 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan
1 M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan
1 M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)
1 M3 Kuda-kuda Kayu Kamper Medan
1 M3 Kuda-kuda Kayu Borneo Super
1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
1 M2 Kaso + Reng Genteng Beton Kayu Borneo Super
1 M' Lisplang uk (3x20)cm, Kayu Kamper Medan
1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
1 M List Plafond + kayu Profil 10 cm
1 M2 Pekerjaan partisi
1 M2 Rangka Langit-langit (1,00 x 1,00) m, Kayu borneo super
1 M2 Rangka langit-langit ( 0,50 x 1,00 ) m, Kayu Borneo Super
1 M' Reuter Kayu kamper Medan
1 M3 Gording kayu kelas II
1 M2 Dinding bilik, rangka kayu borneo
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
K.
Page 131
HRGST
NO
URAIAN PEKERJAAN
28
29
30
31
32
33
34
35
36
37
1 UNIT Pek. Kusen Jendela Alumunium uk. 2,65 X 1,50 M' ( 4 lubang ) dgn 2 Daun Jendela
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk. 2,85 X 2,70 M' ( 3 lb. Jendela + 1 lb. Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,30 X 2,80 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu Alumunium + Kaca uk. 1,50 X 2,70 M' ( 2 Daun Pintu )
1 UNIT Pek. Kusen Pintu & Jendela Alumunium uk.1,55 X 2,70 M' ( 1 lb. Jendela + 1 lb. Pintu )
1 UNIT Pekerjaan Jalusi Alumunium Sofi-sofi
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 1 lubang ) uk. 0,70 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 2 lubang ) uk. 1,35 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 3 lubang ) uk. 2,00 x 0,60 m
1 UNIT Pek. Kusen Bouvenlight Alumunium ( 4 lubang ) uk. 2,65 x 0,60 m
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
PEKERJAAN SANITASI
1 Buah Closet jongkok Porselen Standar
1 Buah Urinoir
1 Buah Wastafel
1 Buah bak Mandi Fibreglass Volume 0,30 m3
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
1 M' Pipa PVC 1/2" (AW)
1 M' Pipa PVC 1" (AW)
1 M' Pipa PVC 11/2" (AW)
1 M' Pipa PVC 2" (AW)
1 M' Pipa PVC 4" (AW)
1 M' Pipa PVC 3/4" (AW)
1 Buah Bak Cuci piring Stainless steel
1 Buah Kran 1/2" - 3/4"
1 Buah Floor Drain
1 M' Grafel beton U 20 cm -60 cm
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
1 M' Saluran Air Limbah Buis Beton 60 cm
1 M' Pasang Talang Seng Datar
1 Buah Closet Duduk
1 Buah Tangki Air fibreglass Volume 1 m3
1 Unit Septictank 2x1,50x1,50 m + Rembesan
1 Unit Septictank 1x1,50x1,50 m + Rembesan
L.
M.
Page 132
HRGST
NO
URAIAN PEKERJAAN
N
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
O.
1
2
3
4
PEKERJAAN PENGECATAN
1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama
1 M2 Mendempul Dan Menggosok Kayu
1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
1 M2 Pelaburan Bidang Kayu dengan Politur
1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
1 M2 Pengecatan Tembok Baru Setara ICI
1 M2 Pengecatan Tembok Lama Setara ICI
1 M2 Pengecatan Plafond ( 3x ) Setara ICI
1 M2 Pengecatan Plafond ( 3x ) Setara Vinilex
1 M2 Pengecatan Plafond ( 2x ) Setara Vinilex
1 M2 Memasang Wallpaper
1 M2 Pengecatan Permukaan Baja dengan Meni Besi
1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
1 M2 Pengecatan Tembok Baru Setara Vinilex (2 x laburan)
1 M2 Pengecatan Tembok Baru Setara Vinilex (3 x laburan)
1 M2 Pengecatan Tembok Lama Setara Vinilex
PEKERJAAN PERTAMANAN
1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
1 M2 Tanam rumput gajah (silang papan catur)
Page 133
HRGST
NO
URAIAN PEKERJAAN
Page 134
HRGST
HARGA
(Rp)
269,316.00
355,236.00
222,843.00
49,266.00
1,135,066.00
927,350.00
861,935.00
8,200.00
96,799.00
306,654.00
282,654.00
474,296.00
166,813.00
265,378.00
43,645.00
54,250.00
20,000.00
26,252.00
36,710.00
31,210.00
41,206.00
2,500.00
25,672.00
9,584.00
25,000.00
223,760.00
33,900.00
256,700.00
119,540.00
120,456.00
735,761.00
689,096.00
656,736.00
363,345.00
2,020,939.00
870,632.00
761,279.00
1,104,309.00
864,246.00
1,073,335.00
128,057.00
216,932.00
628,577.00
716,798.00
689,279.00
970,698.00
1,047,667.00
914,882.00
Page 135
HRGST
HARGA
(Rp)
65,593.00
18,566.00
152,870.00
167,120.00
308,850.00
316,770.00
431,850.00
289,440.00
1,197,898.00
1,186,807.00
4,248,004.00
5,441,279.00
4,616,279.00
5,078,279.00
4,583,279.00
5,408,279.00
6,101,279.00
6,646,664.00
6,573,014.00
7,233,014.00
6,225,664.00
6,803,164.00
7,728,014.00
8,058,014.00
8,498,014.00
7,150,514.00
7,673,014.00
6,691,324.00
6,864,634.00
7,367,944.00
7,706,254.00
8,552,029.00
9,397,804.00
5,693,859.00
6,201,324.00
8,288,164.00
7,199,164.00
6,608,324.00
6,773,324.00
6,959,099.00
6,959,099.00
6,628,499.00
5,969,099.00
7,554,564.00
6,575,339.00
6,904,322.00
6,672,247.00
6,554,453.00
6,925,773.00
5,466,262.00
5,930,412.00
72,847.00
94,786.00
315,287.00
6,438,864.00
6,196,529.00
6,574,999.00
928,986.00
Page 136
HRGST
HARGA
(Rp)
852,609.00
892,501.00
220,267.00
211,736.00
207,720.00
105,680.00
102,345.00
100,253.00
580,016.00
577,485.00
580,016.00
46,791.00
151,794.00
129,077.00
109,862.00
190,791.00
117,281.00
104,781.00
108,782.00
107,282.00
Page 137
HRGST
HARGA
(Rp)
115,282.00
107,282.00
107,282.00
115,282.00
105,782.00
110,782.00
109,582.00
118,282.00
124,982.00
117,182.00
127,982.00
117,182.00
125,682.00
127,982.00
121,682.00
129,382.00
125,282.00
129,782.00
689,841.00
179,935.00
116,082.00
94,920.00
329,174.00
431,147.00
284,431.00
92,049.00
140,691.00
103,090.00
836,685.00
105,137.00
36,022.00
33,620.00
32,054.00
47,253.00
44,739.00
42,318.00
31,284.00
25,355.00
43,737.00
41,302.00
36,417.00
20,213.00
36,390.00
21,823.00
59,915.00
80,177.00
72,510.00
42,371.00
45,157.00
43,172.00
44,011.00
48,016.00
97,758.00
110,652.00
61,015.00
Page 138
HRGST
HARGA
(Rp)
84,415.00
227,572.00
109,174.00
175,955.00
68,516.00
24,132.00
31,145.00
204,160.00
229,465.00
161,550.00
43,125.00
30,000.00
31,443.00
28,143.00
210,400.00
298,060.00
154,907.00
153,893.00
128,684.00
93,960.00
91,408.00
136,615.00
133,743.00
37,073.00
16,765.00
7,500.00
421,657.00
402,591.00
82,032.00
101,549.00
92,670.00
99,170.00
89,670.00
94,670.00
93,470.00
102,170.00
108,870.00
111,870.00
105,570.00
113,270.00
109,170.00
113,670.00
672,798.00
475,845.00
19,492.00
27,552.00
36,348.00
29,301.00
403,815.00
153,570.00
182,445.00
148,215.00
158,715.00
323,040.00
330,990.00
Page 139
HRGST
HARGA
(Rp)
11,956,440.00
8,427,120.00
7,932,000.00
573,768.00
456,124.00
381,041.00
377,653.00
663,826.00
356,459.00
513,126.00
354,562.00
430,185.00
486,735.00
606,635.00
7,736,900.00
7,283,040.00
78,780.00
89,340.00
62,218.00
84,779.00
33,347.00
172,437.00
64,485.00
79,466.00
29,660.00
7,367,660.00
70,471.00
32,216.00
974.00
2,464.00
456,491.00
332,441.00
192,598.00
62,063.00
117,797.00
174,013.00
172,631.00
179,302.00
192,392.00
102,192.00
125,292.00
855,299.00
731,898.00
784,258.00
393,980.00
1,171,360.00
269,541.00
622,341.00
577,519.00
196,000.00
2,215,571.88
3,278,022.70
4,037,418.82
2,168,119.18
Page 140
HRGST
HARGA
(Rp)
4,021,101.40
5,165,780.62
3,001,582.62
3,066,970.73
3,009,751.68
1,264,968.60
789,516.00
912,681.00
1,302,386.40
1,692,091.80
382,160.00
199,370.00
127,785.00
32,569.00
22,710.00
15,119.00
458,550.00
243,950.00
107,705.00
133,669.00
463,770.00
2,430,770.00
1,400,178.00
601,654.00
159,315.00
620,779.00
377,546.00
22,247.00
31,602.00
48,896.00
50,336.00
154,417.00
34,659.00
420,930.00
49,075.00
74,670.00
79,411.00
119,325.00
221,243.00
79,987.00
2,051,157.00
1,618,359.00
10,022,424.00
6,780,162.00
Page 141
HRGST
HARGA
(Rp)
8,280.00
8,708.00
24,517.00
39,790.00
64,424.00
7,515.00
30,608.00
21,521.00
53,775.00
43,775.00
32,330.00
103,251.00
19,340.00
34,752.00
25,842.00
17,608.00
23,669.00
12,521.00
28,274.00
53,274.00
12,024.00
10,500.00
Page 142
HRGST
HARGA
(Rp)
2,215,572
3,278,023
4,037,419
2,168,119
4,021,101
5,165,781
3,001,583
3,066,971
3,009,752
1,264,969
789,516
912,681
1,302,386
1,692,092