Anda di halaman 1dari 2

INISIASI PROYEK >> PERSIAPAN PELAKSANAAN >> PELAKSANAAN

>> PENYERAHAN

INDIRECT COST
INPUT
1. STRUKTUR ORGANISASI
2. DAFTAR KEBUTUHAN KONSTRUKSI (INVESTASI
ASSET)
3. DAFTAR KEBUTUHAN KANTOR
4. DAFTAR KEBUTUHAN LABORATORIUM
5. DAFTAR KEBUTUHAN SURVEI
6. DAFTAR KEBUTUHAN SAFETY
7. DAFTAR KEBUTUHAN KENDARAAN OPERASIONAL
PROSES
1. SCHEDULE TENAGA KERJA
2. SCHEDULE KEBUTUHAN KENDARAAN OPERASI VS
TARIF
3. SCHEDULE LABORATORIUM
4. BIAYA COST & CASH FLOW
OUTPUT
1.
2.
3.
4.
5.
6.
7.
8.

TENAGA KERJA TAK LANGSUNG


REPAIR AND MAINTENANCE
QUALITY CONTROL
SURVEY
SAFETY
OVERHEAD PROYEK
DEPRESIASI ALAT PROYEK (NON KONSTRUKSI)
BIAYA TAK TERDUGA

STANDAR PEDOMAN INDIRECT COST

KEBUTUHAN RATE GAJI & FASILITAS KARYAWAN


STANDAR UU DEPNAKER
STANDAR ASTEK, JAMSOSTEK & BPJS
TARIF R&O KENDARAAN OPERASIONAL & CONSUMABLE LAINNYA
BIAYA INVESTASI / JASA PERALATAN SURVEY, LABORATORIUM, KANTOR
& MESS
RATE ASURANSI PROYEK
UANG MAKAN
TARIF DEPRESIASI ALAT NON KONSTRUKSI

PEDOMAN / SYARAT KETENTUAN PENGADAAN JASA & BARANG

Anda mungkin juga menyukai