Anda di halaman 1dari 27

REKAPITULASI BIAYA

Kegiatan

: KEGITAN KONSERFASI KELAUTAN DAERAH ( KKLD )

Pekerjaan

: PEMBANGUNAN PINTU GERBANG

Lokasi

: DERMAGA PELELANGAN IKAN TONDASI

Peruntukan Analisa

: LUAR KOTA DARATAN


DAFTAR ANALISA SATUAN PEKERJAAN

No

Total Harga

Uraian

( Rp)

A. PEKERJAAN GALIAN, TANAH, PASIR DAN SIRTU

656,825.50

B. PEKERJAAN PONDASI

2,371,425.77

C. PEKERJAAN PAS. DINDING BATU BATA / BATAKO

4,665,959.41

D. PEKERJAAN PLESTERAN

5,854,112.84

E. PEKERJAAN KUSEN, PINTU DAN JENDELA

4,283,085.00

F. PEKERJAAN RANGKA DAN PENUTUP ATAP

3,365,815.89

G. PEKERJAAN LANGIT-LANGIT / PLAFOND

3,604,269.93

H. PEKERJAAN BETON / STRUKTUR


I.

10,953,734.52

PEKERJAAN PENUTUP LANTAI DAN DINDING

504,213.45

J. PEKERJAAN KUNCI DAN KACA

375,104.25

K. PEKERJAAN PENGECATAN

461,144.26

L. PEKERJAAN SANITARY

1,890,041.64

( A ) Jumlah Harga Pekerjaan ( A s/d L )

38,985,732.46

( B ) Pajak Pertambahan Nilai ( PPN ) = 10 % x A

3,898,573.25

( C ) JUMLAH TOTAL HARGA = A + B

42,884,305.71

( D ) D I B U LAT KAN

42,880,000.00

Terbilang : Lima Belas Juta Rupiah

Raha, 6 Maret 2006


Diperiksa :

Dibuat :

KUASA PENGGUNA ANGGARAN

CV. MEGA TEKNIK KONSULTAN

KEGITAN KOSERFASI KELAUTAN DAERAH


(KKLD)

R. LUMBANG GAOL,SP,M.Si

MUH. RISNO Y,ST

NIP.010 226 717

Team Leader
Mengetahui/Menyetujui:

KEPALA DINAS PERIKANAN DAN KELAUTAN

KEPALA DINAS KIMPRASWIL

KABUPATEN MUNA

KABUPATEN MUNA

Ir. FACHRI BAU

LA ODE MUURI

Nip. 080 065 519

NIP. 590 003 380

RENCANA ANGGARAN BIAYA

Kegiatan
Pekerjaan

: KONSERFASI KELAUTAN DAERAH (KKLD)


: PEMBANGUNAN PINTU GERBANG

Lokasi
Peruntukan Analisa

: DERMAGA PELELANGAN IKAN TONDASI


: LUAR KOTA SEBERANG
DAFTAR ANALISA SATUAN PEKERJAAN

No

Uraian

Satuan

Qty

Harga Satuan

Total Biaya

( Rp. )

( Rp. )

A. PEKERJAAN GALIAN, TANAH, PASIR DAN SIRTU


A.1 Galian tanah biasa kedalaman 1 m

M3

1.00

12,800.00

12,800.00

A.2 Galian tanah biasa kedalaman 2 m


A.3 Galian tanah keras kedalaman 1 m

M3
M3

1.00
1.00

16,832.00
20,000.00

16,832.00
20,000.00

A.4 Galian tanah cadas kedalaman 1 m


A.5 Urugan kembali

M3
M3

1.00
1.00

59,687.50
6,144.00

59,687.50
6,144.00

A.6 Urugan tanah dipadatkan

M3

1.00

181,153.60

181,153.60

A.7 Urugan pasir


A.8 Urugan sirtu

M3
M3

1.00
1.00

173,853.60
186,354.80

173,853.60
186,354.80

Jumlah Harga A ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )


B. PEKERJAAN PONDASI

656,825.50

B.1 Pasangan batu gunung 1Pc : 3Psr

M3

1.00

494,389.02

494,389.02

B.2 Pasangan batu gunung 1Pc : 5Psr


B.3 Pasangan batu kosong

M3
M3

1.00
1.00

437,732.96
241,116.30

437,732.96
241,116.30

Jumlah Harga B ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )


C. PEKERJAAN PAS. DINDING BATU BATA / BATAKO
C.1 Pasangan batu bata 1/2 1Pc : 3Psr
M2
1.00
C.2 Pasangan batu bata 1/2 1Pc : 5Psr
C.3 Pasangan batu batako 1/2 1Pc : 5Psr

M2
M2

1.00
1.00

2,371,425.77
65,644.05

65,644.05

509,350.92
546,300.40

509,350.92
546,300.40

Jumlah Harga C ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )


D. PEKERJAAN PLESTERAN
D.1 Plesteran 1Pc : 2Psr tebal 15 MM

M2

4,665,959.41

1.00

23,914.67

23,914.67

D.2 Plesteran 1Pc : 3Psr tebal 15 MM


M2
1.00
D.3 Plesteran 1Pc : 5Psr tebal 15 MM
M2
1.00
Jumlah Harga D ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )
E. PEKERJAAN KUSEN, PINTU DAN JENDELA
E.1 Pasang kusen pintu kayu klas I
M3
1.00
E.2 Pasang pintu panil/jendela kayu klas I
M2
1.00
E.3 Pasang pintu/jendela kaca kayu klas I
M2
1.00
E.4 Pasang jalusi pintu/jendela kayu klas I
M2
1.00
E.5 Pas. jalusi mati pintu/jendela kayu klasI
M2
1.00
E.6 Pas. Pintu double teakwood r. kayu klas I
M2
1.00
E.7 Pasang kusen pintu kayu klas II
M3
1.00
E.8 Pasang pintu panil/jendela kayu klas II
M2
1.00
E.9 Pasang pintu/jendela kaca kayu klas II
M2
1.00
E.10 Pasang jalusi pintu/jendela kayu klas II
M2
1.00
E.11 Psg jalusi mati pintu/jendela kayu klasII
M2
1.00
Jumlah Harga E ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )
F. PEKERJAAN RANGKA DAN PENUTUP ATAP
F.1 Konstruksi kuda-kuda kayu klas II
M3
1.00
F.2 Pasang gording/nok/tiang kayu kayu klas II M3
1.00
F.3 Pasang kaso 5/7+ reng 2/3 genteng metal
M2
1.00
F.4 Pasang lesplank 3x 2/30 kayu klas I
M
1.00
F.5 Pasang atap seng BJLS.2.0
M2
1.00
F.6 Pasang bumbungan atap seng plat
M
1.00
F.7 Pasang atap genteng Beton
M2
1.00
F.8 Pasang nok atap genteng beton
M
1.00
Jumlah Harga F ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )
G. PEKERJAAN LANGIT-LANGIT / PLAFOND
G.1 Rangka plafond 4/6(60x120) kayu klas II
M2
1.00
G.2 Pasang plafond tripleks 3 MM
M2
1.00
G.3 Pasang list palfond kayu profil
M
1.00

22,276.14
20,667.25

22,276.14
20,667.25
5,854,112.84

3,296,000.00
242,750.00
210,425.00
349,400.00
266,003.00
237,879.00
2,553,500.00
204,750.00
167,550.00
271,000.00
233,003.00

3,296,000.00
242,750.00
210,425.00
349,400.00
266,003.00
237,879.00
2,553,500.00
204,750.00
167,550.00
271,000.00
233,003.00
4,283,085.00

1,940,566.00
997,710.00
31,783.00
39,326.00
181,618.40
32,438.05
78,170.60
64,203.84

1,940,566.00
997,710.00
31,783.00
39,326.00
181,618.40
32,438.05
78,170.60
64,203.84
3,365,815.89

27,081.00
25,092.55
3,404.05

27,081.00
25,092.55
3,404.05

G.4 Pasang papan ampig kayu klas II

M2

1.00

40,502.00

Jumlah Harga G ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )

No

Uraian

40,502.00
3,604,269.93

Total Biaya

Satuan

Qty

H. PEKERJAAN BETON / STRUKTUR


H.1 Beton tumbuk 1Pc : 3Psr : 5Kr tebal 5 cm

M2

1.00

29,514.97

29,514.97

H.2 Pembesian dengan besi polos / ulir


H.3 Beton tak bertulang 1Pc : 2Psr : 3Kr

Kg
M3

1.00
1.00

14,004.33
699,798.41

14,004.33
699,798.41

H.4 Bekisting

M2

1.00

62,731.00

62,731.00

H.5 Beton slope 12/15 1Pc : 2Psr : 3Kr


H.6 Beton kolom 11/11 1Pc : 2Psr : 3Kr

M3
M3

1.00
1.00

3,388,021.51
3,442,827.16

3,388,021.51
3,442,827.16

H.7 Beton ring balok 10/12 1Pc : 2Psr : 3Kr


M3
1.00
Jumlah Harga H ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )

3,316,837.16

3,316,837.16
10,953,734.52

( Rp. )

I. PEKERJAAN PENUTUP LANTAI DAN DINDING


I.1 Floor lantai 1Pc : 5 Psr tebal 5 cm
I.2 Lantai screed tebal 2 cm

M2
M2

1.00
1.00

50,826.88
47,237.16

50,826.88
47,237.16

I.3 Lantai keramik 20 x 20 cm


I.4 Lantai keramik 30 x 30 cm

M2
M2

1.00
1.00

174,318.25
132,532.54

174,318.25
132,532.54

I.5 Lantai keramik 20 x 25 cm

M2

1.00

91,325.22

91,325.22

I.6 Tegel plint 10 x 30 cm


M
1.00
Jumlah Harga I ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )

7,973.39

7,973.39
504,213.45

J. PEKERJAAN KUNCI DAN KACA


J.1 Pasang kunci tanam 2x slaag

Buah

1.00

108,190.00

108,190.00

J.2 Pasang engsel pintu kuningan

Buah

1.00

29,156.25

29,156.25

J.3 Pasang engsel jendela


J.4 Pasang kait angin jendela

Buah
Buah

1.00
1.00

19,101.50
7,992.50

19,101.50
7,992.50

J.5 Pasang grendel/seloot jendela


J.6 Pasang kaca 3 MM

Buah
M2

1.00
1.00

7,463.50
95,781.25

7,463.50
95,781.25

M2

1.00

107,419.25

J.7 Pasang kaca 5 MM

Jumlah Harga F ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )


K. PEKERJAAN PENGECATAN
K.1 Mendempul dan menggosok kayu
M2
1.00
K.2 Pengecatan bidang kayu 3x
M2
1.00
K.3 Pelaburan kayu dengan vernis
M2
1.00
K.4 Pengecatan tembok 2x
M2
1.00
K.5 Pengecatan seng
M2
1.00
K.6 pengecatan seng dengan meny besi
M2
1.00
Jumlah Harga G ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )
L. PEKERJAAN SANITARY
L.1 Pasang klosed jongkok
Buah
1.00
L.2 Pasang bak air volume 0,3 M3
Buah
1.00
L.3 Pasang stop kran 1/2"
Buah
1.00
Jumlah Harga H ( masuk pada Rekapitulasi Daftar Kuantitas dan Harga )

107,419.25
375,104.25

9,236.68
20,812.69
24,716.36
10,846.10
14,990.09
5,438.09

9,236.68
20,812.69
24,716.36
10,846.10
14,990.09
5,438.09
461,144.26

212,967.83
1,163,100.12
21,555.15

212,967.83
1,163,100.12
21,555.15
1,890,041.64

Kegiatan
Pekerjaan
Lokasi
Peruntukan Analisa

: KONSERFASI KELAUTAN DAERAH (KKLD)


: PEMBANGUNAN PINTU GERBANG
: DERMAGA PELELANGAN IKAN TONDASI
: LUAR KOTA SEBERANG
DAFTAR ANALISA SATUAN PEKERJAAN

No

Uraian

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

A PEKERJAAN GALIAN TANAH, PASIR DAN SIRTU


A.1 Galian tanah Biasa kedalaman 1 m / m3
A. Material
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0400

45,000.00

1,800.00

0.4000

27,500.00

11,000.00
12,800.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

12,800.00
12,800.00

A.2 Galian tanah Biasa kedalaman 2 m / m3


A. Material
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0526

45,000.00

0.5260

27,500.00

2,367.00
14,465.00
16,832.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

16,832.00
16,832.00

A.3 Galian tanah keras kedalaman 1 m / m3


A. Material
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja
C. Peralatan

Hari
Hari
Hari
Hari

0.0625

45,000.00

0.6250

27,500.00

2,812.50
17,187.50
20,000.00

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

20,000.00
20,000.00

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

A.4 Galian tanah cadas kedalaman 1 m / m3


A. Material
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

1.2500

45,000.00

0.1250

27,500.00

56,250.00
3,437.50
59,687.50

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

59,687.50
59,687.50

A.5 Urugan kembali / m3


A. Material
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0192

45,000.00

0.1920

27,500.00

864.00
5,280.00
6,144.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
A.6 Urugan tanah dipadatkan / m3
A. Material
1. Tanah urug
B. Pekerja
1. Mandor
4. Pekerja

6,144.00
6,144.00

m3

1.2000

137,628.00

165,153.60
165,153.60

Hari
Hari

0.0500
0.5000

45,000.00
27,500.00

2,250.00
13,750.00
16,000.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
A.7 Urugan Pasir / m3
A. Material
1. Pasir urug

181,153.60
181,153.60

m3

1.2000

137,628.00

165,153.60
165,153.60

B. Pekerja
1. Mandor
4. Pekerja

Hari
Hari

0.0100
0.3000

45,000.00
27,500.00

450.00
8,250.00
8,700.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
A.8 Urugan Sirtu / m3
A. Material
1. Sirtu ( campuran Pasir & Batu kerikil )

173,853.60
173,853.60

m3

1.2000

148,629.00

178,354.80

178,354.80
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0250

45,000.00

0.2500

27,500.00

1,125.00
6,875.00
8,000.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

B. PEKERJAAN FONDASI
B.1 Pasangan Batu gunung 1 Pc : 3 Psr / m3
A. Material
1. Batu Gunung
2. Pasir Pasang
3. Semen Portland (Pc)
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

186,354.80
186,354.80

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

m3
m3
Zak

1.1000
0.4850
4.1000

142,839.00
142,839.00
47,162.00

157,122.90
69,276.92
193,364.20
419,764.02

Hari
Hari
Hari
Hari

0.0750
0.0600
0.6000
1.5000

45,000.00
50,000.00
45,000.00
27,500.00

3,375.00
3,000.00
27,000.00
41,250.00
74,625.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
B.2 Pasangan Batu gunung 1 Pc : 5 Psr / m3
A. Material
1. Batu Gunung
2. Pasir Pasang
3. Semen Portland (Pc)
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

494,389.02
494,389.02

m3
m3
Zak

1.1000
0.5440
2.7200

142,839.00
142,839.00
47,162.00

157,122.90
77,704.42
128,280.64
363,107.96

Hari
Hari
Hari
Hari

0.0750
0.0600
0.6000
1.5000

45,000.00
50,000.00
45,000.00
27,500.00

3,375.00
3,000.00
27,000.00
41,250.00
74,625.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
B.3 Pasangan Batu Kosong / m3
A. Material
1. Batu Gunung
2. Pasir urug

437,732.96
437,732.96

m3
m3

1.1000
0.3000

142,839.00
137,628.00

157,122.90
41,288.40
198,411.30

B. Pekerja

1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0390
0.0390
0.3900
0.7800

45,000.00
50,000.00
45,000.00
27,500.00

1,755.00
1,950.00
17,550.00
21,450.00
42,705.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

241,116.30
241,116.30

Satuan

C. PEKERJAAN PASANGAN DINDING BATU BATA / BATAKO


C.1 Pasangan Batu Bata 1/2 1 Pc : 3 Psr / m2
A. Material
1. Batu Bata
Buah
2. Pasir Pasang
m3
3. Semen Portland (Pc)
Zak
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

70.0000
0.0400
0.2870

456.00
142,839.00
47,162.00

31,920.00
5,713.56
13,535.49
51,169.05

0.0150
0.0100
0.1000
0.3200

45,000.00
50,000.00
45,000.00
27,500.00

675.00
500.00
4,500.00
8,800.00
14,475.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
C.2 Pasangan Batu Bata 1/2 1 Pc : 5 Psr / m2
A. Material
1. Batu Bata
2. Pasir Pasang
3. Semen Portland (Pc)
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

65,644.05
65,644.05

Buah
m3
Zak

70.0000
0.0450
9.6800

456.00
142,839.00
47,162.00

31,920.00
6,427.76
456,528.16
494,875.92

Hari
Hari
Hari
Hari

0.0150
0.0100
0.1000
0.3200

45,000.00
50,000.00
45,000.00
27,500.00

675.00
500.00
4,500.00
8,800.00
14,475.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

C.3 Pasangan Batako 1 Pc : 5 Psr / m2

509,350.92
509,350.92

A. Material
1. Batu Batako ()
2. Pasir Pasang
3. Semen Portland (Pc)

Buah
m3
Zak

21.0000
0.0174
0.0747

25,492.00
142,839.00
47,162.00

535,332.00
2,485.40
3,523.00
541,340.40

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0052
0.0030
0.0341
0.1106

45,000.00
50,000.00
45,000.00
27,500.00

234.00
150.00
1,534.50
3,041.50
4,960.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
No

Uraian

D. PEKERJAAN PLESTERAN / SPESI


D.1 Plesteran 1 Pc : 2 Psr tebal 15 mm / m2
A. Material
1. Pasir Pasang
3. Semen Portland (Pc)

546,300.40
546,300.40
Satuan

m3
Zak

Qt ' y

0.0170
0.1704

Harga Satuan
( Rp. )

142,839.00
47,162.00

Total Biaya
( Rp. )

2,428.26
8,036.40
10,464.67

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0100
0.0150
0.1500
0.2000

45,000.00
50,000.00
45,000.00
27,500.00

450.00
750.00
6,750.00
5,500.00
13,450.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
D.2 Plesteran 1 Pc : 3 Psr tebal 15 mm / m2
A. Material
1. Pasir Pasang
3. Semen Portland (Pc)

23,914.67
23,914.67

m3
Zak

0.0190
0.1296

142,839.00
47,162.00

2,713.94
6,112.20
8,826.14

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0100
0.0150
0.1500
0.2000

45,000.00
50,000.00
45,000.00
27,500.00

450.00
750.00
6,750.00
5,500.00
13,450.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

D.3 Plesteran 1 Pc : 5 Psr tebal 15 mm / m2


A. Material
1. Pasir Pasang
3. Semen Portland (Pc)

22,276.14
22,276.14

m3
Zak

0.0220
0.0864

142,839.00
47,162.00

3,142.46
4,074.80
7,217.25

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja
C. Peralatan

Hari
Hari
Hari
Hari

0.0100
0.0150
0.1500
0.2000

45,000.00
50,000.00
45,000.00
27,500.00

450.00
750.00
6,750.00
5,500.00
13,450.00

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
No

Uraian

E. PEKERJAAN KUSEN, PINTU DAN JENDELA


E.1 Pasang Kusen Pintu/Jendela Kayu Klas I / m3
A. Material
1. Kayu Balok Klas I

20,667.25
20,667.25
Satuan

m3

Qt ' y

1.1000

Harga Satuan
( Rp. )

1,925,000.00

Total Biaya
( Rp. )

2,117,500.00

2,117,500.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.3000
2.0000
20.0000
6.0000

45,000.00
50,000.00
45,000.00
27,500.00

13,500.00
100,000.00
900,000.00
165,000.00
1,178,500.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
E.2 Pasang Pintu Panil Kayu Klas I / m2
A. Material
1. Papan Kayu Jati

3,296,000.00
3,296,000.00

m3

0.0400

2,200,000.00

88,000.00

88,000.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0500
0.2500
2.5000
1.0000

45,000.00
50,000.00
45,000.00
27,500.00

2,250.00
12,500.00
112,500.00
27,500.00
154,750.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

E.3 Pasang Pintu / Jendela Kaca Kaca Kayu Klas I / m2


A. Material
1. Papan Klas I

242,750.00
242,750.00

m3

0.0350

2,475,000.00

86,625.00

86,625.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0400
0.2000
2.0000
0.8000

45,000.00
50,000.00
45,000.00
27,500.00

1,800.00
10,000.00
90,000.00
22,000.00
123,800.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
E.4 Pasang Jalusi Pintu / Jendela Kayu Klas I / m2
A. Material
1. Papan Klas I

210,425.00
210,425.00

m3

0.0640

2,475,000.00

158,400.00

158,400.00
B. Pekerja
1. Mandor
2. Kepala Tukang

Hari
Hari

0.3000
0.3000

45,000.00
50,000.00

13,500.00
15,000.00

3. Tukang Kayu
4. Pekerja

Hari
Hari

3.0000
1.0000

45,000.00
27,500.00

135,000.00
27,500.00
191,000.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
E.5 Pasang Jalusi Mati Pintu / Jendela Kayu Klas I / m2
A. Material
1. Papan Klas I
2. Paku Campur

349,400.00
349,400.00

m3
Kg

0.0600
0.1500

2,475,000.00
17,520.00

148,500.00
2,628.00
151,128.00

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0250
0.2000
2.0000
0.5000

45,000.00
50,000.00
45,000.00
27,500.00

1,125.00
10,000.00
90,000.00
13,750.00
114,875.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

266,003.00
266,003.00

E.6 Pasang Pintu Double Teakwood Rangka Kayu Klas I / m2


A. Material
1. Papan Klas I
m3
2. Teakwood
Lembar
3. Paku Campur
Kg
4. Lem Kayu
Kg
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0196
0.6944
0.1500
0.0300

2,475,000.00
90,180.00
17,520.00
10,667.00

48,510.00
62,620.99
2,628.00
320.01
114,079.00

0.0400
0.2000
2.0000
0.8000

45,000.00
50,000.00
45,000.00
27,500.00

1,800.00
10,000.00
90,000.00
22,000.00
123,800.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
E.7 Pasang Kusen Pintu/Jendela Kayu Klas II/ m3
A. Material
1. Kayu Balok Klas II

237,879.00
237,879.00

m3

1.1000

1,250,000.00

1,375,000.00

1,375,000.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.3000
2.0000
20.0000
6.0000

45,000.00
50,000.00
45,000.00
27,500.00

13,500.00
100,000.00
900,000.00
165,000.00
1,178,500.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
E.8 Pasang Pintu Panil Kayu Klas II / m2
A. Material
1. Papan Klas II

2,553,500.00
2,553,500.00

m3

0.0400

1,250,000.00

50,000.00

50,000.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0500
0.2500
2.5000
1.0000

45,000.00
50,000.00
45,000.00
27,500.00

2,250.00
12,500.00
112,500.00
27,500.00
154,750.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

E.9 Pasang Pintu / Jendela Kaca Kaca Kayu Klas II / m2


A. Material
1. Papan Klas II

204,750.00
204,750.00

m3

0.0350

1,250,000.00

43,750.00

43,750.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0400
0.2000
2.0000
0.8000

45,000.00
50,000.00
45,000.00
27,500.00

1,800.00
10,000.00
90,000.00
22,000.00
123,800.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
E.10 Pasang Jalusi Pintu / Jendela Kayu Klas II / m2
A. Material
1. Papan Klas II

167,550.00
167,550.00

m3

0.0640

1,250,000.00

80,000.00

80,000.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.3000
0.3000
3.0000
1.0000

45,000.00
50,000.00
45,000.00
27,500.00

13,500.00
15,000.00
135,000.00
27,500.00
191,000.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
E.11 Pasang Jalusi Mati Pintu / Jendela Kayu Klas I / m2
A. Material
1. Papan Klas I
2. Paku Campur

271,000.00
271,000.00

m3
Kg

0.0600
0.1500

1,925,000.00
17,520.00

115,500.00
2,628.00
118,128.00

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0250
0.2000
2.0000
0.5000

45,000.00
50,000.00
45,000.00
27,500.00

1,125.00
10,000.00
90,000.00
13,750.00
114,875.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

233,003.00
233,003.00

No

Uraian

F. PEKERJAAN RANGKA DAN PENUTUP ATAP


F.1 Konstruksi Kuda-Kuda Kayu Klas II / m3
A. Material
1. Kayu Balok Klas II
2. Paku Campur
3. Besi Strip
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

m3
Kg
Kg

1.1000
0.8000
15.0000

880,000.00
17,520.00
15,970.00

968,000.00
14,016.00
239,550.00
1,221,566.00

Hari
Hari
Hari
Hari

0.2000
1.2000
12.0000
4.0000

45,000.00
50,000.00
45,000.00
27,500.00

9,000.00
60,000.00
540,000.00
110,000.00
719,000.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

1,940,566.00
1,940,566.00

F.2 Pasang Gording / Nok / Tiang Kayu Balok Klas II / m3


A. Material
1. Kayu Balok Klas II
m3
2. Paku Campur
Kg

1.1000
0.5000

880,000.00
17,520.00

968,000.00
8,760.00
976,760.00

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0100
0.0300
0.3000
0.2000

45,000.00
50,000.00
45,000.00
27,500.00

450.00
1,500.00
13,500.00
5,500.00
20,950.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

997,710.00
997,710.00

F.3 Pasang Kaso 5/7 + Reng 2/3 Genteng Metal Kayu Klas II / m2
A. Material
1. Kayu Balok Kayu Klas II
m3
2. Paku Campur
Kg

0.0171
0.5000

880,000.00
17,520.00

15,048.00
8,760.00
23,808.00

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0050
0.0100
0.1000
0.1000

45,000.00
50,000.00
45,000.00
27,500.00

225.00
500.00
4,500.00
2,750.00
7,975.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

F.4 Pasang Lesplank 3/30 Kayu Klas I / m


A. Material
1. Papan Klas I
2. Paku Campur

31,783.00
31,783.00

Satuan

m3
Kg

Qt ' y

0.0110
0.0500

Harga Satuan
( Rp. )

2,200,000.00
17,520.00

Total Biaya
( Rp. )

24,200.00
876.00
25,076.00

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu

Hari
Hari
Hari

0.0050
0.0220
0.2200

45,000.00
50,000.00
45,000.00

225.00
1,100.00
9,900.00

4. Pekerja

Hari

0.1100

27,500.00

3,025.00
14,250.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
F.5 Pasang Atap Sakura Roof
A. Material
1. Atap Sakura Roof
2. Paku Seng

39,326.00
39,326.00

Kaki
Kg

5.4800
0.0200

31,890.00
21,310.00

174,757.20
426.20
175,183.40

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0030
0.0060
0.0600
0.1200

45,000.00
50,000.00
45,000.00
27,500.00

135.00
300.00
2,700.00
3,300.00
6,435.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
F.6 Pasang Nok Sakura Roof
A. Material
1. Nok Sakura Roof
2. Paku Seng
3. Karet Talang

181,618.40
181,618.40

M
Kg
M

1.0500
0.0100
1.0500

5,919.00
21,310.00
7,500.00

6,214.95
213.10
7,875.00
14,303.05

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0030
0.0030
0.0300
0.6000

45,000.00
50,000.00
45,000.00
27,500.00

135.00
150.00
1,350.00
16,500.00
18,135.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

F.7. Pasang Atap Genteng Beton / m2


A. Material
1. Genteng Beton
2. Paku Campur

32,438.05
32,438.05

Satuan

Bh
Kg

Qt ' y

11.0000
0.0300

Harga Satuan
( Rp. )

6,100.00
17,520.00

Total Biaya
( Rp. )

67,100.00
525.60
67,625.60

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0010
0.0100
0.1000
0.2000

45,000.00
50,000.00
45,000.00
27,500.00

45.00
500.00
4,500.00
5,500.00
10,545.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
F.8 Pasang Nok Atap genteng Beton / m
A. Bahan
1. Nok Genteng Beton
2. Paku Campur
3. Semen Portland

78,170.60
78,170.60

Buah
Kg
Kg

3.5000
0.0500
10.8000

7,098.00
17,520.00
943.24

24,843.00
876.00
10,186.99

4. Pasir Pasang
5. Semen Warna

M3
Kg

0.0320
1.0000

142,839.00
1,827.00

4,570.85
1,827.00
42,303.84

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0200
0.0200
0.2000
0.4000

45,000.00
50,000.00
45,000.00
27,500.00

900.00
1,000.00
9,000.00
11,000.00
21,900.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

G. PEKERJAAN LANGIT-LANGIT / PLAFOND


G.1 Rangka Plafond 5/7Kayu Klas II / m2
A. Material
1. Kaso kayu klas II
2. Paku Campur

64,203.84
64,203.84

Satuan

m3
Kg

Qt ' y

0.0073
0.0375

Harga Satuan
( Rp. )

880,000.00
17,520.00

Total Biaya
( Rp. )

6,424.00
657.00
7,081.00

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0750
0.0250
0.2500
0.1500

45,000.00
50,000.00
45,000.00
27,500.00

3,375.00
1,250.00
11,250.00
4,125.00
20,000.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

G.2 Pasang Plafond Tripleks 3 MM / m2


A. Material
1. Tripleks 3 MM
2. Paku Tripleks

27,081.00
27,081.00

Lembar
Kg

0.3750
0.0300

46,162.00
23,310.00

17,310.75
699.30
18,010.05

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0035
0.0100
0.1000
0.0700

45,000.00
50,000.00
45,000.00
27,500.00

157.50
500.00
4,500.00
1,925.00
7,082.50

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
G.3 Pasang Les Plafond Kayu Profil / m
A. Material
1. Les Kayu Profil
2. Paku Campur

25,092.55
25,092.55

M
Kg

1.0500
0.0100

1,487.00
17,520.00

1,561.35
175.20
1,736.55

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0010
0.0020
0.0210
0.0210

45,000.00
50,000.00
45,000.00
27,500.00

45.00
100.00
945.00
577.50
1,667.50

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :

3,404.05

F Total :
G.4 Pasang Papan Ampig Kayu Klas II / m2
A. Material
1. Papan kayu klas II
2. Paku Campur

3,404.05

M3
Kg

0.0070
0.1000

1,250,000.00
17,520.00

8,750.00
1,752.00
10,502.00

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0750
0.0450
0.4500
0.1500

45,000.00
50,000.00
45,000.00
27,500.00

3,375.00
2,250.00
20,250.00
4,125.00
30,000.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

H. PEKERJAAN BETON
H.1 Beton Tumbuk 1 Pc : 3 Psr : 5 Kr / m2 tebal 5 cm
A. Material
1. Pasir beton
2. Kerikil
3. Semen Portland (PC)
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

40,502.00
40,502.00

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

m3
m3
Zak

0.0260
0.0440
0.2180

172,947.00
212,319.00
47,162.00

4,496.62
9,342.04
10,281.32
24,119.97

Hari
Hari
Hari
Hari

0.0060
0.0020
0.0200
0.1500

45,000.00
50,000.00
45,000.00
27,500.00

270.00
100.00
900.00
4,125.00
5,395.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
H.2 Pembesian dengan Besi Polos atau Besi Ulir / Kg
A. Material
1. Besi beton
2. Kawat bendrat

29,514.97
29,514.97

Kg
Kg

1.0500
0.0150

12,599.00
14,625.00

13,228.95
219.38
13,448.33

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Besi
4. Pekerja

Hari
Hari
Hari
Hari

0.0003
0.0007
0.0070
0.0070

45,000.00
50,000.00
45,000.00
27,500.00

13.50
35.00
315.00
192.50
556.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
H.3 Beton tak Bertulang 1Pc : 2Psr : 3Kr / m3
A. Material
1. Pasir beton
2. Kerikil
3. Semn Portland (PC)
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja
C. Peralatan

14,004.33
14,004.33

m3
m3
Zak

0.5400
0.8100
6.7200

172,947.00
212,319.00
47,162.00

93,391.38
171,978.39
316,928.64
582,298.41

Hari
Hari
Hari
Hari

1.0000
0.0350
0.3500
2.0000

45,000.00
50,000.00
45,000.00
27,500.00

45,000.00
1,750.00
15,750.00
55,000.00
117,500.00

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

H.4 Bekisting / m2
A. Material
1. Papan Cor
2. Paku Campur

699,798.41
699,798.41

Satuan

m3
Kg

Qt ' y

0.0450
0.3000

Harga Satuan
( Rp. )

800,000.00
17,520.00

Total Biaya
( Rp. )

36,000.00
5,256.00
41,256.00

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0050
0.0260
0.2600
0.3000

45,000.00
50,000.00
45,000.00
27,500.00

225.00
1,300.00
11,700.00
8,250.00
21,475.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

62,731.00
62,731.00

H.5 Beton Slope 12/15 1Pc : 2Psr : 3 Kr / m3


A. Material
1. Besi beton
2. Kawat bendrat
3. Pasir beton
4. Kerikil
5. Semen Portlad (PC)
6. Papan Cor
7. Paku Campur

Kg
Kg
m3
m3
Zak
m3
Kg

175.6500
3.3750
0.5200
0.7800
6.4600
0.2700
2.0000

12,599.00
14,625.00
172,947.00
212,319.00
47,162.00
800,000.00
17,520.00

2,213,014.35
49,359.38
89,932.44
165,608.82
304,666.52
216,000.00
35,040.00
3,073,621.51

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Tukang Besi
5. Tukang Batu
6. Pekerja

Hari
Hari
Hari
Hari
Hari
Hari

0.1700
0.3310
1.5600
1.5750
0.3500
4.8500

45,000.00
50,000.00
45,000.00
45,000.00
45,000.00
27,500.00

7,650.00
16,550.00
70,200.00
70,875.00
15,750.00
133,375.00
314,400.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

3,388,021.51
3,388,021.51

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

H.6 Beton Kolom Praktis 11/11 1Pc : 2Psr : 3 Kr / m3


A. Material
1. Besi beton
2. Kawat bendrat
3. Pasir beton
4. Kerikil
5. Semen Portlad (PC)
6. Papan Cor
7. Paku Campur

Kg
Kg
m3
m3
Zak
m3
Kg

180.0000
3.3750
0.5200
0.7800
6.4600
0.2700
2.0000

12,599.00
14,625.00
172,947.00
212,319.00
47,162.00
800,000.00
17,520.00

2,267,820.00
49,359.38
89,932.44
165,608.82
304,666.52
216,000.00
35,040.00
3,128,427.16

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Tukang Besi
5. Tukang Batu
6. Pekerja

Hari
Hari
Hari
Hari
Hari
Hari

0.1700
0.3310
1.5600
1.5750
0.3500
4.8500

45,000.00
50,000.00
45,000.00
45,000.00
45,000.00
27,500.00

7,650.00
16,550.00
70,200.00
70,875.00
15,750.00
133,375.00
314,400.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

3,442,827.16
3,442,827.16

H.7 Beton Ring Balok 10/12 1Pc : 2Psr : 3 Kr / m3


A. Material
1. Besi beton
2. Kawat bendrat
3. Pasir beton
4. Kerikil
5. Semen Portlad (PC)
6. Papan Cor
7. Paku Campur

Kg
Kg
m3
m3
Zak
m3
Kg

170.0000
3.3750
0.5200
0.7800
6.4600
0.2700
2.0000

12,599.00
14,625.00
172,947.00
212,319.00
47,162.00
800,000.00
17,520.00

2,141,830.00
49,359.38
89,932.44
165,608.82
304,666.52
216,000.00
35,040.00
3,002,437.16

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Tukang Besi
5. Tukang Batu
6. Pekerja

Hari
Hari
Hari
Hari
Hari
Hari

0.1700
0.3310
1.5600
1.5750
0.3500
4.8500

45,000.00
50,000.00
45,000.00
45,000.00
45,000.00
27,500.00

7,650.00
16,550.00
70,200.00
70,875.00
15,750.00
133,375.00
314,400.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

I. PEKERJAAN PENUTUP LANTAI DAN DINDING


I.1 Floor Lantai Tebal 5 cm / m2
A. Material
1. Pasir pasang
2. Semen Portland (PC)

3,316,837.16
3,316,837.16

Satuan

m3
Zak

Qt ' y

0.0440
0.3640

Harga Satuan
( Rp. )

142,839.00
47,162.00

Total Biaya
( Rp. )

6,284.92
17,166.97
23,451.88

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0250
0.0250
0.2500
0.5000

45,000.00
50,000.00
45,000.00
27,500.00

1,125.00
1,250.00
11,250.00
13,750.00
27,375.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
I.2

Lantai Screed t 20 mm / m2
A. Material
1. Pasir pasang
2. Semen Portland (PC)

50,826.88
50,826.88

m3
Zak

0.0400
0.3000

142,839.00
47,162.00

5,713.56
14,148.60

19,862.16
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0250
0.0250
0.2500
0.5000

45,000.00
50,000.00
45,000.00
27,500.00

1,125.00
1,250.00
11,250.00
13,750.00
27,375.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
I.3. Lantai Keramik Uk. 20 x 20 cm / m2
A. Material
1. Keramik Ikad 20x20 cm
2. Pasir Pasang
3. Semen Portland (PC)
4. Semen Nad
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

47,237.16
47,237.16

Buah
m3
Kg
Kg

25.0000
0.0420
11.3800
1.5000

4,757.78
142,839.00
943.24
1,827.00

118,944.44
5,999.24
10,734.07
2,740.50
138,418.25

Hari
Hari
Hari
Hari

0.0300
0.0350
0.3500
0.6200

45,000.00
50,000.00
45,000.00
27,500.00

1,350.00
1,750.00
15,750.00
17,050.00
35,900.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No
I.4

Uraian
Lantai Keramik Uk. 30 x 30 cm / m2
A. Material
1. Keramik Ikad 30x30 cm
2. Pasir Pasang
3. Semen Portland (PC)
4. Semen Nad
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

174,318.25
174,318.25

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

Buah
m3
Kg
Kg

11.1111
0.0420
11.3800
1.5000

6,944.29
142,839.00
943.24
1,827.00

77,158.73
5,999.24
10,734.07
2,740.50
96,632.54

Hari
Hari
Hari
Hari

0.0300
0.0350
0.3500
0.6200

45,000.00
50,000.00
45,000.00
27,500.00

1,350.00
1,750.00
15,750.00
17,050.00
35,900.00

C. Peralatan

I.5

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
Dinding Keramik Uk. 20x25 cm / m2
A. Material
1. Keramik Ikad 20x25 cm
2. Pasir Pasang
3. Semen Portland (PC)
4. Semen Nad
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

132,532.54
132,532.54

Buah
m3
Zak
Kg

20.0000
0.0150
0.1860
1.5000

1,866.00
142,839.00
47,162.00
1,827.00

37,320.00
2,142.59
8,772.13
2,740.50
50,975.22

Hari
Hari
Hari
Hari

0.0300
0.0450
0.4500
0.6000

45,000.00
50,000.00
45,000.00
27,500.00

1,350.00
2,250.00
20,250.00
16,500.00
40,350.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

91,325.22
91,325.22

I.6

Tegel Plint Uk. 10x30 cm / m


A. Material
1. Tegel Plint Uk. 10x30 cm
2. Pasir Pasang
3. Semen Portland (PC)
4. Semen Nad
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Buah
m3
Zak
Kg

3.3333
0.0030
0.0190
0.1900

905.00
142,839.00
47,162.00
1,827.00

3,016.67
428.52
896.08
347.13
4,688.39

Hari
Hari
Hari
Hari

0.0030
0.0030
0.0300
0.0600

45,000.00
50,000.00
45,000.00
27,500.00

135.00
150.00
1,350.00
1,650.00
3,285.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

J PEKERJAAN KUNCI DAN KACA


J.1 Pasang Kunci Tanam 2x slaag / Set
A. Material
1. Kunci tanam 2x slaag

7,973.39
7,973.39

Satuan

Set

Qt ' y

1.0000

Harga Satuan
( Rp. )

84,690.00

Total Biaya
( Rp. )

84,690.00

84,690.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0050
0.0100
0.5000
0.0100

45,000.00
50,000.00
45,000.00
27,500.00

225.00
500.00
22,500.00
275.00
23,500.00

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
J.2 Pasang Engsel Pintu Kuningan / Buah
A. Material
1. Engsel kuningan

108,190.00
108,190.00

Buah

1.0000

21,210.00

21,210.00

21,210.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.00075
0.0150
0.1500
0.0150

45,000.00
50,000.00
45,000.00
27,500.00

33.75
750.00
6,750.00
412.50
7,946.25

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
J.3 Pasang Engsel jendela / buah
A. Material
1. Engsel Jendela type T Kupu-Kupu

29,156.25
29,156.25

Buah

1.0000

13,804.00

13,804.00

13,804.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0005
0.0100
0.1000
0.0100

45,000.00
50,000.00
45,000.00
27,500.00

22.50
500.00
4,500.00
275.00

5,297.50
C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

J.4 Pasang Kait Angin Jendela / Buah


A. Material
1. Kait angin

19,101.50
19,101.50

Satuan

Buah

Qt ' y

1.0000

Harga Satuan
( Rp. )

2,695.00

Total Biaya
( Rp. )

2,695.00

2,695.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0005
0.0100
0.1000
0.0100

45,000.00
50,000.00
45,000.00
27,500.00

22.50
500.00
4,500.00
275.00
5,297.50

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
J.5 Pasang Grendel/Selot Jendela
A. Material
1. Grendel / Slot

7,992.50
7,992.50

Buah

1.0000

2,166.00

2,166.00

2,166.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja

Hari
Hari
Hari
Hari

0.0005
0.0100
0.1000
0.0100

45,000.00
50,000.00
45,000.00
27,500.00

22.50
500.00
4,500.00
275.00
5,297.50

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :
J.6 Pasang Kaca 3 mm/ m2
A. Material
1. Kaca Polos tebal 3 mm

7,463.50
7,463.50

m2

1.1000

79,850.00

87,835.00

87,835.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja
C. Peralatan
1. Alat bantu

Hari
Hari
Hari
Hari

0.00075
0.0150
0.1500
0.0150

Ls

1.0000

45,000.00
50,000.00
45,000.00
27,500.00

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

33.75
750.00
6,750.00
412.50
7,946.25

95,781.25
95,781.25

Satuan

Qt ' y

Harga Satuan

Total Biaya

No

Uraian

J.7 Pasang Kaca 5 mm/ m2


A. Material
1. Kaca Polos tebal 5 mm

Satuan

m2

Qt ' y

1.1000

( Rp. )

90,430.00

( Rp. )

99,473.00

99,473.00
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Kayu
4. Pekerja
C. Peralatan
1. Alat bantu

Hari
Hari
Hari
Hari

0.00075
0.0150
0.1500
0.0150

Ls

1.0000

45,000.00
50,000.00
45,000.00
27,500.00

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

K PEKERJAAN PENGECATAN
K.1 Mendempul dan Menggosok Kayu / m2
A. Material
1. Dempul Kayu
2. Minyak Cat
3. Amplas
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Cat
4. Pekerja

33.75
750.00
6,750.00
412.50
7,946.25

107,419.25
107,419.25

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

Kg
Ltr
Lembar

0.0800
0.0200
2.0000

6,400.00
11,109.00
2,645.00

512.00
222.18
5,290.00
6,024.18

Hari
Hari
Hari
Hari

0.0025
0.0040
0.0400
0.0400

45,000.00
50,000.00
45,000.00
27,500.00

112.50
200.00
1,800.00
1,100.00
3,212.50

C. Peralatan
1. Alat bantu
D. Sub Total (A+B+C) :
E. Overhead & Profit (10% x D) :
F Total :

9,236.68
9,236.68

K.2 Pengecatan Bidang Kayu / m2


A. Material
1. Meny Kayu
2. Minyak Cat
3. Cat Dasar
4. Cat Penutup

Kg
Kg
Kg
Kg

0.2000
0.0600
0.1700
0.3500

15,920.00
11,109.00
15,920.00
29,145.00

3,184.00
666.54
2,706.40
10,200.75
16,757.69

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Cat
4. Pekerja

Hari
Hari
Hari
Hari

0.00250
0.0075
0.0750
0.0070

45,000.00
50,000.00
45,000.00
27,500.00

112.50
375.00
3,375.00
192.50
4,055.00

C. Peralatan
1. Alat bantu
D. Sub Total (A+B+C) :
E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

K.3 Pelaburan Kayu dengan Vernis / m2


A. Material
1. Vernis
2. Minyak Cat
3. Dempul
4. Amplas
B. Pekerja
1. Mandor
2. Kepala Tukang

20,812.69
20,812.69

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

Ltr
Ltr
Kg
Lembar

0.1500
0.0400
0.0500
0.1000

26,500.00
11,109.00
6,400.00
2,645.00

3,975.00
444.36
320.00
264.50
5,003.86

Hari
Hari

0.0025
0.1600

45,000.00
50,000.00

112.50
8,000.00

3. Tukang Cat
4. Pekerja

Hari
Hari

0.1600
0.1600

45,000.00
27,500.00

7,200.00
4,400.00
19,712.50

C. Peralatan

D. Sub Total (A+B+C) :


E. Overhead & Profit (10% x D) :
F Total :

24,716.36
24,716.36

K.4 Pengecatan Tembok / m2


A. Material
1. Plamir
2. Cat Dasar Tembok
3. Cat Penutup Tembok

Kg
Kg
Kg

0.1000
0.1000
0.2600

18,134.00
10,680.00
15,970.00

1,813.40
1,068.00
4,152.20
7,033.60

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Cat
4. Pekerja

Hari
Hari
Hari
Hari

0.0025
0.0063
0.0630
0.0200

45,000.00
50,000.00
45,000.00
27,500.00

112.50
315.00
2,835.00
550.00
3,812.50

C. Peralatan
1. Alat bantu
D. Sub Total (A+B+C) :
E. Overhead & Profit (10% x D) :
F Total :
K.5 Pengecatan Genteng
A. Material
1. Meny
2. Minyak Cat
3. Cat Atap
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Cat
4. Pekerja

10,846.10
10,846.10

Kg
Ltr
Kg

0.1000
0.0100
0.3000

15,920.00
11,109.00
31,840.00

1,592.00
111.09
9,552.00
11,255.09

Hari
Hari
Hari
Hari

0.0060
0.0120
0.0600
0.0060

45,000.00
50,000.00
45,000.00
27,500.00

270.00
600.00
2,700.00
165.00
3,735.00

C. Peralatan
1. Alat bantu
D. Sub Total (A+B+C) :
E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

K.6 Pengecatan Seng dengan Meny Besi


A. Material
1. Meny
2. Minyak Cat

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Cat
4. Pekerja

14,990.09
14,990.09

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

Kg
Ltr

0.1000
0.0100

15,920.00
11,109.00

1,592.00
111.09
1,703.09

Hari
Hari
Hari
Hari

0.0060
0.0120
0.0600
0.0060

45,000.00
50,000.00
45,000.00
27,500.00

270.00
600.00
2,700.00
165.00
3,735.00

C. Peralatan
1. Alat bantu
D. Sub Total (A+B+C) :
E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

L. PEKERJAAN SANITARY
L.1 Pasang Klosed Jongkok / Buah
A. Material

5,438.09
5,438.09

Satuan

Qt ' y

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

1. Klosed Jongkok Standart


2. Pasir Pasang
3. Semen portland (PC)
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Bh
m3
m3

1.0000
0.0100
0.1200

90,930.00
142,839.00
47,162.00

90,930.00
1,428.39
5,659.44
98,017.83

Hari
Hari
Hari
Hari

0.1100
0.3000
1.5000
1.0000

45,000.00
50,000.00
45,000.00
27,500.00

4,950.00
15,000.00
67,500.00
27,500.00
114,950.00

C. Peralatan
D. Sub Total (A+B+C) :
E. Overhead & Profit (10% x D) :
F Total :
L.2 Pasang Bak Air Batu Bata Volume 0,3 M3 / Buah
A. Material
1. Batu Bata
2. Pasir Pasang
3. Semen Portland (PC)
4. Semen Nad
5. Keramik 20/20
B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

212,967.83
212,967.83

Buah
m3
Zak
Kg
Buah

300.0000
0.3600
2.8800
7.2000
104.5440

456.00
142,839.00
47,162.00
1,827.00
4,757.78

136,800.00
51,422.04
135,826.56
13,154.40
497,397.12
834,600.12

Hari
Hari
Hari
Hari

0.30000
0.3000
3.0000
6.0000

45,000.00
50,000.00
45,000.00
27,500.00

13,500.00
15,000.00
135,000.00
165,000.00
328,500.00

C. Peralatan
D. Sub Total (A+B+C) :
E. Overhead & Profit (10% x D) :
F Total :

No

Uraian

L.3 Pasang Stop Kran 1/2 " / Buah


A. Material
1. Stop kran 1/2 "
2. Seal Tape

1,163,100.12
1,163,100.12

Satuan

Qt ' y

Buah
Buah

1.0000
0.0250

Harga Satuan
( Rp. )

Total Biaya
( Rp. )

16,020.00
1,406.00

16,020.00
35.15
16,055.15

B. Pekerja
1. Mandor
2. Kepala Tukang
3. Tukang Batu
4. Pekerja

Hari
Hari
Hari
Hari

0.0050
0.0100
0.1000
0.0100

45,000.00
50,000.00
45,000.00
27,500.00

225.00
500.00
4,500.00
275.00
5,500.00

C. Peralatan
1. Alat bantu
D. Sub Total (A+B+C) :
E. Overhead & Profit (10% x D) :
F Total :

21,555.15
21,555.15

Raha, 24 Februari 2006

Disetujui;
PEMIMPIN KEGIATAN

Dihitung Oleh:
Dinas Kimpraswil Kab. Muna

Drs. LA MPALI

Ir. MUH. RUSDIANTO


Perencana Teknis
Mengetahui :

KEPALA DINAS KIMPRASWIL


KAB. MUNA

SEKRETARIS DAERAH
KAB. MUNA

LA ODE MUURI

Drs. H. LA ODE KILO

Nip. 590 003 593

Pembina Utama Muda Gol. IV C


Nip. 590 002 689

Referensi :
- Analisa Biaya Konstruksi (ABK) Standar Nasional Indonesia oleh Badan Standarisasi Nasional Edisi Revisi Tahun 2002
- Anaslisa BOW Edisi Kelima Institut Teknologi Bandung 1987
- Referensi Kontraktor Bangunan Gedung dan Sipil PT. PP (Persero) Edisi I Gramedia Tahun 2003

DAFTAR HARGA
SATUAN UPAH DAN BAHAN ( MATERIAL )
TAHUN ANGGARAN 2006
LOKASI : KABUPATEN MUNA

N0
1
I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

N0
1
II
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38

URAIAN

SATUAN

UPAH KERJA
Pekerja Tak Terlatih
Pekerja Agak Terlatih
Pekerja Terlatih
Tukang
Kepala Tukang
Mandor
Operator Terampil
Operator Semi Terampil
Pembantu Operator
Sopir
Pembantu Sopir
Penjaga
Mekanik
Pembantu Mekanik
Pekerja Bongkaran

LOKASI
ASAL
4

UPAH

PERUNTUKAN

HARI
HARI
HARI
HARI
HARI
HARI
HARI
HARI
HARI
HARI
HARI
HARI
HARI
HARI
HARI

URAIAN
2
BAHAN
Semen/Pc 50 Kg
Besi Beton
Paku Campur
Paku Seng
Paku Tripleks
Paku Asbes
Tegel Porselin 11 x 11 cm
Tegel Keramik 30 x 30 cm
Tegel Wafel 20 x 20 cm
Kaca Bening 3 mm
Kaca Bening 5 mm
Kaca Riben 3 mm
Kaca Riben 5 mm
Tripleks 3 mm
Eternit
Teak Wood
Kapur
Minyak Cat
Cat Tembok (AVITEX)
Cat Tembok (TIGER)
Cat Tembok (AQUALISTIK)
Cat Meny Kayu
Cat Kilap (GLOTEX)
Politur / Vernis
Grendel Pintu (Kuningan)
Grendel Jendela (biasa)
Hak Angin (biasa)
Engsel Pintu Kupu-Kupu (Kuningan)
Engsel Pintu H (Kuningan)
Engsel Jendela Kupu-kupu
Engsel Jendla H
Kunci Tanam 2 x Putar
Seng Bjls 0,20
Seng Bjls 0,28
Asbes Gelombang Kecil
Seng Plat Bjls 0,20
Seng Plat Bjls 0,28
Asbes Bumbungan

SATUAN

27,500.00
30,000.00
40,000.00
45,000.00
50,000.00
45,000.00
80,000.00
50,000.00
45,000.00
70,000.00
45,000.00
27,500.00
80,000.00
50,000.00
18,000.00

LOKASI
ASAL

3
Zak
Kg
Kg
Kg
Kg
Bj
M2
M2
M2
M2
M2
M2
M2
Lbr
Lbr
Lbr
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Bh
Bh
Bh
Psg
Psg
Psg
Psg
Bh
KK
KK
Lbr
Lbr
Lbr
Lbr

Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko

LUAR KOTA
DARATAN

UPAH

PERUNTUKAN

47,162.00
12,599.00
17,520.00
21,310.00
23,310.00
391.00
43,320.00
48,610.00
42,820.00
79,850.00
90,430.00
101,010.00
116,880.00
46,162.00
16,120.00
90,180.00
2,166.00
11,109.00
10,680.00
15,970.00
31,840.00
15,920.00
29,145.00
26,500.00
10,630.00
2,166.00
2,695.00
26,500.00
21,210.00
13,804.00
10,630.00
84,690.00
6,007.00
7,556.00
3,959.00
7,027.00
53,050.00
22,368.00

LUAR KOTA
DARATAN

39 Kloset Jongkok

Bh

1
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84

3
Btg
Btg
Btg
Bh
Psg
Lbr
Bh
Btg
Bh
Bh
Bh
M3
M3
M3
M3
M3
Bj
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
Ltr
Ltr
Ltr
Ltr
M3
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2

85
86
87
88
89
90
91

2
Pipa Gips 1/2 Inci
Pipa PVC 4 Inci
Pipa Penguap 2 Inci
Klosaet Duduk KIA
Beugel/Baut/Moor
Kertas Gosok
Stop Kran Air GIPS 1/2
Baja Siku 5"
Sambungan Pipa
Nok Genteng Multi Roof/Sakura Roof
Genteng Multi Roof/Sakura Roof
Material Timbunan Pilihan ( B.Kapur )
Tanah Timbunan Biasa
Pasir Urug
Pasir Pasangan
Pasir Beton (Maligano)
Batu Merah
Kerikil Kali (Maligano)
Kerikil Pecah (Maligano)
Batu Gunung
Batu Gunung 0,5 - 1 cm (Alam)
Batu Gunung 0,5 - 1 cm (Pecah)
Batu Gunung 1 - 2 cm (Alam)
Batu Gunung 1 - 2 cm (Pecah)
Batu Gunung 2 - 3 cm (Alam)
Batu Gunung 2 - 3 cm (Pecah)
Batu Gunung 3 - 5 cm (Alam)
Batu Gunung 3 - 5 cm (Pecah)
Batu Gunung 5 - 7 cm (Alam)
Batu Gunung 5 - 7 cm (Pecah)
Solar
Minyak Tanah
Bensin
Olie
Kayu Perancah
Kayu Balok Jati
Kayu Awet Balok Kls I
Kayu Awet Balok Kls II
Kayu Papan Jati
Kayu Awet Papan Kls I
Kayu Awet Papan Kls II
Kasau Awet 5/7 cm Kls I
Kasau Awet 5/7 cm Kls II
Papan Awet Reng Kls I
Paving Blok Pres Mesin Tekanan 150/Kg/CM
untuk dilalui kendaraan roda -4
Paving Blok Cetak Manual untuk Pejalan Kaki
Tegel Abu-Abu 20 x 20
Kawat Beton
Batu Batako Pres
Alat Bantu
Batang Kelapa
Cat Meny Atap

M2
M2
Kg
M2
set
Bt
Kg

Toko

90,930.00

4
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Toko
Setempat
Setempat
Setempat
Setempat
Maligano
Setempat

Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Setempat
Toko

47,710.00
90.93
47,710.00
1,006,100.00
15,970.00
2,645.00
16,020.00
69,770.00
5,869.00
5,919.00
31,890.00
56,293.00
55,135.00
137,628.00
142,839.00
172,947.00
456.00
212,319.00
276,009.00
142,839.00
148,629.00
228.53
148,629.00
228,531.00
148,629.00
228,531.00
148,629.00
228,531.00
148,629.00
228,531.00
6,840.00
2,971.00
5,561.00
19,836.00
800,000.00
2,200,000.00
1,925,000.00
1,250,000.00
2,475,000.00
2,200,000.00
1,250,000.00
1,925,000.00
1,250,000.00
1,925,000.00
90,080.00

Toko
Toko
Toko
Toko
Setempat
Toko

74,210.00
37,180.00
14,625.00
25,492.00
60,000.00
15,000.00
9,314.00