Anda di halaman 1dari 77

DAFTAR HARGA SATUAN UPAH / TENAGA

TAHUN 2016

No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

URAIAN
Mandor Lapangan
Kepala Tukang
Operator Terampil
Pembantu Operator
Tukang
Buruh Lapangan Terampil
Buruh Lapangan Tak Terampil
Tukang Batu Setengah Terampil
Tukang Batu Terampil
Kepala Tukang Batu
Tukang Kayu Setengah Terampil
Tukang Kayu Terampil
Kepala Tukang Kayu
Tukang Besi Beton Setengah Terampil
Tukang Besi Beton Terampil
Kepala Tukang Besi Beton
Tukang Cat

Analisa Hrg Sat/332098034.xls

HARGA SATUAN
Rp.
157,901.00
139,574.00
157,901.00
121,230.00
121,230.00
102,920.00
90,000.00
121,230.00
125,000.00
139,574.00
121,230.00
135,000.00
139,574.00
121,213.00
135,000.00
139,574.00
121,230.00

/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari
/hari

KODE
L01
L02
L03
L04
L05
L06
L09
L10
L11
L12
L13
L14
L15
L16
L17
L18
L19

KET.

DAFTAR HARGA SATUAN BAHAN


TAHUN 2016
No.
1
2
3
4
5
6

7
8
9
10
11
12
13
14

15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

URAIAN
Tanah Urug/ Timbunan Pilihan
Pasir Urug
Pasir Pasang
Pasir Beton
Batu Pecah Mesin 0.5-1 cm (abu batu)
Sirtu
Sirdam
Base Course
Batu Belah Pondasi
Makadam
Batu Pecah Mesin 5-7 cm
Batu Pecah Mesin 3-5 cm
Batu Pecah Mesin 2-3 cm
Batu Pecah Mesin 1-2 cm
Kayu Bakar dari Kayu Karet
Kayu / Papan Untuk Bekisting
Kayu Borneo Super
Kayu Meranti
Kayu Kamper
Semen PC ( 50 kg )
Besi Tulangan Beton Ulir (U-39)
Besi Tulangan Beton Polos (U24)
Kawat Beton
Kawat Bronjong 4mm
Cat kayu / besi
Cat Primer Marka Thermoplastic Putih AASHTO M249-98 (Full Spec)
Glass Bead Potters DO 03
Thinner
Paku 4 s/d 7 cm
Aspal Bitumen
Aspal RC 70 (Cilacap)
Minyak Tanah
Alat-alat Bantu
Hot Roller Sheet (Lataston) / HRS
Asphalt Concrete Wearing Course
(Laston) / AC-WC
Asphalt Concrete Base Course
(ATB) / AC-BC
Paving Block teb 6cm Natural
Asphalt Concrete Base
(ATB) / AC-BASE
Batu pecah tersaring bergradasi
Material Agregat Klas A
Batu pecah tersaring bergradasi
Material Agregat Klas B
Readymix Beton K350, (tanpa pompa)
Readymix Beton K300, (tanpa pompa)
Readymix Beton K250, (tanpa pompa)
Readymix Beton K225, (tanpa pompa)
Readymix Beton K175, (tanpa pompa)
Readymix Beton K125, (tanpa pompa)
Readymix Beton K B0, (tanpa pompa)

Analisa Hrg Sat/332098034.xls

HARGA SATUAN
Rp.
85,000.00
190,000.00
311,004.78
314,285.71
215,311.00
190,000.00
195,000.00
200,000.00
250,000.00
212,000.00
130,000.00
135,000.00
275,000.00
275,000.00

KODE

/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/m3
/zak
/kg
/kg
/kg
/kg
/kg
/kg
/kg
/lt
/kg
/kg
/kg
/lt
/set
/Ton
/Ton

M25
M26
M27
M28
M30
M31
M32
M41
M44
M44
M47
M49
M51
M52

1,280,000.00 /Ton

M53

/m2
1,256,000.00 /Ton

M54
M57

120,000.00 /m3

M55

95,000.00 /m3

M56

3,750,000.00
3,125,000.00
3,776,041.67
8,203,125.00
68,300.00
7,213.54
7,289.72
17,500.00
24,840.00
36,800.00
22,000.00
18,000.00
28,700.00
18,000.00
14,175.00
8,064.52
7,700.00
4,000.00
1,388,000.00
1,352,000.00

947,600.00
906,400.00
865,200.00
844,600.00
803,400.00
762,200.00
721,000.00

/m3
/m3
/m3
/m3
/m3
/m3
/m3

M01
M03
M04
M05
M06
M07

M10
M11
M12
M13
M14
M21
M22
M22

M24

M57
M58
M59
M60
M61

KET.

No.
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66

URAIAN
Besi Galvanisir
Baja Konstruksi U-39 / U-32
Besi Profil ex DN SII
Baja IWF ex DN SII
Grafel Beton dia. U 20cm
Grafel Beton dia. U 30cm
Buis beton Bulat dia. 20 cm
Buis beton Bulat dia. 30 cm
Buis beton Bulat dia. 60 cm
Buis beton Bulat dia. 80 cm (0,5 M)
Kerb / Kanstin Beton Pracetak P= 60cm (60x25x22x18)
Thermo Plastic Putih AASHTO M249-79(standar)
Bambu diameter 7 - 10
Seng gelombang BJLS 28 (80x180cm)
Triplex 3mm
Bata Merah Bakar
Ampelas
Cat Meni
Kwas 1 1/2"
Karung Plastik (Puing, Lumpur) 25 kg
Injuk
Tegel Badak / Ubin Badak PC 30x30cm
Keramik Warna Anti Slip 30x30 KW I
Batu Sikat Koral
Semen Warna
Minyak Diesel/Solar
Bensin/Premium

Analisa Hrg Sat/332098034.xls

HARGA SATUAN
Rp.
13,259.77
8,173.88
9,259.77
9,259.77

70,000.00
95,000.00
200,000.00
250,000.00
60,000.00
16,500.00
35,000.00
65,625.00
48,000.00
750.00
3,500.00
42,000.00
4,500.00
1,300.00
35,000.00
46,000.00
45,000.00
1,800.00
7,150.00
7,050.00

/kg
/kg
/kg
/kg
/m1
/m1
/m1
/m1
/m1
/bh
/bh
/kg
/bt
/lbr
/lbr
/bh
lbr
/kg
/bh
/bh
/kg
/bh
/m2
/krg
/kg
/lt
/lt

KODE
M62
M63
M64
M65
M66
M67
M68
M69
M70
M71
M72
M73
M74
M75
M76
M77
M78
M79
M80
M81
M82
M83
M84
M85
M86
M87
M88

KET.

DAFTAR HARGA SATUAN ALAT


TAHUN 2016

No.

NAMA ALAT

BIAYA SEWA

KODE

Rp.

1 Dump Truck 5ton/145 HP

175,000.00 /jam

E01

2 Truk Bak Terbuka 3.5 ton/115 HP

125,000.00 /jam

E02

3 Mesin Gilas Roda karet 8-15 ton

/jam

E03

81,250.00 /jam

E04

100,000.00 /jam

E05

6 Pompa air (50mm) 30m3/jam

/jam

E06

7 Mesin Penghampar / Asphalt Finisher

/jam

E08

150,000.00 /jam

E09

/jam

E10

10 Pengaduk Beton 500ltr/20HP

/jam

E11

11 Mesin Gilas Bergetar 6-7 ton

218,750.00 /jam

E12

12 Mesin Gilas Bergetar 1 ton

120,000.00 /jam

E13

13 Motor Grader 100 HP

/jam

E14

14 Plat Bed Truck

/jam

E15

15 Truk Tangki Air 115 HP

/jam

E17

16 Pengaduk Beton 125 Ltr/6 HP

/jam

E18

17 Alat Penggetar Beton 4 HP

/jam

E19

18 Bulldozer 110 HP

/jam

E20

19 Wheel Loader 115 HP

/jam

E21

212,500.00 /jam

E22

4 Mesin Gilas Tandem 10-18 ton


5 Mesin Gilas 3 roda 8-12 ton

8 Compressor 210m3/jam
9 Pengaduk Beton 250 Ltr/10 HP

20 Hidraulick Excavator Backhoe


Hidraulick Excavator Backhoe Long Arm
21 Mesin Penyemprot Aspal 200 ltr

293,750.00 /jam
200,000.00 /jam

E23

22 Stamper 4 HP

/jam

E24

23 Grass Cutter

/jam

E25

24 Mesin Pemecah Batu 185 HP

/jam

E26

25 Mesin Penyaring 80HP

/jam

E27

26 Mesin Pencampur Aspal

/jam

E28

27 Mobilisasi dan Demobilisasi

4,000,000.00 /Pkt

/Pkt

/Pkt

/Pkt

Mesin Gilas 3 Roda di Wilayah Kota Bogor


28 Mobilisasi dan Demobilisasi
Back Hoe Roda Karet di Wilayah Kota Bogor
29 Mobilisasi dan Demobilisasi
Excavator di Wilayah Kota Bogor
30 Mobilisasi dan Demobilisasi
Dozer di Wilayah Kota Bogor

Analisa Hrg Sat/332098034.xls

KET.

No.

NAMA ALAT

31 Mobilisasi dan Demobilisasi Alat Berat


Hotmix di wilayah Kota Bogor terdiri atas :
- Penyediaan Acces Road Alat - alat Berat dari AMP ke Lokasi Proyek
yang berada di wilayah Kota Bogor

- Penyediaan Acces Road Dump Truck Hotmix dari AMP ke Lokasi Proyek
- Pengiriman Alat Asphalt Finisher / Mesin Penghampar Hotmix
- Pengiriman Alat Mesin Gilas Roda Karet / Tire Roller
- Pengiriman Alat Mesin Gilas Tandem / Tandem Roller
- Pengiriman Alat Mesin Penyemprot Aspal
- Pengiriman Alat Mesin Compressor
- Demobilisasi Alat Berat setelah pekerjaan Overlay
- Pemberesan kembali Areal lapangan setelah pekerjaan Overlay
- Pengambilan Contoh Uji Ketebalan Hotmix (Core Drill)
- Test Laboratorium Ekstraksi Kadar Mutu Aspal Hotmix

Analisa Hrg Sat/332098034.xls

BIAYA PEMILIKAN

Rp.
/Pkt

KODE

KET.

RENCANA ANGGARAN BIAYA


JALAN DAN SALURAN

PEKERJAAN REHABILITASI JEMBATAN KOMPLEK SAW


KEMENTERIAN PPN / BAPPENAS

No.

URAIAN PEKERJAAN

VOLUME

SAT

PEKERJAAN PENDAHULUAN
1 Dokumetasi foto dari 0%, 50%, 100% dicetak.4.R
2 Angkutan Material eks. Bongkaran 30 km

3.00
1.00

Set
ls

100.00

m'

A
1
2
3
4

PEKERJAAN JALAN.
JALAN UTAMA , Lebar 8 meter.
Galian Aspal.
Lapis Penetrasi Aspal
Prime Coat
AC-WC ( Over Lay ) Tebal = 3 cm

B
1
2
4
5

JALAN LINGKUNGAN, Lebar 5 meter.


Galian Aspal.
Lapis Penetrasi Aspal
Prime Coat
AC-WC ( Over Lay ) Tebal = 3 cm

100.00
-

II

m3
m2
liter
m2
m'
m2
m2
liter
m2

GARAN BIAYA
SALURAN

ATAN KOMPLEK SAWANGAN.


PN / BAPPENAS
HARGA
SATUAN
(Rp)
5

JUMLAH
HARGA
(Rp)
6

TOTAL
HARGA
(Rp)
7

Total I

Total III

Jumlah Total

Jakarta,
April 2016.
Kepala Biro Umum

Emmy Suparmiatun, SH, MPM


NIP. 19610606 198611 2 001

DAFTAR HARGA SATUAN PEKERJAAN


BIDANG KEBINAMARGAAN T.A. 2006
(EDISI APRIL 2006)

JENIS PEKERJAAN

No.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Pembersihan Damija
Perawatan / Pembersihan Saluran
Pembuatan Selokan Tanpa Pasangan
Pembuatan Selokan Dengan Pasangan
Galian Tanah Biasa
Galian Tanah Berbatu
Timbunan Tanah Biasa ( Dipadatkan )
Timbunan Sirtu
Tambal Sulam Dengan Hotmix
Tambal Sulam Dengan Hotmix (Alternatif)
Lapis Pondasi Agregat Klas A
Lapis Pondasi Agregat Klas B
Perbaikan Lapis Pondasi
Tambal Sulam Dengan Lapen
Sub Base Belah ( Terford )
Lapis Penetrasi Macadam (Lapen)
Lapis Resap Pengikat (Prime Coat)
Lapis Perekat (Tack Coat)
Hotmix Lataston (HRS) teb 3cm
Hotmix Laston (AC) teb 5cm
Hotmix Laston (AC) teb 4cm
Hotmix Asphalt Threated Based (ATB)
Pasangan Batu Kali Ad 1:4
Bronjong / Gabion
Beton Non Struktur
Beton Struktur K-225
Penulangan Beton
Bekisting Untuk Beton
Pengecatan Marka Jalan
Pengecatan Kerb
Perkerasan Block / Pemasangan Paving Block
Pemasangan Patok
Pek. Bouwplank
Pek. Los Kerja / Gudang
Pek. Kantor Direksi
Pek. Papan Nama Kegiatan
Pek. Pagar Pengaman
Pek. Galian Tanah Cadas Max Kedalaman 1M
Pek. Urugan Tanah Kembali Dipadatkan
Pek. Pemadatan Tanah Setiap 20cm

AnalisaHrgSat/Analisa/332098034.xls

KODE
ANALIS

HARGA
(Rp.)

SAT.

AN01
AN02
AN03
AN04
AN06
AN06B
AN07
AN09
AN10

2,331.00
8,615.00
25,965.00
1,201,186.00
68,275.00
102,413.00
179,823.00
365,163.00
182,857.00

M2
M1
M1
M1
M3
M3
M3
M3
M2

AN10(Alt)
AN11
AN12
AN13
AN14
AN15
AN16
AN17
AN18
AN19
AN19B
AN19C
AN20
AN24
AN25
AN26
AN27
AN28
AN29
AN30
AN31
AN33
AN34
A002
A003
A004
A005
A006
A013
A017
A018

4,571,433.00
170,910.00
137,910.00
544,425.00
125,137.00
92,247.00
110,890.00
21,709.00
22,332.00
109,164.00
177,383.00
141,907.00
3,269,538.00
1,077,593.00
858,358.00
994,630.00
1,146,183.00
12,214.00
201,866.00
83,899.00
30,021.00
118,047.00
98,698.00
37,796.00
484,569.00
639,396.00
541,805.00
316,738.00
133,275.00
27,541.00
73,452.00

M3
M3
M3
M3
M2
M2
M2
LTR
LTR
M2
M2
M2
M3
M3
M3
M3
M3
KG
M2
M2
M2
M2
BH
M1
M2
M2
M2
M1
M3
M3
M3

41
42
43
44
45
46

Pek. Galian Tanah Sumuran (Max Kedalaman 10 M)


Pek. Urugan Pasir Urug
Beton Bertulang Sikloop Sumuran K175 + 40% Batu Belah
Cor Beton Site Mix K 175
Cor Beton K-250 Ready Mix Min 6 M3 Berikut Pompa
Cor Beton K-350 Ready Mix Min 6 M3 Berikut Pompa

AnalisaHrgSat/Analisa/332098034.xls

A025
A027
A029
A027
A031
A032

136,736.00
267,387.00
1,776,702.00
1,255,361.00
1,305,882.00
1,400,601.00

M3
M3
M3
M3
M3
M3

JENIS PEKERJAAN

No.
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80

KODE
ANALIS

Pek. Erection Konst Kuda-Kuda Besi


A035
Pekerjaan Baja IWF ex DN
A036
Pekerjaan Konstruksi Besi Siku / Profil Ex. DN
A038
Pekerjaan Bondex
A041
Pekerjaan Pemasangan Cerucuk Bambu
SUPL
Pas. Anstamping Batu Kali
A050
Pas. Lempengan Rumput
A052
Pas. Batang Tanaman (Berikut Pelindungnya)
B6
Lantai Keramik 30/30 Dn Bercorak/Berwarna
A066
Pas. Bata Merah 1 : 4
A073
Pek. Plesteran Ad 1 : 3 (Tebal 15 Mm) (Bidang Pengairan)
G50i
Pek. Siaran 1Pc : 2Ps (Bidang Pengairan)
G50c
Penghamparan Batu Pecah Mesin 5-7 cm Tebal 10cm
A130
Penghamparan Batu Pecah Mesin 2-3 cm Tebal 5cm
A131
Penghamparan Lapisan Pengisi / Penutup Batu Pecah 1-2cm A132
Pengaspalan
A133
Hotmix Manual Teb 3cm Untuk Halaman & Jalan
A134
Hotmix Manual Teb 2cm Untuk Halaman & Jalan
A134B
Hotmix Manual Teb 1cm Untuk Halaman & Jalan
A134C
Pengecatan Besi (3X) Untuk Railling
A090
Pek. Kerb / Kanstin / Pita Beton
SUPL
Pas. Drainase Buis Beton Bulat Dia 30 Untuk Sodetan
SUPL
Pas. Drainase Buis Beton Bulat Dia 20 Untuk Sodetan
SUPL
Pasangan Saluran Gravel Beton U 20cm
SUPL
Pasangan Saluran Gravel Beton U 30cm
SUPL
Beton Bertulang Struktur K225 Penutup Saluran Teb 10cm
SUPL
Untuk Trotoar Penulangan Besi 1 Lapis
Beton Bertulang Struktur K225 Penutup Gorong-Gorong Teb
SUPL
Untuk Jalan Masuk Penulangan Besi 2 Lapis
Beton Bertulang Struktur K225 Penutup Gorong-Gorong
SUPL
Melintang Jalan Teb 20cm Penulangan Besi 2 Lapis
Bongkaran Pasangan / Aspal
L.4
Pekerjaan Kisdam / Pengeringan
SUPL
Pek. Pasangan Batu Sikat Koral Per M2
SUPL
Pek. Pasangan Ubin Badak 30/30 Ad Pc 1 : 2
SUPL
Pemasangan Tulangan Dowel untuk Rigid Pavement
SUPL
Pemasangan Tulangan Tie Bar Untuk Rigid Pavement
SUPL

0
0
0
0

AnalisaHrgSat/Analisa/332098034.xls

HARGA
(Rp.)

SAT.

3,773.00
20,554.00
20,554.00
245,633.00
7,367.00
690,495.00
19,447.00
95,860.00
168,738.00
185,230.00
89,249.00
67,438.00
29,283.00
25,007.00
11,879.00
46,295.00
137,047.00
80,956.00
48,817.00
80,768.00
127,975.00
177,029.00
139,919.00
219,512.00
319,913.00
4,396,150.00

KG
KG
KG
M2
M1
M3
M2
BTG
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M2
M1
M1
M1
M1
M1
M3

4,099,534.00

M3

4,188,922.00

M3

215,369.00
534,410.00
123,702.00
106,285.00
160,756.00
154,228.00

M3
M1
M2
M2
M1
M1

0
Pembina Tingkat I
0

AnalisaHrgSat/Analisa/332098034.xls

DAFTAR HARGA SATUAN PEKERJAAN


BIDANG PENGAIRAN T.A. 2006
(EDISI APRIL 2006)

JENIS PEKERJAAN

No.
1
2
3
4
5
6
7
8
9
10

11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

28
29
30

31

Galian Tanah Biasa

KODE
ANALIS
A1
A2
A3
A4
A5
A6
A7
A7 (Rob)
A8

Galian Tanah Keras


Tanah Galian Yang Banyak Terdapat Batu Bundar
Galian Tanah Lumpur
Galian Tanah Cadas
Tanah Diangkut Sejauh 30 M
Tanah Diangkut Melalui Jarak Lebih Dari 30 M
Upah Angkutan 1 Zak Semen Pc
Tanah Diangkat Dari Dalam Lubang Penggalian Yang Dalamnya
Lebih Dari 1 M Untuk Setiap Meter Dihitung Dari Titik Beratnya.
Tanah Lumpur Diangkat Dari Dalam Lubang Penggalian
A9
Yang Dalamnya Lebih Dari 1 M Untuk Setiap Meter
Dihitung Dari Titik Beratnya.
Tanah Diratakan,Ditimbris Dan Dihaluskan
A16
Urugan Tanah (A1 + A7 + A16)
SUPL
Mengisi Kembali Bekas Galian
A17
Pasangan Lempengan Rumput Termasuk Mengambil
B1
Dan Memasangnya
Ongkos Angkut Lempengan Tempel (Bidang Pengairan)
B2
Menanam Pagar Hidup ( Bidang Pengairan )
B5
Menanam Batang Tanaman Berikut Pelindungnya ( Bidang Pengairan B6
Tiang Cerucuk Bambu Dipancangkan Ke Dalam Tanah Lunak
E13
Tiang Dipancangkan Ke Dalam Tanah Lunak ( Bidang Pengairan )
E14
Papan Penahan Dipancangkan Ke Dalam Tanah Lunak
E17
Mencabut Tiang Pemancang Dari Dalam Tanah
E17
Membuat Senderan Balok Pemikul & Balok Air ( Bidang Pengairan )
F3
Memasang Balok Penggantung & Penarik S.D 15 M1.
F4
Memasang Gelagar Besi ( Bidang Pengairan )
F6
Menurunkan Gelagar Besi ( Bidang Pengairan )
F7
Mengerjakan Lantai Jembatan ( Bidang Pengairan )
F8
Pasangan Batu Kosong Diantara Tiang-Tiang Perkun Dan
G2
Pasangan-Pasangan Lain Dari Batu Kosong
Banyak Batu Yang Diperlukan Tergantung Daripada Tebalnya
Pasangan Lapisan Ditambah Dengan 10%
Karena Hilang (Kerugian), Memasang Batunya Per M3 :
Pasangan Batu Kosong Tebal = 0.25 M Sebelah Luar Disisir
G3
Dengan Perekat
Memasang Batu Pada Bendung Curahan Saluran Miring Dst.
G4
Setebal 0.23 M'
Membuat Bronjong Kawat Digalvano Untuk Diisi Dengan Batu
G5a
( 1 X 1 X 3M) Diisi Batu Untuk Tiap 3 M3 :
(Dengan 2 Sekat, Luas Permukaan Bronjong = 16 M2) Diameter 3 Mm :
Membuat Bronjong Kawat Digalvano Untuk Diisi Dengan Batu
G5b
( 1 X 1 X 3M) Diisi Batu Untuk Tiap 3 M3 :
(Dengan 2 Sekat, Luas Permukaan Bronjong = 16 M2) Diameter 4 Mm :

AnalisaHrgSat/Analisa/332098034.xls

HARGA
(Rp.)

SAT.

78,592.00
104,732.00
157,185.00
157,185.00
209,464.00
34,407.00
16,587.00
2,475.00
16,153.00

M3
M3
M3
M3
M3
M3
M3
ZAK
M3

26,921.00

M3

26,487.00
168,439.00
13,243.00
16,587.00

M3
M3
M3
M2

3,441.00 10 M2
21,768.00 M1
54,218.00 BTG
192,570.00 M1
319,858.00 M1
116,451.00 M1
595,771.00 M1
4,793,952.00 M2
6,121,728.00 M2
70,228.00 100KG
53,842.00 100KG
126,233.00 M1
491,527.00 M3

162,569.00

M3

183,498.00

M3

2,511,469.00 3 M3

2,935,294.00 3 M3

32
33
34
35

Bronjong
Bronjong
Bronjong
Bronjong

Uk.
Uk.
Uk.
Uk.

(0.5
(0.5
(0.5
(0.5

AnalisaHrgSat/Analisa/332098034.xls

X
X
X
X

1
1
1
1

X
X
X
X

2)
3)
2)
3)

Untuk
Untuk
Untuk
Untuk

Diameter
Diameter
Diameter
Diameter

3
4
3
4

Mm
Mm
Mm
Mm

(7.5 M2) 1 Sekat. G5a(rob)


(7.5 M2) 1 Sekat. G5b(rob)
(11.0 M2) 2 Sekat.G5a(rob)
(11.0 M2) 2 Sekat.G5b(rob)

1,067,154.00
1,238,135.00
1,572,809.00
1,957,369.00

M3
M3
M3
M3

KODE

No.

JENIS PEKERJAAN

36
37
38
39
40
41
42

Pasang Batu Kali 1 Pc : 4 Pasir


Pasang Batu Kali 1 Pc : 3 Pasir
Cor Beton Bertulang 1 Pc : 3 Koral Beton, Mutu Beton K 175.
Campuran Beton 1 : 2 : 3 Cetakan / Bekisting Untuk Tiap M3 Beton
Beton Bertulang Ad 1 : 2 : 3 (G41 + I.2 + F.8)
Bongkaran Pasangan (Tebal Lebih Dari 50 mm)
Pasangan Perancah

ANALIS
G32h
G32L
G41
F8
SUPL
L3
A035

HARGA
(Rp.)
1,324,366.00
1,362,867.00
1,744,580.00
2,803,435.00
7,591,625.00
465,476.00
673,859.00

0
0
0
0

0
Pembina Tingkat I
0

AnalisaHrgSat/Analisa/332098034.xls

SAT.

M3
M3
M3
M3
M3
M2
M2

ANALISA HARGA SATUAN PEKERJAAN

KODE

PEMBERSIHAN DAMIJA
(MENGGUNAKAN BURUH)
KODE
DIBUAT OLEH :
( 071 )
-

AN01

PROPINSI :
KODE
KOTA
JAWA BARAT
(32)
PROSES :
ANGGAPAN :
1 Memotong dan membersihkan rumput1. Menggunakan tenaga manusia
dan semak pada Damija
2. Kapasitas kerja 25 m2/hari orang
3. Perhitungan didasarkan pada luas Damija 5m x 100m

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

VOL

HARI

1
10

1
1

MATERIAL
M
A
T
E
R
I
A
L

PERALATAN
P
E
R
A
L
A
T
A
N

Grass Cutter

VOLUME :

AnalisHrgSat/332098034.xls

TOTAL VOL
(org/hari)
1.00
10.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
157,901.00
900,000.00

HARGA
(Rp./Unit)
4,000.00

PEKERJA
BIAYA
(Rp.)
1,600.00

1,057,901.00
SUB TOTAL
(Rp.)

set

TOTAL
VOL
0.40

HARI
KERJA
1

JAM
KERJA
10.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

1,600.00
SUB TOTAL
(Rp.)

SATUAN

Alat Bantu

JUMLAH
2

500

TANGGAL

SATUAN

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
2,119.00
211.90
2,330.90
2,331.00

SUB TOTAL
(Rp.)

1,059,501.00
per M2

per M2

ANALISA HARGA SATUAN PEKERJAAN

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Membersihkan dan menormalisir
selokan
2 Buang kotoran / galian tanah ke
dalam Truk

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

VOL

HARI

1
12

1
1

MATERIAL
M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

Dump Truck

JUMLAH
1

VOLUME :

AnalisHrgSat/332098034.xls

270

AN02
TANGGAL

TOTAL VOL
(org/hari)
1.00
12.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
157,901.00
1,080,000.00

HARGA
(Rp./Unit)
4,000.00

PEKERJA
BIAYA
(Rp.)
1,600.00

1,237,901.00
SUB TOTAL
(Rp.)

set

TOTAL
VOL
0.40

HARI
KERJA
1

JAM
KERJA
5.00

HARGA
( Rp./jam )
175,000.00

MATERIAL
BIAYA
(Rp.)
875,000.00

1,600.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
7,831.49
783.15
8,614.63
8,615.00

875,000.00
2,114,501.00
per M1

SATUAN

Alat Bantu

PERALATAN

KODE

PERAWATAN / PEMBERSIHAN SALURAN


(MENGGUNAKAN BURUH TERMASUK BUANGAN)
KOTA
KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Selokan dibersihkan dari endapan / kotoran
2. Sebagian bekas galian dibuang dengan Truk
3. Kapasitas Kerja gali dan buang + 2,25 m3 / hari / orang
4. Perhitungan endapan 0,10 m3/m1

SATUAN

SUB TOTAL
(Rp.)

per M1

ANALISA HARGA SATUAN PEKERJAAN

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Menggali selokan dan membuang
bekas galian
2 Buang kotoran / galian tanah ke
dalam Truk

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

VOL

HARI

2
30

1
1

MATERIAL
M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

Dump Truck

JUMLAH
1

VOLUME :

AnalisHrgSat/332098034.xls

TOTAL VOL
(org/hari)
2.00
30.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
315,802.00
2,700,000.00

HARGA
(Rp./Unit)
4,000.00

PEKERJA
BIAYA
(Rp.)
4,000.00

3,015,802.00
SUB TOTAL
(Rp.)

set

TOTAL
VOL
1.00

HARI
KERJA
1

JAM
KERJA
5.00

HARGA
( Rp./jam )
175,000.00

MATERIAL
BIAYA
(Rp.)
875,000.00

4,000.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
23,604.86
2,360.49
25,965.35
25,965.00

875,000.00
3,894,802.00
per M1

SATUAN

Alat Bantu

PERALATAN

KODE

PEMBUATAN SELOKAN TANPA PASANGAN


AN03
(MENGGUNAKAN BURUH TERMASUK BUANGAN)
KOTA
KODE
DIBUAT OLEH :
TANGGAL
0
( 071 )
ANGGAPAN :
1. Selokan dengan lebar 0,40m', lebar atas 0,60m' dan kedalaman 0,50 m' (0,30 m3/m')
2. Bekas galian dibuang sejauh +/- 1 km dibuang dengan truck.
3. Kapasitas Kerja gali dan buang + 1,67 m3 / hari / orang (5,50 m'/hari)

165

SATUAN

SUB TOTAL
(Rp.)

per M1

ANALISA HARGA SATUAN PEKERJAAN

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Menggali selokan dan membuang
bekas galian
2 Membuat pasangan batu dinding
dan dasar saluran

PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

VOL

HARI

2
10
30

1
1
1

MATERIAL
M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

Dump Truck
Concrete Mixer

VOLUME :

AnalisHrgSat/332098034.xls

JUMLAH
1
1

12

AN04
TANGGAL

TOTAL VOL
(org/hari)
2.00
10.00
30.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
315,802.00
1,212,300.00
2,700,000.00

HARGA
(Rp./Unit)
250,000.00
311,004.78
68,300.00
4,000.00

PEKERJA
BIAYA
(Rp.)
3,500,000.00
1,866,028.71
2,622,720.00
12,000.00

4,228,102.00
SUB TOTAL
(Rp.)

m3
m3
zak
set

TOTAL
VOL
14.00
6.00
38.40
3.00

HARI
KERJA
1
1

JAM
KERJA
5.00
5.00

HARGA
( Rp./jam )
175,000.00
-

MATERIAL
BIAYA
(Rp.)
875,000.00
-

8,000,748.71
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
1,091,987.56
109,198.76
1,201,186.31
1,201,186.00

875,000.00
13,103,850.71
per M1

SATUAN

Batu Kali
Pasir Pasang
Semen / PC
Alat Bantu

PERALATAN

KODE

PEMBUATAN SELOKAN DENGAN PASANGAN


(MENGGUNAKAN BURUH TERMASUK BUANGAN)
KOTA
KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Ukuran saluran lebar dasar 40cm, lebar atas 80cm, dalam 50cm dan
tebal pasangan rata-rata 20cm
2. Bekas galian dibuang sejauh +/- 1 km dibuang dengan truck.
3. Material disediakan oleh suplayer
4. Volume pasangan batu 0,30 m3/m
5. Spesi adukan 1 PC, 4 PS

SATUAN

SUB TOTAL
(Rp.)

per M1

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Tanah digali dengan tenaga manusia
2 Bekas tanah galian diangkut dengan
truck

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

ANALISA HARGA SATUAN PEKERJAAN

KODE

GALIAN TANAH BIASA

AN06

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Kapasitas kerja kelompok 70 m3/hari
2. Sebagian bekas galian dibuang sejauh + 1 km
3. Kedalaman rata-rata galian max 3m'
4. Untuk jenis tanah berbatu harga satuan analisa ini dikalikan dengan faktor 1,5

TANGGAL

KOTA

VOL

HARI

2
35

1
1

MATERIAL
M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

Dump Truck

JUMLAH
1

VOLUME :

AnalisHrgSat/332098034.xls

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
315,802.00
3,150,000.00

HARGA
(Rp./Unit)
4,000.00

PEKERJA
BIAYA
(Rp.)
4,000.00

3,465,802.00
SUB TOTAL
(Rp.)

set

TOTAL
VOL
1.00

HARI
KERJA
1

JAM
KERJA
5.00

HARGA
( Rp./jam )
175,000.00

MATERIAL
BIAYA
(Rp.)
875,000.00

4,000.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
62,068.60
6,206.86
68,275.46
68,275.00

875,000.00
4,344,802.00
per M3

SATUAN

Alat Bantu

PERALATAN

TOTAL VOL
(org/hari)
2.00
35.00

70

SATUAN

SUB TOTAL
(Rp.)

per M3

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Tanah digali dengan tenaga manusia
2 Bekas tanah galian diangkut dengan
truck

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Dump Truck

VOL

HARI

3
52.5

1
1

JUMLAH

AnalisHrgSat/332098034.xls

70

TANGGAL

TOTAL VOL
(org/hari)
3.00
52.50

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
473,703.00
4,725,000.00

HARGA
(Rp./Unit)
4,000.00

PEKERJA
BIAYA
(Rp.)
6,000.00

5,198,703.00
SUB TOTAL
(Rp.)

set

TOTAL
VOL
1.50

HARI
KERJA
1.5

JAM
KERJA
7.50

HARGA
( Rp./jam )
175,000.00

MATERIAL
BIAYA
(Rp.)
1,312,500.00

6,000.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
93,102.90
9,310.29
102,413.19
102,413.00

1,312,500.00
6,517,203.00
per M3

SATUAN

VOLUME :

AN06B

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Kapasitas kerja kelompok 70 m3/hari
2. Sebagian bekas galian dibuang sejauh + 1 km
3. Kedalaman rata-rata galian max 3m'

Alat Bantu

PERALATAN

KODE

GALIAN TANAH BERBATU


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M3

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Urugan Tanah Dipadatkan
2 Lahan dan Bahan Timbunan harus
bersih dari bahan organis

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Alat Pemadat

VOLUME :

AnalisHrgSat/332098034.xls

AN07

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Tanah Timbunan didatangkan oleh Suplayer
2. Kapasitas kerja 2 m3/orang
3. Koefisien pemadatan 1,3

VOL

HARI

1
10

1
1

JUMLAH
1

20

TANGGAL

TOTAL VOL
(org/hari)
1.00
10.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
157,901.00
900,000.00

HARGA
(Rp./Unit)
85,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
2,210,000.00
1,600.00

1,057,901.00
SUB TOTAL
(Rp.)

m3
set

TOTAL
VOL
26.00
0.40

HARI
KERJA
1

JAM
KERJA
5.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

2,211,600.00
SUB TOTAL
(Rp.)

SATUAN

Tanah Urug
Alat Bantu

PERALATAN

KODE

KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN


TIMBUNAN TANAH BIASA (DIPADATKAN)

SATUAN

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
163,475.05
16,347.51
179,822.56
179,823.00

SUB TOTAL
(Rp.)

3,269,501.00
per M3

per M3

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Material dihamparkan setiap 20cm
2 Tiap lapis dipadatkan minimal 4 kali
lintasan

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Mesin Gilas 3 roda

VOLUME :

AnalisHrgSat/332098034.xls

AN09

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Material Sirtu didatangkan oleh suplayer
2. Kapasitas kerja 15m3/hari
3. Koefisien pemadatan 1,2

VOL

HARI

1
10

1
1

JUMLAH
1

15

TANGGAL

TOTAL VOL
(org/hari)
1.00
10.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
157,901.00
900,000.00

HARGA
(Rp./Unit)
190,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
3,420,000.00
1,600.00

1,057,901.00
SUB TOTAL
(Rp.)

m3
set

TOTAL
VOL
18.00
0.40

HARI
KERJA
1

JAM
KERJA
5.00

HARGA
( Rp./jam )
100,000.00

MATERIAL
BIAYA
(Rp.)
500,000.00

3,421,600.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
331,966.73
33,196.67
365,163.41
365,163.00

500,000.00
4,979,501.00
per M2

SATUAN

Sirtu Klas C
Alat Bantu

PERALATAN

KODE

TIMBUNAN SIRTU AGREGAT KLAS C


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M2

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Penggali membentuk persegi pada
permukaan lubang yang akan
ditambal
2 Bersihkan permukaan yang akan
ditambal
3 Lubang dilabur dengan aspal dan
ditambal dengan hotmix selanjutnya
dipadatkan
PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

P
E
R
A
L
A
T
A
N

Dump Truck
Mesin Gilas 3 roda

VOLUME :

AnalisHrgSat/332098034.xls

AN10

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Kedalaman Rata-rata 4cm
2. Produk Hotmix disediakan oleh suplayer
3. Kapasitas rata-rata 100 m2/hari

VOL

HARI

2
4
15

1
1
1

JUMLAH
1
1

100

TANGGAL

TOTAL VOL
(org/hari)
2.00
4.00
15.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
315,802.00
484,920.00
1,350,000.00

HARGA
(Rp./Unit)
1,352,000.00
21,709.00
4,000.00

PEKERJA
BIAYA
(Rp.)
12,438,400.00
651,270.00
8,000.00

2,150,722.00
SUB TOTAL
(Rp.)

ton
Ltr
set

TOTAL
VOL
9.20
30.00
2.00

HARI
KERJA
1
1

JAM
KERJA
5.00
5.00

HARGA
( Rp./jam )
175,000.00
100,000.00

MATERIAL
BIAYA
(Rp.)
875,000.00
500,000.00

13,097,670.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
166,233.92
16,623.39
182,857.31
182,857.00

1,375,000.00
16,623,392.00
per M2

SATUAN

Material Hotmix (AC WC)


Aspal Prime Coat
Alat Bantu

PERALATAN

KODE

TAMBAL SULAM DENGAN HOTMIX


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M2

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Penggali membentuk persegi pada
permukaan lubang yang akan
ditambal
2 Bersihkan permukaan yang akan
ditambal
3 Lubang dilabur dengan aspal dan
ditambal dengan hotmix selanjutnya
dipadatkan
PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

P
E
R
A
L
A
T
A
N

Dump Truck
Mesin Gilas 3 roda

VOLUME :

AnalisHrgSat/332098034.xls

AN10 (Alt)

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Kedalaman Variabel
2. Produk Hotmix disediakan oleh suplayer
3. Kapasitas rata-rata 100 m2/hari atau 4 m3/hari

VOL

HARI

2
4
15

1
1
1

JUMLAH
1
1

TANGGAL

TOTAL VOL
(org/hari)
2.00
4.00
15.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
315,802.00
484,920.00
1,350,000.00

HARGA
(Rp./Unit)
1,352,000.00
21,709.00
4,000.00

PEKERJA
BIAYA
(Rp.)
12,438,400.00
651,270.00
8,000.00

2,150,722.00
SUB TOTAL
(Rp.)

ton
Ltr
set

TOTAL
VOL
9.20
30.00
2.00

HARI
KERJA
1
1

JAM
KERJA
5.00
5.00

HARGA
( Rp./jam )
175,000.00
100,000.00

MATERIAL
BIAYA
(Rp.)
875,000.00
500,000.00

13,097,670.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
4,155,848.00
415,584.80
4,571,432.80
4,571,433.00

1,375,000.00
16,623,392.00
per M3

SATUAN

Material Hotmix (AC WC)


Aspal Prime Coat
Alat Bantu

PERALATAN

KODE

TAMBAL SULAM DENGAN HOTMIX


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M3

ANALISA HARGA SATUAN PEKERJAAN

KODE

LAPIS PONDASI AGREGAT KLAS A

AN11

PROPINSI :
KODE
KOTA
KODE
DIBUAT OLEH :
JAWA BARAT
(32)
0
( 071 )
PROSES :
ANGGAPAN :
1 Membentuk kembali permukaan jalan 1. Dimulai dengan pekerjaan memperbaiki penurunan
lama dengan motor grader
2. Grader melakukan 2 kali lintasan untuk penghamparan
2 Aggregat dihamparkan disepanjang 3. Koefisien pemadatan 1,2
jalan
4. Material didatangkan oleh suplayer
3 Menghampar aggregat dengan grader
4 Lapisan disiram dengan truck air
5 Pemadatan dilakukan dengan
mesin gilas
PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

VOL

HARI

1
6

1
1

MATERIAL
M
A
T
E
R
I
A
L

PERALATAN
P
E
R
A
L
A
T
A
N

Motor Grader
Mesin Gilas 3 roda
Water Tank Truck

VOLUME :

AnalisHrgSat/332098034.xls

TOTAL VOL
(org/hari)
1.00
6.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
157,901.00
540,000.00

HARGA
(Rp./Unit)
120,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
21,600,000.00
8,000.00

697,901.00
SUB TOTAL
(Rp.)

m3
set

TOTAL
VOL
180.00
2.00

HARI
KERJA
1
1
1

JAM
KERJA
5.00
10.00
5.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

21,608,000.00
SUB TOTAL
(Rp.)

SATUAN

Material Agregat Klas A


Alat Bantu

JUMLAH
1
2
1

150

TANGGAL

SATUAN

100,000.00
-

1,000,000.00
-

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
155,372.67
15,537.27
170,909.94
170,910.00

SUB TOTAL
(Rp.)

1,000,000.00
23,305,901.00
per M3

per M3

ANALISA HARGA SATUAN PEKERJAAN

KODE

LAPIS PONDASI AGREGAT KLAS B

AN12

PROPINSI :
KODE
KOTA
KODE
DIBUAT OLEH :
JAWA BARAT
(32)
0
( 071 )
PROSES :
ANGGAPAN :
1 Membentuk kembali permukaan jalan 1. Dimulai dengan pekerjaan memperbaiki penurunan
lama dengan motor grader
2. Grader melakukan 2 kali lintasan untuk penghamparan
2 Aggregat dihamparkan disepanjang 3. Koefisien pemadatan 1,2
jalan
4. Material didatangkan oleh suplayer
3 Menghampar aggregat dengan grader
4 Lapisan disiram dengan truck air
5 Pemadatan dilakukan dengan
mesin gilas
PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

VOL

HARI

1
6

1
1

MATERIAL
M
A
T
E
R
I
A
L

PERALATAN
P
E
R
A
L
A
T
A
N

Motor Grader
Mesin Gilas 3 roda
Water Tank Truck

VOLUME :

AnalisHrgSat/332098034.xls

TOTAL VOL
(org/hari)
1.00
6.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
157,901.00
540,000.00

HARGA
(Rp./Unit)
95,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
17,100,000.00
8,000.00

697,901.00
SUB TOTAL
(Rp.)

m3
set

TOTAL
VOL
180.00
2.00

HARI
KERJA
1
1
1

JAM
KERJA
5.00
10.00
5.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

17,108,000.00
SUB TOTAL
(Rp.)

SATUAN

Material Agregat Klas B


Alat Bantu

JUMLAH
1
2
1

150

TANGGAL

SATUAN

100,000.00
-

1,000,000.00
-

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
125,372.67
12,537.27
137,909.94
137,910.00

SUB TOTAL
(Rp.)

1,000,000.00
18,805,901.00
per M3

per M3

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Penggali membentuk persegi pada
permukaan lubang yang akan
ditambal
2 Bersihkan permukaan yang akan
ditambal
3 Hamparkan material dan dipadatkan
setiap ketebalan 20cm

PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

P
E
R
A
L
A
T
A
N

Dump Truck
Mesin Gilas 3 roda
Compressor/Jack Hammer

VOLUME :

AnalisHrgSat/332098034.xls

AN13

KODE
0
( 071 )
ANGGAPAN :
1. Kedalaman Rata-rata 20 cm
2. Material didatangkan oleh suplayer
3. Kapasitas rata-rata 20 m3/hari
4. Koefisien pemadatan 1,2

VOL

HARI

2
8
40

1
1
1

JUMLAH
1
1
1

20

DIBUAT OLEH :
-

TANGGAL

TOTAL VOL
(org/hari)
2.00
8.00
40.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
315,802.00
969,840.00
3,600,000.00

HARGA
(Rp./Unit)
120,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
2,880,000.00
8,000.00

4,885,642.00
SUB TOTAL
(Rp.)

m3
set

TOTAL
VOL
24.00
2.00

HARI
KERJA
1
1
1

JAM
KERJA
5.00
5.00
5.00

HARGA
( Rp./jam )
175,000.00
100,000.00
150,000.00

MATERIAL
BIAYA
(Rp.)
875,000.00
500,000.00
750,000.00

2,888,000.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
494,932.10
49,493.21
544,425.31
544,425.00

2,125,000.00
9,898,642.00
per M3

SATUAN

Material Agregat Klas A


Alat Bantu

PERALATAN

KODE

PERBAIKAN LAPIS PONDASI


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M3

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Penggali membentuk persegi pada
permukaan lubang yang akan
ditambal
2 Bersihkan permukaan yang akan
ditambal
3 Labur dengan aspal dan tutup dgn
Lapis Penetrasi

PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

P
E
R
A
L
A
T
A
N

Dump Truck
Mesin Gilas 3 roda

VOLUME :

AnalisHrgSat/332098034.xls

AN14

KODE
0
( 071 )
ANGGAPAN :
1. Kedalaman Rata-rata 5 cm
2. Material didatangkan oleh suplayer
3. Kapasitas rata-rata 100 m2/hari

VOL

HARI

1
2
12

1
1
1

JUMLAH
1
1

100

DIBUAT OLEH :
-

TANGGAL

TOTAL VOL
(org/hari)
1.00
2.00
12.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
242,460.00
1,080,000.00

HARGA
(Rp./Unit)
135,000.00
275,000.00
215,311.00
14,175.00
4,000.00

PEKERJA
BIAYA
(Rp.)
648,000.00
605,000.00
172,248.80
7,087,500.00
8,000.00

1,480,361.00
SUB TOTAL
(Rp.)

m3
m3
m3
kg
m3
set

TOTAL
VOL
4.80
2.20
0.80
500.00
0.80
2.00

HARI
KERJA
1
1

JAM
KERJA
5.00
5.00

HARGA
( Rp./jam )
175,000.00
100,000.00

MATERIAL
BIAYA
(Rp.)
875,000.00
500,000.00

8,520,748.80
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
113,761.10
11,376.11
125,137.21
125,137.00

1,375,000.00
11,376,109.80
per M2

SATUAN

Batu Pecah 3 - 5 cm
Batu Pecah 1 - 2 cm
Abu Batu / Screnn 0.5 - 1 cm
Aspal Bitumen
Kayu Bakar
Alat Bantu

PERALATAN

KODE

TAMBAL SULAM DENGAN LAPEN


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M2

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Material disiapkan dilokasi pekerjaan
2 Menghampar pasir setebal 5cm
3 Batu pecah berukuran besar disusun
berdiri
4 Batu pecah yang lebih kecil mengisi
rongga diatasnya
5 Digilas dengan mesin gilas
PEKERJA

P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Mesin Gilas 3 roda

VOLUME :

AnalisHrgSat/332098034.xls

AN15

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Kedalaman Rata-rata 25 cm
2. Material didatangkan oleh suplayer
3. Kapasitas rata-rata 160 m2/hari
4. Material sudah dipecah / batu pecah
5. Tanah dasar / sub grade sudah dipersiapkan

VOL

HARI

2
28

1
1

JUMLAH
1

160

TANGGAL

TOTAL VOL
(org/hari)
2.00
28.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
315,802.00
2,520,000.00

HARGA
(Rp./Unit)
250,000.00
130,000.00
190,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
6,000,000.00
1,040,000.00
3,040,000.00
2,000.00

2,835,802.00
SUB TOTAL
(Rp.)

m3
m3
m3
set

TOTAL
VOL
24.00
8.00
16.00
0.50

HARI
KERJA
1

JAM
KERJA
5.00

HARGA
( Rp./jam )
100,000.00

MATERIAL
BIAYA
(Rp.)
500,000.00

10,082,000.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
83,861.26
8,386.13
92,247.39
92,247.00

500,000.00
13,417,802.00
per M2

SATUAN

Batu Belah
Batu belah 5-7 cm
Pasir Urug
Alat Bantu

PERALATAN

KODE

SUB BASE BATU BELAH (TELFORD)


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M2

ANALISA HARGA SATUAN PEKERJAAN

KODE

LAPIS PENETRASI MACADAM (LAPEN)

AN16

PROPINSI :
KODE
KOTA
KODE
DIBUAT OLEH :
JAWA BARAT
(32)
0
( 071 )
PROSES :
ANGGAPAN :
1 Hamparkan agregat pokok dan dipada1. Menggunakan tenaga buruh dengan hasil 15m3/hari (3 x 100m')
2 Semprotkan aspal pada Agregat poko 2. Material didatangkan oleh suplayer
3 Hamparkan agregat pengunci
3. Tebal perkerasan total 5cm
4 Semprotkan aspal pada aggregat pengunci
5 Hamparkan agregat penutup
PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

VOL

HARI

1
3
20

1
1
1

MATERIAL
M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

PERALATAN
Mesin Gilas 3 Roda
Asphalt Sprayer
Dump Truck

VOLUME :

AnalisHrgSat/332098034.xls

TOTAL VOL
(org/hari)
1.00
3.00
20.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
363,690.00
1,800,000.00

HARGA
(Rp./Unit)
135,000.00
275,000.00
215,311.00
14,175.00
4,000.00

PEKERJA
BIAYA
(Rp.)
1,944,000.00
1,815,000.00
516,746.41
21,262,500.00
8,000.00

2,321,591.00
SUB TOTAL
(Rp.)

m3
m3
m3
kg
set

TOTAL
VOL
14.40
6.60
2.40
1,500.00
2.00

HARI
KERJA
1
1
1

JAM
KERJA
5.00
5.00
5.00

HARGA
( Rp./jam )
100,000.00
200,000.00
175,000.00

MATERIAL
BIAYA
(Rp.)
500,000.00
1,000,000.00
875,000.00

25,546,246.41
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
100,809.46
10,080.95
110,890.40
110,890.00

2,375,000.00
30,242,837.41
per m2

SATUAN

Batu Pecah 3 - 5 cm
Batu Pecah 1 - 2 cm
Abu Batu / Screnn 0.5 - 1 cm
Aspal Bitumen
Alat Bantu

JUMLAH
1
1
1

300

TANGGAL

SATUAN

SUB TOTAL
(Rp.)

per m2

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Permukaan harus rata, bersih dan
kering
2 Suhu aspal 100-120 derajat
3 Penyemprotan dilakukan dengan
asphalt sprayer

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Mesin Penyemprot Aspal


Air Compressor

VOLUME :

AnalisHrgSat/332098034.xls

AN17

KODE
0
( 071 )
ANGGAPAN :
1. Penyemprotan aspal 0,60 kg/m2
2. Kapasitas kerja 3.500 m2/hari

VOL

HARI

1
12

1
1

JUMLAH
2
2

3500

DIBUAT OLEH :
-

TANGGAL

TOTAL VOL
(org/hari)
1.00
12.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
157,901.00
1,080,000.00

HARGA
(Rp./Unit)
14,175.00
7,700.00
4,000.00

PEKERJA
BIAYA
(Rp.)
45,501,750.00
18,826,500.00
8,000.00

1,237,901.00
SUB TOTAL
(Rp.)

kg
lt
set

TOTAL
VOL
3,210.00
2,445.00
2.00

HARI
KERJA
1
1

JAM
KERJA
10.00
10.00

HARGA
( Rp./jam )
200,000.00
150,000.00

MATERIAL
BIAYA
(Rp.)
2,000,000.00
1,500,000.00

64,336,250.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
19,735.47
1,973.55
21,709.02
21,709.00

3,500,000.00
69,074,151.00
per Ltr

SATUAN

Aspal Bitumen
Minyak Tanah
Alat Bantu

PERALATAN

KODE

KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN


LAPIS RESAP PENGIKAT (PRIME COAT)

SATUAN

SUB TOTAL
(Rp.)

per Ltr

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Permukaan harus rata, bersih dan
kering
2 Suhu aspal 100-120 derajat
3 Penyemprotan dilakukan dengan
asphalt sprayer

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Mesin Penyemprot Aspal


Air Compressor

VOLUME :

AnalisHrgSat/332098034.xls

AN18

KODE
0
( 071 )
ANGGAPAN :
1. Penyemprotan aspal 0,35 kg/m2
2. Kapasitas kerja 8.000 m2/hari

VOL

HARI

1
20

1
1

JUMLAH
2
2

6000

DIBUAT OLEH :
-

TANGGAL

TOTAL VOL
(org/hari)
1.00
20.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
157,901.00
1,800,000.00

HARGA
(Rp./Unit)
14,175.00
7,700.00
4,000.00

PEKERJA
BIAYA
(Rp.)
100,699,200.00
15,646,400.00
8,000.00

1,957,901.00
SUB TOTAL
(Rp.)

kg
lt
set

TOTAL
VOL
7,104.00
2,032.00
2.00

HARI
KERJA
1
1

JAM
KERJA
10.00
10.00

HARGA
( Rp./jam )
200,000.00
150,000.00

MATERIAL
BIAYA
(Rp.)
2,000,000.00
1,500,000.00

116,353,600.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
20,301.92
2,030.19
22,332.11
22,332.00

3,500,000.00
121,811,501.00
per Ltr

SATUAN

Aspal Bitumen
Minyak Tanah
Alat Bantu

PERALATAN

KODE

LAPIS PEREKAT (TACK COAT)


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per Ltr

ANALISA HARGA SATUAN PEKERJAAN


PENGHAMPARAN DAN PEMADATAN HOTMIX

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Permukaan harus rata, bersih dan
kering
2 Sebelum penghamparan harus di
Tack Coat
3 Pemadatan awal 120 derajat Celcius
4 Pemadatan akhir 60 derajat Celcius
5 Penghamparan HRS menggunakan
Asphalt Spreader
PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

KOTA

VOL

HARI

1
2
12

1
1
1

P
E
R
A
L
A
T
A
N

Asphalt Finicher & Spreader


Mesin Gilas Tandem
Mesin Gilas Roda Karet
Truk tangki air
Dump truck

VOLUME :

AnalisHrgSat/332098034.xls

TOTAL VOL
(org/hari)
1.00
2.00
12.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
242,460.00
1,080,000.00

HARGA
(Rp./Unit)
1,388,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
201,260,000.00
8,000.00

1,480,361.00
SUB TOTAL
(Rp.)

tonne
set

TOTAL
VOL
145.00
2.00

HARI
KERJA
1
1
1
1
1

JAM
KERJA
5.00
5.00
5.00
5.00
30.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

201,268,000.00
SUB TOTAL
(Rp.)

SATUAN

Campuran Hotmix (HRS)


Alat Bantu

PERALATAN

AN19

TANGGAL
0
ANGGAPAN :
1. Menggunakan peralatan berat
2. Campuran HRS diangkut dari lokasi AMP dengan Dump Truck jarak angkut +/- 20km
3. Berat jenis padat HRS 2,30t/m3.
4. Tebal lapisan padat 3cm

MATERIAL
M
A
T
E
R
I
A
L

KODE

HOT ROLLER SHEET (H.R.S)


(MENGGUNAKAN ALAT)
KODE
DIBUAT OLEH :
( 071 )
-

JUMLAH
1
1
1
1
6

2100

SATUAN

81,250.00
175,000.00

406,250.00
5,250,000.00

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
99,240.29
9,924.03
109,164.32
109,164.00

SUB TOTAL
(Rp.)

5,656,250.00
208,404,611.00
per M2

per M2

ANALISA HARGA SATUAN PEKERJAAN

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Permukaan harus rata, bersih dan
kering
2 Sebelum penghamparan harus di
Tack Coat
3 Pemadatan awal 120 derajat Celcius
4 Pemadatan akhir 60 derajat Celcius
5 Penghamparan AC menggunakan
Asphalt Spreader
PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

P
E
R
A
L
A
T
A
N

Asphalt Finicher & Spreader


Mesin Gilas Tandem
Mesin Gilas Roda Karet
Truk tangki air
Dump truck

VOLUME :

AnalisHrgSat/332098034.xls

AN19B

TANGGAL
0
ANGGAPAN :
1. Menggunakan peralatan berat
2. Campuran Asphalt Concrete diangkut dari lokasi AMP dgn Dump Truck jarak angkut +/- 20km
3. Berat jenis padat Hotmix Laston 2,30t/m3.
4. Tebal lapisan padat 5cm

VOL

HARI

1
2
12

1
1
1

TOTAL VOL
(org/hari)
1.00
2.00
12.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
242,460.00
1,080,000.00

HARGA
(Rp./Unit)
1,352,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
196,040,000.00
8,000.00

1,480,361.00
SUB TOTAL
(Rp.)

tonne
set

TOTAL
VOL
145.00
2.00

HARI
KERJA
1
1
1
1
1

JAM
KERJA
5.00
5.00
5.00
5.00
30.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

196,048,000.00
SUB TOTAL
(Rp.)

SATUAN

Campuran Hotmix (AC)


Alat Bantu

PERALATAN

KODE

LASTON / ASPHALT CONCRETE (A.C)


(MENGGUNAKAN ALAT)
KODE
DIBUAT OLEH :
( 071 )
-

KOTA

MATERIAL
M
A
T
E
R
I
A
L

PENGHAMPARAN DAN PEMADATAN HOTMIX

JUMLAH
1
1
1
1
6

1260

SATUAN

81,250.00
175,000.00

406,250.00
5,250,000.00

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
161,257.63
16,125.76
177,383.39
177,383.00

SUB TOTAL
(Rp.)

5,656,250.00
203,184,611.00
per M2

per M2

ANALISA HARGA SATUAN PEKERJAAN

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Permukaan harus rata, bersih dan
kering
2 Sebelum penghamparan harus di
Tack Coat
3 Pemadatan awal 120 derajat Celcius
4 Pemadatan akhir 60 derajat Celcius
5 Penghamparan AC menggunakan
Asphalt Spreader
PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

P
E
R
A
L
A
T
A
N

Asphalt Finicher & Spreader


Mesin Gilas Tandem
Mesin Gilas Roda Karet
Truk tangki air
Dump truck

VOLUME :

AnalisHrgSat/332098034.xls

AN19C

TANGGAL
0
ANGGAPAN :
1. Menggunakan peralatan berat
2. Campuran Asphalt Concrete diangkut dari lokasi AMP dgn Dump Truck jarak angkut +/- 20km
3. Berat jenis padat Hotmix Laston 2,30t/m3.
4. Tebal lapisan padat 4cm

VOL

HARI

1
2
12

1
1
1

TOTAL VOL
(org/hari)
1.00
2.00
12.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
242,460.00
1,080,000.00

HARGA
(Rp./Unit)
1,352,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
196,040,000.00
8,000.00

1,480,361.00
SUB TOTAL
(Rp.)

tonne
set

TOTAL
VOL
145.00
2.00

HARI
KERJA
1
1
1
1
1

JAM
KERJA
5.00
5.00
5.00
5.00
30.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

196,048,000.00
SUB TOTAL
(Rp.)

SATUAN

Campuran Hotmix (AC)


Alat Bantu

PERALATAN

KODE

LASTON / ASPHALT CONCRETE (A.C)


(MENGGUNAKAN ALAT)
KODE
DIBUAT OLEH :
( 071 )
-

KOTA

MATERIAL
M
A
T
E
R
I
A
L

PENGHAMPARAN DAN PEMADATAN HOTMIX

JUMLAH
1
1
1
1
6

1575

SATUAN

81,250.00
175,000.00

406,250.00
5,250,000.00

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
129,006.10
12,900.61
141,906.71
141,907.00

SUB TOTAL
(Rp.)

5,656,250.00
203,184,611.00
per M2

per M2

ANALISA HARGA SATUAN PEKERJAAN

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Permukaan harus rata, bersih dan
kering
2 Sebelum penghamparan harus di
Tack Coat
3 Pemadatan awal 120 derajat Celcius
4 Pemadatan akhir 60 derajat Celcius
5 Penghamparan ATB menggunakan
Asphalt Spreader
PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

P
E
R
A
L
A
T
A
N

Asphalt Finicher & Spreader


Mesin Gilas Tandem
Mesin Gilas Roda Karet
Truk tangki air
Dump truck

VOLUME :

AnalisHrgSat/332098034.xls

AN20

TANGGAL
0
ANGGAPAN :
1. Menggunakan peralatan berat
2. Campuran ATB diangkut dari lokasi AMP dengan Dump Truck jarak angkut +/- 20km
3. Berat jenis padat ATB 2,30t/m3.
4. Tebal lapisan padat 5cm

VOL

HARI

1
2
12

1
1
1

TOTAL VOL
(org/hari)
1.00
2.00
12.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
242,460.00
1,080,000.00

HARGA
(Rp./Unit)
1,280,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
192,000,000.00
8,000.00

1,480,361.00
SUB TOTAL
(Rp.)

tonne
set

TOTAL
VOL
150.00
2.00

HARI
KERJA
1
1
1
1
1

JAM
KERJA
5.00
5.00
5.00
5.00
30.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

192,008,000.00
SUB TOTAL
(Rp.)

SATUAN

Campuran Hotmix (ATB)


Alat Bantu

PERALATAN

KODE

ASPHALT THREATED BASED (A.T.B.)


(MENGGUNAKAN ALAT)
KODE
DIBUAT OLEH :
( 071 )
-

KOTA

MATERIAL
M
A
T
E
R
I
A
L

PENGHAMPARAN DAN PEMADATAN HOTMIX

JUMLAH
1
1
1
1
6

67

SATUAN

81,250.00
175,000.00

406,250.00
5,250,000.00

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
2,972,307.63
297,230.76
3,269,538.39
3,269,538.00

SUB TOTAL
(Rp.)

5,656,250.00
199,144,611.00
per M3

per M3

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Permukaan harus rata, bersih
dan kering
2 Hamparkan aspal secara merata
3 Hamparkan Pasir dan di padatkan

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Mesin Gilas 3 roda


Dump Truck 5ton/145 HP

VOLUME :

AnalisHrgSat/332098034.xls

AN21

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Kemampuan kerja 2.000 m2/hari
2. Kebutuhan aspal 1,20 kg/m2 dan Agregat Pasir Jalan

VOL

HARI

2
34

1
1

JUMLAH
1
1

2000

TANGGAL

TOTAL VOL
(org/hari)
2.00
34.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
315,802.00
3,060,000.00

HARGA
(Rp./Unit)
215,311.00
14,175.00
4,000.00

PEKERJA
BIAYA
(Rp.)
4,736,842.11
34,020,000.00
8,000.00

3,375,802.00
SUB TOTAL
(Rp.)

m3
kg
set

TOTAL
VOL
22.00
2,400.00
2.00

HARI
KERJA
1
1

JAM
KERJA
5.00
2.00

HARGA
( Rp./jam )
100,000.00
175,000.00

MATERIAL
BIAYA
(Rp.)
500,000.00
350,000.00

38,764,842.11
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
21,495.32
2,149.53
23,644.85
23,645.00

850,000.00
42,990,644.11
per M2

SATUAN

Abu Batu / Screnn 0.5 - 1 cm


Aspal Bitumen
Alat Bantu

PERALATAN

KODE

LABURAN ASPAL
KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M2

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Permukaan harus rata, bersih
dan kering
2 Pengadaan aspal + 1,5 kg/m2
3 Hamparkan agregat dan padatkan
dengan mesin gilas

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Mesin Gilas 3 roda


Air Compressor
Mesin Penyemprot Aspal
Dump Truck 5ton/145 HP

VOLUME :

AnalisHrgSat/332098034.xls

AN22

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Penebaran Agregat dengan tenaga buruh
2. Tebal hampar 1 cm
3. Kapasitas rata-rata 1800 m2/hari

VOL

HARI

2
30

1
1

JUMLAH
1
1
1
1

1800

TANGGAL

TOTAL VOL
(org/hari)
2.00
30.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
315,802.00
2,700,000.00

HARGA
(Rp./Unit)
215,311.00
14,175.00
4,000.00

PEKERJA
BIAYA
(Rp.)
4,650,717.70
38,272,500.00
8,000.00

3,015,802.00
SUB TOTAL
(Rp.)

m3
kg
set

TOTAL
VOL
21.60
2,700.00
2.00

HARI
KERJA
1
1
1
1

JAM
KERJA
5.00
5.00
5.00
5.00

HARGA
( Rp./jam )
100,000.00
150,000.00
200,000.00
175,000.00

MATERIAL
BIAYA
(Rp.)
500,000.00
750,000.00
1,000,000.00
875,000.00

42,931,217.70
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
27,262.23
2,726.22
29,988.46
29,988.00

3,125,000.00
49,072,019.70
per M2

SATUAN

Abu Batu / Screnn 0.5 - 1 cm


Aspal Bitumen
Alat Bantu

PERALATAN

KODE

LABURAN SATU LAPIS


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M2

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Permukaan harus rata, bersih
dan kering
2 Pengadaan aspal + 3,1 kg/m2
3 Hamparkan agregat dan padatkan
dengan mesin gilas

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Mesin Gilas 3 roda


Air Compressor
Mesin Penyemprot Aspal
Dump Truck 5ton/145 HP

VOLUME :

AnalisHrgSat/332098034.xls

AN23

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Penebaran Agregat dengan tenaga buruh
2. Tebal hampar 3 cm
3. Kapasitas rata-rata 1000 m2/hari

VOL

HARI

2
25

1
1

JUMLAH
1
1
1
1

1000

TANGGAL

TOTAL VOL
(org/hari)
2.00
25.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
315,802.00
2,250,000.00

HARGA
(Rp./Unit)
275,000.00
215,311.00
14,175.00
4,000.00

PEKERJA
BIAYA
(Rp.)
6,600,000.00
2,583,732.06
43,942,500.00
8,000.00

2,565,802.00
SUB TOTAL
(Rp.)

m3
m3
kg
set

TOTAL
VOL
24.00
12.00
3,100.00
2.00

HARI
KERJA
1
1
1
1

JAM
KERJA
5.00
5.00
5.00
5.00

HARGA
( Rp./jam )
100,000.00
150,000.00
200,000.00
175,000.00

MATERIAL
BIAYA
(Rp.)
500,000.00
750,000.00
1,000,000.00
875,000.00

53,134,232.06
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
58,825.03
5,882.50
64,707.54
64,708.00

3,125,000.00
58,825,034.06
per M2

SATUAN

Batu Pecah 1 - 2 cm
Abu Batu / Screnn 0.5 - 1 cm
Aspal Bitumen
Alat Bantu

PERALATAN

KODE

LABURAN DUA LAPIS


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per M2

ANALISA HARGA SATUAN PEKERJAAN


PASANGAN BATU KALI

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Material disiapkan dilokasi oleh
pemasok
2 Batu belah dipasang dengan ikatan
spesi semen + pasir
3 Termasuk pekerjaan tambah lainnya
seperti sulingan dan ijuk
PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

VOL

HARI

1
3
12

1
1
1

MATERIAL
M
A
T
E
R
I
A
L

P
E
R
A
L
A
T
A
N

Concrete mixer

VOLUME :

AnalisHrgSat/332098034.xls

JUMLAH
1

AN24
TANGGAL

TOTAL VOL
(org/hari)
1.00
3.00
12.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
363,690.00
1,080,000.00

HARGA
(Rp./Unit)
311,004.78
250,000.00
68,300.00
4,000.00

PEKERJA
BIAYA
(Rp.)
699,760.77
1,500,000.00
1,092,800.00
4,000.00

1,601,591.00
SUB TOTAL
(Rp.)

m3
m3
zak
set

TOTAL
VOL
2.25
6.00
16.00
1.00

HARI
KERJA
1

JAM
KERJA
5.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

3,296,560.77
SUB TOTAL
(Rp.)

SATUAN

Pasir pasang
Batu Kali
Semen
Alat Bantu

PERALATAN

KODE

(UNTUK SALURAN, GORONG-GORONG, JEMBATAN,


TEMBOK PENAHAN TANAH DAN STRUKTUR LAINNYA)
KOTA
KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Digunakan pada gorong-gorong, jembatan, tembok pengaman jalan dan
struktur-struktur lainnya.
2. Adukan spesi 1 pc : 4 ps.
3. Pengadukan spesi dengan alat pengaduk (concrete mixer)

SATUAN

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
979,630.35
97,963.04
1,077,593.39
1,077,593.00

SUB TOTAL
(Rp.)

4,898,151.77
per M3

per M3

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Pertimbangan harga satuan ini terma
bahan tambah lainnya
2 Anyaman bronjong ukuran kawat 4m
3 Ukuran lubang 12x15 cm
4 Jumlah lilitan 3 lilitan

PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

VOL

HARI

1
6
15

1
1
1

SATUAN
kg
m3
set

JUMLAH

P
E
R
A
L
A
T
A
N

VOLUME :

AnalisHrgSat/332098034.xls

AN25

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Batu belah didatangkan oleh suplayer
2. Kawat Bronjong dikirim kelokasi oleh suplayer
3. Ukuran bronjong (2m x 1m x 0,5m)

Kawat Bronjong ukuran 4mm


Batu Kali
Alat Bantu

PERALATAN

KODE

BRONJONG / GABION
KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

15

HARI
KERJA

SATUAN

TANGGAL

TOTAL VOL
(org/hari)
1.00
6.00
15.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
727,380.00
1,350,000.00

TOTAL
VOL
200.00
18.00
0.40

HARGA
(Rp./Unit)
24,840.00
250,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
4,968,000.00
4,500,000.00
1,600.00

2,235,281.00
SUB TOTAL
(Rp.)

JAM
KERJA

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

9,469,600.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
780,325.40
78,032.54
858,357.94
858,358.00

SUB TOTAL
(Rp.)

11,704,881.00
per M3

per M3

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Material didatangkan oleh suplayer
2 Beton diaduk dengan mesin pengadu
3 pengecoran dibantu dengan alat
penggetar

PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

P
E
R
A
L
A
T
A
N

Concrete Mixer
Penggetar Beton

VOLUME :

AnalisHrgSat/332098034.xls

AN26

KODE
0
( 071 )
ANGGAPAN :
1. Kapasitas Produksi 10m3/hari
2. Campuran beton 1:3:5

VOL

HARI

1
2
10

1
1
1

JUMLAH
1
1

10

DIBUAT OLEH :
-

TANGGAL

TOTAL VOL
(org/hari)
1.00
2.00
10.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
242,460.00
900,000.00

HARGA
(Rp./Unit)
275,000.00
314,285.71
68,300.00
4,000.00

PEKERJA
BIAYA
(Rp.)
2,337,500.00
1,571,428.57
3,824,800.00
8,000.00

1,300,361.00
SUB TOTAL
(Rp.)

m3
m3
zak
set

TOTAL
VOL
8.50
5.00
56.00
2.00

HARI
KERJA
5
5

JAM
KERJA
5.00
5.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

7,741,728.57
SUB TOTAL
(Rp.)

SATUAN

Batu pecah 1-2 cm


Pasir Beton
Semen PC
Alat Bantu

PERALATAN

KODE

BETON NON STRUKTUR


KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
904,208.96
90,420.90
994,629.85
994,630.00

SUB TOTAL
(Rp.)

9,042,089.57
per M3

per M3

ANALISA HARGA SATUAN PEKERJAAN

KODE

BETON STRUKTUR K-225

AN27

PROPINSI :
KODE
KOTA
KODE
JAWA BARAT
(32)
0
( 071 )
PROSES :
ANGGAPAN :
1 Material didatangkan oleh suplayer 1. Kapasitas Produksi 10m3/hari
2 Contoh bahan / material telah diuji
2. Kapasitas alat pengaduk 0,3 m3
di laboratorium sesuai spesifikasi
3. Campuran beton 1 : 1,5 : 2,5
3 Beton diaduk dengan mesin pengaduk
4 Pengecoran dibantu dengan alat
penggetar
PEKERJA
VOL
HARI
TOTAL VOL
(org/hari)
Mandor
1
1
1.00
P
E
Tukang
4
1
4.00
K
Pekerja
12
1
12.00
E
R
J
A

MATERIAL
M
A
T
E
R
I
A
L

PERALATAN
P
E
R
A
L
A
T
A
N

Concrete Mixer
Penggetar Beton

VOLUME :

AnalisHrgSat/332098034.xls

JUMLAH
1
1

10

TANGGAL

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
484,920.00
1,080,000.00

HARGA
(Rp./Unit)
275,000.00
314,285.71
68,300.00
4,000.00

PEKERJA
BIAYA
(Rp.)
2,200,000.00
1,571,428.57
4,917,600.00
8,000.00

1,722,821.00
SUB TOTAL
(Rp.)

m3
m3
zak
set

TOTAL
VOL
8.00
5.00
72.00
2.00

HARI
KERJA
5
5

JAM
KERJA
5.00
5.00

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

8,697,028.57
SUB TOTAL
(Rp.)

SATUAN

Batu pecah 1-2 cm


Pasir Beton
Semen PC
Alat Bantu

DIBUAT OLEH :
-

SATUAN

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
1,041,984.96
104,198.50
1,146,183.45
1,146,183.00

SUB TOTAL
(Rp.)

10,419,849.57
per M3

per M3

ANALISA HARGA SATUAN PEKERJAAN

KODE

PENULANGAN BETON

AN28

PROPINSI :
KODE
KOTA
KODE
DIBUAT OLEH :
JAWA BARAT
(32)
0
( 071 )
PROSES :
ANGGAPAN :
1 Memotong, membengkok dan mengik 1. Besi dikirim ke tempat pekerjaan oleh suplayer
batang besi tulangan di tempat
2. Baja tulangan dibengkok dan dipasang dengan tenaga manusia
persiapan pengecoran beton
3. 200 kg disiapkan dalam satu hari
4. Toeslag 10%

PEKERJA
P
E
K
E
R
J
A

M
A
T
E
R
I
A
L

Mandor
Tukang
Pekerja

VOL

HARI

1
2
2

1
1
1

MATERIAL

SATUAN

Tulangan besi beton


Kawat Beton
Alat Bantu

PERALATAN

kg
kg
set

JUMLAH

P
E
R
A
L
A
T
A
N

VOLUME :

AnalisHrgSat/332098034.xls

200

HARI
KERJA

SATUAN

TANGGAL

TOTAL VOL
(org/hari)
1.00
2.00
2.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
242,460.00
180,000.00

TOTAL
VOL
220.00
2.00
0.40

HARGA
(Rp./Unit)
7,289.72
17,500.00
4,000.00

PEKERJA
BIAYA
(Rp.)
1,603,738.32
35,000.00
1,600.00

580,361.00
SUB TOTAL
(Rp.)

JAM
KERJA

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

1,640,338.32
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
11,103.50
1,110.35
12,213.85
12,214.00

SUB TOTAL
(Rp.)

2,220,699.32
per KG

per KG

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Pekerjaan ini meliputi memasang,
menyetel, dan membongkar bekisting

PEKERJA
P
E
K
E
R
J
A

M
A
T
E
R
I
A
L

Mandor
Tukang
Pekerja

ANALISA HARGA SATUAN PEKERJAAN

KODE

BEKISTING UNTUK BETON

AN29

KOTA

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Harga bahan smpai di lokasi pekerjaan
2. Pembuatan bekisting dapat diselesaikan 50m2/hari
3. Per m3 beton diperlukan 5 m2 bekisting
4. Toeslag 10%

VOL

HARI

1
8
4

1
1
1

MATERIAL

SATUAN

Kayu acuan
Paku
Alat Bantu

m3
kg
set

PERALATAN

JUMLAH

P
E
R
A
L
A
T
A
N

VOLUME :

AnalisHrgSat/332098034.xls

50

HARI
KERJA

SATUAN

TANGGAL

TOTAL VOL
(org/hari)
1.00
8.00
4.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
969,840.00
360,000.00

TOTAL
VOL
2.00
10.00
2.00

HARGA
(Rp./Unit)
3,750,000.00
18,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
7,500,000.00
180,000.00
8,000.00

1,487,741.00
SUB TOTAL
(Rp.)

JAM
KERJA

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

7,688,000.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
183,514.82
18,351.48
201,866.30
201,866.00

SUB TOTAL
(Rp.)

9,175,741.00
per M2

per M2

PENGECATAN MARKA JALAN

KODE
AN30

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Bahan yang digunakan harus
memenuhi syarat
2 Permukaan jalan harus bersih
dari air dan kotoran yang melekat
3 Arah lalu lintas harus jelas

PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

KOTA

KODE
0
( 071 )
ANGGAPAN :
1. Hasil Kerja per hari = 20 m2

VOL

HARI

1
2
6

1
1
1

MATERIAL
M
A
T
E
R
I
A
L

PERALATAN
P
E
R
A
L
A
T
A
N

Air Compressor
Truk bak terbuka

VOLUME :

AnalisHrgSat/332098034.xls

JUMLAH
1
1

80

TANGGAL

TOTAL VOL
(org/hari)
1.00
2.00
6.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
242,460.00
540,000.00

HARGA
(Rp./Unit)
22,000.00
18,000.00
28,700.00
4,000.00

PEKERJA
BIAYA
(Rp.)
2,904,000.00
648,000.00
229,600.00
4,800.00

940,361.00
SUB TOTAL
(Rp.)

kg
kg
ltr
set

TOTAL
VOL
132.00
36.00
8.00
1.20

HARI
KERJA
1
1

JAM
KERJA
5.00
5.00

HARGA
( Rp./jam )
150,000.00
125,000.00

MATERIAL
BIAYA
(Rp.)
750,000.00
625,000.00

3,786,400.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
76,272.01
7,627.20
83,899.21
83,899.00

1,375,000.00
6,101,761.00
per M2

SATUAN

Cat Primer Marka


Glass Bead
Thinner
Alat Bantu

DIBUAT OLEH :
-

SATUAN

SUB TOTAL
(Rp.)

per M2

PROPINSI :
JAWA BARAT
PROSES :

KODE
(32)

PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

KODE

PENGECATAN

AN31

KOTA

KODE
0
( 071 )
ANGGAPAN :
1. Hasil Kerja per hari = 100 m2

VOL

HARI

1
5
10

1
1
1

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

Cat Besi
Thinner
Alat Bantu

kg
ltr
set

PERALATAN

JUMLAH

P
E
R
A
L
A
T
A
N

VOLUME :

AnalisHrgSat/332098034.xls

100

HARI
KERJA

SATUAN

DIBUAT OLEH :
-

TANGGAL

TOTAL VOL
(org/hari)
1.00
5.00
10.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

BIAYA
(Rp.)
157,901.00
606,150.00
900,000.00

TOTAL
VOL
25.00
5.00
0.40

HARGA
(Rp./Unit)
36,800.00
28,700.00
4,000.00

PEKERJA
BIAYA
(Rp.)
920,000.00
143,500.00
1,600.00

1,664,051.00
SUB TOTAL
(Rp.)

JAM
KERJA

HARGA
( Rp./jam )

MATERIAL
BIAYA
(Rp.)

1,065,100.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
27,291.51
2,729.15
30,020.66
30,021.00

SUB TOTAL
(Rp.)

2,729,151.00
per M2

per M2

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
Persiapkan areal menjadi bentuk persegi
pada tanah yang akan dipasang
Ratakan permukaan yang akan dipasang
dengan pasir tebal 3cm
PEKERJA
P
E
K
E
R
J
A

Mandor
Tukang
Pekerja

ANALISA HARGA SATUAN PEKERJAAN

KODE

PERKERASAN BLOCK / PEMASANGAN PAVING BLOCK

AN33

KOTA

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Kedalaman Rata-rata 8cm
2. Material didatangkan oleh suplayer
3. Kapasitas rata-rata 25m2/hari

VOL

HARI

1
8
12

1
1
1

MATERIAL
M
A
T
E
R
I
A
L

Paving Block
Pasir Beton
Alat Bantu

PERALATAN
P
E
R
A
L
A
T
A
N

SATUAN

Alat Pemadat (Stamper)

VOLUME :

AnalisHrgSat/332098034.xls

JUMLAH
1

25

TOTAL VOL
(org/hari)
1.00
8.00
12.00

UPAH
(Rp./org/hari)
157,901.00
121,230.00
90,000.00

HARGA
(Rp./Unit)

m2
m3
set

TOTAL
VOL
25.00
1.50
0.93

HARI
KERJA
1

JAM
KERJA
5.00

HARGA
( Rp./jam )

SATUAN

TANGGAL

BIAYA
(Rp.)
157,901.00
969,840.00
1,080,000.00

PEKERJA
BIAYA
(Rp.)

314,285.71
4,000.00

SUB TOTAL
(Rp.)

2,207,741.00
SUB TOTAL
(Rp.)

471,428.57
3,720.00

MATERIAL
BIAYA
(Rp.)

475,148.57
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
107,315.58
10,731.56
118,047.14
118,047.00

2,682,889.57
per M2

per M2

PROPINSI :
KODE
JAWA BARAT
(32)
PROSES :
1 Gali Tanah untuk pondasi patok
kedalaman 0,50-0,60cm
2 Patok ditanam dan diberi angker

PEKERJA
P
E
K
E
R
J
A

Mandor
Pekerja

P
E
R
A
L
A
T
A
N

Dump Truck

VOL

HARI

1
4

1
1

JUMLAH

AnalisHrgSat/332098034.xls

20

TANGGAL

TOTAL VOL
(org/hari)
1.00
4.00

UPAH
(Rp./org/hari)
157,901.00
90,000.00

BIAYA
(Rp.)
157,901.00
360,000.00

HARGA
(Rp./Unit)
20,000.00
4,000.00

PEKERJA
BIAYA
(Rp.)
400,000.00
1,600.00

517,901.00
SUB TOTAL
(Rp.)

Bh
set

TOTAL
VOL
20.00
0.40

HARI
KERJA
1

JAM
KERJA
5.00

HARGA
( Rp./jam )
175,000.00

MATERIAL
BIAYA
(Rp.)
875,000.00

401,600.00
SUB TOTAL
(Rp.)

Jumlah Rp.
Keuntungan Max. Rp.
Jumlah Total Rp.
Jumlah Dibulatkan Rp.

PERALATAN
TOTAL
89,725.05
8,972.51
98,697.56
98,698.00

875,000.00
1,794,501.00
per BH

SATUAN

VOLUME :

AN34

KODE
DIBUAT OLEH :
0
( 071 )
ANGGAPAN :
1. Patok diadakan oleh suplayer di pool
2. Kapasitas per hari 20 patok
3. Patok dari pool dibawa ke lapangan dengan menggunkan Dump Truck

Patok
Alat Bantu

PERALATAN

KODE

PEMASANGAN PATOK
KOTA

MATERIAL
M
A
T
E
R
I
A
L

ANALISA HARGA SATUAN PEKERJAAN

SATUAN

SUB TOTAL
(Rp.)

per BH

A001
PEK. PENGUKURAN KEMBALI (SITE) PER M2
Tukang batu terampil
Pekerja terampil
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A002
PEK. BOUPLANG PER M1
Kayu Borneo Super
Paku
Ongkos Pasang
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A003
PEK. LOS KERJA / GUDANG PER M2
Kayu Borneo Super
Paku
Seng Gelombang Bjls 28 (80x180cm)
Triplek 3 mm
Semen PC
Peralatan
Ongkos Pasang
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A004
PEK. KANTOR DIREKSI PER M2
Kayu Borneo Super
Paku
Seng Gelombang Bjls 28 (80x180cm)
Triplex 3mm
Semen PC
Pasir pasang
Bata merah
Peralatan
Ongkos Pasang
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

AnalisHrgSat/332098034.xls

0.0100
0.0200
1.0000

Org
Org
Ls

0.0100
0.0200
1.0000

125,000.00
102,920.00
750.00

1,250.00
2,058.40
750.00
4,058.40
405.84
4,464.24
4,464.00

M3
Kg
Ls

3,125,000.00
18,000.00
2,750.00

31,250.00
360.00
2,750.00
34,360.00
3,436.00
37,796.00
37,796.00

0.1000
0.2500
1.1000
0.5000
0.1000
1.0000
1.0000

M3
Kg
Lbr
Lbr
Zak
Ls
Ls

3,125,000.00
18,000.00
65,625.00
48,000.00
68,300.00
5,500.00
15,000.00

312,500.00
4,500.00
72,187.50
24,000.00
6,830.00
5,500.00
15,000.00
440,517.50
44,051.75
484,569.25
484,569.00

0.1000
0.2500
1.1000
0.5000
0.1000
0.2500
70.0000
1.0000
1.0000

M3
Kg
Lbr
Lbr
Zak
M3
Bh
Ls
Ls

3,125,000.00
18,000.00
65,625.00
48,000.00
68,300.00
311,004.78
750.00
11,000.00
20,000.00

312,500.00
4,500.00
72,187.50
24,000.00
6,830.00
77,751.20
52,500.00
11,000.00
20,000.00
581,268.70
58,126.87
639,395.57
639,396.00

A005
PEK. PAPAN NAMA KEGIATAN PER M2
Kayu Borneo Super dan Triplex
Paku
Cat Minyak
Penulisan
Ongkos Pasang
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A006
PEK. PAGAR PENGAMAN PER M1
Seng Gelombang Bjls 28 (80x180cm)
Kayu Borneo Super
Paku
Cat Minyak 2 x bagian luar
Ongkos Pasang
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

0.1300
0.2500
1.0000
1.0000
1.0000

M3
Kg
Kg
Ls
Ls

3,125,000.00
18,000.00
36,800.00
30,000.00
15,000.00

406,250.00
4,500.00
36,800.00
30,000.00
15,000.00
492,550.00
49,255.00
541,805.00
541,805.00

1.4300
0.0360
0.0200
1.8000
1.0000

Lbr
M3
Kg
M2
Ls

65,625.00
3,125,000.00
18,000.00
36,800.00
15,000.00

93,843.75
112,500.00
360.00
66,240.00
15,000.00
287,943.75
28,794.38
316,738.13
316,738.00

102,920.00
157,901.00
96,927.63

77,190.00
19,737.63
24,231.91
121,159.53
12,115.95
133,275.48
133,275.00

102,920.00
157,901.00
22,760.76

19,760.64
3,000.12
2,276.08
25,036.83
2,503.68
27,540.52
27,541.00

102,920.00
157,901.00
59,355.05

51,460.00
7,895.05
7,419.38
66,774.43
6,677.44
73,451.87
73,452.00

A013
PEK. GALIAN TANAH CADAS MAX KEDALAMAN 1M (PER M3)
0.7500 Org
Pekerja terampil
0.1250 Org
Mandor
0.2500 Lot
Alat Bantu
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A017
PEK. URUGAN TANAH KEMBALI DIPADATKAN PER M3
0.1920 Org
Pekerja terampil
0.0190 Org
Mandor
0.1000 Ls
Alat Bantu
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A018
PEK. PEMADATAN TANAH SETIAP 20CM
Tukang Gali
Mandor
Alat Bantu
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan
AnalisHrgSat/332098034.xls

0.5000
0.0500
0.1250

Org
Org
Lot

AnalisHrgSat/332098034.xls

A025
PEK. GALIAN TANAH SUMURAN (MAX KEDALAMAN 10 M)
1.1500
Pekerja terampil
0.0250
Mandor
1.0000
Alat Bantu
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A027
PEK. URUGAN PASIR URUG PER M3
Pasir Urugan
Pekerja
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

1.2000
0.1500
0.0100

PER M3
org
Org
Ls

102,920.00
157,901.00
2,000.00

118,358.00
3,947.53
2,000.00
124,305.53
12,430.55
136,736.08
136,736.00

M3
Org
Org

190,000.00
90,000.00
157,901.00

228,000.00
13,500.00
1,579.01
243,079.01
24,307.90
267,386.91
267,387.00

A029
BETON BERTULANG SIKLOOP SUMURAN K175 + 40% BATU BELAH PER M3
0.6000 M3
1,141,237.39
Beton Struktur Klas K175 (A030)
79.5775 Kg
12,214.00
Memotong, Membengkok &
Memasang Tulangan Besi (AN28)
0.4800 M3
250,000.00
Batu Kali 40%
Jumlah
Jumlah Dibulatkan

120,000.00
1,776,702.02
1,776,702.00

A027
COR BETON SITE MIX K 175 PER M3
Semen PC (50 kg)
Split pecah mesin 2/3
Pasir Beton
Pekerja
Tukang batu setengah terampil
Kep. tukang batu
Mandor
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

68,300.00
275,000.00
314,285.71
90,000.00
121,230.00
139,574.00
157,901.00
1,066,577.00

464,440.00
228,250.00
169,714.29
135,000.00
60,615.00
6,978.70
1,579.01
74,660.39
1,141,237.39
114,123.74
1,255,361.12
1,255,361.00

865,200.00
90,000.00
121,230.00
139,574.00
157,901.00
1,136,043.91

865,200.00
225,000.00
30,307.50
13,957.40
1,579.01
51,121.98
1,187,165.89

6.8000
0.8300
0.5400
1.5000
0.5000
0.0500
0.0100
0.0700

zak
m
m
org
org
org
org
lot

A031
COR BETON K-250 READY MIX MIN 6 M3 BERIKUT POMPA PER M3
1.0000 M3
Adukan K-250 Readymix
2.5000 Org
Pekerja
0.2500 Org
Tukang batu setengah terampil
0.1000 Org
Kepala Tukang Batu
0.0100 Org
Mandor
0.0450 Lot
Alat Bantu (Pompa + Vibrator + Test Lab)
Jumlah
AnalisHrgSat/332098034.xls

684,742.43
971,959.59

Keuntungan Max.
Jumlah
Jumlah Dibulatkan

AnalisHrgSat/332098034.xls

118,716.59
1,305,882.47
1,305,882.00

A032
COR BETON K-350 READY MIX MIN 6 M3 BERIKUT POMPA PER M3
1.0000 M3
Adukan K-350 Readymix
2.5000 Org
Pekerja
0.2500 Org
Tukang batu setengah terampil
0.1000 Org
Kepala Tukang Batu
0.0100 Org
Mandor
0.0450 Lot
Alat Bantu (Pompa + Vibrator + Test Lab)
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A050
1 m3 PAS. ANSTAMPING BATU KALI
Batu kali / belah
Pasir urug
Pekerja
Tukang batu setengah terampil
Kepala Tukang batu
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A052
PAS. LEMPENGAN RUMPUT PER M2
Lempengan Rumput Biasa (Teki)
Pekerja
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

947,600.00
225,000.00
30,307.50
13,957.40
1,579.01
54,829.98
1,273,273.89
127,327.39
1,400,601.27
1,400,601.00

1.2000
0.4000
1.5000
0.7500
0.1000
0.0750

M3
M3
Org
Org
Org
Org

250,000.00
190,000.00
90,000.00
121,230.00
139,574.00
157,901.00

300,000.00
76,000.00
135,000.00
90,922.50
13,957.40
11,842.58
627,722.48
62,772.25
690,494.72
690,495.00

1.0000
0.0400
0.0100

M2
Kg
Org

12,500.00
90,000.00
157,901.00

12,500.00
3,600.00
1,579.01
17,679.01
1,767.90
19,446.91
19,447.00

8,250.00
35,000.00
90,000.00
157,901.00

8,250.00
35,000.00
36,000.00
7,895.05
87,145.05
8,714.51
95,859.56
95,860.00

B6
PAS. BATANG TANAMAN PER BATANG (berikut pelindungnya)
1.0000 Bh
Batang Tanaman
1.0000 Kg
Bambu Tali
0.4000 Org
Pekerja
0.0500 Org
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

AnalisHrgSat/332098034.xls

947,600.00
90,000.00
121,230.00
139,574.00
157,901.00
1,218,443.91

A066
LANTAI KERAMIK 30/30 DN BERCORAK/BERWARNA PER M2
1.0100 M2
Keramik KW 1 DN bercorak/berwarna
0.1600 Zak
Semen PC
0.0300 M3
Pasir pasang
0.0130 Kg
Semen warna
0.2500 Org
Pekerja terampil
0.4000 Org
Tukang batu terampil
0.0500 Org
Kepala Tukang batu
0.0250 Org
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A073
PAS. BATA MERAH 1 : 4 PER M2
Bata merah
Semen PC
Pasir pasang
Pekerja
Tukang batu setengah terampil
Kepala Tukang batu
Mandor Lapangan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

70.0000
0.4192
0.0580
0.4290
0.2140
0.0210
0.0110

Bh
Zak
M3
Org
Org
Org
Org

G50i
PEK. PLESTERAN AD 1 : 3 (tebal 15 mm) (Bidang Pengairan) PER M2
0.1304 Zak
Semen PC
0.0194 M3
Pasir Pasang
0.2000 Org
Tukang Batu
0.0200 Org
Kepala Tukang Batu
0.4000 Org
Pekerja
0.0200 Org
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

G50c
PEK. SIARAN 1PC : 2PS (Bidang Pengairan) PER M2
0.1054 Zak
Semen PC
0.0085 M3
Pasir Pasang
0.1200 Org
Tukang Batu
0.0120 Org
Kepala Tukang Batu
0.3600 Org
Pekerja
0.0180 Org
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan
AnalisHrgSat/332098034.xls

46,000.00
68,300.00
311,004.78
1,800.00
102,920.00
125,000.00
139,574.00
157,901.00

46,460.00
10,928.00
9,330.14
23.40
25,730.00
50,000.00
6,978.70
3,947.53
153,397.77
15,339.78
168,737.55
168,738.00

750.00
68,300.00
311,004.78
90,000.00
121,230.00
139,574.00
157,901.00

52,500.00
28,631.36
18,038.28
38,610.00
25,943.22
2,931.05
1,736.91
168,390.82
16,839.08
185,229.90
185,230.00

68,300.00
311,004.78
121,230.00
139,574.00
90,000.00
157,901.00

8,906.32
6,033.49
24,246.00
2,791.48
36,000.00
3,158.02
81,135.31
8,113.53
89,248.84
89,249.00

68,300.00
311,004.78
121,230.00
139,574.00
90,000.00
157,901.00

7,198.82
2,643.54
14,547.60
1,674.89
32,400.00
2,842.22
61,307.07
6,130.71
67,437.77
67,438.00

AnalisHrgSat/332098034.xls

A130
PENGHAMPARAN BATU PECAH MESIN 5 - 7 cm tebal 10cm PER M2
0.1100 M3
Batu pecah 5 - 7 cm
0.1100 Org
Pekerja Terampil
1.0000 Ls
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A131
PENGHAMPARAN BATU PECAH MESIN 2 - 3 cm tebal 5cm
0.0500
Batu pecah 2 - 3 cm
0.0800
Pekerja Terampil
1.0000
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

PER M2
M3
Org
Ls

130,000.00
102,920.00
1,000.00

14,300.00
11,321.20
1,000.00
26,621.20
2,662.12
29,283.32
29,283.00

275,000.00
102,920.00
750.00

13,750.00
8,233.60
750.00
22,733.60
2,273.36
25,006.96
25,007.00

A132
PENGHAMPARAN LAPISAN PENGISI / PENUTUP BATU PECAH 1 - 2cm PER M2
0.0100 M3
275,000.00
Batu pecah 1 - 2 cm
0.0100 M3
215,311.00
Abu Batu / Screen
0.0500 Org
102,920.00
Pekerja Terampil
1.0000 Ls
750.00
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

2,750.00
2,153.11
5,146.00
750.00
10,799.11
1,079.91
11,879.02
11,879.00

A133
PENGASPALAN PER M2
Abu Batu / Screen
Aspal
Kayu Bakar
Pekerja Terampil
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

215,311.00
8,064.52
102,920.00
1,500.00

2,153.11
32,258.06
6,175.20
1,500.00
42,086.37
4,208.64
46,295.01
46,295.00

215,311.00
14,175.00
90,000.00
102,920.00
157,901.00
29,000.00

9,689.00
70,875.00
7,200.00
3,087.60
4,737.03
29,000.00
124,588.63

0.0100
4.0000
0.0300
0.0600
1.0000

M3
Kg
M3
Org
Ls

A134
HOTMIX MANUAL TEB 3CM UNTUK HALAMAN & JALAN PER M2
0.0450 M3
Abu Batu
5.0000 Kg
Aspal
0.0080 M3
Kayu Bakar
0.0800 Org
Pekerja
0.0300 Org
Pekerja Terampil
0.0300 Org
Mandor
1.0000 Ls
Peralatan
Jumlah
AnalisHrgSat/332098034.xls

Keuntungan Max.
Jumlah
Jumlah Dibulatkan

AnalisHrgSat/332098034.xls

12,458.86
137,047.49
137,047.00

A134B
HOTMIX MANUAL TEB 2CM UNTUK HALAMAN & JALAN PER M2
0.0300 M3
Abu Batu
3.5000 Kg
Aspal
0.0053 M3
Kayu Bakar
0.0800 Org
Pekerja
0.0300 Org
Pekerja Terampil
0.0300 Org
Mandor
1.0000 Ls
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

215,311.00
14,175.00
90,000.00
102,920.00
157,901.00
2,500.00

6,459.33
49,612.50
7,200.00
3,087.60
4,737.03
2,500.00
73,596.46
7,359.65
80,956.11
80,956.00

215,311.00
14,175.00
90,000.00
102,920.00
157,901.00
2,500.00

3,229.67
23,625.00
7,200.00
3,087.60
4,737.03
2,500.00
44,379.30
4,437.93
48,817.22
48,817.00

Kg
Kg
Lbr
Ltr
Bh
Org
Org
Org
Org

42,000.00
36,800.00
3,500.00
28,700.00
4,500.00
90,000.00
121,230.00
139,574.00
157,901.00

7,360.00
1,400.00
4,305.00
225.00
18,000.00
36,369.00
4,187.22
1,579.01
73,425.23
7,342.52
80,767.75
80,768.00

Bh
M3
M3
Org
Org
Org

60,000.00
904,208.96
93,102.90
90,000.00
125,000.00
157,901.00

100,000.00
5,425.25
1,117.23
3,000.00
4,166.67
2,631.68
116,340.84
11,634.08

A134C
HOTMIX MANUAL TEB 1CM UNTUK HALAMAN & JALAN PER M2
0.0150 M3
Abu Batu
1.6667 Kg
Aspal
0.0027 M3
Kayu Bakar
0.0800 Org
Pekerja
0.0300 Org
Pekerja Terampil
0.0300 Org
Mandor
1.0000 Ls
Peralatan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A090
PENGECATAN BESI (3x) UNTUK RAILLING PER M2
Meni besi
0.2000
Cat kayu / besi Glotex
0.4000
Ampelas Besi
0.1500
Minyak Thinner A
0.0500
Kwas 3"
0.2000
Pekerja
0.3000
Tukang cat terampil
0.0300
Kepala tukang cat
0.0100
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

SUPL
PEK. KERB / KANSTIN / PITA BETON PER M1
Kerb Beton Pracetak Ukuran 60cm
Cor Beton Tumbuk (AN26) / Non Provit
Galian Tanah Keras (AN06B) / Non Provit
Pekerja
Tukang Batu Terampil
Mandor
Jumlah
Keuntungan Max.
AnalisHrgSat/332098034.xls

1.6667
0.0060
0.0120
0.0333
0.0333
0.0167

Jumlah
Jumlah Dibulatkan

AnalisHrgSat/332098034.xls

127,974.92
127,975.00

SUPL
PAS. DRAINASE BUIS BETON BULAT DIA 30 UNTUK SODETAN PER M1
0.2400 M3
Galian Tanah (AN06)
0.1143 M3
Urugan Tanah Kembali Dipadatkan
0.0628 M3
Cor Beton Tumbuk (AN26)
1.0000 M1
Buis Beton Dia 30 cm
Jumlah
Jumlah Dibulatkan

68,275.00
27,541.00
994,630.00
95,000.00

16,386.00
3,148.94
62,494.45
95,000.00
177,029.38
177,029.00

SUPL
PAS. DRAINASE BUIS BETON BULAT DIA 20 UNTUK SODETAN PER M1
0.1500 M3
Galian Tanah (AN06)
0.0600 M3
Cor Beton Tumbuk (AN26)
1.0000 M1
Pasangan Buis Beton Dia 20 cm
Jumlah
Jumlah Dibulatkan

68,275.00
994,630.00
70,000.00

10,241.25
59,677.80
70,000.00
139,919.05
139,919.00

SUPL
PASANGAN SALURAN GRAVEL BETON U 20cm PER M1
0.1400
Galian Tanah (AN06)
0.0900
Cor Beton Tumbuk (AN26)
1.0000
Gravel U 1/2 dia 20cm
0.5000
Plesteran ad 1:4 (G50i)
1.2488
Penulangan Besi Beton (AN28)
0.3000
Bekisting (AN29)
Jumlah
Jumlah Dibulatkan

M3
M3
Buah
M2
KG
M2

68,275.00
994,630.00
89,249.00
12,214.00
201,866.00

9,558.50
89,516.70
44,624.50
15,252.84
60,559.80
219,512.34
219,512.00

SUPL
PASANGAN SALURAN GRAVEL BETON U 30cm PER M1
0.2400
Galian Tanah (AN06)
0.1400
Cor Beton Tumbuk (AN26)
1.0000
Gravel U 1/2 dia 30cm
0.6000
Plesteran ad 1:4 (G50i)
1.7840
Penulangan Besi Beton (AN28)
0.4000
Bekisting (AN29)
Jumlah
Jumlah Dibulatkan

M3
M3
Buah
M2
KG
M2

102,413.00
994,630.00
89,249.00
12,214.00
201,866.00

24,579.12
139,248.20
53,549.40
21,789.78
80,746.40
319,912.90
319,913.00

SUPL
BETON BERTULANG STRUKTUR K225 PENUTUP SALURAN TEB 10CM UNTUK TROTOAR
PENULANGAN BESI 1 LAPIS PER M3
1.0000 M3
1,146,183.00
Beton Struktur Klas K225 (AN27)
67.7563 Kg
12,214.00
Memotong, Membengkok &
Memasang Tulangan Besi (AN28)
12.0000 M2
201,866.00
Bekisting Beton (AN29)
Jumlah
Jumlah Dibulatkan

AnalisHrgSat/332098034.xls

1,146,183.00
827,575.45
2,422,392.00
4,396,150.45
4,396,150.00

SUPL
BETON BERTULANG STRUKTUR K225 PENUTUP GORONG-GORONG TEB 15CM UNTUK JALAN MASUK
PENULANGAN BESI 2 LAPIS PER M3
1.0000 M3
1,146,183.00
1,146,183.00
Beton Struktur Klas K225 (AN27)
98.5622 Kg
12,214.00
1,203,838.71
Memotong, Membengkok &
Memasang Tulangan Besi (AN28)
8.6667 M2
201,866.00
1,749,512.06
Bekisting Beton (AN29)
4,099,533.77
Jumlah
4,099,534.00
Jumlah Dibulatkan
SUPL
BETON BERTULANG STRUKTUR K225 PENUTUP GORONG-GORONG TEB 20CM UNTUK PLAT DECKER
MELINTANG PENULANGAN BESI 2 LAPIS PER M3
1.0000 M3
1,146,183.00
1,146,183.00
Beton Struktur Klas K225 (AN27)
133.4270 Kg
12,214.00
1,629,677.38
Memotong, Membengkok &
Memasang Tulangan Besi (AN28)
7.0000 M2
201,866.00
1,413,062.00
Bekisting Beton (AN29)
4,188,922.38
Jumlah
4,188,922.00
Jumlah Dibulatkan

L.4
BONGKARAN PASANGAN / ASPAL PER M3
Pekerja
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

2.0000
0.1000

Org
Org

SUPL
PEKERJAAN KISTDAM / PENGERINGAN PER M1
2.5000 Kg
Kawat Bronjong / Tali
4.0000 M3
Tanah Urugan Setempat
5.0000 Btg
Bambu
50.0000 Bh
Karung Plastik
1.5830 Rol
Tali Rami
0.0150 Org
Pekerja
0.0150 Org
Mandor
0.0150 Org
Kepala Tukang
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

SUPL
PEK. PASANGAN BATU SIKAT KORAL PER M2
Semen PC
Pasir Pasang
Batu Sikat Koral
Tukang Batu
Kepala Tukang Batu
Pekerja
Mandor
Jumlah
AnalisHrgSat/332098034.xls

0.1751
0.0500
0.6666
0.2000
0.0200
0.4000
0.0200

Zak
M3
Krng
Org
Org
Org
Org

90,000.00
157,901.00

180,000.00
15,790.10
195,790.10
19,579.01
215,369.11
215,369.00

24,840.00
42,500.00
35,000.00
1,300.00
5,000.00
90,000.00
157,901.00
139,574.00

62,100.00
170,000.00
175,000.00
65,000.00
7,915.00
1,350.00
2,368.52
2,093.61
485,827.13
48,582.71
534,409.84
534,410.00

68,300.00
311,004.78
45,000.00
121,230.00
139,574.00
90,000.00
157,901.00

11,959.33
15,550.24
29,997.00
24,246.00
2,791.48
36,000.00
3,158.02
123,702.07

Jumlah Dibulatkan

AnalisHrgSat/332098034.xls

123,702.00

SUPL
PEK. PASANGAN UBIN BADAK 30/30 AD PC 1 : 2 PER M2
11.0000
Ubin Badak
0.1600
Semen PC
0.0300
Pasir Pasang
0.1500
Pekerja Terampil
0.4000
Tukang Batu Terampil
0.0500
Kepala Tukang
0.0250
Mandor
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

Buah
Zak
M3
Org
Org
Org
Org

68,300.00
311,004.78
102,920.00
125,000.00
139,574.00
157,901.00

10,928.00
9,330.14
15,438.00
50,000.00
6,978.70
3,947.53
96,622.37
9,662.24
106,284.61
106,285.00

SUPL
PEMASANGAN TULANGAN DOWELUNTUK RIGID PAVEMENT PER M1
12.0485 KG
Penulangan Beton (AN28)
0.1458 BTNG
Pipa PVC dia 1"
0.2000 KG
Pelumas / Gemuk
1.0000 LS
Pembentukan Permukaan, Cutter Joint Sealler
Jumlah
Jumlah Dibulatkan

12,214.00
17,800.00
35,000.00
4,000.00

147,159.95
2,595.83
7,000.00
4,000.00
160,755.78
160,756.00

SUPL
PEMASANGAN TULANGAN TIE BAR UNTUK RIGID PAVEMENT PER M1
11.5594 KG
Penulangan Beton (AN28)
0.1458 BTNG
Pipa PVC dia 3/4"
0.2000 KG
Pelumas / Gemuk
1.0000 LS
Pembentukan Permukaan, Cutter Joint Sealler
Jumlah
Jumlah Dibulatkan

12,214.00
14,000.00
35,000.00
4,000.00

141,186.21
2,041.67
7,000.00
4,000.00
154,227.87
154,228.00

102,920.00
135,000.00
139,574.00
157,901.00
157,901.00
121,230.00
3,000,000.00
7,150.00
20,000.00
3,429.31

102.92
135.00
27.91
15.79
31.58
2,424.60
600.00
71.50
20.00
0.69

A035
PEK. ERECTION KONST KUDA-KUDA BESI (PER KG)
Pekerja terampil
0.0010 ORG
Tukang besi profil terampil
0.0010 ORG
Kepala tukang besi profil
0.0002 ORG
Mandor
0.0001 ORG
Operator alat besar
0.0002 ORG
Pembantu operator
0.0200 ORG
Sewa alat
0.0002 LS
Bahan bakar solar
0.0100 LT
Pelumas
0.0010 LT
Alat bantu
0.0002 LOT
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

AnalisHrgSat/332098034.xls

3,429.99
343.00
3,772.99
3,773.00

A036
PEKERJAAN BAJA IWF EX DN (PER KG)
Besi IWF ex DN SII
Pekerja Terampil
Tukang besi profil terampil
Kepala tukang besi profil
Mandor
Peralatan ( Oksigen , Solar , Elpiji, kawat las, dan
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

1.0500
0.0600
0.0040
0.0010
0.0002
0.1250

KG
ORG
ORG
ORG
ORG
LOT

1,868.52
20,553.77
20,554.00

1.0100
0.1000
0.0500
0.0300
0.0100
1.0000

M2
KG
ORG
ORG
ORG
LS

SUPL
PEKERJAAN PEMASANGAN CERUCUK BAMBU PER M1
Bambu dia 7-10 cm
0.1667 BTG
Buruh Lapangan Tak Terampil
0.0096 ORG
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan
AnalisHrgSat/332098034.xls

9,722.75
6,175.20
540.00
139.57
31.58
2,076.14
18,685.25

A038
PEKERJAAN KONSTRUKSI BESI SIKU / PROFIL EX. DN (PER KG)
Besi Profil / Besi Siku ex DN
1.0500 KG
Pekerja Terampil
0.0600 ORG
Tukang besi profil terampil
0.0040 ORG
Kepala tukang besi profil
0.0010 ORG
Mandor
0.0002 ORG
Peralatan ( Oksigen , Solar , Elpiji, kawat las, dan
0.1250 LOT
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

A041
PEKERJAAN BONDEX (PER M2)
Bondex
Kawat Las
Pekerja Terampil
Tukang besi profil setengah terampil
Mandor
Shear Connector
Jumlah
Keuntungan Max.
Jumlah
Jumlah Dibulatkan

9,259.77
102,920.00
135,000.00
139,574.00
157,901.00
16,609.11

9,259.77
102,920.00
135,000.00
139,574.00
157,901.00
16,609.11

9,722.75
6,175.20
540.00
139.57
31.58
2,076.14
18,685.25
1,868.52
20,553.77
20,554.00

99,000.00
13,000.00
102,920.00
121,213.00
157,901.00
111,651.40

99,990.00
1,300.00
5,146.00
3,636.39
1,579.01
111,651.40
223,302.80
22,330.28
245,633.08
245,633.00

35,000.00
90,000.00

5,833.33
864.00
6,697.33
669.73
7,367.07
7,367.00

ANALISA HARGA SATUAN PEKERJAAN BIDANG PENGAIRAN


TAHUN ANGGARAN 2006

No

A1
1
2

A2
1
2

A3
1
2

A4
1
2

A5
1
2

A6
1
2

URAIAN

KOEF.

SAT.

HARGA
SATUAN
( Rp. )

1 M3 GALIAN TANAH BIASA


Pekerja
0.750
Org
90,000.00
Mandor
0.025
Org
157,901.00
Jumlah
Keuntungan Max
Jumlah
Dibulatkan
1 M3 GALIAN TANAH KERAS
Pekerja
1.000
Org
90,000.00
Mandor
0.033
Org
157,901.00
Jumlah
Keuntungan Max
Jumlah
Dibulatkan
1 M3 TANAH GALIAN YANG BANYAK TERDAPAT BATU BUNDAR
Pekerja
1.500
Org
90,000.00
Mandor
0.050
Org
157,901.00
Jumlah
Keuntungan Max
Jumlah
Dibulatkan
1 M3 GALIAN TANAH LUMPUR
Pekerja
1.500
Org
90,000.00
Mandor
0.050
Org
157,901.00
Jumlah
Keuntungan Max
Jumlah
Dibulatkan
1 M2 GALIAN TANAH CADAS
Pekerja
2.000
Org
90,000.00
Mandor
0.066
Org
157,901.00
Jumlah
Keuntungan Max
Jumlah
Dibulatkan
1 M3 TANAH DIANGKUT SEJAUH 30 M
Pekerja
0.330
Org
90,000.00
Mandor
0.010
Org
157,901.00
Jumlah
Keuntungan Max
Jumlah
Dibulatkan

HARGA
BAHAN
( Rp. )

HARGA
UPAH
( Rp. )

67,500.00
3,947.53
71,447.53

90,000.00
5,210.73
95,210.73

135,000.00
7,895.05
142,895.05

135,000.00
7,895.05
142,895.05

180,000.00
10,421.47
190,421.47

29,700.00
1,579.01
31,279.01

JUMLAH
HARGA
( Rp. )

71,447.53
7,144.75
78,592.28
78,592.00

95,210.73
9,521.07
104,731.81
104,732.00

142,895.05
14,289.51
157,184.56
157,185.00

142,895.05
14,289.51
157,184.56
157,185.00

190,421.47
19,042.15
209,463.61
209,464.00

31,279.01
3,127.90
34,406.91
34,407.00

No

A7

URAIAN

KOEF.

SAT.

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

HARGA
UPAH
( Rp. )

JUMLAH
HARGA
( Rp. )

1 M3 TANAH DIANGKUT MELALUI JARAK LEBIH DARI 30 M


RUMUS
a = Upah pekerja setempat
L = Jarak angkut dalam m1
K = Harga angkutan per m3
Untuk jarak

:
100 M1 =
0.64
X
90,000.00
200 M1 =
1.00
X
300 M1 =
1.36
X
( termasuk harga bahan dan peralatan angkutan )

Jumlah
Keuntungan Max
Jumlah
Dibulatkan
1
Pekerja
0.150
Org
2
Mandor
0.010
Org
Jumlah
Keuntungan Max
Jumlah
Dibulatkan
A7 UPAH ANGKUTAN 1 ZAK SEMEN PC
(rob) 1 Zak PC = 50 KG = 40 Ltr Air = 0,04 M3 = 1/25 M3
maka setiap jarak = ( 1 / (275 / ( L + 75 ) ) ) / 25 x a
a = upah pekerja setempat L =
10 M1 =
0.012 X a
50 M1 =
0.018 X a
100 M1 =
0.025 X a
200 M1 =
0.040 X a
300 M1 =
0.055 X a

57,600.00
57,600.00

90,000.00
157,901.00

13,500.00
1,579.01
15,079.01

57,600.00
5,760.00
63,360.00
63,360.00

15,079.01
1,507.90
16,586.91
16,587.00

90,000.00
90,000.00

2,250.00

Jumlah
2,250.00
2,250.00
Keuntungan Max
225.00
Jumlah
2,475.00
Dibulatkan
2,475.00
A8 1 M3 TANAH DIANGKAT DARI DALAM LUBANG PENGGALIAN YANG DALAMNYA
LEBIH DARI 1 M UNTUK SETIAP METER DIHITUNG DARI TITIK BERATNYA.
1
Pekerja
0.1500
Org
90,000.00
13,500.00
2
Mandor
0.0075
Org
157,901.00
1,184.26
Jumlah
14,684.26
14,684.26
Keuntungan Max
1,468.43
Jumlah
16,152.68
Dibulatkan
16,153.00
A9 1 M3 TANAH LUMPUR DIANGKAT DARI DALAM LUBANG PENGGALIAN YANG DALAMNYA LEBIH DARI 1 M
UNTUK SETIAP METER DIHITUNG DARI TITIK BERATNYA.
1
Pekerja
0.2500
Org
90,000.00
22,500.00
2
Mandor
0.0125
Org
157,901.00
1,973.76
Jumlah
24,473.76
24,473.76
Keuntungan Max
2,447.38
Jumlah
26,921.14
Dibulatkan
26,921.00
A16 1 M3 TANAH DIRATAKAN,DITIMBRIS DAN DIHALUSKAN
1
Pekerja
0.2500 Org
90,000.00
22,500.00
2
Mandor
0.0100 Org
157,901.00
1,579.01
Jumlah
24,079.01
24,079.01
Keuntungan Max
2,407.90
Jumlah
26,486.91
Dibulatkan
26,487.00

No

URAIAN

KOEF.

SAT.

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

HARGA
UPAH
( Rp. )

SUPL 1 M3 URUGAN TANAH ( A1 + A7 + A16 )


A17 1 M3 MENGISI KEMBALI BEKAS GALIAN
1
Pekerja
0.1250 Org
90,000.00
11,250.00
2
Mandor
0.0050 Org
157,901.00
789.51
Jumlah
12,039.51
Keuntungan Max
Jumlah
Dibulatkan
B1 1 M2 PASANGAN LEMPENGAN RUMPUT TERMASUK MENGAMBIL DAN MEMASANGNYA
1 Pekerja
0.1500 Org
90,000.00
13,500.00
2 Mandor
0.0100 Org
157,901.00
1,579.01
Jumlah
15,079.01
Keuntungan Max
Jumlah
Dibulatkan
B2 ONGKOS ANGKUT 10 M2 LEMPENGAN TEMPEL (BIDANG PENGAIRAN)
Angkutan 10 m2 lempengan = angkutan 1 m3 galian
Tidak lebih dari 30 m' :
1 Pekerja
0.0330 Org
90,000.00
2,970.00
2 Mandor
0.0010 Org
157,901.00
157.90
Lebih dari 30 m' :
Rumus :
Rp.
13,363.64 a = Upah pekerja setempat
Rp.
14,700.00 L = Jarak angkut dalam m'
k = Harga angkutan per m3
( termasuk harga bahan dan peralatan angkutan )
Jumlah
3,127.90
Keuntungan Max
Jumlah
Dibulatkan
B5 MENANAM 1 M' PAGAR HIDUP ( BIDANG PENGAIRAN )
1 Buah Stek (cangkok)
10.0000 Bh
10,000.00
2 Pekerja
0.1000 Org
90,000.00
9,000.00
3 Mandor
0.0050 Org
157,901.00
789.51
Jumlah
10,000.00
9,789.51
Keuntungan Max
Jumlah
Dibulatkan
B6 MENANAM 1 BATANG TANAMAN BERIKUT PELINDUNGNYA ( BIDANG PENGAIRAN )
1 Batang Tanaman
1.0000 Bh
10,000.00
10,000.00
2 Bambu Tali
1.0000 Bh
2,500.00
2,500.00
3 Pekerja
0.4000 Org
90,000.00
36,000.00
4 Mandor
0.0050 Org
157,901.00
789.51
Jumlah
12,500.00
36,789.51
Keuntungan Max
Jumlah
Dibulatkan
E13 1 M' TIANG CERUCUK BAMBU DIPANCANGKAN KE DALAM TANAH LUNAK
1 Tukang Kayu
0.0400 Org
135,000.00
5,400.00
2 Kepala Tukang
0.0040 Org
139,574.00
558.30
3 Pekerja
1.8000 Org
90,000.00
162,000.00
4 Mandor
0.0450 Org
157,901.00
7,105.55
Jumlah
175,063.84
Keuntungan Max
Jumlah
Dibulatkan

JUMLAH
HARGA
( Rp. )
168,439.00

12,039.51
1,203.95
13,243.46
13,243.00

15,079.01
1,507.90
16,586.91
16,587.00

3,127.90
312.79
3,440.69
3,441.00

19,789.51
1,978.95
21,768.46
21,768.00

49,289.51
4,928.95
54,218.46
54,218.00

175,063.84
17,506.38
192,570.23
192,570.00

No

URAIAN

KOEF.

SAT.

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

HARGA
UPAH
( Rp. )

E14 1 M' TIANG DIPANCANGKAN KE DALAM TANAH LUNAK ( BIDANG PENGAIRAN )


(Bila perancah dipancangkan di atas rakit)
1 Tukang Kayu
0.0600 Org
135,000.00
8,100.00
2 Kepala Tukang
0.0060 Org
139,574.00
837.44
3 Pekerja
3.0000 Org
90,000.00
270,000.00
4 Mandor
0.0750 Org
157,901.00
11,842.58
Jumlah
290,780.02
Keuntungan Max
Jumlah
Dibulatkan
E17 1 M' PAPAN PENAHAN DIPANCANGKAN KE DALAM TANAH LUNAK
1 Tukang Kayu
0.0800 Org
135,000.00
10,800.00
2 Kepala Tukang
0.0080 Org
139,574.00
1,116.59
3 Pekerja
1.0000 Org
90,000.00
90,000.00
4 Mandor
0.0250 Org
157,901.00
3,947.53
Untuk tanah biasa dihitung = 1.25 x analisa E. 13
Untuk tanah keras dihitung = 1.50 x analisa E. 13
Untuk tanah pasir dihitung = 2.00 x analisa E. 13
Jumlah
105,864.12
Keuntungan Max
Jumlah
Dibulatkan
E17 1 M' MENCABUT TIANG PEMANCANG DARI DALAM TANAH
1 Tukang Kayu
0.3500 Org
135,000.00
47,250.00
2 Kepala Tukang
0.0350 Org
139,574.00
4,885.09
3 Pekerja
5.0000 Org
90,000.00
450,000.00
4 Mandor
0.2500 Org
157,901.00
39,475.25
Jumlah
541,610.34
Keuntungan Max
Jumlah
Dibulatkan
F3 1 M2 MEMBUAT SENDERAN BALOK PEMIKUL & BALOK AIR ( BIDANG PENGAIRAN )
1 Tukang Kayu
24.0000 Org
135,000.00
3,240,000.00
2 Kepala Tukang
2.4000 Org
139,574.00
334,977.60
3 Pekerja
8.0000 Org
90,000.00
720,000.00
4 Mandor
0.4000 Org
157,901.00
63,160.40
Jumlah
4,358,138.00
Keuntungan Max
Jumlah
Dibulatkan
F4 1 M2 MEMASANG BALOK PENGGANTUNG & PENARIK S.D 15 M1.
1 Tukang Kayu
36.0000 Org
135,000.00
4,860,000.00
2 Kepala Tukang
3.6000 Org
139,574.00
502,466.40
3 Pekerja
1.2000 Org
90,000.00
108,000.00
4 Mandor
0.6000 Org
157,901.00
94,740.60
Jumlah
5,565,207.00
Keuntungan Max
Jumlah
Dibulatkan
F6 100 KG MEMASANG GELAGAR BESI ( BIDANG PENGAIRAN )
1 Tukang Kayu
0.1000 Org
135,000.00
13,500.00
2 Kepala Tukang
0.0100 Org
139,574.00
1,395.74
3 Pekerja
0.5000 Org
90,000.00
45,000.00
4 Mandor
0.0250 Org
157,901.00
3,947.53
Jumlah
63,843.27
Keuntungan Max
Jumlah
Dibulatkan

JUMLAH
HARGA
( Rp. )

290,780.02
29,078.00
319,858.02
319,858.00

105,864.12
10,586.41
116,450.53
116,451.00

541,610.34
54,161.03
595,771.37
595,771.00

4,358,138.00
435,813.80
4,793,951.80
4,793,952.00

5,565,207.00
556,520.70
6,121,727.70
6,121,728.00

63,843.27
6,384.33
70,227.59
70,228.00

No

F7

URAIAN

KOEF.

SAT.

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

HARGA
UPAH
( Rp. )

JUMLAH
HARGA
( Rp. )

100 KG MENURUNKAN GELAGAR BESI ( BIDANG PENGAIRAN )


1 Pekerja
0.5000 Org
90,000.00
45,000.00
2 Mandor
0.0250 Org
157,901.00
3,947.53
Jumlah
48,947.53
48,947.53
Keuntungan Max
4,894.75
Jumlah
53,842.28
Dibulatkan
53,842.00
F8 1 M' MENGERJAKAN LANTAI JEMBATAN ( BIDANG PENGAIRAN )
1 Tukang Kayu
0.5000 Org
135,000.00
67,500.00
2 Kepala Tukang
0.0500 Org
139,574.00
6,978.70
3 Pekerja
0.2000 Org
90,000.00
18,000.00
4 Mandor
0.0100 Org
157,901.00
1,579.01
5 Paku (lantai bawah) atau
0.7500
kg
18,000.00
13,500.00
6 Paku
0.4000
kg
18,000.00
7,200.00
Jumlah
20,700.00
94,057.71
114,757.71
Keuntungan Max
11,475.77
Jumlah
126,233.48
Dibulatkan
126,233.00
G2 Pasangan batu kosong diantara tiang-tiang perkun dan pasangan-pasangan lain dari batu kosong.
Banyak batu yang diperlukan tergantung daripada tebalnya pasangan lapisan ditambah dengan 10%
karena hilang (kerugian), Memasang batunya per M3 :
1 Batu Kali
1.2000 m3
250,000.00
300,000.00
2 Pekerja
1.5000 Org
90,000.00
135,000.00
3 Mandor
0.0750 Org
157,901.00
11,842.58
Jumlah
300,000.00
146,842.58
446,842.58
Keuntungan Max
44,684.26
Jumlah
491,526.83
Dibulatkan
491,527.00
G3 1 M' PASANGAN BATU KOSONG TEBAL = 0.25 M SEBELAH LUAR DISISIR DENGAN PEREKAT
1 Batu kecil
0.2750 m3
250,000.00
68,750.00
2 Portland Cement ( 50 kg)
0.0760 zak
68,300.00
5,190.80
3 Pasir
0.0080 m3
311,004.78
2,488.04
4 Tukang Batu
0.0800 Org
125,000.00
10,000.00
5 Kepala Tukang
0.0080 Org
139,574.00
1,116.59
6 Pekerja
0.6150 Org
90,000.00
55,350.00
7 Mandor
0.0310 Org
157,901.00
4,894.93
Jumlah
76,428.84
71,361.52
147,790.36
Keuntungan Max
14,779.04
Jumlah
162,569.40
Dibulatkan
162,569.00
G4 1 M' MEMASANG BATU PADA BENDUNG CURAHAN SALURAN MIRING DST. SETEBAL 0.23 M'
1 Batu kali
0.2500 m3
250,000.00
62,500.00
2 Kerikil / batu pecah
0.2000 m3
130,000.00
26,000.00
3 Pekerja
0.8000 Org
90,000.00
72,000.00
4 Mandor
0.0400 Org
157,901.00
6,316.04
Jumlah
88,500.00
78,316.04
166,816.04
Keuntungan Max
16,681.60
Jumlah
183,497.64
Dibulatkan
183,498.00

No

URAIAN

KOEF.

SAT.

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

HARGA
UPAH
( Rp. )

JUMLAH
HARGA
( Rp. )

G5a Membuat bronjong kawat digalvano untuk diisi dengan batu ( 1 x 1 x 3m) diisi batu untuk tiap 3 m3 :
(dengan 2 sekat, luas permukaan bronjong = 16 m2) Diameter 3 mm :
1 Batu kali
3.0000 m3
250,000.00
750,000.00
2 Kawat bronjong 3 mm
28.5700
kg
24,840.00
709,678.80
3 Pekerja penganyam
1.6000 Org
90,000.00
144,000.00
4 Penganyam
2.0000 Org
125,000.00
250,000.00
5 Mandor penganyam
0.0800 Org
157,901.00
12,632.08
6 Pekerja pengisi
4.5000 Org
90,000.00
405,000.00
7 Mandor pengisi
0.0750 Org
157,901.00
11,842.58
Jumlah
1,459,678.80
823,474.66
2,283,153.46
Keuntungan Max
228,315.35
Jumlah
2,511,468.80
Dibulatkan
2,511,469.00
G5b Membuat bronjong kawat digalvano untuk diisi dengan batu ( 1 x 1 x 3m) diisi batu untuk tiap 3 m3 :
(dengan 2 sekat, luas permukaan bronjong = 16 m2) Diameter 4 mm :
1 Batu kali
3.0000 m3
250,000.00
750,000.00
2 Kawat bronjong 4 mm
42.3500
kg
24,840.00
1,051,974.00
3 Pekerja penganyam
1.8000 Org
90,000.00
162,000.00
4 Penganyam
2.2000 Org
125,000.00
275,000.00
5 Mandor penganyam
0.0800 Org
157,901.00
12,632.08
6 Pekerja pengisi
4.5000 Org
90,000.00
405,000.00
7 Mandor pengisi
0.0750 Org
157,901.00
11,842.58
Jumlah
1,801,974.00
866,474.66
2,668,448.66
Keuntungan Max
266,844.87
Jumlah
2,935,293.52
Dibulatkan
2,935,294.00
G5a 1 m3 bronjong ukuran ( 0.5 x 1 x 2 ) untuk diameter 3 mm (7.5 m2) 1 sekat.
(rob)
1 Batu kali
1.0000 m3
250,000.00
250,000.00
2 Kawat bronjong 3 mm
13.3900
kg
24,840.00
332,607.60
3 Pekerja penganyam
0.7500 Org
90,000.00
67,500.00
4 Penganyam
0.9400 Org
125,000.00
117,500.00
5 Mandor penganyam
0.0400 Org
157,901.00
6,316.04
6 Pekerja pengisi
2.1100 Org
90,000.00
189,900.00
7 Mandor pengisi
0.0400 Org
157,901.00
6,316.04
Jumlah
582,607.60
387,532.08
970,139.68
Keuntungan Max
97,013.97
Jumlah
1,067,153.65
Dibulatkan
1,067,154.00
G5b 1 m3 bronjong ukuran ( 0.5 x 1 x 3 ) untuk diameter 4 mm (7.5 m2) 1 sekat.
(rob)
1 Batu kali
1.0000 m3
250,000.00
250,000.00
2 Kawat bronjong 4 mm
19.8500
kg
24,840.00
493,074.00
3 Pekerja penganyam
0.7900 Org
90,000.00
71,100.00
4 Penganyam
0.9700 Org
125,000.00
121,250.00
5 Mandor penganyam
0.0400 Org
157,901.00
6,316.04
6 Pekerja pengisi
1.9900 Org
90,000.00
179,100.00
7 Mandor pengisi
0.0300 Org
157,901.00
4,737.03
Jumlah
743,074.00
382,503.07
1,125,577.07
Keuntungan Max
112,557.71
Jumlah
1,238,134.78
Dibulatkan
1,238,135.00

No

G5a
(rob)
1
2
3
4
5
6
7

URAIAN

KOEF.

SAT.

HARGA
SATUAN
( Rp. )

HARGA
BAHAN
( Rp. )

HARGA
UPAH
( Rp. )

JUMLAH
HARGA
( Rp. )

1 m3 bronjong ukuran ( 0.5 x 1 x 2 ) untuk diameter 3 mm (11.0 m2) 2 sekat.

Batu kali
1.5000 m3
250,000.00
375,000.00
Kawat bronjong 3 mm
19.6400
kg
24,840.00
487,857.60
Pekerja penganyam
1.1000 Org
90,000.00
Penganyam
1.3800 Org
125,000.00
Mandor penganyam
0.0600 Org
157,901.00
Pekerja pengisi
3.0900 Org
90,000.00
Mandor pengisi
0.0500 Org
157,901.00
Jumlah
862,857.60
Keuntungan Max
Jumlah
Dibulatkan
G5b 1 m3 bronjong ukuran ( 0.5 x 1 x 3 ) untuk diameter 4 mm (11.0 m2) 2 sekat.
(rob)
1 Batu kali
1.5000 m3
250,000.00
375,000.00
2 Kawat bronjong 4 mm
29.1200
kg
24,840.00
723,340.80
3 Pekerja penganyam
1.2400 Org
90,000.00
4 Penganyam
1.5100 Org
125,000.00
5 Mandor penganyam
0.6000 Org
157,901.00
6 Pekerja pengisi
3.0900 Org
90,000.00
7 Mandor pengisi
0.0500 Org
157,901.00
Jumlah
1,098,340.80
Keuntungan Max
Jumlah
Dibulatkan
G32h 1 m3 pasang batu kali 1 PC : 4 Pasir
1 Batu kali
1.2000 m3
250,000.00
300,000.00
2 PC ( 50 kg )
3.2570 zak
68,300.00
222,453.10
3 Pasir pasang
0.5220 m3
311,004.78
162,344.50
4 Tukang Batu
1.2000 Org
125,000.00
5 Kepala Tukang
0.1200 Org
139,574.00
6 Pekerja
3.6000 Org
90,000.00
7 Mandor
0.1800 Org
157,901.00
Jumlah
684,797.60
Keuntungan Max
Jumlah
Dibulatkan
G32L 1 m3 pasang batu kali 1 PC : 3 Pasir
1 Batu kali
1.2000 m3
250,000.00
300,000.00
2 PC ( 50 kg )
4.0700 zak
68,300.00
277,981.00
3 Pasir pasang
0.4560 m3
311,004.78
141,818.18
4 Tukang Batu
1.2000 Org
125,000.00
5 Kepala Tukang
0.1200 Org
139,574.00
6 Pekerja
3.6000 Org
90,000.00
7 Mandor
0.1800 Org
157,901.00
Jumlah
719,799.18
Keuntungan Max
Jumlah
Dibulatkan

99,000.00
172,500.00
9,474.06
278,100.00
7,895.05
566,969.11

111,600.00
188,750.00
94,740.60
278,100.00
7,895.05
681,085.65

150,000.00
16,748.88
324,000.00
28,422.18
519,171.06

150,000.00
16,748.88
324,000.00
28,422.18
519,171.06

1,429,826.71
142,982.67
1,572,809.38
1,572,809.00

1,779,426.45
177,942.65
1,957,369.10
1,957,369.00

1,203,968.66
120,396.87
1,324,365.52
1,324,366.00

1,238,970.24
123,897.02
1,362,867.27
1,362,867.00

No

URAIAN

KOEF.

SAT.

HARGA
SATUAN
( Rp. )

G41 1 m3 Cor Beton bertulang 1 PC : 3 koral beton, Mutu Beton K 175.


Campuran beton 1 : 2 : 3
1 Batu kerikil beton
0.8200 m3
275,000.00
2 Pasir beton
0.5400 m3
314,285.71
3 PC ( 50 kg )
6.8000 zak
68,300.00
4 Tukang Batu
1.0000 Org
125,000.00
5 Kepala Tukang batu
0.1000 Org
139,574.00
6 Pekerja
6.0000 Org
90,000.00
7 Mandor
0.3000 Org
157,901.00
Jumlah
Keuntungan Max
Jumlah
Dibulatkan
1.2 Pembesian untuk setiap 100 Kg
1 Besi beton
110.0000
kg
8,173.88
2 Kawat beton
2.0000
kg
17,500.00
Jumlah 1 m3 beton
memerlukan = . (bb) .. kg
. (bb) . Kg Besi beton
3 Tukang Besi
9.0000 Org
135,000.00
4 Kepala Tukang Besi
3.0000 Org
139,574.00
5 Pekerja
9.0000 Org
90,000.00
Jumlah
Upah diambil 3/4 nya
Keuntungan Max
Jumlah
Dibulatkan
F8 CETAKAN / BEKISTING UNTUK TIAP 1 M3 BETON
1 Tukang Kayu
0.5000 Org
135,000.00
2 Kepala Tukang Kayu
0.0500 Org
139,574.00
3 Pekerja
0.2000 Org
90,000.00
4 Mandor
0.0100 Org
157,901.00
5 Paku
0.4000
kg
18,000.00
6 Kayu Gergajian
0.0400 m3
3,750,000.00
1 m3 beton memerlukan
10 cetakan
Membokar dan menyiram beton :
1 Pekerja
Jumlah
Keuntungan Max
Jumlah
Dibulatkan

HARGA
BAHAN
( Rp. )

HARGA
UPAH
( Rp. )

225,500.00
169,714.29
464,440.00

859,654.29

125,000.00
13,957.40
540,000.00
47,370.30
726,327.70

1,585,981.99
158,598.20
1,744,580.18
1,744,580.00

899,126.80
35,000.00

934,126.80

1,215,000.00
418,722.00
810,000.00
2,443,722.00
1,832,791.50

2,766,918.30
276,691.83
3,043,610.13
3,043,610.00

67,500.00
6,978.70
18,000.00
1,579.01
7,200.00
150,000.00
157,200.00

94,057.71

251,257.71

10.00

251,257.71

2,512,577.10

0.4000

Org

90,000.00

36,000.00
2,548,577.10
254,857.71
2,803,434.81
2,803,435.00

SUPL 1 M3 BETON BERTULANG AD 1 : 2 : 3 ( G41 + I.2 + F.8 )


L3

JUMLAH
HARGA
( Rp. )

1 M2 BONGKARAN PASANGAN (TEBAL LEBIH DARI 50 MM)


1 Pekerja
4.0000 Org
90,000.00
2 Mandor
0.4000 Org
157,901.00
Jumlah
Keuntungan Max
Jumlah
Dibulatkan

7,591,625.00
360,000.00
63,160.40
423,160.40

423,160.40
42,316.04
465,476.44
465,476.00

No

A035
1
2
3
4
5
6
7

URAIAN

1 M2 PASANGAN PERANCAH
Kayu Stoot
Papan
Paku
Tukang Kayu
Kepala Tukang Kayu
Pekerja
Mandor
Jumlah
Keuntungan Max
Jumlah
Dibulatkan

KOEF.

SAT.

9.0000 batang
0.0160 m3
0.5000
kg
0.2000 Org
0.2000 Org
0.1500 Org
0.0170 Org

HARGA
SATUAN
( Rp. )

52,500.00
3,750,000.00
18,000.00
135,000.00
139,574.00
90,000.00
157,901.00

HARGA
BAHAN
( Rp. )

HARGA
UPAH
( Rp. )

JUMLAH
HARGA
( Rp. )

472,500.00
60,000.00
9,000.00

541,500.00

27,000.00
27,914.80
13,500.00
2,684.32
71,099.12

612,599.12
61,259.91
673,859.03
673,859.00