KOP PERUSAHAAN

REKAPITULASI

KEGIATAN
PEKERJAAN
LOKASI
TH. ANGGARAN

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

NO

URAIAN

1
2
3
4
5

TOTAL BIAYA
( Rp )

PEKERJAAN PERSIAPAN
PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN PLAFOND
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN LAIN-LAIN

320,000.000
#NAME?
#NAME?
#NAME?
500,000.00

TOTAL

#NAME?

PPN 10 %

#NAME?

JUMLAH

#NAME?

#NAME?

DIBULATKAN

TERBILANG

: SEPULUH JUTA RUPIAH

Menyetujui
PT/CV..

Boalemo, Mei 2008


Dibuat Oleh
PT/CV..

..
Direktur

.
Pimpinan Teknik

PEMERINTAH KABUPATEN POHUWATO


DEPARTEMEN PENDIDIKAN NASIONAL
MTSN PAGUAT

ANGGARAN PENDAPATAN BELANJA DAERAH


( APBD )

ENGINEERING ESTIMATE

TANGGAL
BULAN

:
:

FEBRUARI 2008
FEBRUARI 2008

PROGRAM

PROGRAM WAJIB BELAJAR PENDIDIKAN


DASAR SEKOLAH
PEKERJAAN
PEMBANGUNAN GEDUNG RKB MTS PAGUAT

KONSULTAN PERENCANA

CV. GREMMY MANDIRI


KABUPATEN POHUWATO

LEMBAR PERHITUNGAN
BACK UP DATA OUANTITY NO : 01
KEGIATAN
PEKERJAAN
NOMOR
TANGGAL
PROVINSI

: PROGRAM PENDIDIKAN TINGGI IAIN SULTAN AMAI GORONTALO


: PEMBANGUNAN RUANG KULIAH KAMPUS I
: 1 / P.P.T.IAIN / 2006
: 2007
: GORONTALO

No.

Sketsa/ Gambar :

Hitungan
Bangunan Utama Lantai I
horisontal
I.
18.00
II.
18.00

1. Pengukuran

Teras
V.
18.00

Jumlah
T O T AL
Bangunan Utama (0,8x0,65)

2. Galian Tanah

Teras
0.65
0.80
A=

0.45

1.15

0.60

0.52

A=

Pond. Utama

0.27

Pond. Telapak 1x1m

0.80
V=

0.92

Pond. Telapak 1.5x2 m

Telapak
1

5.52
T O TAL
T O TAL

3. Urugan Tanah Kembali


4. Urugan Pasir Gunung
0.00
0.35

Bangunan Utama
1. Gedung

T O TAL

No.

Sketsa/ Gambar :

Hitungan

5. Urugan Pasir Bawah Lantai/Pondasi


Bangunan Utama
180.0
66.000
22.000
Telapak
6
0.6

T O TAL

Bangunan Utama
66.00
22.000

6. Pas. Batu Kosong


0.15
0.8

T O TAL
Bangunan Utama
66.00
22.000

7. Pas. Batu Gunung Ad. 1:4


0.25
0.80

T O TAL
0.7

8. Pas. Bata Ad. 1:4

66.00

3.75

11 cm
T O TAL
10. Plesteran Dinding Ad. 1:4
11. Acian Air Semen
Lantai 1
1. Lantai

12. Cor Beton Tumbuk Ad. 1:3:5


10 cm =

0.05

Telapak
6

0.64

T O TAL

No.

Sketsa/ Gambar :

Hitungan

13. Cor Beton Bertulang K225


Sloof 15/15
Kolom 15/20
Kolom 20/20
Ring Balok 15/15
Balok latei 12/12

KOLOM

Pndsi Tlpk
Plat
T O TAL
14.

0.05 x 0.15
Lantai I

Kusen Kayu Klas II

123.0

0.50

P2

JI
J2

2
17.70
BH
6
88.50
BH
KACA MATI
DAUN KACA

BH

16.80

2.65

1.30
P2
0.50
1.40

123.00

1.40
1.55

0.70

J1

3.05

0.72

J2

T O TAL
15.

Pas. Daun Pintu Panel Kayu Klas II

BH

P2

BH

BH
Pas. Daun Pintu doble triplek lapis aluminium Kayu Klas II

BH

T O TAL
16 Pas. Daun Jendela Kaca Bening

Pas. Jendela Kaca MATI

JI
J2
J2

2
6

BH
BH
BH

=
=
=
T O TAL

No.

Sketsa/ Gambar :

Hitungan

18. Kuda-kuda,Gording, Nok dan jurai 6/12 Cm Kayu Klas II

R =

6/12
K1
6
K2
2
k3
6

4.54

155.34
29.20
BH

BH

2.14

193.76
Gording5/7,Nok,Jurai,Balok apit 6/12
K1
2 BH
541.96
K2
2 BH
187.60

1.07
8.00

35

K1

6.48

766.04
5.39

0.00756

712.92
35
K3

7.97

R =

2.14
1.50
35
1.00

2.03

2.47

3.73

3.00

T O TAL

1.50

K4

19. Pas. Reng 5/5 Cm Kayu Klas II


20. Pas. Genteng Metal Roof

2.14
2.14

R1 =

4.54

R2 =

4.55

R3 =

0.00

I.
II.
III.
III.

5.600
6.890
0.500
0.500
3.200

21. Pas. Bubungan Metal Roof

I.
II.

23. Pas. Rangka Plafon

Lantai I

x
x
x
x

11.200
12.000

15.94
15.94x
2.03 x
2.03 x
9.00 x

M
M
180.00
T O TAL

24. Pas. Plafon Tripleks

Lantai I

T O TAL
Lantai I
T O TAL

26. Pas. List Profil Sp4

Lantai I

28. Pas. Lisplank Papan

T O TAL
Lantai I

26. Pas. List Profil Beton

No.

Sketsa/ Gambar :

Hitungan
Lantai I
Tangga
T O TAL

29. Pas. Keramik Uk. 40x40 Cm Ad. 1:6

30. Pas. Batu Alam Uk. 10x20 Cm Ad. 1:6

Lantai I
T O TAL

34. Pas. Jalusi


T O TAL
39. Pas. Espanyolet
40. Pas. Engsel Pintu 3"

Bangunan Utama
Garasi

41. Pas. Engsel Jendela 2"

2 x 15 Bh

No.
42. Pas. Grendel Jendela
43. Pas. Kunci 2 Slaag
44. Pas. Kait Angin
45. Pas. Tarikan Jendela
46. Cat Tembok & Plafond
47. Cat Kayu Mengkilap

48. Pas. Lampu Pijar 10 Watt

Sketsa/ Gambar :

Hitungan

49. Pas. Lampu TL 20 Watt


50. Pas. Saklar Ganda
51. Pas. Saklar Tunggal
52. Pas. Stop Kontak
53. Pas. Sekering Box

55. Penyambungan Listrik

60. Pembersihan Akhir


64. Saluran Keliling Bangunan
65. Administrasi Taknik

Diperiksa Oleh

Project Manager

NGAN

NO : 01

Hitungan

Volume

Sat.

Ket.

Utama Lantai I
vertikal
I.
10.00
II.
10.00
10.00

66.00

22.00
V.
VI.

2.00
2.00

Jumlah
T O T A L Lantai I dan II
Utama (0,8x0,65)

88.00 M
88.00 M
34.32 M3
5.94

300

300

300

M3

5.52 M3

T O TAL
T O TAL

45.78 M3
14.39 M3
63.00 M3

Utama
A

180

400

300
450
50
150

0.660

#NAME?

350

200

350

T O TAL

63.00 M3

Hitungan

Volume

18.00 M3
2.64
0.66 M3

0.100
0.050
0.050
0.05

Sat.

0.19

0.19
M3

T O TAL

21.49 M3
,
M3

x (0,15x0,8)
x (0,15x0,6)

6.93
1.98

T O TAL

8.91 M3
M3

x (((0,25+0,7)/2)x0,8)
x (((0,25+0,5)/2)x0,6)

25.08
4.95

T O TAL

3.75

30.03 M3

212.00 M2

35.5

T O TAL

212.00 M2
424.00 M2
424.00 M2
9.00 M3

180.00

m2 =

9.000

m3

0.19 M3
0.05

0.192

Ket.

T O TAL

9.19 M3

Hitungan

Volume

Sat.

Ket.
1,200,000,000.0000
0.0000

0.150 x
0.200 x
0.200 x
0.150 x
0.120 x

0.150
0.150
0.200
0.150
0.120

6.00 x
T O TAL
daun

x
x
x
x
x

88.0
6 x
5 x
88 x
66 x

0.64x

5.200
2.900

0.18 x

jalusi

5.59 1.300 M2

M
M

2.79 1.550 M2
9.150 M2
7.56
7.56

M3
M3
M3
M3
M3
M3
M3
0.67 M3
7.10 M3
0.92
M3
1.98
0.94
0.58
1.98
0.95

0.972
1.701

1.9440
3.4020

1.192
0.726

1.9181

93.60

54.85
23.50

12.00 M2

T O TAL

35.50 M2

0.92 M3
5.59 M2

5.59 M2

T O TAL
2.79 M2
7.56 M2
7.56 M2
T O TAL

0.00
5.59 M2
10.35 M2

7.56

Hitungan

Volume

Sat.

Ket.
2.535

1.40 M3
M
M
39.000

BH

0.28 M3

3.25 M3

Nok,Jurai,Balok apit 6/12


M
M
M

M3

1.803

M3
M3
T O TAL

4.92 M3
1.70 M3
238.57 M2

x
x
x
x

2.80
1.600
4.000

x
x
x
x

2.000
4.800
0.500

=
=
=
=
=

89.3
109.8
5.7
13.0
20.8

23.20

180.00 M2
T O TAL

180.00 M2
180.00 M2

9.0000
0.0000

4.9875
5.7625

T O TAL
Lantai I
T O TAL

T O TAL
Lantai I

Hitungan
Lantai I
Tangga
T O TAL

180.00 M2
240.00 M
240.00 M
71.00
71.00
37.60

Volume

43.000
M
M

Sat.

Ket.

180.00 M2
5.40 M2
185.40 M2
13.0000

T O TAL

T O TAL

Hitungan

5.00
5.00
12.00
6.00
18.00

M2
M2
M2
M2
M2

4.00

Bh

6.00

Bh

44.00

Bh

Volume

Sat.

22.00

Bh

2.00

Bh

44.00

Bh

22.00

Bh

604.00 M2
114.61 M2

2.00

Bh

29.200

Ket.

4.00

Bh

1.00

Bh

1.00

Bh

2.00

Bh

1.00

Bh

1.00

Ls

1.00

Ls

38.50

1.00

Ls

200

350

0.0848

REKAPITULASI
ENGINEERING ESTIMATE
KEGIATAN
PEKERJAAN
LOKASI
TH. ANGGARAN

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

NO

1
2
3
4
5

URAIAN

TOTAL BIAYA
( Rp )

PEKERJAAN PERSIAPAN
PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN PLAFOND
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN LAIN-LAIN

320,000.000
#NAME?
#NAME?
#NAME?
500,000.00

TOTAL

#NAME?

PPN 10 %

#NAME?

JUMLAH

#NAME?

#NAME?

DIBULATKAN

TERBILANG

: SEPULUH JUTA RUPIAH

Menyetujui
Pejabat Pelaksana Teknis Kegiatan

Boalemo, Mei 2008


Dibuat Oleh
CV. GREMMY MANDIRI KONSULTAN

Sumantri Karim
NIP. 132 218 554

ADRIAN KATILI, ST
KEPALA CABANG
Mengetahui
Kuasa Pengguna Anggaran

Sherman Moridu, S.Pd, MM


NIP. 132 158 065

RENCANA ANGGARAN BIAYA


ENGENEERING ESTIMATE ( EE)

KEGIATAN
PEKERJAAN
LOKASI
TH. ANGGARAN

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

NO.

URAIAN PEKERJAAN

SATUAN

VOLUME

I.

PEKERJAAN PERSIAPAN
1 Pek. Pengukuran
2 Administrasi & Dokumentasi

2.

Pas. Pintu Panel Kayu Kls. I


Pas. Kaca MATI
Pek. Pas. Engsel Pintu 4"
Pas. Grendel Jendela Lengkap
Pas. Kait Angin
Pas. Tarikan Jendela
Pas. Kunci Pintu 3 Slaag

M2
M2
Bh
Bh
Bh
Bh
Bh

6.84
3.60
6.00
35.000
93.901
46.000
3.00

PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls.II
2 Pas. Plafond Tripleks 3 mm

M2

9.71
9.71

M2

URAIAN PEKERJAAN

SATUAN

VOLUME

320,000.00
150,000.00
170,000.00
#NAME?

NO.

150,000.00
170,000.00

JUMLAH HARGA
(Rp)
6

PEKERJAAN PASANGAN DAN PLESTERAN


1
2
3
4
5
6
7

1.000
1.000

Ls
Ls

HARGA SATUAN
(Rp)
5

PEKERJAAN INSTALASI LISTRIK


1 Pas. Saklar Tunggal
2 Pas. Lampu TL 20 Watt

Bh
Bh

3.00
2.00

PEKERJAAN LAIN-LAIN
1 Pek. Pembersihan akhir

Ls

1.00

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
HARGA SATUAN
(Rp)
5

#NAME?
#NAME?
#NAME?
JUMLAH HARGA
(Rp)
6

#NAME?
#NAME?

#NAME?
#NAME?
#NAME?

500,000.00

500,000.00
500,000.00

Menyetujui
Pejabat Pelaksana Teknis Kegiatan

Boalemo, Mei 2008


Dibuat Oleh
CV. GREMMY MANDIRI KONSULTAN

Sumantri Karim
NIP. 132 218 554

ADRIAN KATILI, ST
KEPALA CABANG

Mengetahui
Kuasa Pengguna Anggaran

Sherman Moridu, S.Pd, MM

RENCANA ANGGARAN BIAYA


ENGENEERING ESTIMATE ( EE)

KEGIATAN
PEKERJAAN
LOKASI
TH. ANGGARAN

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

NIP. 132 158 065

DAFTAR ANALISA HARGA SATUAN


KEGIATAN
Pekerjaan
Lokasi
Tahun Anggaran

:
:
:
:

1 M2 Pasang Pintu Panel Kayu Kls I


No
Uraian
A Bahan
Kayu Kls I, Papan
B Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)
1 M2 Pasang Jendela Panel Kaca Kayu Kls I
No
Uraian
A Bahan
Kayu Kls I, Papan
Kaca Bening 5 mm
B Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)
1 M2 Pasang Rangka Plafond Kayu Kls II
No
Uraian
A Bahan
Kayu Kls II , Balok
Paku Biasa 2'-5'
B Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)
1 M2 Pas. Plafond Tripleks t = 2,8 mm
No
Uraian
A Bahan
Tripleks t=2,8mm
Paku Tripleks
B Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)
Pasangan 1 Bh Kunci 3 Slaag
No
Uraian
A Bahan
Kunci 3 Slaag
Kunci 2 Slag
B Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

Volume

Satuan

Harga Sat. Dasar (Rp)

0.035

M3

1,800,000.000

63,000.000

1.000
2.500
0.250
0.050

Oh
Oh
Oh
Oh

35,000.000
50,000.000
60,000.000
45,000.000

35,000.000
125,000.000
15,000.000
2,250.000
240,250.000
24,025.000
264,275.000

Volume

Satuan

0.014
0.820

M3
M2

1,800,000.000
75,000.000

25,200.000
61,500.000

1.000
3.000
0.300
0.030

Oh
Oh
Oh
Oh

35,000.000
50,000.000
60,000.000
45,000.000

35,000.000
150,000.000
18,000.000
1,350.000
291,050.000
29,105.000
320,155.000

Volume

Satuan

0.012
0.100

M3
Kg

1,800,000.000
20,500.000

21,600.000
2,050.000

0.150
0.250
0.025
0.075

Oh
Oh
Oh
Oh

35,000.000
50,000.000
60,000.000
45,000.000

5,250.000
12,500.000
1,500.000
3,375.000
46,275.000
4,627.500
50,902.500

Volume

Satuan

0.336
0.030

Lbr
Kg

55,000.000
22,500.000

18,476.216
675.000

0.070
0.100
0.010
0.004

Oh
Oh
Oh
Oh

35,000.000
50,000.000
60,000.000
45,000.000

2,450.000
5,000.000
600.000
157.500
27,358.716
2,735.872
30,094.588

Volume

Satuan

1.000
1.000

Bh
Bh

45,000.000
40,000.000

45,000.000
40,000.000

0.005
0.500
0.005
0.000

Oh
Oh
Oh
Oh

35,000.000
50,000.000
60,000.000
45,000.000

175.000
25,000.000
300.000
11.250
70,486.250
7,048.625
77,534.875

Harga Sat. Dasar (Rp)

Harga Sat. Dasar (Rp)

Harga Sat. Dasar (Rp)

Harga Sat. Dasar (Rp)

Kunci 3 Slaag

Jumlah Harga (Rp)

Jumlah Harga (Rp)

Jumlah Harga (Rp)

Jumlah Harga (Rp)

Jumlah Harga (Rp)

DAFTAR ANALISA HARGA SATUAN


KEGIATAN
Pekerjaan
Lokasi
Tahun Anggaran

:
:
:
:

Pasangan 1 Bh Engsel Pintu 4 "


No
Uraian
A Bahan
Engsel Pintu 4 "
B Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)
Pasangan 1 Bh Engsel Jendela 3 "
No
Uraian
A Bahan
Engsel Jendela 3 "
B Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)
Pasangan 1 Bh Tarikan
No
Uraian
A Bahan
tarikan
B Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)
Pasangan 1 Bh Kait Angin
No
Uraian
A Bahan
Kait Angin
B Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)
Pasangan 1 Bh Saklar Tunggal
No
Uraian
A Bahan
Saklar Tunggal
B Tenaga
Tukang Listrik
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

Volume

Satuan

Harga Sat. Dasar (Rp)

1.000

Bh

8,500.000

8,500.000

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

35,000.000
50,000.000
60,000.000
45,000.000

525.000
7,500.000
900.000
33.750
17,458.750
1,745.875
19,204.625

Volume

Satuan

1.000

Bh

8,000.000

8,000.000

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

35,000.000
50,000.000
60,000.000
45,000.000

525.000
7,500.000
900.000
33.750
16,958.750
1,695.875
18,654.625

Volume

Satuan

1.000

Bh

10,000.000

10,000.000

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

35,000.000
50,000.000
60,000.000
45,000.000

525.000
7,500.000
900.000
33.750
18,958.750
1,895.875
20,854.625

Volume

Satuan

1.000

Bh

12,500.000

12,500.000

0.015
0.150
0.015
0.001

Oh
Oh
Oh
Oh

35,000.000
50,000.000
60,000.000
45,000.000

525.000
7,500.000
900.000
33.750
21,458.750
2,145.875
23,604.625

Volume

Satuan

1.000

Bh

17,000.000

17,000.000

0.150
0.001

Oh
Oh

50,000.000
45,000.000

7,500.000
33.750
24,533.750
2,453.375
26,987.125

Harga Sat. Dasar (Rp)

Harga Sat. Dasar (Rp)

Harga Sat. Dasar (Rp)

Harga Sat. Dasar (Rp)

Jumlah Harga (Rp)

Jumlah Harga (Rp)

Jumlah Harga (Rp)

Jumlah Harga (Rp)

Jumlah Harga (Rp)

DAFTAR ANALISA HARGA SATUAN


KEGIATAN
Pekerjaan
Lokasi
Tahun Anggaran

:
:
:
:

Pas. 1 Bh. Lampu TL Bambu 20 Watt, Philips


No
Uraian
A Bahan
Lampu TL 20 Watt
B Tenaga
Tukang Listrik
Mandor
C Jumlah
D Biaya umum dan keuntungan (10 % x C)
E Jumlah (C+D)

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

Volume

Satuan

Harga Sat. Dasar (Rp)

2.000

Bh

57,000.000

114,000.000

0.150
0.001

Oh
Oh

50,000.000
45,000.000

7,500.000
33.750
121,533.750
12,153.375
133,687.125

#REF!
#REF!

#REF!
#REF!

Jumlah Harga (Rp)

DAFTAR HARGA SATUAN UPAH & BAHAN


KEGIATAN
Pekerjaan
Lokasi
Tahun Anggaran

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

Hal. 1
No.

Uraian Pekerjaan

VOL

Satuan

A Upah
1. Pekerja
2. Mandor
3. Tukang
4. Kepala Tukang

1.0
1.0
1.0
1.0

B
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
17.
18.
19.
20.
21.
22.
23.
22.
23.
24.
24.
25.
26.
27.
28.
29.
30.
30.
31.

1.0
M3
1.0
Kg
1.0
Kg
1.0
M3
1.0
Krg
1.0
M3
1.0
Bh
1.0
M3
1.0
M3
1.0 Lirang
1.0
M3
1.0
Kg
1.0
Kg
1.0
Kg
1.0
Kg
1.0
Kg
1.0
Kg
1.0
Bh
1.0
M3
1.0
M3
1.0
M3
1.0
M3
1.0
Lbr
1.0
Bh
1.0
Lbr
1.0
Ujg
1.0
Psg
1.0
Psg
1.0
Bh
1.0
Bh
1.0
Bh
1.0
Bh
1.0
Bh
1.0
Bh

Bahan
Pasir Pasang
Semen @ 50 Kg
Semen Putih @ 50 Kg
Batu Kali/Gunung
Kapur
Batu Karang
Batu Bata
Kerikil
Tanah Urug
Ijuk
Pasir Gunung (Domato)
Besi Polos
Paku Campur
Paku Seng
Paku Triplex
Kawat Bendrat
Besi Strip
Baut + Ring & Mur
Kayu Klas I, Kosen (Setara Kayu Lasi)
Kayu Klas I, Pintu/Jend. (Setara Ky Cempaka)
Kayu Klas II
Kayu Klas III, Bekesting
Atap Seng Gelombang BJLS 20
Bubungan Seng
Seng Plat
List Profil Sp.4 Kayu Klas II
Engsel Pintu Lengkap
Engsel Jendela Lengkap
Grendel Jendela Lengkap
Kait Angin
Tarikan Jendela
Kunci 2 Slaag
Kunci Pintu 3 Slaag
Klosed Jongkok

OH
OH
OH
OH

Harga Sat. Dasar


(Rp)

35,000
45,000
50,000
60,000

95,000
1,450
3,900
85,000
50,000
60,000
350
85,000
36,000
25,000
66,000
12,000
20,500
25,000
22,500
22,000
12,000
10,000
2,000,000
1,800,000
1,800,000
1,400,000
40,000
19,000
35,000
13,000
8,500
8,000
9,000
12,500
10,000
40,000
45,000
165,000

DAFTAR HARGA SATUAN UPAH & BAHAN


KEGIATAN
Pekerjaan
Lokasi
Tahun Anggaran

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

DAFTAR HARGA SATUAN UPAH & BAHAN


KEGIATAN
Pekerjaan
Lokasi
Tahun Anggaran

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

Hal. 2
No.

31.
32.
33.
34.
35.
36.
37.
38.
39.
40.
41.
42.
43.
44.
45.
130
131
45.
46.
47.
48.
49.
50.
51.
52.
46.
47.
48.
49.
50.
51.
52.
53.
54.
54.
55.
56.
57.
57.
58.
59.

Uraian Pekerjaan

Expanyolet Tanam
Triplex T=2,88 mm
Teakwood
Kaca Bening T=5 mm
Kaca Gelap T 5mm
Kabel NYM 3x2,5 mm2
Saklar Ganda
Saklar Tunggal
MCB 2 Phase
Tee Dos
Pipa Instalasi Listrik
Pipa PVC dia. 1"
Pipa PVC dia. 3"
Pipa PVC dia. 4"
Knei GLV 3"
Lem PVC
Kran Air San Ei
Isolatip
Stop Kontak
Lampu TL 20 Watt
Lampu SL 20 Watt
Lampu pijar 10 Watt
Fitting
Cat Tembok
Cat Menie besi
Cat Menie Kayu
Cat Minyak Setara
Cat Vernis
Cat Politur
Tinner A Biasa
Amplas
Plamur
Kwas
Lem Kayu
Batu Alam Tempel 10/20
Keramik 30x30 Cm Setara Kw 1
Keramik 20x25 Cm Setara Kw 6
Kunci Laci
Kertas Gosok
Cat Kayu Mengkilat
Cat Melamic Lengkap

Volume Satuan

1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0
1.0

Psg
Lbr
Lbr
M2
M3
M'
Bh
Bh
Unit
Bh
Ujg
Ujg
Ujg
Ujg
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Bh
Kg
Kg
Kg
Kg
Kg
Kg
Kg
Lbr
kg
Bh
Ltr
M2
Dos
Dos
Bh
Lbr
Kg
Set

Harga Sat. Dasar


(Rp)

25,000
55,000
75,000
75,000
100,000
14,000
20,000
17,000
42,000
5,500
11,200
7,500.00
11,666.67
18,333.33
35,000.00
4,200.00
45,000.00
3,000
12,900
57,000
30,000
7,500
20,000
14,000
17,000
20,000
21,000
30,000
35,000
21,500
3,750
7,000
10,000
25,000
175,000
45,000
45,000
10,000.00
4,000.00
29,000.00
140,000.00

DAFTAR HARGA SATUAN UPAH & BAHAN


KEGIATAN
Pekerjaan
Lokasi
Tahun Anggaran

60.
61.
62.
63.
64.
C
1.

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

Kwas 4 Inch
Kwas 3 Inch
Engsel Kuningan
Engsel Type H Sedang Kuningan
Besi Strip Penggantung + Fisher + Sekrup
Peralatan
Alat Bantu

1.0
1.0
1.0
1.0
1.0

Psg
SEt

10,000.00
6,500.00
13,000.00
17,500.00
12,500.00

1.0

Set

1,650

Bh
Bh
Psg

Err:502
Err:502

Err:502
Err:502

KOP PERUSAHAAN
REKAPITULASI
ENGINEERING ESTIMATE
KEGIATAN
PEKERJAAN
LOKASI
TH. ANGGARAN

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

NO

URAIAN

1
2
3
4
5

TOTAL BIAYA
( Rp )

PEKERJAAN PERSIAPAN
PEKERJAAN PASANGAN DAN PLESTERAN
PEKERJAAN PLAFOND
PEKERJAAN INSTALASI LISTRIK
PEKERJAAN LAIN-LAIN

320,000.000
#NAME?
#NAME?
#NAME?
500,000.00

TOTAL

#NAME?

PPN 10 %

#NAME?

JUMLAH

#NAME?

#NAME?

DIBULATKAN

TERBILANG

: SEPULUH JUTA RUPIAH

Menyetujui
CV/PT.

Boalemo, Juni 2008


Dibuat Oleh
CV/PT.

.
Direktur

Pimpinan Teknik
Sherman Moridu, S.Pd, MM
NIP. 132 158 065

KOP PERUSAHAAN
RENCANA ANGGARAN BIAYA
BILL OF QUANTITY

KEGIATAN
PEKERJAAN
LOKASI
TH. ANGGARAN

:
:
:
:

PROGRAM PENDIDIKAN MENENGAH


REHABILITASI RUANG SMAN 1 TILAMUTA (PENDAMPING BLOCK GRAND)
KEC. TILAMUTA
2008

NO.

URAIAN PEKERJAAN

SATUAN

VOLUME

I.

PEKERJAAN PERSIAPAN
1 Pek. Pengukuran
2 Administrasi & Dokumentasi

2.

Pas. Pintu Panel Kayu Kls. I


Pas. Kaca MATI
Pek. Pas. Engsel Pintu 4"
Pas. Grendel Jendela Lengkap
Pas. Kait Angin
Pas. Tarikan Jendela
Pas. Kunci Pintu 3 Slaag

M2
M2
Bh
Bh
Bh
Bh
Bh

6.84
3.60
6.00
35.000
93.901
46.000
3.00

PEKERJAAN PLAFOND
1 Pek. Rangka Plafond Kayu Kls.II
2 Pas. Plafond Tripleks 3 mm

M2
M2

9.71
9.71

URAIAN PEKERJAAN

SATUAN

VOLUME

320,000.00
150,000.00
170,000.00
#NAME?

NO.

150,000.00
170,000.00

JUMLAH HARGA
(Rp)
6

PEKERJAAN PASANGAN DAN PLESTERAN


1
2
3
4
5
6
7

1.000
1.000

Ls
Ls

HARGA SATUAN
(Rp)
5

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?
HARGA SATUAN
(Rp)

#NAME?
#NAME?
#NAME?
JUMLAH HARGA
(Rp)

PEKERJAAN INSTALASI LISTRIK


1 Pas. Saklar Tunggal
2 Pas. Lampu TL 20 Watt

Bh
Bh

3.00
2.00

PEKERJAAN LAIN-LAIN
1 Pek. Pembersihan akhir

Ls

1.00

6
#NAME?
#NAME?
#NAME?

#NAME?
#NAME?

500,000.00

500,000.00
500,000.00

Menyetujui
CV/PT

Boalemo, Juni 2008


Dibuat Oleh
CV/PT.

..
Direktur

..
Pimpinan Teknik
NIP. 132 158 065