I.
1.
2.
3.
PEKERJAAN
PERHITUNGAN VOLUME
GAMBAR
PERHITUNGAN
PEKERJAAN PERSIAPAN
Pembersiha (gambar denah)
n Lokasi
Pemagaran
keliling
(hanya
depan dan
belakang )
Direksi
Keet
(gambar denah)
P = 14 m
L = 18,5 m
Luas = P x L =
18,5 m x 14 m =
259 m2
L = 18,5 m
VOLUME
259 m2
37 m
Pagar = 2 x L =
37 m
L = 4.5 m
p = 4.5 m
20.25 m2
Luas = P x L =
4.5 m x 4.5 m =
20.25 m2
4.
Pekerjaan
Bowplank
II.
1.
Volume Galian :
Pondasi = @53
buah
Keliling tembok
= 87.225 m
Lebar atas = 30
cm, Lebar bawah
= 80 cm, Tinggi
= 80 cm,
Panjang =
87.225 m
Volume pondasi
= ( 0.3 m + 0.6
m ) x 0.4 m x
87.225 m = 31.4
1 m3
Volume
anstamping :
87.225 m x 0.6
m x 0.2 m =
10.476 m3
Volume total
galian tanah
= 134.3265
m3
Volume galian :
(0.8 m + 2 m) x
0.55 m x 87.225
m = 134.3265
m3
2.
Urugan
Volume pasir
urug :
87.225 m x 0.8
m x 0.1 = 6.978
m3
Volume urugan
tansram :
Vol. galian vol.
Anstamping
vol. Pondasi
vol. Pasir urug =
134.3265 m3
31.401 m3
10.476 m3
6.978 m3 =
85.4715 m3
III.
1.
2.
PEKERJAAN
Sloof 15/20
Pasangan
bata
3.
Plesteran
Volume Total
urugan
tanah =
urugan pasir
+ urugan
trasram =
6.978 m3 +
85.4715 m3
= 92.4495
m3