NO
URAIAN KEGIATAN
SATUAN
HARGA
O.H
Rp
50,000.00
O.H
Rp
50,000.00
O.H
Rp
50,000.00
Kepala tukang
O.H
Rp
50,000.00
Mandor
O.H
Rp
60,000.00
TUKANG KONTRUKSI
Tukang kayu
O.H
Rp
45,000.00
Tukang besi
O.H
Rp
45,000.00
Tukang batu
O.H
Rp
45,000.00
Tukang
O.H
Rp
45,000.00
O.H
Rp
35,000.00
Operator mesin
O.H
Rp
30,000.00
Pekerja kasar
O.H
Rp
30,000.00
No
Jam
Rp
50,000.00
NAMA ALAT
SATUAN
0.50 M3
HARGA
Jam
Rp
25,000.00
Sewa vibrator
Jam
Rp
27,000.00
Jam
Rp
30,000.00
Jam
Rp
1,100.00
Jam
Rp
225,000.00
Jam
Rp
185,000.00
Sewa Compresor
Jam
Rp
35,000.00
SEMEN
Semen Gresik
Sak
Rp
48,000.00
Semen Gresik
Sak
Rp
54,000.00
Semen berwarna
Kg
Rp
7,500.00
M3
Rp
230,000.00
M3
Rp
170,000.00
M3
Rp
130,100.00
Bh
Rp
500.00
M3
Rp
130,100.00
Buah
Rp
5,000.00
PASIR
Pasir cor
M3
Rp
130,000.00
Pasir pasang
M3
Rp
120,000.00
Pasir urug
M3
Rp
115,000.00
Sirtu
M3
Rp
60,000.00
Ltr
Rp
13.00
LOGAM BAJA
Kg
Rp
8,000.00
Besi polos
Kg
Rp
8,000.00
Kg
Rp
14,000.00
Kg
Rp
8,500.00
Besi C 150 x 58 x 12 x 3
Kg
Rp
8,500.00
Besi plat
Kg
Rp
8,500.00
Kg
Rp
8,500.00
Elektroda Baja
Kg
Rp
23,000.00
Paku
Kg
Rp
17,000.00
10
M1
Rp
280,000.00
11
M1
Rp
80,000.00
12
M1
Rp
26,000.00
13
M1
Rp
17,500.00
14
M1
Rp
14,500.00
15
Bh
Rp
33,000.00
16
Bh
Rp
8,800.00
17
Bh
Rp
11,000.00
18
Bh
Rp
38,500.00
19
Bh
Rp
29,150.00
20
Angker 16
Bh
Rp
2,750.00
NO
URAIAN KEGIATAN
SATUAN
HARGA
21
1M
Rp
64,500.00
22
1M
Rp
80,000.00
23
1M
Rp
73,000.00
24
Kg
Rp
11,750.00
25
Kg
Rp
14,300.00
26
Bh.
Rp
17,500.00
27
Bh.
Rp
33,600.00
28
Keni 2"
Bh.
Rp
22,500.00
29
Keni 2,5"
Bh.
Rp
42,000.00
30
Sealtape
rol
Rp
6,000.00
KAYU
M3
Rp
2,400,000.00
M3
Rp
2,800,000.00
M3
Rp
2,600,000.00
Kayu meranti 6 / 12
M3
Rp
3,000,000.00
M3
Rp
3,800,000.00
M3
Rp
3,700,000.00
M3
Rp
6,000,000.00
M3
Rp
6,050,000.00
TIANG PANCANG
M1
Rp
315,000.00
M1
Rp
215,000.00
KERAMIK
M2
Rp
49,000.00
M2
Rp
38,000.00
M2
Rp
37,500.00
M2
Rp
58,000.00
BH
Rp
12,000.00
Genteng Bambe
Bh
Rp
4,345.00
Genteng wuwung
Bh
Rp
8,690.00
Genteng kompres
Bh
Rp
8,580.00
BAHAN LAINYA
Minyak begisting
Ltr
Rp
4,800.00
Titik
Rp
25,000.00
Titik
Rp
30,000.00
Plamur tembok
Kg
Rp
14,025.00
Dempul
Kg
Rp
12,500.00
Kertas gosok
Lbr
Rp
3,500.00
Lem
Kg
Rp
13,200.00
Material sanitasi
Bh
Rp
317,875.00
Bh
Rp
1,600,000.00
Bh
Rp
880,000.00
Floor drain
Bh
Rp
55,000.00
Bh
Rp
55,000.00
Bh
Rp
55,000.00
Bh
Rp
15,000.00
Roll TBA
Roll
Rp
3,000.00
Watermoor
Bh
Rp
15,000.00
10
Sifon wasser
Set
Rp
85,000.00
11
Knee
Bh
Rp
9,500.00
12
Rp
245,000.00
13
Rp
155,000.00
M1
Rp
88,500.00
M1
Rp
53,500.00
Bh
Rp
440,000.00
Buah
Rp
400,000.00
Buah
Rp
450,000.00
Kaca t= 5 mm
M2
Rp
60,000.00
Kaca t= 6 mm
M2
Rp
85,000.00
Kaca t= 8 mm
M2
Rp
100,000.00
NO
URAIAN KEGIATAN
SATUAN
HARGA
Kaca Gravier
M2
Rp
275,000.00
Kaca Stainglass
M2
Rp
345,000.00
10
Buah
Rp
244,667.50
11
Karet
M1
Rp
1,250.00
AKSESORIS
Bh
Rp
185,000.00
Bh
Rp
65,000.00
Bh
Rp
17,500.00
Engsel pintu
Bh
Rp
17,500.00
Bh
Rp
20,000.00
Grendel rambuncis
Bh
Rp
17,500.00
Engsel jendela
Bh
Rp
24,750.00
Bh
Rp
35,000.00
Grendel tanam
Bh
Rp
45,000.00
10
Handle aluminium
Unit
Rp
45,000.00
11
Bh
Rp
8,800.00
12
Paku skrup
Bh
Rp
150.00
13
Paku beton
Kg
Rp
22,500.00
14
Kawat ayam
M2
Rp
29,500.00
CAT
Kg
Rp
14,500.00
Kg
Rp
64,960.00
Kg
Rp
41,800.00
Meni besi
Kg
Rp
15,000.00
Minyak cat
Ltr
Rp
9,500.00
Minyak bekisting
Ltr
Rp
4,500.00
Meni kayu
Kg
Rp
15,500.00
Plamir tembok
Kg
Rp
14,500.00
Plamir kayu
Kg
Rp
15,500.00
PELAPIS
Kalsiboard t. = 4.5 mm
Lbr
Rp
67,500.00
Kalsiboard t. = 6mm
Lbr
Rp
96,500.00
Kalsiboard t. = 12mm
Lbr
Rp
165,000.00
Kalsiboard t. = 9mm
Lbr
Rp
104,500.00
Gypsum t. = 9 mm
Lbr
Rp
50,000.00
Gypsum t. = 12 mm
Lbr
Rp
66,000.00
Ljr
Rp
30,800.00
Lbr
Rp
48,500.00
Lbr
Rp
65,000.00
10
Lbr
Rp
95,000.00
11
Lbr
Rp
85,000.00
12
Rp
12,000.00
13
Waterprofing
Kg
Rp
37,000.00
14
Bh
Rp
528,000.00
15
M2
Rp
341,000.00
16
Bh
Rp
15,400.00
17
Roster
Bh
Rp
16,500.00
18
Bh
Rp
16,500.00
19
Watermoor
Bh
Rp
16,500.00
20
Knee
Bh
Rp
10,780.00
21
Sifon
Bh
Rp
93,500.00
22
Angker 16
Bh
Rp
2,750.00
23
M2
Rp
430,000.00
24
Kg
Rp
22,500.00
25
Metal furing
Lem kayu
Ljr
Rp
35,000.00
26
U clam
Bh
Rp
950.00
27
Chanel
Bh
Rp
1,500.00
28
M1
Rp
15,400.00
29
Kompon
Pls
Rp
52,800.00
30
textletape
Bh
Rp
13,750.00
31
Raut drat
Bh
Rp
3,750.00
32
Skrup kalsiboard
Bh
Rp
150.00
33
Bh
Rp
22,500.00
34
Hollow aluminium
Ljr
Rp
35,000.00
35
Sunscreen
Bh
Rp
374,000.00
36
Sealent
Tube
Rp
22,500.00
37
Politur Mowilex
Ltr.
Rp
260,000.00
NO
URAIAN KEGIATAN
SATUAN
HARGA
38
Cerlak
Kg
Rp
95,800.00
39
Clear Doof
Kg
Rp
47,500.00
40
Coumpond
Kaleng
Rp
45,000.00
41
Kg
Rp
9,500.00
42
Pewarna
sachet
Rp
900.00
43
Politur
Kg
Rp
45,000.00
44
Shanding
Kg
Rp
160,000.00
45
Wood Filler
Kg
Rp
32,500.00
46
Thinner A
Liter
Rp
17,500.00
47
Coolter
Liter
Rp
8,500.00
48
Serat fiber
M2
Rp
2,750.00
M2
Rp
50,500.00
M2
Rp
52,000.00
M2
Rp
75,750.00
M2
Rp
89,125.00
M2
Rp
79,250.00
M2
Rp
82,625.00
M2
Rp
63,625.00
M2
Rp
52,000.00
M2
Rp
50,500.00
M2
Rp
50,125.00
M2
Rp
48,625.00
M2
Rp
50,000.00
M2
Rp
45,000.00
M2
Rp
42,625.00
M2
Rp
188,500.00
M2
Rp
179,062.50
M2
Rp
233,000.00
M2
Rp
233,000.00
M2
Rp
163,000.00
M2
Rp
163,000.00
Bh
Rp
1,968,375.00
Bh
Rp
317,875.00
Bh
Rp
2,399,000.00
Bh
Rp
386,750.00
Bh
Rp
189,375.00
Bh
Rp
1,176,500.00
Bh
Bh
Bh
Rp
317,875.00
Bh
Urinior INA
Bh
Rp
1,319,500.00
Urinior TOTO
Bh
Rp
1,577,125.00
Ukuran 5"
set
Rp
31,375.00
Ukuran 8.5"
set
Rp
36,875.00
Ukuran 12"
set
Rp
40,625.00
Ukuran 16"
set
Rp
59,375.00
Ukuran 20"
set
Rp
99,375.00
Bh
Rp
2,499,250.00
Bh
Rp
2,716,250.00
Bh
Rp
553,125.00
Bh
Rp
379,375.00
set
Rp
153,125.00
set
Rp
347,250.00
KIA
Bh
Rp
5,500.00
KANMURI
Bh
Rp
11,000.00
M CLASS
Bh
Rp
10,000.00
KIA
Bh
Rp
14,000.00
KANMURI
Bh
Rp
14,250.00
M CLASS
Bh
Rp
8,000.00
GRANITO NIRO :
Grendel tanam :
Genteng Glazurr :
Bubungan glazurr
NO
URAIAN KEGIATAN
SATUAN
HARGA
set
Rp
62,500.00
set
Rp
25,000.00
set
Rp
32,000.00
set
Rp
69,500.00
Grendel rambuncis
set
Rp
14,000.00
Pintu Alluminium&kusen
Bh
Rp
595,750.00
Lbr
Rp
123,000.00
Ukuran 30X240X16mm
Lbr
Rp
80,000.00
Ukuran 120X240X8mm
Lbr
Rp
226,000.00
Lbr
Rp
62,000.00
Kalsiplank :
Gypsum :
120X240X9mm
Catylac dulux
25
Kg
Rp
430,500.00
Catylac dulux
Kg
Rp
17,220.00
Kg
Rp
61,125.00
Kg
Rp
70,250.00
25
Kg
Rp
1,689,875.00
Kg
Rp
67,595.00
Kg
Rp
186,875.00
Kg
Rp
74,750.00
Ltr
Rp
45,750.00
Rp
67,595.00
Cat weathercoat
Melamine impra
m1
Upah:
Mandor
0.005
O.H
Rp
60,000.00
0.010
O.H
Rp
50,000.00
Tukang Kayu
0.100
O.H
Rp
45,000.00
0.100
O.H
Rp
35,000.00
Jumlah:
Bahan:
Kayu Meranti (Papan 2/20)
0.007
m3
Rp
2,800,000.00
0.012
m3
Rp
2,400,000.00
0.020
Kg
Rp
23,000.00
Jumlah:
Nilai HSPK :
Pembersihan
m2
Upah:
Mandor
0.025
O.H
Rp
60,000.00
0.050
O.H
Rp
35,000.00
Jumlah:
Nilai HSPK :
Pembuangan Bekas Bongkaran
m2
Upah:
Pekerja / Buruh Tak Terampil
0.167
O.H
Rp
35,000.00
Jumlah:
Sewa Peralatan:
Sewa Truk (min 5 Jam)
0.167
O.H
Rp
65,000.00
Jumlah:
Nilai HSPK :
Pembuangan Bekas Bongkaran
m3
Upah:
Pekerja / Buruh Tak Terampil
0.250
O.H
Rp
35,000.00
Jumlah:
Sewa Peralatan:
Sewa Truk (min 5 Jam)
0.250
O.H
Rp
65,000.00
Jumlah:
Nilai HSPK :
Pembongkaran Dinding Tembok Dengan Pembersihan
m2
Upah:
Mandor
Tenaga Kasar
0.050
1.000
O.H
O.H
Rp
60,000.00
Rp
35,000.00
Jumlah:
Nilai HSPK :
Pembongkaran Dinding Tembok Dengan Pembersihan
m2
Upah:
Mandor
0.050
O.H
Rp
60,000.00
1.000
O.H
Rp
35,000.00
Jumlah:
Nilai HSPK :
ANALISIS BOW
m3
Pembongkaran Beton
Upah:
Mandor
0.400
O.H
Rp
60,000.00
Pekerja Terampil
4.000
O.H
Rp
35,000.00
Jumlah:
Nilai HSPK :
Pemasangan Dinding Batu Merah 1 Pc : 4 Pp tebal 1/2 bata
m2
Upah:
Mandor
Kepala Tukang Batu
0.015
0.010
O.H
O.H
Rp
60,000.00
Tukang Batu
Tenaga Kasar
0.100
0.300
O.H
O.H
Rp
50,000.00
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang
Batu Bata Merah uk 22 x 11 x 4.5 cm
0.230
Zak
Rp
48,000.00
0.043
70.000
m3
Buah
Rp
Rp
120,000.00
500.00
Jumlah:
Nilai HSPK :
Plesteran Halus 1 Pc : 2 Ps tebal 1.5 cm
m2
Upah:
Mandor
Kepala Tukang Batu
0.015
0.015
O.H
O.H
Rp
60,000.00
Tukang Batu
Tenaga Kasar
0.150
0.300
O.H
O.H
Rp
50,000.00
Rp
Rp
45,000.00
35,000.00
Jumlah:
0.204
Zak
Rp
48,000.00
Pasir Pasang
0.020
m3
Rp
120,000.00
Bahan:
Jumlah:
Nilai HSPK :
Plesteran Halus 1 Pc : 3 Ps tebal 1.5 cm
m2
Upah:
Mandor
0.015
O.H
Rp
60,000.00
0.015
0.150
O.H
O.H
Tenaga Kasar
0.300
O.H
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Jumlah:
0.156
0.023
Zak
m3
Rp
Rp
48,000.00
120,000.00
Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang
Jumlah:
Nilai HSPK :
Plesteran Halus 1 Pc : 4 Ps tebal 1.5 cm
m2
Upah:
Mandor
0.015
O.H
Rp
60,000.00
0.015
0.150
O.H
O.H
Tenaga Kasar
0.300
O.H
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Jumlah:
0.125
0.024
Zak
m3
Rp
Rp
48,000.00
120,000.00
Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang
Jumlah:
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
0.004
0.040
0.400
O.H
O.H
O.H
Rp
60,000.00
Tenaga Kasar
0.080
O.H
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Jumlah:
0.010
Zak
Rp
48,000.00
Pasir Pasang
0.013
m3
Rp
120,000.00
Bahan:
Jumlah:
Nilai HSPK :
Plesteran Ciprat 1 Pc : 2PS
m2
Upah:
Mandor
0.015
O.H
Rp
60,000.00
0.010
0.100
O.H
O.H
Tenaga Kasar
0.300
O.H
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Jumlah:
0.086
0.006
Zak
m3
Rp
Rp
48,000.00
120,000.00
Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang
Jumlah:
Nilai HSPK :
Kol-Kolan
Upah:
Tukang Batu
0.057
O.H
Rp
45,000.00
Jumlah:
0.010
0.002
Zak
m3
Rp
Rp
48,000.00
120,000.00
Bahan:
Semen PC (Portland Cement) 50 kg
Pasir Pasang
Jumlah:
Nilai HSPK :
Pekerjaan Acian
m2
O.H
O.H
Rp
60,000.00
Rp
50,000.00
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Tenaga Kasar
0.010
0.010
0.100
0.200
Jumlah:
Bahan:
Semen portland (50 kg)
0.065
Zak
Rp
48,000.00
Jumlah:
Nilai HSPK :
Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud
m2
Upah:
Mandor
Kepala Tukang Kayu
0.075
0.045
O.H
O.H
Rp
60,000.00
Tukang Kayu
Pembantu Tukang
0.450
0.150
O.H
O.H
Rp
50,000.00
Rp
Rp
45,000.00
35,000.00
Jumlah:
m3
Rp
4,262,050.00
Lembar
Buah
Rp
Rp
66,000.00
150.00
Bahan:
Rangka Metal Stud
Gypsum Tebal 12 mm
Paku Sekrup
0.015
1.000
28.000
Jumlah:
Nilai HSPK :
Pemasangan Partisi Double Kalsiboard 6 mm Rangka Metal Stud
1.000
M2
Mandor
0.075
O.H
Rp
60,000.00
0.045
0.450
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.150
O.H
Rp
Upah:
35,000.00
Jumlah:
Bahan:
Rangka Metal Stud
2.400
M2
Rp
19,500.00
Nilai HSPK
Bahan:
Double Kalsiboard 6 mm
Paku Sekrup
1.000
28.000
Lembar
Rp
Buah
Rp
96,500.00
150.00
Jumlah:
Nilai HSPK
Bahan:
Triplek 6 mm ( lapisan dasar megatek )
Megatex 3 mm
Lem kuning
1.000
1.000
0.200
Lembar
Lembar
Ltr.
Rp
Rp
Rp
65,000.00
85,000.00
13,200.00
Jumlah:
Nilai HSPK
Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud
m2
Upah:
Mandor
Kepala Tukang Kayu
0.075
0.045
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Kayu
Pekerja/Buruh Tak Terampil
0.450
0.150
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Rangka Metal Stud
Gypsum Tebal 12 mm
Paku Sekrup
0.015
1.000
28.000
m3
Rp
4,262,050.00
Lembar
Buah
Rp
Rp
66,000.00
150.00
Jumlah:
Nilai HSPK :
m3
Upah:
Pekerja / Buruh Tak Terampil
0.250
O.H
Rp
35,000.00
Jumlah:
Sewa Peralatan:
Sewa Dump Truck 5 T (min 5 jam)
0.250
Jam
Rp
65,000.00
Jumlah:
Nilai HSPK :
Penggalian Tanah untuk Konstruksi
m3
Upah:
Mandor
Pekerja / Buruh Tak Terampil
0.045
0.900
O.H
O.H
Rp
Rp
60,000.00
35,000.00
Jumlah:
Nilai HSPK :
Penggalian Tanah Keras
m3
Upah:
Mandor
Pekerja / Buruh Tak Terampil
0.032
1.000
O.H
O.H
Rp
Rp
60,000.00
35,000.00
Jumlah:
Nilai HSPK :
Pengurugan Pasir (PADAT)
m3
O.H
O.H
Rp
Rp
Upah:
Mandor
Pekerja Terampil
0.010
0.300
60,000.00
35,000.00
Jumlah:
Bahan:
Pasir Urug
1.200
m3
Rp
115,000.00
Jumlah:
Nilai HSPK :
Pengurugan Sirtu (PADAT)
m3
Upah:
Mandor
0.025
O.H
Rp
60,000.00
Pekerja Terampil
0.250
O.H
Rp
35,000.00
Jumlah:
Bahan:
Tasirtu/ Sirtu
1.200
m3
Rp
60,000.00
Jumlah:
Nilai HSPK :
Pemasangan Batu Kali Belah Kosongan (aanstamping)
m3
Upah:
Mandor
Kepala Tukang Batu
0.039
0.039
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Batu
Pekerja/Buruh Tak Terampil
0.390
0.780
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Batu Kali Belah 15/20 cm
Pasir Urug
1.200
0.432
m3
m3
Rp
Rp
130,100.00
115,000.00
Jumlah:
Nilai HSPK :
Pemasangan Batu Kali Kosongan tebal 20 cm
m3
Upah:
Mandor
Kepala Tukang Batu
0.017
0.015
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Batu
Pekerja/Buruh Tak Terampil
0.150
0.350
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Batu Kali Belah 15/20 cm
1.200
m3
Rp
130,100.00
Jumlah:
Nilai HSPK :
Pekerjaan Pasangan Batu Kali Belah 15/20 cm (1 Pc : 5 Ps)
m3
O.H
O.H
Rp
Rp
Tenaga:
Mandor
Kepala Tukang Batu
0.075
0.060
60,000.00
50,000.00
Tukang Batu
Pekerja/Buruh Tak Terampil
0.600
1.500
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen portland (50kg)
Pasir Pasang
Batu Kali Belah 15/20 cm
2.720
0.544
1.100
Zak
m3
m3
Rp
54,000.00
Rp
Rp
120,000.00
130,100.00
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Sloof
m2
O.H
Rp
60,000.00
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Tenaga:
Mandor
Kepala Tukang kayu
Tukang Kayu
Pekerja / Buruh Tak Terampil
0.265
0.262
1.300
5.300
O.H
O.H
O.H
Jumlah:
Bahan:
Kayu meranti bekisting
Paku Usuk
Minyak Bekisting
0.045
0.300
m3
Kg
Rp
Rp
2,400,000.00
17,000.00
0.100
ltr
Rp
4,800.00
Jumlah:
Nilai HSPK :
Pekerjaan Beton K-300
m3
O.H
Rp
60,000.00
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Tenaga:
Mandor
Kepala Tukang Batu
Tukang batu
Pekerja / Buruh Tak Terampil
0.083
0.028
0.275
1.650
O.H
O.H
O.H
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
Batu Pecah Mesin 1/2 cm
Air (biaya air tawar)
10.325
0.426
0.537
215.000
Zak
m3
Rp
Rp
48,000.00
130,000.00
m3
Liter
Rp
230,000.00
Rp
13.00
Jumlah:
Nilai HSPK :
Pekerjaan Pembesian dengan besi beton (polos/ulir)
kg
Tenaga:
Mandor
Kepala Tukang Besi
Tukang Besi
Pekerja / Buruh Tak Terampil
0.000
0.001
0.007
0.007
O.H
O.H
O.H
O.H
Rp
60,000.00
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Jumlah:
Bahan:
Besi Beton (polos/ulir)
Kawat Beton
1.050
0.015
Kg
Kg
Rp
Rp
8,000.00
14,000.00
Jumlah:
Nilai HSPK :
Beton bertulang K-300 dengan memakai besi 150 Kg
Pekerjaan pembesian
Acuan untuk beton struktur ( begisting )
Pekerjaan beton bersetruktur K-300
Pembongkaran begisting dan penyiraman beton
150.000
1.000
Kg
M3
Rp
Rp
9,229.00
242,025.00
1.000
1.000
M3
O.H
Rp
Rp
738,524.99
48,600.00
Jumlah
Nilai HSPK
m1
O.H
Rp
60,000.00
Rp
Rp
50,000.00
45,000.00
Rp
Rp
45,000.00
45,000.00
Rp
35,000.00
Tenaga:
Mandor
Kepala Tukang Besi
Tukang Besi
Tukang Batu
Tukang Kayu
Pekerja / Buruh Tak Terampil
0.009
0.006
0.020
0.020
0.020
0.180
O.H
O.H
O.H
O.H
O.H
Jumlah:
Bahan:
Semen portland (40kg)
0.100
Pasir Beton
Batu Pecah Mesin 1/2 cm
0.006
0.009
3.000
0.450
0.002
0.010
Rp
48,000.00
m3
m3
Rp
Rp
130,000.00
230,000.00
Kg
Kg
m3
Kg
Rp
Rp
8,000.00
14,000.00
Rp
Rp
2,400,000.00
17,000.00
Zak
Jumlah:
m1
Nilai HSPK :
SNI DT 91-0008-2007 (6.36)
Tenaga:
Mandor
Kepala Tukang Besi
Tukang Besi
Tukang Batu
Tukang Kayu
Pekerja / Buruh Tak Terampil
0.015
0.010
0.033
0.033
0.033
0.297
O.H
O.H
O.H
O.H
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Rp
Rp
45,000.00
45,000.00
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
0.138
Pasir Beton
Batu Pecah Mesin 1/2 cm
0.009
0.015
3.600
0.050
0.003
0.020
Rp
48,000.00
m3
m3
Rp
Rp
130,000.00
230,000.00
Kg
Kg
m3
Kg
Rp
Rp
8,000.00
14,000.00
Rp
Rp
2,400,000.00
17,000.00
Zak
Jumlah:
Nilai HSPK :
Pengurugan Tanah Kembali untuk Konstruksi
m3
O.H
O.H
Rp
Rp
Upah:
Mandor
Pekerja / Buruh Tak Terampil
0.015
0.300
60,000.00
35,000.00
Jumlah:
Nilai HSPK :
Mengapur dinding tembok baru sampai baik 3X
m2
Upah:
Kepala Tukang Cat
Tukang Cat
Pekerja/Buruh Tak Terampil
0.001
0.010
0.060
O.H
O.H
O.H
Rp
Rp
Rp
50,000.00
45,000.00
35,000.00
Jumlah:
Bahan:
Kapur Gamping
0.001
m3
Rp
80,000.00
Jumlah:
Nilai HSPK :
Cat Tembok
1.000
M2
Mandor
Kepala tukang batu
0.003
0.008
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang cat
Pekerja
0.075
0.500
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Upah :
Jumlah
Bahan
Cat Tembok
0.300
Kg
Rp
14,500.00
Plamir tembok
Kertas gosok no.150
0.050
0.250
Kg
Lbr
Rp
Rp
14,500.00
3,500.00
Jumlah
Nilai HSPK
Cat Tembok weather shield
1.000
M2
Mandor
Kepala tukang batu
0.003
0.008
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang cat
Pekerja
0.075
0.500
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Upah :
Jumlah
Bahan
Cat Tembok weather shield
0.300
Kg
Rp
64,960.00
Plamir tembok
Kertas gosok no.150
0.050
0.250
Kg
Lbr
Rp
Rp
14,500.00
3,500.00
Jumlah
Nilai HSPK
Plamur Tembok
m2
Tabel 1 Pt - T - 38 - 2000 - C
Upah:
Mandor
Kepala Tukang Cat
0.001
0.003
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Cat
Pekerja/Buruh Tak Terampil
0.030
0.020
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Plamur Tembok
0.100
Kg
Rp
14,500.00
0.500
Lembar
Rp
3,500.00
Jumlah:
Nilai HSPK :
Pengecatan Dasar Meni Besi
m2
Upah:
Mandor
0.010
O.H
Rp
60,000.00
0.020
0.200
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.020
O.H
Rp
35,000.00
Jumlah:
Bahan:
Cat Meni (besi/kayu)
Kuas
0.100
0.010
Kg
Bh
Rp
Rp
15,000.00
14,000.00
Jumlah:
Nilai HSPK :
Pengecatan Tembok Lama (1 lapis cat dasar,2 lapis cat penutup)
m2
Upah:
Mandor
0.003
O.H
Rp
60,000.00
0.004
0.042
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.028
O.H
Rp
35,000.00
Jumlah:
Bahan:
Dempul Tembok (cat Dasar)
Cat Tembok Luar
0.120
0.180
Kg
Kg
Rp
Rp
12,500.00
64,960.00
Jumlah:
Nilai HSPK :
m3
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Rp
Rp
45,000.00
45,000.00
Rp
Rp
45,000.00
35,000.00
Tenaga:
Mandor
Kepala Tukang Besi
Tukang Besi
Tukang Batu
Tukang Kayu
Pekerja / Buruh Tak Terampil
0.265
0.262
1.050
0.275
1.300
5.300
O.H
O.H
O.H
O.H
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
Batu Pecah Mesin 1/2 cm
Besi Beton (polos/ulir)
Kawat Beton
Kayu meranti bekisting
Kayu Kamper balok 3/5
Dolken kayu gelam dia 8-10 cm, panjang 4m
Plywood tebal 9 mm
Paku Usuk
Minyak Bekisting
8.400
0.540
0.810
150.000
2.250
0.240
0.160
24.000
2.800
3.200
1.600
Rp
48,000.00
m3
m3
Rp
Rp
130,000.00
230,000.00
Kg
Kg
m3
m3
Rp
Rp
8,000.00
14,000.00
Rp
Rp
2,400,000.00
3,700,000.00
Batang
lembar
Rp
Rp
12,000.00
95,000.00
Kg
ltr
Rp
Rp
17,000.00
4,800.00
Zak
Jumlah:
Pekerjaan Dinding Beton Bertulang (200 kg besi + Bekisting)
m3
Nilai HSPK :
SNI DT 91-0008-2007 (6.34)
Tenaga:
Mandor
Kepala Tukang Besi
Tukang Besi
Tukang Batu
Tukang Kayu
Pekerja / Buruh Tak Terampil
0.283
0.323
1.400
0.275
1.560
5.650
O.H
O.H
O.H
O.H
O.H
O.H
Rp
60,000.00
Rp
Rp
50,000.00
45,000.00
Rp
Rp
45,000.00
45,000.00
Rp
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
Batu Pecah Mesin 1/2 cm
Besi Beton (polos/ulir)
Kawat Beton
Kayu meranti bekisting
Kayu Kamper balok 3/5
Dolken kayu gelam dia 8-10 cm, panjang 4m
Plywood tebal 9 mm
Paku Usuk
Minyak Bekisting
8.400
0.540
Rp
Rp
48,000.00
130,000.00
Rp
Rp
230,000.00
8,000.00
Kg
m3
Rp
Rp
14,000.00
2,400,000.00
0.105
14.000
m3
Batang
Rp
Rp
3,700,000.00
12,000.00
2.500
3.000
lembar
Kg
Rp
Rp
95,000.00
17,000.00
1.200
ltr
Rp
4,800.00
0.810
210.000
3.000
0.250
Zak
m3
m3
Kg
Jumlah:
Nilai HSPK :
Pemasangan Tegel Keramik 40x40 cm (Motif/Warna Gelap)
m2
Upah:
Mandor
Kepala Tukang Batu
0.035
0.035
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Batu
Pekerja/Buruh Tak Terampil
0.350
0.700
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen PC (Portland Cement) 50 kg
0.196
Zak
Rp
54,000.00
1.300
0.045
Kg
m3
Rp
Rp
7,500.00
120,000.00
1.061
m2
Rp
51,700.00
Jumlah:
Nilai HSPK :
Pemasangan Tegel Keramik 20x25 cm (Dinding)
m2
Upah:
Mandor
0.045
O.H
Rp
60,000.00
0.045
0.450
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.900
O.H
Rp
35,000.00
Jumlah:
Bahan:
Semen PC (Portland Cement) 50 kg
Semen Berwarna Yiyitan
0.186
1.940
Zak
Kg
Rp
Rp
54,000.00
7,500.00
Pasir Pasang
Tegel Keramik 20 x 25 Cm (dinding)
0.018
1.050
m3
m2
Rp
Rp
120,000.00
37,500.00
Jumlah:
Nilai HSPK :
m2
Upah:
Mandor
Kepala Tukang Kayu
0.075
0.025
O.H
O.H
Rp
Rp
60,000.00
50,000.00
0.150
0.250
O.H
O.H
Rp
Rp
35,000.00
45,000.00
Jumlah:
Bahan:
Besi Hollow 40/40
0.750
m'
Rp
17,500.00
2.000
0.382
m'
Lembar
Rp
Rp
14,500.00
104,500.00
Skrup
4.000
Buah
Rp
150.00
Jumlah:
Nilai HSPK :
m2
Upah:
Mandor
0.075
O.H
Rp
60,000.00
0.025
0.150
O.H
O.H
Tukang Kayu
0.250
O.H
Rp
Rp
50,000.00
35,000.00
Rp
45,000.00
Jumlah:
0.750
2.000
m'
m'
Rp
Rp
17,500.00
14,500.00
0.382
4.000
Lembar
Buah
Rp
Rp
104,500.00
150.00
Bahan:
Jumlah:
Nilai HSPK :
Pemasangan Kusen Alumunium Profil 4"
m1
Upah:
Mandor
Kepala Tukang Kayu
0.002
0.004
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Kayu
Pekerja Terampil
0.043
0.043
O.H
O.H
Rp
Rp
35,000.00
45,000.00
Jumlah:
Bahan:
Aluminium Putih Uk. 4 x 10, Profil 4"
Skrup/Ripet
Sealent
1.100
m1
Rp
88,500.00
2.000
0.060
Buah
tube
Rp
Rp
150.00
22,500.00
Jumlah:
Nilai HSPK :
Pemasangan Slimar Alumunium Profil 3/8 "
m1
Upah:
Mandor
0.002
O.H
Rp
60,000.00
0.004
0.043
O.H
O.H
Rp
Rp
50,000.00
35,000.00
Pekerja Terampil
0.043
O.H
Rp
45,000.00
Jumlah:
Bahan:
Slimar Alumunium 3/8
Sealent
1.100
0.060
m1
tube
Rp
Rp
Skrup/Ripet
2.000
Buah
Rp
53,500.00
22,500.00
150.00
Jumlah:
Nilai HSPK :
Pemasangan Partisi Double Gypsum 12 mm Rangka Metal Stud
m2
Upah:
Mandor
Kepala Tukang Kayu
0.075
0.045
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Kayu
Pekerja/Buruh Tak Terampil
0.450
0.150
O.H
O.H
Rp
Rp
35,000.00
45,000.00
Jumlah:
Bahan:
Rangka Metal Stud
Gypsum Tebal 12 mm
Paku Sekrup
0.015
1.000
28.000
m3
Rp
4,262,050.00
Lembar
Buah
Rp
Rp
66,000.00
150.00
Jumlah:
Nilai HSPK :
Pemasangan Kaca Mati tebal 6 mm
m2
Upah:
Mandor
Kepala Tukang Kayu
0.001
0.015
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Kayu
Pekerja/Buruh Tak Terampil
0.150
0.015
O.H
O.H
Rp
Rp
35,000.00
45,000.00
Jumlah:
Bahan:
Kaca Polos Tebal 6 mm
1.100
m2
Rp
85,000.00
Jumlah:
Nilai HSPK :
Pemasangan Kaca Mati tebal 8 mm
m2
Upah:
Mandor
0.001
O.H
Rp
60,000.00
0.015
0.150
O.H
O.H
Rp
Rp
50,000.00
35,000.00
0.015
O.H
Rp
45,000.00
Jumlah:
Bahan:
Kaca Polos Tebal 8 mm
1.100
m2
Rp
100,000.00
Jumlah:
Nilai HSPK :
m2
Upah:
Mandor
0.001
O.H
Rp
60,000.00
0.015
0.150
0.015
O.H
O.H
O.H
Rp
Rp
Rp
50,000.00
35,000.00
45,000.00
Jumlah:
Bahan:
Kaca Gravier
1.100
m2
Rp
275,000.00
Jumlah:
Nilai HSPK :
Pemasangan Kaca Stainglass
m2
Upah:
Mandor
0.001
O.H
Rp
60,000.00
0.015
0.150
O.H
O.H
Rp
Rp
50,000.00
35,000.00
0.050
O.H
Rp
45,000.00
Jumlah:
Bahan:
Kaca Stainglass
1.100
m2
Rp
345,000.00
Jumlah:
Nilai HSPK :
Buah
Upah:
Mandor
Kepala Tukang Kayu
0.005
0.010
O.H
O.H
Rp
60,000.00
Tukang Kayu
Pembantu Tukang
0.500
0.010
O.H
O.H
Rp
50,000.00
Rp
Rp
35,000.00
45,000.00
Jumlah:
1.000
Buah
Rp
17,500.00
Bahan:
Kunci Tanam
Jumlah:
Nilai HSPK :
Pemasangan Kunci Tanam Besar 2x Putar kuningan
Buah
Upah:
Mandor
0.005
O.H
Rp
60,000.00
0.010
0.500
0.010
O.H
O.H
O.H
Rp
50,000.00
Rp
Rp
35,000.00
45,000.00
Jumlah:
1.000
Buah
Rp
185,000.00
Bahan:
Kunci Tanam Besar 2x Putar (kuningan)
Jumlah:
Nilai HSPK :
Pemasangan Engsel H (stel)
Stel
Upah:
Mandor
0.001
O.H
Rp
60,000.00
0.015
0.150
O.H
O.H
Pembantu Tukang
0.015
O.H
Rp
Rp
50,000.00
35,000.00
Rp
45,000.00
Jumlah:
1.000
stel
Rp
17,500.00
Bahan:
Engsel H
Jumlah:
Nilai HSPK :
Stel
Upah:
Mandor
0.001
O.H
Rp
60,000.00
0.010
0.100
O.H
O.H
Pembantu Tukang
0.010
O.H
Rp
Rp
50,000.00
35,000.00
Rp
45,000.00
Jumlah:
1.000
stel
Rp
25,000.00
Jumlah:
Bahan:
Engsel Kuningan
Nilai HSPK :
Pemasangan Engsel Kuningan Untuk Pintu
Stel
Upah:
Mandor
Kepala Tukang Kayu
0.001
0.015
O.H
O.H
Rp
60,000.00
Tukang Kayu
Pembantu Tukang
0.150
0.015
O.H
O.H
Rp
50,000.00
Rp
Rp
35,000.00
45,000.00
Jumlah:
1.000
stel
Rp
69,500.00
Jumlah:
Bahan:
Engsel Kuningan (untuk Pintu)
Nilai HSPK :
Pemasangan Grendel
Buah
Upah:
Tukang Kayu
Pembantu Tukang
0.120
0.060
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
1.000
Buah
Rp
35,000.00
Bahan:
Grendel Biasa (besar)
Jumlah:
Nilai HSPK :
Pemasangan Grendel Biasa (Kecil)
Buah
Upah:
Tukang Kayu
0.120
O.H
Pembantu Tukang
0.060
O.H
1.000
Buah
Rp
45,000.00
Rp
35,000.00
Jumlah:
Rp
22,300.00
Jumlah:
Bahan:
Grendel Biasa (kecil)
Nilai HSPK :
Pemasangan Grendel Biasa (Besar)
Buah
Upah:
Tukang Kayu
Pembantu Tukang
0.120
0.060
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
1.000
Buah
Rp
67,100.00
Bahan:
Grendel Panjang
Jumlah:
Nilai HSPK :
Pemasangan Grendel Tanam
Buah
Upah:
Tukang Kayu
0.140
O.H
Pembantu Tukang
0.080
O.H
1.000
Buah
Rp
45,000.00
Rp
35,000.00
Jumlah:
Rp
45,000.00
Bahan:
Grendel Tanam
Jumlah:
Nilai HSPK :
Pemasangan Grendel Kuningan/ Croum (Kecil)
Buah
Upah:
Tukang Kayu
Pembantu Tukang
0.120
0.060
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
1.000
Buah
Rp
67,100.00
Bahan:
Grendel Tanam
Jumlah:
Nilai HSPK :
Pemasangan Grendel Espanyolet
Buah
Upah:
Tukang Kayu
0.140
O.H
Pembantu Tukang
0.080
O.H
1.000
Buah
Rp
45,000.00
Rp
35,000.00
Jumlah:
Rp
62,500.00
Bahan:
Espanyolet
Jumlah:
Nilai HSPK :
Pemasangan Hak Angin (Sikutan)
Stel
Upah:
Tukang Kayu
Pembantu Tukang
0.140
0.080
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
1.000
Buah
Rp
35,000.00
Bahan:
Hak Angin (sikutan biasa)
Jumlah:
Nilai HSPK :
Pemasangan Hak Angin Sikutan (kuningan)
Buah
Upah:
Tukang Kayu
0.120
O.H
Pembantu Tukang
0.060
O.H
1.000
Buah
Rp
45,000.00
Rp
35,000.00
Jumlah:
Rp
62,500.00
Bahan:
Hak Angin kuningan Lurus Maju/Mundur
Jumlah:
Nilai HSPK :
Pemasangan Hak Angin 4 mm (Lurus)
Stel
Upah:
Tukang Kayu
Pembantu Tukang
0.140
0.080
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
1.000
Buah
Rp
4,500.00
Bahan:
Hak Angin 4 mm (lurus biasa)
Jumlah:
Nilai HSPK :
Pemasangan Hak Angin Lurus (Bisa Disetel Maju/Mundur)
Buah
Upah:
Tukang Kayu
0.120
O.H
Pembantu Tukang
0.060
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
1.000
Buah
Rp
19,920.00
Bahan:
Hak Angin Lurus Kuningan (bisa Disetel Maju/Mundur)
Jumlah:
Nilai HSPK :
m2
Upah:
Mandor
0.030
O.H
Rp
60,000.00
0.200
2.000
O.H
O.H
Pembantu Tukang
0.600
O.H
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Jumlah:
1.000
0.020
lembar
m3
Rp
Rp
85,000.00
6,435,000.00
Lem Kayu
Paku Klem (No 4)
0.300
0.300
kg
Doz
Rp
Rp
22,500.00
10,400.00
Jumlah:
Bahan:
Nilai HSPK :
Pelapisan Waterproofing
m2
Upah:
Mandor
Kepala Tukang Cat
0.003
0.008
O.H
O.H
Rp
60,000.00
Tukang Cat
Tenaga Kasar
0.075
0.050
O.H
O.H
Rp
50,000.00
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Waterproofing
Serat Fiber
0.350
1.000
Kg
m2
Rp
Rp
44,000.00
2,750.00
Jumlah:
Nilai HSPK :
Pengecatan Dasar Meni Besi
m2
Upah:
Mandor
0.010
O.H
Rp
60,000.00
0.020
0.200
O.H
O.H
Tenaga Kasar
0.020
O.H
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Jumlah:
0.100
0.010
Kg
Bh
Rp
Rp
16,500.00
14,000.00
Bahan:
Cat Meni (besi)
Kuas
Jumlah:
Nilai HSPK :
Pekerjaan Rangka Kuda - kuda WF
Kg
Upah:
Mandor
Kepala Tukang
Tukang Las
Pembantu tukang
0.003
0.006
0.060
0.060
O.H
O.H
Rp
60,000.00
Rp
50,000.00
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Kg
Rp
9,250.00
Bahan:
Besi Profil WF
1.150
Jumlah:
Nilai HSPK :
PEKERJAAN PABRIKASI BAJA
Pabrikasi dan pemasangan baja WF : Kg
1.000
Kg
Mandor
Kepala tukang besi
0.003
0.060
O.H
O.H
Rp
60,000.00
Tukang besi
Pekerja
0.060
0.080
O.H
O.H
Rp
50,000.00
0.070
Hari
Rp
Rp
Rp
45,000.00
35,000.00
30,000.00
Upah :
Jumlah
Bahan :
Besi propil WF < 200 mm s/d 400 mm
Elektroda baja ( 20 % )
1.100
0.200
Kg
Kg
Rp
Rp
9,250.00
23,000.00
Jumlah
Nilai HSPK
Harga Satuan Jadi
Angker 25mm
1.000
Bh
Rp
33,000.00
Nilai HSPK
Angker 25mm
1.000
Bh
Rp
26,500.00
Nilai HSPK
Baut HTB 16mm
1.000
Bh
Rp
8,800.00
Nilai HSPK
Baut gording HTB 12mm
1.000
Bh
Rp
11,000.00
Nilai HSPK
Penggantung gording 12mm
1.000
Kg
Rp
9,800.00
Nilai HSPK
Ikatan angin 16mm
1.000
Kg
Rp
9,800.00
Nilai HSPK
Kontramoor 22mm
1.000
Bh
Rp
38,500.00
Nilai HSPK
Kontramoor 16mm
1.000
Bh
Rp
29,150.00
Nilai HSPK
Trek stang 22mm
1.000
Kg
Rp
9,800.00
Nilai HSPK
Pemasangan gording C 125 x 50 x 20 x 3,2
Upah :
Mandor
Kepala tukang besi
0.003
0.060
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang besi
Pekerja
0.060
0.080
O.H
O.H
Rp
Rp
45,000.00
35,000.00
0.070
Hari
Rp
27,000.00
Jumlah
Bahan :
Besi profil C 145 x 58 x 10 x 3,2
Elektroda baja ( 20 % )
1.100
0.200
Kg
Kg
Rp
Rp
9,250.00
23,000.00
Jumlah
Nilai HSPK
Pabrikasi dan pemasangan baja L 70.70.7
1.000
Kg
Mandor
0.003
O.H
Rp
60,000.00
0.060
0.060
0.080
O.H
O.H
O.H
Rp
Rp
Rp
50,000.00
45,000.00
35,000.00
0.070
Hari
Rp
27,000.00
Upah :
Jumlah
Bahan :
Besi propil L 70.70.9
Elektroda baja ( 20 % )
1.100
Kg
Rp
10,250.00
0.200
Kg
Rp
23,000.00
Jumlah
Nilai HSPK
Pabrikasi dan pemasangan baja L 70.70.7
1.000
Kg
Mandor
0.003
O.H
Rp
60,000.00
0.060
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Pekerja
Sewa welding set ( min 5 jam )
0.080
0.070
O.H
Hari
Rp
Rp
35,000.00
27,000.00
Upah :
Jumlah
Bahan :
Pipa 2 "
Elektroda baja ( 20 % )
1.100
Kg
Rp
64,500.00
0.200
Kg
Rp
23,000.00
Jumlah
Nilai HSPK
Penyambungan plat baja
1.000
Kg
Mandor
0.003
O.H
Rp
60,000.00
0.060
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Pekerja
Sewa welding set ( min 5 jam )
0.080
0.070
O.H
Hari
Rp
Rp
35,000.00
27,000.00
Upah :
Jumlah
Bahan :
Besi plat
Elektroda baja ( 20 % )
1.100
Kg
Rp
9,850.00
0.200
Kg
Rp
23,000.00
Jumlah
Nilai HSPK
m2
0.005
0.010
0.100
0.400
O.H
O.H
Rp
60,000.00
Rp
50,000.00
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
m2
Rp
95,000.00
Bahan:
Rangka Galvalume uk 0.8mm
1.100
Jumlah:
Nilai HSPK :
m2
0.005
0.010
0.100
0.400
O.H
Rp
60,000.00
O.H
O.H
Rp
Rp
50,000.00
45,000.00
O.H
Rp
35,000.00
Jumlah:
m2
Rp
80,000.00
Bahan:
Rangka Galvalume uk 0.5mm
1.100
Jumlah:
Nilai HSPK :
m2
0.005
0.010
0.100
0.400
O.H
O.H
Rp
60,000.00
Rp
50,000.00
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
m2
Rp
95,000.00
Bahan:
Rangka Galvalume uk 0.8mm
1.100
Jumlah:
Nilai HSPK :
m2
0.005
0.010
0.100
0.400
O.H
O.H
Rp
60,000.00
Rp
50,000.00
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Rangka Galvalume campuran
1.100
m2
Rp
90,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Beton K-300
m3
Tenaga:
Mandor
Kepala Tukang Batu
0.083
0.028
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang batu
Pekerja / Buruh Tak Terampil
0.275
1.650
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
Batu Pecah Mesin 1/2 cm
Air (biaya air tawar)
10.325
Zak
Rp
48,500.00
0.426
0.537
m3
m3
Rp
Rp
130,000.00
254,000.00
Liter
Rp
215.000
13.00
Jumlah:
Nilai HSPK :
kg
Tenaga:
Mandor
Kepala Tukang Besi
0.000
0.001
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Besi
Pekerja / Buruh Tak Terampil
0.007
0.007
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Besi Beton (polos/ulir)
1.050
Kg
Rp
9,800.00
Kawat Beton
0.015
Kg
Rp
17,500.00
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Sloof
m2
Tenaga:
Mandor
0.265
O.H
Rp
60,000.00
0.262
1.300
5.300
O.H
O.H
O.H
Rp
Rp
Rp
50,000.00
45,000.00
35,000.00
Jumlah:
Bahan:
Kayu meranti bekisting
0.045
m3
Rp
3,080,000.00
Paku Usuk
Minyak Bekisting
0.300
0.100
Kg
ltr
Rp
Rp
14,500.00
2,750.00
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Kolom
m2
Tenaga:
Mandor
0.033
O.H
Rp
60,000.00
0.033
0.330
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.660
O.H
Rp
35,000.00
Jumlah:
Bahan:
Kayu meranti bekisting
Paku Usuk
0.040
0.400
m3
Kg
Rp
Rp
3,080,000.00
14,500.00
Minyak Bekisting
Kayu Kamper balok 3/5
0.200
0.015
ltr
m3
Rp
Rp
2,750.00
4,675,000.00
2.000
0.350
Batang
lembar
Rp
Rp
12,000.00
95,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Balok
m2
Tenaga:
Mandor
0.033
O.H
Rp
60,000.00
0.033
0.330
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.660
O.H
Rp
35,000.00
Jumlah:
Bahan:
Kayu meranti bekisting
Paku Usuk
0.040
0.400
m3
Kg
Rp
Rp
3,080,000.00
14,500.00
Minyak Bekisting
Kayu Kamper balok 3/5
0.200
0.018
ltr
m3
Rp
Rp
2,750.00
4,675,000.00
2.000
0.350
Batang
lembar
Rp
Rp
12,000.00
95,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Lantai
m2
Tenaga:
Mandor
Kepala Tukang kayu
0.033
0.033
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Kayu
Pekerja / Buruh Tak Terampil
0.330
0.660
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Kayu meranti bekisting
0.040
m3
Rp
3,080,000.00
Paku Usuk
Minyak Bekisting
0.400
0.200
Kg
ltr
Rp
Rp
14,500.00
2,750.00
0.015
6.000
m3
Batang
Rp
Rp
4,675,000.00
12,000.00
Plywood tebal 9 mm
0.350
lembar
Rp
95,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Dinding
m2
Tenaga:
Mandor
Kepala Tukang kayu
Tukang Kayu
0.033
0.033
0.330
O.H
O.H
O.H
Rp
Rp
Rp
60,000.00
50,000.00
45,000.00
0.660
O.H
Rp
35,000.00
Jumlah:
Bahan:
Kayu meranti bekisting
0.030
m3
Rp
3,080,000.00
Paku Usuk
Minyak Bekisting
Kayu Kamper balok 3/5
0.400
0.200
0.020
Kg
ltr
m3
Rp
Rp
Rp
14,500.00
2,750.00
4,675,000.00
3.000
0.350
Batang
lembar
Rp
Rp
12,000.00
95,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Bekisting Tangga
m2
Tenaga:
Mandor
Kepala Tukang kayu
0.033
0.033
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Kayu
Pekerja / Buruh Tak Terampil
0.330
0.660
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Kayu meranti bekisting
0.030
m3
Rp
3,080,000.00
Paku Usuk
Minyak Bekisting
0.400
0.150
Kg
ltr
Rp
Rp
14,500.00
2,750.00
0.015
2.000
m3
Batang
Rp
Rp
4,675,000.00
12,000.00
Plywood tebal 9 mm
0.350
lembar
Rp
95,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Pondasi Beton Bertulang (135 kg besi + Bekisting) ( Poer 1 )
m3
Tenaga:
Mandor
0.265
O.H
Rp
60,000.00
0.262
1.050
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Tukang Batu
Tukang Kayu
0.275
1.300
O.H
O.H
Rp
Rp
45,000.00
45,000.00
5.300
O.H
Rp
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
8.400
0.540
Zak
m3
Rp
Rp
48,500.00
130,000.00
0.810
135.000
m3
Kg
Rp
Rp
254,000.00
9,800.00
Kawat Beton
Kayu meranti bekisting
2.250
0.200
Kg
m3
Rp
Rp
17,500.00
3,080,000.00
Paku Usuk
Minyak Bekisting
1.500
0.400
Kg
ltr
Rp
Rp
14,500.00
2,750.00
Jumlah:
Nilai HSPK :
m3
Tenaga:
Mandor
Kepala Tukang Besi
0.265
0.262
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Besi
Tukang Batu
1.050
0.275
O.H
O.H
Rp
Rp
45,000.00
45,000.00
Tukang Kayu
Pekerja / Buruh Tak Terampil
1.300
5.300
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
8.400
Zak
Rp
48,500.00
Pasir Beton
Batu Pecah Mesin 1/2 cm
0.540
0.810
m3
m3
Rp
Rp
130,000.00
254,000.00
168.000
2.250
0.200
Kg
Kg
m3
Rp
Rp
Rp
9,800.00
17,500.00
3,080,000.00
1.500
0.400
Kg
ltr
Rp
Rp
14,500.00
2,750.00
Jumlah:
Nilai HSPK :
Pekerjaan Sloof 30X40 Beton Bertulang (216 kg besi + Bekisting)
m3
Tenaga:
Mandor
0.283
O.H
Rp
60,000.00
0.323
1.400
0.275
O.H
O.H
O.H
Rp
Rp
Rp
50,000.00
45,000.00
45,000.00
Tukang Kayu
Pekerja / Buruh Tak Terampil
1.560
5.650
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
8.400
Zak
Rp
48,500.00
Pasir Beton
Batu Pecah Mesin 1/2 cm
0.540
0.810
m3
m3
Rp
Rp
130,000.00
254,000.00
216.000
3.000
Kg
Kg
Rp
Rp
9,800.00
17,500.00
0.270
2.000
m3
Kg
Rp
Rp
3,080,000.00
14,500.00
Minyak Bekisting
0.600
ltr
Rp
2,750.00
Jumlah:
Nilai HSPK :
Pekerjaan Balok 20X40 Beton Bertulang (164 kg besi + Bekisting)
m3
Tenaga:
Mandor
0.318
O.H
Rp
60,000.00
0.333
1.400
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Tukang Batu
Tukang Kayu
0.275
1.650
O.H
O.H
Rp
Rp
45,000.00
45,000.00
6.350
O.H
Rp
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
Batu Pecah Mesin 1/2 cm
Besi Beton (polos/ulir)
Kawat Beton
Kayu meranti bekisting
Kayu Kamper balok 3/5
Dolken kayu gelam dia 8-10 cm, panjang 4m
Plywood tebal 9 mm
Paku Usuk
Minyak Bekisting
8.400
0.540
Zak
m3
Rp
Rp
48,500.00
130,000.00
0.810
164.000
m3
Kg
Rp
Rp
254,000.00
9,800.00
3.000
0.320
0.140
Kg
m3
m3
Rp
Rp
Rp
17,500.00
3,080,000.00
4,675,000.00
16.000
2.800
Batang
lembar
Rp
Rp
12,000.00
95,000.00
3.200
1.600
Kg
ltr
Rp
Rp
14,500.00
2,750.00
Jumlah:
Nilai HSPK :
Pekerjaan Balok 30X50 Beton Bertulang (186 kg besi + Bekisting)
m3
Tenaga:
Mandor
Kepala Tukang Besi
0.318
0.333
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Besi
Tukang Batu
1.400
0.275
O.H
O.H
Rp
Rp
45,000.00
45,000.00
Tukang Kayu
Pekerja / Buruh Tak Terampil
1.650
6.350
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
8.400
Zak
Rp
48,500.00
Pasir Beton
Batu Pecah Mesin 1/2 cm
0.540
0.810
m3
m3
Rp
Rp
130,000.00
254,000.00
164.000
3.000
Kg
Kg
Rp
Rp
9,800.00
17,500.00
0.320
0.140
m3
m3
Rp
Rp
3,080,000.00
4,675,000.00
16.000
2.800
Batang
lembar
Rp
Rp
12,000.00
95,000.00
3.200
1.600
Kg
ltr
Rp
Rp
14,500.00
2,750.00
Jumlah:
Nilai HSPK :
m3
Tenaga:
Mandor
Kepala Tukang Besi
0.318
0.333
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Besi
Tukang Batu
Tukang Kayu
1.400
0.275
1.650
O.H
O.H
O.H
Rp
Rp
Rp
45,000.00
45,000.00
45,000.00
6.350
O.H
Rp
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
8.400
Zak
Rp
48,500.00
Pasir Beton
Batu Pecah Mesin 1/2 cm
0.540
0.810
m3
m3
Rp
Rp
130,000.00
254,000.00
164.000
3.000
Kg
Kg
Rp
Rp
9,800.00
17,500.00
0.320
0.140
m3
m3
Rp
Rp
3,080,000.00
4,675,000.00
16.000
2.800
3.200
Batang
lembar
Kg
Rp
Rp
Rp
12,000.00
95,000.00
14,500.00
ltr
Rp
2,750.00
1.600
Jumlah:
Nilai HSPK :
m3
Tenaga:
Mandor
0.265
O.H
Rp
60,000.00
0.265
1.050
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Tukang Batu
Tukang Kayu
0.275
1.300
O.H
O.H
Rp
Rp
45,000.00
45,000.00
5.400
O.H
Rp
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
8.400
0.540
Zak
m3
Rp
Rp
48,500.00
130,000.00
0.810
133.000
m3
Kg
Rp
Rp
254,000.00
9,800.00
2.250
0.320
Kg
m3
Rp
Rp
17,500.00
3,080,000.00
0.120
32.000
m3
Batang
Rp
Rp
4,675,000.00
12,000.00
Plywood tebal 9 mm
Paku Usuk
2.800
3.200
lembar
Kg
Rp
Rp
95,000.00
14,500.00
Minyak Bekisting
1.600
ltr
Rp
2,750.00
Jumlah:
Nilai HSPK :
m3
Tenaga:
Mandor
Kepala Tukang Besi
0.265
0.262
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Besi
Tukang Batu
1.050
0.275
O.H
O.H
Rp
Rp
45,000.00
45,000.00
Tukang Kayu
Pekerja / Buruh Tak Terampil
1.300
5.300
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
8.400
Zak
Rp
48,500.00
Pasir Beton
Batu Pecah Mesin 1/2 cm
0.540
0.810
m3
m3
Rp
Rp
130,000.00
254,000.00
69.000
2.250
0.240
Kg
Kg
m3
Rp
Rp
Rp
9,800.00
17,500.00
3,080,000.00
0.160
24.000
m3
Batang
Rp
Rp
4,675,000.00
12,000.00
Plywood tebal 9 mm
Paku Usuk
2.800
3.200
lembar
Kg
Rp
Rp
95,000.00
14,500.00
Minyak Bekisting
1.600
ltr
Rp
2,750.00
Jumlah:
Nilai HSPK :
m1
O.H
Rp
Tenaga:
Mandor
0.009
60,000.00
0.006
0.020
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Tukang Batu
Tukang Kayu
Pekerja / Buruh Tak Terampil
0.020
0.020
0.180
O.H
O.H
O.H
Rp
Rp
Rp
45,000.00
45,000.00
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
0.100
0.006
Zak
m3
Rp
Rp
48,500.00
130,000.00
0.009
3.000
0.450
m3
Kg
Kg
Rp
Rp
Rp
254,000.00
9,800.00
17,500.00
0.002
0.010
m3
Kg
Rp
Rp
3,080,000.00
14,500.00
Jumlah:
m1
Tenaga:
Mandor
0.015
O.H
Rp
60,000.00
0.010
0.033
0.033
O.H
O.H
O.H
Rp
Rp
Rp
50,000.00
45,000.00
45,000.00
Tukang Kayu
Pekerja / Buruh Tak Terampil
0.033
0.297
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
Batu Pecah Mesin 1/2 cm
0.138
0.009
0.015
Zak
m3
m3
Rp
Rp
Rp
48,500.00
130,000.00
254,000.00
3.600
0.050
Kg
Kg
Rp
Rp
9,800.00
17,500.00
0.003
0.020
m3
Kg
Rp
Rp
3,080,000.00
14,500.00
Jumlah:
m3
ANALISIS BOW
Upah:
Mandor
Pekerja Terampil
0.400
4.000
O.H
O.H
Rp
Rp
60,000.00
35,000.00
Jumlah:
Nilai HSPK :
Pekerjaan Besi & Baja
Pekerjaan Pemasangan Besi Profil
Kg
Tenaga:
Mandor
Kepala Tukang
Tukang Las
0.003
0.006
0.060
O.H
O.H
O.H
Rp
Rp
Rp
60,000.00
50,000.00
45,000.00
0.060
O.H
Rp
35,000.00
Jumlah:
Bahan:
Besi Profil (Baja Konstruksi)
1.150
Kg
Rp
12,500.00
Jumlah:
Nilai HSPK :
cm
Tenaga:
Mandor
0.000
O.H
Rp
60,000.00
Kepala Tukang
Tukang Besi
0.000
0.002
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.004
O.H
Rp
35,000.00
Jumlah:
Bahan:
Electrode Las
Solar
0.040
0.030
kg
liter
Rp
Rp
23,000.00
4,500.00
Minyak Pelumas
0.004
liter
Rp
2,750.00
Jumlah:
Nilai HSPK :
Pekerjaan Perakitan Besi
kg
Tenaga:
Mandor
0.000
O.H
Rp
60,000.00
Kepala Tukang
Tukang Besi
0.000
0.001
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.001
O.H
Rp
35,000.00
Jumlah:
Bahan:
Solar
Minyak Pelumas
0.010
0.001
liter
liter
Rp
Rp
4,500.00
2,750.00
Jumlah:
Sewa Peralatan:
Sewa Alat Bantu (1 Set @ 3 Alat)
0.008
jam
Rp
1,100.00
Jumlah:
Nilai HSPK :
Total HSPK :
Kg
Tenaga:
Mandor
0.003
O.H
Rp
60,000.00
Kepala Tukang
Tukang Las
0.006
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.060
O.H
Rp
35,000.00
Jumlah:
Bahan:
Besi Profil (Baja Konstruksi)
1.150
Kg
Rp
12,500.00
Jumlah:
Nilai HSPK :
PEKERJAAN PABRIKASI BAJA
Pabrikasi dan pemasangan baja WF : Kg
1.000
Kg
Mandor
Kepala tukang besi
0.003
0.060
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang besi
Pekerja
0.060
0.080
O.H
O.H
Rp
Rp
45,000.00
35,000.00
0.070
Hari
Rp
27,000.00
Upah :
Jumlah
Bahan :
Besi propil WF < 200 mm s/d 400 mm
Elektroda baja ( 20 % )
1.100
0.200
Kg
Kg
Rp
Rp
9,250.00
23,000.00
Jumlah
Nilai HSPK :
Harga Satuan Jadi
Angker 25mm
1.000
Bh
Rp
33,000.00
Nilai HSPK :
Angker 22mm
1.000
Bh
Rp
26,500.00
Nilai HSPK :
Baut HTB 16mm
1.000
Bh
Rp
Nilai HSPK :
8,800.00
1.000
Bh
Rp
11,000.00
Nilai HSPK :
Penggantung gording 12mm
1.000
Kg
Rp
9,800.00
Nilai HSPK :
Ikatan angin 16mm
1.000
Kg
Rp
9,800.00
Nilai HSPK :
Kontramoor 22mm
1.000
Bh
Rp
38,500.00
Nilai HSPK :
Kontramoor 16mm
1.000
Bh
Rp
29,150.00
Nilai HSPK :
Trek stang 22mm
1.000
Kg
Rp
9,800.00
Nilai HSPK :
Pemasangan gording C 125 x 50 x 20 x 3,2
Upah :
Mandor
0.003
O.H
Rp
60,000.00
0.060
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Pekerja
Sewa welding set ( min 5 jam )
0.080
0.070
O.H
Hari
Rp
Rp
35,000.00
27,000.00
Jumlah
Bahan :
Besi profil C 145 x 58 x 10 x 3,2
Elektroda baja ( 20 % )
1.100
Kg
Rp
9,250.00
0.200
Kg
Rp
23,000.00
Jumlah
Nilai HSPK :
Pabrikasi dan pemasangan baja L 70.70.7
1.000
Kg
Mandor
0.003
O.H
Rp
60,000.00
0.060
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Pekerja
Sewa welding set ( min 5 jam )
0.080
0.070
O.H
Hari
Rp
Rp
35,000.00
27,000.00
Upah :
Jumlah
Bahan :
Besi propil L 70.70.9
Elektroda baja ( 20 % )
1.100
Kg
Rp
9,250.00
0.200
Kg
Rp
23,000.00
Jumlah
Nilai HSPK :
Pabrikasi dan pemasangan baja L 70.70.7
1.000
Kg
Mandor
0.003
O.H
Rp
60,000.00
0.060
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Pekerja
Sewa welding set ( min 5 jam )
0.080
0.070
O.H
Hari
Rp
Rp
35,000.00
27,000.00
Upah :
Jumlah
Bahan :
Pipa 2 "
Elektroda baja ( 20 % )
1.100
Kg
Rp
64,500.00
0.200
Kg
Rp
23,000.00
Jumlah
Nilai HSPK :
Penyambungan plat baja
1.000
Kg
Mandor
Kepala tukang besi
0.003
0.060
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang besi
Pekerja
Sewa welding set ( min 5 jam )
0.060
0.080
0.070
O.H
O.H
Hari
Rp
Rp
Rp
45,000.00
35,000.00
27,000.00
Upah :
Jumlah
Bahan :
Besi plat
1.100
Kg
Rp
9,850.00
Elektroda baja ( 20 % )
0.200
Kg
Rp
23,000.00
Jumlah
Nilai HSPK :
Perbaikan Sambungan (Baut, Cincin, Pasak, dll)
Kg
Upah:
Kepala Tukang Besi
Tukang Besi
0.030
0.090
O.H
O.H
Pembantu Tukang
0.090
O.H
Rp
Rp
50,000.00
45,000.00
Rp
35,000.00
Jumlah:
Nilai HSPK :
m3
Tenaga:
Mandor
0.320
O.H
Rp
60,000.00
0.330
1.400
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Tukang Batu
Tukang Kayu
0.280
1.650
O.H
O.H
Rp
Rp
45,000.00
45,000.00
6.350
O.H
Rp
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
8.400
0.540
Zak
m3
Rp
Rp
48,500.00
130,000.00
0.810
130.000
m3
Kg
Rp
Rp
254,000.00
9,800.00
3.000
0.320
Kg
m3
Rp
Rp
17,500.00
3,080,000.00
0.140
16.000
m3
Batang
Rp
Rp
4,675,000.00
12,000.00
Plywood tebal 9 mm
Paku Usuk
2.800
3.200
lembar
Kg
Rp
Rp
95,000.00
14,500.00
Minyak Bekisting
1.600
ltr
Rp
2,750.00
Jumlah:
Nilai HSPK :
Pekerjaan Listplank Beton Bertulang (60 kg besi + Bekisting)
m3
Tenaga:
Mandor
0.320
O.H
Rp
60,000.00
0.330
1.400
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Tukang Batu
Tukang Kayu
0.280
1.650
O.H
O.H
Rp
Rp
45,000.00
45,000.00
6.350
O.H
Rp
35,000.00
Jumlah:
Bahan:
Semen portland (40kg)
Pasir Beton
8.400
0.540
Zak
m3
Rp
Rp
48,500.00
130,000.00
0.810
70.000
m3
Kg
Rp
Rp
254,000.00
9,800.00
3.000
0.320
Kg
m3
Rp
Rp
17,500.00
3,080,000.00
0.140
16.000
m3
Batang
Rp
Rp
4,675,000.00
12,000.00
Plywood tebal 9 mm
Paku Usuk
2.800
3.200
lembar
Kg
Rp
Rp
95,000.00
14,500.00
Minyak Bekisting
1.600
ltr
Rp
2,750.00
Jumlah:
Nilai HSPK :
Pemasangan Angker
buah
Upah :
Mandor
0.003
O.H
Rp
60,000.00
0.060
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Pekerja
Sewa welding set ( min 5 jam )
0.080
0.070
O.H
Hari
Rp
Rp
35,000.00
27,000.00
Angker baut 16
1.000
bh
Rp
Jumlah
2,750.00
Nilai HSPK
Pemasangan Baut 16
buah
Upah :
Mandor
0.003
O.H
Rp
60,000.00
0.060
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Pekerja
Sewa welding set ( min 5 jam )
0.080
0.070
O.H
Hari
Rp
Rp
35,000.00
27,000.00
mur/baut 16
1.000
bh
Rp
Jumlah
2,750.00
Nilai HSPK
Pekerjaan Pemasangan Besi Profil
Kg
Tenaga:
Mandor
0.003
O.H
Rp
60,000.00
Kepala Tukang
Tukang Las
0.010
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
0.060
O.H
Rp
35,000.00
Jumlah:
Bahan:
Besi Profil (Baja Konstruksi)
1.120
Kg
Rp
12,500.00
Jumlah:
Nilai HSPK :
Pemasangan Walter Mour
buah
Upah :
Mandor
0.003
O.H
Rp
60,000.00
0.060
0.060
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Pekerja
Sewa welding set ( min 5 jam )
0.080
0.070
O.H
Hari
Rp
Rp
35,000.00
27,000.00
mur/baut 16
1.000
bh
Rp
Jumlah
2,750.00
Nilai HSPK
Pemancangan Tiang Pancang m1 ( 200m)
m1
Upah:
Mandor
Pekerja tak trampil
0.130
0.750
O.H
O.H
Rp
Rp
60,000.00
35,000.00
Jumlah:
Sewa Peralatan:
Sewa Crane 30 ton - min. 8 jam (termasuk mob/demob, operator, BBM)
0.220
Jam
Rp
225,000.00
0.220
Jam
Rp
185,000.00
Jumlah:
Nilai HSPK :
Pekerjaan pengadaan tiang pancang
1.000
M1
1.000
M1
Rp
367,000.00
Nilai HSPK :
Sambungan tiang pancang 40 cm
1.000
Titik
Rp
44,000.00
Nilai HSPK :
Pecah tiang pancang 40 cm - 30 cm
1.000
Titik
Rp
19,250.00
Nilai HSPK :
Cat railling selasar / pagar / talang
1.000
M2
Upah :
Mandor
0.008
O.H
Rp
60,000.00
0.023
0.225
O.H
O.H
Rp
Rp
50,000.00
45,000.00
Pekerja
0.150
O.H
Rp
35,000.00
Jumlah
Bahan
Meni besi
Cat besi
0.425
0.425
Kg
Kg
Rp
Rp
16,500.00
41,800.00
Dempol
Minyak cat / afduner
0.080
0.057
Kg
Ltr
Rp
Rp
12,500.00
9,500.00
Kertas gosok
1.000
Lbr
Rp
3,500.00
Jumlah
Nilai HSPK :
Pemasangan Listplank Kalsiboard 12 MM X 200 CM (Rangka Kayu Kamper)
Upah:
m2
Mandor
Kepala Tukang Kayu
0.008
0.046
O.H
O.H
Rp
Rp
60,000.00
50,000.00
Tukang Kayu
Pembantu tukang
0.462
0.156
O.H
O.H
Rp
Rp
45,000.00
35,000.00
Jumlah:
Bahan:
Kayu Kamper (balok 5/7)
0.022
m3
Rp
4,642,000.00
Kalsiboard 12 MM X 200 MM
Paku Reng
1.000
0.100
m2
Kg
Rp
Rp
165,000.00
14,500.00
Jumlah:
Nilai HSPK :
Pemasangan Triplek Bawah Aluminium foil
m2
Upah:
Mandor
0.014
O.H
Rp
60,000.00
0.040
0.400
O.H
O.H
O.H
50,000.00
45,000.00
Pembantu tukang
0.270
Rp
Rp
Rp
35,000.00
Jumlah:
0.390
0.060
Lembar
Kg
Rp
Rp
48,500.00
14,500.00
Jumlah:
Bahan:
Triplek tebal 4 mm 1,20 x 2,40 m
Paku Triplek/sekrup triplek
Nilai HSPK :
Pemasangan Alluminiumfoil Bawah reng galvalum
m2
Upah:
Mandor
Kepala Tukang Kayu
0.014
0.040
O.H
O.H
Rp
60,000.00
Tukang Kayu
0.040
0.027
O.H
O.H
Rp
50,000.00
Rp
Rp
45,000.00
35,000.00
Jumlah:
1.050
Lembar
0.060
Kg
Rp
22,500.00
Rp
14,500.00
Jumlah:
Pembantu tukang
Bahan:
Nilai HSPK :
Pemasangan Genteng Glazurr
m2
Upah:
Mandor
Kepala Tukang Kayu
0.008
0.008
O.H
O.H
Rp
60,000.00
Tukang Kayu
0.075
0.150
O.H
O.H
Rp
50,000.00
Rp
Rp
45,000.00
35,000.00
Jumlah:
20.000
Buah
Rp
5,937.50
Pembantu tukang
Bahan:
Genteng Glazurr
Jumlah:
Nilai HSPK :
Pemasangan Wuwung Genteng Glazurr
m1
Upah:
Mandor
Kepala Tukang Batu
0.002
0.020
O.H
O.H
Rp
60,000.00
Tukang Batu
0.200
0.400
O.H
O.H
Rp
50,000.00
Rp
Rp
45,000.00
35,000.00
Jumlah:
0.160
Zak
Rp
54,500.00
Pasir Pasang
Genteng Wuwung Glazurr
0.032
4.000
m3
Buah
Rp
Rp
120,000.00
14,250.00
Pembantu tukang
Bahan:
Jumlah:
Nilai HSPK :
Pemasangan Lantai keramik Granit
Upah:
Mandor
Kepala Tukang Batu
Tukang Batu
Pekerja/Buruh Tak Terampil
m2
0.035
0.035
0.350
O.H
O.H
O.H
Rp
Rp
Rp
60,000.00
50,000.00
45,000.00
0.700
O.H
Rp
35,000.00
Jumlah:
Bahan:
Semen PC (Portland Cement) 50 kg
0.164
Zak
Rp
54,000.00
0.650
0.045
Kg
m3
Rp
Rp
7,500.00
120,000.00
1.040
m2
Rp
233,000.00
Jumlah:
Nilai HSPK :
Saluran Beton Precast ( fabrikasi ) Penurunan dan Pemasangan
Bahan:
U Gutter U400/500-1200 (K 350 ; Besi 130 Kg) (Fabrikasi)
1.000
1.000
bh
Rp
275,000.00
Jumlah:
Sewa Peralatan :
Sewa Crane
0.174
jam
Rp
0.100
jam
Rp
225,000.00
1,100.00
Jumlah:
Nilai HSPK :
1.000
ANALISIS BOW
Mandor
Pekerja Tak Terampil
0.004
0.038
O.H
O.H
Rp
Rp
60,000.00
35,000.00
0.174
O.H
Rp
30,000.00
Upah:
Jumlah:
Cover Saluran Beton Precast ( fabrikasi ) Penurunan dan Pemasangan
Bahan:
Cover 620x1200x150 (K 350 ; Besi 160 Kg) (Fabrikasi)
1.000
1.000
Rp
165,000.00
Jumlah:
Sewa Peralatan :
Sewa Crane
0.174
jam
Rp
0.100
jam
Rp
225,000.00
1,100.00
Jumlah:
Nilai HSPK :
Penurunan dan Pemasangan
1.000
0.004
0.038
0.174
O.H
O.H
O.H
Upah:
Mandor
Pekerja Tak Terampil
Operator Alat Konstruksi
Rp
Rp
Rp
60,000.00
35,000.00
30,000.00
Jumlah:
1.000
Rp
275,000.00
Jumlah:
Sewa Peralatan :
Sewa Crane
Sewa Alat Bantu ( 1 Set @ 3 alat )
0.174
0.100
jam
jam
Rp
Rp
225,000.00
1,100.00
Jumlah:
Nilai HSPK :
Penurunan dan Pemasangan
1.000
Mandor
Pekerja Tak Terampil
0.004
0.038
O.H
O.H
Rp
Rp
60,000.00
35,000.00
0.174
O.H
Rp
30,000.00
Upah:
Jumlah:
Cover Saluran Beton Precast ( fabrikasi ) Penurunan dan Pemasangan
Cover 800x2400x150 (K 350 ; Besi 160 Kg) (Fabrikasi)
1.000
Rp
480,200.00
Jumlah:
Sewa Peralatan :
Sewa Crane
0.174
jam
Rp
225,000.00
0.100
jam
Rp
1,100.00
Jumlah:
Nilai HSPK :
Rp
270.00
Rp
450.00
Rp
4,050.00
Rp
Rp
3,150.00
7,920.00
Rp
48,546.00
Rp
11,592.00
Rp
84,000.00
Rp
144,138.00
Rp
152,058.00
Rp
1,500.00
Rp
Rp
1,750.00
3,250.00
Rp
3,250.00
Rp
Rp
5,833.33
5,833.33
Rp
Rp
10,833.33
10,833.33
Rp
16,666.67
Rp
Rp
8,750.00
8,750.00
Rp
Rp
16,250.00
16,250.00
Rp
25,000.00
Rp
Rp
3,000.00
35,000.00
Rp
38,000.00
Rp
38,000.00
Rp
3,000.00
Rp
35,000.00
Rp
38,000.00
Rp
38,000.00
Rp
24,000.00
Rp
140,000.00
Rp
164,000.00
Rp
164,000.00
Rp
Rp
765.00
425.00
Rp
Rp
3,825.00
8,925.00
Rp
13,940.00
Rp
11,040.00
Rp
Rp
5,160.00
35,000.00
Rp
51,200.00
Rp
65,140.00
Rp
Rp
765.00
637.50
Rp
Rp
5,737.50
8,925.00
Rp
16,065.00
Rp
9,815.04
Rp
2,400.00
Rp
12,215.04
Rp
28,280.04
Rp
765.00
Rp
Rp
637.50
5,737.50
Rp
8,925.00
Rp
16,065.00
Rp
Rp
7,464.96
2,760.00
Rp
10,224.96
Rp
26,289.96
Rp
765.00
Rp
Rp
637.50
5,737.50
Rp
8,925.00
Rp
16,065.00
Rp
Rp
5,990.40
2,880.00
Rp
8,870.40
Rp
24,935.40
Rp
Rp
Rp
204.00
1,700.00
15,300.00
Rp
2,380.00
Rp
19,584.00
Rp
480.00
Rp
1,560.00
Rp
2,040.00
Rp
21,624.00
Rp
765.00
Rp
Rp
425.00
3,825.00
Rp
8,925.00
Rp
13,940.00
Rp
Rp
4,147.20
720.00
Rp
4,867.20
Rp
18,807.20
Rp
Rp
Rp
Rp
2,565.00
2,565.00
480.00
240.00
Rp
720.00
Rp
3,285.00
510.00
425.00
Rp
Rp
3,825.00
5,950.00
Rp
10,710.00
Rp
3,120.00
Rp
3,120.00
Rp
13,830.00
3,600.00
1,800.00
Rp
Rp
16,200.00
4,200.00
Rp
25,800.00
Rp
65,635.57
Rp
Rp
66,000.00
4,200.00
Rp
135,835.57
Rp
161,635.57
Rp
3,600.00
Rp
Rp
1,800.00
16,200.00
Rp
4,200.00
Rp
25,800.00
Rp
46,800.00
Rp
72,600.00
Rp
96,500.00
Rp
4,200.00
Rp
100,700.00
Rp
126,500.00
Rp
Rp
Rp
65,000.00
85,000.00
2,640.00
Rp
152,640.00
Rp
178,440.00
3,600.00
1,800.00
Rp
Rp
16,200.00
4,200.00
Rp
25,800.00
Rp
67,698.40
Rp
Rp
66,000.00
4,200.00
Rp
137,898.40
Rp
163,698.40
Rp
Rp
Rp
8,750.00
8,750.00
16,250.00
Rp
16,250.00
Rp
25,000.00
2,700.00
31,500.00
Rp
34,200.00
Rp
34,200.00
1,920.00
35,000.00
Rp
36,920.00
Rp
36,920.00
600.00
10,500.00
Rp
11,100.00
Rp
138,000.00
Rp
138,000.00
Rp
149,100.00
1,500.00
Rp
8,750.00
Rp
10,250.00
Rp
72,000.00
Rp
72,000.00
Rp
82,250.00
1,872.00
1,560.00
Rp
Rp
14,040.00
21,840.00
Rp
39,312.00
Rp
Rp
156,120.00
49,680.00
Rp
205,800.00
Rp
245,112.00
Rp
Rp
816.00
600.00
Rp
Rp
5,400.00
9,800.00
Rp
16,616.00
Rp
156,120.00
Rp
156,120.00
Rp
172,736.00
3,600.00
2,400.00
Rp
Rp
21,600.00
42,000.00
Rp
69,600.00
Rp
146,880.00
Rp
Rp
65,280.00
143,110.00
Rp
355,270.00
Rp
424,870.00
7,950.00
Rp
Rp
10,480.00
46,800.00
Rp
Rp
148,400.00
213,630.00
Rp
Rp
27,000.00
1,275.00
Rp
Rp
120.00
28,395.00
Rp
242,025.00
3,984.00
Rp
Rp
1,120.00
9,900.00
Rp
Rp
46,200.00
61,204.00
Rp
Rp
495,600.00
55,331.25
Rp
Rp
123,594.74
2,795.00
Rp
677,320.99
Rp
738,524.99
24.00
Rp
Rp
35.00
315.00
Rp
Rp
245.00
619.00
Rp
Rp
8,400.00
210.00
Rp
8,610.00
Rp
9,229.00
Rp
Rp
500,000.00
1,000,000.00
Rp
Rp
300,000.00
30,000.00
Rp
1,830,000.00
Rp
1,830,000.00
540.00
Rp
Rp
300.00
900.00
Rp
Rp
900.00
900.00
Rp
6,300.00
Rp
9,840.00
Rp
4,800.00
Rp
Rp
780.00
2,070.00
Rp
Rp
24,000.00
6,300.00
Rp
Rp
Rp
1,200.00
170.00
39,320.00
Rp
SNI DT 91-0008-2007 (6.36)
49,160.00
Rp
Rp
900.00
500.00
Rp
Rp
1,485.00
1,485.00
Rp
Rp
1,485.00
10,395.00
Rp
16,250.00
Rp
6,600.00
Rp
Rp
1,170.00
3,450.00
Rp
Rp
28,800.00
700.00
Rp
Rp
Rp
1,800.00
340.00
42,860.00
Rp
59,110.00
900.00
12,000.00
Rp
12,900.00
Rp
12,900.00
Rp
Rp
Rp
50.00
450.00
2,100.00
Rp
2,600.00
Rp
249.81
Rp
249.81
Rp
2,849.81
Rp
Rp
135.00
337.50
Rp
Rp
3,037.50
15,750.00
Rp
19,260.00
Rp
3,915.00
Rp
Rp
652.50
787.50
Rp
5,355.00
Rp
24,615.00
Rp
Rp
135.00
337.50
Rp
Rp
3,037.50
15,750.00
Rp
19,260.00
Rp
17,539.20
Rp
Rp
652.50
787.50
Rp
18,979.20
Rp
38,239.20
Tabel 1 Pt - T - 38 - 2000 - C
Rp
Rp
60.00
150.00
Rp
Rp
1,350.00
700.00
Rp
Rp
Rp
2,260.00
1,450.00
1,750.00
Rp
3,200.00
Rp
5,460.00
600.00
Rp
Rp
1,000.00
9,000.00
Rp
700.00
Rp
11,300.00
Rp
Rp
1,500.00
140.00
Rp
1,640.00
Rp
12,940.00
Rp
150.00
Rp
Rp
210.00
1,890.00
Rp
Rp
980.00
3,230.00
Rp
Rp
1,500.00
11,692.80
Rp
13,192.80
Rp
16,422.80
12,720.00
10,480.00
Rp
Rp
37,800.00
9,900.00
Rp
Rp
46,800.00
148,400.00
Rp
266,100.00
Rp
403,200.00
Rp
Rp
70,200.00
186,300.00
Rp
Rp
1,200,000.00
31,500.00
Rp
Rp
144,000.00
148,000.00
Rp
Rp
Rp
72,000.00
66,500.00
54,400.00
Rp
Rp
Rp
SNI DT 91-0008-2007 (6.34)
7,680.00
2,383,780.00
2,649,880.00
Rp
13,584.00
Rp
Rp
12,920.00
50,400.00
Rp
Rp
9,900.00
56,160.00
Rp
Rp
158,200.00
301,164.00
Rp
Rp
403,200.00
70,200.00
Rp
Rp
186,300.00
1,680,000.00
Rp
Rp
42,000.00
150,000.00
Rp
Rp
97,125.00
42,000.00
Rp
Rp
59,375.00
51,000.00
Rp
Rp
5,760.00
2,786,960.00
Rp
3,088,124.00
Rp
Rp
1,680.00
1,400.00
Rp
Rp
12,600.00
19,600.00
Rp
35,280.00
Rp
10,584.00
Rp
Rp
9,750.00
5,400.00
Rp
54,843.36
Rp
80,577.36
Rp
115,857.36
Rp
2,160.00
Rp
Rp
1,800.00
16,200.00
Rp
25,200.00
Rp
45,360.00
Rp
Rp
10,044.00
14,550.00
Rp
Rp
2,160.00
39,375.00
Rp
66,129.00
Rp
111,489.00
Rp
Rp
4,500.00
1,250.00
Rp
Rp
5,250.00
11,250.00
Rp
22,250.00
Rp
13,125.00
Rp
Rp
29,000.00
53,924.28
Rp
600.00
Rp
96,649.28
Rp
118,899.28
Rp
4,500.00
Rp
Rp
1,250.00
5,250.00
Rp
11,250.00
Rp
22,250.00
Rp
Rp
13,125.00
29,000.00
Rp
Rp
39,908.55
600.00
Rp
82,633.55
Rp
104,883.55
132.60
215.00
Rp
Rp
1,505.00
1,935.00
Rp
3,787.60
Rp
97,350.00
Rp
Rp
300.00
1,350.00
Rp
99,000.00
Rp
102,787.60
132.60
Rp
Rp
215.00
1,505.00
Rp
Rp
Rp
Rp
1,935.00
3,787.60
58,850.00
1,350.00
Rp
300.00
Rp
60,500.00
Rp
64,287.60
4,050.00
2,025.00
Rp
Rp
14,175.00
6,075.00
Rp
26,325.00
Rp
67,698.40
Rp
Rp
66,000.00
4,200.00
Rp
137,898.40
Rp
164,223.40
45.00
750.00
Rp
Rp
5,250.00
675.00
Rp
6,720.00
Rp
93,500.00
Rp
93,500.00
Rp
100,220.00
Rp
45.00
Rp
Rp
750.00
5,250.00
Rp
Rp
675.00
6,720.00
Rp
110,000.00
Rp
110,000.00
Rp
116,720.00
45.00
Rp
Rp
Rp
750.00
5,250.00
675.00
Rp
6,720.00
Rp
302,500.00
Rp
302,500.00
Rp
309,220.00
45.00
Rp
Rp
750.00
5,250.00
Rp
Rp
2,250.00
8,295.00
Rp
379,500.00
Rp
379,500.00
Rp
387,795.00
300.00
500.00
Rp
Rp
17,500.00
450.00
Rp
18,750.00
Rp
17,500.00
Rp
17,500.00
Rp
36,250.00
300.00
Rp
Rp
Rp
500.00
17,500.00
450.00
Rp
18,750.00
Rp
185,000.00
Rp
185,000.00
Rp
203,750.00
45.00
Rp
Rp
750.00
5,250.00
Rp
Rp
Rp
675.00
6,720.00
17,500.00
Rp
17,500.00
Rp
24,220.00
30.00
Rp
Rp
500.00
3,500.00
Rp
Rp
450.00
4,480.00
Rp
25,000.00
Rp
25,000.00
Rp
29,480.00
45.00
750.00
Rp
Rp
5,250.00
675.00
Rp
6,720.00
Rp
69,500.00
Rp
69,500.00
Rp
76,220.00
Rp
Rp
5,400.00
2,100.00
Rp
7,500.00
Rp
35,000.00
Rp
35,000.00
Rp
42,500.00
Rp
5,400.00
Rp
Rp
2,100.00
7,500.00
Rp
22,300.00
Rp
22,300.00
Rp
29,800.00
Rp
Rp
5,400.00
2,100.00
Rp
Rp
7,500.00
67,100.00
Rp
67,100.00
Rp
74,600.00
Rp
6,300.00
Rp
Rp
2,800.00
9,100.00
Rp
45,000.00
Rp
45,000.00
Rp
54,100.00
Rp
Rp
5,400.00
2,100.00
Rp
Rp
7,500.00
67,100.00
Rp
67,100.00
Rp
74,600.00
Rp
Rp
Rp
6,300.00
2,800.00
9,100.00
Rp
62,500.00
Rp
62,500.00
Rp
71,600.00
Rp
Rp
6,300.00
2,800.00
Rp
9,100.00
Rp
35,000.00
Rp
35,000.00
Rp
44,100.00
Rp
5,400.00
Rp
Rp
2,100.00
7,500.00
Rp
62,500.00
Rp
62,500.00
Rp
70,000.00
Rp
Rp
6,300.00
2,800.00
Rp
Rp
9,100.00
4,500.00
Rp
4,500.00
Rp
13,600.00
Rp
5,400.00
Rp
Rp
Rp
2,100.00
7,500.00
19,920.00
Rp
19,920.00
Rp
27,420.00
1,800.00
Rp
Rp
10,000.00
90,000.00
Rp
21,000.00
Rp
122,800.00
Rp
Rp
85,000.00
126,126.00
Rp
Rp
6,750.00
3,120.00
Rp
220,996.00
Rp
343,796.00
Rp
Rp
150.00
375.00
Rp
Rp
3,375.00
1,750.00
Rp
5,650.00
Rp
Rp
15,400.00
2,750.00
Rp
18,150.00
Rp
23,800.00
600.00
Rp
Rp
1,000.00
9,000.00
Rp
700.00
Rp
11,300.00
Rp
Rp
1,650.00
140.00
Rp
1,790.00
Rp
13,090.00
Rp
Rp
180.00
300.00
Rp
Rp
Rp
Rp
1,350.00
1,050.00
2,880.00
10,637.50
Rp
10,637.50
Rp
13,517.50
Rp
180.00
Rp
1,350.00
Rp
Rp
Rp
1,215.00
1,260.00
2,100.00
Rp
6,105.00
Rp
Rp
10,175.00
4,600.00
Rp
14,775.00
Rp
20,880.00
Rp
33,000.00
Rp
33,000.00
Rp
26,500.00
Rp
26,500.00
Rp
Rp
8,800.00
8,800.00
Rp
11,000.00
Rp
11,000.00
Rp
Rp
Rp
Rp
9,800.00
9,800.00
9,800.00
9,800.00
Rp
38,500.00
Rp
38,500.00
Rp
29,150.00
Rp
29,150.00
Rp
9,800.00
Rp
9,800.00
Rp
180.00
Rp
1,350.00
Rp
Rp
Rp
1,215.00
1,260.00
1,890.00
Rp
5,895.00
Rp
Rp
10,175.00
4,600.00
Rp
14,775.00
Rp
20,670.00
Rp
180.00
Rp
1,350.00
Rp
Rp
Rp
1,215.00
1,260.00
1,890.00
Rp
Rp
5,895.00
11,275.00
Rp
4,600.00
Rp
15,875.00
Rp
21,770.00
Rp
180.00
Rp
Rp
1,350.00
1,215.00
Rp
Rp
1,260.00
1,890.00
Rp
Rp
5,895.00
70,950.00
Rp
4,600.00
Rp
75,550.00
Rp
81,445.00
Rp
180.00
Rp
Rp
1,500.00
1,350.00
Rp
Rp
1,400.00
1,890.00
Rp
Rp
6,320.00
10,835.00
Rp
4,600.00
Rp
15,435.00
Rp
21,755.00
Rp
Rp
240.00
400.00
Rp
Rp
3,600.00
11,200.00
Rp
15,440.00
Rp
Rp
104,500.00
104,500.00
Rp
119,940.00
Rp
240.00
Rp
Rp
400.00
3,600.00
Rp
11,200.00
Rp
15,440.00
Rp
Rp
88,000.00
88,000.00
Rp
103,440.00
Rp
Rp
240.00
400.00
Rp
Rp
3,600.00
11,200.00
Rp
15,440.00
Rp
104,500.00
Rp
104,500.00
Rp
119,940.00
Rp
Rp
240.00
400.00
Rp
Rp
3,600.00
11,200.00
Rp
15,440.00
Rp
99,000.00
Rp
99,000.00
Rp
114,440.00
4,980.00
1,400.00
Rp
Rp
12,375.00
57,750.00
Rp
76,505.00
Rp
500,762.50
Rp
Rp
55,331.25
136,491.58
Rp
2,795.00
Rp
695,380.33
Rp
771,885.33
Rp
Rp
24.00
35.00
Rp
Rp
315.00
245.00
Rp
619.00
Rp
10,290.00
Rp
262.50
Rp
10,552.50
Rp
11,171.50
15,900.00
Rp
Rp
Rp
13,100.00
58,500.00
185,500.00
Rp
273,000.00
Rp
34,650.00
Rp
Rp
1,087.50
275.00
Rp
36,012.50
Rp
309,012.50
1,584.00
Rp
Rp
1,320.00
11,880.00
Rp
Rp
18,480.00
33,264.00
Rp
Rp
30,800.00
5,800.00
Rp
Rp
137.50
17,531.25
Rp
Rp
Rp
6,000.00
8,312.50
68,581.25
Rp
101,845.25
1,584.00
Rp
Rp
1,320.00
11,880.00
Rp
Rp
18,480.00
33,264.00
Rp
Rp
30,800.00
5,800.00
Rp
550.00
Rp
21,037.50
Rp
Rp
Rp
6,000.00
8,312.50
72,500.00
Rp
105,764.00
1,584.00
1,320.00
Rp
Rp
Rp
11,880.00
18,480.00
33,264.00
Rp
Rp
Rp
30,800.00
5,800.00
550.00
Rp
Rp
17,531.25
18,000.00
Rp
Rp
8,312.50
80,993.75
Rp
114,257.75
1,584.00
Rp
Rp
1,320.00
11,880.00
Rp
Rp
18,480.00
33,264.00
Rp
Rp
Rp
23,100.00
5,800.00
550.00
Rp
23,375.00
Rp
Rp
9,000.00
8,312.50
Rp
70,137.50
Rp
103,401.50
1,584.00
1,320.00
Rp
Rp
Rp
11,880.00
18,480.00
33,264.00
Rp
Rp
Rp
23,100.00
5,800.00
412.50
Rp
Rp
17,531.25
6,000.00
Rp
Rp
8,312.50
61,156.25
Rp
94,420.25
Rp
12,720.00
Rp
Rp
10,480.00
37,800.00
Rp
Rp
9,900.00
46,800.00
Rp
Rp
148,400.00
266,100.00
Rp
Rp
407,400.00
70,200.00
Rp
Rp
205,740.00
1,323,000.00
Rp
39,375.00
Rp
Rp
Rp
154,000.00
21,750.00
1,100.00
Rp
2,222,565.00
Rp
2,488,665.00
Rp
Rp
12,720.00
10,480.00
Rp
Rp
37,800.00
9,900.00
Rp
Rp
Rp
46,800.00
148,400.00
266,100.00
Rp
407,400.00
Rp
Rp
70,200.00
205,740.00
Rp
Rp
1,646,400.00
39,375.00
Rp
Rp
Rp
154,000.00
21,750.00
1,100.00
Rp
2,545,965.00
Rp
2,812,065.00
Rp
Rp
13,584.00
12,920.00
Rp
Rp
50,400.00
9,900.00
Rp
Rp
56,160.00
158,200.00
Rp
301,164.00
Rp
407,400.00
Rp
Rp
70,200.00
205,740.00
Rp
Rp
2,116,800.00
52,500.00
Rp
Rp
207,900.00
29,000.00
Rp
1,650.00
Rp
3,091,190.00
Rp
3,392,354.00
Rp
15,264.00
Rp
Rp
13,320.00
50,400.00
Rp
Rp
Rp
Rp
9,900.00
59,400.00
177,800.00
326,084.00
Rp
Rp
407,400.00
70,200.00
Rp
Rp
205,740.00
1,607,200.00
Rp
52,500.00
Rp
Rp
246,400.00
163,625.00
Rp
Rp
Rp
Rp
48,000.00
66,500.00
46,400.00
4,400.00
Rp
2,918,365.00
Rp
3,244,449.00
Rp
Rp
15,264.00
13,320.00
Rp
Rp
50,400.00
9,900.00
Rp
Rp
Rp
59,400.00
177,800.00
326,084.00
Rp
407,400.00
Rp
Rp
70,200.00
205,740.00
Rp
Rp
1,607,200.00
52,500.00
Rp
Rp
246,400.00
163,625.00
Rp
Rp
Rp
Rp
48,000.00
66,500.00
46,400.00
4,400.00
Rp
2,918,365.00
Rp
3,244,449.00
Rp
Rp
Rp
15,264.00
13,320.00
50,400.00
Rp
Rp
9,900.00
59,400.00
Rp
177,800.00
Rp
326,084.00
Rp
407,400.00
Rp
Rp
70,200.00
205,740.00
Rp
Rp
1,607,200.00
52,500.00
Rp
Rp
246,400.00
163,625.00
Rp
Rp
Rp
48,000.00
66,500.00
46,400.00
Rp
4,400.00
Rp
2,918,365.00
Rp
3,244,449.00
Rp
12,720.00
Rp
Rp
10,600.00
37,800.00
Rp
Rp
9,900.00
46,800.00
Rp
Rp
151,200.00
269,020.00
Rp
Rp
407,400.00
70,200.00
Rp
Rp
205,740.00
1,303,400.00
Rp
39,375.00
Rp
246,400.00
Rp
Rp
140,250.00
96,000.00
Rp
Rp
66,500.00
46,400.00
Rp
4,400.00
Rp
2,626,065.00
Rp
2,895,085.00
Rp
Rp
12,720.00
10,480.00
Rp
Rp
37,800.00
9,900.00
Rp
Rp
Rp
46,800.00
148,400.00
266,100.00
Rp
407,400.00
Rp
Rp
70,200.00
205,740.00
Rp
Rp
676,200.00
39,375.00
Rp
184,800.00
Rp
Rp
187,000.00
72,000.00
Rp
Rp
66,500.00
46,400.00
Rp
4,400.00
Rp
1,960,015.00
Rp
2,226,115.00
Rp
540.00
Rp
Rp
300.00
900.00
Rp
Rp
Rp
900.00
900.00
6,300.00
Rp
9,840.00
Rp
Rp
4,850.00
780.00
Rp
Rp
Rp
2,286.00
29,400.00
7,875.00
Rp
Rp
1,540.00
145.00
Rp
46,876.00
Rp
56,716.00
900.00
Rp
Rp
Rp
500.00
1,485.00
1,485.00
Rp
Rp
1,485.00
10,395.00
Rp
16,250.00
Rp
Rp
Rp
6,668.75
1,170.00
3,810.00
Rp
Rp
35,280.00
875.00
Rp
Rp
2,310.00
290.00
Rp
50,403.75
Rp
66,653.75
Rp
Rp
24,000.00
140,000.00
Rp
164,000.00
Rp
164,000.00
180.00
300.00
Rp
1,350.00
Rp
Rp
Rp
1,050.00
2,880.00
14,375.00
Rp
14,375.00
Rp
17,255.00
Rp
12.00
Rp
Rp
10.00
90.00
Rp
140.00
Rp
252.00
Rp
Rp
920.00
135.00
Rp
11.00
Rp
1,066.00
Rp
1,318.00
3.00
Rp
Rp
0.50
45.00
Rp
Rp
Rp
Rp
Rp
35.00
83.50
45.00
2.75
47.75
Rp
8.80
Rp
8.80
Rp
140.05
Rp
18,713.05
Rp
180.00
Rp
300.00
Rp
1,350.00
Rp
Rp
Rp
1,050.00
2,880.00
14,375.00
Rp
14,375.00
Rp
17,255.00
Rp
180.00
Rp
1,350.00
Rp
Rp
Rp
1,215.00
1,260.00
1,890.00
Rp
5,895.00
Rp
Rp
10,175.00
4,600.00
Rp
14,775.00
Rp
20,670.00
Rp
33,000.00
Rp
33,000.00
Rp
26,500.00
Rp
26,500.00
Rp
Rp
8,800.00
8,800.00
Rp
11,000.00
Rp
11,000.00
Rp
Rp
Rp
Rp
9,800.00
9,800.00
9,800.00
9,800.00
Rp
38,500.00
Rp
38,500.00
Rp
Rp
Rp
Rp
29,150.00
29,150.00
9,800.00
9,800.00
Rp
180.00
Rp
Rp
Rp
Rp
1,350.00
1,215.00
1,260.00
1,890.00
Rp
Rp
5,895.00
10,175.00
Rp
4,600.00
Rp
14,775.00
Rp
20,670.00
Rp
180.00
Rp
Rp
1,350.00
1,215.00
Rp
Rp
1,260.00
1,890.00
Rp
Rp
5,895.00
10,175.00
Rp
4,600.00
Rp
14,775.00
Rp
20,670.00
Rp
180.00
Rp
Rp
1,350.00
1,215.00
Rp
Rp
1,260.00
1,890.00
Rp
Rp
5,895.00
70,950.00
Rp
4,600.00
Rp
75,550.00
Rp
81,445.00
Rp
180.00
Rp
Rp
1,350.00
1,215.00
Rp
Rp
1,260.00
1,890.00
Rp
Rp
5,895.00
10,835.00
Rp
4,600.00
Rp
15,435.00
Rp
21,330.00
Rp
Rp
750.00
2,025.00
Rp
Rp
1,575.00
4,350.00
Rp
4,350.00
Rp
15,360.00
Rp
Rp
13,200.00
50,400.00
Rp
Rp
10,080.00
59,400.00
Rp
Rp
177,800.00
326,240.00
Rp
Rp
407,400.00
70,200.00
Rp
Rp
205,740.00
1,274,000.00
Rp
52,500.00
Rp
246,400.00
Rp
Rp
163,625.00
48,000.00
Rp
Rp
66,500.00
46,400.00
Rp
Rp
4,400.00
2,585,165.00
Rp
2,911,405.00
Rp
15,360.00
Rp
Rp
13,200.00
50,400.00
Rp
Rp
10,080.00
59,400.00
Rp
Rp
177,800.00
326,240.00
Rp
Rp
407,400.00
70,200.00
Rp
Rp
205,740.00
686,000.00
Rp
52,500.00
Rp
246,400.00
Rp
Rp
163,625.00
48,000.00
Rp
Rp
Rp
Rp
66,500.00
46,400.00
4,400.00
1,997,165.00
Rp
2,323,405.00
Rp
180.00
Rp
Rp
1,350.00
1,215.00
Rp
Rp
Rp
1,260.00
1,890.00
5,895.00
Rp
2,750.00
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
8,645.00
180.00
1,350.00
1,215.00
1,260.00
1,890.00
5,895.00
2,750.00
8,645.00
Rp
180.00
Rp
500.00
Rp
1,350.00
Rp
Rp
1,050.00
3,080.00
Rp
Rp
14,000.00
14,000.00
Rp
17,080.00
Rp
180.00
Rp
Rp
1,350.00
1,215.00
Rp
Rp
Rp
1,260.00
1,890.00
5,895.00
Rp
Rp
2,750.00
8,645.00
Rp
Rp
Rp
7,800.00
26,250.00
34,050.00
Rp
49,500.00
Rp
Rp
40,700.00
89,380.00
Rp
179,580.00
Rp
Rp
367,000.00
367,000.00
Rp
Rp
44,000.00
44,000.00
Rp
Rp
19,250.00
19,250.00
Rp
480.00
Rp
Rp
Rp
Rp
1,150.00
10,125.00
5,250.00
17,005.00
Rp
Rp
7,012.50
17,765.00
Rp
Rp
Rp
Rp
1,000.00
541.50
3,500.00
29,819.00
Rp
46,824.00
Rp
Rp
468.00
2,310.00
Rp
Rp
Rp
20,790.00
5,460.00
29,028.00
Rp
102,124.00
Rp
Rp
Rp
165,000.00
1,450.00
268,574.00
Rp
297,602.00
810.00
Rp
Rp
2,000.00
18,000.00
Rp
9,450.00
Rp
30,260.00
Rp
Rp
18,915.00
870.00
Rp
19,785.00
Rp
50,045.00
810.00
2,000.00
Rp
Rp
1,800.00
945.00
Rp
Rp
5,555.00
23,625.00
Rp
870.00
Rp
24,495.00
Rp
30,050.00
480.00
400.00
Rp
Rp
3,375.00
5,250.00
Rp
9,505.00
Rp
118,750.00
Rp
118,750.00
Rp
128,255.00
120.00
1,000.00
Rp
Rp
9,000.00
14,000.00
Rp
24,120.00
Rp
8,720.00
Rp
Rp
3,876.00
57,000.00
Rp
69,596.00
Rp
93,716.00
1,680.00
Rp
Rp
1,400.00
12,600.00
Rp
19,600.00
Rp
35,280.00
Rp
8,845.20
Rp
Rp
4,875.00
5,400.00
Rp
Rp
242,320.00
261,440.20
Rp
296,720.20
Rp
Rp
275,000.00
275,000.00
Rp
39,060.00
Rp
Rp
110.00
39,170.00
Rp
314,170.00
Rp
Rp
228.00
1,333.50
Rp
Rp
5,208.00
6,769.50
Rp
Rp
165,000.00
165,000.00
Rp
39,060.00
Rp
Rp
110.00
39,170.00
Rp
210,939.50
Rp
Rp
Rp
Rp
228.00
1,333.50
5,208.00
6,769.50
Rp
Rp
275,000.00
275,000.00
Rp
Rp
Rp
39,060.00
110.00
39,170.00
Rp
320,939.50
Rp
Rp
228.00
1,333.50
Rp
Rp
5,208.00
6,769.50
Rp
Rp
480,200.00
480,200.00
Rp
39,060.00
Rp
110.00
Rp
39,170.00
Rp
526,139.50
No
1
2
3
4
5
6
7
8
No
A
1
2
B
1
2
3
4
5
C
1
2
3
4
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
E
1
2
3
4
5
6
7
8
F
1
2
G
1
2
3
H
1
2
3
I
1
2
3
4
5
6
7
8
J
1
2
3
4
5
6
K
1
2
3
4
5
6
7
8
L
1
2
3
4
5
6
7
8
9
10
11
12
13
M
1
2
3
4
5
6
7
N
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
B
1
2
3
4
C
1
No
1
2
3
4
5
6
7
8
No
A
1
2
B
1
2
3
4
5
C
1
2
3
4
D
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
E
1
2
3
4
5
6
7
8
F
1
2
G
2
3
H
1
2
3
I
1
2
3
4
5
6
7
8
J
1
2
3
4
5
6
K
1
2
3
4
5
6
7
8
L
1
2
3
4
5
6
7
8
9
10
11
12
13
M
1
2
3
4
5
6
7
N
1
2
3
4
5
6
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
No.
Uraian Pekerjaan
Volume
Sat.
Harga Satuan
LANTAI 1
A
Pekerjaan Persiapan
1 Pengukuran
11.60
M'
5,069
2 Pembersihan
8.55
3,250
48.00
65,140
48.00
24,935
0.36
1,830,000
0.35
1,830,000
48.00
13,830
1 Galian tanah
3.28
34,200
0.31
149,100
0.44
1,830,000
1.31
12,900
Pekerjaan Dinding
5 Pekerjaan acian
C
Pekerjaan Pondasi
Pekerjaan Pengecatan
1 Pekerjaan Pengecatan Plafon
8.55
24,615
48.00
24,615
1.83
102,788
1.83
64,288
3 Engsel Pintu
3.00
Bh.
76,220
4 Grendel tanam
1.00
Set.
54,100
5 Kunci pintu
1.00
Set.
36,250
2.16
116,720
0.36
100,220
8.40
102,788
8.40
64,288
10 Engsel Pintu
4.00
Bh.
76,220
11 Grendel tanam
2.00
Set.
54,100
8.55
296,720
No.
II
Uraian Pekerjaan
Volume
Sat.
Harga Satuan
LANTAI 2
A
8.55
3,250
48.00
65,140
48.00
24,935
3 Pengecatan tembok
48.00
24,615
48.00
24,615
5.76
2,649,880
8.55
115,857
1.20
1,830,000
0.44
1,830,000
8.55
118,899
Pekerjaan Dinding
Pekerjaan Lantai
Jumlah Harga
58,796
27,788
86,583
3,126,720
1,196,899
658,800
636,840
663,840
6,283,099
112,219
46,594
796,050
16,931
971,794
210,458
1,181,520
1,391,978
188,101
117,646
228,660
54,100
36,250
252,115
36,079
863,416
540,016
304,880
108,200
2,729,464
2,536,958
2,536,958
Jumlah
13,999,876
Jumlah Harga
27,788
27,788
3,126,720
1,196,899
1,181,520
1,181,520
6,686,659
15,263,309
990,580
2,196,000
796,050
19,245,939
1,016,589
1,016,589
No.
Uraian Pekerjaan
Jumlah Harga
LANTAI 1
A
Pekerjaan Persiapan
Rp
86,583.26
Pekerjaan Dinding
Rp
6,283,099.20
Pekerjaan Pondasi
Rp
971,793.75
Pekerjaan Pengecatan
Rp
1,391,978.25
#REF!
F
II
#REF!
#REF!
#REF!
Rp
2,536,957.71
LANTAI 2
A
Rp
27,787.50
Pekerjaan Dinding
Rp
6,686,659.20
Pekerjaan Lantai
Rp
#REF!
D
#REF!
#REF!
19,245,939.23
#REF!
Rp
#REF!
1,016,588.84
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF! #REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
JUMLAH
#REF!
LANTAI 1 : ( rehap )
Pekerjaan Pembongkaran Dinding
As C ( 2 4 )
As 2 , 3 ( C D )
As D ( 2 4 )
As 3 ( D D )
As 2 ( D E )
As 2 ( E E )
As 4 ( D F )
As D ( 2 2 )
9.50
5.50
10.00
1.30
4.60
2.50
11.60
2.60
*
*
*
*
*
*
*
*
As I ( 3 4 )
As 2
3.20 *
4.50 *
4.50
6.00
6.60
2.40
3.60
5.00
8.80
2.50
4.50
5.00
2.00
2.50
2.50
2.50
2.50
2.75
8.00
2.50
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
4.2
4.2
4.2
4.2
4.2
0.92
4.2
4.2
*
*
*
*
*
*
*
*
2
1
1
1
1
1
1
1
4.2 *
2.5 *
1
1
4.2
4.2
4.2
4.2
4.2
4.2
4.2
0.92
4.2
4.2
0.8
0.9
1.5
1.5
1.5
4.2
4.2
1.5
*
*
*
*
*
*
*
*
*
*
*
+
*
*
*
*
*
3.2 M2
6 M2
3.75 M2
3.75 M2
3.75 M2
1
1
1
1
1
1
1
1
1
1
2
2.5 *
1
1
1
2.50 *
1
1
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
1.5
0.90
Lantai 1 :
Pekerjaan Pasangan Batu Merah 1 PC. : 4 Psr.
AS D ( 2 - 5 )
AS 3' ( I' - J' )
13.50
5.50
4.00
3.50
6.40
4.00
*
*
*
*
*
*
4.70
4.70
4.10
4.00
4.20
4.20
=
=
=
=
=
=
=
53.85
23.55
16.40
10.80
26.88
13.05
144.53
144.53
2.00
289.06 M
Pekerjaan acian
144.53
2.00
289.06 M
2.00
8.00
6.60
*
*
*
4.20
4.20
4.20
39.60
6.60
*
*
6.40
2.40
1.40
3.60
13.50
3.50
4.20
DIAGONAL
AS 5 ( D - F )
1.
2.
2.00
2.50
1.50
2.00
*
*
*
*
0.80
0.92
2.50
0.80
1.50
2.50
2.00
M
M
M
M
M
M
M
8.40
29.85
27.72
65.97
0.89
27.72
M
M
M
M
M
M
0.90
0.90
0.30
0.90
0.30
0.30
0.30
=
=
=
=
=
=
=
=
8.64
3.24
0.29
4.86
2.84
0.74
0.88
21.49
M
M
M
M
M
M
M
M
*
*
*
0.10
0.10
0.10
=
=
=
=
0.58
0.22
0.32
1.12
M
M
M
M
0.90
0.90
0.90
*
*
*
0.20
0.20
0.20
=
=
=
=
1.15
0.43
0.65
2.23
M
M
M
M
*
*
*
0.30
0.30
0.30
*
*
*
6.40
2.40
3.60
=
=
=
=
1.73
0.65
0.97
3.35
M
M
M
M
0.15
0.15
0.15
*
*
*
0.20
0.20
0.20
*
*
*
6.40
2.40
3.60
=
=
=
=
0.19
0.07
0.11
0.37
M
M
M
M
21.49
1.12
2.23
13.59
1.50
0.15
4.20
0.15
*
*
*
*
*
*
*
1.50
1.50
0.70
1.50
0.70
0.70
0.70
*
*
*
*
*
*
*
6.40
2.40
3.60
*
*
*
0.90
0.90
0.90
6.40
2.40
3.60
*
*
*
0.90
0.90
0.90
6.00
=
=
=
=
=
=
As J ( 2 - 3' )
2.50
Pekerjaan pondasi :
Galian tanah
As D ( 2 - 5 )
As 5 ( D - F )
As 2 ( D' - E )
3.35
0.37
0.83
3.20
3.20
3.20
*
*
*
2
8 6.6
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
3.20
*
*
*
*
*
*
*
*
*
*
13.5
5.5
4
3.5
6.4
27.6
12
8
3
5
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
0.90
*
*
*
*
*
*
*
*
*
*
15.6
9.4
12.6
27.6
8
7.6
4
4.4
1
3.2
*
*
*
*
*
*
*
*
*
*
1.50
2.50
2.00
2.50
1.50
2.00
*
*
*
*
0.80
0.92
2.50
0.80
2.00
*
*
*
*
6.00
1.00
2.00
2.00
1
1
1
1
1
1
1
1
9
2
2X
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
6.40
21.85
21.12
49.37
33.60
15.30
18.10
8.00
20.48
88.32
38.40
25.60
9.60
32.00
289.40
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
=
=
=
=
=
=
=
=
=
=
=
14.04
8.46
11.34
24.84
7.20
6.84
3.60
3.96
8.10
5.76
94.14
M
M
M
M
M
M
M
M
M
M
M
=
=
383.54 M
767.08 M
2.50
1.50
0.40
*
*
*
2 *
2 *
1 *
0.70 +
2.1 *
Engsel Pintu
Grendel tanam
Kunci pintu Alluminium
Kaca pintu t. = 8 mm.
Kaca mati atas pintu t. = 6 mm
=
=
=
0.45 *
0.40 *
12
2
2
0.72
0.6
Bh.
Set.
Set.
*
*
4
4
4
=
=
=
=
20.00
12.00
1.60
33.60
44.80 M
4
4
=
=
1.30 M
0.96 M
1
1
=
=
=
=
4 *
M
M
M
M
2.50
0.90
*
*
2 *
2 *
2X
Daun pintu double triplek 4 mm.
0.80 *
2.1
=
=
0.45 *
6 Bh.
2 Set.
0.8 *
0.20
0.20
0.15
0.15
0.15
0.15
0.15
0.15
*
*
*
*
*
*
*
*
0.2
0.2
0.15
0.2
0.2
0.2
0.2
0.2
Pembongkaran plapon
10.00
10.00
9.00
3.00
5.60
*
*
*
*
*
7.6
16.5
6.8
1
4.5
15.20
8.40
6.00
2.40
3.20
3.00
15.00
10.00
6.80
7.60
*
*
*
+
*
*
*
+
*
*
Kolom 15X15 Cm
Balok latai 15X20 Cm.
15.00 *
8.40 *
6.00 *
*
*
*
*
*
*
*
*
8
1.2
1.5
6.5 *
1.6
0.8
6
8.4 *
4
3.2
8
1.2
1.5
2.4
1.5
4.1
5
2.6
3.7
5.8
3
2.1
0.9
*
*
*
*
*
*
13
3
1
1
1
1
5.00
1.80
6.80
13.60
M
M
M
M
2.00 Bh.
0.72 M
=
=
=
=
=
=
=
=
=
0.19
0.06
1.20
0.45
0.08
0.11
0.17
0.09
2.35
M
M
M
M
M
M
M
M
M
=
=
=
=
=
=
76.00
165.00
61.20
3.00
25.20
330.40
M
M
M
M
M
M
=
=
=
=
=
=
=
=
=
=
=
121.60
10.08
9.00
18.69
5.12
2.40
90.00
16.56
27.20
24.32
324.97
M
M
M
M
M
M
M
M
M
M
M
=
=
=
=
120.00
10.08
9.00
139.08
M
M
M
M
Ruang Tunggu/Lobby
2.40
3.20
3.00
15.00
10.00
6.80
+
*
*
*
+
*
6.5 *
1.6
0.8
6
8.4 *
4
2.1
=
=
=
=
=
=
=
0.9
18.69
5.12
2.40
90.00
16.56
27.20
159.97
M
M
M
M
M
M
M
Ruang koperasi
7.60 *
3.2
24.32 M
Teras
7.20
8.00
3.00
3.00
*
*
*
*
1.6
1.6
2.2
0.7
=
=
=
=
=
11.52
12.80
6.60
2.10
33.02
M
M
M
M
M
15.50
6.50
3.00
8.00
2.80
2.00
7.20
4.00
9.40
4.20
7.00
2.00
1.40
12.50
5.50
6.50
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
4.1
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
63.55
53.30
12.30
32.80
22.96
8.20
27.27
12.65
38.54
17.22
24.95
8.20
22.96
51.25
20.30
22.15
438.60
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
0.90
1.50
*
*
2.50
2.50
1.50
2.50
*
*
2.50
2.50 *
*
-
4
0.90
0.90
79.8
19.9
36
5.46
15.57
2.3
44.97
10.92
214.92
M
M
M
M
M
M
M
M
M
9.69 M
11.25 M
20.94 M
18.9
25.2
27.72
10.08
15.12
21
36.96
2.3
18.9
21
3.2
6
3.75
3.75
3.75
13.8
33.6
3.75
268.78
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
71.6
356.39
LANTAI 2 :
Pekerjaan Pembongkaran Dinding Tembok
As2 ( E H )
As3 ( F H )
As F ( 2 3 )
As H ( 2 3 )
As E ( 2 3 )
As L ( 4 4 )
As I ( 4 4 )
As 4 ( I I )
6.00
6.00
1.00
1.00
5.00
1.00
2.00
1.00
*
*
*
*
*
*
*
*
4.08
4.08
3.50
3.50
3.50
2.50
3.50
3.50
5.00
9.20
1.00
5.00
4.00
2.00
2.00
5.00
3.20
4.00
7.50
2.00
2.00
3.00
*
*
*
*
*
*
*
*
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
2.50
2.50
2.50
2.50
2.50
*
*
*
*
*
1.60
1.40
1.40
0.92
0.92
8.40
0.15
*
*
3.00
0.30
1.50
2.30
1.50
1.00
1.20
2.20
*
*
*
*
*
*
1.50
2.30
1.50
1.00
1.20
2.20
*
*
*
*
*
*
*
*
*
*
*
*
=
=
=
=
=
=
=
=
=
24.48
20.48
3.50
3.50
17.50
2.50
7.00
3.50
82.46
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
16.25
29.90
3.25
16.25
13.00
6.50
6.50
8.95
10.40
13.00
24.38
6.50
6.50
9.75
171.13
=
=
=
=
=
=
4.00
3.50
3.50
2.30
2.30
15.60
=
=
=
3.02
0.47
3.50
3.50
4.08
4.08
4.08
3.50
3.50
=
=
=
=
=
=
=
5.25
9.38
6.12
4.08
4.20
7.70
36.73
3.50
4.08
4.08
4.08
3.50
3.50
2X
=
=
=
=
=
=
=
=
5.25
9.38
6.12
4.08
4.20
7.70
36.73
73.47
2X
=
=
=
=
=
=
=
=
5.25
9.38
6.12
4.08
4.20
7.70
36.73
73.47
1.6 *
2.5
2.92 *
2.5
Pengecatan tembok
As 3 ( E E )
As E ( 3 - 2 )
As 3 ( G H )
As G ( 2 - 3 ) )
As 4 ( H - I )
As 4 ( I I )
1.50
2.30
1.50
1.00
1.20
2.20
*
*
*
*
*
*
*
/
0.12
2
21
3.50
4.08
4.08
4.08
3.50
3.50
7.00
36.00
5.00
7.60
3.60
6.60
6.60
5.00
5.00
4.00
10.00
2.00
5.00
5.00
5.00
6.00
6.00
4.00
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
2.00
3.25
2.5
1.4
2.5
0.92
2.5
2.5
*
*
0.92
0.92
2.5
1.4
2.5
2.5
*
*
1.4
1.4
0.92
0.92
*
*
2.5
2.5
7.00
36.00
5.00
7.60
3.60
6.60
6.60
5.00
5.00
4.00
10.00
2.00
5.00
5.00
5.00
6.00
6.00
4.00
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
*
*
*
*
*
*
*
*
*
-
2.5
2
2.5
2
2
2
2.5
2.5
2
2
2.5
2
2.5
2.5
2
2
0.92
0.92
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
1.4
1
0.92
1
1
1
0.92
0.92
1
1
1.4
1
1.4
1.4
1
1
2.5
2.5
2.00
3.25
20.00
3.60
5.00
3.00
5.00
10.00
4.00
6.00
7.60
13.00
10.00
8.00
13.00
10.00
4.00
10.00
6.00
6.00
38.20
6.00
1.50
3.00
3.00
3.00
6.00
9.00
3.00
3.00
12.00
6.00
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
1.25
1.25
3.25
3.25
3.25
3.25
3.25
1.25
3.25
3.25
3.25
3.25
3.25
3.25
1.58
4.58
2.3
3.5
2.3
2.3
9.18
4.58
2.3
2.3
2
*
*
*
*
1
2.3
2
1
*
*
*
2
1
3
*
-
2
2.3
2.3
*
*
3.5
2.3
*
*
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
*
*
2
2
*
*
2
2
*
*
2
2
*
*
*
2
2
2
1
1
2
1
*
*
2
2
19.25
117.00
13.95
24.70
11.70
21.45
19.15
13.95
16.25
13.00
29.00
6.50
12.75
12.75
16.25
19.50
17.20
10.70
6.50
401.55
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
38.50
234.00
27.90
49.40
23.40
42.90
38.30
27.90
32.50
26.00
58.00
13.00
25.50
25.50
32.50
39.00
34.40
21.40
13.00
803.10
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
52.36
11.70
16.25
9.75
16.25
23.34
13.00
19.50
44.80
68.40
55.80
23.70
7.07
23.34
21.40
25.60
15.00
7.50
124.15
19.50
9.75
9.75
9.75
3.75
39.00
53.90
7.45
9.75
25.00
14.90
As
As
As
As
As
As
As
As
As
As
As
4 ( H' - I' )
5 (G-H)
5' (H-I')
5' (H-I')
5' ( D - E )
5"" (I - I' )
5"" (J -K' )
6(J-K)
6(J-K)
7(J-K)
8 ( G - I' )
As 8 ( J - K )
6.00
3.00
6.00
6.00
6.00
3.60
6.00
6.00
6.00
6.00
9.60
*
*
*
*
*
*
*
*
*
*
*
1.25
3.25
3.25
1.25
3.25
3.25
3.25
3.25
3.25
3.25
3.25
6.00
3.25
3
2
=
=
=
=
=
=
=
*
=
=
=
7.50
19.50
19.50
7.50
34.40
23.40
39.00
2
39.00
12.60
26.60
14.90
*
*
*
-
2.3
2
2
2.3
2
2.3
2.3
4.58
*
*
2.3
M
M
M
M
M
M
M
M
M
82.46
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
171.13
M
M
M
M
M
M
15.60
M
M
M
3.50
M
M
M
M
M
M
M
36.73
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
73.47
73.47
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
401.55
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
803.10
M
M
M
M
M
M
M
=
M
M
M
932.21
1.14
93.10
1,026.45
M2
LANTAI 3 : (rehab)
Pembongkaran dinding tembok
AS 8 ( I - J )
2.50 *
3.25
5.00
6.00
4.50
3.50
6.00
1.80
*
*
*
*
*
*
3.25
3.25
3.50
3.25
3.25 3.25 -
0.40
0.40
0.40
0.40
*
*
*
*
0.12 *
0.55 *
0.55 *
5.00
4.00
5.50
1.80
6.00
10.00
0.92
1.40
*
*
*
*
*
*
*
*
2.30
113.50
27.00
79.20
84.00
0.20 *
2.50
2.50
3.25
3.25
3.25
3.25
3.25
3.25
2.50
2.50
*
*
2.50
2.30
3.50
4.00
3.00
0.92 *
1.40 *
2.00 +
2.00 +
2.50 *
2.50 *
2
3
0.92 *
1.40 *
2.00 +
2.00 +
2.00 *
2.00 *
2
4
0.76 *
1.08 *
1.84 *
1.84 *
1.00
2.00
Kaca terang t. = 6 mm
Ruang tunggu
Ruang Kepala Bidang Statistik Produksi
Gudang kecil
Ruang Tangga
Ruang Depan Lift
Pekerjaan cat dinding ( akibat bocoran )
Ruang Bidang Statistik Sosial
Ruang Kepala bidang distribusi
Rung Bidang Distribusi
Ruang Bidang Statistik Produksi
Ruang rapat umum
Ruang rapat kecil
Gudang
Dapur
KM/WC
Ruang Kepala Bidang Statistik Sosial
Penghubung
Ruang tunggu
Ruang Kepala Bidang Statistik Produksi
10.00
4.50
6.00
7.50
12.00
9.00
4.80
4.20
6.30
6.00
2.70
9.60
2.30
6.00
5.00
4.60
3.20
4.50
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
*
10.00 +
6.00
23.20
9.20 +
20.00
5.00
4.20
2.00
6.20
5.00
17.40
2.40
8.00
7.50
4.60
2.50
5.00
4.00
2.70 *
3.00 *
36.70
2.00
21.00
38.00
39.00
76.00
28.00
12.80
12.40
45.70
22.00
40.20
24.00
20.60
37.00
19.20
*
*
*
*
*
*
*
*
*
*
*
-
3.25
2.29
3.25
3.25
3.25
48.22
10.38
3.25
2.30
1.25
2.30
3.25
3.25
3.25
3.25
10.20
*
+
*
2.00 *
2.00
2.50 *
15.18 *
12.44
3.25
0.79
3.25
3.25
3.50 +
3.25
0.92
3.5
Gudang
Ruang Tangga
14.20 16.40 *
2.30 *
3.25
3.25
6.00
5.50
1.80
5.00
2.70
Pekerjaan sealant
Type J1
Type J4
5.58 *
8.58 *
*
*
*
*
*
3.25
3.25
3.25
3.25
3.25
*
*
*
*
*
1.00
1.00
2.00
1.00
1.00
2.00 *
2.00 *
21.00
15.00
4.50
0.60
4.50
0.60
2.05
2.05
4.50
4.20
2.05
4.20
4.20
*
*
*
*
*
*
*
*
*
*
*
4.20
4.20
4.20
4.20
21.00
17.25
4.20
15.00
9.00
12.00
14.90
Bongkar bubungan
10.20
7.50
*
*
4.00
2.00
Bongkar genteng
15.60 +
2
As G ( 6 - 8 )
As 6 ( C - G )
As 8 ( G - K )
As K ( 2 - 8 )
As 2 ( I - J' )
As 2 ( C - E )
As 2 ( E - I )
*
*
+
+
+
-
2.25
16.00
2.25
6.00
3.90
3.90
2.25
15.30
3.90
14.80
3.15
3.15
*
*
*
21
17.25
3.15
10.20 *
2.00 *
8.10 +
2
12.60 *
5.70 *
7.35 +
2
8.10 *
4.80 *
15.60 +
2
10.20 *
2.00 *
8.10 +
2
12.60 *
5.70 *
7.35 +
2
8.10 *
4.80 *
15.60 +
2
10.20 *
2.00 *
8.10 +
2
12.60 *
5.70 *
7.35 +
2
8.10 *
4.80 *
0.80
3.00
1.40
0.58
0.20
0.45
Stiefner t. = 10 mm.
0.18 *
Flendes t. = 10 mm.
Flendes t. = 12 mm.
Batang tarik 22
0.101
0.101
0.101
0.101
*
*
*
*
*
*
*
*
*
*
5.00 *
2
2
2
2
2
2
*
*
*
*
*
*
21.3
21.3
21.3
21.3
21.3
21.3
Kg/M1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
0.06 *
0.008 *
7850
0.70
0.64
0.52
0.30
0.008
0.008
0.008
0.012
7850
7850
7850
7850
*
*
*
*
2.98
*
*
*
*
Kg/M1
Walter Moer 22
Baut 19
34.00 X
2.00 Bh.
4.00 X
2.00 X
0.120 *
0.10 *
2.00 Bh.
0.004 *
7850
0.79
0.79
0.79
0.79
0.79
0.79
*
*
*
*
*
*
5.60
0.80
1.40
0.58
0.20
0.45
*
*
*
*
*
*
Stiefner t. = 10 mm.
0.18 *
Flendes t. = 10 mm.
Flendes t. = 12 mm.
Batang tarik 22
0.101
0.101
0.101
0.300
*
*
*
*
5.00 *
0.80
3.00
1.40
0.58
0.20
0.45
21.3
21.3
21.3
21.3
21.3
21.3
*
*
*
*
*
*
2.00
2.00
2.00
2.00
2.00
2.00
*
*
*
*
*
*
1
1
1
1
1
1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
0.06 *
0.008 *
7850
0.64
0.52
0.40
0.30
0.008
0.008
0.008
0.012
7850
7850
7850
7850
*
*
*
*
2.98
*
*
*
*
Kg/M1
Walter Moer 22
Baut 19
28.00 X
8.00 Bh.
4.00 X
8.00 X
0.120 *
0.10 *
0.79
0.79
0.79
0.79
0.79
0.79
*
*
*
*
*
*
5.60
0.80
0.58
0.20
0.45
0.45
43.50 X
2.00
87.00 X
0.24
*
*
*
*
*
*
1.00 Bh.
0.004 *
7850
1.00
1.00
1.00
1.00
1.00
1.00
15.60 +
2
10.20 *
2.00 *
8.10 +
2
12.60 *
5.70 *
7.35 +
2
8.10 *
4.80 *
0.85 *
410.10
0.15 *
410.10
0.85 *
0.15 *
410.10
410.10
10.20 *
7.50 *
4.00
2.00
4.80 *
67.50 *
2.00 *
1.20
2.00
12.00 *
15.00 *
2.00
=
=
=
=
=
=
=
16.25
19.50
15.75
11.38
17.20
5.85
85.93
M
M
M
M
M
M
M
=
=
=
=
=
45.40
10.80
31.68
33.60
121.48
M
M
M
M
M
=
=
=
=
=
=
=
=
=
=
=
=
4+
1.58
8.13 M
0.06 M
1.38 M
1.38 M
16.25
13.00
17.88
5.85
17.20
29.00
9.20
10.50
118.88
M
M
M
M
M
M
M
M
M
=
=
=
6.84 M
10.30 M
17.14 M
=
=
=
5.84 M
18.80 M
24.64 M
=
=
=
1.40 M
3.97 M
5.37 M
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
=
113.50
27.00
139.20
84.00
240.00
45.00
20.16
8.40
39.06
30.00
46.98
23.04
18.40
45.00
23.00
11.50
16.00
18.00
948.24
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
M
122.12 M
=
=
=
=
=
=
=
=
=
=
=
=
=
=
70.55
123.50
126.75
90.29
17.62
41.60
32.83
57.13
64.03
130.65
78.00
66.95
112.75
29.25
M
M
M
M
M
M
M
M
M
M
M
M
M
M
=
=
=
38.68 M
53.30 M
1,255.97 M
=
=
=
=
=
=
12
13.5
12.6
9
10.5
2X
19.50
17.88
11.70
16.25
8.78
74.10
M
M
M
M
M
M
=
=
=
234.36 M
257.40 M
491.76 M
=
=
=
=
=
=
=
=
=
=
=
=
141.75
40.32
70.88
15.12
111.45
90.04
106.31
47.70
43.05
35.60
62.58
764.80
M
M
M
M
M
M
M
M
M
M
M
M
=
=
40.80 M
15.00 M
25.80 M
235.98 M
148.32 M
25.80 M
235.98 M
148.32 M
25.80 M
235.98 M
148.32 M
=
=
=
=
=
=
=
=
59.64
106.50
72.42
54.95
46.86
52.19
392.56
785.12
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
10
153.23 Kg.
*
*
*
*
10
10
10
10
=
=
=
=
501.77
463.46
389.99
377.74
10
Kg.
Kg.
Kg.
Kg.
14.90 Kg.
2.00 Bh.
68.00 Bh.
16.00 Bh.
69.08 Kg.
2X
=
=
=
=
=
=
=
=
1.26
4.73
2.21
0.92
0.32
0.71
10.15
20.29
8X
=
=
=
=
=
=
=
=
26.90
22.10
22.70
21.88
21.50
21.75
136.83
1,094.64
6
8X
=
=
*
*
*
*
1
1
1
1
=
=
=
=
=
=
8X
M
M
M
M
M
M
M
M
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
91.94 Kg.
735.51 Kg.
46.35
39.00
31.46
56.52
173.33
1,386.62
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
14.90 Kg.
2.00 Bh.
224.00 Bh.
32.00 Bh.
6
8X
=
=
41.45 Kg.
331.58 Kg.
8X
=
=
=
=
=
=
=
=
4.42
0.63
0.46
0.16
0.36
0.36
6.38
51.00
M
M
M
M
M
M
M
M
87.00 M
20.88 M
2.00 Bh.
25.80 M
235.98 M
148.32 M
410.10 M
410.10 M
348.59 M
61.52 M
=
=
348.59 M
61.52 M
=
=
=
40.80 M
15.00 M
55.80 M
19.20 M
81.00 M
360.00 M
5.8 *
4+
5.5
21.3 +
2
6.6 *
2
5.5 X
8.4 *
4.5 *
12.6 *
8.7 *
21.3 +
2
6.6 *
2
5.5 X
8.4 *
4.5 *
12.6 *
8.7 *
21.3 +
2
6.6 *
2
5.5 X
8.4 *
4.5 *
12.6 *
8.7 *
2-
2
Bongkar usuk/reng galvalum
2-
2
Bongkar alluminium lapis triplek 4 mm
2-
2
Pekerjaan Kuda - Kuda WF 250X125X6X9 ( Type A = 1 bh. ) :
0.80
8.53
1.40
0.58
0.20
0.45
0.23 *
Flendes t. = 10 mm.
*
*
*
*
*
*
Flendes t. = 12 mm.
0.126
0.126
0.126
0.300
*
*
*
*
Batang tarik 22
12.00 *
29.6
29.6
29.6
29.6
29.6
29.6
*
*
*
*
*
*
1
1
1
1
1
1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
=
=
=
=
=
=
=
0.06 *
0.008 *
7850 *
0.70
0.64
0.52
0.30
0.008
0.008
0.008
0.012
7850
7850
7850
7850
*
*
*
*
2.98
*
*
*
*
*
*
*
*
16
2
2
2
2
=
=
=
=
=
Kg/M1
Walter Moer 22
Baut 19
0.120 *
0.77
0.77
0.77
0.77
0.77
0.23
*
*
*
*
*
*
5.00
0.80
1.40
0.58
0.20
0.45
*
*
*
*
*
*
Stiefner t. = 10 mm.
Flendes t. = 10 mm.
Flendes t. = 12 mm.
0.18 *
0.101
0.101
0.101
0.300
*
*
*
*
0.13 *
0.004 *
8.53
0.80
1.40
0.58
0.20
0.06
*
*
*
*
*
*
2
2
2
2
2
16.00
*
*
*
*
*
*
1
1
1
1
1
1
21.3
21.3
21.3
21.3
21.3
21.3
7850 *
18
=
=
=
=
=
=
=
Kg/M1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
Kg/M1
8X
=
=
=
=
=
=
=
=
0.06 *
0.008 *
7850 *
5
8X
=
=
0.64
0.52
0.40
0.30
0.010
0.010
0.010
0.012
7850
7850
7850
7850
1
1
1
1
=
=
=
=
=
=
*
*
*
*
*
*
*
*
*
*
*
*
8X
Baut 19
28.00 X
8.00 Bh.
4.00 X
8.00 X
0.120 *
0.10 *
=
1.00 Bh.
0.004 *
=
7850 *
5
8X
=
=
0.79
0.79
0.79
0.79
0.79
*
*
*
*
*
5.00
0.80
1.00
2.75
0.60
*
*
*
*
*
1.00
1.00
1.00
1.00
1.00
8X
=
=
=
=
=
=
=
55.20 X
1.00
55.20 X
0.24
=
21.30 +
2
5.50 *
8.40 *
6.60 +
2
4.50 *
2.00 *
=
=
12.60 +
2
8.70 *
2.00 *
=
=
0.85 *
214.92
0.15 *
214.92
0.85 *
0.15 *
214.92
214.92
=
=
5.80 *
4.00 +
79.20 *
1.20
12.00 *
21.40 *
5.50
=
=
=
1.00
30.40
38.13
31.00
30.18
29.80
30.05
189.56
28.7 M
=
=
=
225.12 M
\
11.1 M
214.02 M
=
=
21.3 M
235.32 M
=
=
=
225.12 M
\
11.1 M
214.02 M
=
=
21.3 M
235.32 M
=
=
=
225.12 M
\
11.1 M
214.02 M
=
=
21.3 M
235.32 M
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
293.40 Kg.
103.49
95.83
81.14
113.04
393.50
Kg.
Kg.
Kg.
Kg.
Kg.
35.76 Kg.
1.00 Bh.
34.00 Bh.
8.00 Bh.
138.47 Kg.
13.10
1.23
2.15
0.89
0.31
0.22
17.90
26.30
22.10
22.70
21.88
21.50
21.75
136.23
1,089.84
M
M
M
M
M
M
M
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
76.62 Kg.
612.93 Kg.
57.93
48.75
39.33
56.52
202.53
1,620.24
Kg.
Kg.
Kg.
Kg.
Kg.
Kg.
224.00 Bh.
32.00 Bh.
34.54 Kg.
276.32 Kg.
3.95
0.63
0.79
2.17
0.47
8.01
64.07
M
M
M
M
M
M
M
55.20 M
13.25 M
2.00 Bh.
225.12 M
11.10 M
236.22 M
21.30 M
214.92 M
214.92 M
182.68 M
32.24 M
182.68 M
32.24 M
28.70 M
28.70 M
95.04 M
256.80 M