PROGRAM
KEGIATAN
PEKERJAAN
KECAMATAN
TAHUN
:
:
:
:
:
NO.
URAIAN PEKERJAAN
VOLUME
ANALISA
1
A.
1
2
3
4
5
2
PEKERJAAN PERSIAPAN
Pengukuran/Utilizet
Mobilisasi, Demobilisasi Peralatan dan Transportasi Bahan
Papan Nama Proyek
Pondok Kerja
Foto Dokumentasi/Administrasi
B.
1
2
3
4
5
HARGA SATUAN
(Rp.)
5
Taksir
Taksir
Taksir
Taksir
Taksir
JUMLAH HARGA
(Rp.)
6
238,000.00
3,563,000.00
333,000.00
713,000.00
475,000.00
238,000.00
3,563,000.00
333,000.00
713,000.00
475,000.00
5,322,000.00
Total A
1.00
1.00
1.00
-
Unit
Bh
Ls
Unit
Ls
Taksir
Taksir
Taksir
Taksir
Taksir
14,250,000.00
1,425,000.00
2,613,000.00
760,000.00
3,420,000.00
Total B
14,250,000.00
1,425,000.00
2,613,000.00
760,000.00
3,420,000.00
22,468,000.00
5.50
1.37
5.40
M3
M3
M3
Anl. A.1
Anl. A.1
Anl. A.18.b
28,175.00
28,175.00
93,350.00
Sub Total I
154,962.50
38,599.75
504,090.00
697,652.25
8.00
1.20
2.10
0.10
2.25
0.15
1.80
2.87
9.10
141.42
35.71
6.20
64.45
28.00
M3
M3
M3
M3
M3
M3
M3
M3
M3
M2
M2
M2
M2
M2
Anl. G.32h
Anl. Supl.V
Anl. Supl.V
Anl. Supl.V
Anl. Supl.V
Anl. Supl.V
Anl. Supl.V
Anl. Supl.Va
Anl. G.33h
Anl. G.50k
Anl. Supl.IIIa
Anl. Supl.IIIc
Anl. Supl.IVa
Anl. G.67
654,132.60
2,720,414.00
2,720,414.00
2,720,414.00
2,720,414.00
2,720,414.00
2,720,414.00
2,912,219.00
854,025.80
23,194.20
108,859.35
117,318.02
117,023.02
61,170.20
Sub Total II
5,233,060.80
3,264,496.80
5,712,869.40
272,041.40
6,120,931.50
408,062.10
4,896,745.20
8,358,068.53
7,771,634.78
3,280,123.76
3,887,367.39
727,371.72
7,542,133.64
1,712,765.60
59,187,672.63
13.00
2.00
4.00
7.50
6.00
6.00
6.00
Ttk
Bh
Bh
M'
Ttk
Bh
Bh
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
Taksir
76,000.00
124,000.00
29,000.00
119,000.00
114,000.00
48,000.00
33,000.00
Sub Total III
Total C
988,000.00
248,000.00
116,000.00
892,500.00
684,000.00
288,000.00
198,000.00
3,414,500.00
63,299,824.88
3.39
0.40
6.65
M3
M3
M3
Anl. A.1
Anl. A.18b
Anl. A.18b
28,175.00
93,350.00
93,350.00
Sub Total I
95,513.25
37,340.00
620,777.50
753,630.75
0.74
1.98
1.81
0.19
10.15
13.84
M3
M3
M3
M2
M2
M'
Anl. A. 18d
Anl. G. 41
Anl. G. 43
Anl. G. 50h
Anl. G. 67
Taksir
222,470.00
713,454.00
609,050.00
33,568.80
61,170.20
143,000.00
Sub Total II
164,627.80
1,412,638.92
1,102,380.50
6,378.07
620,877.53
1,979,120.00
5,286,022.82
C.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
1
2
3
4
5
6
7
D.
I. PEKERJAAN TANAH
1 Galian Tanah Pondasi
2 Pasir Urug
3 Tanah Urug Isian Dalam Pondasi
1
2
3
4
5
6
1
2
3
4
2
III. PEKERJAAN PENGADAAN DAN
PEMASANGAN WATER TANK DAN ACCESORIS
Water Tank 3000 Liter
Pipa Besi Galvanis 3/4" + Accesoris
Pipa PVC 3/4" + Accesoris
Kran Air + Accesoris
1
2
3
4
5
6
7
1.00
10.00
75.00
6.00
Bh
M'
M'
Bh
Taksir
Taksir
Taksir
Taksir
3,325,000.00
105,000.00
24,000.00
48,000.00
Sub Total III
3,325,000.00
1,050,000.00
1,800,000.00
288,000.00
6,463,000.00
1.00
2.00
4.00
2.00
18.00
141.40
1.00
Unit
Bh
Bh
Set
M
M2
Bh
Taksir
Taksir
Taksir
Taksir
Taksir
Anl. G. 53a
Taksir
2,375,000.00
214,000.00
119,000.00
333,000.00
119,000.00
8,109.00
3,325,000.00
Sub Total IV
Total D
2,375,000.00
428,000.00
476,000.00
666,000.00
2,142,000.00
1,146,612.60
3,325,000.00
10,558,612.60
23,061,266.17
Rp.
Rp.
Rp.
Rp.
5,322,000.00
22,468,000.00
63,299,824.88
23,061,266.17
Rp.
Rp.
114,151,091.05
114,150,000.00
REKAPITULASI :
A.
B.
C.
D.
PEKERJAAN PERSIAPAN
PEKERJAAN SUMUR BOR
PEKERJAAN MEMBANGUN BARU MCK
PEKERJAAN HIDRANT UMUM 1 (SATU) UNIT
Jumlah Total
Dibulatkan
Terbilang : Seratus Empat Belas Juta Seratus Lima Puluh Ribu Rupiah
RAHMAD IRMAYUDI, SE
Direktur
LOKASI
BIDANG
TAHUN
1. Anl. A.1
1 M3 Galian Tanah
0.750
0.025
Pekerja
Mandor
2. Anl. A.18b
1.200 m3
0.300
0.010
3.
4.
5.
6.
7.
Anl. A.18d
1.200 m3
0.300
0.010
Anl. G.32h
1.200 m3
4.071 zak
0.522 m3
1.200
3.600
0.120
0.180
Anl. G.33h
720.000 bh
3.166 zak
0.406 m3
1.500
0.150
4.500
0.225
Anl. G.41
0.820
6.800
0.540
1.000
6.000
0.100
0.300
Anl. G.43
1.000
5.000
0.500
0.500
0.050
6.000
0.300
m3
zak
m3
m3
zak
m3
@Rp
36,000.00
@Rp
47,000.00
Jumlah ..
@Rp
176,000.00
@Rp
36,000.00
@Rp
47,000.00
Jumlah ..
1 m3 Beton Pondasi ( 1 : 4 )
Batu Kali
@Rp
176,000.00
Semen
@Rp
47,000.00
Pasir Pasang
@Rp
79,800.00
Tukang
@Rp
54,000.00
Pekerja
@Rp
36,000.00
Kepala Tukang
@Rp
59,000.00
Mandor
@Rp
47,000.00
Jumlah ..
1 m3 Batu Merah Tebal 1/2 Batas 1 : 4 ps
Batu Merah
@Rp
570.00
Semen PC
@Rp
47,000.00
Pasir Pasang
@Rp
79,800.00
Tukang
@Rp
54,000.00
Kepala Tukang
@Rp
59,000.00
Pekerja
@Rp
36,000.00
Mandor
@Rp
47,000.00
Jumlah ..
1 m3 Beton Cor 1 : 2 : 3 (Setara K-175)
Kerikil
@Rp
74,100.00
Semen
@Rp
47,000.00
Pasir Pasang
@Rp
79,800.00
Tukang
@Rp
54,000.00
Pekerja
@Rp
36,000.00
Kepala Tukang
@Rp
59,000.00
Mandor
@Rp
47,000.00
Jumlah ..
1 m3 Beton Cor 1 : 3 : 5
Kerikil
Semen PC
Pasir Pasang
Tukang
Kepala Tukang
Pekerja
Mandor
@Rp
74,100.00
@Rp
47,000.00
@Rp
79,800.00
@Rp
54,000.00
@Rp
59,000.00
@Rp
36,000.00
@Rp
47,000.00
Jumlah ..
Rp
Rp
Rp
Rp
27,000.00
1,175.00
28,175.00
28,175.00
Rp
Rp
Rp
10,800.00
470.00
11,270.00
93,350.00
Rp
Rp
Rp
10,800.00
470.00
11,270.00
222,470.00
Rp
Rp
Rp
Rp
Rp
64,800.00
129,600.00
7,080.00
8,460.00
209,940.00
654,132.60
Rp
Rp
Rp
Rp
Rp
81,000.00
8,850.00
162,000.00
10,575.00
262,425.00
854,025.80
Rp
Rp
Rp
Rp
Rp
54,000.00
216,000.00
5,900.00
14,100.00
290,000.00
713,454.00
Rp
Rp
Rp
Rp
Rp
27,000.00
2,950.00
216,000.00
14,100.00
260,050.00
609,050.00
82,080.00
Rp
82,080.00
Rp
211,200.00
Rp
211,200.00
Rp
Rp
Rp
211,200.00
191,337.00
41,655.60
Rp
444,192.60
Rp
Rp
Rp
410,400.00
148,802.00
32,398.80
Rp
591,600.80
Rp
Rp
Rp
60,762.00
319,600.00
43,092.00
Rp
423,454.00
Rp
Rp
Rp
74,100.00
235,000.00
39,900.00
Rp
Rp
Rp
Rp
349,000.00
8.
9.
Anl. G.50k
0.089 zak
0.019 m3
0.100
0.010
0.300
0.015
Anl. G.50h
0.178 zak
0.011 m3
0.150
0.015
0.400
0.020
11.
Anl. G.67
0.070
0.364
0.044
0.135
0.014
0.720
0.036
m3
zak
m3
14. Anl. F. 9
4.000
0.500
m3
kg
1 m2 Plesteran 1 : 4 T. 15 cm
Semen PC
@Rp
47,000.00
Pasir Pasang
@Rp
79,800.00
Tukang
@Rp
54,000.00
Kepala Tukang
@Rp
59,000.00
Pekerja
@Rp
36,000.00
Mandor
@Rp
47,000.00
Jumlah ..
1 m2 Plesteran Trasram 1 : 2 T. 10 cm
Semen PC
@Rp
47,000.00
Pasir Pasang
@Rp
79,800.00
Tukang
@Rp
54,000.00
Kepala Tukang
@Rp
59,000.00
Pekerja
@Rp
36,000.00
Mandor
@Rp
47,000.00
Jumlah ..
100 m2 Cat Tembok Polymik/Setara
Cat Tembok
@Rp
21,400.00
Tukang
@Rp
54,000.00
Kepala Tukang
@Rp
59,000.00
Pekerja
@Rp
36,000.00
Jumlah ..
Untuk 1 M2 ..
1 m2 Lantai Beton Cor 1 : 3 : 5 T. 7 cm
Kerikil Kasar
@Rp
68,900.00
Semen PC
@Rp
47,000.00
Pasir Pasang
@Rp
79,800.00
Tukang
@Rp
54,000.00
Kepala Tukang
@Rp
59,000.00
Pekerja
@Rp
36,000.00
Mandor
@Rp
47,000.00
Jumlah ..
100 kg Besi Beton
Tukang Besi
Kepala Tukang
Pekerja
Besi beton
Kawat Beton
@Rp
@Rp
@Rp
Rp
Rp
4,183.00
1,516.20
Rp
5,699.20
Rp
Rp
8,366.00
877.80
Rp
9,243.80
Rp
535,000.00
Rp
Rp
535,000.00
5,350.00
Rp
Rp
Rp
4,823.00
17,108.00
3,511.20
Rp
25,442.20
54,000.00
59,000.00
36,000.00
@Rp
10,500.00
@Rp
11,400.00
Jumlah ..
Upah diambil 3/4 untuk 1 kg Besi
10 m2 Cetakan Beton/Bekisting
Papan Cetakan
@Rp
1,948,000.00
Paku
@Rp
12,400.00
Tukang Besi
@Rp
54,000.00
Kepala Tukang
@Rp
59,000.00
Pekerja
@Rp
36,000.00
Mandor
@Rp
47,000.00
Pek. (Bongkaran + Siram)
@Rp
16,750.00
Jumlah ..
Untuk 1 M2 ..
Membongkar/Menyiram Cetakan
Pekerja
@Rp
36,000.00
Mandor
@Rp
47,000.00
Jumlah ..
Untuk 1 M2 .....
Rp
Rp
Rp
Rp
1,155,000.00
22,800.00
1,177,800.00
11,778.00
Rp
Rp
428,560.00
50,840.00
Rp
Rp
479,400.00
47,940.00
Rp
Rp
Rp
Rp
Rp
5,400.00
590.00
10,800.00
705.00
17,495.00
23,194.20
Rp
Rp
Rp
Rp
Rp
8,100.00
885.00
14,400.00
940.00
24,325.00
33,568.80
Rp
Rp
Rp
Rp
Rp
54,000.00
5,900.00
216,000.00
275,900.00
2,759.00
8,109.00
Rp
Rp
Rp
Rp
Rp
7,290.00
826.00
25,920.00
1,692.00
35,728.00
61,170.20
Rp
Rp
Rp
486,000.00
177,000.00
324,000.00
Rp
Rp
987,000.00
7,402.50
19,180.50
Rp
Rp
Rp
Rp
Rp
Rp
Rp
270,000.00
29,500.00
72,000.00
4,700.00
33,500.00
409,700.00
40,970.00
88,910.00
Rp
Rp
Rp
Rp
144,000.00
23,500.00
167,500.00
16,750.00
16,750.00
17. Anl. G. 16
11.250 zak
1.080 m3
1 m2 Lantai Keramik 30 x 30 cm
Keramik 30 x 30 cm
@Rp
57,000.00
Semen Putih
@Rp
146,000.00
Perekat (G.16)
@Rp
614,934.00
Tukang
@Rp
54,000.00
Kepala Tukang
@Rp
59,000.00
Pekerja
@Rp
36,000.00
Mandor
@Rp
47,000.00
Jumlah ..
1 m2 Lantai Keramik Kulit Jeruk 20 x 20 cm
Keramik 20 x 20 cm
@Rp
61,800.00
Semen Putih
@Rp
146,000.00
Perekat (G.16)
@Rp
614,934.00
Tukang
@Rp
54,000.00
Kepala Tukang
@Rp
59,000.00
Pekerja
@Rp
36,000.00
Mandor
@Rp
47,000.00
Jumlah ..
1 m2 Dinding Keramik 20 x 25 cm
Keramik 20 x 25 cm
@Rp
61,800.00
Semen Putih
@Rp
146,000.00
Perekat (G.16)
@Rp
614,934.00
Tukang
@Rp
54,000.00
Kepala Tukang
@Rp
59,000.00
Pekerja
@Rp
36,000.00
Mandor
@Rp
47,000.00
Jumlah ..
1 m3 Perekat 1 : 2
Semen
Pasir Pasang
@Rp
47,000.00
@Rp
79,800.00
Jumlah ..
Rp
Rp
Rp
57,000.00
2,336.00
15,373.35
Rp
74,709.35
Rp
Rp
Rp
61,800.00
2,920.00
18,448.02
Rp
83,168.02
Rp
Rp
Rp
61,800.00
2,920.00
18,448.02
Rp
83,168.02
Rp
Rp
Rp
528,750.00
86,184.00
614,934.00
Rp
Rp
Rp
Rp
Rp
13,500.00
1,475.00
18,000.00
1,175.00
34,150.00
108,859.35
Rp
Rp
Rp
Rp
Rp
13,500.00
1,475.00
18,000.00
1,175.00
34,150.00
117,318.02
Rp
Rp
Rp
Rp
Rp
13,500.00
1,180.00
18,000.00
1,175.00
33,855.00
117,023.02
614,934.00
Rp
Rp
Rp
Rp
713,454.00
1,918,050.00
88,910.00
2,720,414.00
2,720,414.00
Rp
Rp
Rp
Rp
713,454.00
2,109,855.00
88,910.00
2,912,219.00
2,912,219.00
713,454.00
19,180.50
88,910.00
RAHMAD IRMAYUDI, SE
Direktur
J U M LA H
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
A. U P A H
Mandor Lapangan
Mekanik
Mekanik Pembantu
Kepala Tukang
Tukang
Operator Terlatih
Operator Kurang Terlatih
Pembantu Operator
Supir Truk
Supir Personil
Pembantu Supir
Buruh Lapangan Tak Terlatih / Pekerja
Buruh Lapangan Kurang Terlatih
Buruh Lapangan Terlatih
Upah Penggergaji
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
47,000.00
72,000.00
45,000.00
59,000.00
54,000.00
81,000.00
45,000.00
41,000.00
45,000.00
45,000.00
36,000.00
36,000.00
37,000.00
41,000.00
3,200.00
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/Hari
/M2
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
B. HARGA BAHAN
B. 1. BAHAN LOKAL
Timbunan Pilihan
Tanah Timbun
Kerikil Kasar
Kerikil Halus
Kerikil Campur Tanah
Kerikil Saring 2/3
Kerikil Saring 1/2
Pasir Pasang
Pasir Urug
Batu Pecah 10-15 cm
Batu Pecah 7-10 cm
Batu Pecah 5-7 cm
Batu Pecah 3-5 cm
Batu Pecah 2-3 cm
Batu Pecah 1-2 cm
Batu Pecah 0,5-1 cm
Sirtu
Pasir Beton
Agregat Base Klas A
Agregat Base Klas B
Agregat Base Klas C
Portland Cement (40 kg)
Portland Cement (40 kg)
Semen Putih
Batu Bata
Batu Kali/Belah/Gunung
Besi Beton Polos
Kawat Ikat Beton
Kawat Bronjong 4 mm
Paku Biasa
Paku Asbes + Karet
Paku Skrup
Paku Seng
Paku Reng
Atap Seng Cat Pabrik
Atap Seng Bjls 0,20 mm
Atap Seng Bjls 0,3 mm
Seng Perabung
Seng Plat
Genteng Metal
Bubungan Genteng Metal
Flashing Metal
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
79,800.00
68,400.00
68,900.00
74,100.00
74,100.00
80,800.00
85,500.00
79,800.00
68,400.00
214,000.00
214,000.00
214,000.00
228,000.00
228,000.00
285,000.00
285,000.00
74,100.00
79,800.00
285,000.00
271,000.00
238,000.00
47,000.00
200,000.00
146,000.00
570.00
176,000.00
10,500.00
11,400.00
16,200.00
12,400.00
16,200.00
140.00
15,700.00
12,400.00
12,100.00
9,700.00
10,700.00
35,600.00
61,800.00
78,900.00
61,800.00
26,100.00
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/Zak
/Tong
/Zak
/Bh
/M3
/Kg
/Kg
/Kg
/Kg
/Kg
/Bh
/Kg
/Kg
/Kk
/Kk
/Kk
/Lbr
/Lbr
/M2
/M2
/M2
1
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
2
Genteng Beton
Perabung Genteng Beton
Kayu Seumantok/Setara
Kayu Seumantok Kuda-kuda/Setara
Kayu Tarahan/Rangka Plafond
Kayu Bakar
Kayu Meurante
Kayu Kamper/Krueng
Kayu Medang
Papan Meurante
Kayu Perancah
Papan Reider
Kayu Stut/Dolken
Kayu Bekesting/Papan Cetak
Triplek 4 mm
Teakwood 6 mm
Gypsum 9 mm
Plafond Asbes Quality
Asbes Gelombang Kecil
Rabung Asbes
Lat Plafond
Lat Profil
Cat Tembok Polymik/Setara
Cat Menie
Cat Dasar
Cat Warna
Dempul Kayu
Plamir Tembok
Cat Minyak
Amplas
Sirlak
Spirtus
Minyak Kilat
Residu
Keramik 20 x 20 cm
Keramik 30 x 30 cm
Keramik 20 x 25 cm
Keramik Jeruk 30 x 30 cm
Keramik 40 x 40 cm
Kaca Bening 5 mm
Tegel PC Kepala Basah 20 x 20 cm
Plat Tegel PC Kep. Basah 15 x 30 cm
Aspal Bitumen
Pelumas
Bensin
Minyak Solar
Buis Beton dia. 80 cm
Buis Beton dia. 60 cm
Buis Beton dia. 40 cm
Batu Kerawang
Paving Block
3
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
Rp.
4,800.00
6,200.00
2,850,000.00
2,850,000.00
1,948,000.00
428,000.00
2,375,000.00
2,375,000.00
2,375,000.00
47,500.00
1,948,000.00
57,000.00
1,615,000.00
1,948,000.00
20,400.00
26,100.00
166,300.00
9,000.00
25,200.00
14,300.00
2,400.00
7,100.00
21,400.00
14,300.00
11,400.00
26,400.00
11,400.00
11,900.00
26,400.00
2,400.00
8,600.00
8,100.00
12,400.00
6,200.00
61,800.00
57,000.00
61,800.00
66,500.00
66,500.00
118,800.00
2,900.00
2,600.00
8,600.00
30,900.00
6,200.00
5,900.00
161,500.00
142,500.00
123,500.00
7,100.00
4,800.00
/Bh
/Bh
/M3
/M3
/M3
/M3
/M3
/M3
/M3
/Lbr
/M3
/Lbr
/M3
/M3
/M2
/M2
/Lbr
/M2
/Lbr
/M'
/M'
/M'
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Kg
/Lbr
/Kg
/Ltr
/Ltr
/Ltr
/M2
/M2
/M2
/M2
/M2
/M2
/Bh
/Bh
/Kg
/Ltr
/Ltr
/Ltr
/Bh
/Bh
/Bh
/Bh
/Bh
RAHMAD IRMAYUDI, SE
Direktur
KEGIATAN
PEKERJAAN
KECAMATAN
: KAWAY XVI
TAHUN
: 2009
JUMLAH
NO.
URAIAN PEKERJAAN
HARGA
(Rp.)
BULAN KE-I
I
II
III
BULAN KE-II
IV
II
III
BULAN KE-III
IV
II
III
BULAN KE-IV
IV
II
III
BULAN KE-V
IV
II
KET.
III
IV
100 %
A.
PEKERJAAN PERSIAPAN
5,322,000.00
4.662
B.
22,468,000.00
19.683
C.
D.
0.52
0.52
0.52
2.19
2.19
0.52
2.19
2.19
2.19
2.19
2.19
2.19
0.52
0.52
0.52
0.52
0.52
90 %
80 %
2.19
70 %
697,652.25
0.611
59,187,672.63
51.850
3,414,500.00
2.991
0.20
0.20
0.20
3.70
3.70
60 %
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
3.70
0.43
0.43
0.43
0.43
0.43
0.43
0.43
40 %
50 %
753,630.75
0.660
5,286,022.82
4.631
6,463,000.00
5.662
10,558,612.60
9.250
Jumlah Total
114,151,091.05
100.000
Dibulatkan
114,150,000.00
0.17
0.17
0.17
0.17
0.58
0.58
30 %
0.58
0.58
0.58
0.58
0.58
0.58
0.94
0.94
0.94
0.94
0.94
0.94
0.92
0.92
0.92
0.92
0.92
0.92
20 %
0.92
0.92
0.92
10 %
0.92
0%
RENCANA
Minggu
0.52
2.70
2.70
2.39
6.26
6.26
6.63
6.63
7.39
7.91
6.67
6.67
6.15
6.58
6.00
6.00
5.57
5.57
0.95
0.43
Kumulatif
0.52
3.22
5.93
8.32
14.58
20.84
27.47
34.11
41.50
49.41
56.08
62.75
68.90
75.48
81.48
87.48
93.05
98.63
99.57
100.00
RAHMAD IRMAYUDI, SE
Direktur