DAFTAR UPAH
NO. JENIS UPAH SATUAN
1 2 3
1 Pekerja OH
2 Tukang ( Batu, Kayu, Pipa, Bongkar, Cat dan Besi ) OH
3 Kepala Tukang OH
4 Mandor OH
HARGA
NO. JENIS BAHAN SATUAN MUAT BONGKAR
TOKO/QUARRY
1 2 3 4 5
I BAHAN PASANGAN
1 Pasir Urug (PU) M3 115,000.00 32,461.63
2 Pasir Pasang (PP) M3 120,000.00 32,461.63
3 Pasir Beton (PB) M3 125,000.00 32,461.63
4 Pasir Kuarsa M3 100,000.00 30,656.00
5 Kerikil (KR) M3 150,000.00 33,320.00
6 Sirtu M3 110,000.00 30,656.00
7 Batu Belah (gunung) 15cm/20 cm M3 220,000.00 63,320.00
8 Batu sungai (mangga) M3 200,000.00 38,320.00
9 Portland Cement (PC) Kg 1,279.30 800.00
10 Semen putih Kg 2,300.00 15.33
11 Cornite Compound Jayaboard Zak 70,000.00 3,832.00
12 Bata Merah Uk. ( 3 x 7 x 15 ) CM Buah 250.00 150.00
13 Kerawang (Roster semen)20x20 cm Buah 22,000.00 30.66
14 Kerawang (Roster semen)40x40 cm Buah 45,000.00 30.66
15 Rumput Gajah Mini M2 40,500.00 766.40
HARGA
NO. JENIS BAHAN SATUAN MUAT BONGKAR
TOKO/QUARRY
1 2 3 4 5
16 Rumput Biasa M2 15,500.00 766.40
17 Tanah Hitam M3 53,000.00 30,500.00
18 Tanah Urug M3 20,000.00 30,500.00
19 Conblock Segi 6 Tebal 6 CM Bh 1,500.00 30.66
20 Conblock Segi 4 Tebal 8 CM Bh 1,700.00 30.66
21 Grass Block T= 6 cm Bh 20,600.00 30.66
22 Buis Beton Dia 20cm P= 50 Cm Bh 45,000.00 7,664.00
23 Buis Beton Dia 40cm P = 60 Cm Bh 158,000.00 15,328.00
24 Buis Beton Dia 60cm P= 80 Cm Bh 250,000.00 22,992.00
25 Buis Beton Dia 80cm P= 100 Cm Bh 320,000.00 30,656.00
26 Buis Beton Dia 100cm P = 100 Cm Bh 400,000.00 30,656.00
27 Batu Split / Pecah M3 320,000.00 16,000.00
28 Bata Beton Ringan Buah 6,000.00 2,500.00
29 Batu Tempel Uk. 20 x 20 Buah - -
30 Batu Tempel Uk. 20 x 40 Buah - -
II BAHAN KAYU
1 Kayu Kelas I M3 3,500,000.00 60,656.00
2 Kayu Kelas II M3 2,000,000.00 60,656.00
3 Kayu Kelas III M3 1,500,000.00 60,656.00
4 Kayu Kelas IV M3 1,210,750.00 60,656.00
5 Kayu List Profil siku2" M' 2,500.00 7.66
6 Kayu List Profil 0.8x3" M' 3,000.00 3,000.00
7 Papan 2 x 20 M3 1,800,000.00 60,656.00
8 Kayu Cerocok dia. 10 - 15 cm Btg 30,000.00 766.40
9 Dolken Kayu Galam, (8-10)Cm,Panjang 4 M Batang 6,000.00 766.40
10 Kayu Bakar M3 200,000.00 60,656.00
11 Papan Piri - piri (Siap Ketam 3 sisi) M3 2,200,000.00 60,656.00
12 Papan Lebah Bergayut M' 40,000.00 766.40
13 Singap Ukir kayu M2 750,000.00 4,598.40
14 Singap Ukir GRC M2 400,000.00 4,598.40
15 Selembayung GRC Lebar 30 cm Pasang 400,000.00 1,532.80
HARGA
NO. JENIS BAHAN SATUAN MUAT BONGKAR
TOKO/QUARRY
1 2 3 4 5
16 Selembayung kayu lebar 30 cm Pasang 250,000.00 1,532.80
17 Sayap layang-layang lebar 30 cm Pasang 250,000.00 1,532.80
18 Lisplank papan + anak ( + 30 cm) M' 50,000.00 1,532.80
IV BAHAN PAKU
1 Paku 1 Cm - 2,5 Cm Kg 14,000.00 122.62
2 Paku 5 Cm - 12 Cm Kg 14,000.00 122.62
3 Paku Skrup Kg 19,000.00 122.62
4 Paku Skrup 5 Cm Kg 19,000.00 122.62
5 Paku Skrup 10 Cm Kg 19,000.00 122.62
6 Paku Asbes Kg 20,000.00 122.62
7 Paku Atap Genteng Metal Kg 24,000.00 122.62
8 Paku Atap Seng Gelombang Kg 20,000.00 122.62
9 Skrup Fixer Buah - -
V BAHAN ALLUMUNIUM
1 Profil Allumunium "T" M' 23,000.00 421.52
2 Kusen Alumunium 3'' M' 193,000.00 1,100.00
HARGA
NO. JENIS BAHAN SATUAN MUAT BONGKAR
TOKO/QUARRY
1 2 3 4 5
3 Rangka Jendela Almunium M' 193,000.00 1,100.00
4 Rangka Pintu Almunium M' 193,000.00 1,100.00
VI BAHAN LANTAI
1 Homogenius Ukuran ( 60 x 60 ) Cm Buah 59,800.00 153.28
2 Homogenius Ukuran ( 40 x 40 ) cm Buah 31,700.00 153.28
3 Homogenius Ukuran ( 30 x 30 ) cm Buah 15,500.00 153.28
4 Keramik (40x40) Cm Buah 8,840.00 122.62
5 Keramik (30x30) Cm Buah 4,340.00 122.62
6 Keramik (20x20) Cm Buah 2,095.00 38.32
7 Keramik (20x25) Cm Buah 2,700.00 38.32
8 Granit Warna (60x60) Cm Buah 85,000.00 153.28
9 Keramik Warna (40x40) Cm Buah 9,400.00 122.62
10 Keramik Warna (30x30) Cm Buah 4,895.00 38.32
11 Keramik Warna (20x20) Cm Buah 2,295.00 38.32
12 Plint Keramik (10x20) Cm Buah 1,365.00 19.16
13 Plint Keramik (10x30) Cm Buah 2,300.00 39.85
14 Plint Keramik (10x40) Cm Buah 3,200.00 30.66
15 Plint Homogenius (10x60) Cm Buah 12,000.00 30.66
16 Plint Homogenius (10x40) Cm Buah 11,000.00 350.00
17 Plint Keramik Warna (10x20) Cm Buah 1,300.00 19.16
18 Plint Keramik Warna (10x30) Cm Buah 2,300.00 39.85
19 Plint Keramik Warna (10x40) Cm Buah 3,200.00 30.66
20 Plint Granit Warna (10x60) Cm Buah 13,300.00 30.66
21 Bon-bon Keramik M' 7,700.00 30.66
22 Floor hardener M2 34,800.00 153.28
23 Parquette M2 225,000.00 153.28
24 Karpet M2 12,900.00 496.60
IX BAHAN LANGIT-LANGIT
1 Teakwood Tebal 3,6 mm Lembar 150,000.00 766.40
HARGA
NO. JENIS BAHAN SATUAN MUAT BONGKAR
TOKO/QUARRY
1 2 3 4 5
2 Triplek Tebal 12 MM Lembar 202,000.00 766.40
3 Triplek Tebal 9,0 MM Lembar 110,000.00 766.40
4 Triplek Tebal 3,6 MM Lembar 60,000.00 766.40
5 Triplek Tebal 3,0 MM Lembar 55,700.00 766.40
6 Gypsum Board 9 mm Lembar 85,000.00 766.40
7 List Gypsum lbr 15-20cm M' 17,600.00 766.40
8 Asbes Semen M2 50,000.00 766.40
9 Triplek melamin Lembar 75,000.00 766.40
XI BAHAN PINTU
1 Pintu Besi M2 660,000.00 7,664.00
2 Pintu Fiber Warna Lbr 754,000.00 7,664.00
3 Pintu Fiber KM/WC (lengkap) Lbr 250,000.00 7,664.00
4 Pintu Panel kelas I Lbr 760,000.00 7,664.00
5 Pintu Panel Kelas II Lbr 470,000.00 7,664.00
6 Pintu Plywood (triplek depan blkg) Lbr 190,000.00 7,664.00
7 Pintu Teakwood (lapis jati) depan belakang Lbr 620,000.00 7,664.00
8 Vertical Blind M2 90,000.00 7,664.00
9 Rolling Door M2 500,000.00 7,664.00
10 Folding Gate M2 650,000.00 7,664.00
11 Pintu Aluminium Kaca Lbr 2,100,000.00 7,664.00
XV BAHAN CAT
1 Cat Tembok Standar Kg 19,000.00 153.28
2 Cat Tembok Akrilik Kg 25,000.00 153.28
3 Cat Tembok Weather Shield Kg 75,000.00 153.28
4 Cat Kayu Kg 38,000.00 153.28
5 Cat Dasar / Kapur Kg 6,000.00 153.28
6 Cat Dasar / Menie Kayu Kg 27,000.00 153.28
7 Cat Vernish Kg 56,000.00 153.28
8 Cat Impra Kg 41,500.00 153.28
9 Cat Residu Kg 9,800.00 153.28
10 Soda Api Kg 11,600.00 153.28
11 Plamir setara RJ Kg 27,200.00 153.28
12 Dempul Kayu Kg 38,400.00 153.28
13 Kertas Amplas Lbr 6,100.00 38.32
14 Kuas 3" Bh 17,300.00 38.32
15 Kuas Golong/rol Bh 26,350.00 38.32
16 Thinner Ltr 19,000.00 153.28
17 Flincote / Menie Besi Kg 16,500.00 153.28
BANGKINANG, 2
KEPALA DINAS CIPTA KARYA DAN TAT
KABUPATEN KAMPAR
Ir. H. CHALISMAN, MT
NIP. 19631026 199303 1 002
BANGKINANG, 2
KEPALA DINAS CIPTA KARYA DAN TAT
KABUPATEN KAMPAR
HARGA
NO. JENIS BAHAN SATUAN MUAT BONGKAR
TOKO/QUARRY
1 2 3 4 5
Ir. H. CHALISMAN, MT
NIP. 19631026 199303 1 002
ATE ENGINEERS (EE)
HAN BANGUNAN TAHUN ANGGARAN 2016
DAERAH BAIK
UPAH KETERANGAN
4 5
63,000.00
75,000.00
76,000.00
81,000.00
TRANSPORT JUMLAH
6 7 ( 4+5+6)
38,320.00 185,781.63
38,320.00 190,781.63
38,320.00 195,781.63
76,640.00 207,296.00
38,320.00 221,640.00
38,320.00 178,976.00
101,640.00 384,960.00
38,320.00 276,640.00
800.00 2,879.30
16.40 2,331.73
766.40 74,598.40
150.00 550.00
122.62 22,153.28
122.62 45,153.28
1,532.80 42,799.20
TRANSPORT JUMLAH
6 7 ( 4+5+6)
1,532.80 17,799.20
37,000.00 120,500.00
37,000.00 87,500.00
122.62 1,653.28
122.62 1,853.28
122.62 20,753.28
7,664.00 60,328.00
22,992.00 196,320.00
22,992.00 295,984.00
30,656.00 381,312.00
30,656.00 461,312.00
20,000.00 356,000.00
3,000.00 11,500.00
- 5,750.00
- 14,375.00
53,648.00 3,614,304.00
53,648.00 2,114,304.00
53,648.00 1,614,304.00
53,648.00 1,325,054.00
15.33 2,522.99
7.66 6,007.66
53,648.00 1,914,304.00
4,598.40 35,364.80
766.40 7,532.80
53,648.00 314,304.00
53,648.00 2,314,304.00
1,532.80 42,299.20
15,328.00 769,926.40
15,328.00 419,926.40
7,664.00 409,196.80
TRANSPORT JUMLAH
6 7 ( 4+5+6)
7,664.00 259,196.80
7,664.00 259,196.80
7,664.00 59,196.80
500.00 14,500.00
500.00 17,200.00
750.00 12,500.00
750.00 246,400.00
76.64 16,107.30
76.64 16,107.30
76.64 20,107.30
306.56 14,170.22
229.92 13,160.58
1,532.80 253,065.60
306.56 18,337.22
153.28 17,113.12
153.28 14,275.90
153.28 14,275.90
153.28 19,275.90
153.28 19,275.90
153.28 19,275.90
153.28 20,275.90
153.28 24,275.90
153.28 20,275.90
- 345.00
1,686.08 25,107.60
2,500.00 196,600.00
TRANSPORT JUMLAH
6 7 ( 4+5+6)
2,500.00 196,600.00
2,500.00 196,600.00
153.28 60,106.56
153.28 32,006.56
153.28 15,806.56
122.62 9,085.24
122.62 4,585.24
122.62 2,255.94
122.62 2,860.94
153.28 85,306.56
122.62 9,645.24
122.62 5,055.94
122.62 2,455.94
76.64 1,460.80
45.98 2,385.83
38.32 3,268.98
30.66 12,061.32
500.00 11,850.00
76.64 1,395.80
45.98 2,385.83
38.32 3,268.98
30.66 13,361.32
30.66 7,761.32
153.28 35,106.56
153.28 225,306.56
5,183.93 18,580.53
306.56 34,459.84
TRANSPORT JUMLAH
6 7 ( 4+5+6)
306.56 39,459.84
306.56 39,459.84
306.56 25,459.84
306.56 38,459.84
306.56 71,459.84
306.56 59,459.84
306.56 5,459.84
306.56 250,459.84
306.56 21,959.84
306.56 28,459.84
306.56 13,459.84
1,532.80 42,299.20
306.56 40,459.84
650.00 7,850.00
650.00 11,350.00
650.00 5,250.00
650.00 7,250.00
1,350.00 37,300.00
1,350.00 21,300.00
- 11,000.00
306.56 25,459.84
306.56 12,459.84
306.56 31,459.84
306.56 1,089.84
306.56 1,089.84
306.56 8,459.84
306.56 6,959.84
1,532.80 152,299.20
TRANSPORT JUMLAH
6 7 ( 4+5+6)
1,532.80 204,299.20
1,532.80 112,299.20
1,532.80 62,299.20
1,532.80 57,999.20
1,532.80 87,299.20
1,532.80 19,899.20
1,532.80 52,299.20
1,532.80 77,299.20
306.56 4,283.20
306.56 6,633.20
306.56 9,333.20
306.56 11,133.20
306.56 13,883.20
306.56 23,033.20
306.56 31,333.20
306.56 59,383.20
306.56 15,383.20
306.56 60,383.20
306.56 90,383.20
306.56 123,383.20
306.56 39,383.20
306.56 21,383.20
306.56 31,383.20
306.56 52,383.20
306.56 10,383.20
306.56 100,383.20
30,656.00 258,320.00
30,656.00 338,320.00
30,656.00 1,788,320.00
30,656.00 273,320.00
TRANSPORT JUMLAH
6 7 ( 4+5+6)
30,656.00 1,338,320.00
30,656.00 488,320.00
114.96 5,291.60
306.56 160,383.20
306.56 15,383.20
30,656.00 538,320.00
30,656.00 638,320.00
30,656.00 1,388,320.00
30,656.00 1,638,320.00
30,656.00 3,238,320.00
30,656.00 698,320.00
30,656.00 792,320.00
30,656.00 288,320.00
30,656.00 798,320.00
30,656.00 508,320.00
30,656.00 228,320.00
30,656.00 658,320.00
4,061.92 101,725.92
15,328.00 522,992.00
15,328.00 672,992.00
15,328.00 2,122,992.00
229.92 200,306.56
229.92 100,306.56
229.92 30,306.56
229.92 30,306.56
229.92 7,806.56
229.92 5,306.56
229.92 20,306.56
TRANSPORT JUMLAH
6 7 ( 4+5+6)
229.92 11,306.56
229.92 8,806.56
229.92 6,806.56
229.92 7,806.56
229.92 390,306.56
229.92 20,306.56
800.00 8,800.00
800.00 8,800.00
7,664.00 85,390.24
7,664.00 95,890.24
7,864.00 369,290.24
7,864.00 513,290.24
7,664.00 97,290.24
7,664.00 119,890.24
7,664.00 188,890.24
7,664.00 100,890.24
7,664.00 128,890.24
7,664.00 97,890.24
7,664.00 28,890.24
- 207,000.00
153.28 6,660.94
153.28 8,360.94
153.28 75,160.94
153.28 50,160.94
306.56 74,383.20
306.56 310,383.20
306.56 100,383.20
153.28 94,229.92
TRANSPORT JUMLAH
6 7 ( 4+5+6)
153.28 188,229.92
153.28 14,729.92
153.28 14,729.92
153.28 21,829.92
153.28 27,229.92
153.28 50,229.92
306.56 19,459.84
306.56 25,459.84
306.56 75,459.84
306.56 38,459.84
306.56 6,459.84
306.56 27,459.84
306.56 56,459.84
306.56 41,959.84
306.56 10,259.84
306.56 12,059.84
306.56 27,659.84
306.56 38,859.84
76.64 6,214.96
76.64 17,414.96
76.64 26,464.96
306.56 19,459.84
306.56 16,959.84
- 112,700.00
- 4,025,000.00
7.66 29.19
344.88 3,036.48
719.88 31,286.48
TRANSPORT JUMLAH
6 7 ( 4+5+6)
650.00 5,200.00
550.00 21,050.00
344.88 25,836.48
344.88 12,536.48
260.58 2,025.72
306.56 6,959.84
1,889.18 25,361.48
1,065.30 5,345.04
1,195.58 9,294.48
6,736.66 52,320.82
306.56 15,459.84
1,532.80 32,299.20
1,532.80 97,299.20
1,532.80 52,299.20
- 12,650.00
- 25,185.00
- 45,195.00
- 400,660.00
- 435,160.00
- 862,500.00
- 28,750.00
- 74,750.00
- 230,000.00
- 159,275.00
- 126,500.00
- 241,500.00
- 230,000.00
TRANSPORT JUMLAH
6 7 ( 4+5+6)
- 379,500.00
- 166,750.00
- 218,500.00
- 207,000.00
- 402,500.00
- 462,875.00
- 1,380,000.00
- 977,500.00
- 1,058,000.00
- 5,692,500.00
- 6,641,250.00
- 1,707,750.00
- 1,771,000.00
- 661,250.00
- 402,500.00
- 661,250.00
TRANSPORT JUMLAH
6 7 ( 4+5+6)
- 690,000.00
- 230,000.00
3,500.00
4,000.00
4,000.00
4,500.00
4,500.00
5,000.00
5,500.00
5,500.00
6,000.00
BANGKINANG, 2016
KEPALA DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN KAMPAR
Ir. H. CHALISMAN, MT
NIP. 19631026 199303 1 002
BANGKINANG, 2016
KEPALA DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN KAMPAR
TRANSPORT JUMLAH
6 7 ( 4+5+6)
Ir. H. CHALISMAN, MT
NIP. 19631026 199303 1 002
DAFTAR HARGA SATUAN UPAH DAN BAHAN BANGUNAN
TAHUN ANGGARAN 2016
DAERAH BAIK
DAFTAR UPAH
II BAHAN KAYU
1 Kayu Kelas I M3
2 Kayu Kelas II M3
3 Kayu Kelas III M3
4 Kayu Kelas IV M3
5 Kayu List Profil siku2" M'
6 Kayu List Profil 0.8x3" M'
7 Papan 2 x 20 M3
8 Kayu Cerocok dia. 10 - 15 cm Btg
9 Dolken Kayu Galam, (8-10)Cm,Panjang 4 M Batang
10 Kayu Bakar M3
11 Papan Piri - piri (Siap Ketam 3 sisi) M3
12 Papan Lebah Bergayut M'
13 Singap Ukir kayu M2
14 Singap Ukir GRC M2
15 Selembayung GRC Lebar 30 cm Pasang
16 Selembayung kayu lebar 30 cm Pasang
17 Sayap layang-layang lebar 30 cm Pasang
18 Lisplank papan + anak ( + 30 cm) M'
V BAHAN ALLUMUNIUM
1 Profil Allumunium "T" M'
2 Kusen Alumunium 3'' M'
3 Rangka Jendela Almunium M'
4 Rangka Pintu Almunium M'
VI BAHAN LANTAI
1 Homogenius Ukuran ( 60 x 60 ) Cm Buah
2 Homogenius Ukuran ( 40 x 40 ) cm Buah
3 Homogenius Ukuran ( 30 x 30 ) cm Buah
4 Keramik (40x40) Cm Buah
5 Keramik (30x30) Cm Buah
6 Keramik (20x20) Cm Buah
7 Keramik (20x25) Cm Buah
8 Granit Warna (60x60) Cm Buah
9 Keramik Warna (40x40) Cm Buah
10 Keramik Warna (30x30) Cm Buah
11 Keramik Warna (20x20) Cm Buah
12 Plint Keramik (10x20) Cm Buah
13 Plint Keramik (10x30) Cm Buah
14 Plint Keramik (10x40) Cm Buah
15 Plint Homogenius (10x60) Cm Buah
16 Plint Homogenius (10x40) Cm Buah
17 Plint Keramik Warna (10x20) Cm Buah
18 Plint Keramik Warna (10x30) Cm Buah
19 Plint Keramik Warna (10x40) Cm Buah
20 Plint Granit Warna (10x60) Cm Buah
21 Bon-bon Keramik M'
22 Floor hardener M2
23 Parquette M2
24 Karpet M2
NO. JENIS BAHAN SATUAN
1 2 3
IX BAHAN LANGIT-LANGIT
1 Teakwood Tebal 3,6 mm Lembar
2 Triplek Tebal 12 MM Lembar
3 Triplek Tebal 9,0 MM Lembar
4 Triplek Tebal 3,6 MM Lembar
5 Triplek Tebal 3,0 MM Lembar
6 Gypsum Board 9 mm Lembar
7 List Gypsum lbr 15-20cm M'
8 Asbes Semen M2
NO. JENIS BAHAN SATUAN
1 2 3
9 Triplek melamin Lembar
XI BAHAN PINTU
1 Pintu Besi M2
2 Pintu Fiber Warna Lbr
3 Pintu Fiber KM/WC (lengkap) Lbr
4 Pintu Panel kelas I Lbr
5 Pintu Panel Kelas II Lbr
NO. JENIS BAHAN SATUAN
1 2 3
6 Pintu Plywood (triplek depan blkg) Lbr
7 Pintu Teakwood (lapis jati) depan belakang Lbr
8 Vertical Blind M2
9 Rolling Door M2
10 Folding Gate M2
11 Pintu Aluminium Kaca Lbr
XV BAHAN CAT
1 Cat Tembok Standar Kg
2 Cat Tembok Akrilik Kg
3 Cat Tembok Weather Shield Kg
4 Cat Kayu Kg
5 Cat Dasar / Kapur Kg
6 Cat Dasar / Menie Kayu Kg
7 Cat Vernish Kg
8 Cat Impra Kg
9 Cat Residu Kg
10 Soda Api Kg
11 Plamir setara RJ Kg
12 Dempul Kayu Kg
13 Kertas Amplas Lbr
14 Kuas 3" Bh
15 Kuas Golong/rol Bh
16 Thinner Ltr
17 Flincote / Menie Besi Kg
185,781.63
190,781.63
195,781.63
207,296.00
221,640.00
178,976.00
384,960.00
276,640.00
2,879.30
2,331.73
74,598.40
550.00
22,153.28
45,153.28
42,799.20
17,799.20
120,500.00
87,500.00
1,653.28
1,853.28
20,753.28
60,328.00
196,320.00
295,984.00
HARGA SATUAN KET.
4 5
381,312.00
461,312.00
356,000.00
11,500.00
5,750.00
14,375.00
3,614,304.00
2,114,304.00
1,614,304.00
1,325,054.00
2,522.99
6,007.66
1,914,304.00
35,364.80
7,532.80
314,304.00
2,314,304.00
42,299.20
769,926.40
419,926.40
409,196.80
259,196.80
259,196.80
59,196.80
14,500.00
17,200.00
12,500.00
246,400.00
16,107.30
16,107.30
20,107.30
14,170.22
13,160.58
253,065.60
18,337.22
17,113.12
HARGA SATUAN KET.
4 5
14,275.90
14,275.90
19,275.90
19,275.90
19,275.90
20,275.90
24,275.90
20,275.90
345.00
25,107.60
196,600.00
196,600.00
196,600.00
60,106.56
32,006.56
15,806.56
9,085.24
4,585.24
2,255.94
2,860.94
85,306.56
9,645.24
5,055.94
2,455.94
1,460.80
2,385.83
3,268.98
12,061.32
11,850.00
1,395.80
2,385.83
3,268.98
13,361.32
7,761.32
35,106.56
225,306.56
18,580.53
HARGA SATUAN KET.
4 5
34,459.84
39,459.84
39,459.84
25,459.84
38,459.84
71,459.84
59,459.84
5,459.84
250,459.84
21,959.84
28,459.84
13,459.84
42,299.20
40,459.84
7,850.00
11,350.00
5,250.00
7,250.00
37,300.00
21,300.00
11,000.00
25,459.84
12,459.84
31,459.84
1,089.84
1,089.84
8,459.84
6,959.84
152,299.20
204,299.20
112,299.20
62,299.20
57,999.20
87,299.20
19,899.20
52,299.20
HARGA SATUAN KET.
4 5
77,299.20
4,283.20
6,633.20
9,333.20
11,133.20
13,883.20
23,033.20
31,333.20
59,383.20
15,383.20
60,383.20
90,383.20
123,383.20
39,383.20
21,383.20
31,383.20
52,383.20
10,383.20
100,383.20
258,320.00
338,320.00
1,788,320.00
273,320.00
1,338,320.00
488,320.00
5,291.60
160,383.20
15,383.20
538,320.00
638,320.00
1,388,320.00
1,638,320.00
3,238,320.00
698,320.00
792,320.00
288,320.00
798,320.00
508,320.00
HARGA SATUAN KET.
4 5
228,320.00
658,320.00
101,725.92
522,992.00
672,992.00
2,122,992.00
200,306.56
100,306.56
30,306.56
30,306.56
7,806.56
5,306.56
20,306.56
11,306.56
8,806.56
6,806.56
7,806.56
390,306.56
20,306.56
8,800.00
8,800.00
85,390.24
95,890.24
369,290.24
513,290.24
97,290.24
119,890.24
188,890.24
100,890.24
128,890.24
97,890.24
28,890.24
207,000.00
6,660.94
8,360.94
75,160.94
HARGA SATUAN KET.
4 5
50,160.94
74,383.20
310,383.20
100,383.20
94,229.92
188,229.92
14,729.92
14,729.92
21,829.92
27,229.92
50,229.92
19,459.84
25,459.84
75,459.84
38,459.84
6,459.84
27,459.84
56,459.84
41,959.84
10,259.84
12,059.84
27,659.84
38,859.84
6,214.96
17,414.96
26,464.96
19,459.84
16,959.84
112,700.00
4,025,000.00
29.19
3,036.48
31,286.48
5,200.00
21,050.00
25,836.48
12,536.48
2,025.72
HARGA SATUAN KET.
4 5
6,959.84
25,361.48
5,345.04
9,294.48
52,320.82
15,459.84
32,299.20
97,299.20
52,299.20
12,650.00
25,185.00
45,195.00
435,160.00
862,500.00
28,750.00
74,750.00
230,000.00
159,275.00
126,500.00
241,500.00
230,000.00
379,500.00
166,750.00
218,500.00
207,000.00
402,500.00
402,500.00
1,380,000.00
977,500.00
1,058,000.00
5,692,500.00
6,641,250.00
HARGA SATUAN KET.
4 5
1,707,750.00
1,771,000.00
661,250.00
402,500.00
661,250.00
690,000.00
230,000.00
3,500.00
4,000.00
4,000.00
4,500.00
4,500.00
5,000.00
5,500.00
5,500.00
6,000.00
XIV. PEKERJAAN SANITASI DALAM GEDUNG
A TENAGA
Pekerja L.01 OH 3.30
Tukang Batu L.02 OH 1.10
Kepala Tukang L.03 OH 0.01
Mandor L.04 OH 0.16
JUMLAH TENAGA KERJA
B BAHAN
Closet duduk Unit 1.00
6%x
Perlengkapan LS
Closet
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.00
Tukang Batu L.02 OH 1.50
Kepala Tukang L.03 OH 0.15
Mandor L.04 OH 0.16
JUMLAH TENAGA KERJA
B BAHAN
Closet jongkok Unit 1.00
Semen Portland Kg 6.00
Pasir Pasang M3 0.01
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
3 Pemasangan 1 Buah urinoir
A TENAGA
Pekerja L.01 OH 1.000
Tukang Batu L.02 OH 1.000
Kepala Tukang L.03 OH 0.100
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Urinoir Unit 1.000
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Perlengkapan % 30.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.200
Tukang Batu L.02 OH 1.450
Kepala Tukang L.03 OH 0.150
Mandor L.04 OH 0.060
JUMLAH TENAGA KERJA
B BAHAN
Wastafel Unit 1.200
Semen Portland Kg 6.000
Pasir pasang M3 0.010
Perlengkapan % 12.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
5 Pemasangan 1 M' Pipa PVC Diameter 1/2 Inchi
A TENAGA
Pekerja L.01 OH 0.036
Tukang Batu L.02 OH 0.060
Kepala Tukang L.03 OH 0.006
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Diameter 1/2 Inchi M1 1.200
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.036
Tukang Batu L.02 OH 0.060
Kepala Tukang L.03 OH 0.006
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Diameter 3/4 Inchi M1 1.200
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
7 Pemasangan 1 M' Pipa PVC Diameter 1 Inchi
A TENAGA
Pekerja L.01 OH 0.036
Tukang Batu L.02 OH 0.060
Kepala Tukang L.03 OH 0.006
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Diameter 1 Inchi M1 1.200
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.054
Tukang Batu L.02 OH 0.090
Kepala Tukang L.03 OH 0.009
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Diameter 2 Inchi M1 1.200
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081
Tukang Batu L.02 OH 0.135
Kepala Tukang L.03 OH 0.0135
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Diameter 2,50 Inchi M1 1.200
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081
Tukang Batu L.02 OH 0.135
Kepala Tukang L.03 OH 0.0135
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Diameter 3,0 Inchi M1 1.200
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.081
Tukang Batu L.02 OH 0.135
Kepala Tukang L.03 OH 0.0135
Mandor L.04 OH 0.004
JUMLAH TENAGA KERJA
B BAHAN
Pipa PVC Diameter 4,0 Inchi M1 1.200
Perlengkapan % 35.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 207,900.00
Rp 75,000.00 Rp 82,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 12,960.00
Rp 304,120.00
Rp 1,788,320.00 Rp 1,788,320.00
Rp 107,299.20 Rp 107,299.20
Rp 1,895,619.20
Rp 2,199,739.20
Rp 219,973.92
Rp 2,419,713.12
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 63,000.00
Rp 75,000.00 Rp 112,500.00
Rp 76,000.00 Rp 11,400.00
Rp 81,000.00 Rp 12,960.00
Rp 199,860.00
Rp 273,320.00 Rp 273,320.00
Rp 2,879.30 Rp 17,275.80
Rp 190,781.63 Rp 1,907.82
Rp 292,503.62
Rp 492,363.62
Rp 49,236.36
Rp 541,599.98
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 63,000.00
Rp 75,000.00 Rp 75,000.00
Rp 76,000.00 Rp 7,600.00
Rp 81,000.00 Rp 4,050.00
Rp 149,650.00
Rp 1,338,320.00 Rp 1,338,320.00
Rp 2,879.30 Rp 17,275.80
Rp 190,781.63 Rp 1,907.82
Rp 407,251.08 Rp 407,251.08
Rp 1,764,754.70
Rp 1,914,404.70
Rp 191,440.47
Rp 2,105,845.17
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 75,600.00
Rp 75,000.00 Rp 108,750.00
Rp 76,000.00 Rp 11,400.00
Rp 81,000.00 Rp 4,860.00
Rp 200,610.00
Rp 488,320.00 Rp 585,984.00
Rp 2,879.30 Rp 17,275.80
Rp 190,781.63 Rp 1,907.82
Rp 72,620.11 Rp 72,620.11
Rp 677,787.73
Rp 878,397.73
Rp 87,839.77
Rp 966,237.50
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 2,268.00
Rp 75,000.00 Rp 4,500.00
Rp 76,000.00 Rp 456.00
Rp 81,000.00 Rp 162.00
Rp 7,386.00
Rp 4,283.20 Rp 5,139.84
Rp 1,798.94 Rp 1,798.94
Rp 6,938.78
Rp 14,324.78
Rp 1,432.48
Rp 15,757.26
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 2,268.00
Rp 75,000.00 Rp 4,500.00
Rp 76,000.00 Rp 456.00
Rp 81,000.00 Rp 162.00
Rp 7,386.00
Rp 6,633.20 Rp 7,959.84
Rp 2,785.94 Rp 2,785.94
Rp 10,745.78
Rp 18,131.78
Rp 1,813.18
Rp 19,944.96
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 2,268.00
Rp 75,000.00 Rp 4,500.00
Rp 76,000.00 Rp 456.00
Rp 81,000.00 Rp 162.00
Rp 7,386.00
Rp 9,333.20 Rp 11,199.84
Rp 3,919.94 Rp 3,919.94
Rp 15,119.78
Rp 22,505.78
Rp 2,250.58
Rp 24,756.36
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 3,402.00
Rp 75,000.00 Rp 6,750.00
Rp 76,000.00 Rp 684.00
Rp 81,000.00 Rp 243.00
Rp 11,079.00
Rp 11,133.20 Rp 13,359.84
Rp 4,675.94 Rp 4,675.94
Rp 18,035.78
Rp 29,114.78
Rp 2,911.48
Rp 32,026.26
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 5,103.00
Rp 75,000.00 Rp 10,125.00
Rp 76,000.00 Rp 1,026.00
Rp 81,000.00 Rp 324.00
Rp 16,578.00
Rp 13,883.20 Rp 16,659.84
Rp 5,830.94 Rp 5,830.94
Rp 22,490.78
Rp 39,068.78
Rp 3,906.88
Rp 42,975.66
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 5,103.00
Rp 75,000.00 Rp 10,125.00
Rp 76,000.00 Rp 1,026.00
Rp 81,000.00 Rp 324.00
Rp 16,578.00
Rp 23,033.20 Rp 27,639.84
Rp 9,673.94 Rp 9,673.94
Rp 37,313.78
Rp 53,891.78
Rp 5,389.18
Rp 59,280.96
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 5,103.00
Rp 75,000.00 Rp 10,125.00
Rp 76,000.00 Rp 1,026.00
Rp 81,000.00 Rp 324.00
Rp 16,578.00
Rp 31,333.20 Rp 37,599.84
Rp 13,159.94 Rp 13,159.94
Rp 50,759.78
Rp 67,337.78
Rp 6,733.78
Rp 74,071.56
REKAPITULASI ANALISA PEKERJAAN
1 2 3
I. PEKERJAAN PERSIAPAN 1
2
3
4
5
6
1 2 3
IV. PEKERJAAN BETON 1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
NO. KELOMPOK PEKERJAAN JENIS PEKERJAAN
1 2 3
35
36
37
38
39
40
1 2 3
5
6
7
8
9
10
11
12
13
14
15
16
17
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
NO. KELOMPOK PEKERJAAN JENIS PEKERJAAN
1 2 3
19
20
21
22
X. PEKERJAAN ATAP 1
2
3
4
5
6
7
1 2 3
13
14
15
16
17
1 2 3
1 2 3
REKAPITULASI ANALISA PEKERJAAN
3 4
3 4
Membuat 1 M3 beton mutu f'c = 7,4 Mpa ( K 100 ), slump ( 12 2 ) cm, w/c = 0,87 Rp 1,204,965.97
Membuat 1 M3 beton mutu f'c = 9,8 Mpa ( K 125 ), slump ( 12 2 ) cm, w/c = 0,78 Rp 1,337,806.65
Membuat 1 M3 beton mutu f'c = 12,2 Mpa ( K 150 ), slump ( 12 2 ) cm, w/c = 0,72 Rp 1,407,167.13
Membuat 1 M3 lantai kerja beton mutu f'c = 7,4 Mpa ( K 100 ), slump ( 3 - 6 ) cm, w/c = 0,87 Rp 1,164,704.16
Membuat 1 M3 beton mutu f'c = 14,5 Mpa ( K 175 ), slump ( 12 2 ) cm, w/c = 0,66 Rp 1,488,877.26
Membuat 1 M3 beton mutu f'c = 16,9 Mpa ( K 200 ), slump ( 12 2 ) cm, w/c = 0,61 Rp 1,567,008.02
Membuat 1 M3 beton mutu f'c = 19,3 Mpa ( K 225 ), slump ( 12 2 ) cm, w/c = 0,58 Rp 1,625,034.70
Membuat 1 M3 beton mutu f'c = 21,7 Mpa ( K 250 ), slump ( 12 2 ) cm, w/c = 0,56 Rp 1,663,822.90
Membuat 1 M3 beton mutu f'c = 24 Mpa ( K 275 ), slump ( 12 2 ) cm, w/c = 0,53 Rp 1,730,077.10
Membuat 1 M3 beton mutu f'c = 26,4 Mpa ( K 300 ), slump ( 12 2 ) cm, w/c = 0,52 Rp 1,750,811.01
Membuat 1 M3 beton mutu f'c = 28,8 Mpa ( K 325 ), slump ( 12 2 ) cm, w/c = 0,49 Rp 1,868,702.93
Membuat 1 M3 beton mutu f'c = 31,2 Mpa ( K 350 ), slump ( 12 2 ) cm, w/c = 0,48 Rp 1,895,527.49
Pembesian 10 Kg dengan besi polos Rp 181,700.30
Pembesian 10 Kg dengan besi ulir Rp 212,885.30
Pemasangan 1 M2 bekisting untuk pondasi Rp 138,304.58
Pemasangan 1 M2 bekisting untuk sloof Rp 147,183.25
Pemasangan 1 M2 bekisting untuk kolom Rp 251,842.15
Pemasangan 1 M2 bekisting untuk Balok Rp 258,819.35
Pemasangan 1 M2 bekisting untuk lantai Rp 284,986.47
Pemasangan 1 M2 bekisting untuk dinding Rp 452,857.56
Pemasangan 1 M2 bekisting untuk Tangga Rp 233,790.83
Pemasangan 1 M2 jembatan Rangka Kayu untuk pengecoran beton Rp 76,095.32
Pemasangan 1 M3 pondasi beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 Kg besi + bekisting ) Rp 4,940,376.51
Pemasangan 1 M3 pondasi beton Camp. 1 PC : 2 Psr : 3 Krk ( termasuk bekisting ) Rp 2,388,385.94
Membuat 1 M3 sloof beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 200 Kg besi + bekisting ) Rp 6,005,652.49
Membuat 1 M3 sloof beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 Kg besi + bekisting ) Rp 5,154,988.97
Membuat 1 M3 kolom beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 200 Kg besi + bekisting ) Rp 7,424,767.03
Membuat 1 M3 kolom beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 Kg besi + bekisting ) Rp 6,547,526.46
Membuat 1 M3 balok beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 200 Kg besi + bekisting ) Rp 6,983,114.08
Membuat 1 M3 balok beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 Kg besi + bekisting ) Rp 6,132,450.55
Membuat 1 M3 pelat beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 kg besi + bekisting ) Rp 6,077,591.05
Membuat 1 M3 dinding beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 kg besi + bekisting ) Rp 5,962,022.23
Membuat 1 M3 dinding beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 200 kg besi + bekisting ) Rp 6,658,399.05
Membuat 1 M' kolom praktis beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 11 cm x 11 cm ) Rp 103,233.75
JENIS PEKERJAAN HARGA
3 4
Membuat 1 M' ring balok beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 10 cm x 15 cm ) Rp 126,703.65
Membuat 1 M3 Jalan Beton Mutu K.175 Rp 1,908,171.20
Membuat 1 M3 Dinding dan Lantai Drainase Beton Bertulang Mutu K-175 ( 60 Kg Besi ) Rp 3,375,450.37
Membuat 1 M3 Skor Drainase ( 160 Kg Besi + Bekisting ) Mutu K-175 Rp 5,414,395.97
Membuat Beton Camp. 1 PC : 3 Psr : 5 Krk Rp 1,158,740.71
Membuat Beton Camp. 1 PC : 2 Psr : 3 Krk Rp 1,637,465.81
3 4
Pemasangan 1 M2 Plesteran 1 PC : 5 PP Tebal 15 mm Rp 57,630.77
Pemasangan 1 M2 Plesteran 1 PC : 6 PP Tebal 15 mm Rp 55,408.20
Pemasangan 1 M2 Plesteran 1 PC : 7 PP Tebal 15 mm Rp 54,097.79
Pemasangan 1 M2 Plesteran 1 PC : 8 PP Tebal 15 mm Rp 52,787.38
Pemasangan 1 M2 Plesteran 1 PC : 1 PP Tebal 20 mm Rp 96,694.09
Pemasangan 1 M2 Plesteran 1 PC : 3 PP Tebal 20 mm Rp 76,691.79
Pemasangan 1 M2 Plesteran 1 PC : 4 PP Tebal 20 mm Rp 80,919.07
Pemasangan 1 M2 Plesteran 1 PC : 5 PP Tebal 20 mm Rp 77,089.19
Pemasangan 1 M2 Plesteran 1 PC : 6 PP Tebal 20 mm Rp 74,055.80
Pemasangan 1 M2 Berapen 1 PC : 5 PP Tebal 15 mm Rp 39,839.37
Pemasangan 1 M2 Plesteran Ciprat 1 PC : 2 PP Rp 46,154.09
Pemasangan 1 M2 Acian Rp 34,130.50
Pemasangan 1 M2 Finishing Siar Pasangan Bata Merah Rp 27,807.85
3 4
Pemasangan 1 M2 Dinding Batu Tempel Uk. 20 X 20 CM Rp 295,602.05
Pemasangan 1 M2 Dinding Batu Tempel Uk. 20 X 40 CM Rp 341,458.30
Pemasangan 1 M2 Wallpaper Lebar 50 CM Rp 222,021.93
Pemasangan 1 M' Plint Kayu Tebal 2 CM Lebar 10 CM Rp 32,466.18
Pembuatan & Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I Rp 6,845,702.33
Pembuatan & Pemasangan Kusen Kayu Kelas II Rp 4,916,940.77
Pembuatan dan Pemasangan 1 M2 Pintu Klamp Standar, Kayu Kelas II Rp 215,076.35
Pembuatan & Pemasangan 1 M2 Pintu Klamp Sederhana, Kayu Klam Kelas III Rp 193,076.35
Pembuatan & Pemasangan 1 M2 Daun Pintu Panel, Kayu Kelas I Rp 519,574.44
Pembuatan & Pemasangan 1M2 Pintu/Jendela Kaca Kayu Kelas II Rp 435,340.93
Pembuatan & Pemasangan 1 M2 Jalusi Pintu/Jendela Kayu Kelas II Rp 509,392.07
Pembuatan 1 M2 Daun Pintu Plywood Rangkap, Rangka Kayu Kelas II Tertutup ( Lebar sampai 90 cm ) Rp 383,788.15
Pembuatan & Pemasangan 1M2 Jalusi Kusen Kayu kelas II Rp 399,899.09
Pembuatan & Pemasangan 1 M2 Teakwood Rangka Ekspos Kayu Kelas I Rp 552,987.62
Pemasangan 1M3 Kuda-kuda Konvensional Kayu Kelas II Rp 4,248,736.95
Pemasangan 1 M3 Konstruksi Gordeng, Kayu Kelas II Rp 5,143,012.38
JENIS PEKERJAAN HARGA
3 4
Pemasangan 1 M2 Rangka Langit-langit 60x60 Kayu Kelas II Rp 83,844.34
Pemasangan 1 M2 Rangka Dinding Pemisah ( 60 x 120 ) CM Kayu Kelas II Rp 117,487.59
Pemasangan 1 M2 Dinding Pemisah Plywood Rangkap Rangka Kayu Kelas II Rp 211,593.40
Pemasangan 1 M' Listplank Ukuran ( 3x20 ) cm , Kayu Kelas II Rp 52,235.78
Pemasangan 1 M' Listplank Ukuran ( 3x30 ) Kayu Kelas II Rp 51,915.75
3 4
BANGKINANG, 2016
KEPALA DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN KAMPAR
Ir. H.CHALISMAN, MT
NIP. 19631026 199303 1 002
BANGKINANG, 2016
KEPALA DINAS CIPTA KARYA DAN TATA RUANG
KABUPATEN KAMPAR
3 4
Ir. H.CHALISMAN, MT
NIP. 19631026 199303 1 002
XI. HARGA SATUAN PEKERJAAN KAYU
1 Pembuatan & Pemasangan 1 m3 Kusen Pintu dan Kusen Jendela, Kayu Kelas I
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 7.000
Tukang Kayu L.02 OH 21.000
Kepala Tukang L.03 OH 2.100
Mandor L.04 OH 0.350
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu Kelas I M3 1.100
Paku 10 cm Kg 1.250
Lem Kayu Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 6.000
Tukang Kayu L.02 OH 18.000
Kepala Tukang L.03 OH 1.800
Mandor L.04 OH 0.300
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu Kelas II M3 1.200
Paku 10 cm Kg 1.250
Lem Kayu Kg 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
3 Pembuatan dan Pemasangan 1 M2 Pintu Klamp Standar, Kayu Kelas II
A TENAGA
Pekerja L.01 OH 0.350
Tukang Kayu L.02 OH 1.050
Kepala Tukang L.03 OH 0.105
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas II M3 0.040
Paku 5-7 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
4 Pembuatan & Pemasangan 1 M2 Pintu Klamp Sederhana, Kayu Klam Kelas III
A TENAGA
Pekerja L.01 OH 0.350
Tukang Kayu L.02 OH 1.050
Kepala Tukang L.03 OH 0.105
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kayu Kelas III M3 0.040
Paku 5 - 7 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.000
Tukang Kayu L.02 OH 3.000
Kepala Tukang L.03 OH 0.300
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas I M3 0.040
Lem Kayu Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.800
Tukang Kayu L.02 OH 2.400
Kepala Tukang L.03 OH 0.240
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas II M3 0.024
Kaca Tebal 3 MM M2 1.000
Lem Kayu Kg 0.300
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
7 Pembuatan & Pemasangan 1 M2 Jalusi Pintu/Jendela Kayu Kelas II
A TENAGA
Pekerja L.01 OH 1.000
Tukang Kayu L.02 OH 3.000
Kepala Tukang L.03 OH 0.300
Mandor L.04 OH 0.050
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas II M3 0.064
Lem Kayu Kg 0.500
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
8 Pembuatan 1 M2 Daun Pintu Plywood Rangkap, Rangka Kayu Kelas II Tertutup ( Lebar sampa
A TENAGA
Pekerja L.01 OH 0.700
Tukang Kayu L.02 OH 2.100
Kepala Tukang L.03 OH 0.210
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas II M3 0.025
Paku 1 cm - 2,5cm Kg 0.030
Lem Kayu Kg 0.500
Plywood tebal 4 mm Ukuran Lembar 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.670
Tukang Kayu L.02 OH 2.000
Kepala Tukang L.03 OH 0.200
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas II M3 0.060
Paku 1 cm - 2,5cm Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.800
Tukang Kayu L.02 OH 2.400
Kepala Tukang L.03 OH 0.240
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas I M3 0.025
Paku 1 cm - 2,5cm Kg 0.030
Lem Kayu Kg 0.300
Teakwood 3,60 mm Lembar 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.000
Tukang Kayu L.02 OH 12.000
Kepala Tukang L.03 OH 1.200
Mandor L.04 OH 0.200
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu Kelas II M3 1.100
Besi strip tebal 5mm Kg 15.000
Paku 12 cm Kg 5.600
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
12 Pemasangan 1 M3 Konstruksi Gordeng, Kayu Kelas II
A TENAGA
Pekerja L.01 OH 6.700
Tukang Kayu L.02 OH 20.100
Kepala Tukang L.03 OH 2.010
Mandor L.04 OH 0.335
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu Kelas II M3 1.100
Besi strip tebal 5mm Kg 15.000
Paku 12 cm Kg 3.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang Kayu L.02 OH 0.300
Kepala Tukang L.03 OH 0.030
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu 4 x 6 cm Kayu Kelas II M3 0.0163
Paku 7 10 cm Kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang Kayu L.02 OH 0.450
Kepala Tukang L.03 OH 0.045
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu Kelas II M3 0.028
Paku 7 10 cm Kg 0.150
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang Kayu L.03 OH 0.600
Kepala Tukang L.03 OH 0.060
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu Kelas II M3 0.028
Paku 7 10 cm Kg 0.150
Plywood 4 MM, 120 x 240 Lembar 0.860
Lem Kayu Kg 0.560
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas II M3 0.0108
Paku 5 dan 7 cm Kg 0.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Kelas II M3 0.011
Paku 5 dan 7 cm Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
Jendela, Kayu Kelas I
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 441,000.00
Rp 75,000.00 Rp 1,575,000.00
Rp 76,000.00 Rp 159,600.00
Rp 81,000.00 Rp 28,350.00
Rp 2,203,950.00
Rp 3,614,304.00 Rp 3,975,734.40
Rp 14,275.90 Rp 17,844.88
Rp 25,836.48 Rp 25,836.48
Rp 4,019,415.76
Rp 6,223,365.76
Rp 622,336.58
Rp 6,845,702.33
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 378,000.00
Rp 75,000.00 Rp 1,350,000.00
Rp 76,000.00 Rp 136,800.00
Rp 81,000.00 Rp 24,300.00
Rp 1,889,100.00
Rp 2,114,304.00 Rp 2,537,164.80
Rp 14,275.90 Rp 17,844.88
25,836.48 Rp 25,836.48
Rp 2,580,846.16
Rp 4,469,946.16
Rp 446,994.62
Rp 4,916,940.77
Kayu Kelas II
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 22,050.000
Rp 75,000.00 Rp 78,750.000
Rp 76,000.00 Rp 7,980.000
Rp 81,000.00 Rp 1,458.000
Rp 110,238.00
Rp 2,114,304.00 Rp 84,572.16
Rp 14,275.90 Rp 713.80
Rp 85,285.96
Rp 195,523.96
Rp 19,552.40
Rp 215,076.35
Rp 63,000.00 Rp 22,050.000
Rp 75,000.00 Rp 78,750.000
Rp 76,000.00 Rp 7,980.000
Rp 81,000.00 Rp 1,458.000
Rp 110,238.00
Rp 1,614,304.00 Rp 64,572.16
Rp 14,275.90 Rp 713.80
Rp 65,285.96
Rp 175,523.96
Rp 17,552.40
Rp 193,076.35
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 63,000.00
Rp 75,000.00 Rp 225,000.00
Rp 76,000.00 Rp 22,800.00
Rp 81,000.00 Rp 4,050.00
Rp 314,850.00
Rp 3,614,304.00 Rp 144,572.16
Rp 25,836.48 Rp 12,918.24
Rp 157,490.40
Rp 472,340.40
Rp 47,234.04
Rp 519,574.44
u Kelas II
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 50,400.000
Rp 75,000.00 Rp 180,000.000
Rp 76,000.00 Rp 18,240.000
Rp 81,000.00 Rp 3,240.000
Rp 251,880.00
Rp 2,114,304.00 Rp 50,743.30
Rp 85,390.24 Rp 85,390.24
Rp 25,836.48 Rp 7,750.94
Rp 143,884.48
Rp 395,764.48
Rp 39,576.45
Rp 435,340.93
yu Kelas II
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 63,000.00
Rp 75,000.00 Rp 225,000.00
Rp 76,000.00 Rp 22,800.00
Rp 81,000.00 Rp 4,050.00
Rp 314,850.00
Rp 2,114,304.00 Rp 135,315.46
Rp 25,836.48 Rp 12,918.24
Rp 148,233.70
Rp 463,083.70
Rp 46,308.37
Rp 509,392.07
Rp 63,000.00 Rp 44,100.000
Rp 75,000.00 Rp 157,500.000
Rp 76,000.00 Rp 15,960.000
Rp 81,000.00 Rp 2,835.000
Rp 220,395.00
Rp 2,114,304.00 Rp 52,857.60
Rp 14,275.90 Rp 428.28
Rp 25,836.48 Rp 12,918.24
Rp 62,299.20 Rp 62,299.20
Rp 128,503.32
Rp 348,898.32
Rp 34,889.83
Rp 383,788.15
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 42,210.000
Rp 75,000.00 Rp 150,000.000
Rp 76,000.00 Rp 15,200.000
Rp 81,000.00 Rp 27,135.000
Rp 234,545.00
Rp 2,114,304.00 Rp 126,858.24
Rp 14,275.90 Rp 2,141.39
Rp 128,999.63
Rp 363,544.63
Rp 36,354.46
Rp 399,899.09
Rp 63,000.00 Rp 50,400.000
Rp 75,000.00 Rp 180,000.000
Rp 76,000.00 Rp 18,240.000
Rp 81,000.00 Rp 3,240.000
Rp 251,880.00
Rp 3,614,304.00 Rp 90,357.60
Rp 14,275.90 Rp 428.28
Rp 25,836.48 Rp 7,750.94
Rp 152,299.20 Rp 152,299.20
Rp 250,836.02
Rp 502,716.02
Rp 50,271.60
Rp 552,987.62
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 252,000.00
Rp 75,000.00 Rp 900,000.00
Rp 76,000.00 Rp 91,200.00
Rp 81,000.00 Rp 16,200.00
Rp 1,259,400.00
Rp 2,114,304.00 Rp 2,325,734.40
Rp 13,160.58 Rp 197,408.70
Rp 14,275.90 Rp 79,945.04
Rp 2,603,088.14
Rp 3,862,488.14
Rp 386,248.81
Rp 4,248,736.95
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 422,100.000
Rp 75,000.00 Rp 1,507,500.000
Rp 76,000.00 Rp 152,760.000
Rp 81,000.00 Rp 27,135.000
Rp2,109,495.000
Rp 2,114,304.00 Rp 2,325,734.40
Rp 13,160.58 Rp 197,408.70
Rp 14,275.90 Rp 42,827.70
Rp 2,565,970.80
Rp 4,675,465.80
Rp 467,546.58
Rp 5,143,012.38
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 12,600.000
Rp 75,000.00 Rp 22,500.000
Rp 76,000.00 Rp 2,280.000
Rp 81,000.00 Rp 810.000
Rp 38,190.00
Rp 2,114,304.00 Rp 34,463.16
Rp 14,275.90 Rp 3,568.98
Rp 38,032.13
Rp 76,222.13
Rp 7,622.21
Rp 83,844.34
CM Kayu Kelas II
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 9,450.000
Rp 75,000.00 Rp 33,750.000
Rp 76,000.00 Rp 3,420.000
Rp 81,000.00 Rp 648.000
Rp 47,268.00
Rp 2,114,304.00 Rp 59,200.51
Rp 2,255.94 Rp 338.39
Rp 59,538.90
Rp 106,806.90
Rp 10,680.69
Rp 117,487.59
Rp 2,114,304.00 Rp 59,200.51
Rp 14,275.90 Rp 2,141.39
Rp 62,299.20 Rp 53,577.31
Rp 25,836.48 Rp 14,468.43
Rp 129,387.64
Rp 192,357.64
Rp 19,235.76
Rp 211,593.40
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 6,300.000
Rp 75,000.00 Rp 15,000.000
Rp 76,000.00 Rp 1,520.000
Rp 81,000.00 Rp 405.000
Rp 23,225.00
Rp 2,114,304.00 Rp 22,834.48
Rp 14,275.90 Rp 1,427.59
Rp 24,262.07
Rp 47,487.07
Rp 4,748.71
Rp 52,235.78
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 6,300.000
Rp 75,000.00 Rp 15,000.000
Rp 76,000.00 Rp 1,520.000
Rp 81,000.00 Rp 405.000
Rp 23,225.00
Rp 2,114,304.00 Rp 23,257.34
Rp 14,275.90 Rp 713.80
Rp 23,971.14
Rp 47,196.14
Rp 4,719.61
Rp 51,915.75
XV. PEKERJAAN LAIN - LAIN
Rp 31,500.00
Rp 1,500.00
Rp 1,520.00
Rp 162.00
Rp 34,682.00
Rp 62,824.64
Rp 1,300.47
Rp 64,125.11
Rp 98,807.11
Rp 9,880.71
Rp 108,687.82
JumlahHarga(Rp)
Rp 31,500.00
Rp 1,500.00
Rp 1,520.00
Rp 162.00
Rp 34,682.00
Rp 88,957.44
Rp 1,300.47
Rp 90,257.91
Rp 124,939.91
Rp 12,493.99
Rp 137,433.90
JumlahHarga(Rp)
Rp 1,260.00
Rp 150.00
Rp 81.00
Rp 1,491.00
Rp 13,941.72
Rp 156.96
Rp 6,286.08
Rp 20,384.76
Rp 21,875.76
Rp 2,187.58
Rp 24,063.34
Rp 1,260.00
Rp 81.00
Rp 1,341.00
Rp 1,957.82
Rp 1,957.82
Rp 3,298.82
Rp 329.88
Rp 3,628.70
JumlahHarga(Rp)
Rp 2,520.00
Rp 324.00
Rp 2,844.00
Rp 1,150.00
Rp 44,939.16
Rp 46,089.16
Rp 48,933.16
Rp 4,893.32
Rp 53,826.48
JumlahHarga(Rp)
Rp 5,040.00
Rp 60,000.00
Rp 6,080.00
Rp 324.00
Rp 71,444.00
Rp 230,000.00
Rp 230,000.00
Rp 301,444.00
Rp 30,144.40
Rp 331,588.40
I. PEKERJAAN PERSIAPAN
A TENAGA
Pekerja L.01 OH 0.400 Rp 63,000.00
Tukang Kayu L.02 OH 0.200 Rp 75,000.00
Kepala Tukang L.03 OH 0.020 Rp 76,000.00
Mandor L.04 OH 0.020 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu 8-10/400 cm Batang 1.250 Rp 7,532.80
Semen portland Kg 5.000 Rp 2,879.30
Pasir beton M3 0.005 Rp 195,781.63
Koral beton M3 0.009 Rp 221,640.00
Balok Kayu Uk. 5/7 CM Kelas II M3 0.072 Rp 2,114,304.00
Paku biasa 2 5 Kg 0.060 Rp 14,275.90
Residu Liter 0.400 Rp 10,259.84
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200 Rp 63,000.00
Tukang Kayu L.02 OH 0.400 Rp 75,000.00
Kepala Tukang L.03 OH 0.020 Rp 76,000.00
Mandor L.04 OH 0.020 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Dolken kayu 8-10/400 cm Batang 1.250 Rp 7,532.80
Semen portland Kg 2.500 Rp 2,879.30
Seng Gelombang Lbr 1.200 Rp 38,459.84
Pasir Beton M3 0.005 Rp 195,781.63
Koral Beton M3 0.009 Rp 221,640.00
Balok Kayu Uk. 5/7 CM Kelas II M3 0.072 Rp 2,114,304.00
Paku Biasa 2 " - 5 " Kg 0.060 Rp 14,275.90
Meni Besi Liter 0.450 Rp 16,959.84
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
3 Pengukuran dan pemasangan 1 M' bouwplank
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.100 Rp 63,000.00
Tukang Kayu L.02 OH 0.100 Rp 75,000.00
Kepala Tukang L.03 OH 0.010 Rp 76,000.00
Mandor L.04 OH 0.005 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Balok Uk. 5/7 CM Kelas III M3 0.012 Rp 1,614,304.00
Paku 2" - 3" Kg 0.020 Rp 14,275.90
Kayu Papan Uk. 3/20 CM Kelas II M3 0.007 Rp 1,614,304.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100 Rp 63,000.00
Mandor L.04 OH 0.050 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 13.334 Rp 63,000.00
Mandor L.04 OH 0.666 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 6.667 Rp 63,000.00
Mandor L.04 OH 0.333 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
JumlahHarga(Rp)
Rp 25,200.00
Rp 15,000.00
Rp 1,520.00
Rp 1,620.00
Rp 43,340.00
Rp 9,416.00
Rp 14,396.50
Rp 978.91
Rp 1,994.76
Rp 152,229.89
Rp 856.55
Rp 4,103.94
Rp 183,976.55
Rp 227,316.55
Rp 22,731.65
Rp 250,048.20
JumlahHarga(Rp)
Rp 12,600.00
Rp 30,000.00
Rp 1,520.00
Rp 1,620.00
Rp 45,740.00
Rp 9,416.00
Rp 7,198.25
Rp 46,151.81
Rp 978.91
Rp 1,994.76
Rp 152,229.89
Rp 856.55
Rp 7,631.93
Rp 226,458.10
Rp 272,198.10
Rp 27,219.81
Rp 299,417.91
JumlahHarga(Rp)
Rp 6,300.00
Rp 7,500.00
Rp 760.00
Rp 405.00
Rp 14,965.00
Rp 19,371.65
Rp 285.52
Rp 11,300.13
Rp 30,957.29
Rp 45,922.29
Rp 4,592.23
Rp 50,514.52
JumlahHarga(Rp)
Rp 6,300.00
Rp 4,050.00
Rp 10,350.00
Rp 10,350.00
Rp 1,035.00
Rp 11,385.00
JumlahHarga(Rp)
Rp 840,042.00
Rp 53,946.00
Rp 893,988.00
Rp 893,988.00
Rp 89,398.80
Rp 983,386.80
JumlahHarga(Rp)
Rp 420,021.00
Rp 26,973.00
Rp 446,994.00
Rp 446,994.00
Rp 44,699.40
Rp 491,693.40
II. PEKERJAAN TANAH
A TENAGA
Pekerja L.01 OH 0.750 Rp 63,000.00
Mandor L.04 OH 0.025 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.900 Rp 63,000.00
Mandor L.04 OH 0.045 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.000 Rp 63,000.00
Mandor L.04 OH 0.032 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.200 Rp 63,000.00
Mandor L.04 OH 0.045 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.330 Rp 63,000.00
Mandor L.04 OH 0.010 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.500 Rp 63,000.00
Mandor L.04 OH 0.050 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.500 Rp 63,000.00
Mandor L.04 OH 0.050 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300 Rp 63,000.00
Mandor L.04 OH 0.010 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Pasir Urug M3 1.200 185,781.63
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150 Rp 63,000.00
Mandor L.04 OH 0.015 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Ijuk Kg 6.000 15,459.84
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300 Rp 63,000.00
Mandor L.04 OH 0.010 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tanah Urug 1.200 87,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
JumlahHarga(Rp)
Rp 47,250.00
Rp 2,025.00
Rp 49,275.00
Rp 49,275.00
Rp 4,927.50
Rp 54,202.50
JumlahHarga(Rp)
Rp 56,700.00
Rp 3,645.00
Rp 60,345.00
Rp 60,345.00
Rp 6,034.50
Rp 66,379.50
JumlahHarga(Rp)
Rp 63,000.00
Rp 2,592.00
Rp 65,592.00
Rp 65,592.00
Rp 6,559.20
Rp 72,151.20
JumlahHarga(Rp)
Rp 94,500.00
Rp 4,860.00
Rp 99,360.00
Rp 99,360.00
Rp 9,936.00
Rp 109,296.00
JumlahHarga(Rp)
Rp 75,600.00
Rp 3,645.00
Rp 79,245.00
Rp 79,245.00
Rp 7,924.50
Rp 87,169.50
JumlahHarga(Rp)
Rp 20,790.00
Rp 810.00
Rp 21,600.00
Rp 21,600.00
Rp 2,160.00
Rp 23,760.00
JumlahHarga(Rp)
Rp 31,500.00
Rp 4,050.00
Rp 35,550.00
Rp 35,550.00
Rp 3,555.00
Rp 39,105.00
JumlahHarga(Rp)
Rp 31,500.00
Rp 4,050.00
Rp 35,550.00
Rp 35,550.00
Rp 3,555.00
Rp 39,105.00
JumlahHarga(Rp)
Rp 18,900.00
Rp 810.00
Rp 19,710.00
Rp 222,937.96
Rp 222,937.96
Rp 242,647.96
Rp 24,264.80
Rp 266,912.75
JumlahHarga(Rp)
Rp 9,450.00
Rp 1,215.00
Rp 10,665.00
Rp 92,759.04
Rp 92,759.04
Rp 103,424.04
Rp 10,342.40
Rp 113,766.44
JumlahHarga(Rp)
Rp 18,900.00
Rp 810.00
Rp 19,710.00
Rp 105,000.00
Rp 105,000.00
Rp 124,710.00
Rp 12,471.00
Rp 137,181.00
III. PEKERJAAN PONDASI
A TENAGA
Pekerja L.01 OH 1.500 Rp 63,000.00
Tukang Batu L.02 OH 0.750 Rp 75,000.00
Kepala Tukang L.03 OH 0.075 Rp 76,000.00
Mandor L.04 OH 0.075 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah M3 1.200 384,960.00
Semen Portland Kg 202.000 2,879.30
Pasir Pasang M3 0.485 190,781.63
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500 Rp 63,000.00
Tukang Batu L.02 OH 0.750 Rp 75,000.00
Kepala Tukang L.03 OH 0.075 Rp 76,000.00
Mandor L.04 OH 0.075 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah M3 1.200 384,960.00
Semen Portland Kg 163.000 2,879.30
Pasir Pasang M3 0.520 190,781.63
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.500 Rp 63,000.00
Tukang Batu L.02 OH 0.750 Rp 75,000.00
Kepala Tukang L.03 OH 0.075 Rp 76,000.00
Mandor L.04 OH 0.075 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu Belah M3 1.200 384,960.00
Semen Portland Kg 136.000 2,879.30
Pasir Pasang M3 0.544 190,781.63
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.600 Rp 63,000.00
Tukang Batu L.02 OH 0.200 Rp 75,000.00
Kepala Tukang L.03 OH 0.020 Rp 76,000.00
Mandor L.04 OH 0.030 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah Buah 140.000 Rp 550.00
Semen Portland Kg 43.500 Rp 2,879.30
Pasir Pasang M3 0.080 Rp 190,781.63
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.600 Rp 63,000.00
Tukang Batu L.02 OH 0.200 Rp 75,000.00
Kepala Tukang L.03 OH 0.020 Rp 76,000.00
Mandor L.04 OH 0.030 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah Buah 140.000 Rp 550.00
Semen Portland Kg 26.550 Rp 2,879.30
Pasir Pasang M3 0.093 Rp 190,781.63
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
6 Pemasangan 1 M3 pondasi sumuran diameter 100 cm
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 2.400 Rp 63,000.00
Tukang Batu L.02 OH 0.800 Rp 75,000.00
Kepala Tukang L.03 OH 0.080 Rp 76,000.00
Mandor L.04 OH 0.119 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Batu belah M3 0.450 Rp 384,960.00
Semen Portland Kg 194.000 Rp 2,879.30
Pasir beton M3 0.312 Rp 195,781.63
Kerikil M3 0.468 Rp 221,640.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.1000 Rp 63,000.00
Operator OH 0.1034 Rp 75,000.00
Mandor L.04 OH 0.0500 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Jump Piller Driver + Hammer Jam 0.050 862,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.7500 Rp 63,000.00
Mandor L.04 OH 0.0375 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
JumlahHarga(Rp)
Rp 94,500.00
Rp 56,250.00
Rp 5,700.00
Rp 6,075.00
Rp 162,525.00
Rp 461,952.00
Rp 581,618.60
Rp 92,529.09
Rp 1,136,099.69
Rp 1,298,624.69
Rp 129,862.47
Rp 1,428,487.16
JumlahHarga(Rp)
Rp 94,500.00
Rp 56,250.00
Rp 5,700.00
Rp 6,075.00
Rp 162,525.00
Rp 461,952.00
Rp 469,325.90
Rp 99,206.45
Rp 1,030,484.35
Rp 1,193,009.35
Rp 119,300.93
Rp 1,312,310.28
JumlahHarga(Rp)
Rp 94,500.00
Rp 56,250.00
Rp 5,700.00
Rp 6,075.00
Rp 162,525.00
Rp 461,952.00
Rp 391,584.80
Rp 103,785.21
Rp 957,322.01
Rp 1,119,847.01
Rp 111,984.70
Rp 1,231,831.71
JumlahHarga(Rp)
Rp 37,800.00
Rp 15,000.00
Rp 1,520.00
Rp 2,430.00
Rp 56,750.00
Rp 77,000.00
Rp 125,249.55
Rp 15,262.53
Rp 217,512.08
Rp 274,262.08
Rp 27,426.21
Rp 301,688.29
JumlahHarga(Rp)
Rp 37,800.00
Rp 15,000.00
Rp 1,520.00
Rp 2,430.00
Rp 56,750.00
Rp 77,000.00
Rp 76,445.42
Rp 17,742.69
Rp 171,188.11
Rp 227,938.11
Rp 22,793.81
Rp 250,731.92
JumlahHarga(Rp)
Rp 151,200.00
Rp 60,000.00
Rp 6,080.00
Rp 9,639.00
Rp 226,919.00
Rp 173,232.00
Rp 558,584.20
Rp 61,083.87
Rp 103,727.52
Rp 896,627.59
Rp 1,123,546.59
Rp 112,354.66
Rp 1,235,901.25
JumlahHarga(Rp)
Rp 6,300.00
Rp 7,755.00
Rp 4,050.00
Rp 18,105.00
Rp 43,125.00
Rp 43,125.00
Rp 61,230.00
Rp 6,123.00
Rp 67,353.00
JumlahHarga(Rp)
Rp 47,250.00
Rp 3,037.50
Rp 50,287.50
Rp 50,287.50
Rp 5,028.75
Rp 55,316.25
IV. PEKERJAAN BETON
1 Membuat 1 M3 beton mutu f'c = 7,4 Mpa ( K 100 ), slump ( 12 2 ) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Kepala Tukang L.03 OH 0.028 Rp 76,000.00
Mandor L.04 OH 0.083 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 247.000 Rp 2,879.30
Pasir beton M3 0.621 Rp 195,781.63
Kerikil ( Maks 30 MM ) Kg 0.555 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
2 Membuat 1 M3 beton mutu f'c = 9,8 Mpa ( K 125 ), slump ( 12 2 ) cm, w/c = 0,78
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Kepala Tukang L.03 OH 0.028 Rp 76,000.00
Mandor L.04 OH 0.083 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 276.000 Rp 2,879.30
Pasir beton M3 0.591 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.749 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
3 Membuat 1 M3 beton mutu f'c = 12,2 Mpa ( K 150 ), slump ( 12 2 ) cm, w/c = 0,72
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Kepala Tukang L.03 OH 0.028 Rp 76,000.00
Mandor L.04 OH 0.083 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 299.000 Rp 2,879.30
Pasir beton M3 0.571 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.753 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
4 Membuat 1 M3 lantai kerja beton mutu f'c = 7,4 Mpa ( K 100 ), slump ( 3 - 6 ) cm, w/c = 0,87
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.200 Rp 63,000.00
Tukang Batu L.02 OH 0.200 Rp 75,000.00
Kepala Tukang L.03 OH 0.020 Rp 76,000.00
Mandor L.04 OH 0.060 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 230.000 Rp 2,879.30
Pasir beton M3 0.638 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.760 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
5 Membuat 1 M3 beton mutu f'c = 14,5 Mpa ( K 175 ), slump ( 12 2 ) cm, w/c = 0,66
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Kepala Tukang L.03 OH 0.028 Rp 76,000.00
Mandor L.04 OH 0.083 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 326.000 Rp 2,879.30
Pasir beton M3 0.543 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.762 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
6 Membuat 1 M3 beton mutu f'c = 16,9 Mpa ( K 200 ), slump ( 12 2 ) cm, w/c = 0,61
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Kepala Tukang L.03 OH 0.028 Rp 76,000.00
Mandor L.04 OH 0.083 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 352.000 Rp 2,879.30
Pasir beton M3 0.522 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.763 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
7 Membuat 1 M3 beton mutu f'c = 19,3 Mpa ( K 225 ), slump ( 12 2 ) cm, w/c = 0,58
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Kepala Tukang L.03 OH 0.028 Rp 76,000.00
Mandor L.04 OH 0.083 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 371.000 Rp 2,879.30
Pasir beton M3 0.499 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.775 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
8 Membuat 1 M3 beton mutu f'c = 21,7 Mpa ( K 250 ), slump ( 12 2 ) cm, w/c = 0,56
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Kepala Tukang L.03 OH 0.028 Rp 76,000.00
Mandor L.04 OH 0.083 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 384.000 Rp 2,879.30
Pasir beton M3 0.494 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.769 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
9 Membuat 1 M3 beton mutu f'c = 24 Mpa ( K 275 ), slump ( 12 2 ) cm, w/c = 0,53
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Kepala Tukang L.03 OH 0.028 Rp 76,000.00
Mandor L.04 OH 0.083 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 406.000 Rp 2,879.30
Pasir beton M3 0.489 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.760 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
10 Membuat 1 M3 beton mutu f'c = 26,4 Mpa ( K 300 ), slump ( 12 2 ) cm, w/c = 0,52
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Kepala Tukang L.03 OH 0.028 Rp 76,000.00
Mandor L.04 OH 0.083 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 413 Rp 2,879.30
Pasir beton M3 0.486 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.756 Rp 221,640.00
Air Liter 215 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
11 Membuat 1 M3 beton mutu f'c = 28,8 Mpa ( K 325 ), slump ( 12 2 ) cm, w/c = 0,49
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 2.100 Rp 63,000.00
Tukang Batu L.02 OH 0.350 Rp 75,000.00
Kepala Tukang L.03 OH 0.035 Rp 76,000.00
Mandor L.04 OH 0.105 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 439.000 Rp 2,879.30
Pasir beton M3 0.479 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.745 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
12 Membuat 1 M3 beton mutu f'c = 31,2 Mpa ( K 350 ), slump ( 12 2 ) cm, w/c = 0,48
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 2.100 Rp 63,000.00
Tukang Batu L.02 OH 0.350 Rp 75,000.00
Kepala Tukang L.03 OH 0.035 Rp 76,000.00
Mandor L.04 OH 0.105 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 448.000 Rp 2,879.30
Pasir beton M3 0.476 Rp 195,781.63
Kerikil ( Maks 30 MM ) M3 0.740 Rp 221,640.00
Air Liter 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.070 Rp 63,000.00
Tukang Besi L.02 OH 0.070 Rp 75,000.00
Kepala Tukang L.03 OH 0.007 Rp 76,000.00
Mandor L.04 OH 0.004 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton Polos U-24 Kg 10.500 Rp 14,500.00
Kawat Beton Kg 0.150 Rp 16,107.30
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.070 Rp 63,000.00
Tukang Besi L.02 OH 0.070 Rp 75,000.00
Kepala Tukang L.03 OH 0.007 Rp 76,000.00
Mandor L.04 OH 0.004 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Besi beton Ulir U-39 Kg 10.500 Rp 17,200.00
Kawat Beton Kg 0.150 Rp 16,107.30
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.520 Rp 63,000.00
Tukang Kayu L.02 OH 0.260 Rp 75,000.00
Kepala Tukang L.03 OH 0.026 Rp 76,000.00
Mandor L.04 OH 0.026 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.040 Rp 1,614,304.00
Paku 5 - 10 Kg 0.300 Rp 14,275.90
Minyak bekisting Liter 0.100 Rp 5,345.04
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.520 Rp 63,000.00
Tukang Kayu L.02 OH 0.260 Rp 75,000.00
Kepala Tukang L.03 OH 0.026 Rp 76,000.00
Mandor L.04 OH 0.026 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.045 Rp 1,614,304.00
Paku 5 cm - 10 cm Kg 0.300 Rp 14,275.90
Minyak bekisting Liter 0.100 Rp 5,345.04
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.660 Rp 63,000.00
Tukang Kayu L.02 OH 0.330 Rp 75,000.00
Kepala Tukang L.03 OH 0.033 Rp 76,000.00
Mandor L.04 OH 0.033 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.040 Rp 1,614,304.00
Paku 5 cm - 10 cm Kg 0.400 Rp 14,275.90
Minyak bekisting Liter 0.200 Rp 5,345.04
Balok kayu kelas II M3 0.015 Rp 2,114,304.00
Plywood tebal 9 mm Lbr 0.350 Rp 112,299.20
Dolken kayu 8 - 10 cm panjang 4 Batang 2.000 Rp 7,532.80
m
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.660 Rp 63,000.00
Tukang Kayu L.02 OH 0.330 Rp 75,000.00
Kepala Tukang L.03 OH 0.033 Rp 76,000.00
Mandor L.04 OH 0.033 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.040 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 0.400 Rp 14,275.90
Minyak bekisting Liter 0.200 Rp 5,345.04
Balok kayu kelas II M3 0.018 Rp 2,114,304.00
Plywood tebal 9 mm Lbr 0.350 Rp 112,299.20
Dolken kayu 8 - 10 cm panjang 4 Batang 2.000 Rp 7,532.80
m
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.660 Rp 63,000.00
Tukang Kayu L.02 OH 0.330 Rp 75,000.00
Kepala Tukang L.03 OH 0.033 Rp 76,000.00
Mandor L.04 OH 0.033 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.030 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 0.400 Rp 14,275.90
Minyak bekisting Liter 0.200 Rp 5,345.04
Balok kayu kelas II M3 0.020 Rp 2,114,304.00
Plywood tebal 9 mm Lbr 0.350 Rp 112,299.20
Dolken kayu 8 - 10 cm panjang 4
m Batang 3.000 Rp 7,532.80
A TENAGA
Pekerja L.01 OH 0.660 Rp 63,000.00
Tukang Kayu L.02 OH 0.330 Rp 75,000.00
Kepala Tukang L.03 OH 0.033 Rp 76,000.00
Mandor L.04 OH 0.033 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.030 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 0.400 Rp 14,275.90
Minyak bekisting Liter 0.150 Rp 5,345.04
Balok kayu kelas II M3 0.015 Rp 2,114,304.00
Plywood tebal 9 mm Lbr 0.350 Rp 112,299.20
Dolken kayu 8 - 10 cm panjang 4 Batang 2.000 Rp 7,532.80
m
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150 Rp 63,000.00
Tukang Kayu L.02 OH 0.050 Rp 75,000.00
Kepala Tukang L.03 OH 0.005 Rp 76,000.00
Mandor L.04 OH 0.008 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III ( papan ) M3 0.026 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 0.600 Rp 14,275.90
Dolken kayu 8 - 10 cm panjang 4 Batang 0.500 Rp 7,532.80
m
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
23 Pemasangan 1 M3 pondasi beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 Kg besi + bekistin
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 5.300 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.300 Rp 75,000.00
Tukang Besi L.02 OH 1.050 Rp 75,000.00
Kepala Tukang L.03 OH 0.262 Rp 76,000.00
Mandor L.04 OH 0.265 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III ( papan ) M3 0.200 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 1.500 Rp 14,275.90
Minyak Bekisting Liter 0.400 Rp 5,345.04
Besi Beton Polos Kg 157.500 Rp 14,500.00
Kawat Beton Kg 2.250 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
24 Pemasangan 1 M3 pondasi beton Camp. 1 PC : 2 Psr : 3 Krk ( termasuk bekisting )
A TENAGA
Pekerja L.01 OH 5.300 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.300 Rp 75,000.00
Tukang Besi L.02 OH 1.050 Rp 75,000.00
Kepala Tukang L.03 OH 0.262 Rp 76,000.00
Mandor L.04 OH 0.265 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III ( papan ) M3 0.200 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 1.500 Rp 14,275.90
Minyak Bekisting Liter 0.400 Rp 5,345.04
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
25 Membuat 1 M3 sloof beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 200 Kg besi + bekisting )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 5.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.560 Rp 75,000.00
Tukang Besi L.02 OH 1.400 Rp 75,000.00
Kepala Tukang L.03 OH 0.323 Rp 76,000.00
Mandor L.04 OH 0.283 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III ( papan ) M3 0.270 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 2.000 Rp 14,275.90
Minyak Bekisting Liter 0.600 Rp 5,345.04
Besi Beton Polos Kg 210.000 Rp 14,500.00
Kawat Beton Kg 3.000 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
26 Membuat 1 M3 sloof beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 Kg besi + bekisting )
A TENAGA
Pekerja L.01 OH 5.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.560 Rp 75,000.00
Tukang Besi L.02 OH 1.400 Rp 75,000.00
Kepala Tukang L.03 OH 0.323 Rp 76,000.00
Mandor L.04 OH 0.283 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III ( papan ) M3 0.270 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 2.000 Rp 14,275.90
Minyak Bekisting Liter 0.600 Rp 5,345.04
Besi Beton Polos Kg 157.500 Rp 14,500.00
Kawat Beton Kg 2.250 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
27 Membuat 1 M3 kolom beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 200 Kg besi + bekisting )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 7.050 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.650 Rp 75,000.00
Tukang Besi L.02 OH 2.100 Rp 75,000.00
Kepala Tukang L.03 OH 0.403 Rp 76,000.00
Mandor L.04 OH 0.353 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III ( papan ) M3 0.400 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 4.000 Rp 14,275.90
Minyak Bekisting Liter 2.000 Rp 5,345.04
Besi Beton Polos Kg 210.000 Rp 14,500.00
Kawat Beton Kg 4.500 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
Kayu Kelas II Balok M3 0.150 Rp 2,114,304.00
Plywood 9 mm Lbr 3.500 Rp 112,299.20
Dolken Kayu ( 8 cm - 10 cm ) Batang 20.000 Rp 7,532.80
panjang 4 meter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
28 Membuat 1 M3 kolom beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 Kg besi + bekisting )
A TENAGA
Pekerja L.01 OH 7.050 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.650 Rp 75,000.00
Tukang Besi L.02 OH 2.100 Rp 75,000.00
Kepala Tukang L.03 OH 0.403 Rp 76,000.00
Mandor L.04 OH 0.353 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III ( papan ) M3 0.400 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 4.000 Rp 14,275.90
Minyak Bekisting Liter 2.000 Rp 5,345.04
Besi Beton Polos Kg 157.500 Rp 14,500.00
Kawat Beton Kg 2.250 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
Kayu Kelas II Balok M3 0.150 Rp 2,114,304.00
Plywood 9 mm Lbr 3.500 Rp 112,299.20
Dolken Kayu ( 8 cm - 10 cm ) Batang 20.000 Rp 7,532.80
panjang 4 meter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
29 Membuat 1 M3 balok beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 200 Kg besi + bekisting )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 6.350 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.650 Rp 75,000.00
Tukang Besi L.02 OH 1.400 Rp 75,000.00
Kepala Tukang L.03 OH 0.333 Rp 76,000.00
Mandor L.04 OH 0.318 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.320 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 3.200 Rp 14,275.90
Minyak Bekisting Liter 1.600 Rp 5,345.04
Besi Beton Polos Kg 210.000 Rp 14,500.00
Kawat Beton Kg 3.000 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
Kayu Kelas II Balok M3 0.140 Rp 2,114,304.00
Plywood 9 mm Lembar 2.800 Rp 112,299.20
Dolken Kayu ( 8 cm - 10 cm ) Batang 16.000 Rp 7,532.80
panjang 4 meter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
30 Membuat 1 M3 balok beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 Kg besi + bekisting )
A TENAGA
Pekerja L.01 OH 6.350 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.650 Rp 75,000.00
Tukang Besi L.02 OH 1.400 Rp 75,000.00
Kepala Tukang L.03 OH 0.333 Rp 76,000.00
Mandor L.04 OH 0.318 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.320 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 3.200 Rp 14,275.90
Minyak Bekisting Liter 1.600 Rp 5,345.04
Besi Beton Polos Kg 157.500 Rp 14,500.00
Kawat Beton Kg 2.250 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
Kayu Kelas II Balok M3 0.140 Rp 2,114,304.00
Plywood 9 mm Lembar 2.800 Rp 112,299.20
Dolken Kayu ( 8 cm - 10 cm ) Batang 16.000 Rp 7,532.80
panjang 4 meter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
31 Membuat 1 M3 pelat beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 kg besi + bekisting )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 5.300 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.300 Rp 75,000.00
Tukang Besi L.02 OH 1.050 Rp 75,000.00
Kepala Tukang L.03 OH 0.265 Rp 76,000.00
Mandor L.04 OH 0.265 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.320 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 3.200 Rp 14,275.90
Minyak Bekisting Liter 1.600 Rp 5,345.04
Besi Beton Polos Kg 157.500 Rp 14,500.00
Kawat Beton Kg 2.250 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
Kayu Kelas II Balok M3 0.120 Rp 2,114,304.00
Plywood 9 mm Lembar 2.800 Rp 112,299.20
Dolken Kayu ( 8 cm - 10 cm ) Batang 32.000 Rp 7,532.80
panjang 4 meter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
32 Membuat 1 M3 dinding beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 150 kg besi + bekisting )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 5.300 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.300 Rp 75,000.00
Tukang Besi L.02 OH 1.050 Rp 75,000.00
Kepala Tukang L.03 OH 0.262 Rp 76,000.00
Mandor L.04 OH 0.265 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.240 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 3.200 Rp 14,275.90
Minyak Bekisting Liter 1.600 Rp 5,345.04
Besi Beton Polos Kg 157.500 Rp 14,500.00
Kawat Beton Kg 2.250 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
Kayu Kelas II Balok M3 0.160 Rp 2,114,304.00
Plywood 9 mm Lembar 2.800 Rp 112,299.20
Dolken Kayu ( 8 cm - 10 cm ) Batang 24.000 Rp 7,532.80
panjang 4 meter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
33 Membuat 1 M3 dinding beton bertulang Camp. 1 PC : 2 Psr : 3 Krk ( 200 kg besi + bekisting )
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 5.650 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.560 Rp 75,000.00
Tukang Besi L.02 OH 1.400 Rp 75,000.00
Kepala Tukang L.03 OH 0.323 Rp 76,000.00
Mandor L.04 OH 0.283 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.250 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 3.000 Rp 14,275.90
Minyak Bekisting Liter 1.200 Rp 5,345.04
Besi Beton Polos Kg 210.000 Rp 14,500.00
Kawat Beton Kg 3.000 Rp 16,107.30
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
Kayu Kelas II Balok M3 0.105 Rp 2,114,304.00
Plywood 9 mm Lembar 2.500 Rp 112,299.20
Dolken Kayu ( 8 cm - 10 cm )
Batang 14.000 Rp 7,532.80
panjang 4 meter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.180 Rp 63,000.00
Tukang Batu L.02 OH 0.020 Rp 75,000.00
Tukang Kayu L.02 OH 0.020 Rp 75,000.00
Tukang Besi L.02 OH 0.020 Rp 75,000.00
Kepala Tukang L.03 OH 0.006 Rp 76,000.00
Mandor L.04 OH 0.009 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.002 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 0.010 Rp 14,275.90
Minyak Bekisting Liter 1.500 Rp 5,345.04
Besi Beton Polos Kg 3.000 Rp 14,500.00
Kawat Beton Kg 0.450 Rp 16,107.30
Semen Portland Kg 4.000 Rp 2,879.30
Pasir Beton M3 0.006 Rp 195,781.63
Kerikil M3 0.009 Rp 221,640.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.297 Rp 63,000.00
Tukang Batu L.02 OH 0.033 Rp 75,000.00
Tukang Kayu L.02 OH 0.033 Rp 75,000.00
Tukang Besi L.02 OH 0.033 Rp 75,000.00
Kepala Tukang L.03 OH 0.010 Rp 76,000.00
Mandor L.04 OH 0.015 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.003 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 0.020 Rp 14,275.90
Minyak Bekisting Liter 1.500 Rp 5,345.04
Besi Beton Polos Kg 3.600 Rp 14,500.00
Kawat Beton Kg 0.050 Rp 16,107.30
Semen Portland Kg 5.500 Rp 2,879.30
Pasir Beton M3 0.009 Rp 195,781.63
Kerikil M3 0.015 Rp 221,640.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 4.500 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 0.260 Rp 75,000.00
Kepala Tukang L.04 OH 0.423 Rp 76,000.00
Mandor L.05 OH 0.580 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Balok Kayu Kelas II Uk. 4/6 CM M3 0.019 2,114,304.00
Paku 5 Cm - 12 Cm KG 0.250 14,275.90
Papan Kayu Kelas II Uk. 2 x 20 CM M3 0.032 2,114,304.00
Semen Portland KG 326.000 Rp 2,879.30
Pasir Beton M3 0.543 Rp 195,781.63
Kerikil M3 0.762 Rp 221,640.00
Air LTR 215.000 Rp 29.19
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
37 Membuat 1 M3 Dinding dan Lantai Drainase Beton Bertulang Mutu K-175 ( 60 Kg Besi
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 5.300 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.300 Rp 75,000.00
Tukang Besi L.02 OH 1.050 Rp 75,000.00
Kepala Tukang L.03 OH 0.262 Rp 76,000.00
Mandor L.04 OH 0.265 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.133 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 1.330 Rp 14,275.90
Minyak Bekisting Liter 1.200 Rp 5,345.04
Besi Beton Polos Kg 60.000 Rp 14,500.00
Kawat Beton Kg 1.000 Rp 16,107.30
Semen Portland Kg 326.000 Rp 2,879.30
Pasir Beton M3 0.543 Rp 195,781.63
Kerikil M3 0.762 Rp 221,640.00
Air Liter 215.000 Rp 29.19
Plywood 9 mm Lembar 0.800 Rp 112,299.20
Dolken Kayu ( 8 cm - 10 cm )
Batang 8.000 Rp 7,532.80
panjang 4 meter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 5.300 Rp 63,000.00
Tukang Batu L.02 OH 0.275 Rp 75,000.00
Tukang Kayu L.02 OH 1.300 Rp 75,000.00
Tukang Besi L.02 OH 1.050 Rp 75,000.00
Kepala Tukang L.03 OH 0.262 Rp 76,000.00
Mandor L.04 OH 0.265 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kayu Kelas III M3 0.240 Rp 1,614,304.00
Paku 5 cm - 12 cm Kg 3.200 Rp 14,275.90
Besi Beton Polos Kg 160.00 Rp 14,500.00
Kawat Beton Kg 2.000 Rp 16,107.30
Semen Portland Kg 326.000 Rp 2,879.30
Pasir Beton M3 0.543 Rp 195,781.63
Kerikil M3 0.762 Rp 221,640.00
Air Liter 215.000 Rp 29.19
Plywood 9 mm Lembar 2.800 Rp 112,299.20
Dolken Kayu ( 8 cm - 10 cm ) Batang 4.000 Rp 7,532.80
panjang 4 meter
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.650 Rp 63,000.00
Tukang Batu L.02 OH 0.250 Rp 75,000.00
Kepala Tukang L.02 OH 0.025 Rp 76,000.00
Mandor L.02 OH 0.080 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 218.000 Rp 2,879.30
Pasir Beton M3 0.520 Rp 195,781.63
Kerikil M3 0.870 Rp 221,640.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
40 Membuat Beton Camp. 1 PC : 2 Psr : 3 Krk
No Uraian Kode Satuan Koefisien Harga Satuan (Rp)
A TENAGA
Pekerja L.01 OH 2.000 Rp 63,000.00
Tukang Batu L.02 OH 0.350 Rp 75,000.00
Kepala Tukang L.02 OH 0.035 Rp 76,000.00
Mandor L.02 OH 1.000 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland Kg 336.000 Rp 2,879.30
Pasir Beton M3 0.540 Rp 195,781.63
Kerikil M3 0.810 Rp 221,640.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
JumlahHarga(Rp)
Rp 103,950.00
Rp 20,625.00
Rp 2,128.00
Rp 6,723.00
Rp 133,426.00
Rp 711,187.10
Rp 121,524.45
Rp 123,010.20
Rp 6,275.85
Rp 961,997.60
Rp 1,095,423.60
Rp 109,542.36
Rp 1,204,965.97
JumlahHarga(Rp)
Rp 103,950.00
Rp 20,625.00
Rp 2,128.00
Rp 6,723.00
Rp 133,426.00
Rp 794,686.80
Rp 115,790.85
Rp 166,008.36
Rp 6,275.85
Rp 1,082,761.86
Rp 1,216,187.86
Rp 121,618.79
Rp 1,337,806.65
JumlahHarga(Rp)
Rp 103,950.00
Rp 20,625.00
Rp 2,128.00
Rp 6,723.00
Rp 133,426.00
Rp 860,910.70
Rp 111,735.37
Rp 166,894.92
Rp 6,275.85
Rp 1,145,816.84
Rp 1,279,242.84
Rp 127,924.28
Rp 1,407,167.13
Rp 75,600.00
Rp 15,000.00
Rp 1,520.00
Rp 4,860.00
Rp 96,980.00
Rp 662,239.00
Rp 124,880.71
Rp 168,446.40
Rp 6,275.85
Rp 961,841.96
Rp 1,058,821.96
Rp 105,882.20
Rp 1,164,704.16
JumlahHarga(Rp)
Rp 103,950.00
Rp 20,625.00
Rp 2,128.00
Rp 6,723.00
Rp 133,426.00
Rp 938,651.80
Rp 106,281.46
Rp 168,889.68
Rp 6,275.85
Rp 1,220,098.79
Rp 1,353,524.79
Rp 135,352.48
Rp 1,488,877.26
JumlahHarga(Rp)
Rp 103,950.00
Rp 20,625.00
Rp 2,128.00
Rp 6,723.00
Rp 133,426.00
Rp 1,013,513.60
Rp 102,225.98
Rp 169,111.32
Rp 6,275.85
Rp 1,291,126.75
Rp 1,424,552.75
Rp 142,455.27
Rp 1,567,008.02
JumlahHarga(Rp)
Rp 103,950.00
Rp 20,625.00
Rp 2,128.00
Rp 6,723.00
Rp 133,426.00
Rp 1,068,220.30
Rp 97,611.13
Rp 171,771.00
Rp 6,275.85
Rp 1,343,878.28
Rp 1,477,304.28
Rp 147,730.43
Rp 1,625,034.70
JumlahHarga(Rp)
Rp 103,950.00
Rp 20,625.00
Rp 2,128.00
Rp 6,723.00
Rp 133,426.00
Rp 1,105,651.20
Rp 96,772.06
Rp 170,441.16
Rp 6,275.85
Rp 1,379,140.27
Rp 1,512,566.27
Rp 151,256.63
Rp 1,663,822.90
JumlahHarga(Rp)
Rp 103,950.00
Rp 20,625.00
Rp 2,128.00
Rp 6,723.00
Rp 133,426.00
Rp 1,168,995.80
Rp 95,653.31
Rp 168,446.40
Rp 6,275.85
Rp 1,439,371.36
Rp 1,572,797.36
Rp 157,279.74
Rp 1,730,077.10
JumlahHarga(Rp)
Rp 103,950.00
Rp 20,625.00
Rp 2,128.00
Rp 6,723.00
Rp 133,426.00
Rp 1,189,150.90
Rp 95,233.78
Rp 167,559.84
Rp 6,275.85
Rp 1,458,220.37
Rp 1,591,646.37
Rp 159,164.64
Rp 1,750,811.01
JumlahHarga(Rp)
Rp 132,300.00
Rp 26,250.00
Rp 2,660.00
Rp 8,505.00
Rp 169,715.00
Rp 1,264,012.70
Rp 93,695.49
Rp 165,121.80
Rp 6,275.85
Rp 1,529,105.84
Rp 1,698,820.84
Rp 169,882.08
Rp 1,868,702.93
JumlahHarga(Rp)
Rp 132,300.00
Rp 26,250.00
Rp 2,660.00
Rp 8,505.00
Rp 169,715.00
Rp 1,289,926.40
Rp 93,275.96
Rp 164,013.60
Rp 6,275.85
Rp 1,553,491.81
Rp 1,723,206.81
Rp 172,320.68
Rp 1,895,527.49
JumlahHarga(Rp)
Rp 4,410.00
Rp 5,250.00
Rp 532.00
Rp 324.00
Rp 10,516.00
Rp 152,250.00
Rp 2,416.10
Rp 154,666.10
Rp 165,182.10
Rp 16,518.21
Rp 181,700.30
JumlahHarga(Rp)
Rp 4,410.00
Rp 5,250.00
Rp 532.00
Rp 324.00
Rp 10,516.00
Rp 180,600.00
Rp 2,416.10
Rp 183,016.10
Rp 193,532.10
Rp 19,353.21
Rp 212,885.30
JumlahHarga(Rp)
Rp 32,760.00
Rp 19,500.00
Rp 1,976.00
Rp 2,106.00
Rp 56,342.00
Rp 64,572.16
Rp 4,282.77
Rp 534.50
Rp 69,389.43
Rp 125,731.43
Rp 12,573.14
Rp 138,304.58
JumlahHarga(Rp)
Rp 32,760.00
Rp 19,500.00
Rp 1,976.00
Rp 2,106.00
Rp 56,342.00
Rp 72,643.68
Rp 4,282.77
Rp 534.50
Rp 77,460.95
Rp 133,802.95
Rp 13,380.30
Rp 147,183.25
JumlahHarga(Rp)
Rp 41,580.00
Rp 24,750.00
Rp 2,508.00
Rp 2,673.00
Rp 71,511.00
Rp 64,572.16
Rp 5,710.36
Rp 1,069.01
Rp 31,714.56
Rp 39,304.72
Rp 15,065.60
Rp 157,436.41
Rp 228,947.41
Rp 22,894.74
Rp 251,842.15
JumlahHarga(Rp)
Rp 41,580.00
Rp 24,750.00
Rp 2,508.00
Rp 2,673.00
Rp 71,511.00
Rp 64,572.16
Rp 5,710.36
Rp 1,069.01
Rp 38,057.47
Rp 39,304.72
Rp 15,065.60
Rp 163,779.32
Rp 235,290.32
Rp 23,529.03
Rp 258,819.35
JumlahHarga(Rp)
Rp 41,580.00
Rp 24,750.00
Rp 2,508.00
Rp 2,673.00
Rp 71,511.00
Rp 64,572.16
Rp 5,710.36
Rp 1,069.01
Rp 31,714.56
Rp 39,304.72
Rp 45,196.80
Rp 187,567.61
Rp 259,078.61
Rp 25,907.86
Rp 284,986.47
JumlahHarga(Rp)
Rp 41,580.00
Rp 24,750.00
Rp 2,508.00
Rp 2,673.00
Rp 71,511.00
Rp 48,429.12
Rp 5,710.36
Rp 1,069.01
Rp 42,286.08
Rp 39,304.72
Rp 22,598.40
Rp 180,780.00
Rp 340,177.69
Rp 411,688.69
Rp 41,168.87
Rp 452,857.56
JumlahHarga(Rp)
Rp 41,580.00
Rp 24,750.00
Rp 2,508.00
Rp 2,673.00
Rp 71,511.00
Rp 48,429.12
Rp 5,710.36
Rp 801.76
Rp 31,714.56
Rp 39,304.72
Rp 15,065.60
Rp 141,026.12
Rp 212,537.12
Rp 21,253.71
Rp 233,790.83
JumlahHarga(Rp)
JumlahHarga(Rp)
Rp 9,450.00
Rp 3,750.00
Rp 380.00
Rp 648.00
Rp 14,228.00
Rp 42,617.63
Rp 8,565.54
Rp 3,766.40
Rp 54,949.57
Rp 69,177.57
Rp 6,917.76
Rp 76,095.32
Rp 333,900.00
Rp 20,625.00
Rp 97,500.00
Rp 78,750.00
Rp 19,912.00
Rp 21,465.00
Rp 572,152.00
Rp 322,860.80
Rp 21,413.85
Rp 2,138.02
Rp 2,283,750.00
Rp 36,241.43
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 3,919,099.37
Rp 4,491,251.37
Rp 449,125.14
Rp 4,940,376.51
JumlahHarga(Rp)
Rp 333,900.00
Rp 20,625.00
Rp 97,500.00
Rp 78,750.00
Rp 19,912.00
Rp 21,465.00
Rp 572,152.00
Rp 322,860.80
Rp 21,413.85
Rp 2,138.02
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 1,599,107.95
Rp 2,171,259.95
Rp 217,125.99
Rp 2,388,385.94
Rp 355,950.00
Rp 20,625.00
Rp 117,000.00
Rp 105,000.00
Rp 24,548.00
Rp 22,923.00
Rp 646,046.00
Rp 435,862.08
Rp 28,551.80
Rp 3,207.02
Rp 3,045,000.00
Rp 48,321.90
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 4,813,638.08
Rp 5,459,684.08
Rp 545,968.41
Rp 6,005,652.49
JumlahHarga(Rp)
Rp 355,950.00
Rp 20,625.00
Rp 117,000.00
Rp 105,000.00
Rp 24,548.00
Rp 22,923.00
Rp 646,046.00
Rp 435,862.08
Rp 28,551.80
Rp 3,207.02
Rp 2,283,750.00
Rp 36,241.43
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 4,040,307.61
Rp 4,686,353.61
Rp 468,635.36
Rp 5,154,988.97
p. 1 PC : 2 Psr : 3 Krk ( 200 Kg besi + bekisting )
JumlahHarga(Rp)
Rp 444,150.00
Rp 20,625.00
Rp 123,750.00
Rp 157,500.00
Rp 30,628.00
Rp 28,593.00
Rp 805,246.00
Rp 645,721.60
Rp 57,103.60
Rp 10,690.08
Rp 3,045,000.00
Rp 72,482.85
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 317,145.60
Rp 393,047.20
Rp 150,656.00
Rp 5,944,542.21
Rp 6,749,788.21
Rp 674,978.82
Rp 7,424,767.03
JumlahHarga(Rp)
Rp 444,150.00
Rp 20,625.00
Rp 123,750.00
Rp 157,500.00
Rp 30,628.00
Rp 28,593.00
Rp 805,246.00
Rp 645,721.60
Rp 57,103.60
Rp 10,690.08
Rp 2,283,750.00
Rp 36,241.43
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 317,145.60
Rp 393,047.20
Rp 150,656.00
Rp 5,147,050.79
Rp 5,952,296.79
Rp 595,229.68
Rp 6,547,526.46
Rp 400,050.00
Rp 20,625.00
Rp 123,750.00
Rp 105,000.00
Rp 25,308.00
Rp 25,758.00
Rp 700,491.00
Rp 516,577.28
Rp 45,682.88
Rp 8,552.06
Rp 3,045,000.00
Rp 48,321.90
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 296,002.56
Rp 314,437.76
Rp 120,524.80
Rp 5,647,794.52
Rp 6,348,285.52
Rp 634,828.55
Rp 6,983,114.08
JumlahHarga(Rp)
Rp 400,050.00
Rp 20,625.00
Rp 123,750.00
Rp 105,000.00
Rp 25,308.00
Rp 25,758.00
Rp 700,491.00
Rp 516,577.28
Rp 45,682.88
Rp 8,552.06
Rp 2,283,750.00
Rp 36,241.43
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 296,002.56
Rp 314,437.76
Rp 120,524.80
Rp 4,874,464.05
Rp 5,574,955.05
Rp 557,495.50
Rp 6,132,450.55
Rp 333,900.00
Rp 20,625.00
Rp 97,500.00
Rp 78,750.00
Rp 20,140.00
Rp 21,465.00
Rp 572,380.00
Rp 516,577.28
Rp 45,682.88
Rp 8,552.06
Rp 2,283,750.00
Rp 36,241.43
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 253,716.48
Rp 314,437.76
Rp 241,049.60
Rp 4,952,702.77
Rp 5,525,082.77
Rp 552,508.28
Rp 6,077,591.05
Rp 333,900.00
Rp 20,625.00
Rp 97,500.00
Rp 78,750.00
Rp 19,912.00
Rp 21,465.00
Rp 572,152.00
Rp 387,432.96
Rp 45,682.88
Rp 8,552.06
Rp 2,283,750.00
Rp 36,241.43
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 338,288.64
Rp 314,437.76
Rp 180,787.20
Rp 4,847,868.21
Rp 5,420,020.21
Rp 542,002.02
Rp 5,962,022.23
Rp 355,950.00
Rp 20,625.00
Rp 117,000.00
Rp 105,000.00
Rp 24,548.00
Rp 22,923.00
Rp 646,046.00
Rp 403,576.00
Rp 42,827.70
Rp 6,414.05
Rp 3,045,000.00
Rp 48,321.90
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 222,001.92
Rp 280,748.00
Rp 105,459.20
Rp 5,407,044.05
Rp 6,053,090.05
Rp 605,309.00
Rp 6,658,399.05
Rp 11,340.00
Rp 1,500.00
Rp 1,500.00
Rp 1,500.00
Rp 456.00
Rp 729.00
Rp 17,025.00
Rp 3,228.61
Rp 142.76
Rp 8,017.56
Rp 43,500.00
Rp 7,248.29
Rp 11,517.20
Rp 1,174.69
Rp 1,994.76
Rp 76,823.86
Rp 93,848.86
Rp 9,384.89
Rp 103,233.75
Rp 18,711.00
Rp 2,475.00
Rp 2,475.00
Rp 2,475.00
Rp 760.00
Rp 1,215.00
Rp 28,111.00
Rp 4,842.91
Rp 285.52
Rp 8,017.56
Rp 52,200.00
Rp 805.37
Rp 15,836.15
Rp 1,762.03
Rp 3,324.60
Rp 87,074.14
Rp 115,185.14
Rp 11,518.51
Rp 126,703.65
Rp 283,500.00
Rp 20,625.00
Rp 19,500.00
Rp 32,148.00
Rp 46,980.00
Rp 402,753.00
Rp 40,594.64
Rp 3,568.98
Rp 67,657.73
Rp 938,651.80
Rp 106,309.43
Rp 168,889.68
Rp 6,275.85
Rp 1,331,948.09
Rp 1,734,701.09
Rp 173,470.11
Rp 1,908,171.20
Rp 333,900.00
Rp 20,625.00
Rp 97,500.00
Rp 78,750.00
Rp 19,912.00
Rp 21,465.00
Rp 572,152.00
Rp 214,702.43
Rp 18,986.95
Rp 6,414.05
Rp 870,000.00
Rp 16,107.30
Rp 938,651.80
Rp 106,309.43
Rp 168,889.68
Rp 6,275.85
Rp 89,839.36
Rp 60,262.40
Rp 2,496,439.24
Rp 3,068,591.24
Rp 306,859.12
Rp 3,375,450.37
JumlahHarga(Rp)
Rp 333,900.00
Rp 20,625.00
Rp 97,500.00
Rp 78,750.00
Rp 19,912.00
Rp 21,465.00
Rp 572,152.00
Rp 387,432.96
Rp 45,682.88
Rp 2,320,000.00
Rp 32,214.60
Rp 938,651.80
Rp 106,309.43
Rp 168,889.68
Rp 6,275.85
Rp 314,437.76
Rp 30,131.20
Rp 4,350,026.16
Rp 4,922,178.16
Rp 492,217.82
Rp 5,414,395.97
Rp 103,950.00
Rp 18,750.00
Rp 1,900.00
Rp 6,480.00
Rp 131,080.00
Rp 627,687.40
Rp 101,806.45
Rp 192,826.80
Rp 922,320.65
Rp 1,053,400.65
Rp 105,340.06
Rp 1,158,740.71
Jumlah Harga(Rp)
Rp 126,000.00
Rp 26,250.00
Rp 2,660.00
Rp 81,000.00
Rp 235,910.00
Rp 967,444.80
Rp 105,722.08
Rp 179,528.40
Rp 1,252,695.28
Rp 1,488,605.28
Rp 148,860.53
Rp 1,637,465.81
V. PEKERJAAN BESI DAN ALUMINIUM
A TENAGA
Pekerja L.01 OH 0.040
Tukang Besi Konstruksi L.03 OH 0.020
Kepala Tukang L.03 OH 0.002
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Kawat Las Listrik Kg 0.400
Solar Liter 0.300
Minyak Pelumas Liter 0.040
JUMLAH HARGA BAHAN
C PERALATAN
Sewa Alat Mesin Las Jam 0.170
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.200
Tukang Las Biasa L.03 OH 1.200
Kepala Tukang L.03 OH 0.120
Mandor L.04 OH 0.006
JUMLAH TENAGA KERJA
B BAHAN
Pintu Gulung Besi M2 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.440
Tukang Las Biasa L.03 OH 0.440
Kepala Tukang L.03 OH 0.044
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
Pintu Lipat Besi ( Folding Gate ) M2 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 1.670
Tukang Las L.03 OH 1.670
Kepala Tukang L.03 OH 0.167
Mandor L.04 OH 0.083
JUMLAH TENAGA KERJA
B BAHAN
Besi Strip Kg 6.177
Pengelasan cm 27.080
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.200
Tukang L.03 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Jendela Nako (Rangka + Kaca 5 mm) M2 1.100
Paku Skrup ( 1 cm - 2,5 cm ) Buah 10.000
Besi Strip M 7.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.043
Tukang Khusus Aluminium L.03 OH 0.043
Kepala Tukang L.03 OH 0.0043
Mandor L.04 OH 0.0021
JUMLAH TENAGA KERJA
B BAHAN
Profil Aluminium M2 1.100
Skrup Fixer Buah 2.000
Sealent Tube 0.060
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.350
Tukang L.03 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.018
JUMLAH TENAGA KERJA
B BAHAN
Venetions Blind dan Vertical Blinds M 1.000
( Tirai )
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
Jumlah Harga(Rp)
(Rp)
Rp 63,000.00 Rp 2,520.00
Rp 75,000.00 Rp 1,500.00
Rp 76,000.00 Rp 152.00
Rp 81,000.00 Rp 162.00
Rp 4,334.00
Rp 20,107.30 Rp 8,042.92
Rp 6,959.84 Rp 2,087.95
Rp 25,361.48 Rp 1,014.46
Rp 11,145.33
Rp 112,700.00 Rp 19,159.00
Rp 19,159.00
Rp 34,638.33
Rp 3,463.83
Rp 38,102.16
Harga Satuan
Jumlah Harga(Rp)
(Rp)
Rp 63,000.00 Rp 75,600.00
Rp 75,000.00 Rp 90,000.00
Rp 76,000.00 Rp 9,120.00
Rp 81,000.00 Rp 486.00
Rp 175,206.00
Rp 522,992.00 Rp 522,992.00
Rp 522,992.00
Rp 698,198.00
Rp 69,819.80
Rp 768,017.80
Harga Satuan
Jumlah Harga(Rp)
(Rp)
Rp 63,000.00 Rp 27,720.00
Rp 75,000.00 Rp 33,000.00
Rp 76,000.00 Rp 3,344.00
Rp 81,000.00 Rp 1,782.00
Rp 65,846.00
Rp 672,992.00 Rp 672,992.00
Rp 672,992.00
Rp 738,838.00
Rp 73,883.80
Rp 812,721.80
Harga Satuan
Jumlah Harga(Rp)
(Rp)
Rp 63,000.00 Rp 105,210.00
Rp 75,000.00 Rp 125,250.00
Rp 76,000.00 Rp 12,692.00
Rp 81,000.00 Rp 6,723.00
Rp 249,875.00
13,160.58 Rp 81,292.90
3,810.22 Rp 103,180.66
Rp 184,473.56
Rp 434,348.56
Rp 43,434.86
Rp 477,783.42
Harga Satuan
Jumlah Harga(Rp)
(Rp)
Rp 63,000.00 Rp 12,600.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 81.00
Rp 29,201.00
Rp 97,890.24 Rp 107,679.26
Rp 14,275.90 Rp 142,759.00
Rp 13,160.58 Rp 92,124.06
Rp 342,562.32
Rp 371,763.32
Rp 37,176.33
Rp 408,939.66
Harga Satuan
Jumlah Harga(Rp)
(Rp)
Rp 63,000.00 Rp 2,709.00
Rp 75,000.00 Rp 3,225.00
Rp 76,000.00 Rp 326.80
Rp 81,000.00 Rp 170.10
Rp 6,430.90
Rp 25,107.60 Rp 27,618.36
Rp 345.00 Rp 690.00
Rp 12,536.48 Rp 752.19
Rp 29,060.55
Rp 35,491.45
Rp 3,549.14
Rp 39,040.59
Harga Satuan
Jumlah Harga(Rp)
(Rp)
Rp 63,000.00 Rp 22,050.00
Rp 75,000.00 Rp 26,250.00
Rp 76,000.00 Rp 2,660.00
Rp 81,000.00 Rp 1,458.00
Rp 52,418.00
Rp 101,725.92 Rp 101,725.92
Rp 101,725.92
Rp 154,143.92
Rp 15,414.39
Rp 169,558.31
VI. PEKERJAAN PASANGAN DINDING
A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 140.000
Semen Protland Kg 43.500
Pasir Pasang M3 0.080
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 140.000
Semen Protland Kg 32.950
Pasir Pasang M3 0.091
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
3 Pemasangan 1 M2 dinding bata merah 1 batu camp. 1PC:4PP
A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 140.000
Semen Protland Kg 26.550
Pasir Pasang M3 0.093
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 140.000
Semen Protland Kg 22.200
Pasir Pasang M3 0.102
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.600
Tukang Batu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.030
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 140.000
Semen Protland Kg 18.500
Pasir Pasang M3 0.122
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 70.000
Semen Protland Kg 18.950
Pasir Pasang M3 0.038
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 70.000
Semen Protland Kg 14.370
Pasir Pasang M3 0.040
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 70.000
Semen Protland Kg 11.500
Pasir Pasang M3 0.043
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
9 Pemasangan 1 M2 dinding bata merah 1/2 batu camp. 1PC:5PP
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 70.000
Semen Protland Kg 9.680
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Bata Merah Buah 70.000
Semen Portland Kg 8.320
Pasir Pasang M3 0.049
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 37,800.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 2,430.00
Rp 56,750.00
Rp 550.00 Rp 77,000.00
Rp 2,879.30 Rp 125,249.55
Rp 190,781.63 Rp 15,262.53
Rp 217,512.08
Rp 274,262.08
Rp 27,426.21
Rp 301,688.29
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 37,800.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 2,430.00
Rp 56,750.00
Rp 550.00 Rp 77,000.00
Rp 2,879.30 Rp 94,872.94
Rp 190,781.63 Rp 17,361.13
Rp 189,234.06
Rp 245,984.06
Rp 24,598.41
Rp 270,582.47
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 37,800.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 2,430.00
Rp 56,750.00
Rp 550.00 Rp 77,000.00
Rp 2,879.30 Rp 76,445.42
Rp 190,781.63 Rp 17,742.69
Rp 171,188.11
Rp 227,938.11
Rp 22,793.81
Rp 250,731.92
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 37,800.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 2,430.00
Rp 56,750.00
Rp 550.00 Rp 77,000.00
Rp 2,879.30 Rp 63,920.46
Rp 190,781.63 Rp 19,459.73
Rp 160,380.19
Rp 217,130.19
Rp 21,713.02
Rp 238,843.20
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 37,800.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 2,430.00
Rp 56,750.00
Rp 550.00 Rp 77,000.00
Rp 2,879.30 Rp 53,267.05
Rp 190,781.63 Rp 23,275.36
Rp 153,542.41
Rp 210,292.41
Rp 21,029.24
Rp 231,321.65
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 7,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 1,215.00
Rp 28,375.00
Rp 550.00 Rp 38,500.00
Rp 2,879.30 Rp 54,562.74
Rp 190,781.63 Rp 7,249.70
Rp 100,312.44
Rp 128,687.44
Rp 12,868.74
Rp 141,556.18
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 7,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 1,215.00
Rp 28,375.00
Rp 550.00 Rp 38,500.00
Rp 2,879.30 Rp 41,375.54
Rp 190,781.63 Rp 7,631.27
Rp 87,506.81
Rp 115,881.81
Rp 11,588.18
Rp 127,469.99
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 7,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 1,215.00
Rp 28,375.00
Rp 550.00 Rp 38,500.00
Rp 2,879.30 Rp 33,111.95
Rp 190,781.63 Rp 8,203.61
Rp 79,815.56
Rp 108,190.56
Rp 10,819.06
Rp 119,009.62
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 7,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 1,215.00
Rp 28,375.00
Rp 550.00 Rp 38,500.00
Rp 2,879.30 Rp 27,871.62
Rp 190,781.63 Rp 8,585.17
Rp 74,956.80
Rp 103,331.80
Rp 10,333.18
Rp 113,664.98
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 7,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 1,215.00
Rp 28,375.00
Rp 550.00 Rp 38,500.00
Rp 2,879.30 Rp 23,955.78
Rp 190,781.63 Rp 9,348.30
Rp 71,804.08
Rp 100,179.08
Rp 10,017.91
Rp 110,196.98
VII. PEKERJAAN PLESTERAN
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 15.504
Pasir Pasang M3 0.016
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 10.224
Pasir Pasang M3 0.020
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 7.776
Pasir Pasang M3 0.023
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 6.240
Pasir Pasang M3 0.024
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 5.184
Pasir Pasang M3 0.026
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 4.416
Pasir Pasang M3 0.027
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 3.936
Pasir Pasang M3 0.028
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 3.456
Pasir Pasang M3 0.029
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang Batu L.03 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 13.632
Pasir Pasang M3 0.027
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.260
Tukang Batu L.03 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 10.368
Pasir Pasang M3 0.031
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang Batu L.03 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 8.320
Pasir Pasang M3 0.032
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.400
Tukang Batu L.03 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 6.912
Pasir Pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
13 Pemasangan 1 M2 Plesteran 1 PC : 6 PP Tebal 20 mm
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.400
Tukang Batu L.03 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.022
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 5.888
Pasir Pasang M3 0.036
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang Batu L.03 OH 0.075
Kepala Tukang L.03 OH 0.008
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 5.184
Pasir Pasang M3 0.026
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.300
Tukang Batu L.03 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.015
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 4.320
Pasir Pasang M3 0.006
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
16 Pemasangan 1 M2 Acian
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.200
Tukang Batu L.03 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.010
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 3.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang Batu L.03 OH 0.075
Kepala Tukang L.03 OH 0.008
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Portland Cement Kg 3.108
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 1,215.00
Rp 32,505.00
Rp 2,879.30 Rp 44,640.67
Rp 190,781.63 Rp 3,052.51
Rp 47,693.17
Rp 80,198.17
Rp 8,019.82
Rp 88,217.99
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 1,215.00
Rp 32,505.00
Rp 2,879.30 Rp 29,437.96
Rp 190,781.63 Rp 3,815.63
Rp 33,253.60
Rp 65,758.60
Rp 6,575.86
Rp 72,334.46
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 1,215.00
Rp 32,505.00
Rp 2,879.30 Rp 22,389.44
Rp 190,781.63 Rp 4,387.98
Rp 26,777.41
Rp 59,282.41
Rp 5,928.24
Rp 65,210.66
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 1,215.00
Rp 32,505.00
Rp 2,879.30 Rp 17,966.83
Rp 190,781.63 Rp 4,578.76
Rp 22,545.59
Rp 55,050.59
Rp 5,505.06
Rp 60,555.65
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 1,215.00
Rp 32,505.00
2,879.30 Rp 14,926.29
190,781.63 Rp 4,960.32
Rp 19,886.61
Rp 52,391.61
Rp 5,239.16
Rp 57,630.77
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 1,215.00
Rp 32,505.00
2,879.30 Rp 12,714.99
190,781.63 Rp 5,151.10
Rp 17,866.09
Rp 50,371.09
Rp 5,037.11
Rp 55,408.20
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 1,215.00
Rp 32,505.00
2,879.30 Rp 11,332.92
190,781.63 Rp 5,341.89
Rp 16,674.81
Rp 49,179.81
Rp 4,917.98
Rp 54,097.79
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 1,215.00
Rp 32,505.00
2,879.30 Rp 9,950.86
190,781.63 Rp 5,532.67
Rp 15,483.53
Rp 47,988.53
Rp 4,798.85
Rp 52,787.38
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 25,200.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 1,782.00
Rp 43,502.00
2,879.30 Rp 39,250.62
190,781.63 Rp 5,151.10
Rp 44,401.72
Rp 87,903.72
Rp 8,790.37
Rp 96,694.09
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 16,380.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 1,053.00
Rp 33,953.00
2,879.30 Rp 29,852.58
190,781.63 Rp 5,914.23
Rp 35,766.81
Rp 69,719.81
Rp 6,971.98
Rp 76,691.79
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 25,200.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 1,782.00
Rp 43,502.00
2,879.30 Rp 23,955.78
190,781.63 Rp 6,105.01
Rp 30,060.79
Rp 73,562.79
Rp 7,356.28
Rp 80,919.07
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 25,200.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 1,782.00
Rp 43,502.00
2,879.30 Rp 19,901.72
190,781.63 Rp 6,677.36
Rp 26,579.08
Rp 70,081.08
Rp 7,008.11
Rp 77,089.19
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 25,200.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 1,782.00
Rp 43,502.00
2,879.30 Rp 16,953.32
190,781.63 Rp 6,868.14
Rp 23,821.46
Rp 67,323.46
Rp 6,732.35
Rp 74,055.80
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 9,450.00
Rp 75,000.00 Rp 5,625.00
Rp 76,000.00 Rp 608.00
Rp 81,000.00 Rp 648.00
Rp 16,331.00
2,879.30 Rp 14,926.29
190,781.63 Rp 4,960.32
Rp 19,886.61
Rp 36,217.61
Rp 3,621.76
Rp 39,839.37
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 18,900.00
Rp 75,000.00 Rp 7,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 1,215.00
Rp 28,375.00
2,879.30 Rp 12,438.58
190,781.63 Rp 1,144.69
Rp 13,583.27
Rp 41,958.27
Rp 4,195.83
Rp 46,154.09
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 12,600.00
Rp 75,000.00 Rp 7,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 810.00
Rp 21,670.00
2,879.30 Rp 9,357.73
Rp 9,357.73
Rp 31,027.73
Rp 3,102.77
Rp 34,130.50
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 9,450.00
Rp 75,000.00 Rp 5,625.00
Rp 76,000.00 Rp 608.00
Rp 81,000.00 Rp 648.00
Rp 16,331.00
2,879.30 Rp 8,948.86
Rp 8,948.86
Rp 25,279.86
Rp 2,527.99
Rp 27,807.85
VIII. PEKERJAAN PENUTUP LANTAI & PENUTUP DINDING
A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala Tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu Uk. 40 x 40 cm Buah 6.630
Semen portland Kg 9.800
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala Tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu Uk. 30 x 30 cm Buah 11.870
Semen portland Kg 10.000
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
3 Pemasangan 1 m2 lantai ubin PC abu-abu ukuran 20x20
A TENAGA
Pekerja L.01 OH 0.270
Tukang Batu L.02 OH 0.135
Kepala Tukang L.03 OH 0.014
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Ubin abu-abu Uk. 20 x 20 cm Bh 26.500
Semen portland Kg 10.400
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.240
Tukang Batu L.02 OH 0.120
Kepala Tukang L.03 OH 0.012
Mandor L.04 OH 0.012
JUMLAH TENAGA KERJA
B BAHAN
Homogenius Uk. 60 x 60 cm Bh 3.100
Semen portland Kg 9.600
Semen warna Kg 1.500
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala Tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Homogenius Uk.40 x 40 cm Bh 6.630
Semen portland Kg 9.800
Semen warna Kg 1.300
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
6 Pemasangan 1 M2 Lantai Homogenius Uk. 30/30
A TENAGA
Pekerja L.01 OH 0.260
Tukang Batu L.02 OH 0.130
Kepala Tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Homogenius Uk. 30 x 30 cm Bh 11.870
Semen portland Kg 10.000
Semen warna Kg 1.500
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250
Tukang Batu L.02 OH 0.125
Kepala Tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna Uk.40 x 40 cm Bh 6.630
Semen portland Kg 9.800
Semen warna Kg 1.300
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.260
Tukang Batu L.02 OH 0.130
Kepala Tukang L.03 OH 0.013
Mandor L.04 OH 0.013
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna Uk. 30 x 30 cm Buah 11.870
Semen portland Kg 10.000
Semen warna Kg 1.500
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
9 Pemasangan 1 m2 lantai keramik warna ukuran 20x20
A TENAGA
Pekerja L.01 OH 0.270
Tukang Batu L.02 OH 0.135
Kepala Tukang L.03 OH 0.014
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna Uk. 20 x 20 cm Buah 26.500
Semen portland Kg 10.400
Semen warna Kg 1.620
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang Batu L.02 OH 0.090
Kepala Tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Plint Keramik Warna Uk. 10 x 20 cm Buah 5.300
Semen portland Kg 1.140
Semen warna Kg 0.100
Pasir Pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
11 Pemasangan 1 m' plint keramik warna ukuran 10 x 30 cm
A TENAGA
Pekerja L.01 OH 0.090
Tukang Batu L.02 OH 0.090
Kepala Tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna Uk. 10 x 30 cm Buah 3.530
Semen portland Kg 1.140
Semen warna Kg 0.100
Pasir Pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang Batu L.02 OH 0.090
Kepala Tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna Uk. 10 x 40 cm Buah 2.650
Semen portland Kg 1.140
Semen warna Kg 0.100
Pasir Pasang M3 0.030
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang Batu L.02 OH 0.090
Kepala Tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Homogenius Uk. 10 x 60 cm M1 1.700
Semen portland Kg 1.140
Semen warna Kg 0.100
Pasir Pasang M3 0.003
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.090
Tukang Batu L.02 OH 0.090
Kepala Tukang L.03 OH 0.009
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Homogenius Uk. 10 x 40 cm M1 1.700
Semen portland Kg 1.140
Semen warna Kg 0.100
Pasir Pasang M3 0.030
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.270
Tukang Batu L.02 OH 0.130
Kepala Tukang L.03 OH 0.013
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Keramik warna Uk. 20 x 20 cm Buah 26.500
Semen portland Kg 9.300
Pasir pasang M3 0.018
Semen warna Kg 1.940
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.270
Tukang Batu L.02 OH 0.130
Kepala Tukang L.03 OH 0.013
Mandor L.04 OH 0.014
JUMLAH TENAGA KERJA
B BAHAN
Keramik Uk. 20 x 25 cm Buah 21.500
Semen portland Kg 10.400
Semen warna Kg 1.620
Pasir Pasang M3 0.045
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
17 Pemasangan 1 M2 Lantai Karpet
A TENAGA
Pekerja L.01 OH 0.170
Tukang Kayu L.02 OH 0.170
Kepala Tukang L.03 OH 0.017
Mandor L.04 OH 0.009
JUMLAH TENAGA KERJA
B BAHAN
Karpet M2 1.050
Lem Kg 0.350
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang Kayu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Parquet M2 1.050
Lem Kg 0.600
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
19 Pemasangan 1 M2 Dinding Batu Tempel Uk. 20 X 20 CM
A TENAGA
Pekerja L.01 OH 0.700
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu Tempel Bh 26.500
Semen Portland Kg 11.750
Pasir Pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.700
Tukang Batu L.02 OH 0.350
Kepala Tukang L.03 OH 0.035
Mandor L.04 OH 0.035
JUMLAH TENAGA KERJA
B BAHAN
Batu Tempel Bh 13.500
Semen Portland Kg 11.750
Pasir Pasang M3 0.035
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.350
Tukang Batu L.02 OH 0.175
Kepala Tukang L.03 OH 0.017
Mandor L.04 OH 0.002
JUMLAH TENAGA KERJA
B BAHAN
Wallpaper M 2.200
Lem Kg 0.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
Rp 63,000.00 Rp 15,750.00
Rp 75,000.00 Rp 9,375.00
Rp 76,000.00 Rp 988.00
Rp 81,000.00 Rp 1,053.00
Rp 27,166.00
Rp 9,085.24 Rp 60,235.14
Rp 2,879.30 Rp 28,217.14
Rp 190,781.63 Rp 8,585.17
Rp 97,037.45
Rp 124,203.45
Rp 12,420.35
Rp 136,623.80
Rp 63,000.00 Rp 15,750.00
Rp 75,000.00 Rp 9,375.00
Rp 76,000.00 Rp 988.00
Rp 81,000.00 Rp 1,053.00
Rp 27,166.00
4,585.24 Rp 54,426.80
2,879.30 Rp 28,793.00
190,781.63 Rp 8,585.17
Rp 91,804.97
Rp 118,970.97
Rp 11,897.10
Rp 130,868.07
Harga Satuan (Rp) JumlahHarga(Rp)
Rp 63,000.00 Rp 17,010.00
Rp 75,000.00 Rp 10,125.00
Rp 76,000.00 Rp 1,064.00
Rp 81,000.00 Rp 1,134.00
Rp 29,333.00
Rp 2,255.94 Rp 59,782.41
Rp 2,879.30 Rp 29,944.72
Rp 190,781.63 Rp 8,585.17
Rp 98,312.30
Rp 127,645.30
Rp 12,764.53
Rp 140,409.83
Rp 63,000.00 Rp 15,120.00
Rp 75,000.00 Rp 9,000.00
Rp 76,000.00 Rp 912.00
Rp 81,000.00 Rp 972.00
Rp 26,004.00
Rp 60,106.56 Rp 186,330.34
Rp 2,879.30 Rp 27,641.28
Rp 2,331.73 Rp 3,497.60
Rp 190,781.63 Rp 8,585.17
Rp 226,054.38
Rp 252,058.38
Rp 25,205.84
Rp 277,264.22
Rp 63,000.00 Rp 15,750.00
Rp 75,000.00 Rp 9,375.00
Rp 76,000.00 Rp 988.00
Rp 81,000.00 Rp 1,053.00
Rp 27,166.00
Rp 32,006.56 Rp 212,203.49
Rp 2,879.30 Rp 28,217.14
Rp 2,331.73 Rp 3,031.25
Rp 190,781.63 Rp 8,585.17
Rp 252,037.06
Rp 279,203.06
Rp 27,920.31
Rp 307,123.36
Harga Satuan (Rp) JumlahHarga(Rp)
Rp 63,000.00 Rp 16,380.00
Rp 75,000.00 Rp 9,750.00
Rp 76,000.00 Rp 988.00
Rp 81,000.00 Rp 1,053.00
Rp 28,171.00
Rp 15,806.56 Rp 187,623.87
Rp 2,879.30 Rp 28,793.00
Rp 2,331.73 Rp 3,497.60
Rp 190,781.63 Rp 8,585.17
Rp 228,499.64
Rp 256,670.64
Rp 25,667.06
Rp 282,337.70
Rp 63,000.00 Rp 15,750.00
Rp 75,000.00 Rp 9,375.00
Rp 76,000.00 Rp 988.00
Rp 81,000.00 Rp 1,053.00
Rp 27,166.00
Rp 9,645.24 Rp 63,947.94
Rp 2,879.30 Rp 28,217.14
Rp 2,331.73 Rp 3,031.25
Rp 190,781.63 Rp 8,585.17
Rp 103,781.50
Rp 130,947.50
Rp 13,094.75
Rp 144,042.25
Rp 63,000.00 Rp 16,380.00
Rp 75,000.00 Rp 9,750.00
Rp 76,000.00 Rp 988.00
Rp 81,000.00 Rp 1,053.00
Rp 28,171.00
Rp 5,055.94 Rp 60,014.01
Rp 2,879.30 Rp 28,793.00
Rp 2,331.73 Rp 3,497.60
Rp 190,781.63 Rp 8,585.17
Rp 100,889.78
Rp 129,060.78
Rp 12,906.08
Rp 141,966.85
Harga Satuan (Rp) JumlahHarga(Rp)
Rp 63,000.00 Rp 17,010.00
Rp 75,000.00 Rp 10,125.00
Rp 76,000.00 Rp 1,064.00
Rp 81,000.00 Rp 1,134.00
Rp 29,333.00
Rp 2,455.94 Rp 65,082.41
Rp 2,879.30 Rp 29,944.72
Rp 2,331.73 Rp 3,777.40
Rp 190,781.63 Rp 8,585.17
Rp 107,389.71
Rp 136,722.71
Rp 13,672.27
Rp 150,394.98
Rp 63,000.00 Rp 5,670.00
Rp 75,000.00 Rp 6,750.00
Rp 76,000.00 Rp 684.00
Rp 81,000.00 Rp 405.00
Rp 13,509.00
Rp 1,395.80 Rp 7,397.74
Rp 2,879.30 Rp 3,282.40
Rp 2,331.73 Rp 233.17
Rp 190,781.63 Rp 572.34
Rp 11,485.66
Rp 24,994.66
Rp 2,499.47
Rp 27,494.13
Harga Satuan (Rp) JumlahHarga(Rp)
Rp 63,000.00 Rp 5,670.00
Rp 75,000.00 Rp 6,750.00
Rp 76,000.00 Rp 684.00
Rp 81,000.00 Rp 405.00
Rp 13,509.00
Rp 2,385.83 Rp 8,421.98
Rp 2,879.30 Rp 3,282.40
Rp 2,331.73 Rp 233.17
Rp 190,781.63 Rp 572.34
Rp 12,509.90
Rp 26,018.90
Rp 2,601.89
Rp 28,620.79
Rp 63,000.00 Rp 5,670.00
Rp 75,000.00 Rp 6,750.00
Rp 76,000.00 Rp 684.00
Rp 81,000.00 Rp 405.00
Rp 13,509.00
Rp 3,268.98 Rp 8,662.80
Rp 2,879.30 Rp 3,282.40
Rp 2,331.73 Rp 233.17
Rp 190,781.63 Rp 5,723.45
Rp 17,901.82
Rp 31,410.82
Rp 3,141.08
Rp 34,551.90
Rp 63,000.00 Rp 5,670.00
Rp 75,000.00 Rp 6,750.00
Rp 76,000.00 Rp 684.00
Rp 81,000.00 Rp 405.00
Rp 13,509.00
Rp 12,061.32 Rp 20,504.24
Rp 2,879.30 Rp 3,282.40
Rp 2,331.73 Rp 233.17
Rp 190,781.63 Rp 572.34
Rp 24,592.16
Rp 38,101.16
Rp 3,810.12
Rp 41,911.28
Harga Satuan (Rp) JumlahHarga(Rp)
Rp 63,000.00 Rp 5,670.00
Rp 75,000.00 Rp 6,750.00
Rp 76,000.00 Rp 684.00
Rp 81,000.00 Rp 405.00
Rp 13,509.00
Rp 11,850.00 Rp 20,145.00
Rp 2,879.30 Rp 3,282.40
Rp 2,331.73 Rp 233.17
Rp 190,781.63 Rp 5,723.45
Rp 29,384.02
Rp 42,893.02
Rp 4,289.30
Rp 47,182.33
Rp 63,000.00 Rp 17,010.00
Rp 75,000.00 Rp 9,750.00
Rp 76,000.00 Rp 988.00
Rp 81,000.00 Rp 1,134.00
Rp 28,882.00
Rp 2,455.94 Rp 65,082.41
Rp 2,879.30 Rp 26,777.49
Rp 190,781.63 Rp 3,434.07
Rp 2,331.73 Rp 4,523.56
Rp 99,817.53
Rp 128,699.53
Rp 12,869.95
Rp 141,569.48
Rp 63,000.00 Rp 17,010.00
Rp 75,000.00 Rp 9,750.00
Rp 76,000.00 Rp 988.00
Rp 81,000.00 Rp 1,134.00
Rp 28,882.00
Rp 2,860.94 Rp 61,510.21
Rp 2,879.30 Rp 29,944.72
Rp 2,331.73 Rp 3,777.40
Rp 190,781.63 Rp 8,585.17
Rp 103,817.51
Rp 132,699.51
Rp 13,269.95
Rp 145,969.46
Harga Satuan (Rp) JumlahHarga(Rp)
Rp 63,000.00 Rp 10,710.00
Rp 75,000.00 Rp 12,750.00
Rp 76,000.00 Rp 1,292.00
Rp 81,000.00 Rp 729.00
Rp 25,481.00
Rp 18,580.53 Rp 19,509.56
Rp 3,036.48 Rp 1,062.77
Rp 20,572.32
Rp 46,053.32
Rp 4,605.33
Rp 50,658.66
Rp 50,658.66
Rp 63,000.00 Rp 44,100.00
Rp 75,000.00 Rp 26,250.00
Rp 76,000.00 Rp 2,660.00
Rp 81,000.00 Rp 2,835.00
Rp 75,845.00
Rp 225,306.56 Rp 236,571.89
Rp 3,036.48 Rp 1,821.89
Rp 238,393.78
Rp 314,238.78
Rp 31,423.88
Rp 345,662.65
Rp 345,662.65
Harga Satuan (Rp) JumlahHarga(Rp)
Rp 63,000.00 Rp 44,100.00
Rp 75,000.00 Rp 26,250.00
Rp 76,000.00 Rp 2,660.00
Rp 81,000.00 Rp 2,835.00
Rp 75,845.00
Rp 5,750.00 Rp 152,375.00
Rp 2,879.30 Rp 33,831.78
Rp 190,781.63 Rp 6,677.36
Rp 192,884.13
Rp 268,729.13
Rp 26,872.91
Rp 295,602.05
Rp 295,602.05
Rp 63,000.00 Rp 44,100.00
Rp 75,000.00 Rp 26,250.00
Rp 76,000.00 Rp 2,660.00
Rp 81,000.00 Rp 2,835.00
Rp 75,845.00
Rp 14,375.00 Rp 194,062.50
Rp 2,879.30 Rp 33,831.78
Rp 190,781.63 Rp 6,677.36
Rp 234,571.63
Rp 310,416.63
Rp 31,041.66
Rp 341,458.30
Rp 341,458.30
Rp 63,000.00 Rp 22,050.00
Rp 75,000.00 Rp 13,125.00
Rp 76,000.00 Rp 1,292.00
Rp 81,000.00 Rp 162.00
Rp 36,629.00
Rp 74,750.00 Rp 164,450.00
Rp 3,036.48 Rp 759.12
Rp 165,209.12
Rp 201,838.12
Rp 20,183.81
Rp 222,021.93
Rp 222,021.93
Rp 3,614,304.00 Rp 10,842.91
Rp 14,275.90 Rp 713.80
Rp 11,556.71
Rp 29,514.71
Rp 2,951.47
Rp 32,466.18
Rp 32,466.18
IX. PEKERJAAN PLAFOND
A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Tripleks Tebal 4 MM Lembar 0.375
Paku tripleks Kg 0.030
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.800
Tukang Kayu L.02 OH 0.800
Kepala Tukang L.03 OH 0.080
Mandor L.04 OH 0.040
JUMLAH TENAGA KERJA
B BAHAN
Kayu papan Kelas II M3 0.015
Paku tripleks Kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.100
Tukang Kayu L.02 OH 0.050
Kepala Tukang L.03 OH 0.005
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Gypsum board Lembar 0.364
Paku skrup Kg 0.110
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050
Tukang Kayu L.02 OH 0.050
Kepala Tukang L.03 OH 0.005
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
List kayu profil M 1.050
Paku Kg 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.230
Tukang Kayu L.02 OH 0.670
Kepala Tukang L.03 OH 0.067
Mandor L.04 OH 0.012
JUMLAH TENAGA KERJA
B BAHAN
Papan Piri - Piri ( Siap Ketam ) M3 0.020
Paku Kg 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
tebal 4 MM
Harga Satuan (Rp) JumlahHarga(Rp)
Rp 63,000.00 Rp 6,300.00
Rp 75,000.00 Rp 7,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 405.00
Rp 14,965.00
Rp 62,299.20 Rp 23,362.20
Rp 14,275.90 Rp 428.28
Rp 23,790.48
Rp 38,755.48
Rp 3,875.55
Rp 42,631.02
Rp 63,000.00 Rp 50,400.00
Rp 75,000.00 Rp 60,000.00
Rp 76,000.00 Rp 6,080.00
Rp 81,000.00 Rp 3,240.00
Rp 119,720.00
Rp 2,114,304.00 Rp 31,714.56
Rp 14,275.90 Rp 142.76
Rp 31,857.32
Rp 151,577.32
Rp 15,157.73
Rp 166,735.05
40x9)mm, tebal 9 mm
Rp 63,000.00 Rp 6,300.00
Rp 75,000.00 Rp 3,750.00
Rp 76,000.00 Rp 380.00
Rp 81,000.00 Rp 405.00
Rp 10,835.00
Rp 87,299.20 Rp 31,776.91
Rp 19,275.90 Rp 2,120.35
Rp 33,897.26
Rp 44,732.26
Rp 4,473.23
Rp 49,205.48
Rp 63,000.00 Rp 3,150.00
Rp 75,000.00 Rp 3,750.00
Rp 76,000.00 Rp 380.00
Rp 81,000.00 Rp 243.00
Rp 7,523.00
Rp 2,522.99 Rp 2,649.14
Rp 14,275.90 Rp 142.76
Rp 2,791.90
Rp 10,314.90
Rp 1,031.49
Rp 11,346.39
Rp 63,000.00 Rp 14,490.00
Rp 75,000.00 Rp 50,250.00
Rp 76,000.00 Rp 5,092.00
Rp 81,000.00 Rp 972.00
Rp 70,804.00
Rp 2,314,304.00 Rp 46,286.08
Rp 14,275.90 Rp 2,855.18
Rp 49,141.26
Rp 119,945.26
Rp 11,994.53
Rp 131,939.79
X. PEKERJAAN ATAP
A TENAGA
Pekerja L.01 OH 0.200 Rp 63,000.00
Tukang Kayu L.02 OH 0.100 Rp 75,000.00
Kepala Tukang L.03 OH 0.010 Rp 76,000.00
Mandor L.04 OH 0.001 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Genteng Metal Bh 1.620 Rp 39,459.84
Paku Skrup Kg 0.200 Rp 19,275.90
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250 Rp 63,000.00
Tukang Kayu L.02 OH 0.150 Rp 75,000.00
Kepala Tukang L.03 OH 0.015 Rp 76,000.00
Mandor L.04 OH 0.013 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Nok genteng metal Bh 1.200 Rp 37,300.00
paku biasa 1/2"-1" Kg 0.050 Rp 14,275.90
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.120 Rp 63,000.00
Tukang Kayu L.02 OH 0.060 Rp 75,000.00
Kepala Tukang L.03 OH 0.006 Rp 76,000.00
Mandor L.04 OH 0.006 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng gelombang Lembar 0.700 Rp 38,459.84
paku biasa 1/2"-1" Kg 0.020 Rp 14,275.90
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150 Rp 63,000.00
Tukang Kayu L.02 OH 0.070 Rp 75,000.00
Kepala Tukang L.03 OH 0.007 Rp 76,000.00
Mandor L.04 OH 0.007 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Seng plat Lembar 0.300 Rp 59,459.84
paku biasa 1/2"-1" Kg 0.040 Rp 14,275.90
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150 Rp 63,000.00
Tukang Kayu L.02 OH 0.050 Rp 75,000.00
Kepala Tukang L.03 OH 0.005 Rp 76,000.00
Mandor L.04 OH 0.008 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Aluminium foil M2 1.050 13,459.84
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.250 Rp 63,000.00
Tukang Kayu L.02 OH 0.150 Rp 75,000.00
Kepala Tukang L.03 OH 0.015 Rp 76,000.00
Mandor L.04 OH 0.013 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Terpal Lebar 50 CM M1 1.200 Rp 21,300.00
paku biasa 1/2"-1" Kg 0.050 Rp 17,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.060 Rp 63,000.00
Tukang Las Kontruksi L.03 OH 0.060 Rp 75,000.00
Kepala Tukang L.03 OH 0.006 Rp 76,000.00
Mandor L.04 OH 0.003 Rp 81,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bei Baja IWF KG 1.150 Rp 11,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
JumlahHarga(Rp)
Rp 12,600.00
Rp 7,500.00
Rp 760.00
Rp 81.00
Rp 20,941.00
Rp 63,924.94
Rp 3,855.18
Rp 67,780.12
Rp 88,721.12
Rp 8,872.11
Rp 97,593.23
JumlahHarga(Rp)
Rp 15,750.00
Rp 11,250.00
Rp 1,140.00
Rp 1,053.00
Rp 29,193.00
Rp 44,760.00
Rp 713.80
Rp 45,473.80
Rp 74,666.80
Rp 7,466.68
Rp 82,133.47
JumlahHarga(Rp)
Rp 7,560.00
Rp 4,500.00
Rp 456.00
Rp 486.00
Rp 13,002.00
Rp 26,921.89
Rp 285.52
Rp 27,207.41
Rp 40,209.41
Rp 4,020.94
Rp 44,230.35
JumlahHarga(Rp)
Rp 9,450.00
Rp 5,250.00
Rp 532.00
Rp 567.00
Rp 15,799.00
Rp 17,837.95
Rp 571.04
Rp 18,408.99
Rp 34,207.99
Rp 3,420.80
Rp 37,628.79
JumlahHarga(Rp)
Rp 9,450.00
Rp 3,750.00
Rp 380.00
Rp 648.00
Rp 14,228.00
Rp 14,132.83
Rp 14,132.83
Rp 28,360.83
Rp 2,836.08
Rp 31,196.92
JumlahHarga(Rp)
Rp 15,750.00
Rp 11,250.00
Rp 1,140.00
Rp 1,053.00
Rp 29,193.00
Rp 25,560.00
Rp 850.00
Rp 26,410.00
Rp 55,603.00
Rp 5,560.30
Rp 61,163.30
JumlahHarga(Rp)
Rp 3,780.00
Rp 4,500.00
Rp 456.00
Rp 243.00
Rp 8,979.00
Rp 12,650.00
Rp 12,650.00
Rp 21,629.00
Rp 2,162.90
Rp 23,791.90
XII. PEKERJAAN KUNCI DAN KACA
A TENAGA
Pekerja L.01 OH 0.060
Tukang Kayu L.02 OH 0.600
Kepala Tukang L.03 OH 0.060
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kunci Tanam Antik Buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.010
Tukang Kayu L.02 OH 0.500
Kepala Tukang L.03 OH 0.050
Mandor L.04 OH 0.005
JUMLAH TENAGA KERJA
B BAHAN
Kunci Tanam Biasa Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.005
Tukang Kayu L.02 OH 0.500
Kepala Tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kunci Tanam KM Bh 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.005
Tukang Kayu L.02 OH 0.500
Kepala Tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Kunci Silinder Buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang Kayu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Engsel pintu Buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.010
Tukang Kayu L.02 OH 0.100
Kepala Tukang L.03 OH 0.010
Mandor L.04 OH 0.0005
JUMLAH TENAGA KERJA
B BAHAN
Engsel kupu-kupu Buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang Kayu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Kait angin Buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.020
Tukang Kayu L.02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.001
JUMLAH TENAGA KERJA
B BAHAN
Grendel Jendela Buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.050
Tukang Kayu L.02 OH 0.500
Kepala Tukang L.03 OH 0.050
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Door Closer Buah 1.000
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang Kayu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 3mm m2 1.100
Sealant Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang Kayu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.0008
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 5 mm m2 1.100
Sealant Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.017
Tukang Kayu L.02 OH 0.170
Kepala Tukang L.03 OH 0.017
Mandor L.04 OH 0.0009
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 8 mm m2 1.100
Sealant Kg 0.0009
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
14 Pemasangan 1 m2 Kaca Polos tebal 12mm
A TENAGA
Pekerja L.01 OH 0.025
Tukang Kayu L.02 OH 0.250
Kepala Tukang L.03 OH 0.025
Mandor L.04 OH 0.0013
JUMLAH TENAGA KERJA
B BAHAN
Kaca tebal 12 mm m2 1.100
Sealant Kg 0.070
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.015
Tukang Kayu L.02 OH 0.150
Kepala Tukang L.03 OH 0.015
Mandor L.04 OH 0.008
JUMLAH TENAGA KERJA
B BAHAN
Kaca Cermin Tebal 5 MM m2 1.100
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 3,780.00
Rp 75,000.00 Rp 45,000.00
Rp 76,000.00 Rp 4,560.00
Rp 81,000.00 Rp 243.00
Rp 53,583.00
Rp 200,306.56 Rp 200,306.56
Rp 200,306.56
Rp 253,889.56
Rp 25,388.96
Rp 279,278.52
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 630.00
Rp 75,000.00 Rp 37,500.00
Rp 76,000.00 Rp 3,800.00
Rp 81,000.00 Rp 405.00
Rp 42,335.00
100,306.56 Rp 100,306.56
Rp 100,306.56
Rp 142,641.56
Rp 14,264.16
Rp 156,905.72
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 315.00
Rp 75,000.00 Rp 37,500.00
Rp 76,000.00 Rp 3,800.00
Rp 81,000.00 Rp 243.00
Rp 41,858.00
Rp 30,306.56 Rp 30,306.56
Rp 30,306.56
Rp 72,164.56
Rp 7,216.46
Rp 79,381.02
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 315.00
Rp 75,000.00 Rp 37,500.00
Rp 76,000.00 Rp 3,800.00
Rp 81,000.00 Rp 243.00
Rp 41,858.00
30,306.56 Rp 30,306.56
Rp 30,306.56
Rp 72,164.56
Rp 7,216.46
Rp 79,381.02
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 945.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 64.80
Rp 13,399.80
Rp 7,806.56 Rp 7,806.56
Rp 7,806.56
Rp 21,206.36
Rp 2,120.64
Rp 23,327.00
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 630.00
Rp 75,000.00 Rp 7,500.00
Rp 76,000.00 Rp 760.00
Rp 81,000.00 Rp 40.50
Rp 8,930.50
Rp 5,306.56 Rp 5,306.56
Rp 5,306.56
Rp 14,237.06
Rp 1,423.71
Rp 15,660.77
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 945.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 648.00
Rp 13,983.00
Rp 6,806.56 Rp 6,806.56
Rp 6,806.56
Rp 20,789.56
Rp 2,078.96
Rp 22,868.52
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 945.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 648.00
Rp 13,983.00
Rp 7,806.56 Rp 7,806.56
Rp 7,806.56
Rp 21,789.56
Rp 2,178.96
Rp 23,968.52
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 1,260.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 81.00
Rp 17,861.00
Rp 8,806.56 Rp 8,806.56
Rp 8,806.56
Rp 26,667.56
Rp 2,666.76
Rp 29,334.32
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 3,150.00
Rp 75,000.00 Rp 37,500.00
Rp 76,000.00 Rp 3,800.00
Rp 81,000.00 Rp 243.00
Rp 44,693.00
Rp 390,306.56 Rp 390,306.56
Rp 390,306.56
Rp 434,999.56
Rp 43,499.96
Rp 478,499.52
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 945.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 64.80
Rp 13,399.80
Rp 85,390.24 Rp 93,929.26
Rp 12,536.48 Rp 626.82
Rp 94,556.09
Rp 107,955.89
Rp 10,795.59
Rp 118,751.48
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 945.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 64.80
Rp 13,399.80
Rp 95,890.24 Rp 105,479.26
Rp 12,536.48 Rp 626.82
Rp 106,106.09
Rp 119,505.89
Rp 11,950.59
Rp 131,456.48
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 1,071.00
Rp 75,000.00 Rp 12,750.00
Rp 76,000.00 Rp 1,292.00
Rp 81,000.00 Rp 72.90
Rp 15,185.90
Rp 369,290.24 Rp 406,219.26
Rp 12,536.48 Rp 11.28
Rp 406,230.55
Rp 421,416.45
Rp 42,141.64
Rp 463,558.09
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 1,575.00
Rp 75,000.00 Rp 18,750.00
Rp 76,000.00 Rp 1,900.00
Rp 81,000.00 Rp 105.30
Rp 22,330.30
Rp 513,290.24 Rp 564,619.26
Rp 12,536.48 Rp 877.55
Rp 565,496.82
Rp 587,827.12
Rp 58,782.71
Rp 646,609.83
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 945.00
Rp 75,000.00 Rp 11,250.00
Rp 76,000.00 Rp 1,140.00
Rp 81,000.00 Rp 648.00
Rp 13,983.00
Rp 14,729.92 Rp 16,202.91
Rp 16,202.91
Rp 30,185.91
Rp 3,018.59
Rp 33,204.50
XIII. PEKERJAAN PENGECATAN
A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Soda api Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Sabun Kg 0.050
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
3 Pengecatan 1 M2 Bidang Kayu Baru ( 1 Lapis Plamir, 1 Lapis Cat Dasar dan 2 Lapis Cat Penutu
A TENAGA
Pekerja L.01 OH 0.070
Tukang Cat L. 02 OH 0.009
Kepala Tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat menie Kg 0.200
Plamir Kg 0.150
Cat dasar Kg 0.170
Cat penutup Kg 0.260
Kuas Buah 0.010
Pengencer Kg 0.030
Ampelas Lbr 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.070
Tukang Cat L. 02 OH 0.009
Kepala Tukang L.03 OH 0.006
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat penutup Kg 0.260
Kuas Buah 0.010
Pengencer Kg 0.030
Ampelas Lbr 0.200
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
5 Pengecatan 1 M2 Tembok Baru ( 1 Lapis Plamuur, 1 Lapis Cat Dasar dan 2 Lapis Cat Penutup )
A TENAGA
Pekerja L.01 OH 0.020
Tukang Cat L.02 OH 0.063
Kepala Tukang L.03 OH 0.0063
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Plamuur Kg 0.200
Cat dasar Kg 0.150
Cat Penutup Kg 0.170
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
6 Pengecatan 1 M2 Tembok Lama ( 1 Lapis Cat Dasar dan 2 Lapis Cat Penutup )
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.028
Tukang Cat L.02 OH 0.042
Kepala Tukang L.03 OH 0.0042
Mandor L.04 OH 0.003
JUMLAH TENAGA KERJA
B BAHAN
Cat dasar Kg 0.120
Cat Penutup Kg 0.180
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.150
Tukang Cat L.02 OH 0.001
Kepala Tukang L.03 OH 0.0001
Mandor L.04 OH 0.0025
JUMLAH TENAGA KERJA
B BAHAN
Kapur Sirih Kg 0.150
Ampelas Lbr 0.100
Alang - Alang Ikat 0.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.040
Tukang Cat L.02 OH 0.005
Kepala Tukang L.03 OH 0.0005
Mandor L.04 OH 0.0025
JUMLAH TENAGA KERJA
B BAHAN
Kapur Sirih Kg 0.300
Ampelas Lbr 0.200
Alang - Alang Ikat 0.250
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.020
Tukang Cat L. 02 OH 0.200
Kepala Tukang L.03 OH 0.020
Mandor L.04 OH 0.0025
JUMLAH TENAGA KERJA
B BAHAN
Menie besi Kg 0.100
Kuas Buah 0.010
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 10 % ) 10% x D
F Harga Satuan Pekerjaan (D+E)
10 Pengecatan 1 M2 Permukaan Baja Galvanis secara semprot Sistem 3 Lapis Cat Mutakhir
A TENAGA
Pekerja L.01 OH 0.040
Tukang Cat L. 02 OH 0.700
Kepala Tukang L.03 OH 0.070
Mandor L.04 OH 0.020
JUMLAH TENAGA KERJA
B BAHAN
Cat Dasar Kg 0.30
Pengencer Liter 0.01
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Proft ( 15 % ) 15% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 9,450.00
Rp 81,000.00 Rp 243.00
Rp 9,693.00
Rp 12,059.84 Rp 602.99
Rp 602.99
Rp 10,295.99
Rp 1,029.60
Rp 11,325.59
Pernah dicat
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 9,450.00
Rp 81,000.00 Rp 243.00
Rp 9,693.00
Rp 31,286.48 Rp 1,564.32
Rp 1,564.32
Rp 11,257.32
Rp 1,125.73
Rp 12,383.06
apis Cat Dasar dan 2 Lapis Cat Penutup )
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 4,410.00
Rp 75,000.00 Rp 675.00
Rp 76,000.00 Rp 456.00
Rp 81,000.00 Rp 243.00
Rp 5,784.00
Rp 27,459.84 Rp 5,491.97
Rp 27,659.84 Rp 4,148.98
Rp 27,459.84 Rp 4,668.17
Rp 38,459.84 Rp 9,999.56
Rp 17,414.96 Rp 174.15
Rp 19,459.84 Rp 583.80
Rp 6,214.96 Rp 1,242.99
Rp 26,309.61
Rp 32,093.61
Rp 3,209.36
Rp 35,302.97
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 4,410.00
Rp 75,000.00 Rp 675.00
Rp 76,000.00 Rp 456.00
Rp 81,000.00 Rp 243.00
Rp 5,784.00
Rp 38,459.84 Rp 9,999.56
Rp 17,414.96 Rp 174.15
Rp 19,459.84 Rp 583.80
Rp 6,214.96 Rp 1,242.99
Rp 12,000.50
Rp 17,784.50
Rp 1,778.45
Rp 19,562.94
Rp 63,000.00 Rp 1,260.00
Rp 75,000.00 Rp 4,725.00
Rp 76,000.00 Rp 478.80
Rp 81,000.00 Rp 243.00
Rp 6,706.80
Rp 27,659.84 Rp 5,531.97
Rp 6,459.84 Rp 968.98
Rp 19,459.84 Rp 3,308.17
Rp 9,809.12
Rp 16,515.92
Rp 1,651.59
Rp 18,167.51
Rp 63,000.00 Rp 1,764.00
Rp 75,000.00 Rp 3,150.00
Rp 76,000.00 Rp 319.20
Rp 81,000.00 Rp 243.00
Rp 5,476.20
Rp 6,459.84 Rp 775.18
Rp 19,459.84 Rp 3,502.77
Rp 4,277.95
Rp 9,754.15
Rp 975.42
Rp 10,729.57
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 9,450.00
Rp 75,000.00 Rp 75.00
Rp 76,000.00 Rp 7.60
Rp 81,000.00 Rp 202.50
Rp 9,735.10
Rp 5,200.00 Rp 780.00
Rp 6,214.96 Rp 621.50
Rp 21,050.00 Rp 5,262.50
Rp 6,664.00
Rp 16,399.10
Rp 1,639.91
Rp 18,039.01
eliharaan )
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 2,520.00
Rp 75,000.00 Rp 375.00
Rp 76,000.00 Rp 38.00
Rp 81,000.00 Rp 202.50
Rp 3,135.50
Rp 5,200.00 Rp 1,560.00
Rp 6,214.96 Rp 1,242.99
Rp 21,050.00 Rp 5,262.50
Rp 8,065.49
Rp 11,200.99
Rp 1,120.10
Rp 12,321.09
Harga Satuan
JumlahHarga(Rp)
(Rp)
Rp 63,000.00 Rp 1,260.00
Rp 75,000.00 Rp 15,000.00
Rp 76,000.00 Rp 1,520.00
Rp 81,000.00 Rp 202.50
Rp 17,982.50
Rp 16,959.84 Rp 1,695.98
Rp 17,414.96 Rp 174.15
Rp 1,870.13
Rp 19,852.63
Rp 1,985.26
Rp 21,837.90
Rp 63,000.00 Rp 2,520.00
Rp 75,000.00 Rp 52,500.00
Rp 76,000.00 Rp 5,320.00
Rp 81,000.00 Rp 1,620.00
Rp 61,960.00
Rp 27,459.84 Rp 8,237.95
Rp 19,459.84 Rp 194.60
Rp 8,432.55
Rp 70,392.55
Rp 7,039.26
Rp 77,431.81