PEKERJAAN : PEMBUATAN DESIND KOLAM RENANG DINAS PARIWISATA KABUPATEN PORE NDAO
I PEKERJAAN PERSIAPAN :
1 Pembersihan Lapangan M2 210 3,500.00 3,330 11,655,000
2 Pengukuran dan setting out. M2 13 3,500.00 2,400 8,400,000
3 Pek. Jalan masuk dan mobilisasi material ls 1.00 negosiasi
4 Pek. Direksi Keet dan gudang ls 210 1.00 25,000,000 25,000,000
Jumlah 45,055,000###
Jumlah 113,786,078###
B PEK. PONDASI :
1 Beton Cor 1:3:5 (Lantai kerja) M3 104 12.26 1,009,646 12,378,855
2 Pas. Batu Kosong M3 32 8.31 314,430 2,612,083
3 Pas. Batu Kali 1 : 5 M3 33 26.61 684,260 18,209,009
4 Pekerjaan buis beton bertulang M3 123 18.00 1,079,486 19,430,739
Jumlah 52,630,686###
Jumlah 451,687,394###
Page 3 of 33
NOMO HARGA JUMLAH
R
NO. ANALIS VOL SATUAN HARGA
URAIAN PEKERJAAN SAT. A Rp. Rp.
5 Pas. Keramik dinding open shower 20/25 M3 61 17.50 105,590 1,847,825
6 Pek.Pasangan tembok pagar M3 38 21.45 2,218,995 47,597,443
7 Lantai beton K175 (Fe = 80 Kg) M3 110 34.50 4,132,852 142,600,157
8 Plasteran 1:3 diatas lantai tepi kolam M2 40 177.66 48,008 8,529,012
9 Pas. Lantai keramik 20/20 open shower M2 61 14.80 105,590 1,562,732
10 Pas. Lantai Keramik 20/20 tepi kolam M2 61 177.66 105,590 18,759,119
11 Pas. Lantai Keramik 20/20 kolam M2 61 219.20 105,590 23,145,328
12 Pas. Koral sikat tempat juara M2 85 34.16 123,607 4,222,168
Jumlah 326,699,868###
B PEK. PONDASI :
1 Beton Cor 1:3:5 (Lantai kerja) M3 104 46.38 1,009,646 46,825,844
2 Pas. Batu Kali 1 : 5 M3 32 24.94 314,430 7,843,268
3 Pekerjaan buis beton bertulang M3 123 36.00 1,079,486 38,861,478
Jumlah 93,530,590###
Page 4 of 33
NOMO HARGA JUMLAH
R
NO. ANALIS VOL SATUAN HARGA
URAIAN PEKERJAAN SAT. A Rp. Rp.
A PEK. TANAH DAN URUGAN :
1 Pek. stripping tanah tbl. 20 cm M2 14 712.52 3,330 2,372,692
2 Galian tanah kolam M3 21 1,963.50 22,160 43,511,160
3 Galian tanah tangga loncat indah M3 21 35.00 22,160 775,600
4 Urugan tanah bawah kolam dan sekitarnya M3 31 440.00 482,050 212,102,000
dipadatkan
5 Urugan tanah kembali M3 25 266.30 6,805 1,812,172
6 Urugan pasir bawah pondasi M3 31 18.05 482,050 8,701,003
7 Urugan pasir bawah lantai M3 24 17.00 52,070 885,190
8 Pas. plastik 0,2 mm dibawah balok dan plat beton. M2 211 757.63 122,775 93,018,023
###
Jumlah 363,177,839
B PEK. PONDASI :
1 Beton Cor 1:3:5 (Lantai kerja) M3 104 18.05 1,009,646 18,224,101
2 Pas.batu kali 1:5 M3 32 0.29 314,430 89,613
###
3 Pekerjaan buis beton bertulang M3 123 54.00 1,079,486 58,292,217
###
Jumlah 76,605,931
Page 5 of 33
NOMO HARGA JUMLAH
R
NO. ANALIS VOL SATUAN HARGA
URAIAN PEKERJAAN SAT. A Rp. Rp.
1 Pek. stripping tanah tbl. 20 cm M2 14 948.73 3,330 3,159,276
2 Galian tanah untuk pond. M3 15 527.26 18,640 9,828,080
3 Urugan pasir bawah lantai dipadatkan M3 24 111.51 52,070 5,806,326
4 Pas. plastik 0,2 mm dibawah balok dan plat beton. M2 211 2,230.20 122,775 273,812,805
Jumlah 292,606,487
B PEK. PONDASI :
1 Beton Cor 1:3:5 (Lantai kerja) M3 104 216.07 1,009,646 218,149,055
2 Pas Beton Pondasi (P1) setempat (K250) (Fe 150) M3 112 38.81 4,938,027 191,634,952
3 Pas Beton Pondasi (P2) setempat (K250) (Fe 150) M3 112 46.02 4,938,027 227,238,126
4 Pas. Beton slof (S1-1) K250 (Fe 175) M3 114 0.45 5,225,590 2,343,677
###
5 Pas. Beton slof (S1-2) K250 (Fe 250) M3 118 5.15 6,088,277 31,342,450
6 Pas. Beton slof (S1-3) K250 (Fe 275) M3 119 2.40 6,375,840 15,302,015
7 Pas. Beton slof (S1-4) K250 (Fe 200) M3 116 0.90 5,513,152 4,945,297
8 Pas. Beton slof (S1-5) K250 (Fe 300) M3 120 5.15 6,663,402 34,303,193
9 Pas. Beton slof (S1-6) K250 (Fe 300) M3 120 3.15 6,663,402 20,959,731
10 Pas. Beton slof (S1-7) K250 (Fe 200) M3 116 7.72 5,513,152 42,572,560
11 Pas. Beton slof (S1-8) K250 (Fe 175) M3 114 16.20 5,225,590 84,654,550
12 Pas. Beton slof (S1-9) K250 (Fe 150) M3 112 9.00 4,938,027 44,437,799
13 Pas. Beton slof (S1-10) K250 (Fe 225) M3 117 3.60 5,800,715 20,882,572
14 Pas. Beton slof (S1-11) K250 (Fe 150) M3 112 7.20 4,938,027 35,553,794
15 Pas. Beton slof (S2-1) K250 (Fe 150) M3 112 1.80 4,938,027 8,888,449
16 Pelat lantai (S1) K175 (Fe 80) M3 110 535.25 4,132,852 2,212,100,767
Jumlah 3,195,308,988
C PEK. BETON BERTULANG :
Lantai I
1 Beton balok (B1-1) K 250 (Fe 200) M3 116 1.92 5,513,152 10,585,252
2 Beton balok (B1-2) K 250 (Fe 250) M3 118 1.92 6,088,277 11,689,492
3 Beton balok (B1-3) K 250 (Fe 200) M3 116 3.84 5,513,152 21,170,504
###
4 Beton balok (B1-4) K 250 (Fe 275) M3 119 2.88 6,375,840 18,362,418
5 Beton balok (B1-5) K 250 (Fe 150) M3 112 2.88 4,938,027 14,221,518
6 Beton balok (B1-6) K 250 (Fe 150) M3 112 11.52 4,938,027 56,886,071
7 Beton balok (B4-1) K 250 (Fe 175) M3 114 4.80 5,225,590 25,082,830
8 Beton balok (B4-2) K 250 (Fe 200) M3 116 19.20 5,513,152 105,852,518
9 Pelat lantai (S1) K 250 (Fe 250) M3 118 88.25 6,088,277 537,266,092
Jumlah 801,116,694
Lantai II
1 Beton balok (B2-1) K 250 (Fe 250) M3 118 1.61 6,088,277 9,830,132
2 Beton balok (B2-2) K 250 (Fe 300) M3 120 2.02 6,663,402 13,448,411
3 Beton balok (B2-4) K 250 (Fe 225) M3 117 0.81 5,800,715 4,682,917
4 Beton balok (B2-5) K 250 (Fe 250) M3 118 8.10 6,088,277 49,315,044
5 Beton balok (B3-1) K 250 (Fe 300) M3 120 2.80 6,663,402 18,657,526
6 Beton balok (B3-4) K 250 (Fe 150) M3 112 2.40 4,938,027 11,851,265
7 Beton balok (B4-1) K 250 (Fe 175) M3 114 4.80 5,225,590 25,082,830
8 Beton balok (B4-2) K 250 (Fe 200) M3 116 19.20 5,513,152 105,852,518
9 Beton balok duduk penonton (BD1-1) K250 (Fe 150) M3 112 71.78 4,938,027 354,449,109
10 pelat lantai (S1) K250 (Fe (250) M3 118 93.47 6,088,277 569,071,251
Jumlah 1,162,241,002
roof
1 Beton balok (B2-4) K 250 (Fe 225) M3 117 8.10 5,800,715 46,985,787
2 Beton balok (B3-2) K 250 (Fe 250) M3 118 4.00 6,088,277 24,353,108
3 Beton balok (B3-3) K 250 (Fe 300) M3 120 1.80 6,663,402 11,994,124
4 Beton balok (B3-4) K 250 (Fe 150) M3 112 2.40 4,938,027 11,851,265
5 Beton balok (B3-5) K 250 (Fe200) M3 116 6.00 5,513,152 33,078,912
6 Beton balok B list K 250 (Fe 150) M3 112 6.48 4,938,027 31,998,415
7 Pelat atap (S2) K 250 (Fe 150) M3 112 119.10 4,938,027 588,119,016
Jumlah 748,380,627
KOLOM
Page 6 of 33
NOMO HARGA JUMLAH
R
NO. ANALIS VOL SATUAN HARGA
URAIAN PEKERJAAN SAT. A Rp. Rp.
1 kolom K1-1 K250 (fe 275) M3 119 27.05 6,375,840 172,453,707
###
2 kolom K2-1 K250 (Fe 200) M3 116 68.60 5,513,152 378,202,227
3 kolom K2-2 K250 (Fe 250) M3 118 24.99 6,088,277 152,146,042
4 kolom K3-1 K250 (Fe 300) M3 120 17.14 6,663,402 114,184,057
5 kolom K4-1 K250 (Fe 300) M3 120 2.63 6,663,402 17,549,735
6 kolom K4-2 K250 (Fe 300) M3 120 2.17 6,663,402 14,459,582
Jumlah 848,995,350
E PEKERJAAN LANTAI :
1 Pek. Kusen pintu toilet (DA. 60) M3 135 0.32 25,090,250 8,105,405
2 Pek. Kusen pintu (DP.120) M3 136 0.03 5,880,900 164,665
3 Pek. Kusen pintu (DGP.150) M3 136 0.06 5,880,900 346,973
###
4 Pek. Daun Pintu toilet (DA. 60) M2 147 16.42 357,875 5,875,950
5 Pek. Daun Pintu (DP 120) M2 150 5.05 408,865 2,063,133
6 Pek. Daun Pintu (DGP 150) M2 150 6.39 408,865 2,612,647
Jumlah 4,675,780
###
G PEK. PENGGANTUNG & PENGUNCI
Page 7 of 33
NOMO HARGA JUMLAH
R
NO. ANALIS VOL SATUAN HARGA
URAIAN PEKERJAAN SAT. A Rp. Rp.
1 Pek. Kusen pintu, jendela dan ventilasi M3 135 2.84 25,090,250 71,356,671
2 Pek. Daun Pintu M2 146 19.20 1,058,795 20,328,864
###
3 Pek. Daun Jendela M2 137 10.50 342,000 3,591,000
4 Pek. Ventilasi M2 138 5.07 356,160 1,805,518
5 Pek. Reiling Tangga M1 44.00 300,000 13,200,000
Jumlah 110,282,053
Page 8 of 33
NOMO HARGA JUMLAH
R
NO. ANALIS VOL SATUAN HARGA
URAIAN PEKERJAAN SAT. A Rp. Rp.
Page 9 of 33
NOMO HARGA JUMLAH
R
NO. ANALIS VOL SATUAN HARGA
URAIAN PEKERJAAN SAT. A Rp. Rp.
D PEKERJAAN LANTAI :
1 Pek. Kusen pintu, jendela dan ventilasi M3 135 0.74 25,090,250 18,566,785
2 Pek. Daun Pintu M2 146 149.60 1,058,795 158,395,732
3 Pek. Ventilasi M2 138 2.84 356,160 1,011,494
4 Pek. Reiling Tangga M1 87.40 300,000 26,220,000
Jumlah 204,194,011
Page 10 of 33
NOMO HARGA JUMLAH
R
NO. ANALIS VOL SATUAN HARGA
URAIAN PEKERJAAN SAT. A Rp. Rp.
1 Pekerjaan Plat atap beton bertulang m2 114 221.40 5,225,590 1,156,924,613
2 Pekerjaan Water Proofing m2 192 221.40 79,000 17,490,284
Jumlah 1,994,019,442
Jumlah 106,812,182
Page 11 of 33
NOMO HARGA JUMLAH
R
NO. ANALIS VOL SATUAN HARGA
URAIAN PEKERJAAN SAT. A Rp. Rp.
11 Sakelar bh 23.00 82,500 1,897,500
12 Stop kontak bh 23.00 55,000 1,265,000
Jumlah 30,856,870
Page 12 of 33
DAFTAR ANALISA
BULAN APRIL TAHUN 2007
DISIAPKAN OLEH :
2 10 M2 MEMBONGKAR USUK/RENG
0.250 OH Tukang kayu 48,000 12,000 0 12,000
0.025 OH Kepala Tukang kayu 52,500 1,313 0 1,313
13,313 0 13,313
Untuk 1 M2 .. 1,331
3 10 M2 MENGUPAS PLESTERAN
0.500 OH Pekerja 30,000 15,000 0 15,000
0.025 OH Mandor 55,000 1,375 0 1,375
16,375 0 16,375
Untuk 1 M2 .. 1,638
4 1 M3 MEMBONGKAR TEMBOK
3.300 OH Pekerja 30,000 99,000 0 99,000
0.033 OH Mandor 55,000 1,815 0 1,815
100,815 0 100,815
5 10 M2 MEMBONGKAR LANTAI
2.000 OH Pekerja 30,000 60,000 0 60,000
0.100 OH Mandor 55,000 5,500 0 5,500
65,500 0 65,500
Untuk 1 M2 .. 6,550
15 1 M3 URUGAN KEMBALI
0.192 OH Pekerja 30,000 5,760 0 5,760
0.019 OH Mandor 55,000 1,045 0 1,045
6,805 0 6,805
21 1 M2 PASANG BATACO
12.500 BH Batako Cetak Masif KW.I 1,500 0 18,750 18,750
0.100 ZAK Semen Gresik ( 50 kg ) 87,500 0 8,750 8,750
0.025 M3 Pasir pasang 420,000 0 10,500 10,500
0.240 OH Tukang Batu 45,000 10,800 0 10,800
0.075 OH Kepala Tukang Batu 50,000 3,750 0 3,750
0.500 OH Pekerja 30,000 15,000 0 15,000
0.025 OH Mandor 55,000 1,375 0 1,375
30,925 38,000 68,925
24 1 M2 PLESTERAN PC 1 : 2 TEBAL 20 mm
0.286 ZAK Semen Gresik ( 50 kg ) 87,500 0 24,990 24,990
0.023 M3 Pasir pasang 420,000 0 9,660 9,660
0.200 OH Tukang Batu 45,000 9,000 0 9,000
0.020 OH Kepala Tukang Batu 50,000 1,000 0 1,000
0.250 OH Pekerja 30,000 7,500 0 7,500
0.013 OH Mandor 55,000 688 0 688
18,188 34,650 52,838
27 1 M2 PLESTERAN PC 1 : 6 TEBAL 15 mm
0.125 ZAK Semen Gresik ( 50 kg ) 87,500 0 10,920 10,920
0.030 M3 Pasir pasang 420,000 0 12,600 12,600
0.200 OH Tukang Batu 45,000 9,000 0 9,000
0.020 OH Kepala Tukang Batu 50,000 1,000 0 1,000
0.250 OH Pekerja 30,000 7,500 0 7,500
0.013 OH Mandor 55,000 688 0 688
18,188 23,520 41,708
29 1 M2 PEKERJAAN SIARAN 1 : 2
0.086 ZAK Semen Gresik ( 50 kg ) 87,500 0 7,560 7,560
0.016 M3 Pasir pasang 420,000 0 6,720 6,720
0.070 OH Tukang Batu 45,000 3,150 0 3,150
0.007 OH Kepala Tukang Batu 50,000 350 0 350
0.150 OH Pekerja 30,000 4,500 0 4,500
0.008 OH Mandor 55,000 440 0 440
8,440 14,280 22,720
41 BETON BERTULANG
A 1 M3 BETON COR 1:2:3
0.780 M3 Kerikil beton 394,650 0 307,827 307,827
0.520 M3 Pasir beton 420,000 0 218,400 218,400
4.640 ZAK Semen Gresik ( 50 kg ) 87,500 0 406,000 406,000
0.250 OH Tukang Batu 45,000 11,250 0 11,250
0.025 OH Kepala Tukang Batu 50,000 1,250 0 1,250
1.650 OH Pekerja 30,000 49,500 0 49,500
0.080 OH Mandor 55,000 4,400 0 4,400
(A) 66,400 932,227 998,627
B 1 M2 BEGESTING (KOLOM)
0.040 M3 Papan begesting 700,000 0 28,000 28,000
0.400 KG Paku Usuk 63,000 0 25,200 25,200
0.200 ltr Minyak Bekisting 11,500 0 2,300 2,300
0.015 M3 Kayu Meranti Balok 1,700,000 0 25,500 25,500
0.350 lbr Multipleks (9 MM ) 110,000 0 38,500 38,500
6.000 btg Dolken kayu galam dia 8-10 / 4m 12,500 0 75,000 75,000
0.330 OH Tukang kayu 48,000 15,840 0 15,840
0.033 OH Kepala Tukang Kayu 52,500 1,733 0 1,733
0.300 OH Pekerja 30,000 9,000 0 9,000
0.006 OH Mandor 55,000 330 0 330
(B) 26,903 194,500 221,403
10 M2 BEGESTING 269,025 1,945,000 2,214,025
45 1 M2 PLAPOND GYPSUM
0.380 LBR Gypsum 43,000 0 16,340 16,340
0.015 M3 Kayu Kruing Balok 2,500,000 0 37,500 37,500
0.220 KG Paku Lis 49,000 0 10,780 10,780
0.200 OH Tukang kayu 48,000 9,600 0 9,600
0.020 OH Kepala Tukang kayu 52,500 1,050 0 1,050
0.500 OH Pekerja 30,000 15,000 0 15,000
0.025 OH Mandor 55,000 1,375 0 1,375
27,025 64,620 91,645
46 1 M2 PLAPOND ETERNIT
1.000 LBR Eternit Klas I (1/1) M 11,300 0 11,300 11,300
0.015 M3 Kayu Kruing Balok 2,500,000 0 37,500 37,500
0.220 KG Paku Usuk 63,000 0 13,860 13,860
0.200 OH Tukang kayu 48,000 9,600 0 9,600
0.020 OH Kepala Tukang Kayu 52,500 1,050 0 1,050
0.500 OH Pekerja 30,000 15,000 0 15,000
0.025 OH Mandor 55,000 1,375 0 1,375
27,025 62,660 89,685
1.000 M2 Tadir Gedeg Kelas I 22,500 27,025 73,860 100,885
77 1 M2 PEKERJAAN POLITUR
0.150 KG Politur 32,000 0 4,800 4,800
0.372 LTR Ultran P 01 36,500 0 13,578 13,578
2.000 lbr Amplas 4,200 0 8,400 8,400
0.200 OH Tukang cat 40,000 8,000 0 8,000
0.020 KG Kepala Tukang cat 46,000 920 0 920
0.008 OH Mandor 55,000 413 0 413
9,333 26,778 36,111
79 1 M` SALURAN / GOT
0.150 M3 Galian tanah 55,000 0 0 8,250
60.000 bj Bata Pasang klas I 2,500 0 0 150,000
0.800 M2 Plesteran 1:2 27,500 0 0 22,000
1.000 M' Besi Siku 50/50 x 5 75,000 0 0 75,000
0 0 255,250
83 1 M3 TIMBUNAN SIRTU
1.200 M3 Pasir Batu (Sirtu) 51,900 0 62,280 62,280
0.250 OH Pekerja 30,000 7,500 0 7,500
0.025 OH Mandor 55,000 1,375 0 1,375
0.010 Ls/h Biaya menggilas 400,000 4,000 0 4,000
12,875 62,280 75,155
1 M2 TIMBUNAN SI 1 M2 Timbunan Sirtu tebal 20 Cm 15,031
93 1 M2 CAT RESIDU/TEER
0.350 LTR Residu/Teer 12,500 0 4,375 4,375
0.100 OH Pekerja 30,000 3,000 0 3,000
0.006 OH Mandor 55,000 330 0 330
3,330 4,375 7,705
94 1 M2 PEMBERSIHAN LAPANGAN
0.100 OH Pekerja 30,000 3,000 0 3,000
0.006 OH Mandor 55,000 330 0 330
3,330 0 3,330
HARGA
NO JENIS UPAH / MATERIAL SAT
( Rp. )
1 Pekerja Hari 30,000
2 Tukang batu Hari 45,000
3 Kepala tukang batu Hari 50,000
4 Tukang kayu Hari 48,000
5 Kepala tukang kayu Hari 52,500
6 Tukang cat Hari 40,000
7 Kepala tukang cat Hari 46,000
8 Tukang besi Hari 45,000
9 Kepala tukang besi Hari 50,000
10 Tukang gali Hari 35,000
11 Tukang Listrik Hari 35,000
12 Kepala tukang paras Hari 95,000
13 Tukang ukir paras Hari 90,000
14 Tukang Style Bali Hari 90,000
15 Kepala Tukang Ukir Style Bali Hari 95,000
16 Masinis Hari 50,000
17 Kernet Hari 38,000
18 Tukang masak aspal Hari 40,000
19 Mandor Hari 55,000
20 Tukang pipa Hari 45,000
21 Kepala tukang pipa Hari 47,500
22 Tukang Politur Hari 40,500
23 Stamper Ls 15,000
24 Ongkos angkut kendaraan Ls 17,500
25 Biaya menggilas Ls/h 400,000
26 Sewa walls Hk 100,000
27 Alat bantu pipa Ls 50,000
28 Ongkos angkut pipa Ls 1,500
29 Ongkos Kerja Water Profing m2 4,000
30 Tukang Penganyam Hari 40,000
31 Pekerja Penganyam Hari 30,000
BAHAN PASANGAN
1 Batu Kali m3 126,050
2 Batu Bulat m3 100,600
3 Batu Pecah 5 - 7 cm m3 100,600
4 Batu Pecah 4 - 5 cm m3 100,600
5 Batu Pecah 2 - 3 cm m3 117,900
6 Batu Pecah 3 - 5 cm m3 114,600
7 Batu Pecah 3-4 cm m3 114,600
8 Batu Pecahan Besar m3 104,100
9 Batu Pecah 10/15 m3 290,500
10 Batu Seplit Halus ( 0,5 - 1 ) cm m3 359,800
11 Batu Seplit Jagung ( 1 - 2 ) cm m3 128,500
12 Pasir Batu (Sirtu) m3 51,900
13 Batu Geladak m3 104,100
HARGA
NO JENIS UPAH / MATERIAL SAT
( Rp. )
KERIKIL (KORAL) KAYU JATI
1 Kerikil Koral m3 111,850
2 Kerikil Biasa m3 344,900
3 Kerikil Beton m3 394,650
4 Kerikil Halus m3 344,900
5 kerikil koral sikat m3 1,379,600
PASIR KAYU BINGKIRAI
1 Pasir Urug m3 393,750
2 Pasir Pasang m3 420,000
3 Pasir Beton m3 420,000
BATU BATA BALOK KAMFER DIOVEN
1 Bata Gosok klas I bj 3,500
2 Bata Gosok klas II bj 3,000
3 Bata Pasang klas I bj 2,500
4 Bata Pasang klas II bj 2,000
5 Batu lahar merah Singaraja m3 99,900
6 Batu pipih Singaraja m3 101,200
7 Loster Kerawang m2 187,500
8 Kerawang PC m2 95,500
PARAS/PADAS TRIPLEK 4 MM 4 " X 8 "
1 Paras Pondasi bj 10,000
2 Paras Malam Kr Asem 50 x 20 x 12 cm bj 13,000
3 Paras Ukir Selekarang bj 14,000
4 Paras Batik bh 12,000
5 Paras Kerobokan bh 12,500
6 Paras Buahan bh 7,000
7 Paras Putih Bukit bh 5,600
8 Limestone m3 57,000
9 Serbuk Bata Merah m3 175,000
10 Paras Jogja m2 160,000
11 Batu kali random m2 85,000
12 Batu jogja tbl.10cm m2 190,000
PORTLAN CEMENT AMPLAS
1 Semen Gresik ( 50 kg ) zak 87,500
2 Gresik Putih (40 kg) zak 45,000
3 Semen Tonasa ( 40 kg ) zak 30,000
4 Semen Tonasa Putih (40 kg) zak 39,500
5 Semen Tiga Roda (50 kg) zak 37,400
6 Semen Tiga Roda Putih ( 40 kg) zak 31,790
7 Semen Padang (40 kg) zak 28,500
8 Semen Padang Putih (40 kg) zak 40,000
9 Semen Bosowa (50 kg) zak 32,000
10 Semen warna zak 39,500
BAHAN ATAP CLOSET JONGKOK TOTO
1 Sirap 100 (ikat) 49,800
2 Alang-Alang lbr 12,350
GENTENG MURDA DARI PARAS
HARGA
NO JENIS UPAH / MATERIAL SAT
( Rp. )
1 Bubungan genteng bj 4,500
2 Bubungan karang pilang bj 2,800
3 Bubungan genteng kodok bj 4,500
4 Pejaten Biasa bj 750
5 Vlam Pejaten bj 650
6 Kodok Pelentong bj 1,200
7 Nok/Karpus bj 6,900
8 Genteng Kaca 3 mm bj 13,500
9 Genteng Kaca 2 mm bj 12,700
10 Genteng Beton bj 4,100
11 Genteng Metal bj 105,000
12 Genteng Karang pilang bj 4,700
13 Ijuk kg 21,250
SENG GELOMBANG SOWER CEBOK MERK TOTO
1 Kecil BJLS 0,18 mm lbr 28,750
2 Kecil BJLS 0,20 mm lbr 33,500
3 Kecil BJLS 0,25 mm lbr 39,000
4 Besar BJLS 0,18 mm lbr 28,750
5 Besar BJLS 0,20 mm lbr 33,500
6 Besar BJLS 0,30 mm lbr 46,900
7 Besar BJLS 0,50 mm lbr 80,000
8 Seng Talang lbr 35,000
ASBES PC (DJABESMEN) KERAMIK PLATINUM
1 Asbes Gel. 1,8 m` x 1,05 m`/4 mm lbr 23,700
2 Nok Asbes/Djabesmen m` 17,200
3 Rata/Djabesmen (2 m x 1m x 4mm) lbr 16,900
BAHAN KAYU BUBUNGAN GENTENG PEJA
1 Kayu Jati Papan m3 22,323,000
2 Kayu Jati Balok m3 21,662,500
3 Kayu Jati Bali m3 9,000,000
4 Kayu Kamper Papan m3 4,800,000
5 Kayu Kamper Balok m3 3,929,500
6 Kayu Kamper Usuk m3 3,750,000
7 Kayu Meranti Papan m3 2,000,000
8 Kayu Meranti Balok m3 1,700,000
9 Kayu Meranti usuk m3 1,650,000
10 Kayu Kruing Papan m3 3,000,000
11 Kayu Kruing Balok m3 2,500,000
12 Kayu Kruing Usuk m3 2,450,000
13 Seseh Dolken btg 252,000
14 Seseh Balok m3 1,783,000
15 Papan begesting m3 700,000
16 Kayu Bangkirai Balok m3 3,800,000
17 Kayu Bangkirai Papan m3 4,374,000
18 Kayu api m3 115,000
19 Kayu terentang m3 Gentang Pejaten
20 Dolken kayu galam dia 8-10 / 4m Btg 12,500
BAHAN BAMBU Genteng Kodok Abadi
HARGA
NO JENIS UPAH / MATERIAL SAT
( Rp. )
1 Bambu Besar btg 11,300
2 Bambu Sedang btg 9,750
3 Bambu Kecil btg 8,100
4 Tadir Gedeg Kelas I m2 22,500
5 Tadir Gedeg Kelas II m2 19,900
BETON CETAK Ongkos kerja Pasangan Style
1 Kerawang bj 3,750
2 Buis Beton 50"/0,75 m` bj 65,000
3 Buis Beton 30"/0,75 m` bj 40,000
4 Buis Beton 20"/0,75 m` bj 25,000
5 Buis Beton 15"/0,75 m` bj 21,400
6 Batako Cetak Lubang KW.I bj 1,250
7 Batako Cetak Lubang KW.II bj 1,100
8 Batako Cetak Masif KW.I bj 1,500
9 Batako Cetak Masif KW.II bj 1,350
10 Paving blok T 8 cm berwarna m2 35,100
11 Paving blok biasa m2 32,250
12 Paving Blok / 8 cm m2 46,000
13 Paving Blok / 6 cm m2 34,500
14 Beton cor 1 : 2 : 3 m3 295,000
BAHAN LANTAI
1 PC Polos 20/20 cm m2 24,100
2 PC Polos 30/30 cm m2 29,600
3 Warna 20/20 cm m2 28,100
4 Warna 30/30 cm m2 33,750
5 Teraso 20/20 cm m2 33,750
6 Teraso 30/30 cm m2 41,600
7 Wafel 20/20 cm m2 29,100
8 Wafel 30/30 cm m2 32,800
9 Wafel Warna 20/20 cm m2 31,600
10 Wafel Warna 30/30 cm m2 36,400
11 Granit 20/20 cm m2 29,100
12 Granit 30/30 cm m2 41,800
13 Plint Polos 15/20 cm m2 26,100
14 Plint Polos 15/30 cm m2 28,400
15 Plint Teraso 15/20 m2 32,100
16 Plint Teraso 15/30 m2 33,900
17 Tegel PC Merah 20/20 m2 28,100
MOZAIK PORSELIN
1 Mozaik Lokal 30/30 cm m2 130,500
2 Mozaik Import 30/30 cm m2 204,000
3
MARMER
1 Mamer (30 x 30 cm) m2 129,100
2 Marmer (50 x 50 cm) m2 189,800
UBIN PORSELIN Flexible PVC Clypsal dia 20 m
1 Porselin Lokal Putih 11/11 cm dos 34,900
2 Porselin Lokal Warna 11/11 cm dos 36,800
3 Porselin Lokal Putih 15/15 cm dos 38,800
4 Porselin Lokal Warna 15/15 cm dos 41,500
HARGA
NO JENIS UPAH / MATERIAL SAT
( Rp. )
IKAD KWALITET I DK FLOOR TILE Saklar Serie Clypsal
1 Ikad Warna Muda 10/20 cm dos 41,400
2 Ikad Warna Muda 20/20 cm dos 40,000
DK WALL TILE
1 Wall TileWarna Muda 10/15 cm dos 38,600
2 Wall Tile Warna Muda 15/15 cm dos 42,300
3 Wall Tile Warna Muda 20/20 cm dos 42,100
KERAMIK DIAMOND Ub. Pas. Instalasi Titik Lampu
1 Diamond Muda Klas I 10/20 cm m2 41,000
2 Diamond Muda Klas I 20/20 cm m2 42,300
3 Diamond Muda Klas I 30/30 cm m2 44,800
4 Diamond Tua Klas I 10/20 cm m2 41,000
5 Diamond Tua Klas I 20/20 cm m2 43,600
6 Diamond Tua Klas I 30/30 cm m2 47,000
7 Diamond Tua Klas I 50/50 cm m2 85,000
8 Diamond Tua Klas I 45/45 cm m2 70,000
9 Diamond Muda Klas II 10/20 cm m2 40,000
10 Diamond Muda Klas II 20/20 cm m2 38,700
11 Diamond Muda Klas II 30/30 cm m2 42,300
12 diamond Tua Klas II 10/20 cm m2 43,500
13 Diamond Tua Klas II 20/20 cm m2 43,500
14 Diamond Tua Klas II 30/30 cm m2 44,100
15 Diamond Tua Klas II 50/50 cm m2 60,000
16 KIA WARNA MUDA m2 40,300
17 KIA Klas I 10/20 cm m2 40,300
18 KIA Klas I 20/20 cm m2 43,500
19 KIA Klas I 30/30 cm m2 45,300
20 KIA WARNA TUA 45,300
21 KIA Klas I 10/20 cm m2 43,750
22 KIA Klas I 20/20 cm m2 43,000
23 KIA Klas I 30/30 cm m2 46,650
BAHAN BESI SDL PVC dia 3/4"
1 Besi Beton Polos kg 10,000
2 Besi Beton ulir kg 7,500
BESI PLAT Ub. Pas. Instalasi Pipa PVC d
1 - 3`/6` Tebal 12 MM lbr 112,500
2 - 4`/8` Tebal 18 MM lbr 249,000
Besi strip (6/60 mm) btg 85,000
BESI SIKU L Tee PVC dia 1"
1 Besi Siku 30/30 x 3 btg 30,000
2 Besi Siku 40/40 x 4 btg 45,000
3 Besi Siku 50/50 x 5 btg 75,000
KAWAT Reducer dia 1"x3/4"
1 Kawat Ikat Beton kg 29,500
2 Kawat nyamuk 1x2 m m2 14,900
3 Kawat Harmonika 5 x 5 cm m2 17,100
4 Kawat Harmonika 4 x 4 cm m2 18,800
5 Kawat Harmonika 3 x 3 cm m2 22,000
6 Kasa/Ayak : 2 x 2 mm m2 28,000
7 Kawat 4 mm Kg 12,500
BAHAN PLAFON Knee PVC dia 1 1/2"
1 Eternit Klas I (1/1) M lbr 11,300
HARGA
NO JENIS UPAH / MATERIAL SAT
( Rp. )
2 Eternit Klas II (1/1) M lbr 10,500
3 Akustik 30/30 cm lbr 20,400
4 Triplek 3 mm lbr 39,500
5 Plywood (4 MM) lbr 65,000
6 Teak Wood lbr 66,000
7 Gypsum lbr 43,000
8 Ceilingteak lbr 65,000
9 Fornika lbr 54,500
10 Multipleks ( 6 MM ) lbr 80,000
11 Multipleks (9 MM ) lbr 110,000
12 Multipleks ( 12 MM ) lbr 127,000
13 Aluminium foil lbr 60,000
BAHAN PIPA Sock PVC dia 2"
1 Pipa Galvanis Medium 2 " BSA btg 230,000
2 Pipa Galvanis Medium 1,50" BSA btg 182,500
3 Pipa Galvanis Medium 1" BSA btg 144,350
4 Pipa Galvanis Medium 0,75" BSA btg 125,100
5 Pipa Galvanis Medium 0,50" BSA btg 60,000
6 Pipa PVC (Maspion) AW btg 12,500
7 Abu-abu : - Paralon 0,50 " AW btg 18,000
8 Paralon 0,75 " AW btg 21,500
9 Paralon 1" AW btg 27,500
10 Paralon 1,5" D btg 33,500
11 Paralon 2" D btg 50,000
12 Paralon 2,5" D btg 55,500
13 Paralon 3" D btg 80,000
14 Paralon 4" D btg 107,000
15 Maspion 0,50" btg 18,000
16 Maspion 0,75" btg 24,500
17 Maspion 1" btg 29,500
18 Maspion 1,5" D btg 54,000
19 Maspion 2" D btg 62,500
20 Maspion 2,5" D btg 77,000
21 Maspion 3" D btg 81,500
22 Maspion 4" D btg 114,500
23 Vinilon 0,50" AW btg 18,500
24 Pipa listrik btg 7,500
25 Pipa Besi 5/8 " btg 7,500
26 Pipa Paralon 5/8 " btg 8,000
27 PVC ( Alat bantu ) Ls 15,500
BAHAN FINISHING
1 Amplas lbr 4,200
2 Meni kg 28,125
3 Cat Dasar kg 13,300
4 Dempul kg 23,200
5 Politur ltr 32,000
6 Teak Oil ltr 25,000
7 Spritus ltr 9,300
8 Sirlak ltr 55,000
9 Oker ltr 14,100
10 Cat Kayu Emco kg 35,600
11 Batu kambang Kg 5,000
12 Cat Tembok altex Kg 5,600
HARGA
NO JENIS UPAH / MATERIAL SAT
( Rp. )
13 Vinilek kg 14,000
14 Decolit kg 14,500
15 Vini Voint kg 16,300
16 Paragon kg 12,300
17 Plamur Tembok kg 13,000
18 ICI kg 41,200
19 Residu/Teer ltr 6,800
20 Cat Besi kg 28,125
21 Cat Meni Besi kg 16,700
22 Minyak Cat Ltr 13,900
23 Residu/Teer Ltr 12,500
24 Minyak Bekisting Ltr 11,500
25 Ultran P 01 Ltr 36,500
26 Ultran P03 Ltr 35,500
BAHAN KACA Knee PVC dia 4" - 45
1 Kaca Bening 6 mm m2 108,700
2 Kaca Bening 5 mm m2 63,200
3 Kaca Bening 3 mm m2 45,500
4 Kaca Es/Kapur 3 mm m2 53,500
5 Kaca Ray-Ban 5 mm m2 104,500
6 Nako + Tralis kaca bening m2 135,000
ALAT PENGUNCI Pek. Pipa PVC D Wavin dia 6
1 Union : 1 slaag bh 61,500
2 Union : 2 slaag bh 76,500
3 Yale : 2 slaag bh 60,500
4 Kuda : 2 slaag bh 50,000
ALAT PENGGANTUNG Lem PVC Jepang
1 Hak Angin bh 6,000
2 Grendel bh 10,000
3 Engsel kupu-kupu bh 9,500
4 Engsel Nilon bh 17,500
5 Espanolet bh 33,000
6 Pemelas bh 6,500
BAHAN SANITAIR SDL Tembaga dia 1/2"
1 Wastafel SDD Tembaga dia 1/2"
2 Putih KIA/SUSAN bh 1,039,000
3 Warna KIA/SUSAN bh 1,257,500
4 Toto Type 220/C/Body only Warna Muda bh 331,500
5 Toto Type 220/C/Body only Warna Tua bh 328,500
6 Toto Type L 850 Warna Muda bh 1,270,500
7 Toto Type L 850 Warna Tua bh 1,808,500
8 Urinoir Toto U 57 M standar bh 1,258,500
9 Urinoir Toto U 57 M spesil bh 1,496,500
10 Closet Jongkok : 125,000
11 Traso Lokal/INA bh 109,500
12 Putih Lokal/INA bh 108,500
13 Warna KIA/INA bh 117,000
14 Toto Type CE 9/TU 150 NW V.12 bh 2,397,000
15 Kloset Duduk 1,275,000
16 Putih KIA bh 1,215,500
17 Warna KIA bh 1,594,500
18 Mono blok CW 4203/S 516 STD Muda bh 1,755,000
19 Mono blok CW 4203/S 516 STD Tua bh 1,974,500
HARGA
NO JENIS UPAH / MATERIAL SAT
( Rp. )
20 Bath Tub Toto
21 FB 1700 SDT Warna muda STD bh 4,756,500
22 FB 1700 SDT Warna tua STD bh 6,692,500
23 Toto 1700 S Handel Otomat warna muda bh 5,453,000
24 Toto 1700 S Handel Otomat warna tua bh 7,576,000
25 Pompa Air Tee Galvannish dia 1/2"
26 Sanyo 150 watt bh 1,500,000
27 Sanyo 250 watt bh 2,500,000
28 Hitachi/Dragon bh 362,500
BAHAN PAKU
1 Paku Lis kg 49,000
2 Paku Reng kg 49,000
3 Paku Usuk kg 63,000
4 Paku Seng kg 31,500
5 Paku Sekrup 1/2" biji 11,400
6 Paku Sekrup 2" biji 13,300
7 Paku gypsum kg 16,500
8 Paku beton 3" ktk 28,000
9 Tanah urug m3 16,100
10 Aspal kg 4,400
11 Solar ltr 4,300
12 Oli ltr 25,000
13 Sikat Ijuk Bh 19,000
14 Sikat Baja Bh 230,000
15 Alumnium Kulit Jeruk Lbr 90,000
16 Palimanan 30/30 T. 2,5 cm M2 100,000
17 Acustik dinding Yuman Ivory m2 37,500
LAIN-LAIN
1 Galian tanah M3 55,000
2 Ongkos angkut bahan Ls 35,000
3 Alat Bantu Pipa Ls 60,000
4 Ongkos angkut pipa ljr 2,000
5 Stamper Ls 20,000
6 Buangan tanah M3 55,000
7 Buangan tanah M3 55,000
8 Water Profing m2 75,000
9 Plesteran 1:2 m2 27,500
10 Lem kayu fox Ltr 35,500
11 Plastic sheet m2 3,500