JOINT I J K I J K
BATANG IT IJ JI JU JK KJ KV TI UJ VK
0.234 0.769 0.769 0.133 0.433 0.769 0.234
FEM 125.880 -125.880 125.880 -125.880
BALANCE -29.494 -96.802 0.000 0.000 0.000 96.802 29.494
CO 0.000 -48.401 48.401 0.000 -14.747 0.000 14.747
BALANCE 0.000 0.000 0.000 0.000 0.000 0.000 0.000
TOTAL -29.494 29.078 -174.281 0.000 174.281 -29.078 29.494 -14.747 0.000 14.747
KONTROL 0 0 0
TABEL PENULANGAN BALOK MEMANJANG
Tumpuan Lapangan
No. Penampang Kritis A B C
AB BC
AB BA BC CB
1 Mu (kNm) 160.604 284.586 284.586 160.604 280.735 280.735
2 b (m) 0.25 0.25 0.25 0.25 0.25 0.25
3 d efektif (m) 0.490 0.490 0.490 0.490 0.490 0.490
4 m 15.69 15.69 15.69 15.69 15.69 15.69
5 Mu/(bd ) (kN/m2)
2
1.836 3.253 3.253 1.836 3.209 3.209
6 0.0048 0.0087 0.0087 0.0048 0.0086 0.0086
7 min = 1,4/fy 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
8 dipakai 0.0048 0.0087 0.0087 0.0048 0.0086 0.0086
9 As = dipakai bd (mm2) 584.1 1069.5 1069.5 584.1 1053.9 1053.9
10 Tulangan terpakai (mm) 316 316 316 316 316 316
TABEL PENULANGAN BALOK MELINTANG
Tumpuan Lapangan
No. Penampang Kritis I J K
IJ JK
IJ JI JK KJ
1 Mu (kNm) 29.494 174.281 174.281 29.494 125.880 125.880
2 b (m) 0.25 0.25 0.25 0.25 0.25 0.25
3 d efektif (m) 0.490 0.490 0.490 0.490 0.490 0.490
4 m 15.69 15.69 15.69 15.69 15.69 15.69
5 Mu/(bd ) (kN/m2)
2
0.337 1.992 1.992 0.337 1.439 1.439
6 0.0008 0.0052 0.0052 0.0008 0.0037 0.0037
7 min = 1,4/fy 0.0035 0.0035 0.0035 0.0035 0.0035 0.0035
8 dipakai 0.0035 0.0052 0.0052 0.0035 0.0037 0.0037
9 As = dipakai bd (mm2) 428.8 636.0 636.0 428.8 453.9 453.9
10 Tulangan terpakai (mm) 316 316 316 316 316 316
4500000
4000000
3500000
3000000
2500000
1500000
1000000
500000
0
0 100000000 200000000 300000000 400000000 500000000 600000000