Anda di halaman 1dari 6

BAB II PERANCANGAN POLA DAN SISTEM SALURAN TUANG

2.1 Pengumpulan dan Pengolahan Data


2.1.1 Pengumpulan Data
Tabel 2.2 Data Awal Sistem Saluran Tuang
No Notasi & Rumus Input Output
1 Casting product weight,
0,126
Wo (Kg)
2 Density, (P) (Kg/Cm^3) 0.0027
3 Yield Ratio, Y (%) 70%
4 Pouring Weight, W (Kg) 0,18
Pouring Volume, Qp (cm3) 66,67
5 Wall Thickness, p (cm) 3,9
6 Casting Height, c (cm) 7,8
7 Sprue Height, h (cm) 10
8 Jenis Gating System Parting Line
9 Tipe Sprue Tapared Round Sprue
10 Jumlah Runner 1
11 Jumlah Ingate 1
12 Effective Sprue Height
9,025 cm
(ESH)
13 Pouring Rate ( R )
0,296 Kg/sec
Aluminium
14 Pouring Time (Tp),
0,608
Second
15 Calculate Sprue Area (As)
Sprue Efficiency Factor 0,88
Gravitasi, g = 9,807 m/s
= 980.7 cm/s (cm/s) 980,7

As (cm2) = W/.Tp.C
2gh 1,004

Jari-Jari (r) = (/) 0,565


Diameter
Bawah Sprue, Ab (cm) = 2 1,33
xr
Tinggi Pouring Basin, b
2
(cm) (asumsi)
Diameter Atas Sprue, (cm)
1,69
= Ab x /b
16 Gatting Ratio Sprue Runner Ingate
1 0,9 0,8
Gatting Ratio Yang Sprue Runner Ingate
Digunakan 1,3027 1,1724 1,0421 cm2

LAPORAN PRAKTIKUM PERANCANGAN POLA DAN SISTEM SALURAN TUANG


BAB II PERANCANGAN POLA DAN SISTEM SALURAN TUANG

cm2 cm2
17 Jumlah Runner 1
18 Calculate Runner Area (Ar)
Luas Runner, Ar (cm)
0,9036
Asumsi Kedalaman Tinggi
Runner, t (cm) (asumsi) 1.5

Lebar Runner (cm) =Ar/t 0,6024


19 Calculate Well Dimension
Well Area, (cm) = 5 x As
5,02
Jari-Jari , r (cm) =
(Lwell/) 1,264

Diameter, D (cm) = 2 x r
2,528
Well Depth, (cm) = 2 x 2
tinggi runner 6

20 Calculate Ingate
Jumlah Ingate 1
Luas Area Ingate, Ag (L)
(cm2) 0,8032

Asumsi Kedalaman
0,75
Ingate, t (cm)
Lebar Ingate,l (cm) = L/t
1,0709
21 Velocity (cm/s)
Velocity at Sprue, Vs =
Q1/As 109,217

Velocity at Runner, Vr =
Q1/Ar 121,352

Velocity at Ingate, Vg =
Q1/Ag 136,521

22 Reynold Number, Nr (Cm2/Kg)


Nr Sprue = Vs x Ab /R 416,943 Aliran Laminer

LAPORAN PRAKTIKUM PERANCANGAN POLA DAN SISTEM SALURAN TUANG


BAB II PERANCANGAN POLA DAN SISTEM SALURAN TUANG

Nr Runner = Vr x Ab /R
463,269
Aliran Laminer

Nr Ingate = Vg x Ab / R
521,178 Aliran Laminer

Gambar 2.12 Gambar Teknik 2D Produk Intake Manifold

LAPORAN PRAKTIKUM PERANCANGAN POLA DAN SISTEM SALURAN TUANG


BAB II PERANCANGAN POLA DAN SISTEM SALURAN TUANG

Gambar 2.13 Gambar Teknik 3D Produk Intake Manifold

LAPORAN PRAKTIKUM PERANCANGAN POLA DAN SISTEM SALURAN TUANG


BAB II PERANCANGAN POLA DAN SISTEM SALURAN TUANG

Gambar 2.14 Gambar Teknik 2D Gating System

Gambar 2.15 Gambar Teknik 3D Gating System

LAPORAN PRAKTIKUM PERANCANGAN POLA DAN SISTEM SALURAN TUANG


BAB II PERANCANGAN POLA DAN SISTEM SALURAN TUANG

Gambar 2.16 Gambar Teknik 3D Assembly Intake Manifold dan Gating System

LAPORAN PRAKTIKUM PERANCANGAN POLA DAN SISTEM SALURAN TUANG

Anda mungkin juga menyukai