BILL OF QUANTITY

PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL


LOKASI : CINANGNENG

NO URAIAN PEKERJAAN VOLUME URAIAN


Item Pembelian Q'ty
1 2 3

I PEKERJAAN PERSIAPAN
Pas. Bouwplank m'
2 Pekerjaan pembersihan lokasi ls
Sub Total

II PEKERJAAN GALIAN DAN URUGAN m1


1 Galian pondasi m3
2 Urugan tanah mendatangkan dari luar dipadatkan m3
3 Urugan tanah kembali m3
Sub Total
64.00
III PEKERJAAN STRUKTUR LANTAI 1 13.10 Besi Beton dia 10 mm 77.26
1 Lantai kerja m3 Besi Beton dia 8 mm 41.26
2 Pondasi batu kali 1 : 5 13.44 m3 Cakar Ayam 15.00
3 Pondasi plat Cakar Ayam (13 bh) 4.16 m3 Ring Beton 1,050.00
4 Pondasi tangga beton m3 Kawat Beton 10.00
5 Sloof beton S1 15/20 (64 m) 1.92 m3 Bambu 50.00
6 Plat tangga beton m3 Mutyplek 9 mm 10.00
7 Kolom beton 15/15 (13 BH) 1.32 m3 Paku 20.00
8 Kolom praktis 13/13 (6 BH) 0.41 m3 Kaso 1.00
9 Balok beton lintel 13/13 (15 M) 0.25 m3 Semen 79.09
Pasir 16.94
Sub Total Split 10.87
Besi Jadi 12.00
IV PEKERJAAN STRUKTUR LANTAI 2 Batu Kali 10.75
1 Balok beton 15/25 m3 Papan Cor 30.00
2 Balok beton 15/30 (47 M Ring Balk) m3
3 Balok beton lintel 13/13 (6 M) m3
Kolom beton 20/50 m3
Kolom beton 10/40 m3
Kolom beton 15/20 (12 BH) m3
4 Kolom Praktis 13/13 m3
5 Plat lantai beton tb. 12 cm 2.88 m3
6 Plat topi beton tb. 8 cm 0.24 m3
7 Plat Talang+Kanopy t. 12 cm m3
8 Balok beton+Ring Balk 15/20 1.92 m3
Sub Total

V PEKERJAAN PASANGAN Bata Merah 14,770.00


1 Pas. Bata 1 : 5 252.00 Pasir 55.10
- Lantai 1 (26,75 m) 252.00 m2 Semen 143.84
- Lantai 2 (45,50 m) m2 Granit Tile 60x60 Indogress 75.51
- Atap m2 Keramik Lantai 20x20 7.09
2 Plesteran dan acian 1 : 5 504.00 Keramik Dinding 20x25/30 42.53
- Lantai 1 504.00 m2 Railling Tangga -
- Lantai 2 - m2 Mata Gurinda Potong Granit 2.00
- Atap - m2
3 Lantai Keramik Granit 60x60 155.13
- Lantai 1 92.88 m2
- Lantai 2 m2
4 Lantai keramik tangga tile 60x60 m2
Lantai Keramik Ruang Jemur m2
5 Plin Keramik 10x40 (upah)
- Lantai 1 78.00 m'
- Lantai 2 m'
- Tangga m'
6 Lantai keramik WC/KM 20x20 Bercorak/Anti slip
- Lantai 1 6.75 m2
- Lantai 2 m2
7 Dinding keramik WC/KM 20x25 Bercorak
- Lantai 1 40.50 m2
- R. Melahirkan m2
- Lantai 2 m2
8 Water proofing coating setara Aquafin
- Lantai 2 21.75 m2
9 Reiling tangga m'
Sub Total

VI PEKERJAAN KUSEN

1 Kusen Pintu dan Jendela 6/15 (Kamper Open) m3 Sub Kusen Pintu Dll 1.00
2 Daun pintu panel Kamper Open m2

Sub Total

VII PEKERJAAN ATAP Kuda` Kuda2 Baja Ringan 120.00


1 Kuda-kuda baja ringan zinkalume 120.00 m2 Atap Genteng 1,740.00
2 Atap genteng 120.00 m2 Nok Genteng -
3 Bubungan m' Gypsum Rangka Hollow 99.63
4 Lisplank GRC 31.00 m' List Gypsum 95.00
5 Plafond Gypsumboard + rangka hollow Lisplang GRC 31.00
- Lantai 1 99.63 m2
- Lantai 2 m2
6 List profil gypsum 10 cm
- Lantai 1 95.00 m'
- Lantai 2 m'

Sub Total

VIII PEKERJAAN PENGECATAN 603.63 Cat Tembok 150.91


1 Cat dinding Plamir 15.00
- Lantai 1 504.00 m2 Alat Kerja 1.00
- Lantai 2 - m2
- Atap - m2
2 Cat plafond
- Lantai 1 99.63 m2
- Lantai 2 - m2
3 Melamix Kusen/daun Pintu dan jendela m2

Sub Total
IX PEKERJAAN INSTALASI LISTRIK
1 Instalasi Stop Kontak Kabel Listrik 8.00
- Lantai 1 ttk Stop Kontak 10.00
- Lantai 2 ttk Saklar 10.00
2 Instlasi Penerangan Seltip 2.00
- Lantai 1 ttk Fiting Plafond 20.00
- Lantai 2 ttk MCB 2.00
3 Stop Kontak Sikring 4.00
- Lantai 1 bh Lampu 8.00
- Lantai 2 bh
4 Saklar Tunggal
- Lantai 1 bh
- Lantai 2 bh
5 Saklar Seri
- Lantai 1 bh
- Lantai 2 bh

Sub Total

X PEKERJAAN INSTALASI AIR & SANITAIR Klosed Jongkok 1.00


1 Kloset duduk setara TOTO bh Tempat Sabun 1.00
2 Kloset jongkok setara TOTO 2.00 bh Floor Drain 2.00
3 Wastafel gantung setara TOTO 1.00 bh Kran 2.00
4 Kitchen zink 1.00 bh Jet Shower Onda
5 Jet washer 1.00 bh Paralon 1/2" 7.00
6 Bak mandi fiber lapis keramik bh Paralon 1" 2.00
7 Shower bh Paralon 3" 6.00
8 Kran air 1/2" 4.00 bh Paralon 4" 6.00
9 Kran angsa 1/2" bh Lem Pipa 1.00
10 Floor drain 3.00 bh Accessorien (T,Knee, dll) 1.00
11 Roof Drain bh
12 Instalasi air bersih
- Pipa PVC 1/2" 79.50 m'
- Pipa PVC 1" 25.00 m'
13 Gate valve 1" 2.00 bh
14 Instalasi air kotor
- Pipa PVC AW 3" 24.00 m'
- Pipa PVC AW 4" 24.00 m'
15 Bak Kontrol 30x30 unit
16 Septictank & rembesan 1.00 unit
Sub Total

Upah
Jumlah
Sat. Harga Harga

26,833,196.119

53,500.00 4,133,456.522
35,000.00 1,444,130.435 Besi 10 Besi 8 Besi Jadi
115,000.00 1,725,000.000
1,350.00 1,417,500.000 26 Kolom
18,000.00 180,000.000 22 Sloof
14,000.00 700,000.000 22 Ring Balk
100,000.00 1,000,000.000 4 Topian
15,000.00 300,000.000 15 Dak KM Mandi
3,000,000.00 3,000,000.000 25 Dak Teras
54,000.00 4,270,810.050 4 Kolom Teras
200,000.00 3,388,942.500
225,000.00 2,445,556.613
45,000.00 540,000.000
150,000.00 1,612,800.000
22,500.00 675,000.000
35000 upah
62500 multy
22500 Kaso
5000 Pku
47,419,679.800 15000 steger
140000
675.00 9,969,750.000 #REF!
250,000.00 13,775,610.000
54,000.00 7,767,357.300 45500 bata 22500 upah
150,000.00 11,326,500.000 15000 upah 7898 pasir
86,000.00 609,525.000 11250 pasir 6400 semen
87,500.00 3,720,937.500 6400 semen
375,000.00 - 78150 36798
125,000.00 250,000.000
12,500,000.00 12,500,000.000

35,060,050.000

110,000.00 13,200,000.000
6,500.00 11,310,000.000
12,500.00 -
85,000.00 8,468,550.000
10,000.00 950,000.000
36,500.00 1,131,500.000

4,247,687.500

25,000.00 3,772,687.500
15,000.00 225,000.000
250,000.00 250,000.000

4,020,000.000
270,000.00 2,160,000.000
20,000.00 200,000.000
20,000.00 200,000.000
15,000.00 30,000.000
25,000.00 500,000.000
75,000.00 150,000.000
75,000.00 300,000.000
60,000.00 480,000.000

1,517,500.000

240,000.00 240,000.000
50,000.00 50,000.000
25,000.00 50,000.000
40,000.00 80,000.000
80,000.00 -
22,500.00 157,500.000
25,000.00 50,000.000
45,000.00 270,000.000
55,000.00 330,000.000
40,000.00 40,000.000
250,000.00 250,000.000
131,598,113.42

40,000,000.00
TOTAL 171,598,113.42
Luas
Banyak Lobang P. Kusen P. Daun Kaca Luas Pintu
PJ 2 5.02 11.65 8.92 1.08 3.225
P1 2 1.98 5.3 1.72
P2 2 1.98 5.3 1.72
P3 1 1.87 5.25 1.6125
P4 1 1.76 5.2 1.505
P5 1 1.87 5.25 1.6125
P6 1 3.3 5.9 11.4 2.52
P7 1 1.87 5.25 1.6125
PA (PVC) 1 1.6
J1 1 1.495 6.2 6.8 0.88
J2 1 0.39 2.5 0.275
J3 2 1.805 7.6 8.8 1.02
J4 2 2.185 8 9.2 1.36
J5 1 0.54 3 0.4
J6 1 3.705 11.5 14.3 2.465
J7 1 3.3 16.2 15 1.53
J8 1 0.9 5.1 7 0.4

Luas
Lobang P. Kusen P. Daun Kaca Luas Pintu
PJ 10.04 23.30 17.84 2.16 6.45
P1 3.96 10.60 - - 3.44
P2 3.96 10.60 - - 3.44
P3 1.87 5.25 - - 1.61
P4 1.76 5.20 - - 1.51
P5 1.87 5.25 - - 1.61
P6 3.30 5.90 11.40 2.52 -
P7 1.87 5.25 - - 1.61
PA (PVC) 1.60 - - - -
J1 1.50 6.20 6.80 0.88 -
J2 0.39 2.50 - 0.28 -
J3 3.61 15.20 17.60 2.04 -
J4 4.37 16.00 18.40 2.72 -
J5 0.54 3.00 - 0.40 -
J6 3.71 11.50 14.30 2.47 -
J7 3.30 16.20 15.00 1.53 -
J8 0.90 5.10 7.00 0.40 -

48.54 147.05 108.34 15.39 19.67


1.32345
Engsel
Pintu Jendela H. Angin Kunci L. Plitur
2 2 2 1 10.351
1 1 4.606
1 1 4.606
1 1 4.38
1 1 4.154
1 1 4.38
2 1 3.008
1 1 4.38
0
2 2 2.384
0.55
2 2 2.992
2 2 3.14
0.66
3 3 4.675
3 3 5.814
2 2 2.172
0
Engsel
Pintu Jendela H. Angin Kunci L. Plitur
4.00 4.00 4.00 2.00 20.70
2.00 - - 2.00 9.21
2.00 - - 2.00 9.21
1.00 - - 1.00 4.38
1.00 - - 1.00 4.15
1.00 - - 1.00 4.38
2.00 - - 1.00 3.01
1.00 - - 1.00 4.38
- - - - -
- 2.00 2.00 - 2.38
- - - - 0.55
- 4.00 4.00 - 5.98
- 4.00 4.00 - 6.28
- - - - 0.66
- 3.00 3.00 - 4.68
- 3.00 3.00 - 5.81
- 2.00 2.00 - 2.17

14.00 22.00 22.00 11.00 87.95


BILL OF QUANTITY
PEKERJAAN : PEMBANGUNAN RUMAH TINGGAL
LOKASI : JALAN PALAYU RAYA NO. 3 - BANTAR JATI BOGOR

NO URAIAN PEKERJAAN VOLUME

1 2 3

I PEKERJAAN PERSIAPAN
1 Pas. Bouwplank 38.20 m'
Sub Total

II PEKERJAAN GALIAN DAN URUGAN 68.75 m1


1 Galian pondasi 38.50 m3
2 Urugan tanah kembali 17.33 m3
Sub Total

III PEKERJAAN STRUKTUR LANTAI 1


1 Lantai kerja 0.45 m3
2 Pondasi plat beton 1.79 m3
3 Sloof beton S1 15/20 1.15 m3
4 Kolom praktis 15/15 1.35 m3
5 Balok beton lintel 15/15 0.86 m3
6 Ring Balk 15/20 1.15 m3
7 Pas. Bata 1 : 5 152.80 m2
8 Plesteran dan acian 1 : 5 152.80 m2
9 Kamprotan 76.40 m2
10 Pengecatan 152.80 m2

Sub Total
35,000,206.00
299,542,500.00
266.26
2,250,000.00
599,085,000.00
PROGRESS
Harga Satuan Jumlah Harga %
s/d YG LALU SAAT INI
4 5

10,000.00 382,000.00 1.091


382,000.00 1.091

25,000.00 962,500.00 2.750


20,000.00 346,500.00 0.990
1,309,000.00 3.740

675,000.00 302,400.00 0.864


2,150,000.00 3,852,800.00 11.008
2,250,000.00 2,578,500.00 7.367
2,975,000.00 4,016,250.00 11.475
2,975,000.00 2,558,500.00 7.310
2,400,000.00 2,750,400.00 7.858
65,000.00 9,932,000.00 28.377
28,500.00 4,354,800.00 12.442
14,200.00 1,084,880.00 3.100
12,295.00 1,878,676.00 5.368

33,309,206.00 95.169
35,000,206.00 100.00
ROGRESS BOBOT (%)
s/d SAT INI s/d SAAT INI

- -
-

- -
- -
-

- -
- -
- - 33 83 222 61
- -
- -
- -
- -
- -
- -
- -

-
-
Jendela Kusen 6.6 110000 726000
Daun 6.6 110000 726000
Kaca 1.68 110000 184800
1636800 3273600