4 Memancang 19 x
11 - Lantai Beton 8 x 3
Liner 3 x 0.2
13 Bekisting Lantai 8 x 3
Lining 3 x 0.2
3 x 0.2
13 Baut tongkat 19 x 1
kait angin 10 x 1
8
8x 0.15
3x 0.15
LINNING
TULANGAN POKOK 8X 3
BEUGEL 3x 0.15
x 4 x 19 = 0.76
x x = 19.00
x x = 38
x 0.8 x 19 = 0.05
x 2 x 6 = 0.04
x 3 x 5 = 0.15
x 4.5 x 5 = 0.23
x 0.025 x 2 = 1.25
x 0.12 x = 2.88
x 0.4 x 2 = 0.48
x x = 24
x 0.4 x = 0.24
x 0.4 x = 0.24
x x = 19
x x = 10
= 54.3333333333 3= 108.66667
= 21 8= 94.5
= 48 = 48
= 20 x 1= 20
am Tanah 8 X 0.8
8 X 2
0.8 X 0.08 X 0.04
24 X 1
10 X 1.5
10 x 1
Total
1 Unit
6.08
0.76
4
19
38
0.10
0.04
0.15
0.23
1.25 M3
2.88 M3
0.48
3.36 m3
24.48 M2
29 Bh
0.393 X 12 = 4.716
X 0.393 = 42.706
X 0.393 = 37.1385
79.8445 kg
X 0.393 = 18.864
X 0.22 = 8.8
27.664 kg
0.22 2.64
X BANYAK
X 8 = 1.6
8 = 0.1024
= 32
= 6.4
= 16
X 8 = 0.02048
= 24
X 2 = 30
X 4 = 20
Turap kayu Bulat 206.00 x 2= 412
p j pjg crck jmlh
206 0.1 2,061.00 2 4,122.00
gapit 206 4 2
penarik 206 1 4
Jangkar 206 1 206 2 412
Timbunan Badan P L T =
103.00
51.5 51.50
0.8 82.40
1,267.40
2.00 Kiri/Kanan
2,534.80 btg
1,268 dibulatkan
vol
154.5
PERHITUNGAN VOLUME
1 2
A PEKERJAAN JALAN RABAT BETON
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi
0.00 -
(16,261,222.99)
2 Papan Nama Proyek
3 Mobilisasi
VOLUME
Rw.08 Kel.Terusan
Volume =
206.00 Panjang x Lebar = 206.00 x 2.50 =
Persentase 0.36 =
Volume = 1.00 Ls
Volume = 1.00 Ls
(16,261,223)
117,887,000
PERHITUNGAN VOLUME
1,011,908.57
184.32 m2
184.32 m2
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA
Engineer Estimate (EE)
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
II PEKERJAAN JEMBATAN
IV PEKERJAAN TANAH
Diperiksa Oleh :
Pejabat Pelaksana Teknis Kegiatan IV
Seksi Pembangunan Jalan Lingkungan
Kecamatan Sungai Kunyit dan Mempawah Hilir
Bidang Cipta Karya
WAWAN STIAWAN
Nip. 19810119 201001 1 006
Mengetahui Oleh :
Pejabat Pembuat Komitmen I
Bidang Cipta Karya Dinas Pekerjaan Umum
Kabupaten Mempawah
1,811,908.57
59,740,477.83
13,538,320.00
32,079,607.50
107,170,313.90
10,717,031.39
117,887,345.29
117,887,000.00
Pontianak, 2016
Dibuat Oleh :
Konsultan Perencana
CV. TRIMITRA GRAHA DESAIN
RENDRA NOVIZAR, ST
Team Leader
Mengetahui Oleh :
Pejabat Pembuat Komitmen I
ng Cipta Karya Dinas Pekerjaan Umum
Kabupaten Mempawah
NO URAIAN PEKERJAAN
I PEKERJAAN PERSIAPAN
1 Pembersihan dan Striping / Kosrekan
2 Pengukuran dan Pematokan
3 Papan Nama Proyek
II PEKERJAAN JEMBATAN
1 Pekerjaan Jembatan Komposit
IV PEKERJAAN TANAH
Sta 0+000 - Sta 0+206
P = 206m, L = 2.5 m, T = 0.30 m
1 Timbunan Badan Jalan
DAFTAR KUANTITAS DAN HARGA
Engineer Estimate (EE)
JUMLAH
HARGA
(Rp)
1,011,908.57
500,000.00
300,000.00
Rp 1,811,908.57
59,740,477.83
Rp 59,740,477.83
13,538,320.00
Rp 13,538,320.00
32,079,607.50
Rp 32,079,607.50
Rp 107,170,313.90
RAB JEMBATAN
Program :
Kegiatan :
Pekerjaan :
Lokasi :
Sumber Dana :
Tahun Anggaran :
NO
A.
1
2
3
4
5
6
7
8
NO
B.
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
75
C.
1
2
3
4
5
6
7
8
9
10
17
18
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
1
D.
E.
1
2
3
13
F.
24
31
G.
H.
I.
J.
K.
1
2
3
4
5
6
7
8
9
10
L.
N.
M.
1
2
3
4
5
6
7
STANDAR HARGA SATU
WILAY
JENIS PEKERJA
UPAH
Mandor Lapangan
Mekanik
Mekanik Pembantu
Kepala Tukang
Tukang
Buruh Lapangan Terlatih
Buruh Lapangan Agak Terlatih
Buruh Lapangan Tak Terlatih
Catatan :
JENIS BAHAN
BAHAN PENGISI
Batu pecah 15-20 cm
Batu pecah 10-15 cm
Batu pecah 5-7 cm
Batu pecah 3-5 cm
Batu pecah 2-3 cm
Batu pecah 1-2 cm
Batu pecah 0,5 - 1 cm
Stone Dust
Aspal Bitumen 60/70
Pasir Urug
Pasir Ayak Untuk Beton
Semen PC
Semen PC
Timbunan Tanah Biasa
Timbunan Tanah Pilihan
Bahan Plastik Cor Beton
BAHAN KAYU
Kayu Belian Tidak Ketam uk. 4 cm x 8 cm x 4 m
Kayu Belian Tidak Ketam uk. 6 cm x 6 cm x 4 m
Kayu Belian Tidak Ketam uk. 7 cm x 7 cm x 4 m
Kayu Belian Tidak Ketam uk. 8 cm x 8 cm x 4 m
Kayu Belian Tidak Ketam uk. 8 cm x 16 cm x 4 m
Kayu Belian Tidak Ketam uk. 9 cm x 9 cm x 4 m
Kayu Belian Tidak Ketam uk.10 cm x 10 cm x 4 m
Kayu Belian Tidak Ketam uk.12 cm x 12 cm x 4 m
Kayu Belian Tidak Ketam uk.15 cm x 15 cm x 4 m
Kayu Belian Tidak Ketam uk.5 cm x 10 cm x 4 m
Papan Belian Tidak Ketam uk.2,5 cm x 16 cm x 4 m
Papan Belian Ketam uk. 2 cm x 16 cm x 4 m
Papan kls III Tidak Ketam uk.2 cm x 18 cm x 4 m
Papan Simpiran
Renglat kayu klas I uk 1/8 cm
Kayu profil 10 cm
Profil Kayu Klas II L = 7 cm Pjg 4 m
Kayu cerucuk /dolken 4 - 6 - Pj. 4 M
Kayu cerucuk /dolken 6 - 8 - Pj. 4 M
Kayu cerucuk /dolken 8 - 10 - Pj. 4 M
Kayu cerucuk /dolken 10 - 12 - Pj. 12 M
Kayu cerucuk /dolken 12 - 15 Pj. 12 M
Kayu untuk Perancah
Kayu Simpiran
Kayu Bakar
Alat-alat Bantu
Alat-alat Bantu
Alas laci
Wood Plank
2
BAHAN CAT
BAHAN PENGANTUNG
Paku Campuran
Paku Beton
BAHAN ATAP
BAHAN KACA
BAHAN TRIPLEK
BAHAN SANITASI
BAHAN MINYAK
Minyak Tanah Non Subsidi
Minyak Diesel/Solar
Bensin Premium
Minyak Pelumas
Grease
Oli BEO 154W40/Cat
Gas Elpiji
Sewa Alat Untuk Pengelasan
Sewa Molen
Sewa kuali termasuk angkutan
TANAMAN HIAS
LAIN-LAIN
Pintu Air Sorong Uk. 0,40 s/d 0,60 m
Pintu Air Ulir Uk. 0,60 s/d 0,80 m
Pintu Air Ulir Uk. 0,90 s/d 1,20 m
Gorong2 Beton 40 cm Tanpa Tulang
Gorong2 Beton 60 cm Tanpa Tulang
Gorong2 Beton 80 cm Tanpa Tulang
Gorong2 Beton 100 cm Tanpa Tulang
RGA SATUAN UPAH DAN BAHAN
WILAYAH I
HARGA HARGA
KODE SATUAN SATUAN
(Rp) (Rp)
3 4 5 6 7
- M 11,245,200.00
- M 14,903,900.00
- M 12,535,700.00
- M 11,038,600.00
- M 7,240,700.00
- M 11,254,100.00
- M 11,585,200.00
- M 12,642,600.00
- M 14,564,000.00
- M 10,923,100.00
M.181.d M 17,084,700.00
M.181.e M 20,331,900.00
M.181.l M 2,758,500.00
- M 1,268,900.00
- Btg 51,600.00
- Btg 25,100.00
- Keping 33,300.00
- Batang 9,400.00
- Batang 13,400.00
- Batang 17,400.00
- Batang 92,800.00
- Batang 112,800.00
- M 1,132,200.00
- M 1,096,500.00
- M 79,500.00
M. 170 Set 117,900.00
M. 170.a Ls 1,500.00
- Btg 20,000.00
- M' 66,300.00
3 4 5
M.167 Kg 21,900.00
- Kg 23,800.00
M.168 Kg 25,000.00
- Buah 16,000.00
M.166.b Kg 26,200.00
- Kg 34,400.00
- Unit 3,753,800.00
- Unit 8,431,500.00
- Unit 10,106,300.00
- M1 219,500.00
M 031 M1 346,500.00
M 033 M1 473,600.00
M 035 M1 635,300.00
KETERANGAN
6
6
DAFTAR HARGA PERALATAN
PROPINSI : KALIMANTAN BARAT ( 61 )
KABUPATEN : MEMPAWAH ( 02 )
BENSIN
SOLAR
CRF pada i PELUMAS
sebesar 12,5 % i
HARGA PERALATAN
Wilayah I
9,900.00
8,700.00 CATATAN :
33,800.00 - HARGA BAHAN BAKAR DAN PELUMAS MENGIKUTI PEDOMAN HARGA SK BUPATI (PER WILAYAH)
12.5% - KONSTANTA MENGIKUTI PANDUAN ANALISIS HARGA SATUAN 008/BM/2008 (NOPEMBER 2008)
PENDUKUNG SPESIFIKASI UMUM EDISI DESEMBER 2006 (kolom 9 s/d 15)
- ANALISA HARGA ALAT PER JAM INI DIGUNAKAN UNTUK PERHITUNGAN HARGA SATUAN
PEKERJAAN DENGAN ANALISA K ( PETUNJUK TEKNIK NOMOR : 015/T/Bt/1995)
- KHUSUS ALAT ASPHALT MIXING PLANT DITAMBAH BIAYA BAHAN BAKAR PEMANASAN MATERIAL
DENGAN RUMUS 12 X 0,7 X KAPASITAS X BAHAN BAKAR
NT COST
= TC x 7 Jam
18
7,127,627.03
4,395,230.58
6,458,054.25
1,781,175.68
3,375,654.04
1,390,356.96
972,730.13
3,378,804.19
352,084.46
128,502.10
114,435.70
332,388.84
25,947,183.58
2,195,507.59
171,909.27
1,935,858.26
2,609,827.71
1,575,807.89
270,162.86
152,628.44
6,306,268.61
8,109,735.92
633,682.70
206,463.43
Membuat 1 M Beton Mutu f 9,8 Mpa (K 125) Slump (12 2) Cm, w/c= 0,78
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Tukang Batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Jumlah
B BAHAN
1 Semen Portland - Kg
2 Pasir M.041 Kg
3 Batu pecah 1-2 cm (Kerikil Maks 30 mm) M.025 Kg
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
B.03.b
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
1,102,462.09
1,102,462.09
PEMERINTAH KABUPATEN MEMPAWAH ANALISA BIAYA PE KE
DINAS PEKERJAAN UMUM PEK. MEMBUAT KAYU SANDARAN JEMBATA
Jalan Daeng Manambon Telp. (0561) 691139 Fax. 691144 Kode BALOK AIR PADA BARAU, TOPANGAN ANGIN D
Pos 78911
M E M P A W A H
KAYU-KAYU PENAHAN MENGGUNAKAN KAY
JUMLAH HARI -
PEKERJA JUMLAH ORANG HARI KODE
ORANG
1 2 3 4 5
P
E Pekerja Tidak Terlatih 8.000 1.00 L 101 8.0000
K Tukang Kayu 24.000 1.00 L 079 24.0000
E Kepala Tukang 2.400 1.00 L 073 2.4000
R Mandor 0.400 1.00 L 061 0.4000
J
A
PEKERJA
M 1 2 3 4
A
T Kayu Belian (Tidak Ketam uk. 10/10) 1.10 m3 -
E Paku beton 3.00 Kg -
R
I
A
L
MATERIAL
HARI
PERALATAN JUMLAH ALAT KODE JAM KERJA
KERJA
P
E
1 2 3 4 5
R
A
L
A
T
A
N
L
A
T
A
N
PERALATAN
TOTAL (R
02
BIAYA
UPAH (Rp./Org/hari) SUB TOTAL (Rp.)
(Rp.)
6 7 8
80,000.00 640,000.00
100,000.00 2,400,000.00
115,000.00 276,000.00
115,000.00 46,000.00
PEKERJA 3,362,000.00
5 6 7
11,585,200.00 12,743,720.00
34,400.00 103,200.00
MATERIAL 12,846,920.00
BIAYA
HARGA (Rp./Jam) SUB TOTAL
(Rp)
6 7 8
PERALATAN -
16,208,920.00 Per M3
ANALISIS BOW ANALISA BIAYA PEKERJAAN
PENERBIT M2S BANDUNG PAPAN YANG DIPAKUKAN DI ATAS GELEGAR KAYU
ATAU BALOK-BALOK PEMIKUL
PROPINSI : KODE KABUPATEN: KODE
M
A Paku Jembatan 0.75 Kg M 166 34,400.00
T
E
R
I
A
L
TOTAL Rp.
1,150.00
5,750.00
50,000.00
16,000.00
72,900.00
BIAYA SUB TOTAL
(Rp.) (Rp.)
25,800.00
25,800.00
BIAYA SUB TOTAL
(Rp.) (Rp.)
-
98,700.00
Per M2
PEMERINTAH KABUPATEN MEMPAWAH
JUMLAH
PEKERJA HARI KODE
ORANG
1 2 3 4
P
E Mandor 0.025 1.00 L.061
K Kepala Tukang 0.008 1.00 L.073
R Tukang 0.080 1.00 L.079
J Buruh Tak Terlatih 1.000 1.00 L.101
A
PEKERJ
VOLUME
MATERIAL JUMLAH
SATUAN
1 2 3
M
A
T
E
R
I
A
L
MATERI
EMPAWAH 02
5 6 7 8
PEKERJA 91,795.00
4 5 6 7
MATERIAL -
PERALATAN -
JUMLAH HARI -
PEKERJA JUMLAH ORANG HARI KODE
ORANG
1 2 3 4 5
P
E Pekerja Tidak Terlatih 8.000 1.00 L 101 8.0000
K Tukang Kayu 24.000 1.00 L 079 24.0000
E Kepala Tukang 2.400 1.00 L 073 2.4000
R Mandor 0.400 1.00 L 061 0.4000
J
A
PEKERJA
M 1 2 3 4
A
T Kayu Belian (Tidak Ketam uk. 4/8) 1.10 m3 -
E Paku beton 3.00 Kg -
R
I
A
L
MATERIAL
HARI
PERALATAN JUMLAH ALAT KODE JAM KERJA
KERJA
P
E
1 2 3 4 5
R
A
L
A
T
A
N
A
T
A
N
PERALATAN
TOTAL (R
02
BIAYA
UPAH (Rp./Org/hari) SUB TOTAL (Rp.)
(Rp.)
6 7 8
80,000.00 640,000.00
100,000.00 2,400,000.00
115,000.00 276,000.00
115,000.00 46,000.00
PEKERJA 3,362,000.00
5 6 7
11,245,200.00 12,369,720.00
34,400.00 103,200.00
MATERIAL 12,472,920.00
BIAYA
HARGA (Rp./Jam) SUB TOTAL
(Rp)
6 7 8
PERALATAN -
15,834,920.00 Per M3
PEMERINTAH KABUPATEN MEMPAWAH
A N A L I S A B I A Y A P E K E R J A AN
DINAS PEKERJAAN UMUM
TIANG DIPANCANGKAN DIDALAM TANAH YANG LUN
Jalan Daeng Manambon Telp. (0561) 691139 Fax. 691144 Kode
Pos 78911 DIHITUNG BAGIAN TIANG YANG MASUK KEDALAM
M E M P A W A H
1 2 3 4 5 6
P
E Mandor 0.0430 1.00 L 061 0.0430 115,000.00
K Kepala Tukang 0.0040 1.00 L 073 0.0040 115,000.00
E Tukang 0.0400 1.00 L 079 0.0400 100,000.00
R Buruh Tak Terlatih 1.8000 1.00 L101 1.8000 80,000.00
J
A
PEKERJA
M 1 2 3 4 5
A
T
E
R
I
A
L
MATERIAL
HARI
PERALATAN JUMLAH ALAT KODE JAM KERJA HARGA (Rp./Jam)
KERJA
P
E
1 2 3 4 5 6
R
A
L
A
T
A
N
PERALATAN
T
A
N
TOTAL (Rp.)
DISIAPKAN OLEH :
BIAYA
SUB TOTAL (Rp.)
(Rp.)
7 8
4,945.00
460.00
4,000.00
144,000.00
PEKERJA 153,405.00
6 7
MATERIAL -
BIAYA
SUB TOTAL
(Rp)
7 8
PERALATAN -
153,405.00
Per M'
PEMERINTAH KABUPATEN MEMPAWAH
A N A L I S A B I A Y A P E K E R J A AN
DINAS PEKERJAAN UMUM
Jalan Daeng Manambon Telp. (0561) 691139 Fax. 691144 Kode TIANG PANCANG DICINCIN DAN DILANCIPK
Pos 78911
M E M P A W A H
1 2 3 4 5 6
P
E Mandor 0.01 1.00 L061 0.0050 115,000.00
K Kepala Tukang 0.03 1.00 L073 0.0250 115,000.00
E Tukang 0.25 1.00 L079 0.2500 100,000.00
R Buruh Tak Terlatih 0.10 1.00 L101 0.1000 80,000.00
J
A
PEKERJA
M 1 2 3 4 5
A
T
E
R
I
A
L
MATERIAL
HARI
PERALATAN JUMLAH ALAT KODE JAM KERJA HARGA (Rp./Jam)
KERJA
P
E
1 2 3 4 5 6
R
A
L
A
T
A
N
PERALATAN
T
A
N
TOTAL (Rp.)
DISIAPKAN OLEH :
BIAYA
SUB TOTAL (Rp.)
(Rp.)
7 8
575.00
2,875.00
25,000.00
8,000.00
PEKERJA 36,450.00
6 7
MATERIAL -
BIAYA
SUB TOTAL
(Rp)
7 8
PERALATAN -
36,450.00
Per Btg
Pembesian 10 Kg dengan besi polos atau besi ulir
A TENAGA
1 Pekerja L.01 OH
2 Tukang L 079 OH
3 Kepala Tukang L 073 OH
4 Mandor L 061 OH
B BAHAN
1 Besi Beton (polos/ulir) U 32 M.167 Kg
2 Kawat Beton M.168 Kg
C PERALATAN
D Jumlah (A+B+C)
E Harga Satuan Pekerjaan
F Harga Satuan Pekerjaan per 1 kg
4.1.1.17
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Tukang Batu L 079 OH
3 Kepala Tukang L 073 OH
4 Mandor L 061 OH
Jumlah
B BAHAN
1 Semen Portland - Kg
2 Pasir Ayak Untuk Beton M.041 M3
Jumlah
C Jumlah A + B
D Overhead & Profit
E Harga Satuan
Acuan : SNI DT 91-0010-2007
P.Pls. 04
77,468.08
PEKERJAAN CERUCUK DIA 8/10 Cm - 4 M
A TENAGA KERJA
1 Pekerja L 101 OH
2 Mandor L 061 OH
3 Tukang L 079 OH
4 Kepala Tukang L 073 OH
Jumlah
B BAHAN
1 Cerucuk dia 8 - 10 Cm - 4 M Btg
2 Paku Kg
Jumlah
C Peralatan
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan = ( D + E )
Harga Satuan = / M'
Untuk Cerucuk P = 2 M diambil 50 % dari harga satuan
( An. F. 60 / M )
HARGA BIAYA
SATUAN KWANTITAS SATUAN
( Rp. ) ( Rp. )
3,726,000.00
3,726,000.00
37,260.00
18,630.00
PEKERJAAN CERUCUK DIA 8/10 Cm - 4 M
A TENAGA KERJA
1 Pekerja L 101 OH
2 Mandor L 061 OH
3 Tukang L 079 OH
4 Kepala Tukang L 073 OH
Jumlah
B BAHAN
1 Cerucuk dia 6 - 8 Cm - 4 M Btg
2 Paku Campuran M.166.b Kg
Jumlah
C Peralatan
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan = ( D + E )
Harga Satuan = / M'
Untuk Cerucuk P = 2 M diambil 50 % dari harga satuan
( An. F. 60 / M ).a
HARGA BIAYA
SATUAN KWANTITAS SATUAN
( Rp. ) ( Rp. )
3,286,000.00
3,286,000.00
32,860.00
16,430.00
1m3 Menimbun dengan Tanah Pilihan
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Mandor L 061 OH
Jumlah
B BAHAN
1 Tanah Pilihan M.050.a M3
Jumlah
C Jumlah A + B
D Overhead & Profit
E Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - W.1.b
P.T. 11
207,635.00
Mortar Tipe O (Untuk Mutu PP tertentu setara dengan Campuran 1 PC : 5 PP)
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Tukang Batu L 079 OH
3 Kepala Tukang L 073 OH
4 Mandor L 061 OH
Jumlah
B BAHAN
1 Batu Kali M.020 M3
2 Pasir Pasang M.041 M3
3 Semen Portland - Kg
Jumlah
C PERALATAN
1 Conc.Mixer E 252 Unit/Hari
Jumlah
D Jumlah A + B + C
E Overhead & Profit ( 15% x D )
F Harga Satuan Pekerjaan (D + E)
(AHSP No. 11/PRT/M/2013 )
P.01.d
803,412.40
Memasang 1m3 Pondasi Batu Belah, Campuran 1Pc : 3Ps
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Tukang Batu L 079 OH
3 Kepala Tukang L 073 OH
4 Mandor L 061 OH
Jumlah
B BAHAN
1 Batu Belah 10-15 cm M.020 M3
2 Semen Portland - Kg
3 Pasir Ayak Untuk Beton M.041 M3
Jumlah
C Jumlah A + B
D Overhead & Profit
E Harga Satuan
P.PB. 01
1,050,808.50
Mengurug 1m3 Pasir Urug
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Mandor L 061 OH
Jumlah
B BAHAN
1 Pasir Urug M.040 M3
Jumlah
C Jumlah A + B
D Overhead & Profit
E Harga Satuan
Acuan : SNI DT-91-0006-2007
P.T. 13
198,430.00
PEKERJAAN MENGASPAL DGN ASPAL PANAS ( Prime Coat ) 250 Kg / 100 M
A TENAGA KERJA
1 Pekerja L 101 Orang / hari
2 Mandor L 061 Orang / hari
Jumlah A
B BAHAN
1 Aspal Panas - Kg
2 Kayu Bakar - M3
Jumlah B
C PERALATAN
Jumlah C
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan ( D+E )
Harga Satuan / M = F/100
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Masinis L 071 OH
3 Penjaga Api - OH
4 Penjaga Malam - OH
Jumlah A
B BAHAN
1 Bahan Bakar Solar M 183 Ltr
Jumlah B
C PERALATAN
1 Roller 3 Wheel 8 - 10 T E 080 Hr
Jumlah C
D Jumlah A+B+C
E Overhead & Profit
F Harga Satuan ( D + E )
Harga Satuan / M2 = F/100
A TENAGA KERJA
1 Pekerja L 101 Orang / hari
2 Mandor L 061 Orang / hari
Jumlah A
B BAHAN
1 Aspal Bitumen 60/70 - Kg
2 Kayu Bakar - M3
3 Pasir M.041 M3
4 Abu Batu ( Stone Dust ) - M3
Jumlah B
C PERALATAN
Biaya Gilas 1 Hari ( 2/75 x An.W4/M ) Hari
Jumlah C
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan ( D+E )
Harga Satuan / M = F/100
6.1 (2).a
HARGA BIAYA
SATUAN KWANTITAS SATUAN
( Rp. ) ( Rp. )
857,500.00
4,369,875.00
-
5,227,375.00
5,227,375.00
52,273.75
HARGA BIAYA
SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
4 5 6
64,329,392.12
1,715,450.46
HARGA BIAYA
SATUAN KWANTITAS SATUAN
( Rp. ) ( Rp. )
80,000.00 10.0000 800,000.00
115,000.00 0.5000 57,500.00
857,500.00
9,341,470.00
10,244,715.35
102,447.15
Pemasangan Bekisting ( AHSP 2013 ANALISA BARU KEMENTRIAN PU 2014 HAL. 416)
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Tukang Kayu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Jumlah
B BAHAN
1 Kayu Klas III / Papan Mall M.181.l M3
2 Paku 2" - 5" M.166.b Kg
Jumlah
C Jumlah A + B
D Harga Satuan
E Overhead & Profit
F Harga Satuan Per M
A.4.1.1.20
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
191,780.00
Membuat 1 M Beton Mutu f 9,8 Mpa (K 125) Slump (122) Cm, w/c= 0,78
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Tukang Batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Jumlah
B BAHAN
1 Semen Portland - Kg
2 Pasir M.041 Kg
3 Batu pecah 1-2 cm (Kerikil Maks 30 mm) M.025 Kg
Jumlah
C PERALATAN
1 Conc.Mixer E 252 Unit/Hari
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
B.03.a
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
1,170,002.80
, Buckling factor pasir = 20%
Membuat 1 M Beton Mutu f 14,5 Mpa (K 175) (AHSP2013 ANALISA BARU KEMENTRIAN PU 2014 Hal 389 - 39
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Tukang Batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Jumlah
B BAHAN
1 Semen Portland Kg
2 Pasir Kg
3 Batu pecah 1-2 cm (Kerikil Maks 30 mm) Kg
Jumlah
C PERALATAN
1 Conc.Mixer E 252 Unit/Hari
1 Alat Batu M. 170 Set
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
A.A.4.1.1.5
1,356,754.28
Pengurugan 1 M dengan Pasir Urug (AHSP2013 ANALISA BARU KEMENTRIAN PU 2014 Hal 381)
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.02 OH
Jumlah
B BAHAN
1 Pasir Urug M.040 M3
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
A.2.3.1.11
198,430.00
198,430.00
1 m Galian Tanah Biasa Sedalam < 1 m ( AHSP 2013 Analisa Baru Kementrian PU 2014 Hal. 70 )
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
Jumlah
B BAHAN
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Jumlah
T.06
51,514.50
51,514.50
Timbunan Tanah,Urugan Tanah Kembali Atau Pemadatan ( 1M ) (AHSP2013 ANALISA BARU KEMENTRIAN PU
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
Jumlah
B BAHAN
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Jumlah
T.14
0.00
0.00
30,195.00
30,195.00
1 M Pembersihan dan Striping/kosrekan (AHSP2013 ANALISA BARU KEMENTRIAN PU 2014 Hal 69)
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
Jumlah
B BAHAN
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Jumlah
T.01
5,490.00
5,490.00
Pembersihan 1 M Lapangan dan Perataan (AHSP 2013 ANALISA BARU KEMENTRIAN PU 2014 Hal 373)
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
Jumlah
B BAHAN
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
I. A.2.2.1.9
13,750.00
13,750.00
FORMULIR STANDAR UNTUK
PEREKAMAN ANALISA MASING-MASING HARGA SATUAN
PERKIRAAN
NO. KOMPONEN SATUAN KUANTITAS
A. TENAGA
B. BAHAN
C. PERALATAN
1. Three Wheel Roller E080 Jam 0.0535
2. Alat Bantu Ls 1.0000
JUMLAH HARGA PERALATAN
HARGA JUMLAH
SATUAN HARGA
(Rp.) (Rp.)
11,428.57 7,641.12
16,428.57 549.21
323,400.00 320,812.80
404,300.00 100,266.40
254,453.67 13,625.36
1,500.00 1,500.00
GA PERALATAN 15,125.36
444,394.89
444,394.89
FORMULIR STANDAR UNTU
PEREKAMAN ANALISA MASING-MASING H
A. TENAGA
B. BAHAN
1. Agregat Kasar :
- Batu Uk. 3/5 (M023) M3
2 Agregat Halus :
- Batu Uk. 2/3 (M024) M3
- Batu Uk. 1/2 M3
3 Aspal (M061) Kg
C. PERALATAN
GA TENAGA 1,852.79
GA BAHAN 2,356,731.22
2,371,148.21
% x D -
2,371,148.21
ITEM PEMBAYARAN NO. 6.6 (1).a
JENIS PEKERJAAN Lapis Permukaan Penetrasi Macadam
SATUAN PEMBAYARAN M3
No. U RAIAN
I. ASUMSI
1 Menggunakan alat berat (cara mekanik)
2 Lokasi pekerjaan : sepanjang jalan
3 Kondisi existing jalan : sedang
4 Jarak rata-rata Base Camp ke lokasi pekerjaan
5 Tebal rata2 Lapen
6 Jam kerja efektif per-hari
7 Faktor kehilangan - Agregat
Fator kehilangan - Aspal
8 Komposisi campuran Lapen (spesifikasi) :
- Agregat Pokok
- Agregat Pengunci
- Agregat Penutup
- Aspal : - Paska Agregat Pokok
- Paska Agregat Pengunci
1. BAHAN
1.a. Agregat Kasar = {(Ak/1000 : t M3) x Fh1} : D1
1.b. Agregat Pengunci = {(Ap1/1000 : t M3) x Fh1} : D1
1.c. Agregat Penutup = {(Ap2/1000 : t M3) x Fh1} : D1
1.d. Aspal = {((As1+As2) : t M3) x Fh2}
2. ALAT
URAIA
L
t 0.07
Tk 7
Fh1 1.05
Fh2 1.03
Ak 133
Ap1 25
Ap2 14
As1 5.2
a Agregat Pengunci As2 1.5
As 95.7143
D1 1.42
D2 1.03
(E16)
v 2.5
b 1.9
n 12
Fa 0.83
(v x 1000) x b x t x Fa Q3 23.00
n
(E16) 0.0435
Analisa EI-661
SATUAN KETERANGAN
KM
M
Jam
-
-
ton / M3
ton / M3
M3
M3
M3
Kg
Km / Jam
M
lintasan 2 fase @ 6 lintas
-
M3
Jam
ANALISA HARGA LUMP SUM UNTUK MO
NO U RAIAN SATUAN
C FASILITAS KONTRAKTOR
1 Base Camp dan Kantor Kontraktor ls
2 Lain Lain ls
D FASILITAS LABORATORIUM
E MOBILISASI LAINNYA
1 Papan Nama Proyek Bh
F. DEMOBILISASI PERALATAN
CATATAN :
(a) Biaya Satuan untuk peralatan sudah termasuk bahan bakar, bahan habis terpakai dan operator
(b)
Biaya satuan sudah termasuk pengeluaran untuk seluruh pajak yang berkaitan (tetapi tidak termasuk PPN yang dibayarka
(c) Harga lump-sum yang diajukan penawar harus mencakup seluruh tambahan tenaga kerja, bahan, peralatan atau kerugian
dan gambar.
(d) Harga lump-sum yang diberikan oleh penawar harus tidak termasuk biaya umum dan keuntungan
P SUM UNTUK MOBILISASI
750,000.00
750,000.00
3,350,000.00
bahan, peralatan atau kerugian yang mungkin terjadi untuk menyelesaikan pekerjaan sesuai dengan spesifikasi
Lampiran Mobilisasi
NO U RAIAN SATUAN
CATATAN :
Jenis dan kapasitas peralatan yang dicantumkan di atas hanya sebagai petunjuk, Penawar dapat mengusulkan jenis dan ka
a)
pekerjaan.
Jumlah peralatan tersebut di atas adalah jumlah peralatan minimal, pada saat pelaksanaan pekerjaan keperluan alat dapa
b)
telah disepakati bersama oleh penyedia jasa dan pengguna jasa,
ran Mobilisasi
DEMOBILISASI PERALATAN
750,000.00
dapat mengusulkan jenis dan kapasitas serta jumlah yang berbeda sesuai dengan kebutuhan untuk melaksanakan
pekerjaan keperluan alat dapat disesuaikan dengan kebutuhan lapangan dan jadwal waktu pelaksanaan yang
PEMERINTAH KABUPATEN MEMPAWAH
JUMLAH
PEKERJA HARI KODE
ORANG
1 2 3 4
P
E Mandor 1.00 1.00 L.061
K Buruh Tak Terlatih 10.00 1.00 L.101
R Buruh Semi Terlatih 3.00 1.00 L.103
J
A
PEKERJA
VOLUME
MATERIAL JUMLAH
SATUAN
1 2 3
M
A
T Alat Bantu 0.30 Set
E
R
I
A
L
MATERIAL
PERALATAN JUMLAH ALAT HARI KERJA KODE
1 2 3 4
P
E
R
A
L
A
T
A
N
PERALATAN
EF! 02 #REF!
5 6 7 8
PEKERJA 1,185,000.00
4 5 6 7
MATERIAL 35,370.00
JAM KERJA HARGA (Rp./Jam) BIAYA (Rp) SUB TOTAL
5 6 7 8
PERALATAN -
PROPINSI : KODE
KALIMANTAN BARAT 61
JUMLAH
PEKERJA HARI KODE
ORANG
1 2 3
P
E Mandor 2.00 6.00 L.061
K Operator Terlatih 1.00 6.00 L.081
E Buruh Tak Terlatih 48.00 6.00 L.101
R
J
A
PEKERJ
VOLUME
MATERIAL JUMLAH
SATUAN
1 2
M
A Material Tanah Pilihan ( Tanah datang ) 450.00 M3
T Alat bantu 8.00 Set
E
R
I
A
L
MATERIA
JUMLAH HARI -
KODE UPAH (Rp./Org/hari) BIAYA (Rp.)
ORANG
4 5 6 7
PEKERJA
VOLUME
KODE HARGA (Rp./Unit) BIAYA (Rp)
SATUAN
3 4 5 6
MATERIAL
PERALATAN
K 310.b
25,110,000.00
SUB TOTAL
214,828,200.00
SUB TOTAL
8
#REF!
#REF!
M3
PEMERINTAH KABUPATEN MEMPAWAH
PROPINSI : KODE
KALIMANTAN BARAT 61
JUMLAH
PEKERJA HARI KODE
ORANG
1 2 3
P
E Mandor 2.00 6.00 L.061
K Operator Terlatih 1.00 6.00 L.081
E Buruh Tak Terlatih 48.00 6.00 L.101
R
J
A
PEKERJ
VOLUME
MATERIAL JUMLAH
SATUAN
1 2
M
A Material Tanah Pilihan ( Tanah datang ) 450.00 M3
T Alat bantu 8.00 Set
E
R
I
A
L
MATERIA
JUMLAH HARI -
KODE UPAH (Rp./Org/hari) BIAYA (Rp.)
ORANG
4 5 6 7
PEKERJA
VOLUME
KODE HARGA (Rp./Unit) BIAYA (Rp)
SATUAN
3 4 5 6
MATERIAL
PERALATAN
K 310.b
25,110,000.00
SUB TOTAL
56,653,200.00
SUB TOTAL
8
#REF!
#REF!
M3
MEMBE
PROPINSI : KODE
KALIMANTAN BARAT 61
JUMLAH
PEKERJA HARI KODE
ORANG
1 2 3
P
E Mandor 2.00 6.00 L.061
K Operator Terlatih 1.00 6.00 L.081
E Sopir 1.00 6.00 L.091
R Buruh Tak Terlatih 48.00 6.00 L.101
J
A
PEKERJ
VOLUME
MATERIAL JUMLAH
SATUAN
1 2
M
A Material Tanah Pilihan ( Tanah datang ) 450.00 M3
T Alat bantu 8.00 Set
E
R
I
A
L
MATERIA
JUMLAH HARI -
KODE UPAH (Rp./Org/hari) BIAYA (Rp.)
ORANG
4 5 6 7
PEKERJA
VOLUME
KODE HARGA (Rp./Unit) BIAYA (Rp)
SATUAN
3 4 5 6
MATERIAL
PERALATAN
K 310.a
25,710,000.00
SUB TOTAL
56,653,200.00
SUB TOTAL
8
#REF!
#REF!
M3
PEMERINTAH KABUPATEN MEMPAWAH
PROPINSI : KODE
KALIMANTAN BARAT 61
JUMLAH
PEKERJA HARI KODE
ORANG
1 2 3
P
E Mandor 1.00 1.00 L.061
K Tukang Batu 4.00 1.00 L.079
R Buruh Tak Terlatih 12.00 1.00 L.101
J
A
PEKE
VOLUME
MATERIAL JUMLAH
SATUAN
1 2
M
A Batu Pecah 10/15 5.00 M3
T Pasir Beton 1.20 M3
E Semen 15.20 50 Kg
R Alat Bantu 0.70 Set
I
A
L
MATE
1 2 3
P
E Pompa air ( 5 cm) 30 M3/jam 1.00 ### E.341
R
A
L
A
T
A
N
PERAL
JUMLAH HARI -
KODE UPAH (Rp./Org/hari) BIAYA (Rp.)
ORANG
4 5 6 7
PEKERJA
VOLUME
KODE HARGA (Rp./Unit) BIAYA (Rp)
SATUAN
3 4 5 6
MATERIAL
4 5 6 7
E.341 2.00 #REF! #REF!
PERALATAN
K 810
1,475,000.00
SUB TOTAL
3,286,130.00
SUB TOTAL
8
#REF!
#REF!
M3
PEMERINTAH KABUPATEN MEMPAWAH
PROPINSI : KODE
KALIMANTAN BARAT 61
JUMLAH
PEKERJA HARI KODE
ORANG
1 2 3
P
E Mandor 1.00 1.00 L.061
K Tukang Batu 4.00 1.00 L.079
R Buruh Tak Terlatih 12.00 1.00 L.101
J
A
PEKE
VOLUME
MATERIAL JUMLAH
SATUAN
1 2
M
A Batu Pecah 10/15 5.00 M3
T Pasir Beton 1.20 M3
E Semen 15.20 50 Kg
R Alat Bantu 0.70 Set
I
A
L
MATE
1 2 3
P
E
R
A
L
A
T
A
N
PERAL
JUMLAH HARI -
KODE UPAH (Rp./Org/hari) BIAYA (Rp.)
ORANG
4 5 6 7
PEKERJA
VOLUME
KODE HARGA (Rp./Unit) BIAYA (Rp)
SATUAN
3 4 5 6
MATERIAL
4 5 6 7
PERALATAN
K 810.a
1,475,000.00
SUB TOTAL
3,286,130.00
SUB TOTAL
8
-
4,761,130.00
M3
I. PEKERJAAN BETON
A. PEKERJAAN PERSIAPAN
I. A.2.2.1.9. Pembersihan 1 M Lapangan dan Perataan (AHSP 2013 ANALISA BARU KEMENTR
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
Jumlah
B BAHAN
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
Jumlah
B BAHAN
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Jumlah
T.14 Timbunan dan Pemadatan
a. Timbunan Tanah atau Urugan Tanah Kembali ( 1M ) (AHSP2013 ANALISA BARU KEMENTRIAN PU 20
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
Jumlah
B BAHAN
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Jumlah
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
Jumlah
B BAHAN
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Jumlah
A.2.3.1.11 Pengurugan 1 M dengan Pasir Urug (AHSP2013 ANALISA BARU KEMENTRIAN PU 2014 Ha
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.02 OH
Jumlah
B BAHAN
1 Pasir Urug M3
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
A.A.4.1.1.5 Membuat 1 M Beton Mutu f 14,5 Mpa (K 175) (AHSP2013 ANALISA BARU KEMENTRIAN
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Tukang Batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Jumlah
B BAHAN
1 Semen Portland Kg
2 Pasir Kg
3 Batu pecah 1-2 cm (Kerikil Maks 30 mm) Kg
Jumlah
C PERALATAN
1 Conc.Mixer Unit/Hari
1 Alat Batu Set
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
B. 03.a Membuat 1 M Beton Mutu f 9,8 Mpa (K 125) Slump (122) Cm, w/c= 0,78
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Tukang Batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Jumlah
B BAHAN
1 Semen Portland Kg
2 Pasir Kg
3 Batu pecah 1-2 cm (Kerikil Maks 30 mm) Kg
Jumlah
C PERALATAN
1 Conc.Mixer Unit/Hari
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
B. 03.b Membuat 1 M Beton Mutu f 9,8 Mpa (K 125) Slump (122) Cm, w/c= 0,78
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Tukang Batu L.02 OH
3 Kepala Tukang L.03 OH
4 Mandor L.04 OH
Jumlah
B BAHAN
1 Semen Portland Kg
2 Pasir Kg
3 Batu pecah 1-2 cm (Kerikil Maks 30 mm) Kg
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan Pekerjaan (D + E)
CATATAN : Bobot isi pasir = 1.400 kg/m3, Bobot isi kerikil = 1.350 kg/m3, Buckling factor pasir = 20%
A.4.1.1.20 Pemasangan Bekisting ( AHSP 2013 ANALISA BARU KEMENTRIAN PU 2014 HAL. 416)
No. URAIAN PEKERJAAN KODE SATUAN
1 2 3
A TENAGA
1 Pekerja OH
2 Tukang Kayu OH
3 Kepala Tukang OH
4 Mandor OH
Jumlah
B BAHAN
1 Kayu Klas III / Papan Mall M3
2 Paku 2" - 5" Kg
Jumlah
C Jumlah A + B
D Harga Satuan
E Overhead & Profit
F Harga Satuan Per M
PEKERJAAN MENGASPAL DGN ASPAL PANAS ( Prime Coat ) 250 Kg / 100 M
A TENAGA KERJA
1 Pekerja Orang / hari
2 Mandor Orang / hari
Jumlah A
B BAHAN
1 Aspal Panas Kg
2 Kayu Bakar M3
Jumlah B
C PERALATAN
Jumlah C
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan ( D+E )
Harga Satuan / M = F/100
1. PEKERJAAN 1 BULAN BIAYA MENGILAS UNTUK 1 BUAH MESIN GILAS ( W.4/100M2 )
1 2 3
A TENAGA
1 Pekerja OH
2 Masinis OH
3 Penjaga Api OH
4 Penjaga Malam OH
Jumlah A
B BAHAN
1 Bahan Bakar Solar Ltr
Jumlah B
C PERALATAN
1 Roller 3 Wheel 8 - 10 T Hr
Jumlah C
D Jumlah A+B+C
E Overhead & Profit
F Harga Satuan ( D + E )
Harga Satuan / M2 = F/100
A TENAGA KERJA
1 Pekerja Orang / hari
2 Mandor Orang / hari
Jumlah A
B BAHAN
1 Aspal Bitumen 60/70 - Kg
2 Kayu Bakar - M3
3 Pasir M.041 M3
4 Abu Batu ( Stone Dust ) - M3
Jumlah B
C PERALATAN
Biaya Gilas 1 Hari ( 2/75 x An.W4/M ) Hari
Jumlah C
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan ( D+E )
Harga Satuan / M = F/100
PEK. CERUCUK DIA 8/10 Cm - 4 M ( An. F. 60 / M )
A TENAGA KERJA
1 Pekerja L 101 OH
2 Mandor L 061 OH
3 Tukang L 079 OH
4 Kepala Tukang L 073 OH
Jumlah
B BAHAN
1 Cerucuk dia 8 - 10 Cm - 4 M Btg
2 Paku Kg
Jumlah
C Peralatan
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan = ( D + E )
Harga Satuan = / M'
Untuk Cerucuk P = 2 M diambil 50 % dari harga satuan
PEK. CERUCUK DIA 8/10 Cm - 4 M ( An. F. 60 / M ).a
A TENAGA KERJA
1 Pekerja L 101 OH
2 Mandor L 061 OH
3 Tukang L 079 OH
4 Kepala Tukang L 073 OH
Jumlah
B BAHAN
1 Cerucuk dia 6 - 8 Cm - 4 M Btg
2 Paku Campuran M.166.b Kg
Jumlah
C Peralatan
Jumlah
D Jumlah A + B + C
E Overhead & Profit
F Harga Satuan = ( D + E )
Harga Satuan = / M'
Untuk Cerucuk P = 2 M diambil 50 % dari harga satuan
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Mandor L 061 OH
Jumlah
B BAHAN
1 Tanah Pilihan M.050.a M3
Jumlah
C Jumlah A + B
D Overhead & Profit
E Harga Satuan
Acuan : Harga Satuan Bahan, Upah dan Analisa Biaya Pekerjaan BOW - W.1.b
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Mandor L 061 OH
Jumlah
B BAHAN
1 Pasir Urug M.040 M3
Jumlah
C Jumlah A + B
D Overhead & Profit
E Harga Satuan
Acuan : SNI DT-91-0006-2007
Memasang 1m3 Pondasi Batu Belah, Campuran 1Pc : 3Ps (P.PB. 01)
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Tukang Batu L 079 OH
3 Kepala Tukang L 073 OH
4 Mandor L 061 OH
Jumlah
B BAHAN
1 Batu Belah 10-15 cm M.020 M3
2 Semen Portland - Kg
3 Pasir Ayak Untuk Beton M.041 M3
Jumlah
C Jumlah A + B
D Overhead & Profit
E Harga Satuan
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Tukang Batu L 079 OH
3 Kepala Tukang L 073 OH
4 Mandor L 061 OH
Jumlah
B BAHAN
1 Semen Portland - Kg
2 Pasir Ayak Untuk Beton M.041 M3
Jumlah
C Jumlah A + B
D Overhead & Profit
E Harga Satuan
Acuan : SNI DT 91-0010-2007
1 2 3
A TENAGA
1 Pekerja L 101 OH
2 Tukang Batu L 079 OH
3 Kepala Tukang L 073 OH
4 Mandor L 061 OH
Jumlah
B BAHAN
1 Batu Kali M.020 M3
2 Pasir Pasang M.041 M3
3 Semen Portland - Kg
Jumlah
C PERALATAN
1 Conc.Mixer E 252 Unit/Hari
Jumlah
D Jumlah A + B + C
E Overhead & Profit ( 15% x D )
F Harga Satuan Pekerjaan (D + E)
(AHSP No. 11/PRT/M/2013 )
I. A.2.2.1.9
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
0.00
0.00
13,750.00
13,750.00
T.01
0.00
0.00
5,490.00
5,490.00
T.14
NALISA BARU KEMENTRIAN PU 2014 Hal 82)
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
0.00
0.00
30,195.00
30,195.00
T.06
ementrian PU 2014 Hal. 70 )
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
0.00
0.00
51,514.50
51,514.50
A.2.3.1.11
BARU KEMENTRIAN PU 2014 Hal 381)
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
0.00
198,430.00
198,430.00
A.A.4.1.1.5
3 ANALISA BARU KEMENTRIAN PU 2014 Hal 389 - 390)
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
1,356,754.28
B.03.a
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
1,170,002.80
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
1,102,462.09
1,102,462.09
191,780.00
6.1 (2).a
HARGA BIAYA
SATUAN KWANTITAS SATUAN
( Rp. ) ( Rp. )
857,500.00
4,369,875.00
-
5,227,375.00
5,227,375.00
52,273.75
MESIN GILAS ( W.4/100M2 )
HARGA BIAYA
SATUAN KUANTITAS SATUAN
( Rp. ) ( Rp. )
4 5 6
64,329,392.12
1,715,450.46
HARGA BIAYA
SATUAN KWANTITAS SATUAN
( Rp. ) ( Rp. )
857,500.00
9,341,470.00
10,244,715.35
102,447.15
204,894.31
( An. F. 60 / M )
HARGA BIAYA
SATUAN KWANTITAS SATUAN
( Rp. ) ( Rp. )
3,726,000.00
3,726,000.00
37,260.00
18,630.00
( An. F. 60 / M ).a
HARGA BIAYA
SATUAN KWANTITAS SATUAN
( Rp. ) ( Rp. )
3,286,000.00
3,286,000.00
32,860.00
16,430.00
P.T. 11
HARGA KUANTITAS BIAYA
SATUAN SATUAN
( Rp. ) ( Rp. )
4 5 6
207,635.00
P.T. 13
HARGA KUANTITAS BIAYA
SATUAN SATUAN
( Rp. ) ( Rp. )
4 5 6
80,000.00 0.300 24,000.00
115,000.00 0.010 1,150.00
25,150.00
198,430.00
P.PB. 01
HARGA KUANTITAS BIAYA
SATUAN SATUAN
( Rp. ) ( Rp. )
4 5 6
1,050,808.50
P.Pls. 04
HARGA KUANTITAS BIAYA
SATUAN SATUAN
( Rp. ) ( Rp. )
4 5 6
77,468.08
P.01
A. TENAGA
1. Pekerja L.01 OH
2. Mandor L.04 OH
B. BAHAN
C. PERALATAN
-
JUMLAH HARGA BAHAN -
1 2 3
A TENAGA
1 Pekerja L.01 OH
2 Mandor L.04 OH
Jumlah
B BAHAN
Jumlah
C PERALATAN
Jumlah
D Jumlah A + B + C
E Overhead & Profit ( 15% x D )
F Harga Satuan Pekerjaan (D + E)
HARGA BIAYA
SATUAN KOEFISIEN SATUAN
( Rp. ) ( Rp. )
4 5 6
0.00
0.00
51,514.50
7,727.18
59,241.68
A.4.1.1.20 Pemasangan 1m bekisting untuk pondasi
B BAHAN
1 Kayu kelas III m
2 Paku 5 - 10 cm Kg
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit 0%
F Harga Satuan Pekerjaan
Koefisien Harga Satuan (Rp) Jumlah Harga (Rp)
D Jumlah (A+B+C)
E Overhead & profit 0% XD
F Harga Satuan Pekerjaan
Harga Satuan (Rp) Jumlah Harga (Rp)
80,000.00 105,840.00
100,000.00 18,900.00
115,000.00 2,185.00
115,000.00 15,180.00
JUMLAH TENAGA KERJA 142,105.00
1,814.00 500,664.00
123.79 102,494.57
385.04 389,657.48
1,134,921.05
1,134,921.05
4.4.2.3 Pemasangan 1 m plesteran 1SP:3PP tebal 15mm
80,000.00 24,000.00
100,000.00 15,000.00
115,000.00 1,725.00
115,000.00 1,725.00
H TENAGA KERJA 42,450.00
1,814.00 14,105.66
173,300.00 3,985.90
H HARGA BAHAN 18,091.56
H HARGA ALAT
60,541.56
60,541.56
3.2.1 HARGA SATUAN PEKERJAAN PONDASI
3.2.1.1 Pemasangan 1 m pondasi Batu 10 - 15 campuran 1SP:3PP
D Jumlah (A+B+C)
E Harga Satuan Pekerjaan
D Jumlah (A+B+C)
E Harga Satuan Pekerjaan
D Jumlah (A+B+C)
E Harga Satuan Pekerjaan
3.2.1.10 Pemasangan 1 m pondasi siklop, 60% beton campuran 1SP:2PB:3Kr dan 40% B
D Jumlah (A+B+C)
E Harga Satuan Pekerjaan
Harga Satuan (Rp) Jumlah Harga (Rp)
80,000.00 120,000.00
100,000.00 75,000.00
115,000.00 8,625.00
115,000.00 8,625.00
H TENAGA KERJA 212,250.00
323,400.00 388,080.00
1,814.00 366,428.00
173,300.00 84,050.50
H HARGA BAHAN 838,558.50
H HARGA ALAT
1,050,808.50
1,050,808.50
80,000.00 120,000.00
100,000.00 75,000.00
115,000.00 8,625.00
115,000.00 8,625.00
H TENAGA KERJA 212,250.00
323,400.00 388,080.00
1,814.00 295,682.00
173,300.00 90,116.00
H HARGA BAHAN 773,878.00
H HARGA ALAT
986,128.00
986,128.00
80,000.00 62,400.00
100,000.00 39,000.00
115,000.00 4,485.00
115,000.00 4,485.00
H TENAGA KERJA 110,370.00
323,400.00 388,080.00
173,300.00 74,865.60
H HARGA BAHAN 462,945.60
H HARGA ALAT
573,315.60
573,315.60
80,000.00 272,000.00
100,000.00 85,000.00
115,000.00 9,775.00
115,000.00 19,550.00
H TENAGA KERJA 386,325.00
323,400.00 155,232.00
1,814.00 351,916.00
173,300.00 54,069.60
476,500.00 223,002.00
21,900.00 2,759,400.00
23,800.00 42,840.00
H HARGA BAHAN 3,586,459.60
H HARGA ALAT
3,972,784.60
3,972,784.60
A.2.3.1.11Pengurugan 1 m dengan pasir urug
(AHSP 2013 ANALISA BARU KEMENTRIAN PU 2014 Hal 381)
B BAHAN
Pasir Urug
C PERALATAN
D Jumlah (A+B+C)
E Overhead & profit 0%
F Harga Satuan Pekerjaan
B BAHAN
Tanah pilihan
C PERALATAN
D Jumlah (A+B+C)
198,430.00
XD -
198,430.00
173,710.00
173,710.00
2.2.1. HARGA SATUAN PEKERJAAN PERSIAPAN
D Jumlah (A+B+C)
E Harga Satuan Pekerjaan
2.2.1.9 Pembersihan 1m lapangan dan perataan
D Jumlah (A+B+C)
E Overhead & profit 0% XD
F Harga Satuan Pekerjaan (D + E)
Harga Satuan (Rp) Jumlah Harga (Rp)
80,000.00 8,000.00
100,000.00 10,000.00
115,000.00 1,150.00
115,000.00 575.00
JUMLAH TENAGA KERJA 19,725.00
3,310,000.00 397,200.00
26,200.00 524.00
2,758,500.00 19,309.50
JUMLAH HARGA BAHAN 417,033.50
436,758.50
436,758.50
80,000.00 8,000.00
115,000.00 5,750.00
JUMLAH TENAGA KERJA 13,750.00
13,750.00
-
13,750.00
REKAPITULASI
ANALISA HARGA SATUAN PEKERJAAN (AHSP)
DINAS PEKERJAAN UMUM KABUPATEN MEMPAWAH
1 M2 #REF!
REKAPITULASI
PETUNJUK TEKNIS N0.015/T/BT/1995
PETUNJUK TEKNIS ANALISA BIAYA DAN HARGA SATUAN
PEKERJAAN JALAN KABUPATEN WILAYAH I
### #REF! #REF! #REF! #REF!
#REF!