Provinsi : Jawa Tengah

Kabupaten : Brebes
Kecamatan : Bulakamba
Desa : Bulakamba
RW : 02
PROGRAM SANITASI MASYARAKAT PROVINSI JAWA TENGAH
PERHITUNGAN PEKERJAAN TAMBAH KURANG ( CCO )
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
A. PEKERJAAN IPAL
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan Ls 1.00
2 Direksi Keet / Gudang Ls 1.00
3 Pengukuran & pemasangan bouwplank m2 40.77 0.16 40.92
4 Papan Kegiatan Ls 1.00
JUMLAH ( I )
II. PEKERJAAN TANAH
1 Galian tanah m3 120.90 2.10 118.8
2 Urugan tanah m3 36.27 0.63 35.64
3 Urugan sirtu m3 4.08 0.02 4.092
4 Pemasangan sasak bambu bh 50.00
5 Trucuk Bambu/Dolken Btg 84.00
6 Bambu pj 6 m btg 100.00
JUMLAH ( II )
III. PEKERJAAN BETON
1 Lantai kerja 1 : 3 : 5 m3 4.08 0.02 4.092
2 Plat Beton bertulang bawah 20 cm
Beton bertulang camp 1 : 2 : 3 m3 8.15 0.03 8.18
Pembesian 1 kg besi polos kg 967.49 3.68 971.17
memasang multiplex 9 mm m2 40.30 40.30
3 Beton Sloof camp 1 : 2 : 3 m3 0.978 0.98
Pembesian 1 kg besi polos kg 166.48 166.48
memasang multiplex 9 mm m2 16.3 16.3
4 Dinding Beton bertulang
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
Beton bertulang camp 1 : 2 : 3 m3 30.48 3.33 27.15
Pembesian 1 kg besi polos kg 4,587.18 462.44 4124.73
Memasang multiplex 9 mm m2 193.28 20.855 172.43
5 Plat Beton bertulang atas tb 12 cm
Beton bertulang camp 1 : 2 : 3 m3 4.89 0.02 4.91
Pembesian 1 kg besi polos kg 967.49 3.68 971.17
memasang multiplex 9 mm m2 40.30 0.62 40.92
6 Ring Balk Keliling
Beton bertulang camp 1 : 2 : 3 m3 0.978 0.98
Pembesian 1 kg besi polos kg 131.27 131.27
memasang multiplex 9 mm m2 16.30 16.30
7 Balok penyangga plat saring
Beton bertulang camp 1 : 2 : 3 m3 2.70 1.80 0.90
Pembesian 1 kg besi polos kg 12.86 63.35 76.21
memasang multiplex 9 mm m2 8.25 5.25 13.50
8 Plat saring tb 7 cm
Beton bertulang camp 1 : 2 : 3 m3 0.33 0.33
Pembesian 1 kg besi polos kg 71.10 71.10
memasang multiplex 9 mm m2 18.00 18.00
JUMLAH ( III )
IV. PERLENGKAPAN
1 Filter material AF m3 16.20
2 Pemasangan Pipa PVC type D 4" m' 124.00
3 Pemasangan Pipa PVC Type D 2" m' 57.36
4 Pemasangan Man Hole plat baja bh 10.00
5 Buis beton 40 cm bh 6.00
6 Pengecatan IPAL m2 42.56
JUMLAH ( IV )
JUMLAH ( I + II + III + IV ) )
B. PEKERJAAN PERPIPAAN
I. PEKERJAAN TANAH
1 Galian tanah m3 67.50 40.50 108.00
2 Urugan Tanah m3 20.25 12.15 32.40
3 Urugan Pasir bawah pipa dan pengunci m3 108.00
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
JUMLAH I
II. PEKERJAAN GRESTRAP 30X30
1 Pek Galian tanah m3 2.16 0.54 2.70
2 Pek Urugan tanah kembali m3 0.65 0.16 0.81
3 Grestrap + Penutup bh 60.00 20.00 40.00
4 Pas Tee 3' bh 60.00 20.00 40.00
5 pas Knee 3' bh 60.00 20.00 40.00
JUMLAH II
III. PEKERJAAN BAK KONTROL 30X30
1 Pek Galian tanah m3 2.16 0.36 1.80
2 Pek Urugan tanah kembali m3 0.65 0.11 0.54
3 Bak Kontrol + Penutup bh 60.00 30.00 30.00
JUMLAH III
IV. PEKERJAAN BAK KONTROL 40X40
1 Pek Galian tanah m3 3.84 5.76 9.60
2 Pek Urugan tanah kembali m3 1.15 1.73 2.88
3 Bak Kontrol + Penutup bh 60.00 5.00 65.00
JUMLAH IV
V PEKERJAAN PERPIPAAN
1 Pasang Pipa Limbah Dia 6' m' 325.00 23.00 348.00
2 Pasang Pipa limbah Dia 4' m' 300.00 12.00 312.00
3 Pasang Pipa limbah Dia 3' m' 80.00 20.00 100
JUMLAH V
JUMLAH ( I + II + III + IV + V )
C. PEKERJAAN MCK
I. PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali m3 4.20 4.20
2 Urug tanah Kembali Galian batu kali m3 1.26 1.26
3 Urugan Pasir bawah pondasi m3 0.53 0.53
JUMLAH ( I )
II PEKERJAAN BETON
1 Rabat beton bawah keramik m3 0.32 0.32
2 Rabat keliling bangunan m3 0.23
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
3 Beton Sloof
Beton bertulang camp 1 : 2 : 3 m3 0.32 0.32
Pembesian 10 kg besi polos kg 93.52 93.52
memasang multiplex 9 mm m2 4.20 4.20
4 Beton Kolom
Beton bertulang camp 1 : 2 : 3 m3 0.54 0.54
Pembesian 10 kg besi polos kg 119.08 119.08
Memasang multiplex 9 mm m2 13.02 13.02
5 Beton Balk
Beton bertulang camp 1 : 2 : 3 m3 0.09 0.09
Pembesian 10 kg besi polos kg 93.52 93.52
memasang multiplex 9 mm m2 4.20 4.20
6 Beton Plat
Beton bertulang camp 1 : 2 : 3 m3 0.54 0.54
Pembesian 10 kg besi polos kg 148.00 148.00
Memasang multiplex 9 mm m2 3.00 3.00
JUMLAH ( II )
III. PASANGAN DAN PLESTERAN
1 Pasang Pondasi Batu Kali m3 4.62 4.62
2 Pasang Aanstampeng m3 1.05 1.05
3 Pasang Dinding batu bata 1/2 batu m2 54 54
4 Plesteran m2 56.7 56.7
JUMLAH ( III )
IV PEKERJAAN KAYU
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
1 Kusen pintu dan boven kayu kruing unit 2 2
2 Daun Pintu Panil lapis alumunium unit 2 2
3 Boven unit 2 2
4 Assesoris pintu dan boven Ls 2 2
JUMLAH ( IV )
V PEKERJAAN CAT-CATAN
1 Pengecatan dinding m2 57 57
JUMLAH ( V )
VI PEKERJAAN LANTAI
1 Pasang lantai keramik m2 5 5
2 Pasang lantai keramik dinding m2 16 16
JUMLAH ( VI)
VII PEKERJAAN LAIN-LAIN
1 Pasang Kloset bh 2 2
2 Pasang Kran air bh 2 3
3 Pasang Floordrain bh 2 2
4 Pasang instalasi listrik dan listrik lampu SL 13 watt bh 2 3
5 Saklar tunggal bh 2 2
6 Pasang listrik baru unit 1 1
7 Perlengkapan KM/WC Ls 1 1
8 Tandon air 1000 lt fiber bh 1
9 Tandon air 500 lt fiber + pelengkap bh 1
10 Pompa air listrik (Semi jet pump) unit 1 1
JUMLAH ( VII )
JUMLAH ( I + II + III + IV +V + VI +VII)
IN KIND MASYARAKAT
I Pembuatan Sumur dan Pompa IPAL Serta Ls 1
Kloset Jongkok + Pemasangan

TOTAL A + B + C + In Kind Swadaya


DIBULATKAN

PANITIA EVALUASI
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01

1 ..

Ketua

2 ..

Sekretaris

3 ..

Anggota
PROGRAM : Sanitasi Berbasis Masyarakat
Jenis Kegiatan : MCK MIX
KSM Sanitasi : KARYA SEJAHTERA

TENGAH
CCO )
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.

100,000.00 100,000.00
1,000,000.00 1,000,000.00
60,680.00 12,025.00 2,975,088.60
200,000.00 200,000.00
4,275,088.60

56,207.00 6,795,426.30
15,410.00 558,920.70
156,000.00 14,025.00 693,106.91
9,000.00 50,000.00 2,950,000.00
9,000.00 100,000.00 9,156,000.00
9,000.00 20,500.00 2,950,000.00
23,103,453.91

594,220.00 103,455.00 2,854,886.10

749,040.00 127,588.00 7,174,323.55


8,210.00 845.30 8,794,217.59
96,610.00 34,510.00 -
749,040.00 127,588.00 857,342.18
8,210.00 845.30 1,507,502.20
96,610.00 34,510.00 2,137,256.00
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.
749,040.00 127,588.00 23,797,162.85
8,210.00 845.30 37,350,709.83
96,610.00 34,510.00 22,608,366.00

749,040.00 127,588.00 4,304,594.13


8,210.00 845.30 8,794,217.59
96,610.00 34,510.00 5,365,430.40

749,040.00 127,588.00 857,342.18


8,210.00 845.30 1,188,683.19
96,610.00 34,510.00 2,137,256.00

749,040.00 127,588.00 788,965.20


8,210.00 845.30 690,104.41
96,610.00 34,510.00 1,770,120.00

749,040.00 127,588.00 293,376.71


8,210.00 845.30 643,831.83
96,610.00 34,510.00 2,360,160.00
136,275,847.95

600,000.00 30,000.00 10,206,000.00


20,150.00 8,952.00 3,608,648.00
44,250.00 13,392.50 3,306,373.80
1,200,000.00 100,000.00 13,000,000.00
140,000.00 50,000.00 1,140,000.00
9,900 5,875 671,364.85
31,932,386.65
195,586,777.11

38,525.00 4,160,700.00
15,410.00 499,284.00
15,410.00 61,640.25 8,321,427.00
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.
12,981,411.00

38,525.00 104,017.50
15,410.00 12,482.10
270,000.00 40,000.00 12,400,000.00
15,000.00 10,000.00 1,000,000.00
15,000.00 10,000.00 1,000,000.00
14,516,499.60

- 38,525.00 69,345.00
- 15,410.00 8,321.40
270,000.00 50,000.00 9,600,000.00
9,677,666.40

- 38,525.00 369,840.00
- 15,410.00 44,380.80
292,000.00 50,000.00 22,230,000.00
22,644,220.80

165,000.00 13,392.50 62,080,590.00


60,000.00 13,392.50 22,898,460.00
54,250.00 8,952.00 6,320,200.00
91,299,250.00
151,119,047.80

56,207.00 236,069.40
15,410.00 19,416.60
102,000.00 15,410.00 61,640.25
317,126.25

594,220.00 103,455.00 219,767.63


594,220.00 103,455.00 156,976.88
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.

749,040.00 127,588.00 276,137.82


8,210.00 845.30 846,851.66
96,610.00 34,510.00 550,704.00

749,040.00 127,588.00 473,379.12


8,210.00 845.30 1,078,323.23
96,610.00 34,510.00 1,707,182.40

749,040.00 127,588.00 81,526.40


8,210.00 845.30 846,851.66
96,610.00 34,510.00 550,704.00

749,040.00 127,588.00 473,379.12


8,210.00 845.30 1,340,184.40
96,610.00 34,510.00 393,360.00
8,995,328.31

589,731.00 129,600.00 3,323,309.22


366,720.00 67,392.00 455,817.60
84,247.00 22,535.00 5,766,228.00
14,819.40 25,920.00 2,309,923.98
11,855,278.80
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.
500,000.00 50,000.00 1,100,000.00
800,000.00 50,000.00 1,700,000.00
300,000.00 50,000.00 700,000.00
900,000.00 1,800,000.00
5,300,000.00

9,900 5,875 894,416.99


894,416.99

77,055 66,115 644,265.00


179,978 85,005 4,213,229.70
4,857,494.70

160,240.00 175,105.00 670,690.00


22,500.00 29,862.50 157,087.50
15,000.00 8,157.50 46,315.00
200,000.00 600,000.00
25,000.00 20,000.00 90,000.00
3,000,000.00 3,000,000.00
900,000.00 900,000.00
1,650,000.00 50,000.00 -
1,200,000.00 420,000.00 1,620,000.00
1,950,000.00 50,000.00 2,000,000.00
9,084,092.50
41,303,737.55

4,063,000.00 4,063,000.00

404,072,562.45
404,000,000.00

Dibuat Oleh,
KSM "Karya Sejahtera"
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Dibuat Oleh, Rp.
KSM "Karya Sejahtera"

Amin Kariri
Ketua
Provinsi : Jawa Tengah
Kabupaten : Brebes
Kecamatan : Bulakamba
Desa : Bulakamba
RW : 02
PROGRAM SANITASI MASYARAKAT PROVINSI JAWA TENGAH
PERHITUNGAN PEKERJAAN TAMBAH KURANG ( CCO )
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
A. PEKERJAAN IPAL
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan Ls 1.00
2 Direksi Keet / Gudang Ls 1.00
3 Pengukuran & pemasangan bouwplank m2 40.77 0.16 40.92
4 Papan Kegiatan Ls 1.00
JUMLAH ( I )
II. PEKERJAAN TANAH
1 Galian tanah m3 120.90 2.10 118.8
2 Urugan tanah m3 36.27 0.63 35.64
3 Urugan sirtu m3 4.08 0.02 4.092
4 Pemasangan sasak bambu bh 50.00
5 Trucuk Bambu/Dolken Btg 84.00
6 Bambu pj 6 m btg 100.00
JUMLAH ( II )
III. PEKERJAAN BETON
1 Lantai kerja 1 : 3 : 5 m3 4.08 0.02 4.092
2 Plat Beton bertulang bawah 20 cm
Beton bertulang camp 1 : 2 : 3 m3 8.15 0.03 8.18
Pembesian 1 kg besi polos kg 967.49 3.68 971.17
memasang multiplex 9 mm m2 40.30 40.30
3 Beton Sloof camp 1 : 2 : 3 m3 0.978 0.98
Pembesian 1 kg besi polos kg 166.48 166.48
memasang multiplex 9 mm m2 16.3 16.3
4 Dinding Beton bertulang
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
Beton bertulang camp 1 : 2 : 3 m3 30.48 3.33 27.15
Pembesian 1 kg besi polos kg 4,587.18 462.44 4124.73
Memasang multiplex 9 mm m2 193.28 20.855 172.43
5 Plat Beton bertulang atas tb 12 cm
Beton bertulang camp 1 : 2 : 3 m3 4.89 0.02 4.91
Pembesian 1 kg besi polos kg 967.49 3.68 971.17
memasang multiplex 9 mm m2 40.30 0.62 40.92
6 Ring Balk Keliling
Beton bertulang camp 1 : 2 : 3 m3 0.978 0.98
Pembesian 1 kg besi polos kg 131.27 131.27
memasang multiplex 9 mm m2 16.30 16.30
7 Balok penyangga plat saring
Beton bertulang camp 1 : 2 : 3 m3 2.70 1.80 0.90
Pembesian 1 kg besi polos kg 12.86 63.35 76.21
memasang multiplex 9 mm m2 8.25 5.25 13.50
8 Plat saring tb 7 cm
Beton bertulang camp 1 : 2 : 3 m3 0.33 0.33
Pembesian 1 kg besi polos kg 71.10 71.10
memasang multiplex 9 mm m2 18.00 18.00
JUMLAH ( III )
IV. PERLENGKAPAN
1 Filter material AF m3 16.20
2 Pemasangan Pipa PVC type D 4" m' 124.00
3 Pemasangan Pipa PVC Type D 2" m' 57.36
4 Pemasangan Man Hole plat baja bh 10.00
5 Buis beton 40 cm bh 6.00
6 Pengecatan IPAL m2 42.56
JUMLAH ( IV )
JUMLAH ( I + II + III + IV ) )
B. PEKERJAAN PERPIPAAN
I. PEKERJAAN TANAH
1 Galian tanah m3 67.50 40.50 108.00
2 Urugan Tanah m3 20.25 12.15 32.40
3 Urugan Pasir bawah pipa dan pengunci m3 108.00
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
JUMLAH I
II. PEKERJAAN GRESTRAP 30X30
1 Pek Galian tanah m3 2.16 0.54 2.70
2 Pek Urugan tanah kembali m3 0.65 0.16 0.81
3 Grestrap + Penutup bh 60.00 20.00 40.00
4 Pas Tee 3' bh 60.00 20.00 40.00
5 pas Knee 3' bh 60.00 20.00 40.00
JUMLAH II
III. PEKERJAAN BAK KONTROL 30X30
1 Pek Galian tanah m3 2.16 0.36 1.80
2 Pek Urugan tanah kembali m3 0.65 0.11 0.54
3 Bak Kontrol + Penutup bh 60.00 30.00 30.00
JUMLAH III
IV. PEKERJAAN BAK KONTROL 40X40
1 Pek Galian tanah m3 3.84 5.76 9.60
2 Pek Urugan tanah kembali m3 1.15 1.73 2.88
3 Bak Kontrol + Penutup bh 60.00 5.00 65.00
JUMLAH IV
V PEKERJAAN PERPIPAAN
1 Pasang Pipa Limbah Dia 6' m' 325.00 23.00 348.00
2 Pasang Pipa limbah Dia 4' m' 300.00 12.00 312.00
3 Pasang Pipa limbah Dia 3' m' 80.00 20.00 100
JUMLAH V
JUMLAH ( I + II + III + IV + V )
C. PEKERJAAN MCK
I. PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali m3 4.20 4.20
2 Urug tanah Kembali Galian batu kali m3 1.26 1.26
3 Urugan Pasir bawah pondasi m3 0.53 0.53
JUMLAH ( I )
II PEKERJAAN BETON
1 Rabat beton bawah keramik m3 0.32 0.32
2 Rabat keliling bangunan m3 0.23
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
3 Beton Sloof
Beton bertulang camp 1 : 2 : 3 m3 0.32 0.32
Pembesian 10 kg besi polos kg 93.52 93.52
memasang multiplex 9 mm m2 4.20 4.20
4 Beton Kolom
Beton bertulang camp 1 : 2 : 3 m3 0.54 0.54
Pembesian 10 kg besi polos kg 119.08 119.08
Memasang multiplex 9 mm m2 13.02 13.02
5 Beton Balk
Beton bertulang camp 1 : 2 : 3 m3 0.09 0.09
Pembesian 10 kg besi polos kg 93.52 93.52
memasang multiplex 9 mm m2 4.20 4.20
6 Beton Plat
Beton bertulang camp 1 : 2 : 3 m3 0.54 0.54
Pembesian 10 kg besi polos kg 148.00 148.00
Memasang multiplex 9 mm m2 3.00 3.00
JUMLAH ( II )
III. PASANGAN DAN PLESTERAN
1 Pasang Pondasi Batu Kali m3 4.62 4.62
2 Pasang Aanstampeng m3 1.05 1.05
3 Pasang Dinding batu bata 1/2 batu m2 54 54
4 Plesteran m2 56.7 56.7
JUMLAH ( III )
IV PEKERJAAN KAYU
1 Kusen pintu dan boven kayu kruing unit 2 2
2 Daun Pintu Panil lapis alumunium unit 2 2
3 Boven unit 2 2
4 Assesoris pintu dan boven Ls 2 2
JUMLAH ( IV )
V PEKERJAAN CAT-CATAN
1 Pengecatan dinding m2 57 57
JUMLAH ( V )
VI PEKERJAAN LANTAI
1 Pasang lantai keramik m2 5 5
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
2 Pasang lantai keramik dinding m2 16 16
JUMLAH ( VI)
VII PEKERJAAN LAIN-LAIN
1 Pasang Kloset bh 2 2
2 Pasang Kran air bh 2 3
3 Pasang Floordrain bh 2 2
4 Pasang instalasi listrik dan listrik lampu SL 13 watt bh 2 3
5 Saklar tunggal bh 2 2
6 Pasang listrik baru unit 1 1
7 Perlengkapan KM/WC Ls 1 1
8 Tandon air 1000 lt fiber bh 1
9 Tandon air 500 lt fiber + pelengkap bh 1
10 Pompa air listrik (Semi jet pump) unit 1 1
JUMLAH ( VII )
JUMLAH ( I + II + III + IV +V + VI +VII)

PANITIA EVALUASI

1 ..

Ketua

2 ..

Sekretaris

3 ..
Anggota
PROGRAM : Sanitasi Berbasis Masyarakat
Jenis Kegiatan : MCK MIX
KSM Sanitasi : KARYA SEJAHTERA

TENGAH
CCO )
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.

100,000.00 100,000.00
1,000,000.00 1,000,000.00
60,680.00 12,025.00 2,975,088.60
200,000.00 200,000.00
4,275,088.60

56,207.00 6,795,426.30
15,410.00 558,920.70
156,000.00 14,025.00 693,106.91
9,000.00 50,000.00 2,950,000.00
9,000.00 100,000.00 9,156,000.00
9,000.00 20,500.00 2,950,000.00
23,103,453.91

594,220.00 103,455.00 2,854,886.10

749,040.00 127,588.00 7,174,323.55


8,210.00 845.30 8,794,217.59
96,610.00 34,510.00 -
749,040.00 127,588.00 857,342.18
8,210.00 845.30 1,507,502.20
96,610.00 34,510.00 2,137,256.00
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.
749,040.00 127,588.00 23,797,162.85
8,210.00 845.30 37,350,709.83
96,610.00 34,510.00 22,608,366.00

749,040.00 127,588.00 4,304,594.13


8,210.00 845.30 8,794,217.59
96,610.00 34,510.00 5,365,430.40

749,040.00 127,588.00 857,342.18


8,210.00 845.30 1,188,683.19
96,610.00 34,510.00 2,137,256.00

749,040.00 127,588.00 788,965.20


8,210.00 845.30 690,104.41
96,610.00 34,510.00 1,770,120.00

749,040.00 127,588.00 293,376.71


8,210.00 845.30 643,831.83
96,610.00 34,510.00 2,360,160.00
136,275,847.95

600,000.00 30,000.00 10,206,000.00


20,150.00 8,952.00 3,608,648.00
44,250.00 13,392.50 3,306,373.80
1,200,000.00 100,000.00 13,000,000.00
140,000.00 50,000.00 1,140,000.00
9,900 5,875 671,364.85
31,932,386.65
195,586,777.11

38,525.00 4,160,700.00
15,410.00 499,284.00
15,410.00 61,640.25 8,321,427.00
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.
12,981,411.00

38,525.00 104,017.50
15,410.00 12,482.10
270,000.00 40,000.00 12,400,000.00
15,000.00 10,000.00 1,000,000.00
15,000.00 10,000.00 1,000,000.00
14,516,499.60

- 38,525.00 69,345.00
- 15,410.00 8,321.40
270,000.00 50,000.00 9,600,000.00
9,677,666.40

- 38,525.00 369,840.00
- 15,410.00 44,380.80
292,000.00 50,000.00 22,230,000.00
22,644,220.80

165,000.00 13,392.50 62,080,590.00


60,000.00 13,392.50 22,898,460.00
54,250.00 8,952.00 6,320,200.00
91,299,250.00
151,119,047.80

56,207.00 236,069.40
15,410.00 19,416.60
102,000.00 15,410.00 61,640.25
317,126.25

594,220.00 103,455.00 219,767.63


594,220.00 103,455.00 156,976.88
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.

749,040.00 127,588.00 276,137.82


8,210.00 845.30 846,851.66
96,610.00 34,510.00 550,704.00

749,040.00 127,588.00 473,379.12


8,210.00 845.30 1,078,323.23
96,610.00 34,510.00 1,707,182.40

749,040.00 127,588.00 81,526.40


8,210.00 845.30 846,851.66
96,610.00 34,510.00 550,704.00

749,040.00 127,588.00 473,379.12


8,210.00 845.30 1,340,184.40
96,610.00 34,510.00 393,360.00
8,995,328.31

589,731.00 129,600.00 3,323,309.22


366,720.00 67,392.00 455,817.60
84,247.00 22,535.00 5,766,228.00
14,819.40 25,920.00 2,309,923.98
11,855,278.80

500,000.00 50,000.00 1,100,000.00


800,000.00 50,000.00 1,700,000.00
300,000.00 50,000.00 700,000.00
900,000.00 1,800,000.00
5,300,000.00

9,900 5,875 894,416.99


894,416.99

77,055 66,115 644,265.00


Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.
179,978 85,005 4,213,229.70
4,857,494.70

160,240.00 175,105.00 670,690.00


22,500.00 29,862.50 157,087.50
15,000.00 8,157.50 46,315.00
200,000.00 600,000.00
25,000.00 20,000.00 90,000.00
3,000,000.00 3,000,000.00
900,000.00 900,000.00
1,650,000.00 50,000.00 -
1,200,000.00 420,000.00 1,620,000.00
1,950,000.00 50,000.00 2,000,000.00
9,084,092.50
41,303,737.55

Dibuat Oleh,
KSM "Karya Sejahtera"

Amin Kariri
Ketua
Provinsi : Jawa Tengah PROGRAM : Sanitasi Berbasis Masyarakat
Kabupaten : Brebes Jenis Kegiatan : MCK MIX
Kecamatan : Bulakamba KSM Sanitasi : KARYA SEJAHTERA
Desa : Bulakamba
RW : 02

BACK UP PERUBAHAN VOLUME IPAL

No. Uraian Pekerjaan

I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan
2 Pengukuran & pemasangan bouwplank
3 Papan Kegiatan
II. PEKERJAAN TANAH
1 Galian tanah
2 Urugan tanah
3 Urugan sirtu
4 Pemasangan sasak bambu
5 Trucuk Bambu/Dolken
4 Bambu pj 6 m
III. PEKERJAAN BETON
1 Lantai kerja 1 : 3 : 5
2 Plat Beton bertulang bawah 20 cm
Beton bertulang camp 1 : 2 : 3
Pembesian 1 kg besi polos
3 Dinding Beton bertulang
Beton bertulang camp 1 : 2 : 3
Pembesian 1 kg besi polos
Memasang multiplex 9 mm
4 Plat Beton bertulang atas tb 12 cm
Beton bertulang camp 1 : 2 : 3
Pembesian 1 kg besi polos
memasang multiplex 9 mm
5 Balok penyangga plat saring
Beton bertulang camp 1 : 2 : 3
Pembesian 1 kg besi polos
memasang multiplex 9 mm
6 Plat saring tb 7 cm
Beton bertulang camp 1 : 2 : 3
Pembesian 1 kg besi polos
memasang multiplex 9 mm
IV. PERLENGKAPAN
1 Filter material AF
2 Pemasangan Pipa PVC type D 4"
3 Pemasangan Pipa PVC Type D 2"
4 Pemasangan Man Hole plat baja
No. Uraian Pekerjaan

5 Buis beton 40 cm

Diverivikasi ,
Diperiksa,
TFL Pemda Kab Brebes
TFL Teknik

Slamet Riyadi
Rokhmat Syaeful A,
NIP. 19640929199303 1
011
ROGRAM : Sanitasi Berbasis Masyarakat
enis Kegiatan : MCK MIX
SM Sanitasi : KARYA SEJAHTERA

PERUBAHAN VOLUME IPAL

URAIAN PERHITUNGAN HASIL Satuan

1.00 Ls
13.20*3.1 40.92 m2
1.00 ### Ls

3*13.20*3 118.80 m3
35.64 m3
0.1*13.20*3.1 4.09 m3
50.000 50.00 bh
84.000 84.00 Btg
100.00 ### btg

0.1*13.20*3.1 4.09 m3

0.2*13.20*3.1 8.18 m3
971.17 971.17 kg

(0.15*51.1*2.85)+(0.2*2.85*9.3) 27.15 m3
4,124.73 4,124.73 kg
60.5*2.85 172.43 m2

0.12*13.20*3.1 4.91 m3
971.17 971.17 kg
13.2*3.1 40.92 m2

30*0.15*0.2 0.90 m3
76.21 76.21 kg
6*2.25 13.50 m2

0.06608+0.017625+0.25096 0.33 m3
71.10 71.10 kg
6*3 18.00 m2

6*1*3 18.00 m3
142.70 ### m'
22.00 ### m'
10.00 ### bh
URAIAN PERHITUNGAN HASIL Satuan

6.00 ### bh

Diperiksa, Dibuat Oleh,


TFL Teknik KSM "Karya Sejahtera"

mat Syaeful A, Amin Kariri


Ketua
Provinsi : Jawa Tengah PROGRAM : Sanitasi Berbasis Masyarakat
Kabupaten : Brebes Jenis Kegiatan : MCK MIX
Kecamatan : Bulakamba KSM Sanitasi : KARYA SEJAHTERA
Desa : Bulakamba
RW : 02
BACK UP PERUBAHAN VOLUME PERPIPAAN

No. Uraian Pekerjaan Volume

I. PEKERJAAN TANAH
1 Galian tanah 0.45*600*0.45
2 Urugan Tanah
3 Urugan pasir bawah pipa dan pengunci 0.1*600*0.45
II. PEKERJAAN GRESTRAP 30X30
1 Pek Galian tanah 30*0.3*0.3
2 Pek Urugan tanah kembali
3 Grestrap + Penutup 30.00
4 Pas Tee 3' 30.00
5 pas Knee 3' 30.00
III. PEKERJAAN BAK KONTROL 30X30
1 Pek Galian tanah 20*0.3*0.3
2 Pek Urugan tanah kembali
3 Bak Kontrol + Penutup 30.00
IV. PEKERJAAN BAK KONTROL 40X40
1 Pek Galian tanah 65*0.4*0.4
2 Pek Urugan tanah kembali
1 Bak Kontrol + Penutup 65.00
V PEKERJAAN PERPIPAAN
1 Pasang Pipa Limbah Dia 6' 348.00
2 Pasang Pipa limbah Dia 4' 300.00
4 Pasang Pipa limbah Dia 3' 80.00

Diverivikasi , Diperiksa, Dibuat Oleh,


TFL Pemda Kab Brebes TFL Teknik KSM "Karya Sejahtera"

Slamet Riyadi Rokhmat Syaeful A, Amin Kariri


NIP. 196409291993031 011 Ketua
asis Masyarakat

JAHTERA

ME PERPIPAAN

Hasil Satuan

108.00 m3
32.40 m3
27.00 m3

2.70 m3
0.81 m3
30.00 bh
30.00 bh
30.00 bh

1.80 m3
0.54 m3
30.00 bh

9.60 m3
2.88 m3
65.00 bh

348.00 m'
312.00 m'
80.00 m'

Dibuat Oleh,
KSM "Karya Sejahtera"

Amin Kariri
Ketua
Provinsi : Jawa Tengah
Kabupaten : Brebes
Kecamatan : Bulakamba
Desa : Bulakamba
RW : 02

REKAPITULASI REVISI RAB PEMBANGUNAN IPAL DAN MCK DESA


DIBUAT OLEH KSM " KARYA SEJA

No PEKERJAAN HARGA

1 IPAL 195,586,777.11
2 MCK 41,303,737.55
3 Perpipaan 151,119,047.80
4 BOP 12,000,000.00

Sub Total 400,009,562.45


Jumlah Total
Dibulatkan
"TERBILANG : EMPAT RATUS EMPAT JUTA

Diverivikasi , Diperiksa,
TFL Pemda Kab Brebes TFL Teknik

Slamet Riyadi Rokhmat Syaeful A,


NIP. 19640929199303 1 011
PROGRAM : Sanitasi Berbasis Masyarakat
Jenis Kegiatan : MCK MIX
KSM Sanitasi : KARYA SEJAHTERA

GUNAN IPAL DAN MCK DESA BULAKAMBA RW 02 BLOK BALAI DESA


UAT OLEH KSM " KARYA SEJAHTERA"

MATRIKULASI KONTRIBUSI
Masyarakat BLM SANIMAS
In-kind In-cash
4,063,000.00

4,063,000.00
404,072,562.45
404,000,000.00
LANG : EMPAT RATUS EMPAT JUTA RUPIAH "
Bulakamba, 12 Desember 2015

Diperiksa, Dibuat Oleh,


TFL Teknik KSM "Karya Sejahtera"

Rokhmat Syaeful A, Amin Kariri


Ketua
02 BLOK BALAI DESA

USI
BLM SANIMAS

195,586,777.11
41,303,737.55
151,119,047.80
12,000,000.00

404,072,562.45
404,000,000.00

mba, 12 Desember 2015

Dibuat Oleh,
"Karya Sejahtera"

Amin Kariri
Ketua
Provinsi : Jawa Tengah
Kabupaten : Brebes
Kecamatan : Bulakamba
Desa : Bulakamba
RW : 02
PROGRAM SANITASI MASYARAKAT PROVINSI JAWA TENGAH
PERHITUNGAN PEKERJAAN TAMBAH KURANG ( CCO )
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
A. PEKERJAAN IPAL
I. PEKERJAAN PERSIAPAN
1 Pembersihan Lahan Ls 1.00
2 Direksi Keet / Gudang Ls 1.00
3 Pengukuran & pemasangan bouwplank m2 40.77 0.16 40.92
4 Papan Kegiatan Ls 1.00
JUMLAH ( I )
II. PEKERJAAN TANAH
1 Galian tanah m3 120.90 2.10 118.8
2 Urugan tanah m3 36.27 0.63 35.64
3 Urugan sirtu m3 4.08 0.02 4.092
4 Pemasangan sasak bambu bh 50.00
5 Trucuk Bambu/Dolken Btg 84.00
6 Bambu pj 6 m btg 100.00
JUMLAH ( II )
III. PEKERJAAN BETON
1 Lantai kerja 1 : 3 : 5 m3 4.08 0.02 4.092
2 Plat Beton bertulang bawah 20 cm
Beton bertulang camp 1 : 2 : 3 m3 8.15 0.03 8.18
Pembesian 1 kg besi polos kg 967.49 3.68 971.17
memasang multiplex 9 mm m2 40.30 40.30
3 Beton Sloof camp 1 : 2 : 3 m3 0.978 0.98
Pembesian 1 kg besi polos kg 166.48 166.48
memasang multiplex 9 mm m2 16.3 16.3
4 Dinding Beton bertulang
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
Beton bertulang camp 1 : 2 : 3 m3 30.48 3.33 27.15
Pembesian 1 kg besi polos kg 4,587.18 462.44 4124.73
Memasang multiplex 9 mm m2 193.28 20.855 172.43
5 Plat Beton bertulang atas tb 12 cm
Beton bertulang camp 1 : 2 : 3 m3 4.89 0.02 4.91
Pembesian 1 kg besi polos kg 967.49 3.68 971.17
memasang multiplex 9 mm m2 40.30 0.62 40.92
6 Ring Balk Keliling
Beton bertulang camp 1 : 2 : 3 m3 0.978 0.98
Pembesian 1 kg besi polos kg 131.27 131.27
memasang multiplex 9 mm m2 16.30 16.30
7 Balok penyangga plat saring
Beton bertulang camp 1 : 2 : 3 m3 2.70 1.80 0.90
Pembesian 1 kg besi polos kg 12.86 63.35 76.21
memasang multiplex 9 mm m2 8.25 5.25 13.50
8 Plat saring tb 7 cm
Beton bertulang camp 1 : 2 : 3 m3 0.33 0.33
Pembesian 1 kg besi polos kg 71.10 71.10
memasang multiplex 9 mm m2 18.00 18.00
JUMLAH ( III )
IV. PERLENGKAPAN
1 Filter material AF m3 16.20
2 Pemasangan Pipa PVC type D 4" m' 124.00
3 Pemasangan Pipa PVC Type D 2" m' 57.36
4 Pemasangan Man Hole plat baja bh 10.00
5 Buis beton 40 cm bh 6.00
6 Pengecatan IPAL m2 42.56
JUMLAH ( IV )
JUMLAH ( I + II + III + IV ) )
B. PEKERJAAN PERPIPAAN
I. PEKERJAAN TANAH
1 Galian tanah m3 67.50 40.50 108.00
2 Urugan Tanah m3 20.25 12.15 32.40
3 Urugan Pasir bawah pipa dan pengunci m3 108.00
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
JUMLAH I
II. PEKERJAAN GRESTRAP 30X30
1 Pek Galian tanah m3 2.16 0.54 2.70
2 Pek Urugan tanah kembali m3 0.65 0.16 0.81
3 Grestrap + Penutup bh 60.00 20.00 40.00
4 Pas Tee 3' bh 60.00 20.00 40.00
5 pas Knee 3' bh 60.00 20.00 40.00
JUMLAH II
III. PEKERJAAN BAK KONTROL 30X30
1 Pek Galian tanah m3 2.16 0.36 1.80
2 Pek Urugan tanah kembali m3 0.65 0.11 0.54
3 Bak Kontrol + Penutup bh 60.00 30.00 30.00
JUMLAH III
IV. PEKERJAAN BAK KONTROL 40X40
1 Pek Galian tanah m3 3.84 5.76 9.60
2 Pek Urugan tanah kembali m3 1.15 1.73 2.88
3 Bak Kontrol + Penutup bh 60.00 5.00 65.00
JUMLAH IV
V PEKERJAAN PERPIPAAN
1 Pasang Pipa Limbah Dia 6' m' 325.00 23.00 348.00
2 Pasang Pipa limbah Dia 4' m' 300.00 12.00 312.00
3 Pasang Pipa limbah Dia 3' m' 80.00 20.00 100
JUMLAH V
JUMLAH ( I + II + III + IV + V )
C. PEKERJAAN MCK
I. PEKERJAAN TANAH
1 Galian Tanah Pondasi Batu Kali m3 4.20 4.20
2 Urug tanah Kembali Galian batu kali m3 1.26 1.26
3 Urugan Pasir bawah pondasi m3 0.53 0.53
JUMLAH ( I )
II PEKERJAAN BETON
1 Rabat beton bawah keramik m3 0.32 0.32
2 Rabat keliling bangunan m3 0.23
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
3 Beton Sloof
Beton bertulang camp 1 : 2 : 3 m3 0.32 0.32
Pembesian 10 kg besi polos kg 93.52 93.52
memasang multiplex 9 mm m2 4.20 4.20
4 Beton Kolom
Beton bertulang camp 1 : 2 : 3 m3 0.54 0.54
Pembesian 10 kg besi polos kg 119.08 119.08
Memasang multiplex 9 mm m2 13.02 13.02
5 Beton Balk
Beton bertulang camp 1 : 2 : 3 m3 0.09 0.09
Pembesian 10 kg besi polos kg 93.52 93.52
memasang multiplex 9 mm m2 4.20 4.20
6 Beton Plat
Beton bertulang camp 1 : 2 : 3 m3 0.54 0.54
Pembesian 10 kg besi polos kg 148.00 148.00
Memasang multiplex 9 mm m2 3.00 3.00
JUMLAH ( II )
III. PASANGAN DAN PLESTERAN
1 Pasang Pondasi Batu Kali m3 4.62 4.62
2 Pasang Aanstampeng m3 1.05 1.05
3 Pasang Dinding batu bata 1/2 batu m2 54 54
4 Plesteran m2 56.7 56.7
JUMLAH ( III )
IV PEKERJAAN KAYU
1 Kusen pintu dan boven kayu kruing unit 2 2
2 Daun Pintu Panil lapis alumunium unit 2 2
3 Boven unit 2 2
4 Assesoris pintu dan boven Ls 2 2
JUMLAH ( IV )
V PEKERJAAN CAT-CATAN
1 Pengecatan dinding m2 57 57
JUMLAH ( V )
VI PEKERJAAN LANTAI
1 Pasang lantai keramik m2 5 5
Volume
No. Uraian Pekerjaan Satuan
Kontrak Tambah Kurang ADD-01
2 Pasang lantai keramik dinding m2 16 16
JUMLAH ( VI)
VII PEKERJAAN LAIN-LAIN
1 Pasang Kloset bh 2 2
2 Pasang Kran air bh 2 3
3 Pasang Floordrain bh 2 2
4 Pasang instalasi listrik dan listrik lampu SL 13 watt bh 2 3
5 Saklar tunggal bh 2 2
6 Pasang listrik baru unit 1 1
7 Perlengkapan KM/WC Ls 1 1
8 Tandon air 1000 lt fiber bh 1
9 Tandon air 500 lt fiber + pelengkap bh 1
10 Pompa air listrik (Semi jet pump) unit 1 1
JUMLAH ( VII )
JUMLAH ( I + II + III + IV +V + VI +VII)
IN KIND MASYARAKAT
I Pembuatan Sumur dan Pompa IPAL Serta Ls 1
Kloset Jongkok + Pemasangan

TOTAL A + B + C + In Kind Swadaya


DIBULATKAN

Diverivikasi , Diperiksa,
TFL Pemda Kab Brebes TFL Teknik

Slamet Riyadi Rokhmat Syaeful A,


NIP. 19640929199303 1 011
PROGRAM : Sanitasi Berbasis Masyarakat
Jenis Kegiatan : MCK MIX
KSM Sanitasi : KARYA SEJAHTERA

TENGAH
CCO )
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.

100,000.00 100,000.00
1,000,000.00 1,000,000.00
60,680.00 12,025.00 2,975,088.60
200,000.00 200,000.00
4,275,088.60

56,207.00 6,795,426.30
15,410.00 558,920.70
156,000.00 14,025.00 693,106.91
9,000.00 50,000.00 2,950,000.00
9,000.00 100,000.00 9,156,000.00
9,000.00 20,500.00 2,950,000.00
23,103,453.91

594,220.00 103,455.00 2,854,886.10

749,040.00 127,588.00 7,174,323.55


8,210.00 845.30 8,794,217.59
96,610.00 34,510.00 -
749,040.00 127,588.00 857,342.18
8,210.00 845.30 1,507,502.20
96,610.00 34,510.00 2,137,256.00
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.
749,040.00 127,588.00 23,797,162.85
8,210.00 845.30 37,350,709.83
96,610.00 34,510.00 22,608,366.00

749,040.00 127,588.00 4,304,594.13


8,210.00 845.30 8,794,217.59
96,610.00 34,510.00 5,365,430.40

749,040.00 127,588.00 857,342.18


8,210.00 845.30 1,188,683.19
96,610.00 34,510.00 2,137,256.00

749,040.00 127,588.00 788,965.20


8,210.00 845.30 690,104.41
96,610.00 34,510.00 1,770,120.00

749,040.00 127,588.00 293,376.71


8,210.00 845.30 643,831.83
96,610.00 34,510.00 2,360,160.00
136,275,847.95

600,000.00 30,000.00 10,206,000.00


20,150.00 8,952.00 3,608,648.00
44,250.00 13,392.50 3,306,373.80
1,200,000.00 100,000.00 13,000,000.00
140,000.00 50,000.00 1,140,000.00
9,900 5,875 671,364.85
31,932,386.65
195,586,777.11

38,525.00 4,160,700.00
15,410.00 499,284.00
15,410.00 61,640.25 8,321,427.00
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.
12,981,411.00

38,525.00 104,017.50
15,410.00 12,482.10
270,000.00 40,000.00 12,400,000.00
15,000.00 10,000.00 1,000,000.00
15,000.00 10,000.00 1,000,000.00
14,516,499.60

- 38,525.00 69,345.00
- 15,410.00 8,321.40
270,000.00 50,000.00 9,600,000.00
9,677,666.40

- 38,525.00 369,840.00
- 15,410.00 44,380.80
292,000.00 50,000.00 22,230,000.00
22,644,220.80

165,000.00 13,392.50 62,080,590.00


60,000.00 13,392.50 22,898,460.00
54,250.00 8,952.00 6,320,200.00
91,299,250.00
151,119,047.80

56,207.00 236,069.40
15,410.00 19,416.60
102,000.00 15,410.00 61,640.25
317,126.25

594,220.00 103,455.00 219,767.63


594,220.00 103,455.00 156,976.88
Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.

749,040.00 127,588.00 276,137.82


8,210.00 845.30 846,851.66
96,610.00 34,510.00 550,704.00

749,040.00 127,588.00 473,379.12


8,210.00 845.30 1,078,323.23
96,610.00 34,510.00 1,707,182.40

749,040.00 127,588.00 81,526.40


8,210.00 845.30 846,851.66
96,610.00 34,510.00 550,704.00

749,040.00 127,588.00 473,379.12


8,210.00 845.30 1,340,184.40
96,610.00 34,510.00 393,360.00
8,995,328.31

589,731.00 129,600.00 3,323,309.22


366,720.00 67,392.00 455,817.60
84,247.00 22,535.00 5,766,228.00
14,819.40 25,920.00 2,309,923.98
11,855,278.80

500,000.00 50,000.00 1,100,000.00


800,000.00 50,000.00 1,700,000.00
300,000.00 50,000.00 700,000.00
900,000.00 1,800,000.00
5,300,000.00

9,900 5,875 894,416.99


894,416.99

77,055 66,115 644,265.00


Harga Satuan Jumlah
Material Upah Harga
Rp. Rp. Rp.
179,978 85,005 4,213,229.70
4,857,494.70

160,240.00 175,105.00 670,690.00


22,500.00 29,862.50 157,087.50
15,000.00 8,157.50 46,315.00
200,000.00 600,000.00
25,000.00 20,000.00 90,000.00
3,000,000.00 3,000,000.00
900,000.00 900,000.00
1,650,000.00 50,000.00 -
1,200,000.00 420,000.00 1,620,000.00
1,950,000.00 50,000.00 2,000,000.00
9,084,092.50
41,303,737.55

4,063,000.00 4,063,000.00

404,072,562.45
404,000,000.00
Bulakamba 12 Desember 2015

Dibuat Oleh,
KSM "Karya Sejahtera"

Amin Kariri
Ketua
Provinsi : Jawa Tengah PROGRAM : Sanitasi Berbasis Masyarakat
Kabupaten : Brebes Jenis Kegiatan : MCK MIX
Kecamatan : Bulakamba KSM Sanitasi : KARYA SEJAHTERA
Desa : Bulakamba
RW : 02

DAFTAR HARGA UPAH PEKERJA

No URAIAN Satuan

1 Pekerja OH
2 Tukang OH
3 Kepala Tukang OH
4 Mandor OH
PROGRAM : Sanitasi Berbasis Masyarakat
Jenis Kegiatan : MCK MIX
KSM Sanitasi : KARYA SEJAHTERA

R HARGA UPAH PEKERJA

HARGA SATUAN
UPAH ( Rp. )
49,000.00
61,000.00
67,000.00
71,000.00
Provinsi : Jawa Tengah
Kabupaten : Brebes
Kecamatan : Bulakamba
Desa : Bulakamba
RW : 02

ANALISA CIPTA KARYA


TAHUN 2015

A.2.2.1.4 Mengerjakan 1 m pengukuran dan pemasangan bouwplank


A. Bahan
Kayu Meranti Batu 5/7 (ikat)
Paku Biasa 2" - 5"
Kayu Papan Meranti Batu (2 x 20 x 400)

B. Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.2.3.1.3 Menggali 1 m tanah biasa sedalam 3 meter
A. Bahan

B. Tenaga
Pekerja
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.2.3.1.1 Menggali 1 m tanah biasa sedalam 1 meter
A. Bahan

B. Tenaga
Pekerja
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.2.3.1.11.a Mengurug 1 m tanah urug
A. Bahan
Tanah Urug

B. Tenaga
Pekerja
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.2.3.1.14 Mengurug 1 m sirtu padat
A. Bahan
Sirtu

B. Tenaga
Pekerja
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.2.3.1.11 Mengurug 1 m pasir urug


A. Bahan
Pasir Urug

B. Tenaga
Pekerja
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.3.2.1.4 Memasang 1 m pondasi batu belah; campuran 1 PC : 6 PP


A. Bahan
Batu Belah 15/20
Portland Cement (PC)
Pasir Pasang (PP)

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.3.2.1.9 Memasang 1 m batu kosong (aanstampeeng)


A. Bahan
Batu Belah 15/20
Pasir Urug

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

G.042 Membuat 1 m beton tumbuk 1 PC : 3 PB : 5 KR menggunakan batu split pecah tang


Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm) pecah tangan

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

Jumlah (1) + (2)


G.046 Membuat 1 m beton bertulang 1 PC : 2 PB : 3 KR menggunakan batu pecah mesin
Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm) pecah mesin

Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah (1) + (2)
A.4.1.1.7 Membuat 1 m beton mutu f'c=19,3 Mpa (K 225); slump (12 2) cm; w/c = 0,58
A. Bahan
Portland Cement (PC)
Pasir Beton (PB)
Koral Beton (maksimum 30 mm) pecah mesin
Air

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.4.1.1.17 Pembesian 1 kg dengan besi polos atau besi ulir
A. Bahan
Besi Beton (polos/ulir)
Kawat Beton

B. Tenaga
Pekerja
Tukang Besi
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
G.059 Memasang 1 m bekisting multipleks 9 mm
Bahan
Multipleks 9 mm
Paku 5 cm - 12 cm
Balok Kayu Meranti Batu 5/7

Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor
Pekerja (bongkar cetakan)

Jumlah (1) + (2)


A.4.4.1.4 Memasang 1 m dinding bata merah (5x11x22) cm; tebal 1 bata; campuran 1 PC : 5
A. Bahan
Bata Merah
Portland Cement (PC)
Pasir Pasang (PP)

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.4.4.1.10 Memasang 1 m dinding bata merah (5x11x22) cm; tebal bata; campuran 1 PC : 5
A. Bahan
Bata Merah
Portland Cement (PC)
Pasir Pasang (PP)

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.44.2.3 Memasang 1 m plesteran 1 PC : 3 PP; tebal 15 mm
A. Bahan
Portland Cement (PC)
Pasir Pasang

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.44.2.27 Memasang 1 m acian
A. Bahan
Portland Cement (PC)

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.5.1.1.29 Memasang 1 m' pipa PVC tipe D 2"
A. Bahan
Pipa PVC
Perlengkapan

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.5.1.1.32 Memasang 1 m' pipa PVC tipe D 4"
A. Bahan
Pipa PVC
Perlengkapan

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.5.1.1.29 Memasang 1 m' pipa PVC tipe AW 3"


A. Bahan
Pipa PVC
Perlengkapan

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )
A.5.1.1.32 Memasang 1 m' pipa PVC tipe AW 4"
A. Bahan
Pipa PVC
Perlengkapan

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.5.1.1.32 Memasang 1 m' pipa PVC tipe AW 6"


A. Bahan
Pipa PVC
Perlengkapan

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.5.1.1.2.a Memasang 1 buah closet jongkok porselen


A. Bahan
Closet Jongkok
Portland Cement (PC)
Pasir Pasang

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.5.1.1.19 Memasang 1 buah kran " atau " standar


A. Bahan
Kran Air standar
Seal Tape

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.5.1.1.14 Memasang 1 buah floor drain


A. Bahan
Floordrain

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.4.4.3.54.c Memasang 1 m dinding keramik motif ukuran 25X40 cm


A. Bahan
Keramik 25X40 cm motif
Portland Cement (PC)
Pasir Pasang (PP)
Semen Warna

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.4.4.3.35.d Memasang 1 m lantai keramik motif (40 x 40) cm


A. Bahan
keramik 40 x 40 cm motif
Portland Cement (PC)
Pasir Pasang (PP)
Semen Warna

B. Tenaga
Pekerja
Tukang Batu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.4.7.1.10 1 m pengecetan tembok baru ( 1 lapis plamur, 1 lapis cat dasar, 2 lapis cat penutup
A. Bahan
plamir tembok
cat dasar
cat tembok catylac exterior

B. Tenaga
Pekerja
Tukang Cat
Kepala Tukang
Mandor

C. Peralatan
D. Jumlah ( A + B + C )

A.4.6.1.2.b Membuat dan memasang 1 m kusen pintu dan kusen jendela, kayu kelas III ( kayu K
A. Bahan
Balok Kayu Kruing
Paku 10 cm
Lem kayu

B. Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

A.4.6.1.6.c Membuat dan memasang 1 m pintu dan jendela kaca, kayu kelas III ( kayu Kruing )
A. Bahan
Papan Kayu Kruing
Lem kayu

B. Tenaga
Pekerja
Tukang Kayu
Kepala Tukang
Mandor

C. Peralatan

D. Jumlah ( A + B + C )

Diverivikasi , Diperiksa,
TFL Pemda Kab Brebes TFL Teknik

Slamet Riyadi Rokhmat Syaeful A,


NIP. 19640929199303 1 011
PROGRAM : Sanitasi Berbasis Masyarakat
Jenis Kegiatan : MCK MIX
KSM Sanitasi : KARYA SEJAHTERA

ALISA CIPTA KARYA


TAHUN 2015

bouwplank

0.012 m 2,700,000.00 32,400.00


0.020 kg 14,000.00 280.00
0.007 m 4,000,000.00 28,000.00
Jumlah harga bahan 60,680.00

0.100 OH 49,000.00 4,900.00


0.100 OH 61,000.00 6,100.00
0.010 OH 67,000.00 670.00
0.005 OH 71,000.00 355.00
Jumlah harga tenaga 12,025.00
-

Jumlah harga peralatan -


72,705.00

Jumlah harga bahan -

1.050 OH 49,000.00 51,450.00


0.067 OH 71,000.00 4,757.00
Jumlah harga tenaga 56,207.00
-

Jumlah harga peralatan -


56,207.00

Jumlah harga bahan -

0.750 OH 49,000.00 36,750.00


0.025 OH 71,000.00 1,775.00
Jumlah harga tenaga 38,525.00
-

Jumlah harga peralatan -


38,525.00
1.200 m 71,000.00 85,200.00
Jumlah harga bahan 85,200.00

0.300 OH 49,000.00 14,700.00


0.010 OH 71,000.00 710.00
Jumlah harga tenaga 15,410.00
-

Jumlah harga peralatan -


100,610.00

1.200 m 130,000.00 156,000.00


Jumlah harga bahan 156,000.00

0.250 OH 49,000.00 12,250.00


0.025 OH 71,000.00 1,775.00
Jumlah harga tenaga 14,025.00
-

Jumlah harga peralatan -


170,025.00

1.200 m 85,000.00 102,000.00


Jumlah harga bahan 102,000.00

0.300 OH 49,000.00 14,700.00


0.010 OH 71,000.00 710.00
Jumlah harga tenaga 15,410.00
-

Jumlah harga peralatan -


117,410.00

1.200 m 275,000.00 330,000.00


117.000 kg 1,400.00 163,800.00
0.561 m 171,000.00 95,931.00
Jumlah harga bahan 589,731.00

1.500 OH 49,000.00 73,500.00


0.750 OH 61,000.00 45,750.00
0.075 OH 67,000.00 5,025.00
0.075 OH 71,000.00 5,325.00
Jumlah harga tenaga 129,600.00
-

Jumlah harga peralatan -


719,331.00

1.200 m 275,000.00 330,000.00


0.432 m 85,000.00 36,720.00
Jumlah harga bahan 366,720.00

0.780 OH 49,000.00 38,220.00


0.390 OH 61,000.00 23,790.00
0.039 OH 67,000.00 2,613.00
0.039 OH 71,000.00 2,769.00
Jumlah harga tenaga 67,392.00
-

Jumlah harga peralatan -


434,112.00

menggunakan batu split pecah tangan

218.0000 kg 1,400.00 305,200.00


0.5200 m 171,000.00 88,920.00
0.8700 m 230,000.00 200,100.00
Jumlah (1) 594,220.00

1.6500 OH 49,000.00 80,850.00


0.2500 OH 61,000.00 15,250.00
0.0250 OH 67,000.00 1,675.00
0.0800 OH 71,000.00 5,680.00
Jumlah (2) 103,455.00
697,675.00
R menggunakan batu pecah mesin

336.0000 kg 1,400.00 470,400.00


0.5400 m 171,000.00 92,340.00
0.8100 m 230,000.00 186,300.00
Jumlah (1) 749,040.00

2.0000 OH 49,000.00 98,000.00


0.3500 OH 61,000.00 21,350.00
0.0350 OH 67,000.00 2,345.00
0.0830 OH 71,000.00 5,893.00
Jumlah (2) 127,588.00
876,628.00
; slump (12 2) cm; w/c = 0,58

371.000 kg 1,400.00 519,400.00


698.000 kg 122.14 85,255.71
1,047.000 kg 158.62 166,075.86
215.000 liter 42.00 9,030.00
Jumlah harga bahan 779,761.58

1.650 OH 49,000.00 80,850.00


0.275 OH 61,000.00 16,775.00
0.028 OH 67,000.00 1,876.00
0.083 OH 71,000.00 5,893.00
Jumlah harga tenaga 105,394.00
-

Jumlah harga peralatan -


885,155.58

1.000 kg 8,000.00 8,000.00


0.015 kg 14,000.00 210.00
Jumlah harga bahan 8,210.00

0.007 OH 49,000.00 343.00


0.007 OH 61,000.00 427.00
0.001 OH 67,000.00 46.90
0.0004 OH 71,000.00 28.40
Jumlah harga tenaga 845.30
-

Jumlah harga peralatan -


9,055.30

0.3470 lbr 130,000.00 45,110.00


0.4000 kg 14,000.00 5,600.00
0.0170 m 2,700,000.00 45,900.00
Jumlah (1) 96,610.00

0.1200 OH 49,000.00 5,880.00


0.1500 OH 61,000.00 9,150.00
0.1500 OH 67,000.00 10,050.00
0.0500 OH 71,000.00 3,550.00
0.1200 OH 49,000.00 5,880.00
Jumlah (2) 34,510.00
131,120.00
m; tebal 1 bata; campuran 1 PC : 5 PP

140.000 buah 900.00 126,000.00


22.200 kg 1,400.00 31,080.00
0.102 m 171,000.00 17,442.00
Jumlah harga bahan 174,522.00

0.600 OH 49,000.00 29,400.00


0.200 OH 61,000.00 12,200.00
0.020 OH 67,000.00 1,340.00
0.030 OH 71,000.00 2,130.00
Jumlah harga tenaga 45,070.00
-

Jumlah harga peralatan -


219,592.00
m; tebal bata; campuran 1 PC : 5 PP

70.000 buah 900.00 63,000.00


9.680 kg 1,400.00 13,552.00
0.045 m 171,000.00 7,695.00
Jumlah harga bahan 84,247.00

0.300 OH 49,000.00 14,700.00


0.100 OH 61,000.00 6,100.00
0.010 OH 67,000.00 670.00
0.015 OH 71,000.00 1,065.00
Jumlah harga tenaga 22,535.00
-

Jumlah harga peralatan -


106,782.00

7.776 kg 1,400.00 10,886.40


0.023 m 171,000.00 3,933.00
Jumlah harga bahan 14,819.40

0.300 OH 49,000.00 14,700.00


0.150 OH 61,000.00 9,150.00
0.015 OH 67,000.00 1,005.00
0.015 OH 71,000.00 1,065.00
Jumlah harga tenaga 25,920.00
-

Jumlah harga peralatan -


40,739.40
3.250 kg 1,400.00 4,550.00
Jumlah harga bahan 4,550.00

0.200 OH 49,000.00 9,800.00


0.100 OH 61,000.00 6,100.00
0.010 OH 67,000.00 670.00
0.010 OH 71,000.00 710.00
Jumlah harga tenaga 17,280.00
-

Jumlah harga peralatan -


21,830.00

1.200 m' 13,000.00 15,600.00


35% harga pipa 4,550.00
Jumlah harga bahan 20,150.00

0.054 OH 49,000.00 2,646.00


0.090 OH 61,000.00 5,490.00
0.009 OH 67,000.00 603.00
0.003 OH 71,000.00 213.00
Jumlah harga tenaga 8,952.00
-

Jumlah harga peralatan -


29,102.00

1.200 m' 29,500.00 35,400.00


35% harga pipa 8,850.00
Jumlah harga bahan 44,250.00

0.081 OH 49,000.00 3,969.00


0.135 OH 61,000.00 8,235.00
0.0135 OH 67,000.00 904.50
0.004 OH 71,000.00 284.00
Jumlah harga tenaga 13,392.50
-

Jumlah harga peralatan -


57,642.50

1.200 m' 35,000.00 42,000.00


35% harga pipa 12,250.00
Jumlah harga bahan 54,250.00

0.054 OH 49,000.00 2,646.00


0.090 OH 61,000.00 5,490.00
0.009 OH 67,000.00 603.00
0.003 OH 71,000.00 213.00
Jumlah harga tenaga 8,952.00
-

Jumlah harga peralatan -


63,202.00

1.200 m' 40,000.00 48,000.00


35% harga pipa 12,000.00
Jumlah harga bahan 60,000.00

0.081 OH 49,000.00 3,969.00


0.135 OH 61,000.00 8,235.00
0.0135 OH 67,000.00 904.50
0.004 OH 71,000.00 284.00
Jumlah harga tenaga 13,392.50
-

Jumlah harga peralatan -


73,392.50

1.200 m' 110,000.00 132,000.00


35% harga pipa 33,000.00
Jumlah harga bahan 165,000.00

0.081 OH 49,000.00 3,969.00


0.135 OH 61,000.00 8,235.00
0.0135 OH 67,000.00 904.50
0.004 OH 71,000.00 284.00
Jumlah harga tenaga 13,392.50
-

Jumlah harga peralatan -


178,392.50

1.000 bh 150,000.00 150,000.00


6.000 kg 1,400.00 8,400.00
0.010 m 184,000.00 1,840.00
Jumlah harga bahan 160,240.00

1.000 OH 54,500.00 54,500.00


1.500 OH 65,500.00 98,250.00
0.150 OH 68,500.00 10,275.00
0.160 OH 75,500.00 12,080.00
Jumlah harga tenaga 175,105.00
-

Jumlah harga peralatan -


335,345.00

1.000 bh 20,000.00 20,000.00


0.025 bh 2,500.00 2,500.00
Jumlah harga bahan 22,500.00

0.010 OH 54,500.00 545.00


0.400 OH 65,500.00 26,200.00
0.040 OH 68,500.00 2,740.00
0.005 OH 75,500.00 377.50
Jumlah harga tenaga 29,862.50
-

Jumlah harga peralatan -


52,362.50

1.000 bh 15,000.00 15,000.00


Jumlah harga bahan 15,000.00

0.010 OH 54,500.00 545.00


0.100 OH 65,500.00 6,550.00
0.010 OH 68,500.00 685.00
0.005 OH 75,500.00 377.50
Jumlah harga tenaga 8,157.50
-

Jumlah harga peralatan -


23,157.50

20.000 Buah 8,000.00 160,000.00


9.300 kg 1,400.00 13,020.00
0.018 m 171,000.00 3,078.00
1.940 kg 2,000.00 3,880.00
Jumlah harga bahan 179,978.00

0.900 OH 54,500.00 49,050.00


0.450 OH 65,500.00 29,475.00
0.045 OH 68,500.00 3,082.50
0.045 OH 75,500.00 3,397.50
Jumlah harga tenaga 85,005.00
-

Jumlah harga peralatan -


264,983.00

6.630 Buah 8,000.00 53,040.00


9.800 kg 1,400.00 13,720.00
0.045 m 171,000.00 7,695.00
1.300 kg 2,000.00 2,600.00
Jumlah harga bahan 77,055.00

0.700 OH 54,500.00 38,150.00


0.350 OH 65,500.00 22,925.00
0.035 OH 68,500.00 2,397.50
0.035 OH 75,500.00 2,642.50
Jumlah harga tenaga 66,115.00
-

Jumlah harga peralatan -


143,170.00

1 lapis cat dasar, 2 lapis cat penutup )

0.100 kg 15,000.00 1,500.00


0.100 kg 19,000.00 1,900.00
0.260 kg 25,000.00 6,500.00
Jumlah harga bahan 9,900.00

0.020 OH 54,500.00 1,090.00


0.063 OH 65,500.00 4,126.50
0.0063 OH 68,500.00 431.55
0.003 OH 75,500.00 226.50
Jumlah harga tenaga 5,874.55
-
Jumlah harga peralatan -
15,774.55

kusen jendela, kayu kelas III ( kayu Kruing )

1.200 m 5,000,000.00 6,000,000.00


1.250 kg 14,000.00 17,500.00
1.000 kg 15,000.00 15,000.00
Jumlah harga bahan 6,032,500.00

6.000 OH 54,500.00 327,000.00


18.000 OH 65,500.00 1,179,000.00
1.800 OH 68,500.00 123,300.00
0.300 OH 75,500.00 22,650.00
Jumlah harga tenaga 1,651,950.00
-

Jumlah harga peralatan -


7,684,450.00

kaca, kayu kelas III ( kayu Kruing )

0.024 m 5,300,000.00 127,200.00


0.300 kg 15,000.00 4,500.00
Jumlah harga bahan 131,700.00

0.800 OH 54,500.00 43,600.00


2.400 OH 65,500.00 157,200.00
0.240 OH 68,500.00 16,440.00
0.040 OH 75,500.00 3,020.00
Jumlah harga tenaga 220,260.00
-

Jumlah harga peralatan -


351,960.00

eriksa, Dibuat Oleh,


Teknik KSM "Karya Sejahtera"

t Syaeful A, Amin Kariri


Ketua
Provinsi : Jawa Tengah
PROGRAM : Sanitasi Berbasis Masyarakat
Kabupaten : Brebes
Jenis Kegiatan : MCK MIX
Kecamatan : Bulakamba
KSM Sanitasi : KARYA SEJAHTERA
Desa : Bulakamba
RW : 02

BACK UP PERUBAHAN VOLUME MCK

No. Uraian Pekerjaan

I PEKERJAAN TANH
1 Galian Tanah Pondasi Batu Kali
2 Urug tanah Kembali Galian batu kali
3 Urug pasir bawah pondasi
II PEKERJAAN BETON
1 Rabat beton bawah keramik
2 Beton Sloof
Beton bertulang camp 1 : 2 : 3
Pembesian 10 kg besi polos
memasang multiplex 9 mm
3 Beton Kolom
Beton bertulang camp 1 : 2 : 3
Pembesian 10 kg besi polos
Memasang multiplex 9 mm
4 Beton Balk
Beton bertulang camp 1 : 2 : 3
Pembesian 10 kg besi polos
memasang multiplex 9 mm
5 Beton Plat
Beton bertulang camp 1 : 2 : 3
Pembesian 10 kg besi polos
Memasang multiplex 9 mm
III. PASANGAN DAN PLESTERAN
1 Pasang pondasi batu kali
2 Pasang Aanstanpeng
3 Pasang Dinding batu bata 1/2 batu
4 Plesteran
IV PEKERJAAN KAYU
1 Kusen pintu dan boven kayu kruing
2 Daun Pintu
V PEKERJAAN CAT-CATAN
1 Pengecatan dinding
VI PEKERJAAN LANTAI
No. Uraian Pekerjaan

1 Pasang lantai keramik


2 Pasang lantai keramik dinding
VII PEKERJAAN LAIN-LAIN
1 Pasang Kloset
2 Pasang Kran air
3 Pasang Floordrain
4 Pasang instalasi listrik dan listrik lampu SL 13 watt
5 Saklar tunggal
6 Pasang listrik baru
7 Perlengkapan KM/WC
8 Tandon air 1000 lt fiber
9 Pompa air listrik (Semi jet pump)

Diverivikasi , Diperiksa,
TFL Pemda Kab Brebes TFL Teknik

Slamet Riyadi Rokhmat Syaeful A,


NIP. 19640929199303 1 011
RAM : Sanitasi Berbasis Masyarakat
Kegiatan : MCK MIX
Sanitasi : KARYA SEJAHTERA

RUBAHAN VOLUME MCK

Volume Hasil Satuan

0.5*0.8*10.5 4.20 m3
1.26 m3
0.1*0.5*10.5 0.53 m3

1.5*3*0.07 0.32 m3

0.2*0.2*10.5 0.32 m3
93.52 93.52 kg
(0.2+0.2)*10.5 4.20 m2

0.15*0.2*6*3 0.54 m3
119.08 119.08 kg
(0.15+0.15+0.2+0.2)*3.1*6 13.02 m2

0.15*0.2*3.1 0.09 m3
3.99 3.99 kg
(0.2+0.2)*10.5 6.60 m2

0.12*3*1.5 0.54 m3
14.80 14.80 kg
1.5*2 3.00 m2

((0.3+0.5/2)*0.8)*10.5 4.62 m3
0.2*0.5*10.5 1.05 m3
8*3*2 48 m2
48+(0.3*9) 56.7 m2

2 2 unit
2 2 unit

48+(0.3*9) 2 m2
Volume Hasil Satuan

3*1.5 5 m2
((1.5*8)-1.4)*1.5 16 m2

2 2 bh
2 2 bh
2 2 bh
2 2 bh
2 2 bh
1 1 unit
1 1 Ls
1 1 bh
1 1 unit

riksa, Dibuat Oleh,


Teknik KSM "Karya Sejahtera"

Syaeful A, Amin Kariri


Ketua
Provinsi : Jawa Tengah PROGRAM : Sanitasi Berbasis Masyarakat
Kabupaten : Brebes Jenis Kegiatan : MCK MIX
Kecamatan : Bulakamba KSM Sanitasi : KARYA SEJAHTERA
Desa : Bulakamba
RW : 02
DAFTAR HARGA BAHAN

No NAMA BAHAN / MATERIAL Satuan

1 Pasir urug m
2 Tanah urug m3
3 Pasir pasang m
4 Sirtu m
5 Pasir beton m
6 Semen Warna kg
7 Split m
8 Portland cement kg
9 Bata merah buah
10 Batu Kali/batu Belah m3
11 Besi beton kg
12 Kawat Beton kg
13 Kayu 5/7 m
14 Kayu terentang (bekisting) m
15 Multipleks 9 mm (120x240) lembar
16 Kayu Kruing Balok m3
17 Lem kayu kg
18 Papan Kayu Kruing m3
19 Paku kg
20 Floordrain bh
21 Bambu btg
22 Krain air bh
23 Kloset Jongkok bh
24 plamir tembok kg
25 cat dasar kg
26 cat tembok catylac exterior kg
27 Pipa PVC tipe AW 2" m'
28 Pipa PVC tipe AW 3" m'
29 Pipa PVC tipe AW 4" m'
30 Pipa PVC tipe AW 6" m'
31 T 3" buah
32 keramik 40 x 40 cm motif buah
33 Keramik 25X40 cm motif buah
34 Pipa type D 2" m'
35 Pipa type D 4" m'
36 Material AF m
37 Manhole Plat Baja buah
38 Buis Beton 40 cm buah
39 Saklar Tunggal bh
40 Tandon Air bh
41 Jet Pump bh
basis Masyarakat
X
EJAHTERA

AN

HARGA ( Rp. )
SATUAN
85,000.00
71,000.00
171,000.00
130,000.00
171,000.00
2,000.000
230,000.00
1,400.00
900.00
275,000.00
8,000.00
14,000.00
2,700,000.00
4,000,000.00
130,000.00
5,000,000.00
15,000.00
5,300,000.00
14,000.00
15,000.00
9,000.00
20,000.00
150,000.00
15,000.00
19,000.00
25,000.00
17,000.00
35,000.00
40,000.00
110,000.00
15,000.00
8,000.00
8,000.00
13,000.00
29,500.00
600,000.00
1,200,000.00
140,000.00
25,000.00
1,650,000.00
1,950,000.00
Provinsi : Jawa Tengah PROGRAM : Sanitasi Berbasis Ma
Kabupaten : Brebes Jenis Kegiatan : MCK MIX
Kecamatan : Bulakamba KSM Sanitasi : KARYA SEJAHTERA
Desa : Bulakamba
RW : 02
RENCANA BAHAN DAN ALAT

No URAIAN VOLUME SATUAN

A TENAGA KERJA
1 Pekerja 730 OH
2 Tukang 560 OH
3 Kepala Tukang 90 OH
4 Mandor 90 OH

B MATERIAL
1 Pasir urug 3 m
2 Tanah urug 1 m3
3 Pasir pasang 100 m
4 Sirtu 3 m
5 Pasir beton 100 m
6 Semen Warna 20 kg
7 Split 90 m
8 Portland cement 25000 kg
9 Bata merah 5000 buah
10 Batu Kali/batu Belah 5 m3
11 Besi beton 7075 kg
12 Kawat Beton 200 kg
13 Kayu 5/7 7 m
14 Kayu terentang (bekisting) 2 m
15 Multipleks 9 mm (120x240) 112 lembar
16 Kayu Kruing Balok 1.7 m3
17 Lem kayu 20 kg
18 Papan Kayu Kruing 0.7 m3
19 Paku 151 kg
20 Floordrain 2 bh
21 Bambu 234 btg
22 Krain air 2 bh
23 Kloset Jongkok 2 bh
24 plamir tembok 10 kg
25 cat dasar 40 kg
26 cat tembok catylac exterior 40 kg
27 Pipa PVC tipe AW 2" 20 m'
28 Pipa PVC tipe AW 3" 80.00 m'
29 Pipa PVC tipe AW 4" 300.00 m'
30 Pipa PVC tipe AW 6" 325.00 m'
31 T 3" 30 buah
32 keramik 40 x 40 cm motif 27 buah
33 Keramik 25X40 cm motif 318 buah
34 Pipa type D 2" 57.36 m'
35 Pipa type D 4" 124.00 m'
36 Material AF 16.2 m
37 Manhole Plat Baja 10 buah
38 Buis Beton 40 cm 6 buah
39 Saklar Tunggal 2 buah
40 Tandon Air 1 buah
41 Jet Pump 1 buah

C ALAT
1 Molen 5.00 Hr
2 Pompa/Diesel 30.00 Hr
3 Gerobag 30.00 hr
4 Listrik 30.00 Hr

Diverivikasi , Diperiksa,
TFL Pemda Kab Brebes TFL Teknik

Slamet Riyadi Rokhmat Syaeful A,


NIP. 19640929199303 1 011
GRAM : Sanitasi Berbasis Masyarakat
Kegiatan : MCK MIX
Sanitasi : KARYA SEJAHTERA

DAN ALAT

HARGA KEBUTUHAN BIAYA

49,000.00 35,757,929.44
61,000.00 34,160,000.00
67,000.00 6,030,000.00
71,000.00 6,390,000.00
82,337,929.44

85,000.00 255,000.00
71,000.00 71,000.00
171,000.00 17,100,000.00
130,000.00 390,000.00
171,000.00 17,100,000.00
2,000.00 40,000.00
230,000.00 20,700,000.00
1,400.00 35,000,000.00
900.00 4,500,000.00
275,000.00 1,375,000.00
8,000.00 56,598,528.00
14,000.00 2,800,000.00
2,700,000.00 19,065,295.44
4,000,000.00 8,000,000.00
130,000.00 14,560,000.00
5,000,000.00 8,500,000.00
15,000.00 300,000.00
5,300,000.00 3,895,103.03
14,000.00 2,114,000.00
15,000.00 30,000.00
9,000.00 2,106,000.00
20,000.00 40,000.00
150,000.00 300,000.00
15,000.00 150,000.00
19,000.00 760,000.00
25,000.00 1,000,000.00
17,000.00 340,000.00
35,000.00 2,800,000.00
40,000.00 12,000,000.00
110,000.00 35,750,000.00
15,000.00 450,000.00
8,000.00 216,000.00
8,000.00 2,544,000.00
13,000.00 745,680.00
29,500.00 3,658,000.00
600,000.00 9,720,000.00
1,200,000.00 12,000,000.00
140,000.00 840,000.00
25,000.00 50,000.00
1,650,000.00 1,650,000.00
1,950,000.00 1,950,000.00
301,463,606.47

#REF! #REF!
#VALUE!
#VALUE!
#VALUE!
#REF!

Dibuat Oleh,
KSM "Karya Sejahtera"

A, Amin Kariri
Ketua
Provinsi : Jawa Tengah
Kabupaten : Brebes
Kecamatan : Bulakamba
Desa : Bulakamba
RW : 02
R

VOLUME

No URAIAN KEBUTUHAN
RPD I RPD II
TOTAL

A TENAGA KERJA
1 Pekerja 720 300 180
2 Tukang 538 300 150
3 Kepala Tukang 90 30 30
4 Mandor 90 30 30

B MATERIAL
1 Pasir urug 3.00 3
2 Tanah urug 1.00 1
3 Pasir pasang 100.00 25 35
4 Sirtu 3.00 3
5 Pasir beton 100.00 50 25
6 Semen Warna 20.00 10
7 Split 90.00 60 30
8 Portland cement 36300.00 15350 9550
9 Bata merah 5000.00 3420
10 Batu Kali/batu Belah 5.00 5
11 Besi beton 7074.82 4574.82 2500
12 Kawat Beton 152 82 70
13 Kayu 5/7 2.10 1.05 1.05
14 Kayu terentang (bekisting) 2.00 1 1
15 Multipleks 9 mm (120x240) 159.00 100 59
16 Kayu Kruing Balok 1.70 0.65 0.65
17 Lem kayu 14.00 14
18 Papan Kayu Kruing 0.73 0.37 0.37
19 Paku 60.00 37.5 19.5
20 Floordrain 2.00
21 Bambu 184.00 170 14
22 Krain air 2.00
23 Kloset Jongkok 2.00 2
24 plamir tembok 10.00
25 cat dasar 40.00
26 cat tembok catylac exterior 40.00
27 Pipa PVC tipe AW 2" 20.00 20
28 Pipa PVC tipe AW 3" 80.00
29 Pipa PVC tipe AW 4" 300.00 40 40
30 Pipa PVC tipe AW 6" 325.00 88
31 T 3" 30.00 15
32 keramik 40 x 40 cm motif 27.00 27
33 Keramik 25X40 cm motif 318.00 318
34 Pipa type D 2" 57.36 40 17.36
35 Pipa type D 4" 124.00 90
36 Material AF 16.20
37 Manhole Plat Baja 10.00
38 Buis Beton 40 cm 6.00 3 3
39 Saklar Tunggal 2.00 2
40 Tandon Air 1.00
41 Jet Pump 1.00

BOP :
TOTAL
DIBULATKAN

Diverivikasi ,
TFL Pemda Kab Brebes

Slamet Riyadi
NIP. 19640929199303 1 011
PROGRAM : Sanitasi Berbasis Masyarakat
Jenis Kegiatan : MCK MIX
KSM Sanitasi : KARYA SEJAHTERA

0.00
RENCANA BAHAN DAN ALAT

SATUAN HARGA JUMLAH TOTAL


RPD III

240 OH 49,000.00 35,280,000.00


88 OH 61,000.00 32,797,730.32
30 OH 67,000.00 6,030,000.00
30 OH 71,000.00 6,390,000.00
80,497,730.32

m 85,000.00 255,000.00
m3 71,000.00 71,000.00
40 m 171,000.00 17,100,000.00
m 130,000.00 390,000.00
25 m 171,000.00 17,100,000.00
10 kg 2,000.00 40,000.00
m 230,000.00 20,700,000.00
11400 kg 1,400.00 50,820,000.00
1580 buah 900.00 4,500,000.00
m3 275,000.00 1,375,000.00
kg 8,000.00 56,598,528.00
kg 14,000.00 2,125,675.24
m 2,700,000.00 5,670,000.00
m 4,000,000.00 8,000,000.00
lembar 130,000.00 20,670,000.00
0.400 m3 5,000,000.00 8,500,000.00
kg 15,000.00 210,000.00
m3 5,300,000.00 3,895,103.03
3 kg 14,000.00 840,000.00
2 bh 15,000.00 30,000.00
btg 9,000.00 1,656,000.00
2 bh 20,000.00 40,000.00
bh 150,000.00 300,000.00
10 kg 15,000.00 150,000.00
40 kg 19,000.00 760,000.00
40 kg 25,000.00 1,000,000.00
m' 17,000.00 340,000.00
80.00 m' 35,000.00 2,800,000.00
220.00 m' 40,000.00 12,000,000.00
237.00 m' 110,000.00 35,750,000.00
15 buah 15,000.00 450,000.00
buah 8,000.00 216,000.00
buah 8,000.00 2,544,000.00
m' 13,000.00 745,680.00
34 m' 29,500.00 3,658,000.00
16.20 m 600,000.00 9,720,000.00
10 buah 1,200,000.00 12,000,000.00
buah 140,000.00 840,000.00
buah 25,000.00 50,000.00
1 buah 1,650,000.00 1,650,000.00
1 buah 1,950,000.00 1,950,000.00
307,509,986.27
12,000,000.00
12,000,000.00 400,007,716.59
12,000,000.00 400,000,000.00

Diperiksa,
TFL Teknik

Rokhmat Syaeful A,
RAM : Sanitasi Berbasis Masyarakat
egiatan : MCK MIX
anitasi : KARYA SEJAHTERA

80,497,730.32

JUMLAH RPD I JUMLAH RPD II JUMLAH RPD III

14,700,000.00 8,820,000.00 11,760,000.00


18,300,000.00 9,150,000.00 5,347,730.32
2,010,000.00 2,010,000.00 2,010,000.00
2,130,000.00 2,130,000.00 2,130,000.00
37,140,000.00 22,110,000.00 21,247,730.32

255,000.00 - -
71,000.00 - -
4,275,000.00 5,985,000.00 6,840,000.00
390,000.00 - -
8,550,000.00 4,275,000.00 4,275,000.00
- 20,000.00 20,000.00
13,800,000.00 6,900,000.00 -
21,490,000.00 13,370,000.00 15,960,000.00
- 3,078,000.00 1,422,000.00
- 1,375,000.00 -
36,598,528.00 20,000,000.00 -
1,148,000.00 977,675.24 -
2,835,000.00 2,835,000.00 -
4,000,000.00 4,000,000.00 -
13,000,000.00 7,670,000.00 -
3,250,000.00 3,250,000.00 2,000,000.00
- 210,000.00 -
1,947,551.52 1,947,551.52 -
525,000.00 273,000.00 42,000.00
- - 30,000.00
1,530,000.00 126,000.00 -
- - 40,000.00
- 300,000.00 -
- - 150,000.00
- - 760,000.00
- - 1,000,000.00
- 340,000.00 -
- - 2,800,000.00
1,600,000.00 1,600,000.00 8,800,000.00
- 9,680,000.00 26,070,000.00
- 225,000.00 225,000.00
- 216,000.00 -
- 2,544,000.00 -
520,000.00 225,680.00 -
2,655,000.00 - 1,003,000.00
- - 9,720,000.00
- - 12,000,000.00
420,000.00 420,000.00 -
- 50,000.00 -
- - 1,650,000.00
- - 1,950,000.00
156,000,079.52 114,002,906.76 118,004,730.32
4,000,000.00 6,000,000.00 2,000,000.00
160,000,079.52 120,002,906.76 120,004,730.32
160,000,000.00 120,000,000.00 120,000,000.00

Dibuat Oleh,
KSM "Karya Sejahtera"

Amin Kariri
Ketua