00
2 Pek. Pembuatan Papan Nama Proyek 1 Is Rp 400,000.00
Jumlah
I. PEKERJAANPENDAHULUAN Pembersihan & Pas.Bouwplank 80.000 m' Rp
1
Jumlah Rp 4,337,600.00
16,200.00 Rp 2,282,518.44
10,125.00 Rp 356,643.51
216,250.00 Rp 1,566,731.25
129,850.00 Rp 13,617,888.90
216,250.00 Rp 8,803,537.50
Jumlah Rp 26,627,319.60
335,345.00 Rp 9,718,298.10
813,160.00 Rp 7,341,371.11
578,120.00 Rp 54,259,452.60
120,338.00 Rp 10,718,048.38
107,820.00 Rp 28,031,852.25
32,215.80 Rp 7,869,582.20
26,642.00 Rp 18,303,546.88
38,344.00 Rp 35,709,598.49
67,700.00 Rp 9,413,685.00
159,806.00 Rp 37,397,784.14
85,487.50 Rp 691,004.01
102,537.50 Rp 4,357,074.72
Jumlah Rp 223,811,297.87
4,706,158.46 Rp 19,631,457.63
4,343,125.96 Rp 13,368,141.69
4,140,442.21 Rp 4,099,037.78
3,937,758.46 Rp 4,434,408.24
3,839,474.96 Rp 15,607,465.69
3,704,352.46 Rp 1,904,037.16
3,704,352.46 Rp 1,904,037.16
3839474.96 Rp 15 607 465.69
No. Uraian Pekerjaan Volume Ha
1 2 3
VII. PEKERJAANPENGECATAN
1 Pengecetan Kolom & Dinding 794.059 m" Rp
2 Pengecetan Plafond 296.534 m" Rp
3 Pengecatan Kuse Pintu, Jendela & Ventilasi 136.537 m" Rp
4 Pengecatan Lisplank 42.997 m" Rp
5 Residu kap, Kuda-kuda + Gording 463.532 m" Rp
4 5
4,042,158.71 Rp 4,284,688.23
3,839,474.96 Rp 1,789,195.33
3,862,599.96 Rp 5,384,464.34
3,862,599.96 Rp 849,771.99
54,712.70 Rp 12,622,329.32
54,712.70 Rp 1,977,409.99
100,000.00 Rp 1,424,650.00
145,250.00 Rp 36,348,115.30
Jumlah Rp 141,236,675.53
3,638,000.00 Rp 28,496,381.24
39,787.50 Rp 9,221,389.73
87,688.52 Rp 20,323,217.53
530,995.00 Rp 20,279,654.84
202,562.50 Rp 38,816,930.34
128,719.00 Rp 4,492,975.31
65,000.00 Rp 14,321,047.00
31,937.50 Rp 2,800,918.75
44,362.50 Rp 1,707,956.25
1,250,000.00 Rp 1,250,000.00
Jumlah Rp 141,710,470.98
3,877,437.50 Rp 9,689,231.63
374,575.00 Rp 4,944,390.00
452,200.00 Rp 1,573,656.00
269,750.00 Rp 3,088,637.50
452,200.00 Rp 72,352.00
374,575.00 Rp 4,405,002.00
233,663.75 Rp 6,570,624.65
347,513.75 Rp 5,671,424.40
275,646.00 Rp 1,518,809.46
Jumlah Rp 37,534,127.64
62,615.50 Rp 49,720,413.84
62,615.50 Rp 18,567,630.94
30,032.50 Rp 4,100,544.45
30,032.50 Rp 1,291,301.40
17,917.50 Rp 8,305,334.61
Jumlah Rp 81,985,225.23
43,466.25 Rp 651,993.75
51,966.25 Rp 207,865.00
411,466.25 Rp 5,760,527.50
210,466.25 Rp 1,473,263.75
178,477.50 Rp 1,249,342.50
34,977.50 Rp 524,662.50
14,477.50 Rp 217,162.50
12,966.25 Rp 194,493.75
28,966.25 Rp 434,493.75
621,212.50 Rp 1,863,637.50
289,790.00 Rp 869,370.00
15,600.00 Rp 62,400.00
116,690.00 Rp 466,760.00
41,620.50 Rp 448,668.99
64,095.50 Rp 1,194,740.12
Jumlah Rp 15,619,381.61
No. Uraian Pekerjaan Volume Ha
1 2 3
I. PEKERJAAN PENDAHULUAN Rp
II. PEKERJAAN TANAH DAN PASIR Rp
III. PEK. PASANGAN & LANTAI Rp
IV. PEKERJAAN BETON Rp
V. PEKERJAAN KAP, ATAP & PLAFOND Rp
VI. PEKERJAAN KUSEN PINTU & JENDELA Rp
VII. PEKERJAAN PENGECETAN Rp
VIII. PEKERJAAN ALAT PENGGANTUNG & SANITASI Rp
IX. PEKERJAAN INSTALASI LISTRIK Rp
X. PEKERJAAN LAIN-LAIN Rp
rga Satuan Jumlah
4 5
187,500.00 Rp 187,500.00
125,000.00 Rp 4,500,000.00
646,875.00 Rp 1,293,750.00
12,500.00 Rp 87,500.00
119,000.00 Rp 3,213,000.00
37,500.00 Rp 337,500.00
31,250.00 Rp 125,000.00
37,500.00 Rp 150,000.00
6,500,000.00 Rp 6,500,000.00
Jumlah Rp 16,394,250.00
538,507.25 Rp 14,378,143.58
118,916.00 Rp 6,220,246.24
305,475.00 Rp 1,221,900.00
3,450,000.00 Rp 6,900,000.00
Jumlah Rp 28,720,289.81
Rp 4,337,600.00
Rp 26,627,319.60
Rp 223,811,297.87
Rp 141,236,675.53
Rp 141,710,470.98
Rp 37,534,127.64
Rp 81,985,225.23
Rp 15,619,381.61
Rp 16,394,250.00
Rp 28,720,289.81
A. PEKERJAAN PERSIAPAN
B. PEMBANGUNAN PASAR TRADISIONAL
C. PEMBUATANBAKSANWAH
D. PEMBUATAN PAPAN NAMA
E. PEKERJAAN AKHIR
JUMLAH
PPN 10 %
TOTALHARGA
DIBULATKAN
Rp 4,400,000.00
Rp 717,976,638.28
Rp 10,671,983.56
Rp 18,915,010.28
Rp 2,600,000.00
Rp 754,563,632.11
Rp 75,456,363.21
Rp 830,019,995.32
Rp 830,019,000.00
I. PEKERJAANPENDAHULUAN Pembersihan & Pas.Bouwplank 10.560 m' Rp
1
I. PEKERJAAN PENDAHULUAN Rp
II. PEKERJAAN TANAH DAN PASIR Rp
III. PEK. PASANGAN & LANTAI Rp
IV. PEKERJAAN BETON Rp
V. PEKERJAAN KUSEN Rp
VI. PEKERJAAN PENGECETAN Rp
VII. PEKERJAAN ALAT PENGGANTUNG Rp
54,220.00 Rp 572,563.20
Jumlah Rp 572,563.20
16,200.00 Rp 17,496.00
10,125.00 Rp 2,733.75
216,250.00 Rp 38,925.00
129,850.00 Rp 70,995.49
216,250.00 Rp 78,823.13
Jumlah Rp 208,973.36
335,345.00 Rp 241,448.40
578,120.00 Rp 450,933.60
120,338.00 Rp 463,000.46
32,215.80 Rp 183,630.06
38,344.00 Rp 218,560.80
Jumlah Rp 1,557,573.32
3,937,758.46 Rp 336,678.35
3,839,474.96 Rp 691,105.49
3,839,474.96 Rp 375,788.61
54,712.70 Rp 99,713.90
Jumlah Rp 1,503,286.35
1,490,355.00 Rp 4,743,054.79
1,250,000.00 Rp 1,250,000.00
Jumlah Rp 5,993,054.79
62,615.50 Rp 356,908.35
30,032.50 Rp 201,860.45
Jumlah Rp 558,768.80
43,466.25 Rp 130,398.75
51,966.25 Rp 103,932.50
14,477.50 Rp 43,432.50
Jumlah Rp 277,763.75
Rp 572,563.20
Rp 208,973.36
Rp 1,557,573.32
Rp 1,503,286.35
Rp 5,993,054.79
Rp 558,768.80
Rp 277,763.75
I. PEKERJAANPENDAHULUAN Pembersihan & Pas.Bouwplank 10.750 m'
1
I. PEKERJAAN PENDAHULUAN Rp
II. PEKERJAAN TANAH DAN PASIR Rp
III. PEKERJAAN PASANGAN Rp
IV. PEKERJAAN BETON Rp
V. PEKERJAAN PENGECETAN Rp
VI. PEKERJAAN LAI N-LAIN Rp
Rp 54,220.00 Rp 582,865.00
Jumlah Rp 582,865.00
Rp 16,200.00 Rp 481,140.00
Rp 10,125.00 Rp 75,178.13
Rp 216,250.00 Rp 58,387.50
Rp 129,850.00 Rp 78,299.55
Rp 216,250.00 Rp 31,356.25
Jumlah Rp 724,361.43
Rp 335,345.00 Rp 362,172.60
Rp 578,120.00 Rp 1,053,623.70
Rp 120,338.00 Rp 791,523.20
Rp 32,215.80 Rp 1,255,014.81
Rp 38,344.00 Rp 1,493,748.04
Jumlah Rp 4,956,082.34
Rp 4,706,158.46 Rp 1,435,378.33
Rp 4,140,442.21 Rp 699,734.73
Rp 3,937,758.46 Rp 315,020.68
Rp 3,704,352.46 Rp 562,598.53
Rp 3,704,352.46 Rp 351,913.48
Rp 54,712.70 Rp 79,333.42
Jumlah Rp 3,443,979.17
Rp 62,615.50 Rp 2,207,722.35
Jumlah Rp 2,207,722.35
Rp 5,500,000.00 Rp 5,500,000.00
Rp 1,500,000.00 Rp 1,500,000.00
Jumlah Rp 7,000,000.00
Rp 582,865.00
Rp 724,361.43
Rp 4,956,082.34
Rp 3,443,979.17
Rp 2,207,722.35
Rp 7,000,000.00
No. Uraian Pekerjaan Volume Harga Satuan
1 2 3 4
5 Pembersihan Akhir 1 Ls
6 Dokumentasi & Administrasi 1 Ls
Harga Satuan Jumlah
4 5
Rp 1,500,000.00 Rp 1,500,000.00
Rp 1,100,000.00 Rp 1,100,000.00
Jumlah Rp 2,600,000.00
1.1 m3 Batu Kali Rp 211,600.00 Rp
0.3 m3 Pasir Urug Rp 171,000.00 Rp
0.78 Oh Pekerja Rp 35,000.00 Rp
0.39 Oh TukangBatu Rp 50,000.00 Rp
0.039 Oh Kepala Tukang Rp 60,000.00 Rp
0.039 Oh Mandor Rp 55,000.00 Rp
232,760.00
51,300.00
27,300.00
19,500.00
2,340.00
2,145.00
" Pasangan Batu Kali Camp. 1: 5 (SNI)
1.1 m3 Batu kali Rp 211,600.00
2.72 zak Semen Rp 77,000.00
0.247 m3 Pasir pasang Rp 185,000.00
0.6 Oh Tukangbatu Rp 50,000.00
0.06 Oh Kepala Tukang Rp 60,000.00
1.5 Oh Pekerja Rp 35,000.00
0.075 Oh Mandor Rp 55,000.00 Rp 4,125.00
I Jumlah
I Rp
211,600.00 Rp 232,760.00
77,000.00 Rp 411,180.00
185,000.00 Rp 78,995.00
50,000.00 Rp 30,000.00
60,000.00 Rp 3,600.00
35,000.00 Rp 52,500.00
55,000.00 Rp 4,125.00
77,000.00 Rp 13,120.80
185,000.00 Rp 3,145.00
50,000.00 Rp 7,500.00
60,000.00 Rp 900
35,000.00 Rp 7,000.00
55,000.00 Rp 550
77,000.00 Rp 6,622.00
185,000.00 Rp 4,070.00
50,000.00 Rp 7,500.00
60,000.00 Rp 900
35,000.00 Rp 7,000.00
55,000.00 Rp 550
77,000.00 Rp 154
46,000.00 Rp 32,200.00
50,000.00 Rp 4,000.00
60,000.00 Rp 480
35,000.00 Rp 1,400.00
55,000.00 Rp 110
578,120.00 I
9 1 m" Beton Tak Bertulang 1 : 3 : 5 ( Beton
4.360 zak Semen
0.52 m3 Pasir Beton
0.94 m3 Kerikil
0.25 Oh TukangBatu
0.025 Oh Kepala Tukang
1.65 Oh Pekerja
0.07 m3 An. 1 m3 Cor. Struktur Beton] Rp
0.78 m3 Kerikil Rp
0.52 m3 Pasir Beton Rp
4.64 zak Semen Rp
0.25 Oh TukangBatu Rp
0.025 Oh Kepala Tukang Rp
1.65 Oh Pekerja Rp
0.08 Oh Mandor Rp
0.78 m3 Kerikil Rp
0.52 m3 Pasir Beton Rp
4.64 zak Semen Rp
0.25 Oh TukangBatu Rp
0.025 Oh Kepala Tukang Rp
1.65 Oh Pekerja Rp
0.08 Oh Mandor Rp
0.78 m3 Kerikil Rp
0.47 m3 Pasir Beton Rp
7.72 zak Semen Rp
0.25 Oh TukangBatu Rp
0.025 Oh Kepala Tukang Rp
1.65 Oh Pekerja Rp
0.08 Oh Mandor Rp
0.4 m3 KayuDaerah
4 kg Paku Biasa
0.1 Ltr Minyak Bekisting
0.26 Oh TukangKayu
0.026 Oh Kepala Tukang
0.3 Oh Pekerja
0.005 Oh Mandor
0.4 m3 KayuDaerah Rp
2 kg Paku Biasa Rp
0.26 Oh TukangKayu Rp
0.026 Oh Kepala Tukang Rp
0.3 Oh Pekerja Rp
0.005 Oh Mandor Rp
1 : 3 : 5 ( Beton Tumbuk) Rp (SNI) 77,000.00 Rp 335,720.00
Rp 185,000.00 Rp 96,200.00
Rp 291,000.00 Rp 273,540.00
Rp 50,000.00 Rp 12,500.00
Rp 60,000.00 Rp 1,500.00
Rp 35,000.00 Rp 57,750.00
781,610.00
Rp 291,000.00 Rp 226,980.00
Rp 185,000.00 Rp 96,200.00
Rp 77,000.00 Rp 357,280.00
Rp 50,000.00 Rp 12,500.00
Rp 60,000.00 Rp 1,500.00
Rp 35,000.00 Rp 57,750.00
Rp 55,000.00 Rp 4,400.00
Rp 291,000.00 Rp 226,980.00
Rp 185,000.00 Rp 96,200.00
Rp 77,000.00 Rp 357,280.00
Rp 50,000.00 Rp 12,500.00
Rp 60,000.00 Rp 1,500.00
Rp 35,000.00 Rp 57,750.00
Rp 55,000.00 Rp 4,400.00
Rp 291,000.00 Rp 226,980.00
Rp 185,000.00 Rp 86,950.00
Rp 77,000.00 Rp 594,440.00
Rp 50,000.00 Rp 12,500.00
Rp 60,000.00 Rp 1,500.00
Rp 35,000.00 Rp 57,750.00
Rp 55,000.00 Rp 4,400.00
Rp 2,300,000.00 Rp 920,000.00
Rp 18,750.00 Rp 75,000.00
Rp 23,000.00 Rp 2,300.00
Rp 50,000.00 Rp 13,000.00
Rp 60,000.00 Rp 1,560.00
Rp 35,000.00 Rp 10,500.00
Rp 55,000.00 Rp 275
Rp 2,300,000.00 Rp 920,000.00
Rp 18,750.00 Rp 37,500.00
Rp 50,000.00 Rp 13,000.00
Rp 60,000.00 Rp 1,560.00
Rp 35,000.00 Rp 10,500.00
Rp 55,000.00 Rp 275
335,720.00
96,200.00
273,540.00
12,500.00
1,500.00
57,750.00
105 kg Besi Beton Rp 12,000.00 Rp 1,260,000.00
1.5 kg KawatBeton Rp 17,250.00 Rp 25,875.00
0.7 Oh Tukang Besi Rp 50,000.00 Rp 35,000.00
0.07 Oh Kepala Tukang Rp 60,000.00 Rp 4,200.00
0.7 Oh Pekerja Rp 35,000.00 Rp 24,500.00
0.03 Oh Mandor Rp 55,000.00 Rp 1,650.00
I Jumlah
G. 1 m3 Upah Menyiram/Bongkar Bekesting Beton 35,000.00 Rp
6.667 Oh Pekerja Rp
I
a. 1 m3 Pekerjaan Sloof Beton 15/15, K-175 756,610.00 Rp
1.000 m3 Cor Beton K-175 Rp
Jumlah
756,610.00
1,363,172.46
1,351,225.00
233,345.00
756,610.00
1,363,172.46
1,486,347.50
233,345.00
756,610.00
1,363,172.46
1,689,031.25
233,345.00
756,610.00
1,363,172.46
1,486,347.50
98,283.50
233,345.00
756,610.00
1,363,172.46
1,756,592.50
98,283.50
233,345.00
984,520.00
1,363,172.46
2,026,837.50
98,283.50
233,345.00
756,610.00
1,363,172.46
1,891,715.00
98,283.50
233,345.00
h. 1 m3 P kerjaan Kolom Beton 15120, K-175
1 m3 Cor Beton K-175 Rp
13.33 m2 Bekisting Rp
125 Kg Besi Beton Rp
0.1 m3 Perancah Rp
1 Ls Menyiramibongkar Cetakan Rp
1 m3 Cor Beton K-175 Rp
13.33 m2 Bekisting Rp
100 Kg Besi Beton Rp
1 Ls Menyiramibongkar Cetakan Rp
1 m3 Cor Beton K-175 Rp
13.33 m2 Bekisting Rp
110 Kg Besi Beton Rp
1 Ls Menyiramibongkar Cetakan Rp
I Jumlah
I Rp 3,839,474.96
I
Rp 756,610.00
Rp 1,363,172.46
Rp 1,486,347.50
1 m3 Cor Beton K-175 Rp
13.33 m2 Bekisting Rp
110 Kg Besi Beton Rp
1 Ls Menyiramibongkar Cetakan Rp
1 m3 Cor Beton K-175 Rp
13.33 m2 Bekisting Rp
125 Kg Besi Beton Rp
1 Ls Menyiramibongkar Cetakan Rp
1 m3 Cor Beton K-175 Rp 756,610.00
8.33 m2 Bekisting Rp 102,263.50
95 Kg Besi Beton Rp 13,512.25
0.75 m3 Perancah Rp 982,835.00
1 Ls Menyiramibongkar Cetakan Rp 233,345.00
I Rp 3,862,599.96
I
I Rp 54,712.70
I
30 Bh Paving Blok Rp 3,200.00
0.2 m3 Timbunan Rp 99,000.00
0.07 m3 Pasir pasang Rp 185,000.00
0.15 Oh TukangBatu Rp 50,000.00
0.015 Oh Kepala Tukang Rp 60,000.00
0.2 Oh Pekerja Rp 35,000.00
0.02 Oh Mandor Rp 55,000.00
1.1 m' Kusen Aluminium Rp 287,500.00
2 Bh Skrup Fixer Rp 500
1 m' Sealant Rp 1,000.00
0.43 Oh Pekerja Rp 35,000.00
0.43 Oh Tukang Rp 50,000.00
0.004 Oh Kepala Tukang Rp 60,000.00
0.002 Oh Mandor Rp 55,000.00
756,610.00 Rp 756,610.00
102,263.50 Rp 1,363,172.46
13,512.25 Rp 1,689,031.25
982,835.00 Rp 98,283.50
233,345.00 Rp 233,345.00
756,610.00 Rp 756,610.00
102,263.50 Rp 1,363,172.46
13,512.25 Rp 1,351,225.00
233,345.00 Rp 233,345.00
756,610.00 Rp 756,610.00
102,263.50 Rp 1,363,172.46
13,512.25 Rp 1,486,347.50
233,345.00 Rp 233,345.00
756,610.00
102,263.50
13,512.25
233,345.00
756,610.00 Rp 756,610.00
102,263.50 Rp 1,363,172.46
13,512.25 Rp 1,689,031.25
233,345.00 Rp 233,345.00
756,610.00 Rp 756,610.00
102,263.50 Rp 851,854.96
13,512.25 Rp 1,283,663.75
982,835.00 Rp 737,126.25
233,345.00 Rp 233,345.00
3,200.00 Rp 96,000.00
99,000.00 Rp 19,800.00
185,000.00 Rp 12,950.00
50,000.00 Rp 7,500.00
60,000.00 Rp 900
35,000.00 Rp 7,000.00
55,000.00 Rp 1,100.00
287,500.00 Rp 316,250.00
500 Rp 1,000.00
1,000.00 Rp 1,000.00
35,000.00 Rp 15,050.00
50,000.00 Rp 21,500.00
60,000.00 Rp 240
55,000.00 Rp 115.5
1.1 m3 Kayu Kelas II Rp
0.8 kg Paku Biasa Rp
15 kg Besi Strip Rp
12 Oh Tukangkayu Rp
1.2 Oh Kepala Tukang Rp
4 Oh Pekerja Rp
0.200 Oh Mandor Rp 55,000.00 Rp 11,000.00
I Jum
Kaso dan Reng (SNI)
0.012 m3 Kayu Kelas II Rp
0.15 kg Paku Biasa Rp
0.1 Oh Tukangkayu Rp
0.01 Oh Kepala Tukang Rp
0.1 Oh Pekerja Rp
0.005 Oh Mandor Rp
0.01l m3 Kayu Papan Kelas II
0.05 kg Paku Biasa
0.25 Oh TukangKayu
0.025 Oh Kepala Tukang
0.1l0 Oh Pekerja
0.005 Oh Mandor
0.023 m3 Kayu Papan Kelas II
0.15 kg Paku Biasa
0.2 Oh Pekerja
0.3 Oh TukangKayu
0.03 Oh Kepala Tukang
0.01 Oh Mandor
1.500 m2 Atap Polyearbonate
1.6 btg Besi Holow 40x40x200 em
0.2 kg Paku Skrup
0.2 Oh Pekerja
0.1 Oh Tukang
0.01 Oh Kepala Tukang
0.001 Oh Mandor
8 1 m- Lagnit-langit Gypsum Board, Gypsum Board Tebal 9 mm (SNI)
1.000 m2
Jum lah I Rp
2,300,000.00 Rp 27,600.00
18,750.00 Rp 2,812.50
50,000.00 Rp 5,000.00
60,000.00 Rp 600
35,000.00 Rp 3,500.00
55,000.00 Rp 275
Rp 2,300,000.00 Rp 25,300.00
Rp 18,750.00 Rp 937.5
Rp 50,000.00 Rp 12,500.00
Rp 60,000.00 Rp 1,500.00
Rp 35,000.00 Rp 3,850.00
Rp 55,000.00 Rp 275
Rp 2,300,000.00 Rp 52,900.00
Rp 18,750.00 Rp 2,812.50
Rp 35,000.00 Rp 7,000.00
Rp 50,000.00 Rp 15,000.00
Rp 60,000.00 Rp 1,800.00
Rp 55,000.00 Rp 550
Rp 150,000.00 Rp 225,000.00
Rp 178,337.50 Rp 285,340.00
Rp 40,000.00 Rp 8,000.00
Rp 35,000.00 Rp 7,000.00
Rp 50,000.00 Rp 5,000.00
Rp 60,000.00 Rp 600
Rp 55,000.00 Rp 55
Tebal 9 mm (SNI) Rp 93,750.00 Rp 93,750.00
Rp 40,000.00 Rp 4,400.00
Rp 35,000.00 Rp 7,000.00
Rp 50,000.00 Rp 15,000.00
Rp 60,000.00 Rp 1,800.00
Rp 55,000.00 Rp 550
3,638,000.00 I
27,600.00
2,812.50
5,000.00
600
3,500.00
275
25,300.00
937.5
12,500.00
1,500.00
3,850.00
275
52,900.00
2,812.50
7,000.00
15,000.00
1,800.00
550
93,750.00
4,400.00
7,000.00
15,000.00
1,800.00
550
I Jumlah
up Plafon Gypsum =
0.4 lbr Tripleks Rp 106,250.00 Rp
0.05 kg Paku Tripleks Rp 20,200.00 Rp
0.075 Oh TukangKayu Rp 50,000.00 Rp
0.008 Oh Kepala Tukang Rp 60,000.00 Rp
0.025 Oh Pekerja Rp 35,000.00 Rp
0.001 Oh Mandor Rp 55,000.00 Rp
1 m- Pasang Kaca Rangka JendelaIVentiiasi/Kisi Papan (Non SNI)
0.035 m3 Kayu palapi Rp 2,300,000.00 Rp
0.05 kg Paku Biasa Rp 18,750.00 Rp
2 Oh TukangKayu Rp 50,000.00 Rp
0.2 Oh Kepala Tukang Rp 60,000.00 Rp
0.8 Oh Pekerja Rp 35,000.00 Rp
0.04 Oh Mandor Rp 55,000.00 Rp
I
A. 1 m- Bingkai Kaca Bening 5 mm
Rp 80,500.00
Rp 937.5
Rp 100,000.00
Rp 12,000.00
Rp 28,000.00
Rp 2,200.00
I Jumlah
Rp 223,637.50
Rp 150,937.50
I Jumlah
Rp 223,637.50
Rp 228,562.50
Rp 562.5
Rp 2,760.00
Rp 7,500.00
Rp 900
Rp 525
Rp 41.25
93,750.00
45,080.00
606
1,560.00
100,000.00
12,000.00
21,000.00
1,650.00
Rp 45,080.00
Rp 562.5
Rp 1,560.00
Rp 68,750.00
Rp 21,000.00
Rp 100,000.00
Rp 12,000.00
Rp 1,650.00
3.8 m2 Besi Siku 7x7x100 em Rp 315,000.00 Rp
5.8 m2 Besi Siku 4x4x100 em Rp 30,500.00 Rp
1 m2 Pintu Plat Besi Rp 55,545.00 Rp
0.65 Oh Tukang Besi Rp 50,000.00 Rp
0.65 Oh Pekerja Rp 35,000.00 Rp
0.065 Oh Kepala Tukang Rp 60,000.00 Rp
1.1 m1 List Profil Gypsum Rp 56,250.00
0.01 kg Paku Gypsum Rp 32,500.00
0.05 Oh TukangKayu Rp 50,000.00
1.1 m1 List Profil Kayu 5/ 7 Rp 18,000.00
0.05 kg Paku Biasa Rp 18,750.00
0.2 Oh TukangKayu Rp 50,000.00
1.54 lbr Genteng Metal Multy Roof Rp. 46,288.00
0.2 kg Paku Biasa 2"-4" Rp. 18,750.00
0.1 Oh TukangKayu Rp. 50,000.00
0.01 Oh Kepala Tukang Rp. 60,000.00
0.2 Oh Pekerja Rp. 35,000.00
0.001 Oh Mandor Rp. 55,000.00
Rp 1,197,000.00
Rp 176,900.00
Rp 55,545.00
Rp 32,500.00
Rp 22,750.00
Rp 3,900.00
Rp 61,875.00
Rp 325
Rp 2,500.00
0 Rp 19,800.00
0 Rp 937.5
0 Rp 10,000.00
Rp. 71,283.52
Rp. 3,750.00
Rp. 5,000.00
Rp. 600
Rp. 7,000.00
Rp. 55
0.6 lbr Seng Plat Rp. 55,545.00
0.014 kg Paku Rp. 18,750.00
0.001 m3 Kayu palapi Rp. 2,300,000.00
0.003 Oh TukangKayu Rp. 50,000.00
0.003 Oh Kepala Tukang Rp. 60,000.00
0.003 Oh Pekerja Rp. 35,000.00
0.001 Oh Mandor Rp. 55,000.00
3.5 Bh Bumbungan Genteng Metal Rp. 43,010.00
0.05 kg Paku Biasa 2"x5" Rp. 18,750.00
0.2 Oh TukangKayu Rp. 50,000.00
0.02 Oh Kepala Tukang Rp. 60,000.00
0.4 Oh Pekerja Rp. 35,000.00
0.02 Oh Mandor Rp. 55,000.00
1 1 m2 Pasang Tegel Dinding Keramik 40 x 40 em (SNI)
1.100 dos Tegel Keramik 40x40 Rp
12.440 Kg Semen Rp
0.0250 m3 Pasir pasang Rp
0.650 Kg Semen warna Rp
0.650 Oh TukangBatu Rp
0.065 Oh Kepala Tukang Rp
0.720 Oh Pekerja Rp
0.283 zak Semen Rp 77,000.00
0.039 m3 Pasir pasang Rp 185,000.00
0.04 zak Semen warna Rp 10,000.00
0.35 Oh TukangBatu Rp 50,000.00
0.035 Oh Kepala Tukang Rp 60,000.00
0.62 Oh Pekerja Rp 35,000.00
0.03 Oh Mandor Rp 55,000.00
5,545.00 Rp. 33,327.00
8,750.00 Rp. 262.5
,300,000.00 Rp. 2,760.00
0,000.00 Rp. 125
0,000.00 Rp. 150
5,000.00 Rp. 87.5
5,000.00 Rp. 71.5
43,010.00 Rp. 150,535.00
18,750.00 Rp. 937.5
50,000.00 Rp. 10,000.00
60,000.00 Rp. 1,200.00
35,000.00 Rp. 14,000.00
55,000.00 Rp. 1,100.00
79,500.00 Rp 87,450.00
1,540.00 Rp 19,157.60
185,000.00 Rp 4,625.00
10,000.00 Rp 6,500.00
50,000.00 Rp 32,500.00
60,000.00 Rp 3,900.00
35,000.00 Rp 25,200.00
77,000.00 Rp 21,791.00
185,000.00 Rp 7,215.00
10,000.00 Rp 400
50,000.00 Rp 17,500.00
60,000.00 Rp 2,100.00
35,000.00 Rp 21,700.00
55,000.00 Rp 1,650.00
1.1 dos Tegel Keramik Wafel30x30 Rp 60,500.00 Rp
0.283 zak Semen Rp 77,000.00 Rp
0.039 m3 Pasir pasang Rp 185,000.00 Rp
0.04 zak Semen warna Rp 10,000.00 Rp
0.35 Oh TukangBatu Rp 50,000.00 Rp
0.035 Oh Kepala Tukang Rp 60,000.00 Rp
0.62 Oh Pekerja Rp 35,000.00 Rp
0.02 kg Minyak Cat Rp 27,600.00 Rp
0.08 kg PlamurKayu Rp 25,000.00 Rp
1 Ibr Kertas Pasir Rp 2,875.00 Rp
0.04 Oh Tukang Cat Rp 50,000.00 Rp
0.004 Oh Kepala Tukang Rp 60,000.00 Rp
0.04 Oh Pekerja Rp 35,000.00 Rp
0.003 Oh Mandor Rp 55,000.00 Rp
0.2 kg Cat Meni Rp 10,350.00 Rp
0.15 kg PlamurKayu Rp 25,000.00 Rp
0.42 kg CatKayu Rp 43,000.00 Rp
1 Ibr Kertas Pasir Rp 2,875.00 Rp
0.009 Oh Tukang Cat Rp 50,000.00 Rp
0.004 Oh Kepala Tukang Rp 60,000.00 Rp
0.07 Oh Pekerja Rp 35,000.00 Rp
0.003 Oh Mandor Rp 55,000.00 Rp
0.522 kg Politur Rp 40,250.00 Rp
2 Itr Kertas Pasir Rp 2,875.00 Rp
0.06 Oh Tukang Cat Rp 50,000.00 Rp
0.016 Oh Kepala Tukang Rp 60,000.00 Rp
0 Oh Pekerja Rp 35,000.00 Rp
0.0025 Oh Mandor Rp 55,000.00 Rp
5 1 m- Residu Kuda-Kuda, Kap + Gording (SNI)
0.350 Ltr Teer Residu Rp 40,250.00
0.100 Oh Pekerja Rp 35,000.00
Rp 66,550.00
Rp 21,791.00
Rp 7,215.00
Rp 400
Rp 17,500.00
Rp 2,100.00
Rp 21,700.00
Rp 552
Rp 2,000.00
Rp 2,875.00
Rp 2,000.00
Rp 240
Rp 1,400.00
Rp 137.5
Rp 2,070.00
Rp 3,750.00
Rp 18,060.00
Rp 2,875.00
Rp 450
Rp 240
Rp 2,450.00
Rp 137.5
Rp 21,010.50
Rp 5,750.00
Rp 3,000.00
Rp 960
Rp
Rp 137.5
Rp 14,087.50
Rp 3,500.00
VII PEKERJAAN ALAT PENGGANTUNG DAN SANITASI
10,000.00
5,000.00
600.00
Jumlah I Rp 15,600.00 I
111,090.00
5,000.00
600.00
Jumlah I Rp 116,690.00 I
27,550.00
4,440.00
45,000.00
15,246.00
7,800.00
1,200.00
16,415.00
1,265.00
17 1 Buah Bak Kontrol Pas. Batu Bata Ukuran 45 x 45 Tinggi 50 cm.
1.42 Oh Pekerja Rp 35,000.00 Rp
0.071 Oh Mandor Rp 55,000.00 Rp
0.473 Oh TukangBatu Rp 50,000.00 Rp
0.047 Oh Kepala Tukang Rp 60,000.00 Rp
81 Bh Batu Bata Rp 950 Rp
1.54 Zak Semen Portland Rp 77,000.00 Rp
0.13 M3 Pasir Pasang Rp 185,000.00 Rp
0.02 M3 Kerikil Rp 291,000.00 Rp
I
18 Memasang 1 m' Pipa PVC Tipe AW Dia. 3" (SNI)
1.2 m' PipaPVC 3" Rp 20,000.00 Rp
35 % Perlengkapan Rp 20,000.00 Rp
0.081 Oh Pekerja Rp 35,000.00 Rp
0.135 Oh TukangBatu Rp 50,000.00 Rp
0.014 Oh Kepala Tukang Rp 60,000.00 Rp
0.015 btg m2 Besi Holow 20x40x200 em Rp 150,250.00 Rp 52,587.50
6.000 Pengelasan Rp 30,500.00 Rp 183,000.00
0.3 lbr Seng Plat Rp 55,545.00 Rp 16,663.50
0.2 Oh Pekerja Rp 35,000.00 Rp 7,000.00
0.2 Oh Tukang Besi Rp 50,000.00 Rp 10,000.00
0.02 Oh Kepala Tukang Rp 60,000.00 Rp 1,200.00
0.01 Oh Mandor Rp 55,000.00 Rp 550
49,700.00
3,905.00
23,650.00
2,820.00
76,950.00
118,580.00
24,050.00
5,820.00
Jumlah
24,000.00
7,000.00
2,835.00
6,750.00
810
52,587.50
183,000.00
16,663.50
7,000.00
10,000.00
1,200.00
550
I. UPAHKERJA Pekerja orang/hari Rp
1
2 Mandor orang/hari Rp
3 Tukang BatuIKayu!Besi/CatIListrik orang/hari Rp
4 Kepala Tukang orang/hari Rp
II. BAHAN-BAHAN Batu Kali m3 Rp
1
2 Kerikil m3 Rp
3 Pasir Pasang m3 Rp
4 Pasir Urug m3 Rp
5 Tanah Timbunan m3 Rp
6 Pasir Beton m3 Rp
7 Batu Bata bh Rp
8 Kapur kg Rp
9 Semen / PC. (Tonasa) 50 Kg Zak Rp
10 Semen Warna Kg Rp
11 Kayu Klas II m3 Rp
12 Kayu Papan Kelas II m3 Rp
13 KayuDaerah m3 Rp
14 Kayu List Profil m' Rp
15 Tripleks 3 mm lbr Rp
16 Teakwood 3 mm lbr Rp
17 Triplek Lapis Alumunium lbr Rp
18 Gypsum m2 Rp
19 List Gypsum m' Rp
20 Teakwood lbr Rp
21 Besi Beton kg Rp
22 Besi Strip kg Rp
23 KawatBeton kg Rp
24 Paku Tripleks kg Rp
25 Paku Biasa Ukuran 2" sid 4" kg Rp
26 Paku Seng kg Rp
27 Paku Gypsum kg Rp
28 Paku Sekrup kg Rp
29 Kunci Tanam 2 Slag bh Rp
30 Hendel Pintu bh Rp
31 Engsel Pintu psg Rp
32 Tarikan Pintu psg Rp
33 Door Closer bh Rp
34 Engsel Jendela psg Rp
35 Tarikan Jendela bh Rp
36 Grendel jendela bh Rp
37 Grendel Pintu Tanam bh Rp
38 Hak Angin psg Rp
39 Kloset Jongkok bh Rp
40 Floor Drain bh Rp
41 Kran Air Biasa 112" bh Rp
42 Pipa PVC 112" m' Rp
43 PipaPVC 2" m' Rp
44 PipaPVC 3" m' Rp
45 PipaPVC 4" m' Rp
46 SeptictankiPeresapan Bh Rp
47 Kaca Rayband 5 mm m2 Rp
48 Kaca Bening 5 mm m2 Rp
35,000.00
55,000.00
50,000.00
60,000.00
211,600.00
291,000.00
185,000.00
171,000.00
99,000.00
185,000.00
950
46,000.00
77,000.00
10,000.00
2,300,000.00
2,300,000.00
1,275,000.00
15,625.00
106,250.00
68,750.00
93,750.00
93,750.00
56,250.00
106,250.00
12,000.00
18,000.00
17,250.00
20,200.00
18,750.00
20,200.00
32,500.00
40,000.00
201,500.00
402,500.00
34,500.00
115,000.00
172,500.00
29,000.00
8,500.00
4,000.00
43,000.00
20,000.00
138,000.00
111,090.00
10,000.00
5,400.00
10,781.00
20,000.00
34,500.00
3,450,000.00
304,750.00
201,250.00
49 Pisau Dempul bh Rp
50 AM-30 Mortar Flex kg Rp
51 Water Proofing kg Rp
52 DempulKayu kg Rp
53 Cat Menie Kayu kg Rp
54 Cat Tembok (LUX) kg Rp
55 Cat Kayu (LUX) kg Rp
56 Cat Atap kg Rp
57 Politur / teakoil ltr Rp
58 Tee r ltr Rp
59 Plamir kg Rp
60 Minyak Cat kg Rp
61 Kertas Pasir lbr Rp
62 LemKayu Kg Rp
63 Instalasi Titik Lampu ttk Rp
64 Instalasi Listrik Ls Rp
65 Sekering Boks bh Rp
66 Stop Kontak bh Rp
67 Saklar Tunggal bh Rp
68 Saklar Ganda bh Rp
69 Lampu Pijar 25 Watt bh Rp
70 Lampu SL 25 Watt bh Rp
71 Lampu TL 2x40 Watt Reflektor bh Rp
72 Lampu Sorot Taman bh Rp
73 Tegel Keramik 20 x 20 em dos Rp
74 Tegel Keramik Plint 10 x 40 em bh Rp
75 Tegel Keramik Wafe120x20em dos Rp
76 Tegel Keramik Wafe130x30em dos Rp
77 Tegel Keramik Wafe140x40em dos Rp
78 Instalasi Titik Air (lengkap material pipa) ttk Rp
79 Buis Beton U Dia. 20 em m' Rp
80 Minyak Bekisting Ltr Rp
81 Karet List Kaea m' Rp
82 Genteng Metal Multy Roof lbr Rp
83 Bumbungan Genteng Metal Multy Roof lbr Rp
84 Seng Plat lbr Rp
85 Seng Gelombang BJLS 20 lbr Rp
86 Atap Polyearbonate lbr Rp
87 Paving Blok Bh Rp
88 List Profil Kayu m' Rp
89 List Profil Beton ( Biasa ) m' Rp
90 Aluminium Coklat 4 " m' Rp
91 Besi Holow 20x40x200 em btg Rp
92 Besi Holow 40x40x200 em btg Rp
93 Besi Siku 7x7x100 em m' Rp
94 Besi Siku 4x4x100 em m' Rp
95 Pengelasan m2 Rp
96 Kusen Pintu Aluminium m' Rp
5,400.00
15,000.00
34,000.00
25,000.00
10,350.00
66,125.00
43,000.00
30,000.00
40,250.00
40,250.00
32,200.00
27,600.00
2,875.00
5,200.00
125,000.00
1,800,000.00
187,500.00
37,500.00
31,250.00
37,500.00
12,500.00
119,000.00
103,500.00
646,875.00
60,500.00
4,750.00
45,000.00
60,500.00
79,500.00
180,000.00
45,000.00
23,000.00
3,450.00
46,288.00
43,010.00
55,545.00
41,250.00
150,000.00
3,200.00
18,000.00
100,000.00
287,500.00
150,250.00
178,337.50
315,000.00
43,500.00
30,500.00
287,500.00