I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 Ls 135,000.00 135,000.00
2 Uitzet & Bouplank 1.00 Ls 500,000.00 500,000.00
635,000.00
II PEKERJAAN TANAH
1 Galian Tanah 70.80 m3 2.1 35,250.00 2,495,700.00
2 Urugan kembali 23.60 m3 2.9 11,750.00 277,300.00
3 Urugan Pasir 9.90 m3 2.11 158,100.00 1,565,190.00
4 Urugan Tanah Padas 27.00 m3 Dihit.1 91,500.00 2,470,500.00
6,808,690.00
III PEKERJAAN PASANGAN
1 Pas. Batu Kali 1Pc : 5Psr. Muntilan 19.20 m3 3.3 707,315.00 13,580,448.00
2 Pas. 1/2 Bata 1Pc : 5Psr. Muntilan 248.32 m2 4.10 90,670.00 22,515,174.40
3 Plesteran 15 mm 1Pc : 5Psr. Muntilan 496.63 m2 5.5 38,911.00 19,324,369.93
55,419,992.33
IV PEKERJAAN BETON
1 Footplat 100x100 cm
Beton K-100 0.65 m3 7.4 762,880.63 495,872.41
Beton K-200 3.29 m3 7.6 946,531.03 3,114,087.09
Pembesian 38.13 10kg 7.17 109,445.00 4,173,137.85
Bekisting 1.73 m2 7.20 153,650.00 265,814.50
2 Footplat 80x80 cm
Beton K-100 0.03 m3 7.4 762,880.63 22,886.42
Beton K-200 0.23 m3 7.6 946,531.03 217,702.14
Pembesian 2.09 10kg 7.17 109,445.00 228,740.05
Bekisting 0.11 m2 7.20 153,650.00 16,901.50
3 Sloof 20x30 cm
Beton K-200 2.88 m3 7.6 946,531.03 2,726,009.37
Pembesian 27.94 10kg 7.17 109,445.00 3,057,893.30
Bekisting 4.80 m2 7.21 166,150.00 797,520.00
4 Kolom 1 25x25 cm
Beton K-200 4.63 m3 7.6 946,531.03 4,382,438.68
Pembesian 74.40 10kg 7.17 109,445.00 8,142,708.00
Bekisting 12.35 m2 7.22 336,525.00 4,156,083.75
5 Kolom Teras 1 20x20 cm
Beton K-200 0.23 m3 7.6 946,531.03 217,702.14
Pembesian 3.35 10kg 7.17 109,445.00 366,640.75
Bekisting 0.76 m2 7.22 336,525.00 255,759.00
6 Kolom 2 20x20 cm
Beton K-200 1.85 m3 7.6 946,531.03 1,751,082.41
Pembesian 17.34 10kg 7.17 109,445.00 1,897,776.30
Bekisting 9.23 m2 7.22 336,525.00 3,106,125.75
8 Balok 20x40 cm
Beton K-200 0.86 m3 7.6 946,531.03 814,016.69
Pembesian 15.25 10kg 7.17 109,445.00 1,669,036.25
Bekisting 11.70 m2 7.21 166,150.00 1,943,955.00
9 Balok 20x30 cm
Beton K-200 2.74 m3 7.6 946,531.03 2,593,495.03
Pembesian 71.28 10kg 7.17 109,445.00 7,801,239.60
Bekisting 19.28 m2 7.21 166,150.00 3,203,372.00
10 Plat Lantai Tebal 12 cm
Beton K-200 14.19 m3 7.6 946,531.03 13,431,275.34
Pembesian 196.90 10kg 7.17 109,445.00 21,549,720.50
Bekisting 24.17 m2 7.24 376,525.00 9,100,609.25
HARGA JUMLAH TOTAL
VOLUME HARGA
NO URAIAN PEKERJAAN ANALIS SATUAN HARGA
PEKERJAAN
Rp. Rp. Rp.
11 Tangga
Beton K-200 1.89 m3 7.6 946,531.03 1,788,943.65
Pembesian 24.77 10kg 7.17 109,445.00 2,710,952.65
Bekisting 4.55 m2 7.26 308,525.00 1,403,788.75
12 Ringbalk, Balok Gunungan 15x20 cm
Beton K-200 2.04 m3 7.6 946,531.03 1,930,923.30
Pembesian 22.41 10kg 7.17 109,445.00 2,452,662.45
Bekisting 4.53 m2 7.21 166,150.00 752,659.50
13 Balok Latiu, Balok Sunduk, Konsol 15x20 cm
Beton K-200 0.27 m3 7.6 946,531.03 255,563.38
Pembesian 2.98 10kg 7.17 109,445.00 326,146.10
Bekisting 0.83 m2 7.21 166,150.00 137,904.50
113,259,145.35
V PEKERJAAN ATAP
1 Kuda-kuda Kayu Kruing 0.49 m3 6.13 7,945,800.00 3,893,442.00
2 Nok, Gording & Murplat 1.04 m3 6.15 7,503,000.00 7,803,120.00
3 Rangka Atap (Usuk & Reng) untuk Genteng 204.00 m2 6.16 135,278.00 27,596,712.00
4 Lispang Kayu Kruing 2x20 cm 62.30 m' 6.21 93,124.00 5,801,625.20
5 Pas. Genteng Press 204.00 m2 8.1 47,250.00 9,639,000.00
6 Pas. Bubungan 16.00 m' 8.4 81,740.00 1,307,840.00
56,041,739.20
VI PEKERJAAN PINTU DAN JENDELA
1 Pasang Kusen Kayu Kruing 0.66 m3 6.2 8,731,500.00 5,762,790.00
2 Pasang Daun Pintu Panil Kayu Kruing 5.60 m2 6.5 519,900.00 2,911,440.00
3 Pasang Daun Jendela Kaca Kayu Kruing 1.11 m2 6.6 367,920.00 408,391.20
4 Pasang Kunci Pintu 2.00 bh 12.2 109,400.00 218,800.00
5 Pasang Engsel Pintu 12.00 bh 12.5 29,100.00 349,200.00
6 Pasang Engsel Jendela 24.00 bh 12.6 19,400.00 465,600.00
7 Pasang Kait Angin 24.00 bh 12.9 25,695.00 616,680.00
8 Pasang Grendel Jendela 12.00 bh 12.11 20,260.00 243,120.00
9 Pasang Kaca Bening tebal 5 mm 11.97 m2 12.17 131,695.00 1,576,389.15
12,552,410.35
VII PEKERJAAN PENUTUP LANTAI
1 Beton K-100 4.81 m3 7.4 762,880.63 3,669,455.85
2 Keramik 30x30 cm Polos 232.06 m2 13.35 160,925.00 37,344,255.50
41,013,711.35
VIII PEKERJAAN LANGIT-LANGIT
1 Pasang Rangka Langit-langit Kayu Kruing 96.25 m2 6.19 139,212.00 13,399,155.00
2 Pasang Langi-langit Asbes Tebal 4 mm 96.25 m2 9.1 30,625.00 2,947,656.25
3 Pasang List Tepi Plafond 40.40 m' 9.10 10,660.00 430,664.00
16,777,475.25
IX PEKERJAAN CAT
1 Cat tembok Baru 526.33 m2 14.14 15,159.50 7,978,899.64
2 Cat Plafond 96.25 m2 14.14 15,159.50 1,459,101.88
3 Cat kayu 36.93 m2 14.8 28,290.00 1,044,749.70
10,482,751.21
X PEKERJAAN INSTALASI LISTRIK
1 Pasang Titik Lampu, Saklar & Stop Kontak 10.00 titik Ls 130,000.00 1,300,000.00
2 Pas. Lampu SL 23 Watt 6.00 bh Ls 50,000.00 300,000.00
4 Pas. Stop Kontak 2.00 bh Ls 20,000.00 40,000.00
5 Pas. Saklar Tunggal 1.00 bh Ls 20,000.00 20,000.00
6 Pas. Saklar Ganda 1.00 bh Ls 25,000.00 25,000.00
7 Pas. MCB 1.00 bh Ls 250,000.00 250,000.00
8 Pas. Fusebox 1.00 bh Ls 75,000.00 75,000.00
2,010,000.00
Total : 315,000,915.04
Dibulatkan : 315,000,000.00
Terbilang : "Tiga Ratus Lima Belas Juta Rupiah"
HARGA SATUAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU MI TAMANGEDE KEC. GEMUH
TAHUN : 2014
LOKASI : DESA TAMANGEDE KEC. GEMUH
HARGA
SNI KODE URAIAN PEKERJAAN SATUAN
SATUAN
PEKERJAAN DIHIT
HARGA
SNI KODE URAIAN PEKERJAAN SATUAN
SATUAN
315,000,000.00
ANALISA SATUAN PEKERJAAN
PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU MI TAMANGEDE KEC. GEMUH
TAHUN : 2014
LOKASI : DESA TAMANGEDE KEC. GEMUH
HARGA JUMLAH
SNI KODE KOEF SAT. URAIAN
BAHAN / UPAH HARGA
4.10 1 m2Memasang Dinding Bata Merah Ukuran (5x11x22)cm Tebal 1/2 Bata Camp. 1Pc : 5PP 90,670.00
4.10.1 Bahan 69,620.00
70 Buah Bata Merah 5 x 11 x 22 620.00 43,400.00
9.68 Kg Portland Semen 1,500.00 14,520.00
0.045 m3 Pasir Pasang 260,000.00 11,700.00
6.13 1 m3 Memasang Konstruksi Kuda-kuda Konvensional Kayu Kruing Bentang 6 meter 7,945,800.00
6.13.1 Bahan 6,955,800.00
1.1 m3 Kayu Kruing (Kruing) , Balok 6,000,000.00 6,600,000.00
15 Kg Besi Strip 17,000.00 255,000.00
5.6 Kg Paku Biasa 2" - 5" 18,000.00 100,800.00
7.4 1 m3 Membuat Lantai Kerja Beton mutu f'c=7,4 MPa (K100), slum (3-6)cm, w/c = 0,87 762,880.63
7.4.1 Bahan 695,220.63
230 Kg Portland Semen 1,500.00 345,000.00
893 kg Pasir Beton 185.71 165,842.86
1027 kg Kerikil (maksimum 30 mm) 177.78 182,577.78
200 ltr Air 9.00 1,800.00
7.6 1 m3 Membuat Beton mutu f'c=16,9 MPa (K200), slum (122)cm, w/c = 0,61 946,531.03
7.6.1 Bahan 848,981.03
352 Kg Portland Semen 1,500.00 528,000.00
731 Kg Pasir Beton 185.71 135,757.14
1031 Kg Kerikil (maksimum 30 mm) 177.78 183,288.89
215 ltr Air 9.00 1,935.00
8.4 1 m'
Pasang Genteng Bubung Plentong 81,740.00
8.4.1 Bahan 50,320.00
5 Buah Genteng Bubung Plentong 6,000.00 30,000.00
8 Kg Portland Semen 1,500.00 12,000.00
0.032 m3 Pasir Pasang 260,000.00 8,320.00
14.8 1 m2 Pengecatan Bidang Kayu Baru (1 lap.Plamir, 1 lap.Cat Dasar & 2 lap.Cat Penutup) 28,290.00
14.8.1 Bahan 24,060.00
0.2 Kg Cat Meni 26,000.00 5,200.00
0.15 Kg Plamir 10,000.00 1,500.00
0.17 Kg Cat Dasar 18,000.00 3,060.00
0.26 Kg Cat Penutup 2 kali 55,000.00 14,300.00
14.14 1 m2 Pengecat Tembok Baru (1lap.Plamir, 1lap Cat Dasar 2 lap. Cat Penutup) 15,159.50
14.14.1 Bahan 9,920.00
0.1 Kg Plamir 20,000.00 2,000.00
0.1 Kg Cat Dasar 22,000.00 2,200.00
0.26 Kg Cat Penutup 2 kali 22,000.00 5,720.00
PEKERJAAN DIHIT
1 Pekerja Hr 45,000.00
2 Mandor Hr 60,000.00
3 Tukang Kayu Hr 60,000.00
4 Kepala Tukang Kayu Hr 65,000.00
5 Tukang Batu Hr 60,000.00
6 Kepala Tukang Batu Hr 65,000.00
7 Tukang Besi Hr 60,000.00
8 Kepala Tukang Besi Hr 65,000.00
9 Tukang Cat Hr 60,000.00
10 Kepala Tukang Cat Hr 65,000.00
11 Tukang Ledeng Hr 60,000.00
1 BAHAN DASAR
BATU KALI
Bulat Belah m3 200,000.00
KERIKIL
Beton 2/3 m3 240,000.00
TANAH
Wadas m3 55,000.00
BATU BATA
Lokal bh 620.00
PORTLAND CEMENT
Semen Portland 40 kg zak 60,000.00
Semen warna kg 12,000.00
2 BAHAN KAYU
KRUING Papan m3 6,780,000.00
Balok/pesagen m3 6,000,000.00
3 BAHAN BESI
BESI TULANGAN
NO URAIAN SAT HARGA
BESI PLAT
Besi Strip kg 18,000.00
6 BAHAN LANGIT-LANGIT
PLYWOOD
Teakwood
90 x 210 x 9 mm lbr 120,000.00
ASBES PLAT
100cm X 100 cm X 4 mm bh 22,000.00
9 BAHAN KACA
POLOS
5 mm m2 110,000.00
10 BAHAN FINISHING
KAYU
Menie kg 26,000.00
Dempul plamur kg 10,000.00
Cat dasar kg 18,000.00
Cat Penutup (emco) kg 55,000.00
NO URAIAN SAT HARGA
TEMBOK
Plamur kg 20,000.00
Cat Tembok kg 22,000.00
Cat Penutup 5 kg 110,000.00
11 LAIN-LAIN
Air m3 9,000.00
Minyak Bekisting ltr 60,000.00
ARGA UPAH DAN BAHAN
KETERANGAN
KETERANGAN
KETERANGAN
KETERANGAN
BACK UP VOLUME
PEKERJAAN : PEMBANGUNAN RUANG KELAS BARU MI TAMANGEDE KEC. GEMUH
TAHUN : 2014
LOKASI : DESA TAMANGEDE KEC. GEMUH
2 FOOTPLAT 1
V 1.00 x 1.00 x 2.10 x 12.00 =
3 FOOTPLAT 2
V 0.80 x 0.80 x 2.10 x 5.00 =
TOTAL =
2 URUGAN KEMBALI
V =
3 URUGAN PASIR
1 PONDASI 1
V 0.90 x 0.10 x 48.00 =
3 FOOTPLAT 1
V 1.00 x 1.00 x 0.10 x 12.00 =
4 FOOTPLAT 2
V 0.80 x 0.80 x 0.10 x 5.00 =
5 GEDUNG
V1 7.50 x 7.00 x 0.05 =
V2 10.00 x 2.00 x 0.05 =
V3 3.50 x 2.50 x 0.05 =
TOTAL =
TOTAL =
GAMBAR SKET PERHITUNGAN VOLUME
III PEKERJAAN PASANGAN
1 PAS. BATU KALI
1 PONDASI 1
V 0.30 + 0.70 x 0.80 x 48.00 =
2.00
TOTAL =
2 LT 2
GEDUNG 3.35 x 35.00 =
BOK 0.90 x 15.00 =
LATEI 0.80 x 5.00 =
3 GUNUNGAN
G1 7.00 x 2.10 x 2.00 =
2.00
PAS =
LOBANG
P 2.52 x 1.52 x 2.00 =
TOTAL =
PAS - LBG =
3 PLESTERAN
V =
2 BETON K-200
A1 1.00 x 1.00 = 1.00
A2 0.25 x 0.25 = 0.06
3 PEMBESIAN
12 0.006165 x 12.00 x 12.00 = 0.888
4 BEKISTING
V 4.00 x 0.20 x 13.00 =
6.00
GAMBAR SKET PERHITUNGAN VOLUME
2 FOOTPLAT 80X80
1 BETON K-100
V 0.80 x 0.80 x 0.05 x 1.00 =
2 BETON K-200
A1 0.80 x 0.80 = 0.64
A2 0.20 x 0.20 = 0.04
3 PEMBESIAN
12 0.006165 x 12.00 x 12.00 = 0.888
4 BEKISTING
V 3.20 x 0.20 x 1.00 =
6.00
3 SLOOF 20X30
1 BETON K-200
V 0.20 x 0.30 x 48.00 =
2 BESI TULANGAN
12 0.006165 x 12.00 x 12.00 = 0.888
8 0.006165 x 8.00 x 8.00 = 0.395
TOTAL =
10.00
3 BEKISTING
V 0.60 x 48.00 / 6.00 =
4 KOLOM 1 25x25
1 BETON K-200
V 0.25 x 0.25 x 5.70 x 13.00 =
2 BESI TULANGAN
12 0.006165 x 12.00 x 12.00 = 0.888
D13 0.006165 x 13.00 x 13.00 = 1.042
8 0.006165 x 8.00 x 8.00 = 0.395
TOTAL =
10.00
3 BEKISTING
V 1.00 x 5.70 x 13.00 =
6.00
GAMBAR SKET PERHITUNGAN VOLUME
6 KOLOM TERAS 1 20x20
1 BETON K-200
V 0.20 x 0.20 x 5.70 x 1.00 =
2 BESI TULANGAN
12 0.006165 x 12.00 x 12.00 = 0.888
8 0.006165 x 8.00 x 8.00 = 0.395
TOTAL =
10.00
3 BEKISTING
V 0.80 x 5.70 x 1.00 =
6.00
7 KOLOM 2 20x20
1 BETON K-200
V 0.20 x 0.20 x 3.55 x 13.00 =
2 BESI TULANGAN
10 0.006165 x 10.00 x 10.00 = 0.617
6 0.006165 x 6.00 x 6.00 = 0.222
TOTAL =
10.00
3 BEKISTING
V 0.80 x 3.55 x 13.00 =
4.00
9 BALOK 20x40
1 BETON K-200
V 0.20 x 0.28 x 15.40 =
2 BESI TULANGAN
12 0.006165 x 12.00 x 12.00 = 0.888
8 0.006165 x 8.00 x 8.00 = 0.395
TOTAL =
10.00
3 BEKISTING
V 0.76 x 15.40 / 1.00 =
10 BALOK 20x30
1 BETON K-200
V 0.20 x 0.18 x 76.10 =
2 BESI TULANGAN
12 0.006165 x 12.00 x 12.00 = 0.888
8 0.006165 x 8.00 x 8.00 = 0.395
TOTAL =
GAMBAR SKET PERHITUNGAN VOLUME
10.00
3 BEKISTING
V 0.76 x 76.10 / 3.00 =
GAMBAR SKET PERHITUNGAN VOLUME
11 PLAT LANTAI 12 CM
1 BETON K-200
V1 12.50 x 8.90 x 0.12 =
V2 3.90 x 1.80 x 0.12 =
TOTAL =
2 BESI TULANGAN
10 0.006165 x 10.00 x 10.00 = 0.617
TOTAL =
10.00
3 BEKISTING
V1 7.00 x 7.50 =
V2 2.00 x 10.00 =
TOTAL =
12 TANGGA
1 BETON K-200
V1 2.75 x 1.10 x 0.12 x 2.00 =
V2 1.30 x 2.35 x 0.12 =
V3 0.15 x 0.40 x 2.50 x 2.00 =
V4 0.25 x 0.20 x 1.10 x 18.00 =
2.00
TOTAL =
2 BESI TULANGAN
12 0.006165 x 12.00 x 12.00 = 0.888
8 0.006165 x 8.00 x 8.00 = 0.395
TOTAL =
10.00
3 BEKISTING
V1 2.75 x 1.10 x 2.00 =
V2 1.30 x 2.35 =
TOTAL =
GAMBAR SKET PERHITUNGAN VOLUME
13 RINGBALK, BALOK GUNUNGAN 15X20
1 BETON K-200
V 0.15 x 0.20 x 68.00 =
2 BESI TULANGAN
10 0.006165 x 10.00 x 10.00 = 0.617
6 0.006165 x 6.00 x 6.00 = 0.222
TOTAL =
10.00
3 BEKISTING
V 0.40 x 68.00 / 6.00 =
2 BESI TULANGAN
10 0.006165 x 10.00 x 10.00 = 0.617
6 0.006165 x 6.00 x 6.00 = 0.222
TOTAL =
10.00
3 BEKISTING
V 0.55 x 9.00 / 6.00 =
GAMBAR SKET PERHITUNGAN VOLUME
V PEKERJAAN ATAP
1 KUDA-KUDA
V1 0.08 x 0.12 x 3.80 x 2.00 x 2.00 =
V2 0.08 x 0.12 x 3.85 x 2.00 x 2.00 =
V3 0.08 x 0.12 x 1.60 x 2.00 x 2.00 =
V4 0.08 x 0.12 x 2.00 x 1.00 x 2.00 =
V5 0.08 x 0.12 x 1.00 x 1.00 x 2.00 =
V6 0.04 x 0.12 x 4.00 x 2.00 x 2.00 =
TOTAL =
2 GORDING
V1 0.06 x 0.12 x 16.00 x 3.00 =
V2 0.06 x 0.12 x 16.00 x 2.00 =
3 MURPLAT
V1 0.08 x 0.12 x 16.00 x 1.00 =
V2 0.08 x 0.12 x 16.00 x 1.00 =
TOTAL =
TOTAL =
4 LISPLANG
V 16.00 x 2.00 =
5.60 x 2.00 =
1.55 x 2.00 =
16.00 x 1.00 =
TOTAL =
5 PAS. GENTENG
V =
6 BUBUNGAN
V 16.00 =
GAMBAR SKET PERHITUNGAN VOLUME
VI PEKERJAAN PINTU DAN JENDELA
1 KUSEN
1 PINTU 1
v 2.52 + 2.52 + 0.52 = 5.56
TOTAL = 8.80
2 JENDELA
v 1.28 + 1.28 + 1.28 + 1.28 = 5.12
TOTAL = 11.64
3 BOVEN 1
v 0.52 + 0.52 + 0.52 + 0.52 = 2.08
TOTAL = 6.56
TOTAL =
2 DAUN PINTU
1 PINTU 1
V 0.70 x 2.00 x 2.00 x 2.00 =
4 KUNCI PINTU
V =
5 ENGSEL PINTU
V 3.00 x 2.00 x 2.00 =
6 ENGSEL JENDELA
V 2.00 x 2.00 x 6.00 =
7 KAIT ANGIN
V 2.00 x 2.00 x 6.00 =
8 GRENDEL JENDELA
V 1.00 x 2.00 x 6.00 =
9 KACA BENING
1 PINTU 1
V 0.67 x 0.30 x 4.00 x 2.00 =
2 JENDELA
V1 0.56 x 0.46 x 2.00 x 3.00 =
V2 0.60 x 0.70 x 1.00 x 3.00 =
V3 0.60 x 0.30 x 6.00 x 3.00 =
3 BV
V 0.60 x 0.30 x 6.00 x 4.00 =
GAMBAR SKET PERHITUNGAN VOLUME
TOTAL =
GAMBAR SKET PERHITUNGAN VOLUME
VII PEKERJAAN PENUTUP LANTAI
1 BETON K-100
V1 12.50 x 7.70 x 0.05 =
TOTAL =
2 KERAMIK 30x30
1 LANTAI 1
V1 12.50 x 7.40 =
2 LANTAI 2
V1 12.50 x 7.70 =
V2 14.30 x 1.20 =
V3 7.70 x 1.80 =
3 TANGGA
V1 1.10 x 0.25 x 18.00 =
V2 1.10 x 0.20 x 18.00 =
V3 2.50 x 1.35 =
TOTAL =
TOTAL =
2 LANGIT-LANGIT ASBES
V =
TOTAL =
IX PEKERJAAN CAT
1 CAT TEMBOK
1 PLESTERAN =
2 BEKISTING TIMBUL
KONSOL & BALOK SUNDUK =
KOLOM TERAS =
TOTAL =
2 CAT PLAFOND
V =
3 CAT KAYU
P 2.52 x 1.52 x 2.00 x 1.00 =
TOTAL =
E
38.88
25.20
6.72
70.80
23.60
4.32
1.20
0.32
2.63
1.00
0.44
9.90
18.38
6.00
2.63
27.00
E
19.20
19.20
117.25
4.25
117.25
13.50
4.00
14.70
1.84
272.79
7.66
10.44
6.36
24.47
248.32
496.63
0.65
2.60
0.69
3.29
38.13
1.73
E
0.03
0.20
0.03
0.23
2.09
0.11
2.88
170.45
108.92
27.94
4.80
4.63
263.13
308.81
172.04
74.40
12.35
E
0.23
20.24
13.23
3.35
0.76
1.85
113.81
59.55
17.34
9.23
0.86
109.37
43.08
15.25
11.70
2.74
540.47
172.38
71.28
E
19.28
E
13.35
0.84
14.19
921.79
924.75
59.92
62.51
196.90
52.50
20.00
24.17
0.73
0.37
0.30
0.50
1.89
37.11
39.06
37.55
36.93
26.63
12.88
57.53
24.77
6.05
3.06
4.55
E
2.04
167.69
56.43
22.41
4.53
0.27
22.19
7.58
2.98
0.83
E
0.15
0.15
0.06
0.04
0.02
0.08
0.49
0.15
0.35
0.23
0.15
0.15
1.04
89.60
89.60
24.80
204.00
32.00
11.20
3.10
16.00
62.30
204.00
16.00
E
0.13
0.25
0.28
0.66
5.60
1.11
2.00
12.00
24.00
24.00
12.00
1.61
1.55
1.26
3.24
4.32
E
11.97
E
4.81
4.81
92.50
96.25
17.16
13.86
4.95
3.96
3.38
232.06
96.25
96.25
96.25
40.40
40.40
496.63
29.70
4.56
526.33
96.25
7.66
10.44
6.36
12.46
36.93