I. PEKERJAAN PERSIAPAN
REKAPITULASI
II. PEKERJAAN JALAN PERKERASAN P. 176.0 m' ; L. 5.0 m' Rp. 372,493,871.39
P. 533.0 m' ; L. 3.0 m'
III. Timbunan
PEKERJAAN
tanahSALURAN
merah P. 451.0 m' Rp. 197,006,128.61
Subang, 2016
Penawar,
SLAMET SUPUWIJARA
Direktur
DAFTAR HARGA SATUAN UPAH, BAHAN DAN ALAT
HARGA HARGA
No. URAIAN KODE SATUAN SATUAN SATUAN
( Rp./O/jam) (Rp./OH/8jam)
HARGA
No. URAIAN KODE SATUAN SATUAN KETERANGAN
( Rp.)
BIAYA
No. URAIAN KODE HP KAPASITAS SEWA KETERANGAN
ALAT
HARGA
No. URAIAN SATUAN KETERANGAN
( Rp.)
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
1. Pekerja (L01) jam 2.0000 11,300.00 22,600.00
2. Tukang (L02) jam 0.5000 12,900.00 6,450.00
3. Mandor (L03) jam 0.0100 13,200.00 132.00
B. BAHAN
1. Semen portland kg 197.8000 1,350.00 267,030.00
2. Pasir beton klas II m3 0.5500 225,000.00 123,750.00
3. Batu pecah tangan 2/3 cm m3 0.9300 231,000.00 214,830.00
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
1. Tamper (E25) Jam 0.0120 46,000.00 554.22
2. Alat Bantu Ls 1.0000 6,800.00 6,800.00
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
1. Pekerja (L01) jam 1.4000 11,300.00 15,820.00
2. Tukang (L02) jam 0.7000 12,900.00 9,030.00
3. Mandor (L03) jam 0.2000 13,200.00 2,640.00
B. BAHAN
1 Campuran beton K. 350 (M72) M3 1.0000 950,000.00 950,000.00
2 Plastik M2 5.5000 7,500.00 41,250.00
3 Multiplex 12 mm (M73) Lbr 0.1736 170,000.00 29,513.89
4 Kayu Acuan (M99) M3 0.0268 1,650,000.00 44,294.25
5 Paku (M18) Kg 0.3000 11,500.00 3,450.00
6 Besi Tulangan U24 Kg 38.8500 7,950.00 308,857.50
C. PERALATAN
1 Con. Vibrator (E20) jam 0.1000 397,500.00 39,750.00
2 Alat Bantu Ls 1.0000 7,000.00 7,000.00
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN
A. TENAGA
B. BAHAN
C. PERALATAN