2 Retaining Wall OP 5 dan OP 7 6/6/2017 3 Box Culvert Ramp 1,2 dan 4 IC. GS 6/6/2017 4 Plan Draenase IC. GS 6/6/2017 5 Berita Acara (OP 5,6,7, proteksi) 6/6/2017 6 Berita Acara PDA IC. TB 6/6/2017 7 Box Culvert Menceng STA 140+200 6/6/2017 8 PJU (IC Terbanggi Besar) 6/6/2017 9 PJU (IC Gunung Sugih) 6/6/2017 10 Plan + Detail DS-8 130+000 s.d 135+700 6/6/2017 11 Detail Pasangan Batu Inlet Outlet BC 130+000 - 135+700 6/6/2017 12 Jembatan Way Seputih Komplit 6/6/2017 13 Asbuilt Drawing High Way 135+700 sd 140+412 6/6/2017 14 ROW Plan (Ramp, intersection dll) 6/6/2017 15 BC STA 312+282 (Perbaikan Cross) 6/6/2017 16 BC 131+265 (Box Pedestrian) (Perbaikan Cross) 6/6/2017 17 BC 135+255 (2 Lokasi Box perbaikan existing) 6/6/2017 18 Perbandingan Intersection IC. Terbanggi Besar 6/6/2017 19 Metode Kerja untuk Kontrak Anak III 6/6/2017 20 Membuat Surat dan Izin Lalin Jalan 2 6/6/2017 21 Peta Pembebasan untuk KA III 6/6/2017 22 Abuilt Drawing Main Road 6/6/2017 23 Asbuilt Drawing Struktur Jembatan 6/6/2017 23 Asbuilt Drawing Box Culvert 6/6/2017 24 Plan2 PJU di Jalan Desa atau yang lainnya 6/6/2017 NG KEGIATAN ENGINEERING
Target Tgl Closed Sisa Hari Status PIC
5/24/2017 5/23/2016 -13.55 Closed Dandan
5/26/2017 5/30/2017 -11.55 Proses Dandan 5/31/2017 -6.55 Closed Satrio 5/31/2017 -6.55 Proses Johan 5/25/2017 -12.55 Proses Dhani 5/25/2017 5/22/2017 -12.55 Closed Dhani 5/25/2017 -12.55 Proses Satrio 5/31/2017 6/2/2017 -6.55 Closed Grandson 6/15/2017 6/2/2017 8.45 Closed Grandson 5/31/2017 -6.55 Proses Canggih 6/3/2017 -3.55 Proses Qory 6/3/2017 -3.55 Proses Ali 6/10/2017 3.45 Proses Dangdut 5/27/2017 -10.55 Proses Dhani 5/25/2017 5/25/2017 -12.55 Closed Satrio 5/25/2017 5/25/2017 -12.55 Closed Satrio 5/25/2017 5/25/2017 -12.55 Closed Satrio 5/29/2017 4/27/2017 -8.55 Closed Dhani 5/30/2017 -7.55 Closed Dhani 5/25/2017 5/25/2017 -12.55 Closed Dhani 6/2/2017 -4.55 Proses Dhani 6/5/2017 -1.55 Proses Lukman 6/5/2017 -1.55 Proses Ali 6/5/2017 -1.55 Proses Satrio 6/10/2017 3.45 Proses Canggih