Anda di halaman 1dari 68

PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN ACEH SELATAN (OT

PW-JLJB/25/2014

A. BIAYA LANGSUNG PERSONIL

NO. NAMA POSISI JUMLAH 0B SATUAN

I BIAYA TENAGA AHLI


1 Holong Simaremare, ST Site Engineer (1 Orang) 1.00 x 6.00 OB
2 Sulemen Natal Eduard Siahaan, ST Chief Insp./Quant Eng (1 Oran 1.00 x 6.00 OB
3 Ir. Sugeng Quality Engineer (1 Orang) 1.00 x 6.00 OB

Sub Total I

II BIAYA STAF PENDUKUNG


1 Inspector 1 ( 1 Orang ) 1.00 x 6.00 OB
2 Inspector 2 ( 1 Orang ) 1.00 x 4.50 OB
3 Inspector 3 ( 1 Orang ) 1.00 x 4.00 OB
4 Inspector 4 ( 1 Orang ) 1.00 x 4.00 OB
5 Lab. Technician ( 1 Orang ) 1.00 x 6.00 OB
6 Surveyor ( 1 Orang ) 1.00 x 6.00 OB
7 Operator Komputer ( 1 Orang ) 1.00 x 6.00 OB
8 Pelayan Kantor ( 1 Orang ) 1.00 x 6.00 OB

Sub Total II

TOTAL BIAYA LANGSUNG PERSONIL ( I+II )

B. BIAYA LANGSUNG NON PERSONIL

NO. URAIAN VOLUME SATUAN

I BIAYA ALAT TULIS DAN BAHAN HABIS PAKAI


1 Bahan Operasional Kantor/ATK dan FotoCopy Field Team 6.00 Bln
2 Bahan - bahan Gambar Field Team 6.00 Bln

Sub Total I

II BIAYA KOMUNIKASI
1 Field Team 6.00 Bln

Sub Total II

III BIAYA PENGADAAN PERALATAN KANTOR (BELI ATAU SEWA)


2 Sewa Komputer + Printer + UPS + Meja (1 Unit) 1.00 x 6.00 Unit
3 Sewa Camera Digital (1 Unit) 1.00 x 6.00 Unit
4 Sewa GPS (1 Unit) 1.00 x 6.00 UB
Sub Total III

IV BIAYA TRANSPORTASI
1 Sewa Kendaraan Roda 4 (1 Unit) 1.00 x 6.00 UB
2 Sewa Sepeda Motor Prof. Staff (2 Unit) 12.00 UB
3 Sewa Sepeda Motor Sub Prof Staff (6 Unit) 30.50 UB

Sub Total IV

V BIAYA KANTOR / PERUMAHAN


1 Sewa Kantor Field Team (Lengkap Mobilair) 1.00 x 6.00 UB
2 Tunjangan Perumahan Prof. Staff 18.00 OB
3 Tunjangan Perumahan Sub Prof. Staff 30.50 OB

Sub Total V
PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN ACEH SELATAN (OT
PW-JLJB/25/2014

JUMLAH
NO. NAMA POSISI VOLUME
0B

VI BIAYA PERJALANAN DINAS


1 Field Team Ke Banda Aceh
- Biaya Harian (uang makan + transportasi lokal + uang Saku) 41.00 OH
- Biaya Penginapan 41.00 OH
2 Mobilisasi/Demobilisasi
1. Banda Aceh - Lapangan 9.00 x 2.00 Org/PP

Sub Total VI

VII BIAYA LAPORAN - LAPORAN


A. Field Team
1 Laporan RMK 5.00 Eks
2 Laporan Bulanan 5.00 x 6.00 Eks
3 Laporan Triwulan 5.00 x 2.00 Eks
4 Laporan khusus 5.00 Eks
5 Laporan Akhir 5.00 Eks
6 Laporan CD 5.00 Eks

Sub Total VII

TOTAL BIAYA LANGSUNG NON PERSONIL ( I+II+III+IV+V+VI+VII)


AN KABUPATEN ACEH SELATAN (OTSUS ACEH)
B/25/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

12,500,000.00 75,000,000.00
10,000,000.00 60,000,000.00
10,000,000.00 60,000,000.00

195,000,000.00

5,500,000.00 33,000,000.00
5,500,000.00 24,750,000.00
5,500,000.00 22,000,000.00
5,500,000.00 22,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
1,500,000.00 9,000,000.00
1,300,000.00 7,800,000.00

184,550,000.00

RSONIL ( I+II ) 379,550,000.00

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

1,000,000.00 6,000,000.00
800,000.00 4,800,000.00

10,800,000.00

1,000,000.00 6,000,000.00

6,000,000.00

250,000.00 1,500,000.00
250,000.00 1,500,000.00
250,000.00 1,500,000.00
4,500,000.00

8,500,000.00 51,000,000.00
8,500,000.00 102,000,000.00
800,000.00 24,400,000.00

177,400,000.00

1,100,000.00 6,600,000.00
300,000.00 5,400,000.00
200,000.00 6,100,000.00

18,100,000.00
AN KABUPATEN ACEH SELATAN (OTSUS ACEH)
B/25/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

250,000.00 10,250,000.00
250,000.00 10,250,000.00

250,000.00 4,500,000.00

25,000,000.00

100,000.00 500,000.00
100,000.00 3,000,000.00
100,000.00 1,000,000.00
100,000.00 500,000.00
100,000.00 500,000.00
30,000.00 150,000.00

5,650,000.00

( I+II+III+IV+V+VI+VII) 247,450,000.00
REKAPITULASI PENAWARAN BIAYA

KEGIATAN : Pengawasan Teknis Jalan dan Jembatan Dinas Bina Marga Aceh
PEKERJAAN : Pengawasan Teknis Jalan dan Jembatan Kabupaten Aceh Selatan (
PAKET : PW-JLJB/25/2014
SUMBER DANA : APBA Tahun Anggaran 2014
WAKTU : 6,0 ( enam koma nol) bulan

No. Uraian

A. BIAYA LANGSUNG PERSONIL

B. BIAYA LANGSUNG NON PERSONIL

TOTAL
PPN 10%
GRAND TOTAL

Terbilang : Satu milyar tiga ratus empat puluh enam juta dua ratus sembilan
puluh ribu rupiah,-

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
REKAPITULASI PENAWARAN BIAYA

an Teknis Jalan dan Jembatan Dinas Bina Marga Aceh


an Teknis Jalan dan Jembatan Kabupaten Aceh Selatan (Otsus Aceh)

Harga

379,550,000

247,450,000

627,000,000
62,700,000
689,700,000

ar tiga ratus empat puluh enam juta dua ratus sembilan

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN NAGAN RAYA (OT
PW-JLJB/23/2014

A. BIAYA LANGSUNG PERSONIL

SATUA
NO. NAMA POSISI JUMLAH 0B
N

I BIAYA TENAGA AHLI


1 Ir. Indra Irawati Site Engineer (1 Orang) 1.00 x 6.00 OB
2 Ir. Asman Chief Insp./Quant Eng (1 Orang) 1.00 x 6.00 OB
3 Ir. Anta Nazaruddin Quality Engineer (1 Orang) 1.00 x 6.00 OB

Sub Total I

II BIAYA STAF PENDUKUNG


1 Inspector 1 ( 1 Orang ) 1.00 x 6.00 OB
2 Inspector 2 ( 1 Orang ) 1.00 x 4.00 OB
3 Inspector 3 ( 1 Orang ) 1.00 x 4.00 OB
4 Lab. Technician ( 1 Orang ) 1.00 x 6.00 OB
5 Surveyor 1 ( 1 Orang ) 1.00 x 6.00 OB
6 Surveyor 2 ( 1 Orang ) 1.00 x 4.00 OB
7 Operator Komputer ( 1 Orang ) 1.00 x 6.00 OB
8 Pelayan Kantor ( 1 Orang ) 1.00 x 6.00 OB

Sub Total II

TOTAL BIAYA LANGSUNG PERSONIL ( I+II )

B. BIAYA LANGSUNG NON PERSONIL

SATUA
NO. URAIAN VOLUME
N

I BIAYA ALAT TULIS DAN BAHAN HABIS PAKAI


1 Bahan Operasional Kantor/ATK dan FotoCopy Field Team 6.00 Bln
2 Bahan - bahan Gambar Field Team 6.00 Bln

Sub Total I

II BIAYA KOMUNIKASI
1 Field Team 6.00 Bln

Sub Total II

III BIAYA PENGADAAN PERALATAN KANTOR (BELI ATAU SEWA)


2 Sewa Komputer + Printer + UPS + Meja (1 Unit) 1.00 x 6.00 UB
3 Sewa Camera Digital (2 Unit) 2.00 x 6.00 UB
4 Sewa GPS (2 Unit) 2.00 x 6.00 UB
Sub Total III

IV BIAYA TRANSPORTASI
1 Sewa Kendaraan Roda 4 (1 Unit) 1.00 x 6.00 UB
2 Sewa Sepeda Motor Prof. Staff (2 Unit) 12.00 UB
3 Sewa Sepeda Motor Sub Prof Staff (6 Unit) 30.00 UB

Sub Total IV

V BIAYA KANTOR / PERUMAHAN


1 Sewa Kantor Field Team (Lengkap Mobilair) 1.00 x 6.00 UB
2 Tunjangan Perumahan Prof. Staff 18.00 OB
3 Tunjangan Perumahan Sub Prof. Staff 30.00 OB

Sub Total V
PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN NAGAN RAYA (OT
PW-JLJB/23/2014

JUMLA
NO. NAMA POSISI VOLUME
H 0B

VI BIAYA PERJALANAN DINAS


1 Field Team Ke Banda Aceh
- Biaya Harian (uang makan + transportasi lokal + uang Saku) 39.0 OH
- Biaya Penginapan 39.0 OH
2 Mobilisasi/Demobilisasi
1. Banda Aceh - Lapangan 9.00 x 2.00 Org/PP

Sub Total VI

VII BIAYA LAPORAN - LAPORAN


A. Field Team
1 Laporan RMK 5.0 Eks
2 Laporan Bulanan 5.0 x 6.0 Eks
3 Laporan Triwulan 5.0 x 2.0 Eks
4 Laporan khusus 5.0 Eks
5 Laporan Akhir 5.0 Eks
6 Laporan CD 5.0 Eks

Sub Total VII

TOTAL BIAYA LANGSUNG NON PERSONIL ( I+II+III+IV+V+VI+VII)


AN KABUPATEN NAGAN RAYA (OTSUS ACEH)
/23/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

13,500,000.00 81,000,000.00
10,000,000.00 60,000,000.00
10,000,000.00 60,000,000.00

201,000,000.00

6,500,000.00 39,000,000.00
6,500,000.00 26,000,000.00
6,500,000.00 26,000,000.00
6,500,000.00 39,000,000.00
6,500,000.00 39,000,000.00
6,500,000.00 26,000,000.00
2,500,000.00 15,000,000.00
1,800,000.00 10,800,000.00

220,800,000.00

ONIL ( I+II ) 421,800,000.00

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

1,000,000.00 6,000,000.00
800,000.00 4,800,000.00

10,800,000.00

1,300,000.00 7,800,000.00

7,800,000.00

1,500,000.00 9,000,000.00
300,000.00 3,600,000.00
250,000.00 3,000,000.00
15,600,000.00

8,500,000.00 51,000,000.00
800,000.00 9,600,000.00
800,000.00 24,000,000.00

84,600,000.00

1,500,000.00 9,000,000.00
300,000.00 5,400,000.00
200,000.00 6,000,000.00

20,400,000.00
AN KABUPATEN NAGAN RAYA (OTSUS ACEH)
/23/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

300,000.00 11,700,000.00
300,000.00 11,700,000.00

350,000.00 6,300,000.00

29,700,000.00

150,000.00 750,000.00
150,000.00 4,500,000.00
100,000.00 1,000,000.00
100,000.00 500,000.00
180,000.00 900,000.00
30,000.00 150,000.00

7,800,000.00

I+II+III+IV+V+VI+VII) 176,700,000.00
REKAPITULASI PENAWARAN BIAYA

KEGIATAN : Pengawasan Teknis Jalan dan Jembatan Dinas Bina Marga Aceh
PEKERJAAN : Pengawasan Teknis Jalan dan Jembatan Kabupaten Nagan Raya (Otsus Aceh)
PAKET : PW-JLJB/23/2014
SUMBER DANA : APBA Tahun Anggaran 2014
WAKTU : 6,0 ( enam koma nol) bulan

No. Uraian Harga

A. BIAYA LANGSUNG PERSONIL 421,800,000

B. BIAYA LANGSUNG NON PERSONIL 176,700,000

TOTAL 598,500,000
PPN 10% 59,850,000
GRAND TOTAL 658,350,000

Terbilang : Lima ratus lima puluh delapan juta tiga ratus ima puluh ribu rupiah

Banda Aceh, 14 April 2014


PT. Pemeta Engineering System Kso
PT.Duta Pratama Cipta

H. Luthfi Djatnika, SE
Direktur Utama
PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN ACEH UTARA (M
PW-JLJB/12/2014

A. BIAYA LANGSUNG PERSONIL

NO. NAMA POSISI JUMLAH 0B SATUAN

I BIAYA TENAGA AHLI


1 Holong Simaremare, ST Site Engineer (1 Orang) 1.00 x 6.00 OB
2 Sulemen Natal Eduard Siahaan, ST Chief Insp./Quant Eng 1 (1 Orang) 1.00 x 6.00 OB
3 Sulemen Natal Eduard Siahaan, ST Chief Insp./Quant Eng 2 (1 Orang) 1.00 x 6.00 OB
4 Ir. Sugeng Quality Engineer 1 (1 Orang) 1.00 x 6.00 OB
5 Ir. Sugeng Quality Engineer 2 (1 Orang) 1.00 x 6.00 OB

Sub Total I

II BIAYA STAF PENDUKUNG


1 Inspector 1 ( 1 Orang ) 1.00 x 6.00 OB
2 Inspector 2 ( 1 Orang ) 1.00 x 6.00 OB
3 Inspector 3 ( 1 Orang ) 1.00 x 6.00 OB
4 Inspector 4 ( 1 Orang ) 1.00 x 6.00 OB
5 Inspector 5 ( 1 Orang ) 1.00 x 5.00 OB
6 Inspector 6 ( 1 Orang ) 1.00 x 4.00 OB
7 Inspector 7 ( 1 Orang ) 1.00 x 4.00 OB
8 Lab. Technician 1 ( 1 Orang ) 1.00 x 6.00 OB
9 Lab. Technician 2 ( 1 Orang ) 1.00 x 6.00 OB
10 Surveyor 1 ( 1 Orang ) 1.00 x 6.00 OB
11 Surveyor 2 ( 1 Orang ) 1.00 x 6.00 OB
12 Operator Komputer ( 1 Orang ) 1.00 x 6.00 OB
13 Pelayan Kantor ( 1 Orang ) 1.00 x 6.00 OB

Sub Total II

TOTAL BIAYA LANGSUNG PERSONIL ( I+II )


PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN ACEH UTARA (M
PW-JLJB/12/2014

B. BIAYA LANGSUNG NON PERSONIL

NO. URAIAN VOLUME SATUAN

I BIAYA ALAT TULIS DAN BAHAN HABIS PAKAI


1 Bahan Operasional Kantor/ATK dan FotoCopy Field Team 6.00 Bln
2 Bahan - bahan Gambar Field Team 6.00 Bln

Sub Total I

II BIAYA KOMUNIKASI
1 Field Team 6.00 Bln

Sub Total II

III BIAYA PENGADAAN PERALATAN KANTOR (BELI ATAU SEWA)


1 Sewa Komputer + Printer + UPS + Meja (1 Unit) 1.00 x 6.00 UB
2 Sewa Camera Digital (1 Unit) 1.00 x 6.00 UB
3 Sewa GPS (1 Unit) 1.00 x 6.00 UB

Sub Total III

IV BIAYA TRANSPORTASI
1 Sewa Kendaraan Roda 4 (1 Unit) 1.00 x 6.00 UB
2 Sewa Sepeda Motor (15 Unit) 85.00 UB

Sub Total IV

V BIAYA KANTOR / PERUMAHAN


1 Sewa Kantor Field Team (Lengkap Mobilair) 1.00 x 6.00 UB
2 Tunjangan Perumahan Prof. Staff 30.00 OB
3 Tunjangan Perumahan Sub Prof. Staff 61.00 OB

Sub Total V

JUMLAH
NO. NAMA POSISI VOLUME
0B

VI BIAYA PERJALANAN DINAS


1 Field Team Ke Banda Aceh
- Biaya Harian (uang makan + transportasi lokal + uang Saku) 1.00 x 50.00 OH
- Biaya Penginapan 1.00 x 50.00 OH
2 Mobilisasi/Demobilisasi
1. Banda Aceh - Lapangan 16.00 x 2.00 Org/PP
Sub Total VI

VII BIAYA LAPORAN - LAPORAN


A. Field Team
1 Laporan RMK 5.00 Eks
2 Laporan Bulanan 5.00 x 6.00 Eks
3 Laporan Triwulan 5.00 x 2.00 Eks
4 Laporan khusus 5.00 Eks
5 Laporan Akhir 5.00 Eks
6 Laporan CD 5.00 Eks

Sub Total VII

TOTAL BIAYA LANGSUNG NON PERSONIL ( I+II+III+IV+V+VI+VII)


TAN KABUPATEN ACEH UTARA (MIGAS/KAB)
B/12/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

12,500,000.00 75,000,000.00
10,000,000.00 60,000,000.00
10,000,000.00 60,000,000.00
10,000,000.00 60,000,000.00
10,000,000.00 60,000,000.00

315,000,000.00

5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 27,500,000.00
5,500,000.00 22,000,000.00
5,500,000.00 22,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
1,500,000.00 9,000,000.00
1,300,000.00 7,800,000.00

352,300,000.00

NIL ( I+II ) 667,300,000.00


TAN KABUPATEN ACEH UTARA (MIGAS/KAB)
B/12/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

1,000,000.00 6,000,000.00
800,000.00 4,800,000.00

10,800,000.00

1,000,000.00 6,000,000.00

6,000,000.00

250,000.00 1,500,000.00
250,000.00 1,500,000.00
250,000.00 1,500,000.00

4,500,000.00

8,500,000.00 51,000,000.00
8,500,000.00 722,500,000.00

773,500,000.00

1,100,000.00 6,600,000.00
300,000.00 9,000,000.00
200,000.00 12,200,000.00

27,800,000.00

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

250,000.00 12,500,000.00
250,000.00 12,500,000.00

250,000.00 8,000,000.00
33,000,000.00

100,000.00 500,000.00
100,000.00 3,000,000.00
100,000.00 1,000,000.00
100,000.00 500,000.00
100,000.00 500,000.00
30,000.00 150,000.00

5,650,000.00

+II+III+IV+V+VI+VII) 861,250,000.00
REKAPITULASI PENAWARAN BIAYA

KEGIATAN : Pengawasan Teknis Jalan dan Jembatan Dinas Bina Marga Aceh
PEKERJAAN : Pengawasan Teknis Jalan dan Jembatan Kabupaten Aceh Utara (Migas/Kab)
PAKET : PW-JLJB/12/2014
SUMBER DANA : Migas Kab Tahun Anggaran 2014
WAKTU : 6,0 ( enam koma nol) bulan

No. Uraian

A. BIAYA LANGSUNG PERSONIL

B. BIAYA LANGSUNG NON PERSONIL

TOTAL
PPN 10%
GRAND TOTAL

Terbilang : Satu milyar tiga ratus empat puluh enam juta dua ratus sembilan
puluh ribu rupiah,-

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
PITULASI PENAWARAN BIAYA

Jembatan Kabupaten Aceh Utara (Migas/Kab)

Harga

667,300,000

861,250,000

1,528,550,000
152,855,000
1,681,405,000

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
PENGAWASAN TEKNIS JALAN DAN JEMBATAN KOTA LHOKSEUMAWE (O
PW-JLJB/11/2014

A. BIAYA LANGSUNG PERSONIL

NO. NAMA POSISI JUMLAH 0B SATUAN

I BIAYA TENAGA AHLI


1 Holong Simaremare, ST Site Engineer (1 Orang) 1.00 x 6.00 OB
2 Sulemen Natal Eduard Siahaan, ST Chief Insp./Quant Eng (1 Orang) 1.00 x 6.00 OB
3 Ir. Sugeng Quality Engineer (1 Orang) 1.00 x 6.00 OB

Sub Total I

II BIAYA STAF PENDUKUNG


1 Inspector 1 ( 1 Orang ) 1.00 x 6.00 OB
2 Inspector 2 ( 1 Orang ) 1.00 x 5.00 OB
3 Lab. Technician ( 1 Orang ) 1.00 x 4.00 OB
4 Surveyor ( 1 Orang ) 1.00 x 4.00 OB
5 Operator Komputer ( 1 Orang ) 1.00 x 6.00 OB
6 Pelayan Kantor ( 1 Orang ) 1.00 x 6.00 OB

Sub Total II

TOTAL BIAYA LANGSUNG PERSONIL ( I+II )


PENGAWASAN TEKNIS JALAN DAN JEMBATAN KOTA LHOKSEUMAWE (O
PW-JLJB/11/2014

B. BIAYA LANGSUNG NON PERSONIL

NO. URAIAN VOLUME SATUAN

I BIAYA ALAT TULIS DAN BAHAN HABIS PAKAI


1 Bahan Operasional Kantor/ATK dan FotoCopy Field Team 6.00 Bln
2 Bahan - bahan Gambar Field Team 6.00 Bln

Sub Total I

II BIAYA KOMUNIKASI
1 Field Team 6.00 Bln

Sub Total II

III BIAYA PENGADAAN PERALATAN KANTOR (BELI ATAU SEWA)


1 Sewa Komputer + Printer + UPS + Meja (1 Unit) 1.00 x 6.00 UB
2 Camera Digital (1 Unit) 1.00 x 6.00 UB
3 Sewa GPS (1 Unit) 1.00 x 6.00 UB

Sub Total III

IV BIAYA TRANSPORTASI
1 Sewa Kendaraan Roda 4 (1 Unit) 1.00 x 6.00 UB
2 Sewa Sepeda Motor (6 Unit) 31.00 UB

Sub Total IV

V BIAYA KANTOR / PERUMAHAN


1 Sewa Kantor Field Team (Lengkap Mobilair) 1.00 x 6.00 UB
2 Tunjangan Perumahan Prof. Staff 18.00 OB
3 Tunjangan Perumahan Sub Prof. Staff 19.00 OB

Sub Total V

JUMLAH
NO. NAMA POSISI VOLUME
0B

VI BIAYA PERJALANAN DINAS


1 Field Team Ke Banda Aceh
- Biaya Harian (uang makan + transportasi lokal + uang Saku) 1.00 x 30.00 OH
- Biaya Penginapan 1.00 x 30.00 OH
2 Mobilisasi/Demobilisasi
1. Banda Aceh - Lapangan 7.00 x 2.00 Org/PP
Sub Total VI

VII BIAYA LAPORAN - LAPORAN


A. Field Team
1 Laporan RMK 5.00 Eks
2 Laporan Bulanan 5.00 x 6.00 Eks
3 Laporan Triwulan 5.00 x 2.00 Eks
4 Laporan khusus 5.00 Eks
5 Laporan Akhir 5.00 Eks
6 Laporan CD 5.00 Eks

Sub Total VII

TOTAL BIAYA LANGSUNG NON PERSONIL ( I+II+III+IV+V+VI+VII)


ATAN KOTA LHOKSEUMAWE (OTSUS ACEH)
B/11/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

12,500,000.00 75,000,000.00
10,000,000.00 60,000,000.00
10,000,000.00 60,000,000.00

195,000,000.00

5,500,000.00 33,000,000.00
5,500,000.00 27,500,000.00
5,500,000.00 22,000,000.00
5,500,000.00 22,000,000.00
1,500,000.00 9,000,000.00
1,300,000.00 7,800,000.00

121,300,000.00

L ( I+II ) 316,300,000.00
ATAN KOTA LHOKSEUMAWE (OTSUS ACEH)
B/11/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

1,000,000.00 6,000,000.00
800,000.00 4,800,000.00

10,800,000.00

1,000,000.00 6,000,000.00

6,000,000.00

250,000.00 1,500,000.00
250,000.00 250,000.00
250,000.00 1,500,000.00

3,250,000.00

8,500,000.00 51,000,000.00
8,500,000.00 263,500,000.00

314,500,000.00

1,100,000.00 6,600,000.00
300,000.00 5,400,000.00
200,000.00 3,800,000.00

15,800,000.00

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

250,000.00 7,500,000.00
250,000.00 7,500,000.00

250,000.00 3,500,000.00
18,500,000.00

100,000.00 500,000.00
100,000.00 3,000,000.00
100,000.00 1,000,000.00
100,000.00 500,000.00
100,000.00 500,000.00
30,000.00 150,000.00

5,650,000.00

I+III+IV+V+VI+VII) 374,500,000.00
REKAPITULASI PENAWARAN BIAYA

KEGIATAN : Pengawasan Teknis Jalan dan Jembatan Dinas Bina Marga Aceh
PEKERJAAN : Pengawasan Teknis Jalan dan Jembatan Kota Lhokseumawe (Otsus Aceh)
PAKET : PW-JLJB/11/2014
SUMBER DANA : Otsus Aceh Tahun Anggaran 2014
WAKTU : 6,0 ( Enam koma nol) bulan

No. Uraian

A. BIAYA LANGSUNG PERSONIL

B. BIAYA LANGSUNG NON PERSONIL

TOTAL
PPN 10%
GRAND TOTAL

Terbilang : Satu milyar tiga ratus empat puluh enam juta dua ratus sembilan
puluh ribu rupiah,-

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
PITULASI PENAWARAN BIAYA

Jembatan Kota Lhokseumawe (Otsus Aceh)

Harga

316,300,000

374,500,000

690,800,000
69,080,000
759,880,000

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN ACEH BESAR WILAYA
PW-JLJB/04/2014

A. BIAYA LANGSUNG PERSONIL

NO. NAMA POSISI JUMLAH 0B SATUAN

I BIAYA TENAGA AHLI


1 Holong Simaremare, ST Site Engineer (1 Orang) 1.00 x 6.00 OB
2 Sulemen Natal Eduard Siahaan, ST Chief Insp./Quant Eng (1 Orang) 1.00 x 6.00 OB
3 Ir. Sugeng Quality Engineer (1 Orang) 1.00 x 6.00 OB

Sub Total I

II BIAYA STAF PENDUKUNG


1 Inspector 1 ( 1 Orang ) 1.00 x 6.00 OB
2 Inspector 2 ( 1 Orang ) 1.00 x 6.00 OB
3 Inspector 3 ( 1 Orang ) 1.00 x 6.00 OB
4 Inspector 4 ( 1 Orang ) 1.00 x 6.00 OB
5 Inspector 5 ( 1 Orang ) 1.00 x 5.00 OB
6 Inspector 6 ( 1 Orang ) 1.00 x 4.00 OB
7 Lab. Technician ( 1 Orang ) 1.00 x 6.00 OB
8 Surveyor ( 1 Orang ) 1.00 x 6.00 OB
9 Operator Komputer ( 1 Orang ) 1.00 x 6.00 OB
10 Pelayan Kantor ( 1 Orang ) 1.00 x 6.00 OB

Sub Total II

TOTAL BIAYA LANGSUNG PERSONIL ( I+II )

B. BIAYA LANGSUNG NON PERSONIL

NO. URAIAN VOLUME SATUAN

I BIAYA ALAT TULIS DAN BAHAN HABIS PAKAI


1 Bahan Operasional Kantor/ATK dan FotoCopy Field Team 6.00 Bln
2 Bahan - bahan Gambar Field Team 6.00 Bln

Sub Total I

II BIAYA KOMUNIKASI
1 Field Team 6.00 Bln

Sub Total II

III BIAYA PENGADAAN PERALATAN KANTOR (BELI ATAU SEWA)


1 Sewa Komputer + Printer + UPS + Meja (1 Unit) 1.00 x 6.00 Unit
2 Sewa Camera Digital (1 Unit) 1.00 x 6.00 Unit
3 Sewa GPS (2 Unit) 2.00 x 6.00 UB

Sub Total III

IV BIAYA TRANSPORTASI
1 Sewa Kendaraan Roda 4 (1 Unit) 1.00 x 6.00 UB
2 Sewa Sepeda Motor Prof. Staff (2 Unit) 12.00 UB
3 Sewa Sepeda Motor Sub Prof Staff (8 Unit) 45.00 UB

Sub Total IV

V BIAYA KANTOR / PERUMAHAN


1 Sewa Kantor Field Team (Lengkap Mobilair) 1.00 x 6.00 UB
2 Tunjangan Perumahan Prof. Staff 18.00 OB
3 Tunjangan Perumahan Sub Prof. Staff 45.00 OB

Sub Total V
PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN ACEH BESAR WILAYA
PW-JLJB/04/2014

VI BIAYA LAPORAN - LAPORAN


A. Field Team
1 Laporan RMK 5.00 Eks
2 Laporan Bulanan 5.00 x 6.00 Eks
3 Laporan Triwulan 5.00 x 2.00 Eks
4 Laporan khusus 5.00 Eks
4 Laporan Akhir 5.00 Eks
5 Laporan CD 5.00 Eks

Sub Total VI

TOTAL BIAYA LANGSUNG NON PERSONIL ( I+II+III+IV+V+VI)


ABUPATEN ACEH BESAR WILAYAH 2 (OTSUS ACEH)
B/04/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

12,500,000.00 75,000,000.00
10,000,000.00 60,000,000.00
10,000,000.00 60,000,000.00

195,000,000.00

5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 27,500,000.00
5,500,000.00 22,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
1,500,000.00 9,000,000.00
1,300,000.00 7,800,000.00

264,300,000.00

NIL ( I+II ) 459,300,000.00

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

1,000,000.00 6,000,000.00
800,000.00 4,800,000.00

10,800,000.00

1,000,000.00 6,000,000.00

6,000,000.00

250,000.00 1,500,000.00
250,000.00 1,500,000.00
250,000.00 3,000,000.00

6,000,000.00

8,500,000.00 51,000,000.00
8,500,000.00 102,000,000.00
800,000.00 36,000,000.00

189,000,000.00

1,100,000.00 6,600,000.00
300,000.00 5,400,000.00
200,000.00 9,000,000.00

21,000,000.00
ABUPATEN ACEH BESAR WILAYAH 2 (OTSUS ACEH)
B/04/2014

100,000.00 500,000.00
100,000.00 3,000,000.00
100,000.00 1,000,000.00
100,000.00 500,000.00
100,000.00 500,000.00
30,000.00 150,000.00

5,650,000.00

( I+II+III+IV+V+VI) 238,450,000.00
REKAPITULASI PENAWARAN BIAYA

KEGIATAN : Pengawasan Teknis Jalan dan Jembatan Dinas Bina Marga Aceh
PEKERJAAN : Pengawasan Teknis Jalan dan Jembatan Kabupaten Aceh Besar Wilayah 2 (Otsus A
PAKET : PW-JLJB/04/2014
SUMBER DANA : APBA Tahun Anggaran 2014
WAKTU : 6,0 ( enam koma nol) bulan

No. Uraian

A. BIAYA LANGSUNG PERSONIL

B. BIAYA LANGSUNG NON PERSONIL

TOTAL
PPN 10%
GRAND TOTAL

Terbilang : Satu milyar tiga ratus empat puluh enam juta dua ratus sembilan
puluh ribu rupiah,-

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
PITULASI PENAWARAN BIAYA

Jembatan Kabupaten Aceh Besar Wilayah 2 (Otsus Aceh)

Harga

459,300,000

238,450,000

697,750,000
69,775,000
767,525,000

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN ACEH BESAR WILAYA
PW-JLJB/03/2014

A. BIAYA LANGSUNG PERSONIL

NO. NAMA POSISI JUMLAH 0B SATUAN

I BIAYA TENAGA AHLI


1 Holong Simaremare, ST Site Engineer (1 Orang) 1.00 x 6.00 OB
2 Sulemen Natal Eduard Siahaan, ST Chief Insp./Quant Eng (1 Orang) 1.00 x 6.00 OB
3 Ir. Sugeng Quality Engineer (1 Orang) 1.00 x 6.00 OB

Sub Total I

II BIAYA STAF PENDUKUNG


1 Inspector 1 ( 1 Orang ) 1.00 x 6.00 OB
2 Inspector 2 ( 1 Orang ) 1.00 x 6.00 OB
3 Inspector 3 ( 1 Orang ) 1.00 x 6.00 OB
4 Inspector 4 ( 1 Orang ) 1.00 x 6.00 OB
5 Inspector 5 ( 1 Orang ) 1.00 x 5.00 OB
6 Inspector 6 ( 1 Orang ) 1.00 x 4.00 OB
7 Lab. Technician ( 1 Orang ) 1.00 x 6.00 OB
8 Surveyor ( 1 Orang ) 1.00 x 6.00 OB
9 Operator Komputer ( 1 Orang ) 1.00 x 6.00 OB
10 Pelayan Kantor ( 1 Orang ) 1.00 x 6.00 OB

Sub Total II

TOTAL BIAYA LANGSUNG PERSONIL ( I+II )

B. BIAYA LANGSUNG NON PERSONIL

NO. URAIAN VOLUME SATUAN

I BIAYA ALAT TULIS DAN BAHAN HABIS PAKAI


1 Bahan Operasional Kantor/ATK dan FotoCopy Field Team 6.00 Bln
2 Bahan - bahan Gambar Field Team 6.00 Bln

Sub Total I

II BIAYA KOMUNIKASI
1 Field Team 6.00 Bln

Sub Total II

III BIAYA PENGADAAN PERALATAN KANTOR (BELI ATAU SEWA)


1 Sewa Komputer + Printer + UPS + Meja (1 Unit) 1.00 x 6.00 UB
2 Sewa Camera Digital (1 Unit) 1.00 x 6.00 UB
3 Sewa GPS (2 Unit) 2.00 x 6.00 UB

Sub Total III

IV BIAYA TRANSPORTASI
1 Sewa Kendaraan Roda 4 (1 Unit) 1.00 x 6.00 UB
2 Sewa Sepeda Motor Prof. Staff (2 Unit) 12.00 UB
3 Sewa Sepeda Motor Sub Prof Staff (8 Unit) 45.00 UB

Sub Total IV

V BIAYA KANTOR / PERUMAHAN


1 Sewa Kantor Field Team (Lengkap Mobilair) 1.00 x 6.00 UB
2 Tunjangan Perumahan Prof. Staff 18.00 OB
3 Tunjangan Perumahan Sub Prof. Staff 45.00 OB

Sub Total V
PENGAWASAN TEKNIS JALAN DAN JEMBATAN KABUPATEN ACEH BESAR WILAYA
PW-JLJB/03/2014

VI BIAYA LAPORAN - LAPORAN


A. Field Team
1 Laporan RMK 5.00 Eks
2 Laporan Bulanan 5.00 x 6.00 Eks
3 Laporan Triwulan 5.00 x 2.00 Eks
4 Laporan khusus 5.00 Eks
4 Laporan Akhir 5.00 Eks
5 Laporan CD 5.00 Eks

Sub Total VI

TOTAL BIAYA LANGSUNG NON PERSONIL ( I+II+III+IV+V+VI)


ABUPATEN ACEH BESAR WILAYAH 1 (OTSUS ACEH)
B/03/2014

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

12,500,000.00 75,000,000.00
10,000,000.00 60,000,000.00
10,000,000.00 60,000,000.00

195,000,000.00

5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 27,500,000.00
5,500,000.00 22,000,000.00
5,500,000.00 33,000,000.00
5,500,000.00 33,000,000.00
1,500,000.00 9,000,000.00
1,300,000.00 7,800,000.00

264,300,000.00

NIL ( I+II ) 459,300,000.00

HARGA JUMLAH
SATUAN HARGA
(Rp) (Rp)

1,000,000.00 6,000,000.00
800,000.00 4,800,000.00

10,800,000.00

1,000,000.00 6,000,000.00

6,000,000.00

250,000.00 1,500,000.00
250,000.00 1,500,000.00
250,000.00 3,000,000.00

6,000,000.00

8,500,000.00 51,000,000.00
8,500,000.00 102,000,000.00
800,000.00 36,000,000.00

189,000,000.00

1,100,000.00 6,600,000.00
300,000.00 5,400,000.00
200,000.00 9,000,000.00

21,000,000.00
ABUPATEN ACEH BESAR WILAYAH 1 (OTSUS ACEH)
B/03/2014

100,000.00 500,000.00
100,000.00 3,000,000.00
100,000.00 1,000,000.00
100,000.00 500,000.00
100,000.00 500,000.00
30,000.00 150,000.00

5,650,000.00

( I+II+III+IV+V+VI) 238,450,000.00
REKAPITULASI PENAWARAN BIAYA

KEGIATAN : Pengawasan Teknis Jalan dan Jembatan Dinas Bina Marga Aceh
PEKERJAAN : Pengawasan Teknis Jalan dan Jembatan Kabupaten Aceh Besar Wilayah 1 (Otsus A
PAKET : PW-JLJB/03/2014
SUMBER DANA : APBA Tahun Anggaran 2014
WAKTU : 6,0 ( enam koma nol) bulan

No. Uraian

A. BIAYA LANGSUNG PERSONIL

B. BIAYA LANGSUNG NON PERSONIL

TOTAL
PPN 10%
GRAND TOTAL

Terbilang : Satu milyar tiga ratus empat puluh enam juta dua ratus sembilan
puluh ribu rupiah,-

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
PITULASI PENAWARAN BIAYA

n dan Jembatan Kabupaten Aceh Besar Wilayah 1 (Otsus Aceh)

Harga

459,300,000

238,450,000

697,750,000
69,775,000
767,525,000

Banda Aceh, 14 April 2014


PT. Karla Indah Pramuditha

Ir. Nahdatun Nur, MT


Kuasa Direktur
RINCIAN BEBAN BIAYA PERSONIL (AUDITED PAYROLL)
Pengawasan Teknis Jalan dan Jembatan Kabupaten Aceh Selatan (Otsus Aceh)
PW - JLJB/25/2014
TAHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta P

1 2 (0.3 %) 3 (0.4 %) 4 (0.4 %) 5=1+2+3+4 6 (0.19 %)


No NAMA Posisi Status Gaji Beban Biaya Beban Beban Subtotal Tunjangan
Dasar Sosial Biaya Biaya (Rp) Penugasan
(Rp) (Rp) Umum K3 (Rp)

1 Ir. Bambang Iswahyudi Site Engineer Tidak Tetap 5,000,000 1,500,000 2,000,000 2,000,000 10,500,000 950,000
2 Nitson Simamora, ST Chief Insp./Quant. Eng Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000
3 Edy Triono, ST Quality Engineer Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000

Bandung, 14 April 2013


KAP Noor Salim, Nursehan & Sinarahardja
Nomor Usaha : KEP.212/KM.6/2003 PT. Pemeta Engineering System
Kso PT. Duta Pratama Cipta

H. Luthfi Djatnika, SE
DIREKTUR UTAMA
BIAYA PERSONIL (AUDITED PAYROLL)
an Jembatan Kabupaten Aceh Selatan (Otsus Aceh)
PW - JLJB/25/2014
AHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta Pratama Cipta

6 (0.21 %) 7=4+5+6
Keuntungan Biaya
(Rp) Langsung
Personil

1,050,000 12,500,000
840,000 10,000,000
840,000 10,000,000
RINCIAN BEBAN BIAYA PERSONIL (AUDITED PAYROLL)
Pengawasan Teknis Jalan dan Jembatan Kabupaten Nagan Raya (Otsus Aceh)
PW - JLJB/23/2014
TAHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta P

1 2 (0.3 %) 3 (0.4 %) 4 (0.4 %) 5=1+2+3+4 6 (0.19 %)


No NAMA Posisi Status Gaji Beban Biaya Beban Beban Subtotal Tunjangan
Dasar Sosial Biaya Biaya (Rp) Penugasan
(Rp) (Rp) Umum K3 (Rp)

1 Ir. Indra Irawat Site Engineer Tidak Tetap 5,400,000 1,620,000 2,160,000 2,160,000 11,340,000 1,026,000
2 Ir. Asman Chief Insp./Quant. Eng Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000
3 Ir. Anta Nazaruddin Quality Engineer Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000

KAP Noor Salim, Nursehan & Sinarahardja Banda Aceh, 14 April 2013
Nomor Usaha : KEP.212/KM.6/2003 PT. Pemeta Engineering System
Kso PT. Duta Pratama Cipta

H. Luthfi Djatnika, SE
DIREKTUR UTAMA
BIAYA PERSONIL (AUDITED PAYROLL)
an Jembatan Kabupaten Nagan Raya (Otsus Aceh)
PW - JLJB/23/2014
AHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta Pratama Cipta

6 (0.21 %) 7=4+5+6
Keuntungan Biaya
(Rp) Langsung
Personil

1,134,000 13,500,000
840,000 10,000,000
840,000 10,000,000
RINCIAN BEBAN BIAYA PERSONIL (AUDITED PAYROLL)
Pengawasan Teknis Jalan dan Jembatan Kabupaten Aceh Utara (Migas/Kab)
PW - JLJB/12/2014
TAHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta P

1 2 (0.3 %) 3 (0.4 %) 4 (0.4 %) 5=1+2+3+4 6 (0.19 %)


No NAMA Posisi Status Gaji Beban Biaya Beban Beban Subtotal Tunjangan
Dasar Sosial Biaya Biaya (Rp) Penugasan
(Rp) (Rp) Umum K3 (Rp)

1 Ir. Bambang Iswahyudi Site Engineer Tidak Tetap 5,000,000 1,500,000 2,000,000 2,000,000 10,500,000 950,000
2 Nitson Simamora, ST Chief Insp./Quant. Eng 1 Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000
3 Nitson Simamora, ST Chief Insp./Quant. Eng 2 Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000
4 Edy Triono, ST Quality Engineer 1 Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000
5 Edy Triono, ST Quality Engineer 2 Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000

Bandung, 14 April 2013


KAP Noor Salim, Nursehan & Sinarahardja
Nomor Usaha : KEP.212/KM.6/2003 PT. Pemeta Engineering System
Kso PT. Duta Pratama Cipta

H. Luthfi Djatnika, SE
DIREKTUR UTAMA
BIAYA PERSONIL (AUDITED PAYROLL)
dan Jembatan Kabupaten Aceh Utara (Migas/Kab)
PW - JLJB/12/2014
AHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta Pratama Cipta

6 (0.21 %) 7=4+5+6
Keuntungan Biaya
(Rp) Langsung
Personil

1,050,000 12,500,000
840,000 10,000,000
840,000 10,000,000
840,000 10,000,000
840,000 10,000,000
RINCIAN BEBAN BIAYA PERSONIL (AUDITED PAYROLL)
Pengawasan Teknis Jalan dan Jembatan Kota Lhokseumawe (Otsus Aceh)
PW - JLJB/11/2014
TAHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta P

1 2 (0.3 %) 3 (0.4 %) 4 (0.4 %) 5=1+2+3+4 6 (0.19 %)


No NAMA Posisi Status Gaji Beban Biaya Beban Beban Subtotal Tunjangan
Dasar Sosial Biaya Biaya (Rp) Penugasan
(Rp) (Rp) Umum K3 (Rp)

1 Ir. Bambang Iswahyudi Site Engineer Tidak Tetap 5,000,000 1,500,000 2,000,000 2,000,000 10,500,000 950,000
2 Nitson Simamora, ST Chief Insp./Quant. Eng Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000
3 Edy Triono, ST Quality Engineer Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000

Bandung, 14 April 2013


KAP Noor Salim, Nursehan & Sinarahardja
Nomor Usaha : KEP.212/KM.6/2003 PT. Pemeta Engineering System
Kso PT. Duta Pratama Cipta

H. Luthfi Djatnika, SE
DIREKTUR UTAMA
BIAYA PERSONIL (AUDITED PAYROLL)
dan Jembatan Kota Lhokseumawe (Otsus Aceh)
PW - JLJB/11/2014
AHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta Pratama Cipta

6 (0.21 %) 7=4+5+6
Keuntungan Biaya
(Rp) Langsung
Personil

1,050,000 12,500,000
840,000 10,000,000
840,000 10,000,000
REKA
DAFTAR KUAN

Nama Paket : Perencanaan Pembangunan Jembatan Rangka Baja Suak Keutap


Lokasi : Kec. Kuala Batee
Kabupaten : Aceh Barat Daya
Tahun Anggaran : 2015

NO. URAIAN

A. BIAYA LANGSUNG PERSONIL

B. BIAYA LANGSUNG NON PERSONIL

Terbilang : Tujuh Puluh Dua Juta Tujuh Ratus Sepuluh Ribu Rupiah
DAFTAR KUAN

Nama Paket : Perencanaan Pembangunan Jembatan Rangka Baja Suak Keutap


Lokasi : Kec. Kuala Batee
Kabupaten : Aceh Barat Daya
Tahun Anggaran : 2015

A. BIAYA LANGSUNG PERSONIL

NO. NAMA

I Tenaga Ahli
1 Bukhari, ST
2 Belia Bestari, ST
3 Muhammad Hakim, ST
4 Cut Berliana, ST

Assisten Tenaga Ahli


1 Harmaidi, ST
2 Alhusni Muddasir, ST
3 M. Zaky Ilmawan, ST

II Tenaga Pendukung & Data Pendukung


1 Muhammad Rizal, ST
2 Muhammad Nazar, A.Md
3 Muhammad Mulyadi
4 Fandi Al-Akbar
5 Oky Firmansyah
6 Ferdyan

B. BIAYA LANGSUNG NON PERSONIL

NO. URAIAN

I Transportasi
1 Biaya Mobilisasi & Demobilisasi Personil
II Peralatan Kantor
1 Theodolit (sewa)
2 Komputer/Laptop (sewa)
3 Printer A3 (sewa)
4 Printer A4 (sewa)
5 Kantor dan Rumah (sewa)
6 Kenderaan Roda 2 (sewa)

III Operasional Kantor


1 Alat Tulis Kantor
2 Listrik, Telepon, Air, Sampah, dll

IV Buku Pelaporan
1 Laporan Pendahuluan + CD
2 Laporan Antara + CD
3 Laporan Akhir + CD
REKAPITULASI
DAFTAR KUANTITAS DAN HARGA

tan Rangka Baja Suak Keutapang Kec. Kuala Batee

JUMLAH
URAIAN HARGA
(Rp.)

JUMLAH
PPN 10%
TOTAL JUMLAH
DIBULATKAN

puluh Ribu Rupiah

Banda Aceh, 18 November 20


CV. Intan Consult

Taufiq Ismail, ST
Direktur
DAFTAR KUANTITAS DAN HARGA

tan Rangka Baja Suak Keutapang Kec. Kuala Batee

HARGA
POSISI VOLUME BULAN SATUAN SATUAN
(RP)

Ketua Tim (Team Leader) 1.00 1.00 OB 8,000,000.00


Ahli Teknik Jembatan 1.00 1.00 OB 6,000,000.00
Ahli Teknik Jalan 1.00 1.00 OB 6,000,000.00
Ahli Quantity & Cost Estimator 1.00 1.00 OB 6,000,000.00

Asisten Ahli Teknik Jembatan 1.00 1.00 OB 4,000,000.00


Asisten Ahli Teknik Jalan 1.00 1.00 OB 4,000,000.00
Asisten Ahli Quantity & Cost Estimator 1.00 1.00 OB 4,000,000.00

Surveyor 1 1.00 1.00 OB 2,750,000.00


Surveyor 2 1.00 1.00 OB 2,750,000.00
Operator Komputer 1.00 1.00 OB 1,800,000.00
Drafter (Operator AutoCad) 1 1.00 1.00 OB 2,500,000.00
Drafter (Operator AutoCad) 2 1.00 1.00 OB 2,500,000.00
Office Boy dan Security Kantor 1.00 1.00 OB 1,500,000.00

TOTAL BIAYA LANGSUNG PERSONIL

HARGA
VOLUME WAKTU SATUAN SATUAN
(RP)

13.00 2.00 OT 200,000.00


1.00 1.00 UB 1,000,000.00
2.00 1.00 UB 600,000.00
1.00 1.00 UB 350,000.00
1.00 1.00 UB 200,000.00
1.00 1.00 UB 1,200,000.00
2.00 1.00 UB 500,000.00

1.00 1.00 PB 400,000.00


1.00 1.00 PB 500,000.00

5.00 Eks 100,000.00


5.00 Eks 150,000.00
10.00 Eks 200,000.00
JUMLAH
HARGA
(Rp.)

51,800,000.00

14,300,000.00

66,100,000.00
6,610,000.00
72,710,000.00
72,710,000.00

Banda Aceh, 18 November 2015


CV. Intan Consult

Taufiq Ismail, ST
Direktur
JUMLAH
HARGA
(RP)

8,000,000.00
6,000,000.00
6,000,000.00
6,000,000.00

4,000,000.00
4,000,000.00
4,000,000.00

2,750,000.00
2,750,000.00
1,800,000.00
2,500,000.00
2,500,000.00
1,500,000.00

51,800,000.00

JUMLAH
HARGA
(RP)

5,200,000.00
1,000,000.00
1,200,000.00
350,000.00
200,000.00
1,200,000.00
1,000,000.00

400,000.00
500,000.00

500,000.00
750,000.00
2,000,000.00
RINCIAN BEBAN BIAYA PERSONIL (AUDITED PAYROLL)
Pengawasan Teknis Jalan dan Jembatan Kabupaten Aceh Besar Wilayah 2 (Otsus Aceh)
PW - JLJB/04/2014
TAHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta P

1 2 (0.3 %) 3 (0.4 %) 4 (0.4 %) 5=1+2+3+4 6 (0.19 %)


No NAMA Posisi Status Gaji Beban Biaya Beban Beban Subtotal Tunjangan
Dasar Sosial Biaya Biaya (Rp) Penugasan
(Rp) (Rp) Umum K3 (Rp)

1 Ir. Bambang Iswahyudi Site Engineer Tidak Tetap 5,000,000 1,500,000 2,000,000 2,000,000 10,500,000 950,000
2 Nitson Simamora, ST Chief Insp./Quant. Eng Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000
3 Edy Triono, ST Quality Engineer Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000

Bandung, 14 April 2013


KAP Noor Salim, Nursehan & Sinarahardja
Nomor Usaha : KEP.212/KM.6/2003 PT. Pemeta Engineering System
Kso PT. Duta Pratama Cipta

H. Luthfi Djatnika, SE
DIREKTUR UTAMA
BIAYA PERSONIL (AUDITED PAYROLL)
embatan Kabupaten Aceh Besar Wilayah 2 (Otsus Aceh)
PW - JLJB/04/2014
AHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta Pratama Cipta

6 (0.21 %) 7=4+5+6
Keuntungan Biaya
(Rp) Langsung
Personil

1,050,000 12,500,000
840,000 10,000,000
840,000 10,000,000
RINCIAN BEBAN BIAYA PERSONIL (AUDITED PAYROLL)
Pengawasan Teknis Jalan dan Jembatan Kabupaten Aceh Besar Wilayah 1 (Otsus Aceh)
PW - JLJB/03/2014
TAHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta P

1 2 (0.3 %) 3 (0.4 %) 4 (0.4 %) 5=1+2+3+4 6 (0.19 %)


No NAMA Posisi Status Gaji Beban Biaya Beban Beban Subtotal Tunjangan
Dasar Sosial Biaya Biaya (Rp) Penugasan
(Rp) (Rp) Umum K3 (Rp)

1 Ir. Bambang Iswahyudi Site Engineer Tidak Tetap 5,000,000 1,500,000 2,000,000 2,000,000 10,500,000 950,000
2 Nitson Simamora, ST Chief Insp./Quant. Eng Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000
3 Edy Triono, ST Quality Engineer Tidak Tetap 4,000,000 1,200,000 1,600,000 1,600,000 8,400,000 760,000

Bandung, 14 April 2013


KAP Noor Salim, Nursehan & Sinarahardja
Nomor Usaha : KEP.212/KM.6/2003 PT. Pemeta Engineering System
Kso PT. Duta Pratama Cipta

H. Luthfi Djatnika, SE
DIREKTUR UTAMA
BIAYA PERSONIL (AUDITED PAYROLL)
embatan Kabupaten Aceh Besar Wilayah 1 (Otsus Aceh)
PW - JLJB/03/2014
AHUN ANGGARAN 2014

PT. Pemeta Engineering System Kso PT. Duta Pratama Cipta

6 (0.21 %) 7=4+5+6
Keuntungan Biaya
(Rp) Langsung
Personil

1,050,000 12,500,000
840,000 10,000,000
840,000 10,000,000