A PEKERJAAN TANAH
1 Bor strous 20 cm, h = 6 m 48.00 m' 28,000 - 1,344,000 1,344,000
2 Galian tanah 4.64 m3 24,000 - 111,408 111,408
3 Urug tanah bekas galian 2.94 m3 24,000 - 70,608 70,608
4 Urug gragal 1.44 m3 24,000 - 34,560 34,560
5 Pembuangan tanah bekas galian + bor strous 5.09 m3 24,000 - 122,189 122,189
B PEKERJAAN BETON
1 Lantai kerja t. 5 cm bawah pond (1Pc : 3Ps : 5Kr) 0.42 m3 1,000,000 200,000 417,500 83,500 501,000
2 Lantai kerja t. 5 cm bawah keramik (1Pc : 3Ps : 5Kr) 0.60 m3 1,000,000 200,000 600,000 120,000 720,000
3 Pondasi strous 20 cm 3.39 m3 1,600,000 200,000 5,425,920 678,240 6,104,160 campuran 1pc : 2ps : 3kr
4 Pondasi type P1 0.24 m3 1,600,000 200,000 388,800 48,600 437,400 campuran 1pc : 2ps : 3kr
5 Pondasi type P1a 0.30 m3 1,600,000 200,000 475,200 59,400 534,600 campuran 1pc : 2ps : 3kr
6 Pondasi type P2 0.22 m3 1,600,000 200,000 345,600 43,200 388,800 campuran 1pc : 2ps : 3kr
7 Pondasi type P2a 0.32 m3 1,600,000 200,000 518,400 64,800 583,200 campuran 1pc : 2ps : 3kr
8 Sloof 15/25 cm 0.28 m3 1,600,000 200,000 444,000 55,500 499,500 campuran 1pc : 2ps : 3kr
9 Kolom 15/15 cm 0.68 m3 1,600,000 200,000 1,081,800 135,225 1,217,025 campuran 1pc : 2ps : 3kr
10 Balok latei 12/15 cm 0.11 m3 1,600,000 200,000 172,800 21,600 194,400 campuran 1pc : 2ps : 3kr
11 Ring balk 12/15 cm 0.32 m3 1,600,000 200,000 515,520 64,440 579,960 campuran 1pc : 2ps : 3kr
E PEKERJAAN KERAMIK
1 Keramik lantai 40 x 40 cm 13.22 m2 80,000 24,000 1,057,600 317,280 1,374,880 KIA
2 Keramik dinding 40 x 40 cm 22.75 m2 80,000 28,000 1,819,800 636,930 2,456,730
G PEKERJAAN ATAP
1 Konsol 2C 125.50.20.3,2 129.93 kg 1,600 - 207,888 207,888 material yg ada dari candle
2 Rangka atap C 125.50.20.3,2 untuk tempat tabung 18.30 kg 1,600 - 29,280 29,280 material yg ada dari candle
3 Gording C 125.50.20.3,2 206.18 kg 1,600 - 329,888 329,888 material yg ada dari candle
4 Pas. Rock wooll 13.20 m2 16,000 - 211,200 211,200 material yg ada dari candle
5 Pas. Kawat ayam untuk pengikat rock woll 13.20 m2 8,000 - 105,600 105,600 material yg ada dari candle
6 Pas. Alumunium voil 13.20 m2 8,000 - 105,600 105,600 material yg ada dari candle
7 Penutup atap galvalume 32.40 m2 56,000 - 1,814,400 1,814,400 material yg ada dari candle
H PEKERJAAN PENGECATAN
1 Cat dinding + plamur 97.81 m2 12,000 8,000 1,173,716 782,478 1,956,194 Ex. Catylac
Catatan :
1. Harga exclude PPn, include PPh
2. Lama waktu pengerjaan 21 hari, air- listrik disediakan PT MEGA SURYA MAS pada saat pengerjaan di site
3. Metode pembayaran
a. Terminj (DP) I 30% dibayarkan setelah disepakati harga/SPK
b. Terminj II 65 % pada saat kemajuan pekerjaan 100%, retensi 5% dibayarkan 1 bulan setelah serah terima pekerjaan
4. Lama waktu pembayaran maksimal 2 minggu setelah invoice disetujui
diajukan oleh PT NIMBUS3 , harga berlaku selama 30 hari
Abdul Aziz
(0857 3313 5515 / 0821 4362 0998 )
Page 1
BACK UP VOLUME
### #REF!
### #REF! 13.00 m2
bangunan 3.00 x 4.00 = 12.00
pmbuangn 0.40 x 2.50 = 1.00
A PEKERJAAN TANAH
1 Bor strous 20 cm, h = 6 m 48.00 m'
6.00 x 8.00 = 48.00
B PEKERJAAN BETON
1 Lantai kerja t. 5 cm bawah pond (1Pc : 3Ps : 5Kr) 0.42 m3
P1 1.55 x 0.80 x 0.05 x 1.00 = 0.06
P1a 1.85 x 0.80 x 0.05 x 1.00 = 0.07
P2 0.80 x 0.80 x 0.05 x 2.00 = 0.06
P2a 1.10 x 0.80 x 0.05 x 2.00 = 0.09
sloof X 0.35 x 1.40 x 0.05 x 2.00 = 0.05
sloof Y 0.35 x 1.90 x 0.05 x 2.00 = 0.07
0.35 x 0.80 x 0.05 x 1.00 = 0.01
3 Acian 120.56 m2
E PEKERJAAN KERAMIK
1 Keramik lantai 40 x 40 cm 13.22 m3
bangunan 3.00 x 4.00 = 12.00
meja beton 0.60 x 1.60 = 0.96
0.60 x 1.25 = 0.75
wastafel 0.70 x 0.70 = 0.49
G PEKERJAAN ATAP
1 Konsol 2C 125.50.20.3,2 129.93 kg
1.45 x 3.00 x 2.00 = 8.70
2.10 x 3.00 x 2.00 = 12.60
H PEKERJAAN PENGECATAN
1 Cat dinding + plamur 97.81 m2
120.56 - 22.75 = 97.81
0.500 13.333 m2
4.000 0.892 95.111 138.188 kg
0.610 0.395 43.077
0.300 13.333 m2
4.000 0.617 109.630 157.777 kg
0.410 0.395 48.147
0.240 13.333 m2
4.000 0.617 137.037 188.379 kg
0.350 0.395 51.342
8.333 m2
3.087 0.617 2.000 77.077 154.154 kg
3.087 0.617 2.000 77.077
Bill Of Quantity
Project Name : Pembangunan R. Hidrogenasi Pilot (Akibat Pembangunan Tangki Belakang Margarine)
Belakang Gudang SCP
PT. NIMBUS3
OFFICE : PURI TERATAI F9 - SIDOKERTO - BUDURAN - SIDOARJO
Owner : PT. Megasurya Mas Phone : 0857 3313 5515, Email : nimbus3.pt@gmail.com
Lokasi : Tambak Sawah, Sidoarjo
No. : 017/NPE/QP/X/15
HARGA SATUAN TOTAL HARGA
No. JENIS PEKERJAAN VOL SAT KETERANGAN
BAHAN UPAH BAHAN UPAH TOTAL
A PEKERJAAN PERSIAPAN
1 Bongkar paving 13.00 m2 18,000 - 234,000 234,000
2 Bongkar pasang tempat tabung 1.00 ls 150,000 300,000 150,000 300,000 450,000
3 Bongkar wastafel 1.00 unit 18,000 - 18,000 18,000
4 Pengukuran / uitzet 14.00 m' 12,000 - 168,000 168,000
B PEKERJAAN TANAH
1 Bor strous 20 cm, h = 6 m 48.00 m' 21,000 - 1,008,000 1,008,000
2 Galian tanah 4.64 m3 18,000 - 83,556 83,556
3 Urug tanah bekas galian 2.94 m3 18,000 - 52,956 52,956
4 Urug gragal 1.44 m3 18,000 - 25,920 25,920
5 Pembuangan tanah bekas galian + bor strous 5.09 m3 18,000 - 91,642 91,642
C PEKERJAAN BETON
1 Lantai kerja t. 5 cm bawah pond (1Pc : 3Ps : 5Kr) 0.42 m3 750,000 150,000 313,125 62,625 375,750
2 Lantai kerja t. 5 cm bawah keramik (1Pc : 3Ps : 5Kr) 0.60 m3 750,000 150,000 450,000 90,000 540,000
3 Pondasi strous 20 cm 3.39 m3 1,200,000 150,000 4,069,440 508,680 4,578,120 campuran 1pc : 2ps : 3kr
4 Pondasi type P1 0.24 m3 1,200,000 150,000 291,600 36,450 328,050 campuran 1pc : 2ps : 3kr
5 Pondasi type P1a 0.30 m3 1,200,000 150,000 356,400 44,550 400,950 campuran 1pc : 2ps : 3kr
6 Pondasi type P2 0.22 m3 1,200,000 150,000 259,200 32,400 291,600 campuran 1pc : 2ps : 3kr
7 Pondasi type P2a 0.32 m3 1,200,000 150,000 388,800 48,600 437,400 campuran 1pc : 2ps : 3kr
8 Sloof 15/25 cm 0.28 m3 1,200,000 150,000 333,000 41,625 374,625 campuran 1pc : 2ps : 3kr
9 Kolom 15/15 cm 0.68 m3 1,200,000 150,000 811,350 101,419 912,769 campuran 1pc : 2ps : 3kr
10 Balok latei 12/15 cm 0.11 m3 1,200,000 150,000 129,600 16,200 145,800 campuran 1pc : 2ps : 3kr
11 Ring balk 12/15 cm 0.32 m3 1,200,000 150,000 386,640 48,330 434,970 campuran 1pc : 2ps : 3kr
12 Plat beton t. 12 mm untuk meja beton 0.15 m3 1,200,000 150,000 175,680 21,960 197,640 campuran 1pc : 2ps : 3kr
G PEKERJAAN ATAP
1 Konsol 2C 125.50.20.3,2 129.93 kg 1,200 - 155,916 155,916 material yg ada dari candle
2 Rangka atap C 125.50.20.3,2 untuk tempat tabung 18.30 kg 1,200 - 21,960 21,960 material yg ada dari candle
3 Gording C 125.50.20.3,2 206.18 kg 1,200 - 247,416 247,416 material yg ada dari candle
4 Pas. Rock wooll 13.20 m2 12,000 - 158,400 158,400 material yg ada dari candle
5 Pas. Kawat ayam untuk pengikat rock woll 13.20 m2 6,000 - 79,200 79,200 material yg ada dari candle
6 Pas. Alumunium voil 13.20 m2 6,000 - 79,200 79,200 material yg ada dari candle
7 Penutup atap galvalume 32.40 m2 42,000 - 1,360,800 1,360,800 material yg ada dari candle
H PEKERJAAN PENGECATAN
1 Cat dinding + plamur 97.81 m2 9,000 6,000 880,287 586,858 1,467,146 Ex. Catylac
dibulatkan 36,700,000
Note : Exclude Instalasi listrik
Catatan :
1. Harga exclude PPn, include PPh
2. Lama waktu pengerjaan 30 hari, air- listrik disediakan PT MEGA SURYA MAS pada saat pengerjaan di site
3. Metode pembayaran
a. Terminj (DP) I 30% dibayarkan setelah disepakati harga/SPK
b. Terminj II 65 % pada saat kemajuan pekerjaan 100%, retensi 5% dibayarkan 1 bulan setelah serah terima pekerjaan
4. Lama waktu pembayaran maksimal 2 minggu setelah invoice disetujui
diajukan oleh PT NIMBUS3 , harga berlaku selama 30 hari
Sidoarjo, 12 November 2015
Abdul Aziz
(0857 3313 5515 / 0821 4362 0998 )
20.00 m2/hri
0.25 ls/hri
1.00 unit/hri
12.00 m'/hri
8.00 m'/hri
2.66 m3/hri
4.00 m3/hri
4.00 m3/hri
4.00 m3/hri
4.00 m3/hri
4.00 m3/hri
1.00 m3/hri
1.50 m3/hri
1.50 m3/hri
1.50 m3/hri
1.50 m3/hri
1.50 m3/hri
2.00 m3/hri
2.00 m3/hri
2.00 m3/hri
1.00 m3/hri
8.00 m'/hri
6.00 m'/hri
1.00 unit/hri
4.00 m2/hri
1.00 unit/hri