SUB TOTAL A
B PEKERJAAN TANAH
1 Urug sirtu +/- 80 cm 576.00 m3
2 Pemadatan tanah 1440.00 m3
3 Pasir pasang t.5 cm
4 Pasang paving baru K 500
SUB TOTAL B
C PEKERJAAN BETON
1 Penguatan jembatan t. 15 cm (mutu beton K-300) 1.80 m3
2 Pembuatan pos satpam 4 x 3 m2 + Kamar mandi 0.00 m3
3 Pembuatan site office 4 x 6 m2 0.00 m3
SUB TOTAL C
Page 2
HARGA SATUAN TOTAL HARGA
No. JENIS PEKERJAAN VOL SAT
BAHAN UPAH BAHAN UPAH TOTAL
7 Pasang pagar depan CNP 100, h.2m 218.24 m2
8 Pembuatan pintu gerbang + motor 218.24 m2
SUB TOTAL E
E PEKERJAAN PIPERACK
1 Plat landasan t. 8 mm 70.13 kg
2 Angkur bolt 16 mm 192.00 bh
3 U bolt sesuai ukuran pipa 1239.84 kg
4 UNP 100.50.5 3237.12 kg
5 Pondasi beton 4370.69 kg
6 Plesteran
7 Acian
8 Pengecatan pipe rack 389.38 m2
SUB TOTAL F
Page 3
HARGA SATUAN TOTAL HARGA
No. JENIS PEKERJAAN VOL SAT
BAHAN UPAH BAHAN UPAH TOTAL
18 Lisplank Galvalum
19 Rangka metal hollow 40x40 mm
20 Tangga akses ke walk way
21 Lantai walkway chekered plate t 3,2mm
22 Kolom penggantung UNP 125.65.6
23 Balok lantai UNP 125.65.6
24 Balok lantai L 60,60,6
25 Pengecatan
SUB TOTAL G
Page 4
KETERANGAN
BY OTHER
BY OTHER
BY OTHER
BY OTHER
BY OTHER
Page 5
KETERANGAN
Page 6
KETERANGAN
Page 7
BACK UP VOLUME
A PEKERJAAN PERSIAPAN
1 Transport
1.00 x 1.00 = 1.00
2 Akomodasi/site office/bedeng
1.00 x 1.00 = 1.00
4 Pengukuran / uitzet
40.00 x 36.00 = 1440.00
B PEKERJAAN TANAH
1 Urug sirtu +/- 80 cm
40.00 x 36.00 x 0.80 x 0.50 = 576.00
2 Pemadatan tanah
40.00 x 36.00 = 1440.00
3 Pasir pasang t.5 cm
40.00 x 36.00 x 0.05 = 72.00
4 Pasang paving baru K 500
40.00 x 36.00 = 1440.00
C PEKERJAAN BETON
Err:509
Err:509
vertikal 1.50 x 16.00 = 24.00
horizontal 67.15 x 4.00 = 268.60
Err:509
Err:509
E PEKERJAAN PIPERACK
1 Plat landasan t. 8 mm
0.15 x 0.15 x 4.00 x 12.00 = 1.08
2 Angkur bolt 16 mm
4.00 x 4.00 x 12.00 = 192.00
4 UNP 100.50.5
1.20 x 4.00 x 6.00 x 12.00 = 345.60
5 Pondasi beton
1.40 x 8.00 x 6.00 x 12.00 = 806.40
4 Pile cap
1.5 x 1x 0.35 x 4= 2.1
Lantai
7 kerja t.5cm
Kolom
10 HB 250.250.9.14
11
Rib plat t.8 mm
1.00 Ls
1.00 Ls
1.00 Ls
1440.00 m2
576.00 m3
1440.00 m2
72.00 m3
1440.00 m2
1.80 m3
0.00 m3
0.00 m3
36.00 m'
1.13 m3
5.04 m3
1.69 m3
#REF! m3
100.73 m3
218.24 m2
218.24 m2
292.60 m'
218.24 m2
70.13 kg
192.00 bh
1239.84 kg
3237.12 kg
4370.69 kg
389.38 m2
120.00 m1
8.48 m2
1.08 m3
2.10 m3
#REF! m'
1 Plat beton t. 50 cm untuk pond. Tangki 1.000 x 1.000 x 0.500 = 0.500
Bekesting
Besi beton ulir arah Y & X D19 7.667
4 Pasangan dinding batu kali 15/20 cm ( 1 pc:3 1.000 / 0.250 / 0.250 = 16.000
0.190 / 0.190
Bekesting
Besi beton polos tul 10 16.000
beg 8 107.66667
4.000 2.000 4.000 m2
1.500 2.230 4.000 102.580 102.580 205.160 kg
0.600 8.000 m2
6.000 0.617 49.333 81.644 kg
0.91 0.395 32.311
1.000 16.000 m2
4.000 0.617 39.467 73.915 kg
0.81 0.395 34.448