PERINCIAN BIAYA

LOKASI : JL RAYA BYPASS MANADO - BITUNG DS.TREMAN, KEC. KAUDITAN,


KAB.MINAHASA UTARA, SULAWESI UTARA
PEKERJAAN : PEMBANGUNAN PAGAR, PINTU GERBANG, & SALURAN

BAHAN UPAH TOT. HARGA NILAI TOTAL


No. URAIAN PEKERJAAN VOL STN KET.
(Rp) (Rp) SAT. (Rp) (Rp)

D. PAGAR, PINTU GERBANG,& POS JAGA 14.45 m2

I. PEKERJAAN TANAH DAN PONDASI


5 Urugan pasir dibawah pondasi + lantai kerja dasar t = 10 cm 8.96 m3
6 Pondasi batu kali 1 : 5 dan stek 384.00 m3
Subtotal I

II. PEKERJAAN STRUKTUR BETON


1 Sloof pagar 15 x 25 cm 11.70 m3
2 Kolom pedestal 25 x 25 x 80 cm ( Umpak Beton ) K-300 6.25 m3
3 Pasang Kolom Sarcon 300 x16 x20 cm 125.00 bh
4 Pasang Pagar T=200 (6 daun ) @5x40cm (K-300) 312.01 m'
8 Dinding beton dan pondasi resapan ,lihat gambar 6.00 m3
9 sloof penahan dinding resapan 15X40 Cm / lihat gambar 1.80 m3
10 balok penahan dinding resapan 15X40 Cm / lihat gambar 1.80 m3
Subtotal II

IV. PEKERJAAN INTALASI AIR BERSIH & AIR KOTOR ( PLUMBING ) Pos jaga.
1 Saluran air bersih rucia 1" - 5/8" pos jaga 1.00 ls
2 Washtafel termasuk kran san ei 1.00 bh
3 Instalasi iar kotor 4" aw ex Wavin ke saluran 1.00 ls
4 Biofil 1m3 1.00 bh
5 Sumber air bersih jetpump 1.00 bh include
Sub Total IV
PERINCIAN BIAYA
LOKASI : JL RAYA BYPASS MANADO - BITUNG DS.TREMAN, KEC. KAUDITAN,
KAB.MINAHASA UTARA, SULAWESI UTARA
PEKERJAAN : PEMBANGUNAN PAGAR, PINTU GERBANG, & SALURAN

BAHAN UPAH TOT. HARGA NILAI TOTAL


No. URAIAN PEKERJAAN VOL STN KET.
(Rp) (Rp) SAT. (Rp) (Rp)

V. PEKERJAAN DINDING
1 Kolom Beton 0.76 m3
2 Balok beton + ring balok pasangan bata 0.54 m3
3 Pasang bata 49.95 m2
4 Pekerjaan plesteran + acian 99.89 m2
Subtotal V

VI. PEKERJAAN FINISHING


1 Pasang dinding keramik 20 x 25 Roman 10.50 m2
2 Pasang keramik lantai 30 x 30 Roman 14.45 m2
3 Pasang keramik kamar mandi lantai 20 x 20 Roman 2.06 m2
4 Pasang langit-langit gypsum 9 mm rangka hollow 60x60 , t=0.35 16.50 m2
5 Cat dinding 99.89 m2
6 Cat langit-langit 16.50 m2
7 Kunci P2 (Kusen, pintu (PVC) WC), PJ1, J1, J2, BV1 (termasuk kunci-kunci) 1.00 ls
8 Closet jongkok TOTO (besar) C7 1.00 Unit
9 Balok kolom keliling opening pintu jendela 0.34 m3
10 Plint keramik 26.50 m1
11 Floor drain 1.00 bh
Sub Total VI

VII. PEKERJAAN ATAP


1 Kuda-kuda rangka baja Ringan 33.31 kg
2 Gording rangka baja ringan 33.31 kg
3 Atap zink alumn colour 0.5mm 38.00 m2
4 Nok zink alumn colour 0.5mm 16.71 m1
5 Cat besi anti karat zincromate 2x + cat finish ex Kansai paint 2x 66.62 kg
6 Glass wool t = 2" density 24 kg/m3 38.00 m2
9 Talang datar + plaat strip ( rangka ) + listplank trimdek 24.00 m1
10 Corong talang 3" 4.00 bh
11 PVC ex Wavin 3" D 12.00 m1
Sub Total VII
PERINCIAN BIAYA
LOKASI : JL RAYA BYPASS MANADO - BITUNG DS.TREMAN, KEC. KAUDITAN,
KAB.MINAHASA UTARA, SULAWESI UTARA
PEKERJAAN : PEMBANGUNAN PAGAR, PINTU GERBANG, & SALURAN

BAHAN UPAH TOT. HARGA NILAI TOTAL


No. URAIAN PEKERJAAN VOL STN KET.
(Rp) (Rp) SAT. (Rp) (Rp)

VIII. PEKERJAAN INTALASI LISTRIK


1 Kabel feeder NYY 4 x 4 mm2 ex. Supreme (dari Panel 1 ke Panel 4) 100.00 m1
2 Pasang Panel + wiring merlin gern 1.00 bh + wiring Merlin Gern
3 Instalasi penerangan 8.00 ttk +kabel NYM
4 Instalasi stop kontak (termasuk untuk pompa) 2.00 ttk
6 Stop Kontak ex. Clipsal 3.00 bh
8 Saklar Seri ex. Clipsal 3.00 bh
9 Lampu PLC 18 watt 23.00 bh
10 Test commissioning 1.00 ls
11 Stop kontak pompa 1.00 bh
12 Pompa 1.00 bh Kemampuan hisap 30m, daya 250w
Subtotal VIII

TOTAL B