Nama Proyek : Pembangunan Rumah Tipe 36
Lokasi : Pekanbaru
NO. URUTAN PEKERJAAN VOLUME
I PEKERJAAN TANAH DAN PONDASI
1 Galian tanah pondasi 10.50
2 Urugan tanah kembali bekas galian 2.63
3 Urugan pasir 5 cm (bawah pondasi+lantai) 0.88
4 Urugan tanah elevasi lantai 12.15
5 Lantai kerja 5 cm ad. 1:3:5 0.88
6 Pasang pondasi bata pas. 1 bata ad. 1:2 21.88
7 Raben pondasi ad. 1:2 43.75
8 Pondasi setempat pondasi camp. 1:2:3 0.58
JADWAL PELAKSANAAN PROYEK
1 OKTOBER-1 NOVEMBER
SATUAN JUMLAH HARGA BOBOT (%)
1 2 3 4
m3 386,400.00
m3
46,305.00
m3
106,050.00
m3
789,750.00
m2
100,423.75
m2
3,864,218.75
m2
2,693,381.25
m3 2,208,877.23
2 NOVEMBER-2 DESEMBER 3 DESEMBER-3 JANUARI
MINGGU KE
1 2 3 4 1 2 3 4
RENCANA ANGGARAN BIAYA (RAB)
PEKERJAAN : PEMBANGUNAN RUMAH TIPE 36 1 UNIT
LOKASI : PEKANBARU
NO. URAIAN PEKERJAAN VOLUME SATUAN HARGA SATUAN (RP)
I PEKERJAAN TANAH & PONDASI
1 Galian tanah pondasi 10.50 m3 36,800.00
2 Urugan tanah kembali bekas galian 2.63 m3
17,640.00
3 Urugan pasir 5 cm (bawah pondasi + lantai) 0.88 m3
121,200.00
4 Urugan tanah elevasi lantai 12.15 m3
65,000.00
5 Lantai kerja 5 cm ad. 1 : 3 : 5 0.88 m2
114,770.00
6 Pasang Pondasi Bata Pas. 1 Bata ad. 1 : 2 21.88 m2
176,650.00
7 Raben Pondasi ad. 1 : 2 43.75 m2
61,563.00
8 Pondasi Setempat Beton Camp. 1:2:3 0.58 m3
3,841,525.62
PEKERJAAN STRUKTUR
II
1 Pekerjaan sloof beton tipe TB1 (15/20) Beton Camp. 1:2:3 1.31 m3 4,781,765.31
2 Kolom struktur tipe SC1 (20/20) Beton Camp. 1:2:3 0.24 m3
5,262,475.00
3 Kolom struktur type PC (13/13) Beton Camp. 1:2:3 0.71 m3
4,914,314.35
4 Pekerjaan Ring Balok tipe RB01 (15/20) Beton Camp. 1:2:3 1.14 m3
4,725,700.05
PEKERJAAN ARSITEKTUR
III
A Pekerjaan Lantai
1 Cor Lantai 1 : 3 : 5 2.03 m3 584,100.00
2 Lantai Keramik 30x30 cm ex Roman 33.75 m2
161,888.00
3 Lantai Keramik 30x30 cm ex Roman (Anti Slip TERAS) 4.50 m2
161,888.00
4 Lantai Keramik 20x20 cm ex Roman 2.25 m2
162,388.00
B Pekerjaan Dinding
1 Pas. 1/2 bata, adukan 1pc : 2 pc (Trasram) 13.13 m2 84,675.00
2 Pas. 1/2 bata, adukan 1pc : 4 pc 118.13 m2
80,305.00
3 Plesteran + acian u/ pasangan bata adukan. 1pc : 2ps (Trasram) 26.25 m2 61,563.00
4 Plesteran + acian u/ pasangan bata adukan. 1pc : 4ps 236.25 m2 59,228.00
5 Dinding Keramik 20x20 cm ex. Roman 7.80 m2
132,660.00
6 List Dinding Keramik 10x20 cm ex. Roman 5.20 m1
19,266.00
C Pekerjaan Kusen Pintu dan Jendela
1 Pintu Type P-J1 1.00 bh 2,888,100.00
2 Pintu Type P-1 3.00 bh 1,760,700.00
3 Pintu Type P-2 1.00 bh 490,700.00
3 Jendela Type J-1 2.00 bh 1,610,000.00
4 Jendela Type J-2 1.00 bh 1,351,700.00
5 Jendela Type V 1.00 bh 123,300.00
D Pekerjaan Plafond
1 Pas. Plafond gypsumboard 9 mm + rangka hollow 40.50 m2 242,780.00
2 Pas. List profil Gypsum 59.00 m' 27,260.00
3 Pas. Rangka Plafond Luar Bangunan 23.50 m2 70,800.00
4 Pas. Plafond Lambersering Luar Bangunan 23.50 m2
287,300.00
E Pekerjaan Pengecatan
1 Pengecatan dinding ex. ICI 262.50 m2 32,856.00
2 Pengecatan plafond Gypsum ex. ICI 40.50 m2 32,856.00
3 Pengecatan plafond Lambersering 23.50 m2 46,240.00
4 Pengecatan Listplank Papan 9.45 m2
46,240.00
F Pekerjaan Sanitair
1 Pek. Meja Beton 1.00 Unit 1,500,000.00
2 Pek. Pas. Sink Aluminium 1.00 bh 200,000.00
3 Pek. Pas. Kloset Jogkok 1.00 bh 636,650.00
3 Pek. Pas. Bak Air Fiberglass 1.00 bh 915,620.00
4 Pek. Pas. Kran Air 1.00 bh 37,725.00
5 Pek. Pas. Kran Air Bebek 1.00 bh 162,725.00
6 Pek. Pas. Soap Holder 1.00 bh 37,600.00
7 Pek. Pas. Floordrain 1.00 bh 132,600.00
G Pekerjaan Kap dan Penutup Atap
1 Kuda-Kuda Kayu 0.51 m3 3,510,800.00
2 Rangka Atap (Kaso/Reng) 51.00 m2
41,800.00
3 Atap Genteng Metal 51.00 m2
148,020.00
4 List plank Papan 2 x 3/20 31.50 m1 53,640.00
5 Perabung Atap 9.25 m1 74,894.00
6 Talang patahan Atap 5.00 m 1
76,596.00
7 Bola-Bola Atap 21.00 m 1
69,296.00
H Pekerjaan Exterior dan Outdoor
1 Septictank + Peresapan 1.00 unit 4,070,009.53
2 Bak Kontrol 1.00 Bh 533,322.92
3 Canopy Beton 0.79 m3 3,946,830.00
4 Profil beton/Relief beton bawah kosen 11.90 m' 70,000.00
5 Profil /Ornamen tiang 2.00 unit 300,000.00
PEKERJAAN PLUMBING
IV
A INSTALASI AIR BERSIH ( pipa PVC klas AW)
1 dia. 3/4' 24.00 m 47,016.00
2 dia. 1/2' 6.00 m 20,666.00
3 Fitting-fitting 1.00 Ls 100,000.00
4 Material Bantu 1.00 Ls 100,000.00
B INSTALASI AIR KOTOR, BEKAS DAN VENT (pipa PCV klas AW)
1 dia. 3" 12.00 m 76,342.00
2 dia. 4" 12.00 m 87,192.00
2 Fitting-fitting 1.00 Ls 150,000.00
3 Material bantu 1.00 Ls 125,000.00
PEKERJAAN LISTRIK
V
A PANEL
1 Panel Utama MCB dan Accessories 1.00 Unit 5,000,000.00
B INSTALASI PENERANGAN
1 Instalasi Penerangan 7.00 ttk 158,850.00
2 Instalasi Stop Kontak dinding 4.00 ttk 158,850.00
C ARMATURE
1 Armature / Lampu pijar 25 watt (hemat energi) 7.00 bh 40,470.00
2 Stop Kontak dinding 4.00 bh 11,000.00
3 Sakelar Tunggal 3.00 bh 13,000.00
4 Sakelar Ganda 2.00 bh 13,000.00
TOTAL
NAMA : FAUZI ERDIANSYAH
NIM : 1507123062
1 OKTOBER - 28 OKTOBER 29 OKTOBER - 25 NOVEMBER 26 NOVEMBER - 22 DESEMBER
JUMLAH (RP) BOBOT (%) MINGGU KE
1 2 3 4 1 2 3 4 1 2
386,400.00 0.265258416 0.265
46,305.00 0.0317877613 0.032
106,050.00 0.0728019022 0.073
789,750.00 0.5421527796 0.542
100,423.75 0.0689395571 0.069
3,864,218.75 2.6527343291 2.653
2,693,381.25 1.8489700934 0.924 0.924
2,208,877.23 1.5163645849 0.758 0.758
6,276,066.97 4.308435774 2.154 2.154
1,262,994.00 0.8670284365 0.434 0.434
3,488,180.32 2.3945889933 1.197 1.197
5,375,483.80 3.6901975114 1.845 1.845
1,182,802.50 0.8119780476 0.812
5,463,720.00 3.7507704781
728,496.00 0.5001027304
365,373.00 0.2508236626
1,111,359.38 0.7629333008 0.381 0.381
9,486,028.13 6.5120310421 3.256 3.256
1,616,028.75 1.109382056 1.109
13,992,615.00 9.6057424709 9.606
1,034,748.00 0.7103406197
100,183.20 0.0687744227
2,888,100.00 1.9826419029 1.983
5,282,100.00 3.6260907847 3.626
490,700.00 0.3368589667 0.337
3,220,000.00 2.2104868001 2.210
1,351,700.00 0.9279239154 0.928
123,300.00 0.0846437958 0.085
9,832,590.00 6.7499411198 6.750
1,608,340.00 1.1041038323 1.104
1,663,800.00 1.1421763783 1.142
6,751,550.00 4.6348484954 4.635
8,624,700.00 5.92074084
1,330,668.00 0.9134857296
1,086,640.00 0.7459637815 0.746
436,968.00 0.2999726696 0.300
1,500,000.00 1.0297298758 1.030
200,000.00 0.1372973168 0.137
636,650.00 0.4370516836 0.437
915,620.00 0.6285608459 0.629
37,725.00 0.0258977064
162,725.00 0.1117085294
37,600.00 0.0258118956
132,600.00 0.091028121
1,790,508.00 1.2291597203 1.229
2,131,800.00 1.4634520995 1.463
7,549,020.00 5.1823009514 5.182
1,689,660.00 1.1599289213 1.160
692,769.50 0.4755769675 0.476
382,980.00 0.2629106319 0.263
1,455,216.00 0.9989862606 0.999
4,070,009.53 2.7940069395 2.794
533,322.92 0.3661190272 0.366
3,117,995.70 2.1404622166 2.140
833,000.00 0.5718433244
600,000.00 0.4118919503
1,128,384.00 0.7746204775 0.775
123,996.00 0.0851215905 0.085
100,000.00 0.0686486584 0.069
100,000.00 0.0686486584 0.069
916,104.00 0.6288931054 0.629
1,046,304.00 0.7182736587 0.718
150,000.00 0.1029729876 0.103
125,000.00 0.085810823 0.086
5,000,000.00 3.4324329194
1,111,950.00 0.7633387569 0.763
635,400.00 0.4361935754 0.436
283,290.00 0.1944747843
44,000.00 0.0302054097 0.030
39,000.00 0.0267729768 0.027
26,000.00 0.0178486512 0.018
5.285 3.869 3.785 1.631 6.798 7.623 4.538 9.279 5.578 34.636
145,669,270.67 100 5.285 9.153 12.938 14.569 21.367 28.990 33.527 42.807 48.384 83.020
VEMBER - 22 DESEMBER
3 4
3.751
0.500
0.251
0.710
0.069
5.921
0.913
0.026
0.112
0.026
0.091
0.572
0.412
3.432
0.194
9.951 7.029
92.971 100.000