TOTAL 91,112,733.29
DIBULATKAN 91,113,000.00
TERBILANG : Sembilan Puluh Satu Juta Seratus Tiga Belas Ribu Rupiah
..........................................
Direktur
RENCANA ANGGARAN BIAYA
KEGIATAN : PEMBANGUNAN PERUMAHAN
PEKERJAAN : FISIK PEMBANGUNAN PERUMAHAN PESONA JATI ASRI TYPE 36 / 108
LOKASI : Jl. Utama/Tengku Bey dan Jl. Kayu Jati Simpang Tiga, Pekanbaru
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi 108.00 m2 6,500.00 702,000.00
2 Pek. Pengukuran dan Pas. Bouplank 34.00 m' 29,530.00 1,004,020.00
IV PEKERJAAN ARSITEKTUR
A Pekerjaan Lantai
1 Cor Lantai 1 : 3 : 5 1.82 m3 520,060.00 947,622.13
2 Lantai Keramik 40x40 cm 36.44 m2 113,428.40 4,133,648.50
3 Lantai Keramik 20x20 cm 1.81 m2 130,428.40 236,649.29
B Pekerjaan Dinding
1 Pas. 1/2 bata, adukan 1pc : 2 pc (Trasram) - m2 59,111.00 0.00
2 Pas. 1/2 bata, adukan 1pc : 4 pc 131.83 m2 53,520.00 7,055,541.60
3 Plesteran + acian u/ pasangan bata adukan. 1pc : 2ps (Trasram) - m2 39,775.40 0.00
4 Plesteran + acian u/ pasangan bata adukan. 1pc : 4ps 263.66 m2 36,367.40 9,588,628.68
5 Keramik Dinding 20 x 20 cm 6.87 m2 137,928.40 947,568.11
6 Pek. kanopi Beton 0.04 m3 2,141,170.00 92,327.25
E Pekerjaan Atap
1 Pek. Pas. Kuda-kuda Baja Ringan Terpasang 58.10 m2 115,000.00 6,680,971.00
2 Pek. Pas. Atap Genteng Metal 58.10 m2 37,000.00 2,149,529.80
3 Pek. Pas. Perabung Atap 6.35 m1 46,750.00 296,862.50
4 Pek. Pas. Bola2 Atap 13.05 m1 54,650.00 713,182.50
5 Pek. Pas. Listplank 27.27 m1 33,350.00 909,454.50
Pek. Dag atap 0.30 m3 2,981,850.00 879,645.75
E Pekerjaan Plafond
1 Pas. Plafond gypsumboard 9 mm + rangka hollow 34.77 m2 181,455.00 6,309,789.15
2 Pas. List profil Gypsum 58.74 m' 23,050.00 1,353,957.00
3 Pas. Plafond Calsiboard (Exterior) 14.03 m2 181,455.00 2,546,630.20
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
F Pekerjaan Pengecatan
1 Pengecatan dinding 256.79 m2 24,805.00 6,369,675.95
2 Pengecatan plafond Gypsum 34.77 m2 24,805.00 862,551.71
3 Pas. Plafond Calsiboard (Exterior) 14.03 m2 24,805.00 348,125.77
G Pekerjaan Sanitair
1 Pek. Pas. Closet Jongkok 1.00 bh 225,000.00 225,000.00
2 Pek. Pas. Bak air fiber 1.00 bh 120,000.00 120,000.00
3 Pek. Pas. Kran Air 2.00 bh 27,775.00 55,550.00
4 Pek. Pas. Floor Drain 1.00 bh 177,050.00 177,050.00
V PEKERJAAN PLUMBING
A INSTALASI AIR BERSIH
( Pipa PVC Klas AW )
1 dia. 3/4' 5.00 m 17,065.00 85,325.00
2 Fitting-fitting 1.00 Ls 200,000.00 200,000.00
3 Material Bantu 1.00 Ls 95,000.00 95,000.00
VI PEKERJAAN LISTRIK
Lantai I (Satu)
1 Instalasi Penerangan 11.00 ttk 135,000.00 1,485,000.00
2 Pas. MCB 1.00 unit 75,000.00 75,000.00
3 Pek. Stop Kontak 4.00 bh 40,470.00 161,880.00
4 Pek. Pas. Saklar tunggal 3.00 bh 25,000.00 75,000.00
5 Pek. Pas. Saklar ganda 2.00 bh 20,000.00 40,000.00
6 Pek. Pas. Lampu pijar 18 watt 7.00 bh 22,000.00 154,000.00
Jumlah Harga
No. Uraian Pekerjaan
( Rp )
1 2 3
Jumlah #REF!
PPn 10% #REF!
Jumlah Total #REF!
Dibulatkan #REF!
Terbilang : Empat ratus sembilan puluh empat juta delapan puluh delapan ribu rupiah
, Juni 2009
PT. ………………………………
…………………………..
Direktur
RENCANA ANGGARAN BIAYA
Kegiatan : Pembangunan Instalasi Domestikasi Ikan Langka dan Ekonomis Penting Peraian Pantai
Pekerjaan : Kajian Detail Engineering Design Pembangunan Instalasi Domestikasi
Lokasi :
Tahun : 2009
VOLUME
No. URAIAN PEKERJAAN Harga Satuan Jumlah
Satuan Jumlah
Harga
No. Jenis Bahan Satuan Bahan/Upah
(Rp)
1 2 3 4
I TENAGA KERJA
1 Mandor Org/Hari 50,000.00
2 Kepala Tukang Kayu Org/Hari 50,000.00
3 Kepala Tukang batu Org/Hari 50,000.00
4 Kepala Tukang Besi Org/Hari 50,000.00
5 Tukang Cat Org/Hari 45,000.00
6 Tukang Kayu/Batu Org/Hari 45,000.00
7 Tukang Besi Org/Hari 45,000.00
8 Pekerja Org/Hari 40,000.00
II BAHAN
A. BAHAN PASANGAN
1 Pasir Urug m3 100,000.00
2 Pasir Pasang m3 100,000.00
3 Pasir Beton / Cor m3 120,000.00
4 Tanah Urug ( timbun ) m3 35,000.00
5 Kerikil m3 130,000.00
9 Batu Bata bh 180.00
10 Portland Cement/Semen Padang Type I zak 59,000.00
11 Portland Cement/Semen Padang Type I Kg 1,180.00
12 Portland Cement Putih Kg 2,000.00
13 Batu tempel hitam M2 155,000.00
B. BAHAN KAYU
1 Kayu Kelas I m3 1,800,000.00
2 Kayu Kelas II m3 1,300,000.00
3 Papan Kelas II m3 1,100,000.00
4 Kayu Cerocok / Kayu Ubar/Mahang Btg 12,000.00
5 Kayu Perancah ( Bekesting ) dalam m3 800,000.00
6 Kayu Profil m' 8,500.00
C. BAHAN BESI
1 Besi Beton Kg 11,000.00
2 Kawat Ikat Beton ( bindraat ) Kg 14,000.00
3 Besi holow 4 x 4 m' 27,000.00
4 Besi holow 2 x 4 m' 17,000.00
D. BAHAN LANTAI
1 Keramik Ukuran 40 x 40 CM bh 6,500.00
2 Keramik Ukuran 30 x 30 CM bh 4,500.00
3 Keramik Ukuran 20 x 20 CM bh 2,500.00
4 Keramik Ukuran 20 x 25 CM bh 3,500.00
Harga
No. Jenis Bahan Satuan Bahan/Upah
(Rp)
E. BAHAN ATAP
1 Rangka atap baja ringan ( Smart Truss ) (terpasang) m2 110,000.00
2 Atap Genteng Metal m2 37,000.00
3 Perabung Gentang Metal Bulat Lbr 22,000.00
4 Bola bola atap genteng metal Lbr 20,000.00
5 Seng Plat BJLS 20 K Lbr 40,000.00
G. BAHAN PIPA
1 Stop Kran 0 3/4" bh 12,000.00
2 Kran air 1/2" bh 21,000.00
3 Pipa PVC Dia 3/4 " m' 7,700.00
4 Pipa PVC Dia 3 " m' 25,000.00
5 Pipa PVC Dia 4 " m' 35,000.00
G. BAHAN SANITAIR
1 Closet Duduk Bh 1,300,000.00
2 Floor Drain Bh 25,000.00
3 Closet Jongkok Bh 225,000.00
4 Bak Air Kamar Mandi bh 120,000.00
5 Kran air bebek bh 164,450.00
6 Kran tembok bh 21,000.00
H. BAHAN PAKU
1 Paku Atap genteng metal Kg 20,000.00
2 Paku kayu Kg 14,000.00
3 Paku 2" - 5" Kg 14,000.00
4 Paku skrup + baut + karet dia 8" bh 125.00
5 Angker Besi bh 7,500.00
6 Besi Skrip 2" Kg 18,000.00
7 Paku Gipsum Kg 27,000.00
8 Paku ripet bh 225.00
Harga
No. Jenis Bahan Satuan Bahan/Upah
(Rp)
J. BAHAN KACA
1 Kaca bening tebal 5 MM m2 65,000.00
3 Kaca Cermin 6 MM m2 115,000.00
K. BAHAN LISTRIK
1 Instalasi Penerangan ttk 135,000.00
2 Stop Kontak dinding bh 40,470.00
3 Saklar tunggal bh 25,000.00
4 Saklar Ganda bh 20,000.00
5 Lampu Pijar 18 Watt bh 22,000.00
K. BAHAN PINTU
1 Pintu Panil Lapis Seng Aluminium m2 450,000.00
2 Pintu Teakwood Lbr 350,000.00
3 Pintu Plywood Lbr 300,000.00
1 Pintu Fiber Glass Lbr 298,000.00
2 Pintu Panil Kaca Lbr 350,000.00
3 Pintu Fiber Motif Lbr 298,000.00
2 Pintu Panil Lbr 1,000,000.00
L. BAHAN FINISHING
1 Cat Minyak Kg 22,000.00
2 Kapur tembok Kg 9,000.00
3 Cat air Kg 15,000.00
4 Cat Vernish Kg 6,250.00
5 Cat Kayu dasar/Menie Kg 11,000.00
6 Minyak Cat Ltr 13,000.00
7 Residu Kg 9,500.00
8 Dempul Kg 22,000.00
9 Plamur Kg 12,000.00
Harga
No. Jenis Bahan Satuan Bahan/Upah
(Rp)
I. PEKERJAAN PERSIAPAN
Total 6,500.00
Total 29,530.00
TENAGA
Pekerja 0.2500 OH 40,000.00 10,000.00
Tukang Kayu 0.0300 OH 45,000.00 1,350.00
Kepala Tukang 0.0040 OH 50,000.00 200.00
Mandor 0.0300 OH 50,000.00 1,500.00
BAHAN
Kayu Cerocok Dia. 15 cm 1.0000 Btg 12,000.00 12,000.00
Total 25,050.00
Total 18,000.00
2 1 M3 URUGAN KEMBALI
TENAGA
Pekerja 0.1920 OH 40,000.00 7,680.00
Mandor 0.0190 OH 50,000.00 950.00
Total 8,630.00
Total 22,500.00
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
4 1 M3 URUGAN PASIR
TENAGA
Pekerja 0.3000 OH 40,000.00 12,000.00
Mandor 0.0100 OH 50,000.00 500.00
BAHAN
Pasir Urug 1.2000 M3 100,000.00 120,000.00
Total 132,500.00
5 1 M3 URUGAN TANAH
TENAGA
Pekerja 0.2500 OH 40,000.00 10,000.00
Mandor 0.0250 OH 50,000.00 1,250.00
BAHAN
Tanah timbun 1.2000 M3 35,000.00 42,000.00
Total 53,250.00
Total 125,630.00
Total 59,111.00
Total 53,906.60
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
Total 53,520.00
5 1 M2 PLESTERAN 1 PC : 2 PS (TEBAL 20 MM )
TENAGA
Pekerja 0.2500 OH 40,000.00 10,000.00
Tukang Batu 0.2000 OH 45,000.00 9,000.00
Kepala Tukang 0.0200 OH 50,000.00 1,000.00
Mandor 0.0125 OH 50,000.00 625.00
BAHAN
Semen Portland 14.2800 Kg 1,180.00 16,850.40
Pasir Pasang 0.0230 M 3
100,000.00 2,300.00
Total 39,775.40
6 1 M2 PLESTERAN 1 PC : 4 PS (TEBAL 20 MM )
TENAGA
Pekerja 0.2500 OH 40,000.00 10,000.00
Tukang Batu 0.2000 OH 45,000.00 9,000.00
Kepala Tukang 0.0200 OH 50,000.00 1,000.00
Mandor 0.0125 OH 50,000.00 625.00
BAHAN
Semen Portland 8.6800 Kg 1,180.00 10,242.40
Pasir Pasang 0.0280 M3 100,000.00 2,800.00
Perancah Kayu 0.0020 M 3
800,000.00 1,600.00
Kayu Papan Klas II 0.0010 M3 1,100,000.00 1,100.00
Total 36,367.40
Total 3,325,000.00
TENAGA
Pekerja 0.8000 OH 40,000.00 32,000.00
Tukang Kayu 2.0000 OH 45,000.00 90,000.00
Kepala Tukang 0.2000 OH 50,000.00 10,000.00
Mandor 0.0400 OH 50,000.00 2,000.00
BAHAN
Kayu Klas II 0.0600 M3 1,300,000.00 78,000.00
Total 212,000.00
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
TENAGA
Pekerja 0.1100 OH 40,000.00 4,400.00
Tukang Kayu 0.2200 OH 45,000.00 9,900.00
Kepala Tukang 0.0220 OH 50,000.00 1,100.00
Mandor 0.0050 OH 50,000.00 250.00
BAHAN
Kayu Klas II 0.0110 M3 1,300,000.00 14,300.00
Paku Biasa 2" - 5" 0.0500 Kg 14,000.00 700.00
Perancah kayu 0.0020 M3 800,000.00 1,600.00
Kayu Papan Klas II 0.0010 M3 1,100,000.00 1,100.00
Total 33,350.00
Total 181,455.00
Total 23,050.00
Total 515,240.00
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
Total 67,940.00
Total 520,060.00
Total 2,913,150.00
Total 2,141,170.00
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
Total 2,909,150.00
Total 2,981,850.00
Total 56,900.00
Total 46,750.00
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
Total 54,650.00
VIII. PEKERJAAN SANITASI
Total 1,578,550.00
2 1 BH WESTAFEL
TENAGA
Pekerja 3.0000 OH 40,000.00 120,000.00
Tukang Batu 1.1000 OH 55,000.00 60,500.00
Kepala Tukang 0.0010 OH 50,000.00 50.00
Mandor 0.1600 OH 50,000.00 8,000.00
BAHAN
Westafel 1.0000 Bh 1,350,000.00 1,350,000.00
Perlengkapan ( 6 % harga Westafel) 1.0000 Ls 81,000.00 81,000.00
Total 1,619,550.00
Total 177,050.00
Total 17,065.00
Total 50,295.00
Total 65,795.00
Total 38,700.00
Total 21,975.00
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
Total 14,925.00
Total 20,300.00
Total 19,975.00
Total 152,125.00
Total 38,625.00
Total 44,125.00
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
Total 81,475.00
TENAGA
Pekerja 0.6200 OH 40,000.00 24,800.00
Tukang 0.3500 OH 55,000.00 19,250.00
Kepala Tukang 0.0350 OH 50,000.00 1,750.00
Mandor 0.0300 OH 50,000.00 1,500.00
BAHAN
Ubin Keramik 20 x 20 cm 25.0000 Bh 2,500.00 62,500.00
Semen portland 11.3800 Kg 1,180.00 13,428.40
Pasir Pasang 0.0420 M3 100,000.00 4,200.00
Semen warna 1.5000 Kg 2,000.00 3,000.00
Total 130,428.40
Total 117,428.40
Total 113,428.40
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
Total 137,928.40
4 1 M2 PLESTER WATERPROOF
TENAGA
Pekerja 0.3000 OH 40,000.00 12,000.00
Tukang 0.2000 OH 55,000.00 11,000.00
Kepala Tukang 0.0200 OH 50,000.00 1,000.00
Mandor 0.0150 OH 50,000.00 750.00
BAHAN
Waterproofing 2.9000 Kg 40,000.00 116,000.00
Total 140,750.00
Total 234,112.50
Total 54,790.00
1 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PELAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
TENAGA
Pekerja 0.0700 OH 40,000.00 2,800.00
Tukang 0.0090 OH 55,000.00 495.00
Kepala Tukang 0.0060 OH 50,000.00 300.00
Mandor 0.0025 OH 50,000.00 125.00
BAHAN
Cat Menie 0.2000 Kg 11,000.00 2,200.00
Plamir 0.1500 Kg 12,000.00 1,800.00
Cat dasar 0.1700 Kg 22,000.00 3,740.00
Cat Penutup 2 kali 0.2600 Kg 22,000.00 5,720.00
Perancah kayu 0.0020 M3 800,000.00 1,600.00
Total 18,780.00
NO URAIAN PEKERJAAN VOLUME HARGA SATUAN JUMLAH
2 1 M2 PENGECATAN BIDANG KAYU BARU ( 1 LAPIS PELAMIR), 1 LAPIS CAT DASAR, 3 LAPIS CAT PENUTUP
TENAGA
Pekerja 0.0700 OH 40,000.00 2,800.00
Tukang 0.1050 OH 55,000.00 5,775.00
Kepala Tukang 0.0040 OH 50,000.00 200.00
Mandor 0.0025 OH 50,000.00 125.00
BAHAN ha
Cat Menie 0.2000 Kg 11,000.00 2,200.00
Plamir 0.1500 Kg 12,000.00 1,800.00
Cat dasar 0.1700 Kg 22,000.00 3,740.00
Cat Penutup 3 kali 0.3500 Kg 22,000.00 7,700.00
Total 24,340.00
3 1 M2 PENGECATAN TEMBOK BARU ( 1 LAPIS PELAMIR), 1 LAPIS CAT DASAR, 2 LAPIS CAT PENUTUP
TENAGA
Pekerja 0.0200 OH 40,000.00 800.00
Tukang 0.0630 OH 55,000.00 3,465.00
Kepala Tukang 0.0063 OH 50,000.00 315.00
Mandor 0.0025 OH 50,000.00 125.00
BAHAN
Plamir 0.1000 Kg 12,000.00 1,200.00
Amplas 0.1000 Lbr 7,000.00 700.00
Kuas Golong 0.0100 Bh 20,000.00 200.00
Cat dasar 0.1000 Kg 15,000.00 1,500.00
Cat Penutup 2 kali 0.2600 Kg 15,000.00 3,900.00
Perancah kayu 0.0020 M3 800,000.00 1,600.00
Kayu Papan Klas II 0.0100 M3 1,100,000.00 11,000.00
Total 24,805.00
Total 80,625.98
DAFTAR HARGA SATUAN BAHAN DAN UPAH
1 2 3 4
I. UPAH
1 Mandor Hari Rp. 60,000.00
2 Kepala tukang Hari Rp. 55,000.00
3 Tukang batu Hari Rp. 50,000.00
4 Tukang kayu Hari Rp. 50,000.00
5 Tukang cat Hari Rp. 50,000.00
6 Tukang besi Hari Rp. 50,000.00
7 Pekerja Hari Rp. 40,000.00
II. BAHAN
A. Bahan Pasangan
1 Pasir urug M3 Rp. 90,000.00
2 Pasir pasang M3 Rp. 85,000.00
3 Pasir Beton/cor M3 Rp. 100,000.00
4 Tanah urug M3 Rp. 35,000.00
5 Kerikil M3 Rp. 130,000.00
6 Batu bata Bh Rp. 200.00
7 Portland Cement/Semen Padang Type I Zak Rp. 54,000.00
B. Bahan Kayu
1 Kayu Klas I M3 Rp. 1,750,000.00
2 Kayu Klas II M3 Rp. 1,300,000.00
3 Kayu Klas III M3 Rp. 1,100,000.00
C. Bahan Besi
1 Besi beton Kg Rp. 11,500.00
2 Kawat ikat beton (bindraat) Kg Rp. 15,000.00
D. Bahan Lantai
1 Keramik ukuran 30 x 30 cm Bh Rp. 5,500.00
2 Tepung Keramik Kg Rp. 2,000.00
No. Uraian Satuan Harga Satuan
1 2 3 4
G. Bahan Paku
1 Paku biasa Kg Rp. 12,000.00
2 Paku 2"-5" Kg Rp. 12,000.00
3 Plat Strip Kg Rp. 12,000.00
4 Paku Triplek Kg Rp. 13,000.00
H. Bahan Pintu
1 Pintu Panil Tembusu Lbr Rp. 1,000,000.00
2 Pintu Fibeglass lbr Rp. 298,000.00
3
4
H. Bahan Penggantung/Kunci
1 Kunci 2 slaag setara Ses bh Rp. 150,000.00
2 Kunci 1 slaag setara Ses bh Rp. 80,000.00
3 Kunci Alfa bh Rp. 22,500.00
4 Grendel Pintu 6" bh Rp. 15,000.00
5 Engsel Pintu ( Kuningan 4" ) bh Rp. 15,000.00
6 Engsel Jendela bh Rp. 10,000.00
7 Grendel Jendela bh Rp. 6,000.00
8 Hak angin Jendela bh Rp. 7,000.00
9 Hendel jendela bh Rp. 5,000.00
I. Bahan Kaca
1 Kaca bening tebal 5 mm M2 Rp. 87,500.00
J. Bahan Listrik
1 Pemasangan titik lampu (kabel standard PLN) Ttk Rp. 135,000.00
2 Lampu TL 40 watt Bh Rp. 76,000.00
3 Lampu XL 18 watt Bh Rp. 35,000.00
4 Stop kontak Bh Rp. 15,000.00
5 MCB Bh Rp. 125,000.00
6 Saklar ganda Bh Rp. 20,000.00
7 Saklar Triple Bh Rp. 30,000.00
L Bahan Finishing
1 Cat Minyak Kg Rp. 27,500.00
2 Cat Air Kg Rp. 11,000.00
3 Cat kayu dasar/menie Kg Rp. 10,000.00
4 Minyak cat Ltr Rp. 15,000.00
5 Residu setara cap roket Kg Rp. 9,000.00
6 Dempul Kg Rp. 17,000.00
7 Plamur Kg Rp. 7,000.00
8 Kertas pasir/amplas Lbr Rp. 5,000.00
9 Tempat adukan cat Bh Rp. 7,000.00
10 Kuas 2" Bh Rp. 8,000.00
11 Kuas golong (rol) Bh Rp. 20,500.00
12 Minyak Bekisting Bh Rp. 8,000.00
No. Uraian Satuan Harga Satuan
1 2 3 4
............................................
DAFTAR ANALISA HARGA SATUAN PEKERJAAN
1. 1 M2 Membersihkan Lokasi
Tenaga
0.7500 Oh Pekerja Rp 40,000 = Rp 30,000.00
0.0250 Oh Mandor Rp 60,000 = Rp 1,500.00
Jumlah (1) = Rp 31,500.00
1 M2 Membersihkan Lokasi = Rp 3,150.00
3. 1 M3 Galian tanah
Tenaga
0.4000 Oh Pekerja Rp 40,000 = Rp 16,000.00
0.0400 Oh Mandor Rp 60,000 = Rp 2,400.00
Jumlah = Rp 18,400.00
4. 1 M3 Urugan kembali
Tenaga
0.1920 Oh Pekerja Rp 40,000 = Rp 7,680.00
0.0190 Oh Mandor Rp 60,000 = Rp 1,140.00
Jumlah = Rp 8,820.00
5. 1 M3 Urugan pasir
Bahan
1.1000 M3 Pasir urug Rp 90,000 = Rp 99,000.00
Jumlah (1) = Rp 99,000.00
Tenaga
0.3000 Oh Pekerja Rp 40,000 = Rp 12,000.00
0.0100 Oh Mandor Rp 60,000 = Rp 600.00
Jumlah (2) = Rp 12,600.00
Jumlah (1) + (2) = Rp 111,600.00
6. 1 M3 Urugan tanah
Bahan
1.2000 M3 Tanah Urug Rp 35,000 = Rp 42,000.00
Jumlah (1) = Rp 42,000.00
Tenaga
0.3000 Oh Pekerja Rp 40,000 = Rp 12,000.00
0.0100 Oh Mandor Rp 60,000 = Rp 600.00
Jumlah (2) = Rp 12,600.00
Jumlah (1) + (2) = Rp 54,600.00
Jumlah = Rp 67,926.01
ENGINEER ESTIMATE (EE)
KEGIATAN
PEKERJAAN
LOKASI : PEKANBARU
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
I PEKERJAAN PENDAHULUAN
1 Pembersihan Lokasi m2 -
2 Pek. Pengukuran dan Pas. Bouplank m' -
Lantai II (Dua)
1 Kolom struktur Beton Bertulang m3
2 Pekerjaan Balok Beton Bertulang m3
3 Pekerjaan Plat Lantai t = 13 cm Beton Bertulang m3
4 Beton Tangga Beton Bertulang Lantai II m3
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)
IV PEKERJAAN ARSITEKTUR
Lantai I (Satu)
A Pekerjaan Lantai
1 Cor Lantai 1 : 3 : 5 m3
2 Lantai Keramik 30x30 cm m2
B Pekerjaan Dinding
1 Pas. 1/2 bata, adukan 1pc : 2 pc (Trasram) m2
2 Pas. 1/2 bata, adukan 1pc : 4 pc m2
3 Plesteran + acian u/ pasangan bata adukan. 1pc : 2ps (Trasram) m2
4 Plesteran + acian u/ pasangan bata adukan. 1pc : 4ps m2
5 Pas. 1/2 Bata Railing Tangga m2
D Pekerjaan Pengecatan
1 Pengecatan dinding m2
Lantai II (Dua)
A Pekerjaan Lantai
1 Lantai Keramik 30x30 m2
B Pekerjaan Dinding
1 Pas. 1/2 bata, adukan 1pc : 4 pc m2
2 Plesteran + acian u/ pasangan bata adukan. 1pc : 4ps m2
3 Pas. 1/2 Bata Railing Tangga m2
F Pekerjaan Pengecatan
1 Pengecatan dinding m2
Pekerjaan Dinding
1 Pas. 1/2 bata, adukan 1pc : 4 pc m2
Plesteran + acian u/ pasangan bata adukan. 1pc : 4ps m2
Pas. 1/2 Bata Railing Tangga m1
B
1 Pekerjaan Kusen Pintu dan Jendela
Jendela Type J-1 bh
C Pekerjaan Pengecatan
Pengecatan dinding m2
HARGA JUMLAH
NO URAIAN PEKERJAAN VOLUME SATUAN SATUAN HARGA
(Rp.) (Rp.)