RENCANA ANGGARAN BIAYA

KONTRAK
No. URAIAN PEKERJAAN JUMLAH HARGA
(Rp)

A PEKERJAAN PERSIAPAN
1 Pekerjaan uitzet / pasang bouwplank 2,278,500.00
2 Listrik kerja 500,000.00
3 Air kerja 500,000.00
4 Andang - andang 800,000.00
5 Pembersihan awal 800,000.00
6 Pembersihan akhir 800,000.00
7 Papan nama proyek 400,000.00
6,078,500.00

B SUB GEDUNG
I. Pekerjaan tanah dan pancang
1 Galian tanah pondasi rumah 7,126,293.92
2 Pancang ulin 7,833,403.72
3 Urugan tanah kembali 831,710.21
4 Urugan pasir bawah pondasi 555,936.21
5 Urugan pasir bawah lantai 1,882,547.95
18,229,892.01

II. Pekerjaan pasangan dan plesteran


1 Aanstamping 9,289,753.40
2 Pemasangan pondasi batu belah 42,416,604.78
3 Pasangan dinding bata merah ½ bata 48,999,904.90
4 Plesteran 46,843,213.63
5 Acian 25,948,612.79
173,498,089.49

III. Pekerjaan beton


1 Rabatan lantai ruangan dan teras 6,993,682.81
2 Sloof 15/20
- Beton 5,128,094.54
- Pembesian 13,892,370.61
- Bekisting 3,792,486.88

3 Kolom praktis 21,158,318.44

4 Kolom 15/20
- Beton 334,440.95
- Pembesian 1,907,270.08
- Bekisting 1,855,961.85

5 Ring balk 10/15 19,285,753.59


6 Balok Latai 10/15 5,665,678.98
7 Balok gewel 10/15 5,993,853.06
8 Kolom gewel 2,805,633.35

9 Plat dak teras tebal 10 cm


- Beton 716,659.17
- Pembesian 1,135,960.19
- Bekisting 1,435,206.91
10 Lisplank beton 191,109.11
11 Kanopi diatas jendela 398,143.99
12 Meja dapur 429,995.50
93,120,620.01

IV. Pekerjaan lantai


1 Keramik ruangan polish 40x40 41,568,869.93
2 Keramik teras unpolish 40x40 4,265,904.55
3 Keramik lantai KM 30x30 2,747,569.46
4 Keramik dinding KM 30x60 20,531,253.09
5 Keramik meja dapur 60/60 1,421,224.64
6 Keramik dinding dapur 60/60 1,358,753.23
71,893,574.90

V. Pekerjaan Plafond
1 Rangka galvalum + gypsumboard 9 mm dalam ruangan 22,766,011.25
2 Rangka galvalum + kalsiboard 4 mm luar ruangan 4,932,358.87
27,698,370.12

VI. Pekerjaan atap


1 Pemasangan rangka atap baja ringan 87,616,483.75
2 Pekerjaan penutup atap ondulen 48,003,183.32
3 Pekerjaan bubung 6,895,825.98
4 Pekerjaan talang seng BJLS 90 4,524,678.91
5 Pekerjaan Lisplank ex. kalsiplank 20 cm 2,629,162.97
149,669,334.93

VII. Pekerjaan cat - catan


1 Pek. Cat tembok dalam 24,410,327.76
2 Pek. Cat tembok luar 14,861,187.32
3 Pek. Cat plafond 11,185,510.53
4 Pek. Cat kalsiplank 804,510.94
51,261,536.56

VIII. Pek. Instalasi listrik


1 Box MCB 12 group 800,000.00
2 Down Light LED 12 W 2,040,000.00
3 Down Light LED 5 W 1,540,000.00
4 Pasang saklar tunggal 559,193.66
5 Pasang saklar seri 480,833.95
6 Pasang stop kontak dinding 1 ph, 10 A 760,089.29
7 Pasang stop kontak AC 1 ph, 16 A 419,265.19
8 Titik nyala lampu dengan kabel NYM 2 x 2,5 mm² 8,270,407.66
di dalam conduit PVC HI 20 mm
9 Titik nyala stop kontak dengan kabel NYM 3 x 2,5 mm² 6,324,458.24
di dalam conduit PVC HI 20 mm
10 Titik nyala stop kontak AC dengan kabel NYM 3 x 2,5 mm² 2,108,152.75
di dalam conduit PVC HI 20 mm
11 Instalasi Box MCB kabel NYY 3 x 2,5 mm² ke KWH meter PLN 160,000.00
23,462,400.74

IX. Pekerjaan sanitasi


1 Instalasi air bersih
- Pipa PVC AW 3/4 '' 906,790.35
- Pipa PVC AW 1/2 '' 524,821.70
2 Instalasi air kotor dan air bekas
- Pipa PVC AW 4" 7,811,454.27
- Pipa PVC AW 3" 5,627,592.56
- Pipa PVC AW 2" 1,212,545.40
- Pipa PVC AW 1½" 150,690.99
3 Instalasi air kotor dan air bekas
- Pipa PVC AW 4" 2,195,505.74
4 Kloset jongkok 799,097.09
5 Kloset duduk dan aksesoris 8,671,796.42
6 Kitchen Zink dan aksesoris 840,718.08
7 Floor drain dia 3" 606,797.45
8 Kran air 621,559.12
9 Septictank biofil kapasitas 2 m3 15,737,034.89
10 Bak kontrol 829,723.16
46,536,127.23

X. Pekerjaan kusen, pintu, jendela dan penggantung, pengunci


1 Kunci pintu 2,678,397.25
2 Engsel pintu 4" 1,578,090.17
3 Handle jendela 1,347,285.19
4 Kusen Alumunium 21,028,931.12
5 Pintu HPL 42,769,224.35
6 Pintu Spandrail 3,094,842.66
7 Door Holder 2,710,322.50
8 Jendela + Boven Alumunium 9,157,340.74
9 Kaca bening 5 mm 3,099,628.03
87,464,062.01

C SUB PAGAR
I Pekerjaan Galian dan Urugan
1 Galian tanah 706,189.64
2 Urugan kembali 4,729.76
3 Urugan pasir bawah pondasi 116,913.62

II Pekerjaan Pasangan
1 Pondasi batu pecah 1 : 4 7,667,892.13
2 Pasangan bata merah 1 : 4 9,855,380.06

C. Pekerjaan Plesteran dan Benangan


1 Plesteran 1 : 4 13,631,492.41
2 Acian 7,406,977.90

III Pekerjaan Beton


1 Sloof 15/20 573,327.34
2 Kolom 10/10 3,567,390.90
3 Ringbalk 10/15 6,878,052.66

IV Pekerjaan Cat
1 Pek. Cat tembok luar 10,375,519.31
60,783,865.73

D SUB CARPORT
1 Urugan tanah 91,320.76
2 Urugan pasir bawah lantai 687,165.79
3 Rabatan lantai dengan tulangan dia. 8 - 200 tebal 10 cm 16,883,614.98
17,662,101.54

827,358,475.27
91,009,432.28
918,367,907.55
918,367,907.00
KONTRAK HARI INI
No. URAIAN PEKERJAAN
SATUAN VOLUME VOLUME BOBOT JUMLAH ( Rp )

A PEKERJAAN PERSIAPAN
1 Pekerjaan uitzet / pasang bouwplank m' 30.00 11.01 0.10 836209.5
2 Listrik kerja ls 1.00 - 0
3 Air kerja ls 1.00 - 0
4 Andang - andang ls 1.00 - 0
5 Pembersihan awal ls 1.00 - 0
6 Pembersihan akhir ls 1.00 - 0
7 Papan nama proyek ls 1.00 - 0
0.10 836,209.50

B SUB GEDUNG
I. Pekerjaan tanah dan pancang
1 Galian tanah pondasi rumah m3 65.29 - 0
2 Pancang ulin ttk 55.00 - 0
3 Urugan tanah kembali m3 22.86 - 0
4 Urugan pasir bawah pondasi m3 2.33 - 0
5 Urugan pasir bawah lantai m3 7.89 - 0

II. Pekerjaan pasangan dan plesteran


1 Aanstamping m3 9.76
2 Pemasangan pondasi batu belah m3 29.65
3 Pasangan dinding bata merah ½ bata m2 314.18
4 Plesteran m2 531.37
5 Acian m2 541.71

III. Pekerjaan beton


1 Rabatan lantai ruangan dan teras m3 5.22
2 Sloof 15/20
- Beton m3 3.22
- Pembesian kg 568.80
- Bekisting m2 18.86

3 Kolom praktis m1 154.80

4 Kolom 15/20
- Beton m3 0.21
- Pembesian kg 78.09
- Bekisting m2 6.48

5 Ring balk 10/15 m1 113.42


6 Balok Latai 10/15 m1 33.32
7 Balok gewel 10/15 m1 35.25
8 Kolom gewel m1 16.50

9 Plat dak teras tebal 10 cm


- Beton m3 0.45
- Pembesian kg 46.51
- Bekisting m2 3.60

10 Lisplank beton m3 0.12


11 Kanopi diatas jendela m3 0.25
12 Meja dapur m3 0.27

IV. Pekerjaan lantai


1 Keramik ruangan polish 40x40 m2 131.55
2 Keramik teras unpolish 40x40 m2 13.50
3 Keramik lantai KM 30x30 m2 8.75
4 Keramik dinding KM 30x60 m2 56.60
5 Keramik meja dapur 60/60 m2 3.64
6 Keramik dinding dapur 60/60 m2 3.48

V. Pekerjaan Plafond
1 Rangka galvalum + gypsumboard 9 mm dalam ruangan m2 140.30
2 Rangka galvalum + kalsiboard 4 mm luar ruangan m2 29.08

VI. Pekerjaan atap


1 Pemasangan rangka atap baja ringan m2 222.85
2 Pekerjaan penutup atap ondulen m2 222.85
3 Pekerjaan bubung m' 67.90
4 Pekerjaan talang seng BJLS 90 m' 35.40
5 Pekerjaan Lisplank ex. kalsiplank 20 cm m' 40.00

VII. Pekerjaan cat - catan


1 Pek. Cat tembok dalam m2 366.04
2 Pek. Cat tembok luar m2 200.24
3 Pek. Cat plafond m2 167.73
4 Pek. Cat kalsiplank m2 10.84

VIII. Pek. Instalasi listrik


1 Box MCB 12 group bh 1.00
2 Down Light LED 12 W bh 12.00
3 Down Light LED 5 W bh 11.00
4 Pasang saklar tunggal bh 12.00
5 Pasang saklar seri bh 6.00
6 Pasang stop kontak dinding 1 ph, 10 A bh 15.00
7 Pasang stop kontak AC 1 ph, 16 A bh 5.00
8 Titik nyala lampu dengan kabel NYM 2 x 2,5 mm² ttk 23.00
di dalam conduit PVC HI 20 mm
9 Titik nyala stop kontak dengan kabel NYM 3 x 2,5 mm² ttk 15.00
di dalam conduit PVC HI 20 mm
10 Titik nyala stop kontak AC dengan kabel NYM 3 x 2,5 mm² ttk 5.00
di dalam conduit PVC HI 20 mm
11 Instalasi Box MCB kabel NYY 3 x 2,5 mm² ke KWH meter PLN m 2.00

IX. Pekerjaan sanitasi


1 Instalasi air bersih
- Pipa PVC AW 3/4 '' m1 31.08
- Pipa PVC AW 1/2 '' m1 19.35
2 Instalasi air kotor dan air bekas
- Pipa PVC AW 4" m1 43.30
- Pipa PVC AW 3" m1 38.00
- Pipa PVC AW 2" m1 11.69
- Pipa PVC AW 1½" m1 2.93
3 Instalasi air kotor dan air bekas
- Pipa PVC AW 4" m1 12.17
4 Kloset jongkok unit 1.00
5 Kloset duduk dan aksesoris unit 3.00
6 Kitchen Zink dan aksesoris unit 1.00
7 Floor drain dia 3" bh 4.00
8 Kran air bh 6.00
9 Septictank biofil kapasitas 2 m3 unit 1.00
10 Bak kontrol unit 2.00

X. Pekerjaan kusen, pintu, jendela dan penggantung, pengunci


1 Kunci pintu daun 16.00
2 Engsel pintu 4" buah 32.00
3 Handle jendela buah 39.00
4 Kusen Alumunium m1 173.83
5 Pintu HPL m2 28.74
6 Pintu Spandrail m2 4.27
7 Door Holder set 16.00
8 Jendela + Boven Alumunium m2 17.18
9 Kaca bening 5 mm m2 11.55

C SUB PAGAR
I Pekerjaan Galian dan Urugan
1 Galian tanah m3 6.47
2 Urugan kembali m3 0.13
3 Urugan pasir bawah pondasi m3 0.49

II Pekerjaan Pasangan
1 Pondasi batu pecah 1 : 4 m3 5.36
2 Pasangan bata merah 1 : 4 m2 66.37

C. Pekerjaan Plesteran dan Benangan


1 Plesteran 1 : 4 m2 154.63
2 Acian m2 154.63

III Pekerjaan Beton


1 Sloof 15/20 m3 0.36
2 Kolom 10/10 m' 26.10
3 Ringbalk 10/15 m' 40.45

IV Pekerjaan Cat
1 Pek. Cat tembok luar m2 139.80
D SUB CARPORT
1 Urugan tanah m3 2.51
2 Urugan pasir bawah lantai m3 2.88
3 Rabatan lantai dengan tulangan dia. 8 - 200 tebal 10 cm m3 42.35

(A)
(B) 11% x (A)
(C) (A) + (B)
SD/HARI INI
VOLUME BOBOT JUMLAH ( Rp )

11.01 0.10 836,209.50


- - -
- - -
- - -
- - -
- - -
- - -
0.10 836,209.50

- - -
- - -
- - -
- - -
- - -
KONTRAK
NO URAIAN PEKERJAAN
JUMLAH (Rp) BOBOT (%)
1 Dec 2022 2 Dec 2022

A PEKERJAAN PERSIAPAN 6,078,500.00 0.73 0.367 0.367


B SUB GEDUNG
I Pekerjaan tanah dan pancang 18,229,892.01 2.20
II Pekerjaan pasangan dan plesteran 173,498,089.49 20.97
III Pekerjaan beton 93,120,620.01 11.26
IV Pekerjaan lantai 71,893,574.90 8.69
V Pekerjaan Plafond 27,698,370.12 3.35
VI Pekerjaan atap 149,669,334.93 18.09
VII Pekerjaan cat - catan 51,261,536.56 6.20
VIII Pek. Instalasi listrik 23,462,400.74 2.84
IX Pekerjaan sanitasi 46,536,127.23 5.62
X Pekerjaan kusen, pintu, jendela dan penggantung, pengunci 87,464,062.01 10.57
0.775 1.346 1.93
C SUB PAGAR 60,783,865.73 7.35 0.377
D SUB CARPORT 17,662,101.54 2.13 0.367 0.735 1.286 1.83

(Rp) (%)
TOTAL
827,358,475.27 100.00 1 Dec 2022 2 Dec 2022

PROGRESS PLAN HARIAN = 0.367 0.367


PROGRESS PLAN KOMULATIF HARIAN = 0.367 0.735
PROGRESS ACT. HARIAN = 0.377 0.397
PROGRESS ACT. KOMULATIF = 0.377 0.775
DEVIASI = 0.010 0.040

`
W1

3 Dec 2022 4 Dec 2022 5 Dec 2022 6 Dec 2022 7 Dec 2022

0.551 0.551 0.551 0.551 0.551

2.507 3.108 3.669 0.000


1.346 1.936 0.000 0.000 0.000 0.000
0.377 0.775
2.938 3.489 3.778 4.066 4.355 4.643 4.932
0.367 0.735 1.286 1.836 2.387

W1
3 Dec 2022 4 Dec 2022 5 Dec 2022 6 Dec 2022 7 Dec 2022

0.551 0.551 0.551 0.551 0.551


1.286 1.836 2.387 2.938 3.489
0.571 0.591 0.571 0.601 0.561
1.346 1.936 2.507 3.108 3.669
0.060 0.100 0.120 0.170 0.180
W2

8 Dec 2022 9 Dec 2022 10 Dec 2022 11 Dec 2022 12 Dec 2022 13 Dec 2022 14 Dec 2022

0.289 0.289 0.289 0.289 0.289 0.289 0.289

2.507 3.108 3.669 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000

4.355 4.643 4.932 5.220 5.509 5.798 6.086 6.375 6.663


2.387 2.938 3.489 3.778 4.066

W2
8 Dec 2022 9 Dec 2022 10 Dec 2022 11 Dec 2022 12 Dec 2022 13 Dec 2022 14 Dec 2022

0.289 0.289 0.289 0.289 0.289 0.289 0.289


3.778 4.066 4.355 4.643 4.932 5.220 5.509
W3 W4

15 Dec 2022 16 Dec 2022 17 Dec 2022 18 Dec 2022 19 Dec 2022 20 Dec 2022 21 Dec 2022 22 Dec 2022 23 Dec 2022 24 Dec 2022 25 Dec 2022

0.218 0.218 0.218 0.218 0.218


0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289

0.000 0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000
8.762 9.269 9.776 10.283 10.790
5.798 6.086 6.375 6.663 6.952 7.241 7.748 8.255
5.509

W3 W4
15 Dec 2022 16 Dec 2022 17 Dec 2022 18 Dec 2022 19 Dec 2022 20 Dec 2022 21 Dec 2022 22 Dec 2022 23 Dec 2022 24 Dec 2022 25 Dec 2022

0.289 0.289 0.289 0.289 0.289 0.289 0.507 0.507 0.507 0.507 0.507
5.798 6.086 6.375 6.663 6.952 7.241 7.748 8.255 8.762 9.269 9.776
W4 W5

26 Dec 2022 27 Dec 2022 28 Dec 2022 29 Dec 2022 30 Dec 2022 31 Dec 2022 1 Jan 2023 2 Jan 2023 3 Jan 2023 4 Jan 2023 5 Jan 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218
0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289

0.000 0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000 0.000
0.000 0.000 0.000 0.000
14.339 14.846 15.353 15.860 16.367
11.804 12.311 12.818 13.325 13.832
9.776 10.283 10.790 11.297

W4 W5
26 Dec 2022 27 Dec 2022 28 Dec 2022 29 Dec 2022 30 Dec 2022 31 Dec 2022 1 Jan 2023 2 Jan 2023 3 Jan 2023 4 Jan 2023 5 Jan 2023

0.507 0.507 0.507 0.507 0.507 0.507 0.507 0.507 0.507 0.507 0.507
10.283 10.790 11.297 11.804 12.311 12.818 13.325 13.832 14.339 14.846 15.353
W6 W7

6 Jan 2023 7 Jan 2023 8 Jan 2023 9 Jan 2023 10 Jan 2023 11 Jan 2023 12 Jan 2023 13 Jan 2023 14 Jan 2023 15 Jan 2023 16 Jan 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218
0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289 0.289

0.000 0.000
0.000 0.000
0.000 0.000
0.000 0.000 28.418 30.281
0.000 0.000 0.000 0.000 0.000 0.937 0.937 0.937 0.937 0.937 0.937
26.555
0.000 23.666 25.111
20.777 22.222
16.874 17.381 17.888 19.333
15.353 15.860 16.367

W6 W7
6 Jan 2023 7 Jan 2023 8 Jan 2023 9 Jan 2023 10 Jan 2023 11 Jan 2023 12 Jan 2023 13 Jan 2023 14 Jan 2023 15 Jan 2023 16 Jan 2023

0.507 0.507 0.507 0.507 0.507 1.444 1.444 1.444 1.444 1.444 1.444
15.860 16.367 16.874 17.381 17.888 19.333 20.777 22.222 23.666 25.111 26.555
7 W8 W

17 Jan 2023 18 Jan 2023 19 Jan 2023 20 Jan 2023 21 Jan 2023 22 Jan 2023 23 Jan 2023 24 Jan 2023 25 Jan 2023 26 Jan 2023 27 Jan 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218

0.000 0.000 0.000


1.64 1.64 1.64 1.64 1.64 1.64 1.64 0.0001.64
0.000 0.0001.64 0.0001.64 1.64
49.375
0.000 0.000 47.048 48.212
0.000 43.322 45.185
0.000 0.000 41.459
0.000 37.733 39.596
0.000 35.870
32.144 34.007
28.418 30.281
26.555

7 W8 W
17 Jan 2023 18 Jan 2023 19 Jan 2023 20 Jan 2023 21 Jan 2023 22 Jan 2023 23 Jan 2023 24 Jan 2023 25 Jan 2023 26 Jan 2023 27 Jan 2023

1.863 1.863 1.863 1.863 1.863 1.863 1.863 1.863 1.863 1.863 1.863
28.418 30.281 32.144 34.007 35.870 37.733 39.596 41.459 43.322 45.185 47.048
W9 W10

28 Jan 2023 29 Jan 2023 30 Jan 2023 31 Jan 2023 1 Feb 2023 2 Feb 2023 3 Feb 2023 4 Feb 2023 5 Feb 2023 6 Feb 2023 7 Feb 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218

0.724 0.724 0.724 0.724 0.724 0.724 0.724 0.000


0.724 0.000 0.000
0.000 0.000 0.000
0.000 0.000
0.000
1.116
0.000
1.116 1.116 62.370 63.313
0.000 0.000 59.542 60.485 61.428
0.000 0.000 56.715 57.657 58.600
52.598 54.656
48.212 49.375 50.539
47.048

0.945 0.945 0.945

W9 W10
28 Jan 2023 29 Jan 2023 30 Jan 2023 31 Jan 2023 1 Feb 2023 2 Feb 2023 3 Feb 2023 4 Feb 2023 5 Feb 2023 6 Feb 2023 7 Feb 2023

1.164 1.164 1.164 2.059 2.059 2.059 0.943 0.943 0.943 0.943 0.943
48.212 49.375 50.539 52.598 54.656 56.715 57.657 58.600 59.542 60.485 61.428
W11 W12

8 Feb 2023 9 Feb 2023 10 Feb 2023 11 Feb 2023 12 Feb 2023 13 Feb 2023 14 Feb 2023 15 Feb 2023 16 Feb 2023 17 Feb 2023 18 Feb 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.0000.724 0.0000.724 0.000
0.000 0.724 0.724
65.198 65.416 65.635 65.853 66.072 66.290 66.508 66.727 66.945 67.164
62.370 63.313 64.255
61.428

W11 W12
8 Feb 2023 9 Feb 2023 10 Feb 2023 11 Feb 2023 12 Feb 2023 13 Feb 2023 14 Feb 2023 15 Feb 2023 16 Feb 2023 17 Feb 2023 18 Feb 2023

0.943 0.943 0.943 0.943 0.218 0.218 0.218 0.218 0.218 0.218 0.218
62.370 63.313 64.255 65.198 65.416 65.635 65.853 66.072 66.290 66.508 66.727
W12 W13

19 Feb 2023 20 Feb 2023 21 Feb 2023 22 Feb 2023 23 Feb 2023 24 Feb 2023 25 Feb 2023 26 Feb 2023 27 Feb 2023 28 Feb 2023 1 Mar 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000
67.164 67.382 67.601 67.819 68.037 68.256 68.474 68.693 68.911 69.130 69.348 69.567
66.727 66.945

W12 W13
19 Feb 2023 20 Feb 2023 21 Feb 2023 22 Feb 2023 23 Feb 2023 24 Feb 2023 25 Feb 2023 26 Feb 2023 27 Feb 2023 28 Feb 2023 1 Mar 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218
66.945 67.164 67.382 67.601 67.819 68.037 68.256 68.474 68.693 68.911 69.130
W14 W15

2 Mar 2023 3 Mar 2023 4 Mar 2023 5 Mar 2023 6 Mar 2023 7 Mar 2023 8 Mar 2023 9 Mar 2023 10 Mar 2023 11 Mar 2023 12 Mar 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000
69.567 69.785 70.003 70.222 70.440 70.659 70.877 71.096 71.314 71.533 71.751 71.969
69.130 69.348

W14 W15
2 Mar 2023 3 Mar 2023 4 Mar 2023 5 Mar 2023 6 Mar 2023 7 Mar 2023 8 Mar 2023 9 Mar 2023 10 Mar 2023 11 Mar 2023 12 Mar 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218
69.348 69.567 69.785 70.003 70.222 70.440 70.659 70.877 71.096 71.314 71.533
W15 W16

13 Mar 2023 14 Mar 2023 15 Mar 2023 16 Mar 2023 17 Mar 2023 18 Mar 2023 19 Mar 2023 20 Mar 2023 21 Mar 2023 22 Mar 2023 23 Mar 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218
0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000
71.969 72.188 72.406 72.625 72.843 73.062 73.280 73.498 73.717 73.935 74.154 74.372
71.533 71.751

W15 W16
13 Mar 2023 14 Mar 2023 15 Mar 2023 16 Mar 2023 17 Mar 2023 18 Mar 2023 19 Mar 2023 20 Mar 2023 21 Mar 2023 22 Mar 2023 23 Mar 2023

0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218 0.218
71.751 71.969 72.188 72.406 72.625 72.843 73.062 73.280 73.498 73.717 73.935
W17 W18

24 Mar 2023 25 Mar 2023 26 Mar 2023 27 Mar 2023 28 Mar 2023 29 Mar 2023 30 Mar 2023 31 Mar 2023 1 Apr 2023 2 Apr 2023 3 Apr 2023

0.000 0.000
0.000 0.000
0.000 0.000
0.000 92.343 93.541
0.000 0.000 88.398 90.371
0.218 0.218 0.218 0.000 86.426
0.000 0.000 0.000 0.000 82.481 84.453
78.536 80.508
74.154 74.372 74.591 76.563
73.935

0.774 0.774 0.774 0.774 0.774 0.774 0.774 0.774

0.961 0.961 0.961 0.961 0.961 0.961 0.961 0.961

0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237

W17 W18
24 Mar 2023 25 Mar 2023 26 Mar 2023 27 Mar 2023 28 Mar 2023 29 Mar 2023 30 Mar 2023 31 Mar 2023 1 Apr 2023 2 Apr 2023 3 Apr 2023

0.218 0.218 0.218 1.973 1.973 1.973 1.973 1.973 1.973 1.973 1.973
74.154 74.372 74.591 76.563 78.536 80.508 82.481 84.453 86.426 88.398 90.371
18 W19 W

4 Apr 2023 5 Apr 2023 6 Apr 2023 7 Apr 2023 8 Apr 2023 9 Apr 2023 10 Apr 2023 11 Apr 2023 12 Apr 2023 13 Apr 2023 14 Apr 2023

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
0.000 0.000
0.000
94.739 94.976 95.213 95.450 95.687 95.924 96.161 96.398 96.635 96.872 97.109
92.343 93.541
90.371

0.774

0.961 0.961 0.961

0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237

18 W19 W
4 Apr 2023 5 Apr 2023 6 Apr 2023 7 Apr 2023 8 Apr 2023 9 Apr 2023 10 Apr 2023 11 Apr 2023 12 Apr 2023 13 Apr 2023 14 Apr 2023

1.973 1.198 1.198 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237
92.343 93.541 94.739 94.976 95.213 95.450 95.687 95.924 96.161 96.398 96.635
W20 W21

15 Apr 2023 16 Apr 2023 17 Apr 2023 18 Apr 2023 19 Apr 2023 20 Apr 2023 21 Apr 2023 22 Apr 2023 23 Apr 2023 24 Apr 2023 25 Apr 2023

0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000


0.000 0.000 0.000 0.000
97.583 97.820 98.057 98.294 98.531 98.768 99.005 99.242 100.000
96.635 96.872 97.109 97.346

0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237

W20 W21
15 Apr 2023 16 Apr 2023 17 Apr 2023 18 Apr 2023 19 Apr 2023 20 Apr 2023 21 Apr 2023 22 Apr 2023 23 Apr 2023 24 Apr 2023 25 Apr 2023

0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237 0.237
96.872 97.109 97.346 97.583 97.820 98.057 98.294 98.531 98.768 99.005 99.242
W21

26 Apr 2023

0.000 0.000 0.000 0.000 0.000 0.000 0.000

98.057 98.294 98.531 98.768 99.005 99.242 100.000

0.237
0.521

W21
26 Apr 2023

0.758
100.000