NAGA SINAGA.ST D
NIP.1968 0715 2007 011007
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 01 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 11 Januari s/d 17 Januari 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 01 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 11 Januari s/d 17 Januari 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 01 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 11 Januari s/d 17 Januari 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - -
-
-
Konsultan Supervisi Kontraktor Pelaksana
PT. Wahana Mitra Amerta ( Jo ) PT. Budi Graha Perkasa
Mitraparama PT.Ciriatama Nusawidya
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 02 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 18 Januari s/d 24 Januari 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 02 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 18 Januari s/d 24 Januari 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 02 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 18 Januari s/d 24 Januari 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- 0.088 0.088
-
0.088
Konsultan Supervisi Kontraktor Pelaksana
PT. Wahana Mitra Amerta ( Jo ) PT. Budi Graha Perkasa
Mitraparama PT.Ciriatama Nusawidya
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 03 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 25 Januari s/d 31 Januari 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 03 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 25 Januari s/d 31 Januari 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 03 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 25 Januari s/d 31 Januari 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 04 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
01 FEBRUARI s/d 07 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 04 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
01 FEBRUARI s/d 07 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 04 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
01 FEBRUARI s/d 07 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 05 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
08 FEBRUARI s/d 14 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 05 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
08 FEBRUARI s/d 14 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 05 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
08 FEBRUARI s/d 14 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 06 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
15 FEBRUARI s/d 21 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 06 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
15 FEBRUARI s/d 21 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 06 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
15 FEBRUARI s/d 21 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 07 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
22 FEBRUARI s/d 28 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 07 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
22 FEBRUARI s/d 28 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 07 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
22 FEBRUARI s/d 28 FEBRUARI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 08 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
: 29 FEBRUARI s/d 06 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 08 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
: 29 FEBRUARI s/d 06 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 08 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
: 29 FEBRUARI s/d 06 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 09 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 07 MARET s/d 13 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 09 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 07 MARET s/d 13 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 09 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 07 MARET s/d 13 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 10 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 14 MARET s/d 20 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 10 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 14 MARET s/d 20 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 11 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 21 MARET s/d 27 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 11 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 21 MARET s/d 27 MARET 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 12 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 28 MARET s/d 03 APRIL 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 12 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 28 MARET s/d 03 APRIL 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- 240.000 240.000 - 0.166 0.166 61.538
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 13 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 04 APRIL s/d 10 APRIL 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 13 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 04 APRIL s/d 10 APRIL 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
240.000 15.500 255.500 0.166 0.011 0.177 65.513
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 14 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
ODE : 11 APRIL s/d 17 APRIL 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 14 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
ODE : 11 APRIL s/d 17 APRIL 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
- 9.500 9.500 - 0.013 0.013 100.000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 15 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 18 APRIL s/d 24 APRIL 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 15 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 18 APRIL s/d 24 APRIL 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
9.500 - 9.500 0.013 - 0.013 100.000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 16 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
ODE : 25 APRIL s/d 01 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 16 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
ODE : 25 APRIL s/d 01 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
9.500 - 9.500 0.013 - 0.013 100.000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 17 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 02 MEI s/d 08 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 17 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 02 MEI s/d 08 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- 27.000 27.000 - 0.136 0.136 2.241
- - - - - - -
- 1,999.830 1,999.830 - 0.079 0.079 1.927
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
9.500 - 9.500 0.013 - 0.013 100.000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 18 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 09 MEI s/d 15 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 18 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 09 MEI s/d 15 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
27.000 34.000 61.000 0.136 0.172 0.308 5.062
- - - - - - -
1,999.830 - 1,999.830 0.079 - 0.079 1.927
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
9.500 - 9.500 0.013 - 0.013 100.000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 19 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 16 MEI s/d 22 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 19 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 16 MEI s/d 22 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
61.000 40.000 101.000 0.308 0.202 0.510 8.382
- - - - - - -
1,999.830 5,396.170 7,396.000 0.079 0.214 0.293 7.126
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
9.500 - 9.500 0.013 - 0.013 100.000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 20 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 23 MEI s/d 29 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 20 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 23 MEI s/d 29 MEI 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
101.000 - 101.000 0.510 - 0.510 8.382
- - - - - - -
7,396.000 - 7,396.000 0.293 - 0.293 7.126
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
9.500 - 9.500 0.013 - 0.013 100.000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 21 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
IODE : 30 MEI s/d 05 Juni 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 21 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
IODE : 30 MEI s/d 05 Juni 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
101.000 27.000 128.000 0.510 0.136 0.646 10.622
- - - - - - -
7,396.000 2,152.890 9,548.890 0.293 0.085 0.378 9.200
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
9.500 - 9.500 0.013 - 0.013 100.000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
NAGA SINAGA.ST D
NIP.
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 22 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
IODE : 06 Juni s/d 12 Juni 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
RESS LAPORAN MINGGUAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
MINGGU KE : 22 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
IODE : 06 Juni s/d 12 Juni 2016 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
128.000 11.000 139.000 0.646 0.056 0.701 11.535
- - - - - - -
9,548.890 815.700 ### 0.378 0.032 0.411 9.986
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
9.500 - 9.500 0.013 - 0.013 100.000
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
D
NIP.
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 01 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
ODE : 11 JANUARI S/D 25 JANUARI NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 01 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
ODE : 11 JANUARI S/D 25 JANUARI NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 01 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
ODE : 11 JANUARI S/D 25 JANUARI NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- 0.104 0.104
DANIEL SINULINGGA.ST
CHIEF INSPECTOR QUANTITY
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
: 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
PERIODE : 25 JA
NO.KONTRAK
No.
Item KONTRAK AWAL
U r a i an Pekerjaan Sat.
Pemba Harga Satuan Jumlah Harga Bobot
Kuantitas
yaran (Rp) (Rp) (%)
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 ### 125,600,000.00 0.299
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 ### 117,800,000.00 0.281
1.17 Pengamanan Lingkungan Hidup LS 1.00 13,560,000.00 13,560,000.00 0.032
1.21 Manajemen Mutu LS 1.00 57,500,000.00 57,500,000.00 0.137
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 3060.90 37,643.57 115,223,203.41 0.275
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan Diameter dalam 20 cm M' 480.00 183,117.38 87,896,342.40 0.209
2.3 (11a) Saluran pracetak U-Ditch + U-Ditch Cover (type 1) M' 425.00 1,462,397.92 621,519,116.00 1.481
2.3 (11b) Saluran pracetak U-Ditch + U-Ditch Cover (type 2) M' 100.00 2,059,530.15 205,953,015.00 0.491
DIVISI 3. PEKERJAAN TANAH
3.1(1a) Galian Biasa M3 18,457.90 38,578.57 712,079,387.20 1.697
3.1.(3) Galian Struktur dengan kedalaman 0-2 meter M3 28.60 103,110.84 2,948,970.02 0.007
3.2 (1a) Timbunan Biasa (dari Sumber Galian) M3 2,692.60 135,322.61 364,369,659.69 0.868
3.2(2a) Timbunan Pilihan dari sumber galian M3 8,641.20 169,834.78 1,467,576,300.94 3.497
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 3,640.20 454,393.26 1,654,082,345.05 3.942
5.3.(1) Perkerasan Beton Semen M3 10,695.90 2,134,313.19 ### 54.401
5.3.(3) Lapis Pondasi bawah Beton kurus M3 3,905.00 1,317,815.67 5,146,070,191.35 12.263
DIVISI 6. PERKERASAN ASPAL
6.1.(1)(a) Lapis resap pengikat-aspal cair Liter 600.00 11,630.47 6,978,282.00 0.017
6.1(2)(a) lapis perekat - aspal cair Liter 210.00 11,721.11 2,461,433.10 0.006
6.3(5a) Laston lapis aus (Ac-WC) Ton 55.68 1,248,200.07 69,499,779.90 0.166
6.3(6a) Laston lapis Antara (AC-BC) Ton 83.52 1,204,433.46 100,594,282.58 0.240
6.3.(8) Bahan anti Pengelupasan Kg 24.97 90,640.00 2,263,280.80 0.005
DIVISI 7. STRUKTUR
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
PERIODE : 25 JA
NO.KONTRAK : 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
7.1(5)b Beton mutu sedang fc'=30 MPa untuk ....... M3 45.40 2,365,320.84 107,385,566.14 0.256
7.1(7)a Beton mutu sedang fc'=20 MPa M3 1,205.01 2,117,381.71 2,551,466,134.37 6.080
7.1(10) Beton mutu rendah fc'=10 Mpa M3 277.43 1,213,486.82 336,657,648.47 0.802
7.3(1) Baja tulangan U 24 Polos KG ### 16,629.25 1,726,015,376.75 4.113
7.3(6) Anyaman kawat yang dilas (Welded Wire Mesh) KG 13,668.40 20,179.50 275,821,477.80 0.657
7.9.(1) Pasangan batu M3 29.00 746,172.66 21,639,007.14 0.052
7.15.(1) Pembongkaran Pasangan Batu M3 390.00 290,838.38 113,426,968.20 0.270
7.15.(2) Pembongkaran Beton M3 9.50 591,637.62 5,620,557.39 0.013
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4.(1) Marka Jalan Termplastik M2 1,149.90 161,572.60 185,792,332.74 0.443
8.4.(3a) Rambu jalan tunggal dengan permukaan pemantul Engineer Grade Buah 18.00 1,142,151.41 20,558,725.38 0.049
8.4.(10b) Kerb Pracetak jenis 2 (Penghalang/Barrier) M1 3,000.00 165,718.25 497,154,750.00 1.185
8.4.(10e) Kerb Pracetak jenis 5 (Penghalang Berparit/Barrier Gutter) t=30cm M1 2,160.00 184,436.38 398,382,580.80 0.949
8.4.(10f) Kerb Pracetak jenis 6 (kerb dngan bukaan) Buah 240.00 109,003.95 26,160,948.00 0.062
8.4.(10g) Kerb Pracetak jenis 7a (kerb pada pelandaian trotoar) Buah 10.00 126,065.24 1,260,652.40 0.003
8.4.(10h) Kerb Pracetak jenis 7b (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003
8.4.(10i) Kerb Pracetak jenis 7c (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003
8.4.(10j) Kerb Pracetak jenis 7d (kerb pada pelandaian trotoar) Buah 24.00 126,065.24 3,025,565.76 0.007
8.4.(12) Perkerasan Blok beton pada trotoar dan median M2 2,400.00 148,398.15 356,155,560.00 0.849
8.4(17) Unit lampu PJU solar cell lengan ganda h=11M, type LED 60 W Buah 27.00 59,914,450.81 1,617,690,171.87 3.855
DIVISI 9. PEKERJAAN HARIAN
9.1.(1) Mandor Jam 50.00 14,928.57 746,428.50 0.002
9.1.(2) Pekerja biasa Jam 100.00 9,428.57 942,857.00 0.002
9.1.(4)a Dump truk, kapasitas 3-4 m3 Jam 10.00 352,938.27 3,529,382.70 0.008
9.1.(11) Alat penggali (excavator) 80 -140 PK Jam 10.00 669,245.42 6,692,454.20 0.016
9.1.(18) Beton pengaduk (molen) 0.3 - 0.6 m3 Jam 10.00 138,818.43 1,388,184.30 0.003
9.1.(19) Pompa air 70 - 100 mm Jam 10.00 41,663.93 416,639.30 0.001
9.1.(20) Jack hammer Jam 10.00 27,756.81 277,568.10 0.001
A. TOTAL HARGA FISIK ### 100.000
B. BIAYA PERTAMBAHAN NILAI PPN, 10% X A ###
C. JUMLAH NILAI KONTRAK A + B ###
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
PERIODE : 25 JA
NO.KONTRAK : 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
D. JUMLAH NILAI KONTRAK A + B ###
E. REALISASI KUMM. PROGRESS ( % )
F. RENCANA ( % )
G DEVIASI KUMM. PROGRESS ( % )
Disetujui Oleh :
KOORDINATOR PENGAWAS LAPANGAN PT. W
PT.Triduta Mitraparama
NIP.
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 02 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 25 JANUARI S/D 25 FEBRUARI NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 02 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 25 JANUARI S/D 25 FEBRUARI NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 02 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
DE : 25 JANUARI S/D 25 FEBRUARI NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
Ir.EDISON MARBUN
SITE ENGINEERING QUANTITY
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
: 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
PERIODE : 25 FE
NO.KONTRAK
No.
Item KONTRAK AWAL
U r a i an Pekerjaan Sat.
Pemba Harga Satuan Jumlah Harga Bobot
Kuantitas
yaran (Rp) (Rp) (%)
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 ### 125,600,000.00 0.299
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 ### 117,800,000.00 0.281
1.17 Pengamanan Lingkungan Hidup LS 1.00 13,560,000.00 13,560,000.00 0.032
1.21 Manajemen Mutu LS 1.00 57,500,000.00 57,500,000.00 0.137
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 3060.90 37,643.57 115,223,203.41 0.275
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan Diameter dalam 20 cm M' 480.00 183,117.38 87,896,342.40 0.209
2.3 (11a) Saluran pracetak U-Ditch + U-Ditch Cover (type 1) M' 425.00 1,462,397.92 621,519,116.00 1.481
2.3 (11b) Saluran pracetak U-Ditch + U-Ditch Cover (type 2) M' 100.00 2,059,530.15 205,953,015.00 0.491
DIVISI 3. PEKERJAAN TANAH
3.1(1a) Galian Biasa M3 18,457.90 38,578.57 712,079,387.20 1.697
3.1.(3) Galian Struktur dengan kedalaman 0-2 meter M3 28.60 103,110.84 2,948,970.02 0.007
3.2 (1a) Timbunan Biasa (dari Sumber Galian) M3 2,692.60 135,322.61 364,369,659.69 0.868
3.2(2a) Timbunan Pilihan dari sumber galian M3 8,641.20 169,834.78 1,467,576,300.94 3.497
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 3,640.20 454,393.26 1,654,082,345.05 3.942
5.3.(1) Perkerasan Beton Semen M3 10,695.90 2,134,313.19 ### 54.401
5.3.(3) Lapis Pondasi bawah Beton kurus M3 3,905.00 1,317,815.67 5,146,070,191.35 12.263
DIVISI 6. PERKERASAN ASPAL
6.1.(1)(a) Lapis resap pengikat-aspal cair Liter 600.00 11,630.47 6,978,282.00 0.017
6.1(2)(a) lapis perekat - aspal cair Liter 210.00 11,721.11 2,461,433.10 0.006
6.3(5a) Laston lapis aus (Ac-WC) Ton 55.68 1,248,200.07 69,499,779.90 0.166
6.3(6a) Laston lapis Antara (AC-BC) Ton 83.52 1,204,433.46 100,594,282.58 0.240
6.3.(8) Bahan anti Pengelupasan Kg 24.97 90,640.00 2,263,280.80 0.005
DIVISI 7. STRUKTUR
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
PERIODE : 25 FE
NO.KONTRAK : 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
7.1(5)b Beton mutu sedang fc'=30 MPa untuk ....... M3 45.40 2,365,320.84 107,385,566.14 0.256
7.1(7)a Beton mutu sedang fc'=20 MPa M3 1,205.01 2,117,381.71 2,551,466,134.37 6.080
7.1(10) Beton mutu rendah fc'=10 Mpa M3 277.43 1,213,486.82 336,657,648.47 0.802
7.3(1) Baja tulangan U 24 Polos KG ### 16,629.25 1,726,015,376.75 4.113
7.3(6) Anyaman kawat yang dilas (Welded Wire Mesh) KG 13,668.40 20,179.50 275,821,477.80 0.657
7.9.(1) Pasangan batu M3 29.00 746,172.66 21,639,007.14 0.052
7.15.(1) Pembongkaran Pasangan Batu M3 390.00 290,838.38 113,426,968.20 0.270
7.15.(2) Pembongkaran Beton M3 9.50 591,637.62 5,620,557.39 0.013
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4.(1) Marka Jalan Termplastik M2 1,149.90 161,572.60 185,792,332.74 0.443
8.4.(3a) Rambu jalan tunggal dengan permukaan pemantul Engineer Grade Buah 18.00 1,142,151.41 20,558,725.38 0.049
8.4.(10b) Kerb Pracetak jenis 2 (Penghalang/Barrier) M1 3,000.00 165,718.25 497,154,750.00 1.185
8.4.(10e) Kerb Pracetak jenis 5 (Penghalang Berparit/Barrier Gutter) t=30cm M1 2,160.00 184,436.38 398,382,580.80 0.949
8.4.(10f) Kerb Pracetak jenis 6 (kerb dngan bukaan) Buah 240.00 109,003.95 26,160,948.00 0.062
8.4.(10g) Kerb Pracetak jenis 7a (kerb pada pelandaian trotoar) Buah 10.00 126,065.24 1,260,652.40 0.003
8.4.(10h) Kerb Pracetak jenis 7b (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003
8.4.(10i) Kerb Pracetak jenis 7c (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003
8.4.(10j) Kerb Pracetak jenis 7d (kerb pada pelandaian trotoar) Buah 24.00 126,065.24 3,025,565.76 0.007
8.4.(12) Perkerasan Blok beton pada trotoar dan median M2 2,400.00 148,398.15 356,155,560.00 0.849
8.4(17) Unit lampu PJU solar cell lengan ganda h=11M, type LED 60 W Buah 27.00 59,914,450.81 1,617,690,171.87 3.855
DIVISI 9. PEKERJAAN HARIAN
9.1.(1) Mandor Jam 50.00 14,928.57 746,428.50 0.002
9.1.(2) Pekerja biasa Jam 100.00 9,428.57 942,857.00 0.002
9.1.(4)a Dump truk, kapasitas 3-4 m3 Jam 10.00 352,938.27 3,529,382.70 0.008
9.1.(11) Alat penggali (excavator) 80 -140 PK Jam 10.00 669,245.42 6,692,454.20 0.016
9.1.(18) Beton pengaduk (molen) 0.3 - 0.6 m3 Jam 10.00 138,818.43 1,388,184.30 0.003
9.1.(19) Pompa air 70 - 100 mm Jam 10.00 41,663.93 416,639.30 0.001
9.1.(20) Jack hammer Jam 10.00 27,756.81 277,568.10 0.001
A. TOTAL HARGA FISIK ### 100.000
B. BIAYA PERTAMBAHAN NILAI PPN, 10% X A ###
C. JUMLAH NILAI KONTRAK A + B ###
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
PERIODE : 25 FE
NO.KONTRAK : 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
D. JUMLAH NILAI KONTRAK A + B ###
E. REALISASI KUMM. PROGRESS ( % )
F. RENCANA ( % )
G DEVIASI KUMM. PROGRESS ( % )
Disetujui Oleh :
KOORDINATOR PENGAWAS LAPANGAN PT. W
PT.Triduta Mitraparama
NIP.
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 03 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
ODE : 25 FEBRUARI S/D 25 MARET NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 03 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
ODE : 25 FEBRUARI S/D 25 MARET NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
Ir.EDISON MARBUN
SITE ENGINEERING QUANTITY
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
: 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
PERIODE : 25
NO.KONTRAK
No.
Item KONTRAK AWAL
U r a i an Pekerjaan Sat.
Pemba Harga Satuan Jumlah Harga Bobot
Kuantitas
yaran (Rp) (Rp) (%)
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 ### 125,600,000.00 0.299
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 ### 117,800,000.00 0.281
1.17 Pengamanan Lingkungan Hidup LS 1.00 13,560,000.00 13,560,000.00 0.032
1.21 Manajemen Mutu LS 1.00 57,500,000.00 57,500,000.00 0.137
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 3060.90 37,643.57 115,223,203.41 0.275
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan Diameter dalam 20 cm M' 480.00 183,117.38 87,896,342.40 0.209
2.3 (11a) Saluran pracetak U-Ditch + U-Ditch Cover (type 1) M' 425.00 1,462,397.92 621,519,116.00 1.481
2.3 (11b) Saluran pracetak U-Ditch + U-Ditch Cover (type 2) M' 100.00 2,059,530.15 205,953,015.00 0.491
DIVISI 3. PEKERJAAN TANAH
3.1(1a) Galian Biasa M3 18,457.90 38,578.57 712,079,387.20 1.697
3.1.(3) Galian Struktur dengan kedalaman 0-2 meter M3 28.60 103,110.84 2,948,970.02 0.007
3.2 (1a) Timbunan Biasa (dari Sumber Galian) M3 2,692.60 135,322.61 364,369,659.69 0.868
3.2(2a) Timbunan Pilihan dari sumber galian M3 8,641.20 169,834.78 1,467,576,300.94 3.497
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 3,640.20 454,393.26 1,654,082,345.05 3.942
5.3.(1) Perkerasan Beton Semen M3 10,695.90 2,134,313.19 ### 54.401
5.3.(3) Lapis Pondasi bawah Beton kurus M3 3,905.00 1,317,815.67 5,146,070,191.35 12.263
DIVISI 6. PERKERASAN ASPAL
6.1.(1)(a) Lapis resap pengikat-aspal cair Liter 600.00 11,630.47 6,978,282.00 0.017
6.1(2)(a) lapis perekat - aspal cair Liter 210.00 11,721.11 2,461,433.10 0.006
6.3(5a) Laston lapis aus (Ac-WC) Ton 55.68 1,248,200.07 69,499,779.90 0.166
6.3(6a) Laston lapis Antara (AC-BC) Ton 83.52 1,204,433.46 100,594,282.58 0.240
6.3.(8) Bahan anti Pengelupasan Kg 24.97 90,640.00 2,263,280.80 0.005
DIVISI 7. STRUKTUR
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
PERIODE : 25
NO.KONTRAK : 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
7.1(5)b Beton mutu sedang fc'=30 MPa untuk ....... M3 45.40 2,365,320.84 107,385,566.14 0.256
7.1(7)a Beton mutu sedang fc'=20 MPa M3 1,205.01 2,117,381.71 2,551,466,134.37 6.080
7.1(10) Beton mutu rendah fc'=10 Mpa M3 277.43 1,213,486.82 336,657,648.47 0.802
7.3(1) Baja tulangan U 24 Polos KG ### 16,629.25 1,726,015,376.75 4.113
7.3(6) Anyaman kawat yang dilas (Welded Wire Mesh) KG 13,668.40 20,179.50 275,821,477.80 0.657
7.9.(1) Pasangan batu M3 29.00 746,172.66 21,639,007.14 0.052
7.15.(1) Pembongkaran Pasangan Batu M3 390.00 290,838.38 113,426,968.20 0.270
7.15.(2) Pembongkaran Beton M3 9.50 591,637.62 5,620,557.39 0.013
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4.(1) Marka Jalan Termplastik M2 1,149.90 161,572.60 185,792,332.74 0.443
8.4.(3a) Rambu jalan tunggal dengan permukaan pemantul Engineer Grade Buah 18.00 1,142,151.41 20,558,725.38 0.049
8.4.(10b) Kerb Pracetak jenis 2 (Penghalang/Barrier) M1 3,000.00 165,718.25 497,154,750.00 1.185
8.4.(10e) Kerb Pracetak jenis 5 (Penghalang Berparit/Barrier Gutter) t=30cm M1 2,160.00 184,436.38 398,382,580.80 0.949
8.4.(10f) Kerb Pracetak jenis 6 (kerb dngan bukaan) Buah 240.00 109,003.95 26,160,948.00 0.062
8.4.(10g) Kerb Pracetak jenis 7a (kerb pada pelandaian trotoar) Buah 10.00 126,065.24 1,260,652.40 0.003
8.4.(10h) Kerb Pracetak jenis 7b (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003
8.4.(10i) Kerb Pracetak jenis 7c (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003
8.4.(10j) Kerb Pracetak jenis 7d (kerb pada pelandaian trotoar) Buah 24.00 126,065.24 3,025,565.76 0.007
8.4.(12) Perkerasan Blok beton pada trotoar dan median M2 2,400.00 148,398.15 356,155,560.00 0.849
8.4(17) Unit lampu PJU solar cell lengan ganda h=11M, type LED 60 W Buah 27.00 59,914,450.81 1,617,690,171.87 3.855
DIVISI 9. PEKERJAAN HARIAN
9.1.(1) Mandor Jam 50.00 14,928.57 746,428.50 0.002
9.1.(2) Pekerja biasa Jam 100.00 9,428.57 942,857.00 0.002
9.1.(4)a Dump truk, kapasitas 3-4 m3 Jam 10.00 352,938.27 3,529,382.70 0.008
9.1.(11) Alat penggali (excavator) 80 -140 PK Jam 10.00 669,245.42 6,692,454.20 0.016
9.1.(18) Beton pengaduk (molen) 0.3 - 0.6 m3 Jam 10.00 138,818.43 1,388,184.30 0.003
9.1.(19) Pompa air 70 - 100 mm Jam 10.00 41,663.93 416,639.30 0.001
9.1.(20) Jack hammer Jam 10.00 27,756.81 277,568.10 0.001
A. TOTAL HARGA FISIK ### 100.000
B. BIAYA PERTAMBAHAN NILAI PPN, 10% X A ###
C. JUMLAH NILAI KONTRAK A + B ###
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
PERIODE : 25
NO.KONTRAK : 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
D. JUMLAH NILAI KONTRAK A + B ###
E. REALISASI KUMM. PROGRESS ( % )
F. RENCANA ( % )
G DEVIASI KUMM. PROGRESS ( % )
Disetujui Oleh :
KOORDINATOR PENGAWAS LAPANGAN PT. W
PT.Triduta Mitraparama
NIP.
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 04 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 25 MARET S/D 25 APRIL NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- 255.500 255.500 - 0.177 0.177 65.513
- 9.500 9.500 - 0.013 0.013 100.000
-
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
-
50.000 - 50.000 0.002 - 0.002 100.000
100.000 - 100.000 0.002 - 0.002 100.000
10.000 - 10.000 0.008 - 0.008 100.000
10.000 - 10.000 0.016 - 0.016 100.000
10.000 - 10.000 0.003 - 0.003 100.000
10.000 - 10.000 0.001 - 0.001 100.000
10.000 - 10.000 0.001 - 0.001 100.000
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 04 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
RIODE : 25 MARET S/D 25 APRIL NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
Ir.EDISON MARBUN
SITE ENGINEERING QUANTITY
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
: 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
PERIODE :
NO.KONTRAK
No.
Item KONTRAK AWAL
U r a i an Pekerjaan Sat.
Pemba Harga Satuan Jumlah Harga Bobot
Kuantitas
yaran (Rp) (Rp) (%)
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 ### 125,600,000.00 0.299
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 ### 117,800,000.00 0.281
1.17 Pengamanan Lingkungan Hidup LS 1.00 13,560,000.00 13,560,000.00 0.032
1.21 Manajemen Mutu LS 1.00 57,500,000.00 57,500,000.00 0.137
DIVISI 2. DRAINASE
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 3060.90 37,643.57 115,223,203.41 0.275
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan Diameter dalam 20 cm M' 480.00 183,117.38 87,896,342.40 0.209
2.3 (11a) Saluran pracetak U-Ditch + U-Ditch Cover (type 1) M' 425.00 1,462,397.92 621,519,116.00 1.481
2.3 (11b) Saluran pracetak U-Ditch + U-Ditch Cover (type 2) M' 100.00 2,059,530.15 205,953,015.00 0.491
DIVISI 3. PEKERJAAN TANAH
3.1(1a) Galian Biasa M3 18,457.90 38,578.57 712,079,387.20 1.697
3.1.(3) Galian Struktur dengan kedalaman 0-2 meter M3 28.60 103,110.84 2,948,970.02 0.007
3.2 (1a) Timbunan Biasa (dari Sumber Galian) M3 2,692.60 135,322.61 364,369,659.69 0.868
3.2(2a) Timbunan Pilihan dari sumber galian M3 8,641.20 169,834.78 1,467,576,300.94 3.497
DIVISI 5. PERKERASAN BERBUTIR
5.1.(1) Lapis Pondasi Agregat Kelas A M3 3,640.20 454,393.26 1,654,082,345.05 3.942
5.3.(1) Perkerasan Beton Semen M3 10,695.90 2,134,313.19 ### 54.401
5.3.(3) Lapis Pondasi bawah Beton kurus M3 3,905.00 1,317,815.67 5,146,070,191.35 12.263
DIVISI 6. PERKERASAN ASPAL
6.1.(1)(a) Lapis resap pengikat-aspal cair Liter 600.00 11,630.47 6,978,282.00 0.017
6.1(2)(a) lapis perekat - aspal cair Liter 210.00 11,721.11 2,461,433.10 0.006
6.3(5a) Laston lapis aus (Ac-WC) Ton 55.68 1,248,200.07 69,499,779.90 0.166
6.3(6a) Laston lapis Antara (AC-BC) Ton 83.52 1,204,433.46 100,594,282.58 0.240
6.3.(8) Bahan anti Pengelupasan Kg 24.97 90,640.00 2,263,280.80 0.005
DIVISI 7. STRUKTUR
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
PERIODE :
NO.KONTRAK : 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
7.1(5)b Beton mutu sedang fc'=30 MPa untuk ....... M3 45.40 2,365,320.84 107,385,566.14 0.256
7.1(7)a Beton mutu sedang fc'=20 MPa M3 1,205.01 2,117,381.71 2,551,466,134.37 6.080
7.1(10) Beton mutu rendah fc'=10 Mpa M3 277.43 1,213,486.82 336,657,648.47 0.802
7.3(1) Baja tulangan U 24 Polos KG ### 16,629.25 1,726,015,376.75 4.113
7.3(6) Anyaman kawat yang dilas (Welded Wire Mesh) KG 13,668.40 20,179.50 275,821,477.80 0.657
7.9.(1) Pasangan batu M3 29.00 746,172.66 21,639,007.14 0.052
7.15.(1) Pembongkaran Pasangan Batu M3 390.00 290,838.38 113,426,968.20 0.270
7.15.(2) Pembongkaran Beton M3 9.50 591,637.62 5,620,557.39 0.013
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR
8.4.(1) Marka Jalan Termplastik M2 1,149.90 161,572.60 185,792,332.74 0.443
8.4.(3a) Rambu jalan tunggal dengan permukaan pemantul Engineer Grade Buah 18.00 1,142,151.41 20,558,725.38 0.049
8.4.(10b) Kerb Pracetak jenis 2 (Penghalang/Barrier) M1 3,000.00 165,718.25 497,154,750.00 1.185
8.4.(10e) Kerb Pracetak jenis 5 (Penghalang Berparit/Barrier Gutter) t=30cm M1 2,160.00 184,436.38 398,382,580.80 0.949
8.4.(10f) Kerb Pracetak jenis 6 (kerb dngan bukaan) Buah 240.00 109,003.95 26,160,948.00 0.062
8.4.(10g) Kerb Pracetak jenis 7a (kerb pada pelandaian trotoar) Buah 10.00 126,065.24 1,260,652.40 0.003
8.4.(10h) Kerb Pracetak jenis 7b (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003
8.4.(10i) Kerb Pracetak jenis 7c (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003
8.4.(10j) Kerb Pracetak jenis 7d (kerb pada pelandaian trotoar) Buah 24.00 126,065.24 3,025,565.76 0.007
8.4.(12) Perkerasan Blok beton pada trotoar dan median M2 2,400.00 148,398.15 356,155,560.00 0.849
8.4(17) Unit lampu PJU solar cell lengan ganda h=11M, type LED 60 W Buah 27.00 59,914,450.81 1,617,690,171.87 3.855
DIVISI 9. PEKERJAAN HARIAN
9.1.(1) Mandor Jam 50.00 14,928.57 746,428.50 0.002
9.1.(2) Pekerja biasa Jam 100.00 9,428.57 942,857.00 0.002
9.1.(4)a Dump truk, kapasitas 3-4 m3 Jam 10.00 352,938.27 3,529,382.70 0.008
9.1.(11) Alat penggali (excavator) 80 -140 PK Jam 10.00 669,245.42 6,692,454.20 0.016
9.1.(18) Beton pengaduk (molen) 0.3 - 0.6 m3 Jam 10.00 138,818.43 1,388,184.30 0.003
9.1.(19) Pompa air 70 - 100 mm Jam 10.00 41,663.93 416,639.30 0.001
9.1.(20) Jack hammer Jam 10.00 27,756.81 277,568.10 0.001
A. TOTAL HARGA FISIK ### 100.000
B. BIAYA PERTAMBAHAN NILAI PPN, 10% X A ###
C. JUMLAH NILAI KONTRAK A + B ###
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRESS L
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
BUL
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA )
PERIODE :
NO.KONTRAK : 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
D. JUMLAH NILAI KONTRAK A + B ###
E. REALISASI KUMM. PROGRESS ( % )
F. RENCANA ( % )
G DEVIASI KUMM. PROGRESS ( % )
Disetujui Oleh :
KOORDINATOR PENGAWAS LAPANGAN PT. W
PT.Triduta Mitraparama
NIP.
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 05 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
PERIODE : 25 April S/D 25 Mei NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- - - - - - -
- 101.000 101.000 - 0.510 0.510 8.382
- - - - - - -
- 7,396.000 7,396.000 - 0.293 0.293 7.126
- - - - - - -
- - - - - - -
255.500 - 255.500 0.177 - 0.177 65.513
9.500 - 9.500 0.013 - 0.013 100.000
-
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
- - - - - - -
-
50.000 - 50.000 0.002 - 0.002 100.000
100.000 - 100.000 0.002 - 0.002 100.000
10.000 - 10.000 0.008 - 0.008 100.000
10.000 - 10.000 0.016 - 0.016 100.000
10.000 - 10.000 0.003 - 0.003 100.000
10.000 - 10.000 0.001 - 0.001 100.000
10.000 - 10.000 0.001 - 0.001 100.000
: PT.Wahana Mitraamerta ( Jo )
GRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 05 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
PERIODE : 25 April S/D 25 Mei NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
Ir.EDISON MARBUN
SITE ENGINEERING QUANTITY
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA PROGRES
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
NIP.
: PT.Wahana Mitraamerta ( Jo )
ROGRESS LAPORAN BULANAN KONSULTAN : PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
BULAN KE : 01 NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
KONTRAKTOR : PT.Budi Graha Perkasa
PERIODE : 11 JANUARI S/D 25 JANUARI NO. KONTRAK : HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
- 0.104 0.104
DANIEL SINULINGGA.ST
CHIEF INSPECTOR QUANTITY
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II
PROVINSI SUMATERA UTARA
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS
ADD-01
100.000 41,962,976,646.38
Selisih (7,234.09)
(0.00)
1,711,471,463.59 ###
: PT.Wahana Mitraamerta ( Jo )
: PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
: HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
: PT.Budi Graha Perkasa
: HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
: PT.Wahana Mitraamerta ( Jo )
: PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
: HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
: PT.Budi Graha Perkasa
: HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
: PT.Wahana Mitraamerta ( Jo )
: PT.Triduta Mitraparama
: PT.Ciriatama Nusawidya
: HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
: PT.Budi Graha Perkasa
: HK.02.03/Br.S1/PPK19/PAKET-19/13/2016
SATUAN KERJA PELAKSANAAN JALAN NASIONAL WILAYAH II : PT.Wahana Mitraamerta ( Jo
PROVINSI SUMATERA UTARA KONSULTAN : PT.Triduta Mitraparama
PEJABAT PEMBUAT KOMITMEN 17 MEDAN TIMUR,CS RENCANA SISA PEKERJAAN : PT.Ciriatama Nusawidya
NAMA PAKET : PEMBANGUNAN JALAN CEMARA TR-17B (LINGKAR LUAR UTARA ) KONTRAKTOR : PT.Budi Graha Perkasa
NO.KONTRAK : 02 / KTR-APBN / CEMARA / TR-17B / PPK17 / 2016
No.
Item KONTRAK ADDENDUM PROGRESS AGUSTUS 2016 SISA PEKERJAAN
U r a i an Pekerjaan Sat.
M - 33 M - 34
Pemba Harga Satuan Jumlah Harga Bobot Jumlah Harga Bobot Jumlah Harga Bobot
Kuantitas Kuantitas Kuantitas 23 - 29 30 - 05
yaran (Rp) (Rp) (%) (Rp) (%) (Rp) (%) Kuantitas Bobot Kuantitas Bobot
DIVISI 1. UMUM
1.2 Mobilisasi LS 1.00 ### 125,600,000.00 0.299 1.00 125,600,000.000 0.299 - - - - -
1.8.(1) Manajemen dan Keselamatan Lalu Lintas LS 1.00 ### 117,800,000.00 0.281 0.31 36,518,000.000 0.087 0.690 81,282,000.000 0.194 - -
1.17 Pengamanan Lingkungan Hidup LS 1.00 13,560,000.00 13,560,000.00 0.032 - - - 1.000 13,560,000.000 0.032 - -
1.18(3) Relokasi Utilitas Dan Pelayanan PLN Yang Ada LS 1.00 ### 250,000,000.00 0.596 - - 1.000 250,000,000.000 0.596 0.25 0.149 0.250 0.149
1.21 Manajemen Mutu LS 1.00 57,500,000.00 57,500,000.00 0.137 0.14 7,935,000.000 0.019 0.862 49,565,000.000 0.118 - -
DIVISI 2. DRAINASE - - -
2.1(1) Galian untuk Selokan Drainase dan Saluran Air M3 3523.10 37,643.57 132,622,061.47 0.316 3,060.90 115,223,203.413 0.275 462.200 17,398,858.054 0.041 57.775 0.005 57.775 0.005
2.3.(6) Gorong-gorong Pipa Beton Tanpa Tulangan Diameter dalam 20 cm M' 852.50 183,117.38 156,107,566.45 0.372 - - - 852.500 156,107,566.450 0.372 - - - -
2.3 (11a) Saluran pracetak U-Ditch + U-Ditch Cover (type 1) M' 425.00 1,462,397.92 621,519,116.00 1.481 - - - 425.000 621,519,116.000 1.481 - - - -
2.3 (11b) Saluran pracetak U-Ditch + U-Ditch Cover (type 2) M' 100.00 2,059,530.15 205,953,015.00 0.491 - - - 100.000 205,953,015.000 0.491 - - - -
DIVISI 3. PEKERJAAN TANAH - - - -
3.1(1a) Galian Biasa M3 8,925.61 38,578.57 344,337,251.47 0.821 7,995.58 308,458,042.721 0.735 930.030 35,879,208.748 0.086 310.010 0.029 310.010 0.029
3.1.(3) Galian Struktur dengan kedalaman 0-2 meter M3 101.57 103,110.84 10,472,761.80 0.025 - - - 101.568 10,472,761.797 0.025 - - - -
3.2 (1a) Timbunan Biasa (dari Sumber Galian) M3 2,606.53 135,322.61 352,722,172.00 0.841 - - - 2,606.528 352,722,171.998 0.841 372.361 0.120 372.361 0.120
3.2(2a) Timbunan Pilihan dari sumber galian M3 7,270.68 169,834.78 1,234,814,872.72 2.943 6,117.85 1,039,023,708.823 2.476 1,152.833 195,791,163.896 0.467 288.208 0.117 288.208 0.117
3.4(3) Penebangan Pohon Pilihan dia. 30 -50 cm Pohon 142.00 175,941.12 24,983,639.04 0.060 - - 142.000 24,983,639.040 0.060 - -
DIVISI 5. PERKERASAN BERBUTIR - - -
5.1.(1) Lapis Pondasi Agregat Kelas A M3 3,292.10 454,393.26 1,495,909,349.38 3.565 1,982.13 900,666,512.444 2.146 1,309.973 595,242,836.931 1.418 261.995 0.284 261.995 0.284
5.3.(1) Perkerasan Beton Semen M3 10,438.68 2,134,313.19 22,279,412,410.19 53.093 2,223.00 4,744,578,221.370 11.307 8,215.680 17,534,834,188.819 41.786 456.427 2.321 456.427 2.321
5.3.(3) Lapis Pondasi bawah Beton kurus M3 3,728.10 1,317,815.67 4,912,948,599.33 11.708 1,320.50 1,740,175,592.235 4.147 2,407.600 3,172,773,007.092 7.561 343.943 1.080 343.943 1.080
DIVISI 6. PERKERASAN ASPAL - - - - - -
6.1.(1)(a) Lapis resap pengikat-aspal cair Liter 1,728.00 11,630.47 20,097,452.16 0.048 - - - 1,728.000 20,097,452.160 0.048 - -
6.1(2)(a) lapis perekat - aspal cair Liter 288.00 11,721.11 3,375,679.68 0.008 - - - 288.000 3,375,679.680 0.008 - -
6.3(5a) Laston lapis aus (Ac-WC) Ton 176.64 1,248,200.07 220,482,060.37 0.525 - - - 176.640 220,482,060.365 0.525 - -
6.3(6a) Laston lapis Antara (AC-BC) Ton 264.96 1,204,433.46 319,126,689.56 0.760 - - - 264.960 319,126,689.562 0.760 - -
6.3.(8) Bahan anti Pengelupasan Kg 32.33 90,640.00 2,930,391.20 0.007 - - - 32.330 2,930,391.200 0.007 - -
DIVISI 7. STRUKTUR - - - -
7.1(5)b Beton mutu sedang fc'=30 MPa untuk ....... M3 35.87 2,365,320.84 84,839,327.89 0.202 - - - 35.868 84,839,327.889 0.202 - - - -
7.1(7)a Beton mutu sedang fc'=20 MPa M3 1,468.99 2,117,381.71 3,110,413,405.13 7.412 310.50 657,447,020.955 1.567 1,158.490 2,452,966,384.171 5.846 127.608 0.644 131.858 0.665
7.1(10) Beton mutu rendah fc'=10 Mpa M3 633.16 1,213,486.82 768,334,421.48 1.831 - - - 633.163 768,334,421.477 1.831 57.560 0.166 57.560 0.166
7.3(1) Baja tulangan U 24 Polos KG 114,194.82 16,629.25 1,898,974,210.49 4.525 20,729.76 344,720,302.291 0.821 93,465.064 1,554,253,908.194 3.704 ### 0.206 ### 0.206
7.3(6) Anyaman kawat yang dilas (Welded Wire Mesh) KG 13,841.65 20,179.50 279,317,576.18 0.666 - - - 13,841.650 279,317,576.175 0.666 768.981 0.037 768.981 0.037
7.9.(1) Pasangan batu M3 29.94 746,172.66 22,340,409.44 0.053 - - - 29.940 22,340,409.440 0.053 - - - -
7.15.(1) Pembongkaran Pasangan Batu M3 377.65 290,838.38 109,835,114.21 0.262 255.50 74,309,206.090 0.177 122.150 35,525,908.117 0.085 - -
7.15.(2) Pembongkaran Beton M3 585.64 591,637.62 346,486,655.78 0.826 9.50 5,620,557.390 0.013 576.140 340,866,098.387 0.812 115.23 0.162 115.228 0.162
DIVISI 8. PENGEMBALIAN KONDISI DAN PEKERJAAN MINOR - - - -
8.3(3) Pohon Jenis Buah 354.00 70,000.00 24,780,000.00 0.059 - - - 354.000 24,780,000.000 0.059 - - - -
8.4.(1) Marka Jalan Termplastik M2 1,154.10 161,572.60 186,470,937.66 0.444 - - - 1,154.100 186,470,937.660 0.444 - - - -
8.4.(3a) Rambu jalan tunggal dengan permukaan pemantul Engineer Grade Buah 18.00 1,142,151.41 20,558,725.38 0.049 - - - 18.000 20,558,725.380 0.049 - - - -
8.4.(10b) Kerb Pracetak jenis 2 (Penghalang/Barrier) M1 2,964.80 165,718.25 491,321,467.60 1.171 - - - 2,964.800 491,321,467.600 1.171 - - - -
8.4.(10e) Kerb Pracetak jenis 5 (Penghalang Berparit/Barrier Gutter) t=30cm M1 2,318.80 184,436.38 427,671,077.94 1.019 - - - 2,318.800 427,671,077.944 1.019 - - - -
8.4.(10f) Kerb Pracetak jenis 6 (kerb dngan bukaan) Buah 339.00 109,003.95 36,952,339.05 0.088 - - - 339.000 36,952,339.050 0.088 - - - -
8.4.(10g) Kerb Pracetak jenis 7a (kerb pada pelandaian trotoar) Buah 10.00 126,065.24 1,260,652.40 0.003 - - - 10.000 1,260,652.400 0.003 - - - -
8.4.(10h) Kerb Pracetak jenis 7b (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003 - - - 10.000 1,200,152.400 0.003 - - - -
8.4.(10i) Kerb Pracetak jenis 7c (kerb pada pelandaian trotoar) Buah 10.00 120,015.24 1,200,152.40 0.003 - - - 10.000 1,200,152.400 0.003 - - - -
8.4.(10j) Kerb Pracetak jenis 7d (kerb pada pelandaian trotoar) Buah 24.00 126,065.24 3,025,565.76 0.007 - - - 24.000 3,025,565.760 0.007 - - - -
8.4.(12) Perkerasan Blok beton pada trotoar dan median M2 2,016.76 148,398.15 299,283,452.99 0.713 - - - 2,016.760 299,283,452.994 0.713 - - - -
8.4(17) Unit lampu PJU solar cell lengan ganda h=11M, type LED 60 W Buah 15.00 59,914,450.81 898,716,762.15 2.142 - - - 15.000 898,716,762.150 2.142 - - - -
DIVISI 9. PEKERJAAN HARIAN - - -
9.1.(1) Mandor Jam 100.00 14,928.57 1,492,857.00 0.004 50.00 746,428.500 0.002 50.000 746,428.500 0.002 - -
9.1.(2) Pekerja biasa Jam 200.00 9,428.57 1,885,714.00 0.004 100.00 942,857.000 0.002 100.000 942,857.000 0.002 - -
9.1.(4)a Dump truk, kapasitas 3-4 m3 Jam 24.00 352,938.27 8,470,518.48 0.020 10.00 3,529,382.700 0.008 14.000 4,941,135.780 0.012 - -
9.1.(11) Alat penggali (excavator) 80 -140 PK Jam 45.00 669,245.42 30,116,043.90 0.072 10.00 6,692,454.200 0.016 35.000 23,423,589.700 0.056 - -
9.1.(18) Beton pengaduk (molen) 0.3 - 0.6 m3 Jam 29.00 138,818.43 4,025,734.47 0.010 10.00 1,388,184.300 0.003 19.000 2,637,550.170 0.006 - -
9.1.(19) Pompa air 70 - 100 mm Jam 25.00 41,663.93 1,041,598.25 0.002 10.00 416,639.300 0.001 15.000 624,958.950 0.001 - -
9.1.(20) Jack hammer Jam 25.00 27,756.81 693,920.25 0.002 10.00 277,568.100 0.001 15.000
- 416,352.150
- 0.001 - -
A. TOTAL HARGA FISIK 1.15 41,962,983,880.47 100.000 10,114,268,881.84 24.103 31,848,714,998.64 75.897 5.320 5.342
B. BIAYA PERTAMBAHAN NILAI PPN, 10% X A 4,196,298,388.05 1,011,426,888.19 29.42 34.76
C. JUMLAH NILAI KONTRAK A + B 46,159,282,268.52 11,125,695,770.03
D. JUMLAH NILAI KONTRAK A + B 46,159,282,000.00 11,125,695,000.00
Disetujui Oleh : Konsultan Supervisi Kontraktor Pelaksana
Pejabat Pembuat Komitmen PT. Wahana Mitra Amerta ( Jo ) PT. Budi Graha Perkasa
PPK 17 (METROPOLITAN MEDAN TIMUR, Cs) PT.Triduta Mitraparama PT.Ciriatama Nusawidya
M - 33 M - 34
No Uraian Pekerjaan Sat Volume
23 - 29 30
Galian untuk Selokan Drainase dan Saluran Air m3 462.20 57.78 57.78
Gorong-gorong Pipa Beton Tanpa Tulangan Diameter dalam 20 m' 852.50
Saluran pracetak U-Ditch + U-Ditch Cover (type 1) m' 425.00
Saluran pracetak U-Ditch + U-Ditch Cover (type 2) m' 100.00
Beton mutu rendah fc'=10 Mpa m3 633.16 57.56 57.56
Beton mutu sedang fc'=20 MPa m3 1,158.49 127.61 131.86
Saluran U-Ditch 1110.22 123.36 123.36
Box Culvert Sidomulyo 5 4.25
Pinus Raya 7 5.95
Wartawan 7 5.95
Perdata 5 4.25
Mesjid 5 4.25 4.25
Flamboyan 5 4.25
Pasar ikan 5 4.25 4.25
SPBU 15 15.12 4.25
Pasangan batu m3 29.94
Timbunan Pilihan
Aggregat Base A
Rigid K-350
Lean Concrete
Box Culvert 150 x 150
- 5 6 - 12 13 - 19 20 - 26 27 - 3 4 - 10 11 - 17 18 -
310.01 310.01
101.57
372.36 372.36 372.36 372.36 372.36
288.21 288.21 288.21
261.99 261.99 261.99 261.99
456.43 912.85 912.85 912.85 912.85 912.85 912.85 912.85
343.94 343.94 343.94 343.94 343.94 343.94
35.87
5,192.50 10,385.01 10,385.01 10,385.01 10,385.01 10,385.01 10,385.01 10,385.01
768.98 1,537.96 1,537.96 1,537.96 1,537.96 1,537.96 1,537.96 1,537.96
Kap. Produksi
Kap. Produksi
Kap. Produksi
Kap. Produksi
vert 150 x 150
118.00
384.70
24 25 - 31 1 - 5
121.79 121.79
141.67 141.67
100.00
57.56 57.56 57.56
123.36 - -
123.36
372.36 372.36
261.99
912.85 912.85
343.94
10,385.01 10,385.01
1,537.96 1,537.96
118.00 118.00 118.00
384.70 384.70 384.70
9.00 9.00
741.20 741.20