RENCANA PENGGUNAAN DANA (RPD)

VOLUME JUMLAH HARGA (Rp)

No URAIAN SAT HARGA SATUAN


ADDENDUM-I (Rp) REALISASI REALISASI

I PEKERJAAN PEMATANGAN LAHAN


A PEKERJAAN PENDAHULUAN
1 Patok Dan Pengukuran Kembali Pkt 1,500,000.00 1.00 1,500,000.00
2 Pembersihan Menggunakan Alat Berat m2 15,200.00 11,120.00 169,024,000.00
3 Direksi keet Unit 7,500,000.00 1.00 7,500,000.00
4 Mobilisasi Dan Demobilisasi Unit 25,000,000.00 0.50 12,500,000.00
5 Pekerjaan Cutting M3 3,290.52 22,884.24 75,301,057.53
6 Pekerjaan Fill M3 1,360.12 31,946.96 43,451,613.74
7 Biaya SMK-3 Pkt 13,130,000.00 0.50 6,565,000.00
JUMLAH 315,841,671.26
II PEKERJAAN KONSTRUKSI BANGUNAN UTAMA
A PEKERJAAN PENDAHULUAN
1 Pekerjaan Pengukuran dan Pemasangan Bowplank m 543,800.00 116.00 63,080,800.00
B PEKERJAAN PEMATANGAN LAHAN
B-1 PEKERJAAN PENDAHULUAN
1 Pekerjaan Galian Tanah Pondasi Menerus m3 92,100.00 140.00 12,894,000.00
2 Pekerjaan Urugan Pasir dibawah Pondasi Menerus m3 192,600.00 8.75 1,685,250.00
3 Pekerjaan Lantai Kerja beton mutu fc = 7,4 Mpa (K-100) m3 933,800.00 17.50 16,341,500.00
4 Pekerjaan Pondasi Menerus Batu Belah, Camp. 1 4 m3 1,032,500.00 77.00 79,502,500.00
5 Pekerjaan Urugan Kembali Pondasi Menerus Batu Belah m3 34,600.00 36.75 1,271,550.00
B-2 Pekerjaan Tanah Pondasi Tapak
1 Pekerjaan Galian Tanah Pondasi Tapak m3 92,100.00 5.18 477,078.00
2 Pekerjaan Urugan Pasir dibawah Pondasi Tapak m3 192,600.00 0.22 42,372.00
3 Pekerjaan Lantai Kerja beton mutu fc = 7,4 Mpa (K-100) Pondasi Tapak m3 933,800.00 0.43 401,534.00
4 Beton K175 m3 1,155,900.00 1.15 1,329,285.00
5 Besi Beton kg 18,100.00 102.22 1,850,182.00
6 Bekesting Pondasi m2 326,381.50 7.20 2,349,946.80
B-3 Pedestal Pondasi Tapak
1 Beton K175 m3 1,155,900.00 0.43 497,037.00
2 Besi Beton kg 18,100.00 46.85 847,985.00
3 Bekesting Pondasi m2 326,381.50 8.64 2,819,936.16
4 Pekerjaan Urugan Kembali m3 34,600.00 2.95 102,070.00
C PEKERJAAN BETON / STRUKTUR
C-1 Pekerjaan Sloof 20/25 Beton Bertulang
1 Pekerjaan Galian Tanah m3 92,100.00 8.75 805,875.00
2 Beton K175 U.20x25 cm m3 1,155,900.00 8.75 10,114,125.00
3 Besi Beton kg 18,100.00 908.64 16,446,384.00
4 Bekesting Sloof m2 352,141.50 70.00 24,649,905.00
C-2 Pekerjaan Kolom 20/20 Beton Bertulang (K1)
1 Beton K175 m3 1,155,900.00 7.20 8,322,480.00
2 Besi Beton kg 18,100.00 1,130.86 20,468,566.00
3 Bekesting Kolom m2 650,750.50 144.00 93,708,072.00
C-3 Pekerjaan Ring Balok 15/20 Beton Bertulang untuk Selasar
1 Beton K175 m3 1,155,900.00 2.01 2,323,359.00
2 Besi Beton kg 18,100.00 350.14 6,337,534.00
3 Bekesting Ring Balok m2 687,030.70 36.85 25,317,081.30
C-4 Pekerjaan Ring Balok 15/20 Beton Bertulang untuk Ruangan
1 Beton K175 m3 1,155,900.00 4.80 5,548,320.00
2 Besi Beton kg 18,100.00 831.84 15,056,304.00
3 Bekesting Ring Balok m2 687,030.70 88.00 60,458,701.60
4 Pekerjaan Kolom Praktis 11/11 Beton Bertulang m 129,900.00 52.00 6,754,800.00
D PEKERJAAN DINDING
D-1 Dinding Bangunan
1 Pekerjaan Dinding Bata Merah 1/2 Bata, Camp. 1 SP 2 PP m2 141,900.00 77.00 10,926,300.00
D-2 untuk Trasraam T. 50 cm Ruangan
1 Pekerjaan Dinding Bata Merah 1/2 Bata Ruangan, Camp. 1 SP 4 PP m2 130,000.00 442.55 57,531,500.00
2 Pekerjaan Plesteran Ruangan, Camp. 1 SP 2 PP tebal 1,5 cm m2 87,500.00 154.00 13,475,000.00
3 Pekerjaan Plesteran Ruangan, Camp. 1 SP 4 PP tebal 1,5 cm m2 81,300.00 885.10 71,958,630.00
VOLUME JUMLAH HARGA (Rp)

No URAIAN SAT HARGA SATUAN


ADDENDUM-I (Rp) REALISASI REALISASI

E PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Baja Ringan C.75 m2 299,800.00 591.61 177,364,678.00
F PEKERJAAN PINTU, JENDELA DAN PARTISI KACA
1 Pasang Kosen Pintu Jendela Kayu Kelas II ( P2 ) Unit 1,500,000.00 4.00 6,000,000.00
4 Pasang Kosen (J2) bh 1,850,000.00 4.00 7,400,000.00
5 Pasang Kosen (J3) bh 1,850,000.00 11.00 20,350,000.00
JUMLAH 846,810,640.86
III PEKERJAAN KONSTRUKSI RUANG KELAS
A PEKERJAAN PENDAHULUAN
1 Pekerjaan Pengukuran dan Pemasangan Bowplank m 543,800.00 82.00 44,591,600.00
B PEKERJAAN PONDASI
B-1 Pekerjaan Pondasi Menerus
1 Pekerjaan Galian Tanah Pondasi Menerus m3 92,100.00 55.04 5,069,184.00
2 Pekerjaan Urugan Pasir dibawah Pondasi Menerus m3 192,600.00 3.44 662,544.00
3 Pekerjaan Batu Kosong Dibawah Pondasi Menerus m3 575,600.00 6.88 3,960,128.00
4 Pekerjaan Pondasi Menerus Batu Belah, Camp. 1 4 m3 1,032,500.00 23.22 23,974,650.00
5 Pekerjaan Urugan Kembali Pondasi Menerus Batu Belah m3 34,600.00 21.50 743,900.00
B-2 Pekerjaan Pondasi Telapak
1 Pekerjaan Galian Tanah Pondasi Tapak m3 92,100.00 6.48 596,808.00
2 Pekerjaan Urugan Pasir dibawah Pondasi Tapak m3 192,600.00 0.41 78,966.00
3 Pekerjaan Lantai Kerja beton mutu fc = 7,4 Mpa (K-100) Pondasi Tapak m3 933,800.00 0.50 466,900.00
4 Beton K175 m3 1,155,900.00 0.78 901,602.00
5 Besi Beton kg 18,100.00 117.13 2,120,053.00
6 Bekesting Pondasi m2 326,381.50 6.00 1,958,289.00
B-3 Pedestal Pondasi Tapak
1 Beton K175 m3 1,155,900.00 0.40 462,360.00
2 Besi Beton kg 18,100.00 74.16 1,342,296.00
3 Bekesting Pondasi m2 326,381.50 8.00 2,611,052.00
4 Pekerjaan Urugan Kembali m3 34,600.00 4.40 152,240.00
C PEKERJAAN BETON/STRUKTUR
C-1 Pekerjaan Sloof 20/25 Beton Bertulang
1 Pekerjaan Galian Tanah m3 92,100.00 6.05 557,205.00
2 Beton K175 U.20x25 cm m3 1,155,900.00 6.05 6,993,195.00
3 Besi Beton kg 18,100.00 628.94 11,383,814.00
4 Bekesting Sloof m2 352,141.50 48.40 17,043,648.60
C-2 Pekerjaan Kolom 20/20 Beton Bertulang (K1)
1 Beton K175 m3 1,155,900.00 3.84 4,438,656.00
2 Besi Beton kg 18,100.00 603.12 10,916,472.00
3 Bekesting Kolom m2 687,030.70 76.80 52,763,957.76
C-3 Pekerjaan Kolom 20/20 Beton Bertulang (K2) - Tiang Selasar
1 Beton K175 m3 1,155,900.00 1.60 1,849,440.00
2 Besi Beton kg 18,100.00 250.35 4,531,335.00
3 Bekesting Kolom m2 650,750.50 32.00 20,824,016.00
C-4 Pekerjaan Ring Balok 15/20 Beton Bertulang untuk Selasar
1 Beton K175 m3 1,155,900.00 1.05 1,213,695.00
2 Besi Beton kg 18,100.00 184.39 3,337,459.00
3 Bekesting Ring Balok m2 687,030.70 19.25 13,225,340.98
C-5 Pekerjaan Ring Balok 15/20 Beton Bertulang untuk Ruang Kelas
1 Beton K175 m3 1,155,900.00 2.58 2,982,222.00
2 Besi Beton kg 18,100.00 448.47 8,117,307.00
3 Bekesting Ring Balok m2 687,030.70 47.30 32,496,552.11
D PEKERJAAN DINDING
D-1 Dinding Bangunan
1 Pekerjaan Dinding Bata Merah 1/2 Bata, Camp. 1 SP 2 PP m2 141,900.00 43.00 6,101,700.00
D-2 untuk Trasraam T. 50 cm Ruangan
1 Pekerjaan Dinding Bata Merah 1/2 Bata Ruangan, Camp. 1 SP 4 PP m2 130,000.00 220.89 28,715,417.38
2 Pekerjaan Plesteran Ruangan, Camp. 1 SP 2 PP tebal 1,5 cm m2 87,500.00 86.00 7,525,000.00
3 Pekerjaan Plesteran Ruangan, Camp. 1 SP 4 PP tebal 1,5 cm m2 81,300.00 400.00 32,520,000.00
E PEKERJAAN ATAP
1 Pekerjaan Rangka Atap Baja Ringan C.75 m2 299,800.00 - -
F PEKERJAAN PINTU, JENDELA DAN VENTILASI
1 Pasang Kosen dan Daun Pintu Kayu Kelas II ( P2 ) Unit 1,500,000.00 3.00 4,500,000.00
2 Pekerjaan Kusen dan Daun Jendela (J1) Unit 2,500,000.00 15.00 37,500,000.00
3 Pekerjaan Kusen dan Daun Jendela (J3) Unit 2,500,000.00 3.00 7,500,000.00
JUMLAH 406,729,004.82
IV PEKERJAAN RUMAH DINAS
A PEKERJAAN PENDAHULUAN
1 Pekerjaan Pengukuran dan Pemasangan Bowplank m 543,800.00 45.00 24,471,000.00
VOLUME JUMLAH HARGA (Rp)

No URAIAN SAT HARGA SATUAN


ADDENDUM-I (Rp) REALISASI REALISASI

B PEKERJAAN PONDASI
B-1 Pekerjaan Pondasi Menerus
1 Pekerjaan Galian Tanah Pondasi Menerus m3 92,100.00 30.40 2,799,840.00
2 Pekerjaan Urugan Pasir dibawah Pondasi Menerus m3 192,600.00 1.52 292,752.00
3 Pekerjaan Batu Kosong Dibawah Pondasi Menerus m3 575,600.00 3.04 1,749,824.00
4 Pekerjaan Pondasi Menerus Batu Belah, Camp. 1 4 m3 1,032,500.00 16.72 17,263,400.00
5 Pekerjaan Urugan Kembali Pondasi Menerus Batu Belah m3 34,600.00 9.12 315,552.00
C PEKERJAAN BETON/STRUKTUR
C-1 Pekerjaan Sloof 20/25 Beton Bertulang
1 Beton K175 U.20x25 cm m3 1,155,900.00 - -
3 Bekesting Sloof m2 352,141.50 - -
JUMLAH 46,892,368.00
V PEKERJAAN JAMBAN
A PEKERJAAN PENDAHULUAN
1 Pekerjaan Pengukuran dan Pemasangan Bowplank m 543,800.00 54.00 29,365,200.00
B PEKERJAAN PONDASI
B-1 Pekerjaan Pondasi Menerus
1 Pekerjaan Galian Tanah Pondasi Menerus m3 92,100.00 21.76 2,004,096.00
2 Pekerjaan Urugan Pasir dibawah Pondasi Menerus m3 192,600.00 1.36 261,936.00
3 Pekerjaan Batu Kosong Dibawah Pondasi Menerus m3 575,600.00 2.72 1,565,632.00
4 Pekerjaan Pondasi Menerus Batu Belah, Camp. 1 4 m3 1,032,500.00 9.18 9,478,350.00
5 Pekerjaan Urugan Kembali Pondasi Menerus Batu Belah m3 34,600.00 8.50 294,100.00
C PEKERJAAN BETON/STRUKTUR
C-1 Pekerjaan Sloof 20/25 Beton Bertulang
1 Pekerjaan Galian Tanah Sloof 20 x 25 m3 92,100.00 1.70 156,570.00
2 Beton K175 U.20x25 cm m3 1,155,900.00 1.70 1,965,030.00
3 Besi Beton kg 18,100.00 178.32 3,227,592.00
4 Bekesting Sloof m2 352,141.50 13.60 4,789,124.40
5 Pekerjaan Kolom Praktis 15/15 Beton Bertulang m 129,900.00 45.50 5,910,450.00
C-2 Pekerjaan Ring Balok 15/20 Beton Bertulang Selasar
1 Beton K175 U.20x25 cm m3 1,155,900.00 1.02 1,179,018.00
2 Besi Beton kg 18,100.00 179.29 3,245,149.00
3 Bekesting untuk Ring Balok m2 687,030.70 18.70 12,847,474.09
D PEKERJAAN DINDING
D-1 Dinding Bangunan
1 Pekerjaan Dinding Bata Merah 1/2 Bata, Camp. 1 SP 2 PP m2 141,900.00 19.50 2,767,050.00
D-2 untuk Trasraam T. 50 cm Ruangan
1 Pekerjaan Dinding Bata Merah 1/2 Bata Ruangan, Camp. 1 SP 4 PP m2 130,000.00 119.04 15,475,200.00
2 Pekerjaan Plesteran Ruangan, Camp. 1 SP 2 PP tebal 1,5 cm m2 87,500.00 - -
3 Pekerjaan Plesteran Ruangan, Camp. 1 SP 4 PP tebal 1,5 cm m2 81,300.00 - -
E PEKERJAAN ATAP
E-1 Pekerjaan Atap Plat Beton Bertulang t=10Cm
1 Beton K175 U.20x25 cm m3 130,000.00 - -
2 Besi Beton kg 87,500.00 - -
3 Bekesting untuk Pelat m2 687,030.70 - -
JUMLAH 94,531,971.49
(A) JUMLAH PEKERJAAN 1,710,805,656.43

(B) PAJAK PERTAMBAHAN NILAI (PPN) : 11 % x A 188,188,622.21

(C) TOTAL HARGA + PPN : (A) + (B) 1,898,994,278.64

(D) DIBULATKAN 1,898,994,000.00