Anda di halaman 1dari 51

REKAPITULASI

PEKERJAAN : REHABILITASI PUSKESMAS CIAPUS


PEMBERI TUGAS : DINAS KESEHATAN KABUPATEN BOGOR
LOKASI : KECAMATAN CIOMAS
SUMBER DANA : APBD
TAHUN ANGGARAN : 2017

NO URAIAN JUMLAH HARGA


(Rp.)

A PEKERJAAN PERSIAPAN 6,776,452.80

B PEKERJAAN TANAH DAN PONDASI #N/A

C PEKERJAAN BETON, PASANGAN, DAN PLESTERAN 444,601,829.27


C.1 Lantai 1 305,887,762.16
C.2 Lantai 2 138,714,067.11

D PEKERJAAN KUSEN PINTU DAN JENDELA #N/A


D.1 Lantai 1 #N/A
D.2 Lantai 2 #N/A

E PEKERJAAN ATAP DAN PLAFOND 133,649,633.74


E.1 Lantai 1 59,266,938.94
E.2 Lantai 2 74,382,694.80

F PEKERJAAN LABURAN DAN PENGECATAN 29,060,880.07


F.1 Lantai 1 18,855,153.13
F.2 Lantai 2 10,205,726.94

G PEKERJAAN INSTALASI LISTRIK DAN AIR 97,989,693.23


G.1 Instalasi Listrik Lantai 1 27,685,375.23
G.2 Instalasi Listrik Lantai 2 15,788,175.00
G.3 Instalasi Air Lantai 1 42,661,027.00
G.4 Instalasi Air Lantai 2 11,855,116.00

H PEKERJAAN INFRASTRUKTUR DAN PEMBERSIHAN AKHIR 1,270,103.75

TOTAL BIAYA PELAKSANAAN PEKERJAAN #N/A


DIBULATKAN #N/A
Terbilang :
Err:511

Dibuat Oleh
Konsultan Perencana
PT. ABHINAYA KANAK ADIYANTI

PIPIT MEIDAWATI
Direktur
RENCANA ANGGARAN BIAYA

PEKERJAAN : REHABILITASI PUSKESMAS CIAPUS


PEMBERI TUGAS : DINAS KESEHATAN KABUPATEN BOGOR
LOKASI : KECAMATAN CIOMAS
SUMBER DANA : APBD
TAHUN ANGGARAN : 2017

HARGA SATUAN JUMLAH HARGA


NO URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 5=3X4

A PEKERJAAN PERSIAPAN
1 Pekerjaan bongkaran pondasi, beton, dinding, plafond, 1.00 Ls 2,500,000.00 2,500,000.00
atap, keramik, paving, instalasi listrik
dan air serta pembuangan puing dan penebangan pohon
2 Pengukuran dan pemasangan bowplank bagian depan 20.40 m' 89,532.00 1,826,452.80
3 Air dan Listrik Kerja 4.00 bln 250,000.00 1,000,000.00
4 Pemasangan papan nama pekerjaan 1.00 unit 450,000.00 450,000.00
5 Aministrasi dan Dokumentasi 4.00 bln 250,000.00 1,000,000.00
A. TOTAL PEKERJAAN PERSIAPAN 6,776,452.80

B PEKERJAAN TANAH DAN PONDASI


1 Pekerjaan Galian Tanah
- pondasi footplat 52.39 m3 62,637.00 3,281,828.03
- Pondasi Menerus 28.51 m3 62,637.00 1,785,906.14
- Tie Beam 2.66 m3 62,637.00 166,802.33
2 Urugan pasir 5 cm di bawah
- pondasi footplat 1.89 m3 327,454.00 618,888.06
- pondasi menerus 1.59 m 3
327,454.00 520,651.86
- tie beam 0.52 m 3
327,454.00 169,580.24
- Lantai 7.44 m 3
327,454.00 2,435,656.88
- Rabat 2.31 m3 327,454.00 757,152.24
3 Lantai kerja 5 cm di bawah :
- Pondasi setempat 1.17 m3 1,038,478.00 1,215,019.26
- Tie Beam 0.52 m 3
1,038,478.00 537,801.79
4 Urugan tanah kembali 46.35 m 3
20,879.00 967,841.87
5 Urugan peninggian level lantai menggunakan puing bekas bongkaran 28.53 m 3
20,879.00 595,613.08
6 Pondasi Tapak
- P1 ; 170 x 170 x 30 1.73 m3 #N/A #N/A
- P2; 130 x 130 x 30 5.07 m 3
#N/A #N/A
- P3; 80 x 80 x 20 0.14 m 3
#N/A #N/A
7 Pasangan Batu Kosong (Aanstamping) ; t = 20 cm 6.36 m 3
526,576.00 3,349,023.36
8 Pas. Pondasi batu kali ad. 1:5 14.31 m 3
1,040,411.00 14,888,281.41
9 Tie Beam
- TB1 ; 20 x 40 1.88 m3 4,635,886.00 8,715,465.68
- TB2 ; 20 x 30 1.42 m 3
4,832,384.00 6,842,655.74
HARGA SATUAN JUMLAH HARGA
NO URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 5=3X4

- TB3 ; 15 x 25 0.14 m3 4,855,345.00 673,679.12


- TB4 ;15 x 20 0.08 m 3
5,103,553.00 390,421.80
10 Sloop 15 x 20 1.59 m 3
4,490,720.00 7,140,244.80
11 Beton Rabat ; t = 7 cm 3.24 m 3
1,038,478.00 3,361,694.52
12 Beton Ramp dan penutup rabat ; t = 10 cm + wiremesh m-8, 1 lapis 0.14 m 3
5,331,749.00 754,666.59
#N/A

C PEKERJAAN BETON, PASANGAN, DAN PLESTERAN


C.1 Lantai 1
1 Kolom K1 ; 30 x 30 ; Beton K-225
- Kolom Pedestal K1; 30 x 30 2.24 m3 5,400,145.00 12,072,564.16
Kolom Pedestal K2; 20 x 20 0.05 m 3
6,284,070.00 301,635.36
- Kolom K1 ; 30 x 30 3.73 m 3
5,400,145.00 20,120,940.27
- Kolom K2 ; 20 x 20 0.29 m 3
6,284,070.00 1,834,948.44
2 Kolom praktis
- Kolom praktis 12 x 12 95.70 m' 64,300.00 6,153,510.00
- Kolom praktis stek 6.65 m' 64,300.00 427,595.00
3 Pekerjaan Balok ; Beton K-225
- B1 ; 25 x 40 3.89 m3 4,848,572.00 18,860,945.08
- B1A ; 25 x 40 0.19 m 3
-
- B1* ; 25 x 45 1.47 m 3
4,719,115.00 6,954,795.73
- B2 ; 20 x 30 2.02 m 3
6,253,783.00 12,645,149.23
- B2A ; 20 x 31 0.59 m 3
-
4 Ringbalk 1.46 m 3
5,778,051.00 8,433,065.43
- Ringbalk RB3 ; 15 x 25 0.24 m 3

- Ringbalk RB4 ; 15 x 20 1.46 m3


5 Balok Lintel BL ; 11 x 11 0.64 m3 7,410,378.00 4,747,792.13
6 Pekerjaan Plat Lantai 12 cm ; Beton K-225 9.69 m3 5,331,749.00 51,647,053.04
7 Pekerjaan Plat Atap 10 cm ; Beton K-225 0.84 m3 6,161,999.00 5,151,431.16
8 Pekerjaan Beton Plat
- Plat Topi-topi 8 cm 0.74 m3 2,880,950.00 2,143,426.80
- Plat Meja Dapur 8 cm 0.20 m3 3,657,875.00 719,664.96
9 Pekerjaan Tangga
- Plat Tangga ; 15 cm 1.46 m3 6,645,018.00 9,701,726.28
- Plat Bordes ; 15 cm 0.03 m 3
5,233,994.00 157,019.82
- Balok Tangga BTG ; 25 x 40 0.25 m 3
4,848,572.00 1,212,143.00
10 Pasangan Dinding
- Dinding pas. 1/2 bata ad. 1:5 207.64 m2 131,518.00 27,307,739.93
- Dinding pas. 1 bata ad. 1:5 2.37 m 2
276,199.00 654,591.63
- Penahan Rabat dan Sopi-sopi 13.94 m 2
131,518.00 1,833,320.81
11 Pekerjaan Plesteran
- Plesteran dinding 372.88 m2 62,222.00 23,201,339.36
- Ban-banan 10 x 3 cm 12.00 m' 15,946.00 191,352.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 5=3X4

- Plesteran kamprot 4.83 m2 62,222.00 300,532.26


12 Pekerjaan acian
- Acian dinding 372.88 m2 35,015.00 13,056,393.20
- Acian Beton dak expose 154.54 m 2
35,015.00 5,411,305.64
- Tali air 2 x 0,5 23.10 m' 12,779.00 295,194.90
13 Dinding Partisi Gypsum 9 mm rangka Hollow galvalum 4/4 127.85 m2 114,795.00 14,676,540.75
14 Pasangan penutup dinding dan lantai
- Keramik dinding KM 25 x 40 setara Mulia 37.56 m2 280,541.00 10,537,119.96
- Keramik meja beton 25 x 25 polos setara Mulia 2.96 m2 244,013.00 723,327.74
- Keramik Lantai 40 x 40 Polos setara Mulia 145.12 m2 222,667.00 32,313,056.51
- Homogenous Tile Tangga Non-slip 30 x 60 12.37 m2 196,772.00 2,434,069.64
- keramik 25 x 25 corak kasar 3.65 m 2
280,541.00 1,022,571.95
15 Railing tangga stainless 10.74 m 2
735,000.00 7,893,900.00
16 Tangga GIP 1" akses torn air 1.00 unit 750,000.00 750,000.00
305,887,762.16
C.2 Lantai 2
1 Kolom K1 ; 30 x 30 ; Beton K-225 3.11 m3 5,400,145.00 16,767,450.23
2 Kolom praktis 12 x 12 67.55 m' 64,300.00 4,343,465.00
3 Pekerjaan Ringbalk ; Beton K-225
- RB1 ; 20 x 35 1.32 m3 5,276,332.00 6,943,652.91
- RB1* ; 25 x 40 0.94 m3 4,060,586.00 3,816,950.84
- RB2 ; 20 x 30 0.71 m3 5,152,228.00 3,647,777.42
- RB4 ; 15 x 20 0.62 m3 5,778,051.00 3,605,503.82
4 Balok Lintel BL ; 11 x 11 0.24 m3 7,410,378.00 1,761,928.53
5 Pekerjaan Plat Atap 12 cm ; Beton K-225 0.20 m3 5,777,804.00 1,171,738.65
6 Plat beton meja dapur 8 cm 0.08 m 3
3,657,875.00 280,924.80
7 Dinding pas. 1/2 bata ad. 1:5
- Dinding Baru 163.79 m2 131,518.00 21,541,333.22
8 Pekerjaan Plesteran
- Plesteran dinding 296.11 m2 62,222.00 18,424,556.42
- Ban-banan 10 x 3 cm 6.75 m' 15,946.00 107,635.50
9 Pekerjaan acian
- Acian dinding 296.11 m2 35,015.00 10,368,291.65
- Acian Beton 33.12 m 2
35,015.00 1,159,696.80
- Tali air 2 x 0,5 9.00 m' 12,779.00 115,011.00
10 Dinding Partisi Gypsum 9 mm rangka Hollow galvalum 4/4 91.68 m2 114,795.00 10,524,405.60
13 Pasangan penutup dinding dan lantai
- Dinding Homogenous tile 60 x 60 polish 7.15 m2 257,409.00 1,840,474.35
- Keramik dinding KM 25 x 40 setara Mulia 24.32 m 2
280,541.00 6,822,757.12
- Keramik meja beton 25 x 25 polos setara Mulia 1.12 m 2
244,013.00 273,294.56
- Keramik Lantai 40 x 40 Polos setara Mulia 77.17 m 2
222,667.00 17,183,212.39
- keramik lantai 25 x 25 corak kasar 4.50 m2 254,740.00 1,145,056.30
14 Logo Kabupaten Bogor bahan stainless ; t = 50 cm 1.00 unit 1,897,500.00 1,897,500.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 5=3X4

15 Logo Puskesmas bahan stainless ; t = 50 cm 1.00 unit 1,897,500.00 1,897,500.00


16 Letter Stainless t = 20 cm "PUSKESMAS CIAPUS" 15.00 unit 170,775.00 2,561,625.00
17 Letter Stainless t = 15 cm "UGD" 3.00 unit 170,775.00 512,325.00
138,714,067.11
444,601,829.27
HARGA SATUAN JUMLAH HARGA
NO URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 5=3X4

D PEKERJAAN KUSEN PINTU DAN JENDELA


D.1 Lantai 1
1 Pekerjaan Pintu Aluminium
- P1 2.00 unit 3,336,441.00 6,672,882.00
- P2 3.00 unit #N/A #N/A
- P2A 1.00 unit #N/A #N/A
- P3 7.00 unit #N/A #N/A
- P4 1.00 unit #N/A #N/A
- P6 1.00 unit #N/A #N/A
- P6A 1.00 unit -
- P7 2.00 unit 2,714,648.00 5,429,296.00
2 Pekerjaan Pintu Besi P5 1.00 unit 3,000,000.00 3,000,000.00
3 Pekerjaan Jendela Aluminium
- J1 3.00 unit 720,064.00 2,160,192.00
- J2 4.00 unit #N/A #N/A
- J3 5.00 unit #N/A #N/A
- J4 2.00 unit 2,241,406.00 4,482,812.00
- J5 2.00 unit 2,995,873.00 5,991,746.00
- J6 1.00 unit 1,291,420.00 1,291,420.00
4 Rooster kayu 15 x 30 cm 74.00 bh 25,300.00 1,872,200.00
#N/A
D.2 Lantai 2
1 Pekerjaan Pintu Aluminium
- P2 3.00 unit #N/A #N/A
- P3 1.00 unit #N/A #N/A
- P6 2.00 unit #N/A #N/A
2 Pekerjaan Jendela Aluminium
- J3 8.00 unit #N/A #N/A
- J5 1.00 unit 2,995,873.00 2,995,873.00
- J6 1.00 unit 1,291,420.00 1,291,420.00
3 Rooster kayu 15 x 30 cm 50.00 bh 25,300.00 1,265,000.00
#N/A
#N/A

E PEKERJAAN ATAP DAN PLAFOND


E.1 Lantai 1
1 Rangka atap baja ringan 109.53 m2 180,000.00 19,715,400.00
2 Penutup atap genteng Murando Glazur 109.53 m 2
136,301.00 14,929,048.53
3 Genteng Bubung Murando Glazur 26.60 m' 151,764.00 4,036,922.40
4 Lisplank GRC 8 mm tumpangsari 20+10 46.85 m2 89,577.00 4,196,682.45
5 Plafond Gypsum ; t = 9 mm rangka Hollow galvalum 4/4 49.30 m2 117,370.00 5,786,634.43
6 Plafond Gypsum 9mm water resist ex. Jayaboard rangka Hollow galvalum 4/4 55.04 m2 113,461.00 6,244,326.14
7 Ornamen identitas kabupaten Bogor
- Ornamen GRC 2 cm ; capit gunting 1.00 unit 1,138,500.00 1,138,500.00
- Kaca patri motif pohon kawung 1.00 unit 2,333,925.00 2,333,925.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 5=3X4

- Ornamen GRC 3 cm ; motif kujang 1.00 ps 885,500.00 885,500.00


59,266,938.94
E.2 Lantai 2
1 Rangka atap baja ringan 156.08 m2 180,000.00 28,094,400.00
2 Penutup atap genteng Murando Glazur 156.08 m 2
136,301.00 21,273,860.08
3 Genteng Bubung Murando Glazur 36.22 m 2
151,764.00 5,496,892.08
4 Lisplank GRC 8 mm tumpangsari 20+10 51.25 m' 89,577.00 4,590,821.25
5 Plafond Gypsum ; t = 9 mm rangka Hollow galvalum 4/4 88.62 m2 117,370.00 10,401,329.40
6 Plafond Gypsum 9mm water resist ex. Jayaboard rangka Hollow galvalum 4/4 39.89 m 2
113,461.00 4,525,391.99
74,382,694.80
133,649,633.74

F PEKERJAAN LABURAN DAN PENGECATAN


F.1 Lantai 1
1 Pengecatan dinding eksterior setara Vinilex 161.10 m2 17,221.00 2,774,277.27
2 Pengecatan dinding interior setara Vinilex 510.55 m 2
17,221.00 8,792,250.43
3 Pengecatan plafond setara vinilex 258.88 m 2
17,221.00 4,458,172.48
4 Pengecatan Lisplank 14.06 m 2
28,485.00 400,356.68
5 Politur Daun Pintu 54.32 m 2
41,877.00 2,274,758.64
6 Cat Batu alam anti lumut 4.83 m 2
32,161.00 155,337.63
18,855,153.13
F.2 Lantai 2
1 Pengecatan dinding eksterior setara Vinilex 107.59 m2 17,221.00 1,852,764.34
2 Pengecatan dinding interior setara Vinilex 287.24 m 2
17,221.00 4,946,560.04
3 Pengecatan plafond setara vinilex 128.51 m 2
17,221.00 2,212,984.61
4 Pengecatan Lisplank 15.38 m 2
28,485.00 437,956.88
5 Politur Daun Pintu 18.04 m 2
41,877.00 755,461.08
10,205,726.94
29,060,880.07

G PEKERJAAN INSTALASI LISTRIK DAN AIR


G.1 Instalasi Listrik Lantai 1
1 Pemasangan kembali panel listrik eksisting 1.00 ls 1,000,000.00 1,000,000.00
2 Pengadaan dan pemasangan Panel Change Over Switch (COS) 1.00 unit 1,454,750.00 1,454,750.00
3 NYY 3 x 4 dari Genset ke panel COS 25.00 m' 25,134.00 628,350.00
4 Instalasi titik lampu NYM 2 x 2,5 mm2 dalam conduit 43.00 ttk 240,350.00 10,335,050.00
5 Instalasi titik daya NYM 3 x 2,5 mm2 dalam conduit 19.00 ttk 240,350.00 4,566,650.00
6 Pemasangan lampu
- TKO 2 x 18 Watt 12.00 bh 294,112.50 3,529,350.00
- TKI 2 x 18 Watt
- DLI 1 x 18 watt
- SL 1 x 18 watt 15.00 bh 145,475.00 2,182,125.00
- DLI 1 x 13 watt
- SL 1 x 13 watt 9.00 bh 132,825.00 1,195,425.00
- DLO 1 x 13 Watt 5.00 bh 139,150.00 695,750.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 5=3X4

- Lampu Baret 22 Watt 2.00 bh 316,250.00 632,500.00


HARGA SATUAN JUMLAH HARGA
NO URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 5=3X4

7 Aksesories Elektrikal
- Saklar Tunggal 12.00 bh 32,450.00 389,400.00
- Saklar Seri 8.00 bh 35,950.00 287,600.00
- Stop Kontak standart 18.00 bh 35,600.00 640,800.00
- Stopkontak Outbow 1.00 bh 147,625.23 147,625.23
27,685,375.23
G.2 Instalasi Listrik Lantai 2
1 MCB box 4 Group 1.00 bh 75,900.00 75,900.00
2 NYY 3x4 mm2 dari panel lt. 1 ke MCB lt.2 22.00 m' 30,360.00 667,920.00
3 Panel MCB 1 phase
- MCB 6 A 2.00 bh 67,000.00 134,000.00
- MCB 10 A 1.00 bh 76,600.00 76,600.00
4 Instalasi titik lampu NYM 2 x 2,5 mm2 dalam conduit 27.00 ttk 240,350.00 6,489,450.00
5 Instalasi titik daya NYM 3 x 2,5 mm2 dalam conduit 9.00 ttk 240,350.00 2,163,150.00
6 Pemasangan lampu
- RMI 2 x 18 Watt 10.00 bh 294,112.50 2,941,125.00
- DLI 1 x 18 watt 9.00 bh 145,475.00 1,309,275.00
- DLI 1 x 13 watt 7.00 bh 132,825.00 929,775.00
- Lampu sorot LED 20 Watt 1.00 bh 306,130.00 306,130.00
7 Aksesories Elektrikal
- Saklar Tunggal 6.00 bh 32,450.00 194,700.00
- Saklar Seri 5.00 bh 35,950.00 179,750.00
- Stop Kontak 9.00 bh 35,600.00 320,400.00
15,788,175.00
G.3 Instalasi Air Lantai 1
1 Pembuatan Rumah Pompa 50 x 100 cm 1.00 unit 1,500,000.00 1,500,000.00
2 Pemasangan Get Valve
- Get Valve 1 1/2" setara KIT 1.00 bh 388,600.00 388,600.00
Get Valve 1" setara KIT 2.00 bh 194,000.00 388,000.00
3 Pipa Instalasi air bersih PVC AW
dia 1" dari pompa ke torn 12.00 m' 41,055.00 492,660.00
dia 1 1/2" 17.00 m' 43,617.00 741,489.00
- dia 1" 9.00 m' 41,055.00 369,495.00
- dia 3/4" 6.00 m' 34,875.00 209,250.00
- dia 1/2" 44.00 m' 30,809.00 1,355,596.00
4 Pipa Instalasi air bekas PVC AW
- dia 3" 17.00 m' 76,406.00 1,298,902.00
- dia 2" 63.00 m' 51,302.00 3,232,026.00
5 Pipa Instalasi air kotor PVC AW
dia 6" 12.00 m' 392,093.00 4,705,116.00
- dia 4" 23.00 m' 135,930.00 3,126,390.00
HARGA SATUAN JUMLAH HARGA
NO URAIAN VOLUME
(Rp.) (Rp.)
1 2 3 5=3X4

5 Pengadaan dan pemasangan sanitari fixtures


- Closet Jongkok setara TOTO 1.00 unit 677,786.00 677,786.00
- Closet Duduk setara TOTO 1.00 unit 2,414,868.00 2,414,868.00
- Wastafel bulat standart setara TOTO 6.00 unit 1,256,681.00 7,540,086.00
- Kitchen zink stainless 2.00 unit 704,053.00 1,408,106.00
- kran leher angsa 1/2" stainless steel 2.00 bh 106,068.00 212,136.00
- kran dinding 1/2" stainless steel 2.00 bh 69,468.00 138,936.00
- Floordrain stainless 2" 2.00 bh 96,105.00 192,210.00
6 Grafel U-30 75.00 m' 110,491.00 8,286,825.00
7 Pembuatan septictank 1,5 x 1,5 x 1,5 termasuk resapan 1.00 unit 3,232,550.00 3,232,550.00
8 Railing stainless 1 1/2" ; L= 50 3.00 unit 250,000.00 750,000.00
42,661,027.00
G.4 Instalasi Air Lantai 2
1 Pemasangan kembali torn air lama 1.00 unit 250,000.00 250,000.00
2 Pipa Instalasi air bersih PVC AW
- pipa drain 1" 2.00 m' 41,055.00 82,110.00
- dia 1" 12.00 m' 41,055.00 492,660.00
- dia 3/4" 6.00 m' 34,875.00 209,250.00
- dia 1/2" 21.00 m' 30,809.00 646,989.00
3 Pipa Instalasi air bekas PVC AW
- dia 2" 24.00 m' 51,302.00 1,231,248.00
4 Pipa Instalasi air kotor PVC AW
- dia 4" 11.40 m' 135,930.00 1,549,602.00
5 Pengadaan dan pemasangan sanitari fixtures
- Closet Duduk setara TOTO 2.00 unit 2,414,868.00 4,829,736.00
- Wastafel bulat standart setara TOTO 1.00 unit 1,256,681.00 1,256,681.00
- Kitchen zink stainless 1.00 unit 704,053.00 704,053.00
- kran leher angsa 1/2" stainless steel 1.00 bh 106,068.00 106,068.00
- kran dinding 1/2" stainless steel 3.00 bh 69,468.00 208,404.00
- kran dinding 1/2" stainless steel dobel napel + shower tanpa tiang 1.00 bh -
- Floordrain stainless 2" 3.00 bh 96,105.00 288,315.00
11,855,116.00
97,989,693.23

H PEKERJAAN INFRASTRUKTUR DAN PEMBERSIHAN AKHIR


1 urugan abu batu 5 cm di bawah pavingblock termasuk pemadatan 0.39 m3 435,825.00 169,971.75
2 Pemasangan kembali paving block eksisting t = 8 cm 7.80 m 2
76,940.00 600,132.00
3 Pembersihan dan perapihan 1.00 ls 500,000.00 500,000.00
1,270,103.75
REKAPITULASI ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI PUSKESMAS CIAPUS


LOKASI : KECAMATAN CIOMAS
TAHUN : 2017

HARGA SATUAN
NO URAIAN
PEKERJAAN

1 m' Pemasangan Bouwplank Rp 89,532.00


1 m3 Galian Tanah Biasa sedalam 1 m Rp 62,637.00
1 m3 Urugan Kembali Rp 20,879.00
1 m3 Pasir Urug Rp 327,454.00
1 m3 abu batu urug Rp 435,825.00
1 m3 Pasang Pondasi Batu Kosong (aanstamping) Rp 526,576.00
1 m3 Pasang Pondasi Batu Belah, campuran 1pc : 5pp Rp 1,040,411.00
1 m3 Membuat Beton Tumbuk adk 1pc : 3ps : 5kr Rp 1,038,478.00
1 kg Pembesian dengan besi polos atau besi ulir Rp 10,342.00
1 m2 Pasang Bekisting untuk Pondasi Rp 137,760.00
1 m3 pondasi tapak t = 30 cm #N/A
1 m3 pondasi tapak t = 20 cm #N/A
1 m2 Pasang Bekisting untuk Kolom Rp 202,296.00
1 m3 Kolom K1 30 x 30 Rp 5,400,145.00
1 m3 Kolom K2 20 x 20 Rp 6,284,070.00
1 m' Kolom Praktis beton bertulang (12 x 12) Rp 64,300.00
1 m2 Pasang Bekisting untuk Tie Beam Rp 190,132.00
1 m3 Tie Beam Beton Tulang TB1 20 x 40 Rp 4,635,886.00
1 m3 Tie Beam Beton Tulang TB2 20 x 30 Rp 4,832,384.00
1 m3 Tie Beam Beton Tulang TB3 15 x 25 Rp 4,855,345.00
1 m3 Tie Beam Beton Tulang TB4 15 x 20 Rp 5,103,553.00
1 m2 Pasang Bekisting untuk Sloof Rp 144,158.00
1 m3 Sloof Beton Tulang SL 15 x 20 Rp 4,490,720.00
1 m2 Pasang Bekisting untuk Balok Rp 240,732.00
1 m3 Balok Beton Tulang B1 25 x 40 Rp 4,848,572.00
1 m3 Balok Beton Tulang B1* 25 x 45 Rp 4,719,115.00
1 m3 Balok Beton Tulang B2 20 x 30 Rp 6,253,783.00
1 m3 Ringbalk Beton Tulang RB4 15 x 20 Rp 5,778,051.00
1 m3 Ringbalk Beton Tulang RB1 20 x 35 Rp 5,276,332.00
1 m3 Ringbalk Beton Tulang RB1* 25 x 40 Rp 4,060,586.00
1 m3 Ringbalk Beton Tulang RB2 20 x 30 Rp 5,152,228.00
1 m3 Balok Lintel BL ( 11 x 11 ) Rp 7,410,378.00
1 m2 Pasang Bekisting untuk Plat Lantai Rp 292,805.00
1 m3 plat lantai beton bertulang t = 12 cm Rp 5,777,804.00
1 m3 plat lantai beton bertulang t = 10 cm Rp 6,161,999.00
1 m3 plat ramp t = 10 cm + wiremesh M8 Rp 5,331,749.00
1 m3 topi-topi beton bertulang t = 8 cm Rp 2,880,950.00
1 m3 meja dapur beton bertulang t = 8 cm Rp 3,657,875.00
HARGA SATUAN
NO URAIAN
PEKERJAAN
1 m2 Pasang Bekisting untuk Tangga Rp 264,721.00
1 m3 Plat Tangga Beton Tulang t = 15 cm Rp 6,645,018.00
1 m3 Plat Bordes Beton Tulang t = 15 cm Rp 5,233,994.00
1 m3 Balok Tangga BTG 25 x 40 Rp 4,848,572.00
1 m2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps Rp 276,199.00
1 m2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps Rp 131,518.00
1 m2 Plesteran adk. 1pc : 5ps Tebal 15 mm Rp 62,222.00
1 m' Ban-banan 3 x 10 cm Rp 15,946.00
1 m2 Acian Rp 35,015.00
1 m' Tali Air adk. 1pc : 2ps tebal 10 mm Rp 12,779.00
1 m2 Dinding Pemisah Gypsum t = 9 mm + rangka hollow galva Rp 114,795.00
1 m2 Lantai Keramik Polos 40 x 40 cm Setara Mulia Rp 222,667.00
1 m2 Dinding Granit 60 x 60 cm Rp 257,409.00
1 m2 homogenous Tile 30 x 60 cm antislip Rp 196,772.00
1 m2 Lantai Keramik polos 25 x 25 cm setara Mulia Rp 244,013.00
1 m2 Lantai Keramik corak (antislip) 25 x 25 cm setara Mulia Rp 254,740.00
1 m2 Dinding Keramik Corak 25 x40 cm Setara Mulia Rp 280,541.00
1 m2 Batu Andesit alur lurus Rp 288,603.00
1 UNIT Pekerjaan Kusen Pintu (P1) Rp 3,336,441.00
Membuat 1 m2 pintu multiplek 9 mm, rangka expose kayu kelas #N/A
1 UNIT Pekerjaan Kusen Pintu (P2) #N/A
1 UNIT Pekerjaan Kusen Pintu (P2A) #N/A
1 UNIT Pekerjaan Kusen Pintu (P3) #N/A
1 UNIT Pekerjaan Kusen Pintu (P4) #N/A
1 m2 Pasang alumunium strip lebar 8 cm Rp 273,036.00
1 UNIT Pekerjaan Kusen Pintu (P6) #N/A
1 UNIT Pekerjaan Kusen Pintu (P7) Rp 2,714,648.00
1 UNIT Pekerjaan Kusen Jendela Alumunium J1 Rp 720,064.00
1 UNIT Pekerjaan Kusen Jendela Alumunium J2 #N/A
1 UNIT Pekerjaan Kusen Jendela Alumunium J3 #N/A
1 UNIT Pekerjaan Kusen Jendela Alumunium J4 Rp 2,241,406.00
1 UNIT Pekerjaan Kusen Jendela Alumunium J5 Rp 2,995,873.00
1 UNIT Pekerjaan Kusen Jendela Alumunium J6 Rp 1,291,420.00
Memasang 1 m2 Dinding Rooster Beton 15 x 30, adk 1pc : 4pc Rp 457,519.00
1 m2 Pasang Atap Genteng Murando Glazur Rp 136,301.00
1 m' Pasang Genteng Bubung Murando Glazur Rp 151,764.00
1 m2 Plafond Gypsum Board, tebal 9 mm + Rangka Besi Hollow Rp 117,370.00
1 m2 Langit-langit GRC t = 4 mm + Rangka Besi Hollow galvalu Rp 113,461.00
1 m' Lisplank GRC 20+10 cm Rp 89,577.00
1 m2 Pengecatan Tembok Baru Setara ICI (2x Laburan) eksterio Rp 37,524.00
1 m2 Pengecatan Tembok Baru Setara Vinilex (2x Laburan) Rp 17,221.00
1 m2 Pengecatan Plafond (2x) Setara Vinilex Rp 39,057.00
1 m2 Pengecatan Bidang Kayu Baru Setara Sieve Rp 28,485.00
1 m2 Pelaburan Bidang Kayu dengan Politur Rp 41,877.00
1 m2 Pengecatan Batu Alam Anti Lumut Rp 32,161.00
1 buah Tangki Air Fibreglass Volume 1 m3 Rp 2,487,844.00
HARGA SATUAN
NO URAIAN
PEKERJAAN
1 m' Pipa PVC 1/2" (AW) Rp 30,809.00
1 m' Pipa PVC 3/4" (AW) Rp 34,875.00
1 m' Pipa PVC 1" (AW) Rp 41,055.00
1 m' Pipa PVC 1 1/2" (AW) Rp 43,617.00
1 Buah Wastafel lengkap Rp 1,256,681.00
1 Buah Kitchen Zink Stainless steel Rp 704,053.00
1 buah kran 1/2" Rp 69,468.00
1 buah kran leher angsa 1/2" ITAP Rp 106,068.00
1 m' Pipa PVC 2" (AW) Rp 51,302.00
1 m' Pipa PVC 3" (AW) Rp 76,406.00
1 Buah Floor Drain Rp 96,105.00
1 m' Pipa PVC 4" (AW) Rp 135,930.00
1 m' Pipa PVC 6" (AW) Rp 392,093.00
1 Buah Closet jongkok Standard Putih Poslin TOTO Rp 677,786.00
1 Buah Closet Duduk Warna Standard TOTO C 240 Lengkap Rp 2,414,868.00
1 m' Grafel beton U 30 cm Rp 110,491.00
1 Unit Septictank 1 x 1,50 x 1,50 m + Rembesan Rp 3,232,550.00
1 m2 Pasang kembali paving block natural 8 cm Rp 76,940.00
ANALISA HARGA SATUAN PEKERJAAN

PEKERJAAN : REHABILITASI PUSKESMAS CIAPUS


LOKASI : KECAMATAN CIOMAS
TAHUN : 2017

Harga Satuan Total Harga


No. Uraian Satuan Volume
(Rp) (Rp)

1 m ' Pemasangan Bouwplank


- Kayu Balok Terentang m3 0.0120 Rp 3,795,000.00 Rp 45,540.00
- Paku 4 cm s/d 7 cm kg 0.0200 Rp 16,445.00 Rp 328.90
- Kayu Papan 3/20 4m m3 0.0070 Rp 3,289,000.00 Rp 23,023.00
- Pekerja Oh 0.1000 Rp 78,177.92 Rp 7,817.79
- Tukang Kayu Oh 0.1000 Rp 107,758.75 Rp 10,775.88
- Kepala Tukang kayu Oh 0.0100 Rp 124,662.08 Rp 1,246.62
- Mandor Oh 0.0050 Rp 160,159.08 Rp 800.80
Jumlah Rp 89,532.00
1 m Galian Tanah Biasa sedalam 1 m
3

- Pekerja Oh 0.7500 Rp 78,177.92 Rp 58,633.44


- Mandor Oh 0.0250 Rp 160,159.08 Rp 4,003.98
Jumlah Rp 62,637.42
Dibulatkan Rp 62,637.00
1 m Urugan Kembali
3

- Pekerja Oh 0.2500 Rp 78,177.92 Rp 19,544.48


- Mandor Oh 0.0083 Rp 160,159.08 Rp 1,334.66
Jumlah Rp 20,879.14
Dibulatkan Rp 20,879.00
1 m 3 Pasir Urug
- Pasir Urug m3 1.2000 Rp 252,000.00 Rp 302,400.00
- Pekerja Oh 0.3000 Rp 78,177.92 Rp 23,453.38
- Mandor Oh 0.0100 Rp 160,159.08 Rp 1,601.59
Jumlah Rp 327,454.97
Dibulatkan Rp 327,454.00
1 m abu batu urug
3

- abu batu m3 1.2000 Rp 342,309.00 Rp 410,770.80


- Pekerja Oh 0.3000 Rp 78,177.92 Rp 23,453.38
- Mandor Oh 0.0100 Rp 160,159.08 Rp 1,601.59
Jumlah Rp 435,825.77
Dibulatkan Rp 435,825.00
1 m 3 Pasang Pondasi Batu Kosong (aanstamping)
- Batu blondos m3 1.2000 Rp 253,000.00 Rp 303,600.00
- Pasir Urug m 3
0.4320 Rp 252,000.00 Rp 108,864.00
- Pekerja Oh 0.7800 Rp 78,177.92 Rp 60,978.78
- Tukang Batu Oh 0.3900 Rp 107,758.75 Rp 42,025.91
- Kepala Tukang batu Oh 0.0390 Rp 124,662.08 Rp 4,861.82
- Mandor Oh 0.0390 Rp 160,159.08 Rp 6,246.20
Jumlah Rp 526,576.72
Dibulatkan Rp 526,576.00
1 m Pasang Pondasi Batu Belah, campuran 1pc : 5pp
3

- Batu belah pondasi m3 1.2000 Rp 323,850.00 Rp 388,620.00


Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Semen Portland kg 136.0000 Rp 1,771.00 Rp 240,856.00


- Pasir Pasang m3 0.5440 Rp 352,000.00 Rp 191,488.00
- Pekerja Oh 1.5000 Rp 78,177.92 Rp 117,266.88
- Tukang Batu Oh 0.7500 Rp 107,758.75 Rp 80,819.06
- Kepala Tukang batu Oh 0.0750 Rp 124,662.08 Rp 9,349.66
- Mandor Oh 0.0750 Rp 160,159.08 Rp 12,011.93
Jumlah Rp 1,040,411.53
Dibulatkan Rp 1,040,411.00
1 m Membuat Beton Tumbuk adk 1pc : 3ps : 5kr
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 1,038,478.03
Dibulatkan Rp 1,038,478.00
1 kg Pembesian dengan besi polos atau besi ulir
- Besi beton (polos/ulir) kg 1.0500 Rp 8,104.77 Rp 8,510.00
- Kawat beton kg 0.0150 Rp 25,300.00 Rp 379.50
- Pekerja Oh 0.0070 Rp 78,177.92 Rp 547.25
- Tukang Besi/Baja Oh 0.0070 Rp 107,758.75 Rp 754.31
- Kepala Tukang besi Oh 0.0007 Rp 124,662.08 Rp 87.26
- Mandor Oh 0.0004 Rp 160,159.08 Rp 64.06
Jumlah Rp 10,342.39
Dibulatkan Rp 10,342.00
1 m 2 Pasang Bekisting untuk Pondasi
- Kayu papan kelas III m3 0.0280 Rp 1,828,000.00 Rp 51,184.00
- Paku 4 cm s/d 7 cm kg 0.3000 Rp 16,445.00 Rp 4,933.50
- Minyak bekisting ltr 0.1000 Rp 55,680.00 Rp 5,568.00
- Pekerja Oh 0.5200 Rp 78,177.92 Rp 40,652.52
- Tukang Kayu Oh 0.2600 Rp 107,758.75 Rp 28,017.28
- Kepala Tukang kayu Oh 0.0260 Rp 124,662.08 Rp 3,241.21
- Mandor Oh 0.0260 Rp 160,159.08 Rp 4,164.14
Jumlah Rp 137,760.64
Dibulatkan Rp 137,760.00
1 m pondasi tapak t = 30 cm
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m3 0.5200 #N/A #N/A
- Batu Pecah Mesin 2/3 m 3
0.8700 #N/A #N/A
- Bekisting pondasi m 2
5.9300 Rp 137,760.00 Rp 816,916.80
- besi kg 125.0000 Rp 10,342.00 Rp 1,292,750.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah #N/A
Dibulatkan #N/A
1 m pondasi tapak t = 20 cm
3
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 #N/A #N/A
- Batu Pecah Mesin 2/3 m 3
0.8700 #N/A #N/A
- Bekisting pondasi m2 7.4000 Rp 137,760.00 Rp 1,019,424.00
- besi kg 61.0000 Rp 10,342.00 Rp 630,862.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah #N/A
Dibulatkan #N/A
1 m 2 Pasang Bekisting untuk Kolom
- Paku 8 cm s/d 15 cm kg 0.4000 Rp 16,445.00 Rp 6,578.00
- Minyak bekisting ltr 0.2000 Rp 55,680.00 Rp 11,136.00
- Kayu balok kelas III m 3
0.0101 Rp 1,828,000.00 Rp 18,508.50
- Plywood 9 mm 120 X 240 lbr 0.2450 Rp 214,900.00 Rp 52,650.50
- Bambu 6-10 (600) cm 7 s/d 10 btg 0.6667 Rp 25,300.00 Rp 16,866.67
- Pekerja Oh 0.6600 Rp 78,177.92 Rp 51,597.43
- Tukang Kayu Oh 0.3300 Rp 107,758.75 Rp 35,560.39
- Kepala Tukang kayu Oh 0.0330 Rp 124,662.08 Rp 4,113.85
- Mandor Oh 0.0330 Rp 160,159.08 Rp 5,285.25
Jumlah Rp 202,296.58
Dibulatkan Rp 202,296.00
1 m 3 Kolom K1 30 x 30
- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00
- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- Bekisting kolom m2 13.3300 Rp 202,296.00 Rp 2,696,605.68
- besi kg 161.0000 Rp 10,342.00 Rp 1,665,062.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 5,400,145.71
Dibulatkan Rp 5,400,145.00
1 m 3 Kolom K2 20 x 20
- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00
- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- Bekisting kolom m2 20.0000 Rp 202,296.00 Rp 4,045,920.00
- besi kg 116.0000 Rp 10,342.00 Rp 1,199,672.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 6,284,070.03
Dibulatkan Rp 6,284,070.00
1 m' Kolom Praktis beton bertulang (12 x 12)
- Kayu papan kelas III m3 0.0020 Rp 1,828,000.00 Rp 3,656.00
- Paku 5 cm s/d 12 cm kg 0.0100 Rp 16,445.00 Rp 164.45
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Besi beton (polos/ulir) kg 3.0000 Rp 8,104.77 Rp 24,314.30


- Kawat beton kg 0.0450 Rp 25,300.00 Rp 1,138.50
- Semen Portland kg 4.0000 Rp 1,771.00 Rp 7,084.00
- Pasir Beton m3 0.0060 Rp 395,000.00 Rp 2,370.00
- koral beton m 3
0.0090 Rp 316,250.00 Rp 2,846.25
- Pekerja Oh 0.1800 Rp 78,177.92 Rp 14,072.03
- Tukang Batu Oh 0.0200 Rp 107,758.75 Rp 2,155.18
- Tukang Kayu Oh 0.0200 Rp 107,758.75 Rp 2,155.18
- Tukang Besi/Baja Oh 0.0200 Rp 107,758.75 Rp 2,155.18
- Kepala Tukang besi Oh 0.0060 Rp 124,662.08 Rp 747.97
- Mandor Oh 0.0090 Rp 160,159.08 Rp 1,441.43
Jumlah Rp 64,300.45
Dibulatkan Rp 64,300.00
1 m Pasang Bekisting untuk Tie Beam
2

- Kayu papan kelas III m3 0.0280 Rp 1,828,000.00 Rp 51,184.00


- Paku 5 cm s/d 12 cm kg 0.4000 Rp 16,445.00 Rp 6,578.00
- Minyak bekisting ltr 0.2000 Rp 55,680.00 Rp 11,136.00
- Kayu balok kelas III m3 0.0135 Rp 1,828,000.00 Rp 24,678.00
- Pekerja Oh 0.6600 Rp 78,177.92 Rp 51,597.43
- Tukang Kayu Oh 0.3300 Rp 107,758.75 Rp 35,560.39
- Kepala Tukang kayu Oh 0.0330 Rp 124,662.08 Rp 4,113.85
- Mandor Oh 0.0330 Rp 160,159.08 Rp 5,285.25
Jumlah Rp 190,132.91
Dibulatkan Rp 190,132.00
1 m Tie Beam Beton Tulang TB1 20 x 40
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting tie beam m 2
10.0000 Rp 190,132.00 Rp 1,901,320.00
- besi kg 164.0000 Rp 10,342.00 Rp 1,696,088.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 4,635,886.03
Dibulatkan Rp 4,635,886.00
1 m Tie Beam Beton Tulang TB2 20 x 30
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting tie beam m 2
10.0000 Rp 190,132.00 Rp 1,901,320.00
- besi kg 183.0000 Rp 10,342.00 Rp 1,892,586.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 4,832,384.03
Dibulatkan Rp 4,832,384.00
1 m Tie Beam Beton Tulang TB3 15 x 25
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Pasir Beton m3 0.5200 Rp 395,000.00 Rp 205,400.00


- Batu pecah mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting tie beam m 2
13.3300 Rp 190,132.00 Rp 2,534,459.56
- besi kg 124.0000 Rp 10,342.00 Rp 1,282,408.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 4,855,345.59
Dibulatkan Rp 4,855,345.00
1 m Tie Beam Beton Tulang TB4 15 x 20
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting tie beam m 2
13.3300 Rp 190,132.00 Rp 2,534,459.56
- besi kg 148.0000 Rp 10,342.00 Rp 1,530,616.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 5,103,553.59
Dibulatkan Rp 5,103,553.00
1 m Pasang Bekisting untuk Sloof
2

- Kayu papan kelas III m3 0.0315 Rp 1,828,000.00 Rp 57,582.00


- Paku 5 cm s/d 12 cm kg 0.3000 Rp 16,445.00 Rp 4,933.50
- minyak bekisting ltr 0.1000 Rp 55,680.00 Rp 5,568.00
- Pekerja Oh 0.5200 Rp 78,177.92 Rp 40,652.52
- Tukang kayu Oh 0.2600 Rp 107,758.75 Rp 28,017.28
- Kepala Tukang kayu Oh 0.0260 Rp 124,662.08 Rp 3,241.21
- Mandor Oh 0.0260 Rp 160,159.08 Rp 4,164.14
Jumlah Rp 144,158.64
Dibulatkan Rp 144,158.00
1 m Sloof Beton Tulang SL 15 x 20
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting sloof m 2
13.3300 Rp 144,158.00 Rp 1,921,626.14
- besi kg 148.0000 Rp 10,342.00 Rp 1,530,616.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 4,490,720.17
Dibulatkan Rp 4,490,720.00
1 m Pasang Bekisting untuk Balok
2

- Kayu papan kelas III m3 0.0280 Rp 1,828,000.00 Rp 51,184.00


- Paku 5 cm s/d 12 cm kg 0.4000 Rp 16,445.00 Rp 6,578.00
- Minyak bekisting ltr 0.2000 Rp 55,680.00 Rp 11,136.00
- Kayu balok kelas III m3 0.0135 Rp 1,828,000.00 Rp 24,678.00
- Bambu 6-10 (600) cm 7 s/d 10 btg 2.0000 Rp 25,300.00 Rp 50,600.00
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Pekerja Oh 0.6600 Rp 78,177.92 Rp 51,597.43


- Tukang Kayu Oh 0.3300 Rp 107,758.75 Rp 35,560.39
- Kepala Tukang kayu Oh 0.0330 Rp 124,662.08 Rp 4,113.85
- Mandor Oh 0.0330 Rp 160,159.08 Rp 5,285.25
Jumlah Rp 240,732.91
Dibulatkan Rp 240,732.00
1 m Balok Beton Tulang B1 25 x 40
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting balok m 2
10.5000 Rp 240,732.00 Rp 2,527,686.00
- besi kg 124.0000 Rp 10,342.00 Rp 1,282,408.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 4,848,572.03
Dibulatkan Rp 4,848,572.00
1 m Balok Beton Tulang B1* 25 x 45
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting balok m 2
10.2200 Rp 240,732.00 Rp 2,460,281.04
- besi kg 118.0000 Rp 10,342.00 Rp 1,220,356.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 4,719,115.07
Dibulatkan Rp 4,719,115.00
1 m Balok Beton Tulang B2 20 x 30
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting balok m 2
13.3300 Rp 240,732.00 Rp 3,208,957.56
- besi kg 194.0000 Rp 10,342.00 Rp 2,006,348.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 6,253,783.59
Dibulatkan Rp 6,253,783.00
1 m Ringbalk Beton Tulang RB4 15 x 20
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting balok m 2
13.3300 Rp 240,732.00 Rp 3,208,957.56
- besi kg 148.0000 Rp 10,342.00 Rp 1,530,616.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55


- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 5,778,051.59
Dibulatkan Rp 5,778,051.00
1 m Ringbalk Beton Tulang RB1 20 x 35
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting balok m 2
10.0000 Rp 240,732.00 Rp 2,407,320.00
- besi kg 177.0000 Rp 10,342.00 Rp 1,830,534.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 5,276,332.03
Dibulatkan Rp 5,276,332.00
1 m Ringbalk Beton Tulang RB1* 25 x 40
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting balok m 2
8.0000 Rp 240,732.00 Rp 1,925,856.00
- besi kg 106.0000 Rp 10,342.00 Rp 1,096,252.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 4,060,586.03
Dibulatkan Rp 4,060,586.00
1 m Ringbalk Beton Tulang RB2 20 x 30
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu pecah mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- bekisting balok m 2
10.0000 Rp 240,732.00 Rp 2,407,320.00
- besi kg 165.0000 Rp 10,342.00 Rp 1,706,430.00
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
Jumlah Rp 5,152,228.03
Dibulatkan Rp 5,152,228.00
1 m Balok Lintel BL ( 11 x 11 )
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
- Bekisting sloof m2 27.2700 Rp 144,158.00 Rp 3,931,188.66
- besi kg 236.0000 Rp 10,342.00 Rp 2,440,712.00
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

Jumlah Rp 7,410,378.69
Dibulatkan Rp 7,410,378.00
1 m Pasang Bekisting untuk Plat Lantai
2

- Paku 5 cm s/d 12 cm kg 0.4000 Rp 16,445.00 Rp 6,578.00


- Minyak bekisting ltr 0.2000 Rp 55,680.00 Rp 11,136.00
- Kayu balok kelas III m3 0.0150 Rp 1,828,000.00 Rp 27,420.00
- Plywood 9 MM 120 X 240 lbr 0.3500 Rp 214,900.00 Rp 75,215.00
- Bambu 6-10 (600) cm 7 s/d 10 btg 3.0000 Rp 25,300.00 Rp 75,900.00
- Pekerja Oh 0.6600 Rp 78,177.92 Rp 51,597.43
- Tukang Kayu Oh 0.3300 Rp 107,758.75 Rp 35,560.39
- Kepala Tukang kayu Oh 0.0330 Rp 124,662.08 Rp 4,113.85
- Mandor Oh 0.0330 Rp 160,159.08 Rp 5,285.25
Jumlah Rp 292,805.91
Dibulatkan Rp 292,805.00
1 m plat lantai beton bertulang t = 12 cm
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
- Bekisting plat m 2
10.5700 Rp 292,805.00 Rp 3,094,948.85
- Besi kg 159.0000 Rp 10,342.00 Rp 1,644,378.00
Jumlah Rp 5,777,804.88
Dibulatkan Rp 5,777,804.00
1 m plat lantai beton bertulang t = 10 cm
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
- Bekisting plat m 2
12.2000 Rp 292,805.00 Rp 3,572,221.00
- Besi kg 150.0000 Rp 10,342.00 Rp 1,551,300.00
Jumlah Rp 6,161,999.03
Dibulatkan Rp 6,161,999.00
1 m plat ramp t = 10 cm + wiremesh M8
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
- Bekisting pondasi m 2
12.2000 Rp 292,805.00 Rp 3,572,221.00
- Wiremesh M8 m2 10.0000 Rp 72,105.00 Rp 721,050.00
Jumlah Rp 5,331,749.03
Dibulatkan Rp 5,331,749.00
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

1 m 3 topi-topi beton bertulang t = 8 cm


- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00
- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
- Bekisting plat m2 2.1600 Rp 292,805.00 Rp 632,458.80
- Besi kg 117.0000 Rp 10,342.00 Rp 1,210,014.00
Jumlah Rp 2,880,950.83
Dibulatkan Rp 2,880,950.00
1 m meja dapur beton bertulang t = 8 cm
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
- Bekisting plat m2 14.6600 Rp 137,760.00 Rp 2,019,561.60
- Besi kg 58.0000 Rp 10,342.00 Rp 599,836.00
Jumlah Rp 3,657,875.63
Dibulatkan Rp 3,657,875.00
1 m Pasang Bekisting untuk Tangga
2

- Paku 5 cm s/d 12 cm kg 0.4000 Rp 16,445.00 Rp 6,578.00


- Minyak bekisting ltr 0.1500 Rp 55,680.00 Rp 8,352.00
- Kayu balok kelas III m3 0.0150 Rp 1,828,000.00 Rp 27,420.00
- Plywood 9 mm 120 X 240 lbr 0.3500 Rp 214,900.00 Rp 75,215.00
- Bambu 6-10 (600) cm 7 s/d 10 btg 2.0000 Rp 25,300.00 Rp 50,600.00
- Pekerja Oh 0.6600 Rp 78,177.92 Rp 51,597.43
- Tukang Kayu Oh 0.3300 Rp 107,758.75 Rp 35,560.39
- Kepala Tukang kayu Oh 0.0330 Rp 124,662.08 Rp 4,113.85
- Mandor Oh 0.0330 Rp 160,159.08 Rp 5,285.25
Jumlah Rp 264,721.91
Dibulatkan Rp 264,721.00
1 m Plat Tangga Beton Tulang t = 15 cm
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m3 0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
- Bekisting plat m2 7.6582 Rp 292,805.00 Rp 2,242,358.13
- Besi kg 325.2932 Rp 10,342.00 Rp 3,364,182.34
Jumlah Rp 6,645,018.51
Dibulatkan Rp 6,645,018.00
1 m Plat Bordes Beton Tulang t = 15 cm
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Pasir Beton m3 0.5200 Rp 395,000.00 Rp 205,400.00


- Batu Pecah Mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
- Bekisting plat m 2
8.9600 Rp 292,805.00 Rp 2,623,532.80
- Besi kg 152.0000 Rp 10,342.00 Rp 1,571,984.00
Jumlah Rp 5,233,994.83
Dibulatkan Rp 5,233,994.00
1 m Balok Tangga BTG 25 x 40
3

- Semen Portland kg 218.0000 Rp 1,771.00 Rp 386,078.00


- Pasir Beton m 3
0.5200 Rp 395,000.00 Rp 205,400.00
- Batu Pecah Mesin 2/3 m 3
0.8700 Rp 316,250.00 Rp 275,137.50
- Pekerja Oh 1.6500 Rp 78,177.92 Rp 128,993.57
- Tukang Batu Oh 0.2500 Rp 107,758.75 Rp 26,939.69
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0800 Rp 160,159.08 Rp 12,812.73
- Bekisting balok m 2
10.5000 Rp 240,732.00 Rp 2,527,686.00
- Besi kg 124.0000 Rp 10,342.00 Rp 1,282,408.00
Jumlah Rp 4,848,572.03
Dibulatkan Rp 4,848,572.00
1 m Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps
2

- Bata merah bakar bh 140.0000 Rp 866.53 Rp 121,313.50


- Semen Portland kg 22.2000 Rp 1,771.00 Rp 39,316.20
- Pasir Pasang m 3
0.1020 Rp 352,000.00 Rp 35,904.00
- Pekerja Oh 0.6500 Rp 78,177.92 Rp 50,815.65
- Tukang Batu Oh 0.2000 Rp 107,758.75 Rp 21,551.75
- Kepala Tukang batu Oh 0.0200 Rp 124,662.08 Rp 2,493.24
- Mandor Oh 0.0300 Rp 160,159.08 Rp 4,804.77
Jumlah Rp 276,199.11
Dibulatkan Rp 276,199.00
1 m 2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps
- Bata merah bakar bh 70.0000 Rp 866.53 Rp 60,656.75
- Semen Portland kg 9.6800 Rp 1,771.00 Rp 17,143.28
- Pasir Pasang m3 0.0450 Rp 352,000.00 Rp 15,840.00
- Pekerja Oh 0.3000 Rp 78,177.92 Rp 23,453.38
- Tukang Batu Oh 0.1000 Rp 107,758.75 Rp 10,775.88
- Kepala Tukang batu Oh 0.0100 Rp 124,662.08 Rp 1,246.62
- Mandor Oh 0.0150 Rp 160,159.08 Rp 2,402.39
Jumlah Rp 131,518.29
Dibulatkan Rp 131,518.00
1 m Plesteran adk. 1pc : 5ps Tebal 15 mm
2

- Semen Portland kg 5.1840 Rp 1,771.00 Rp 9,180.86


- Pasir Pasang m 3 0.0260 Rp 352,000.00 Rp 9,152.00
- Pekerja Oh 0.3000 Rp 78,177.92 Rp 23,453.38
- Tukang Batu Oh 0.1500 Rp 107,758.75 Rp 16,163.81
- Kepala Tukang batu Oh 0.0150 Rp 124,662.08 Rp 1,869.93
- Mandor Oh 0.0150 Rp 160,159.08 Rp 2,402.39
Jumlah Rp 62,222.37
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

Dibulatkan Rp 62,222.00
1 m Ban-banan 3 x 10 cm
'

- Semen Portland kg 1.3618 Rp 1,771.00 Rp 2,411.75


- Pasir Pasang m3 0.0052 Rp 352,000.00 Rp 1,830.40
- Pekerja Oh 0.0800 Rp 78,177.92 Rp 6,254.23
- Tukang Batu Oh 0.0400 Rp 107,758.75 Rp 4,310.35
- Kepala Tukang batu Oh 0.0040 Rp 124,662.08 Rp 498.65
- Mandor Oh 0.0040 Rp 160,159.08 Rp 640.64
Jumlah Rp 15,946.02
Dibulatkan Rp 15,946.00
1 m Acian
2

- Semen Portland kg 3.2500 Rp 1,771.00 Rp 5,755.75


- Pekerja Oh 0.2000 Rp 78,177.92 Rp 15,635.58
- Tukang Batu Oh 0.1000 Rp 107,758.75 Rp 10,775.88
- Kepala Tukang batu Oh 0.0100 Rp 124,662.08 Rp 1,246.62
- Mandor Oh 0.0100 Rp 160,159.08 Rp 1,601.59
Jumlah Rp 35,015.42
Dibulatkan Rp 35,015.00
1 m Tali Air adk. 1pc : 2ps tebal 10 mm
'

- Semen Portland kg 0.1300 Rp 1,771.00 Rp 230.23


- Pasir Pasang m 3 0.0090 Rp 352,000.00 Rp 3,168.00
- Pekerja Oh 0.1200 Rp 78,177.92 Rp 9,381.35
Jumlah Rp 12,779.58
Dibulatkan Rp 12,779.00
1 m Dinding Pemisah Gypsum t = 9 mm + rangka hollow galvalum
2

- Hollow 4 x 4 cm (400 cm) galvalum btg 0.4150 Rp 44,275.00 Rp 18,374.13


- Hollow 4 x 4 cm (400 cm) galvalum btg 0.1500 Rp 44,275.00 Rp 6,641.25
- Gypsum (120 x 240 t = 9 mm ex Jayaboard) lbr 0.3640 Rp 94,875.00 Rp 34,534.50
- Paku Gypsum kg 0.1100 Rp 25,300.00 Rp 2,783.00
- Ramset / dinabolt bh 3.5000 Rp 5,150.00 Rp 18,025.00
- Cotton plaster bh 0.0720 Rp 82,400.00 Rp 5,932.80
- Compound zak 0.1250 Rp 111,000.00 Rp 13,875.00
- Pekerja Oh 0.1000 Rp 78,177.92 Rp 7,817.79
- Tukang kayu Oh 0.0500 Rp 107,758.75 Rp 5,387.94
- Kepala Tukang kayu Oh 0.0050 Rp 124,662.08 Rp 623.31
- Mandor Oh 0.0050 Rp 160,159.08 Rp 800.80
Jumlah Rp 114,795.51
Dibulatkan Rp 114,795.00
1 m Lantai Keramik Polos 40 x 40 cm Setara Mulia
2

- keramik 40 x 40 KW 1 DN Putih Polos Mulia m2 1.0600 Rp 59,455.00 Rp 63,022.30


- Semen portland kg 8.1900 Rp 1,771.00 Rp 14,504.49
- Pasir pasang m 3
0.0450 Rp 352,000.00 Rp 15,840.00
- Semen warna kg 1.6200 Rp 16,600.00 Rp 26,892.00
- Pekerja Oh 0.7000 Rp 78,177.92 Rp 54,724.54
- Tukang batu Oh 0.3500 Rp 107,758.75 Rp 37,715.56
- Kepala Tukang batu Oh 0.0350 Rp 124,662.08 Rp 4,363.17
- Mandor Oh 0.0350 Rp 160,159.08 Rp 5,605.57
Jumlah Rp 222,667.64
Dibulatkan Rp 222,667.00
1 m Dinding Granit 60 x 60 cm
2
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- homogenous tile 60 x 60 cm polish garuda m2 1.0600 Rp 151,800.00 Rp 160,908.00


- Semen portland kg 8.5846 Rp 1,771.00 Rp 15,203.35
- Pasir pasang m 3 0.0180 Rp 352,000.00 Rp 6,336.00
- Semen warna kg 1.7963 Rp 16,600.00 Rp 29,818.52
- Pekerja Oh 0.3086 Rp 78,177.92 Rp 24,123.47
- Tukang batu Oh 0.1543 Rp 107,758.75 Rp 16,625.64
- Kepala Tukang batu Oh 0.0154 Rp 124,662.08 Rp 1,923.36
- Mandor Oh 0.0154 Rp 160,159.08 Rp 2,471.03
Jumlah Rp 257,409.36
Dibulatkan Rp 257,409.00
1 m homogenous Tile 30 x 60 cm antislip
2

- homogenous tile 30 x 60 cm antislip garuda m2 1.0600 Rp 98,037.50 Rp 103,919.75


- Semen portland kg 9.6000 Rp 1,771.00 Rp 17,001.60
- Pasir pasang m 3 0.0450 Rp 352,000.00 Rp 15,840.00
- Semen warna kg 1.5000 Rp 16,600.00 Rp 24,900.00
- Pekerja Oh 0.2400 Rp 78,177.92 Rp 18,762.70
- Tukang batu Oh 0.1200 Rp 107,758.75 Rp 12,931.05
- Kepala Tukang batu Oh 0.0120 Rp 124,662.08 Rp 1,495.94
- Mandor Oh 0.0120 Rp 160,159.08 Rp 1,921.91
Jumlah Rp 196,772.95
Dibulatkan Rp 196,772.00
1 m Lantai Keramik polos 25 x 25 cm setara Mulia
2

- Keramik 25 x 25 (KM) KW 1 DN Putih polos Mulia m2 1.0600 Rp 75,900.00 Rp 80,454.00


- Semen portland kg 10.4000 Rp 1,771.00 Rp 18,418.40
- Pasir pasang m 3
0.0450 Rp 352,000.00 Rp 15,840.00
- Semen warna kg 1.6200 Rp 16,600.00 Rp 26,892.00
- Pekerja Oh 0.7000 Rp 78,177.92 Rp 54,724.54
- Tukang batu Oh 0.3500 Rp 107,758.75 Rp 37,715.56
- Kepala Tukang batu Oh 0.0350 Rp 124,662.08 Rp 4,363.17
- Mandor Oh 0.0350 Rp 160,159.08 Rp 5,605.57
Jumlah Rp 244,013.25
Dibulatkan Rp 244,013.00
1 m Lantai Keramik corak (antislip) 25 x 25 cm setara Mulia
2

- Keramik 25 x 25 (KM) KW 1 DN Corak/Warna/Anti Slip Mulia m2 1.0600 Rp 86,020.00 Rp 91,181.20


- Semen portland kg 10.4000 Rp 1,771.00 Rp 18,418.40
- Pasir pasang m3 0.0450 Rp 352,000.00 Rp 15,840.00
- Semen warna kg 1.6200 Rp 16,600.00 Rp 26,892.00
- Pekerja Oh 0.7000 Rp 78,177.92 Rp 54,724.54
- Tukang batu Oh 0.3500 Rp 107,758.75 Rp 37,715.56
- Kepala Tukang batu Oh 0.0350 Rp 124,662.08 Rp 4,363.17
- Mandor Oh 0.0350 Rp 160,159.08 Rp 5,605.57
Jumlah Rp 254,740.45
Dibulatkan Rp 254,740.00
1 m 2 Dinding Keramik Corak 25 x40 cm Setara Mulia
- Keramik 25 x 40 Dinding (KM) KW 1 DN Polos Mulia m2 1.0600 Rp 88,550.00 Rp 93,863.00
- Semen portland kg 9.3000 Rp 1,771.00 Rp 16,470.30
- Pasir pasang m 3
0.0180 Rp 352,000.00 Rp 6,336.00
- Semen warna kg 1.9400 Rp 16,600.00 Rp 32,204.00
- Pekerja Oh 0.9000 Rp 78,177.92 Rp 70,360.13
- Tukang batu Oh 0.4500 Rp 107,758.75 Rp 48,491.44
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Kepala Tukang batu Oh 0.0450 Rp 124,662.08 Rp 5,609.79


- Mandor Oh 0.0450 Rp 160,159.08 Rp 7,207.16
Jumlah Rp 280,541.82
Dibulatkan Rp 280,541.00
1 m Batu Andesit alur lurus
2

- Batu Andesit alur lurus m2 1.1000 Rp 139,150.00 Rp 153,065.00


- Semen portland kg 11.7500 Rp 1,771.00 Rp 20,809.25
- Pasir pasang m3 0.0350 Rp 352,000.00 Rp 12,320.00
- Pekerja Oh 0.7000 Rp 78,177.92 Rp 54,724.54
- Tukang batu Oh 0.3500 Rp 107,758.75 Rp 37,715.56
- Kepala Tukang batu Oh 0.0350 Rp 124,662.08 Rp 4,363.17
- Mandor Oh 0.0350 Rp 160,159.08 Rp 5,605.57
Jumlah Rp 288,603.10
Dibulatkan Rp 288,603.00
1 UNIT Pekerjaan Kusen Pintu (P1)
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 5.8000 Rp 113,850.00 Rp 660,330.00
- Daun Pintu Aluminium Natural (tanpa kaca dan accesoris) m' 10.6400 Rp 166,980.00 Rp 1,776,667.20
- Engsel Pintu Unilon Standard psg 3.0000 Rp 18,280.00 Rp 54,840.00
- kunci 2 Slaagh ROYAL buah 1.0000 Rp 225,000.00 Rp 225,000.00
- Espagnolet tanam psg 1.0000 Rp 84,328.32 Rp 84,328.32
- Kaca polos 5 mm (ASAHI) m 2
2.2816 Rp 181,200.00 Rp 413,425.92
Accessories (5%) Rp 121,849.86
Jumlah Rp 3,336,441.30
Dibulatkan Rp 3,336,441.00
Membuat 1 m pintu multiplek 9 mm, rangka expose kayu kelas I
2

- kayu papan kamper Banjar m3 0.0256 Rp 12,083,280.00 Rp 309,331.97


- paku biasa kg 0.0300 #N/A #N/A
- Lem Fox kg 0.5000 #N/A #N/A
- Multiplek 9 mm 120 x 240 lbr 1.0000 #N/A #N/A
- Pekerja Oh 0.8000 Rp 78,177.92 Rp 62,542.34
- Tukang Kayu Oh 2.4000 Rp 107,758.75 Rp 258,621.00
- Kepala Tukang kayu Oh 0.2400 Rp 124,662.08 Rp 29,918.90
- Mandor Oh 0.0400 Rp 160,159.08 Rp 6,406.36
Jumlah #N/A
Dibulatkan #N/A
1 UNIT Pekerjaan Kusen Pintu (P2)
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (3") m' 5.4000 Rp 98,670.00 Rp 532,818.00
- pintu multiplek 9 mm, rangka expose kayu kelas I m 2
2.3451 #N/A #N/A
- Engsel Pintu Unilon Standard psg 3.0000 Rp 18,280.00 Rp 54,840.00
- kunci 2 Slaagh ROYAL buah 1.0000 Rp 225,000.00 Rp 225,000.00
- Espagnolet tanam psg 1.0000 Rp 84,328.32 Rp 84,328.32
- Kaca polos 5 mm (ASAHI) m 2
0.1269 Rp 181,200.00 Rp 22,994.28
- Accessories (5%) #N/A
Jumlah #N/A
Dibulatkan #N/A
1 UNIT Pekerjaan Kusen Pintu (P2A)
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 5.4000 Rp 113,850.00 Rp 614,790.00
- Daun Pintu Aluminium Natural (tanpa kaca dan accesoris) m' 5.5000 Rp 166,980.00 Rp 918,390.00
- Engsel Pintu Unilon Standard psg 3.0000 Rp 18,280.00 Rp 54,840.00
- kunci 2 Slaagh ROYAL buah 1.0000 Rp 225,000.00 Rp 225,000.00
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Espagnolet tanam psg 1.0000 Rp 84,328.32 Rp 84,328.32


- Kaca polos 5 mm (ASAHI) m 2
1.9769 Rp 181,200.00 Rp 358,214.28
- Accessories (5%) #N/A
Jumlah #N/A
Dibulatkan #N/A
1 UNIT Pekerjaan Kusen Pintu (P3)
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (3") m' 5.0000 Rp 98,670.00 Rp 493,350.00
- pintu multiplek 9 mm, rangka expose kayu kelas I m2 1.5211 #N/A #N/A
- Engsel Pintu Unilon Standard psg 1.5000 Rp 18,280.00 Rp 27,420.00
- kunci 2 Slaagh ROYAL buah 1.0000 #N/A #N/A
- Kaca polos 5 mm (ASAHI) m 2
0.1269 Rp 181,200.00 Rp 22,994.28
- Accessories (5%) Rp 25,817.21
Jumlah #N/A
Dibulatkan #N/A
1 UNIT Pekerjaan Kusen Pintu (P4)
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (3") m' 5.0000 Rp 98,670.00 Rp 493,350.00
- Daun Pintu Aluminium Natural (tanpa kaca dan accesoris) m' 6.6400 Rp 166,980.00 Rp 1,108,747.20
- Multiplek 9 mm 120 x 240 lbr 1.0836 #N/A #N/A
- Engsel Pintu Unilon Standard psg 1.5000 Rp 18,280.00 Rp 27,420.00
- kunci 2 Slaagh ROYAL buah 1.0000 Rp 225,000.00 Rp 225,000.00
- Accessories (5%) Rp 24,999.76
Jumlah #N/A
Dibulatkan #N/A
1 m 2 Pasang alumunium strip lebar 8 cm
- Alumunium strip m 14.6000 Rp 17,500.00 Rp 255,500.00
- Pekerja Oh 0.0850 Rp 78,177.92 Rp 6,645.12
- Tukang batu Oh 0.0850 Rp 107,758.75 Rp 9,159.49
- Kepala Tukang batu Oh 0.0085 Rp 124,662.08 Rp 1,059.63
- Mandor Oh 0.0042 Rp 160,159.08 Rp 672.67
Jumlah Rp 273,036.91
Dibulatkan Rp 273,036.00
1 UNIT Pekerjaan Kusen Pintu (P6)
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 5.0000 Rp 113,850.00 Rp 569,250.00
- Daun Pintu Aluminium Natural (tanpa kaca dan accesoris) m' 6.0000 Rp 166,980.00 Rp 1,001,880.00
- Engsel Pintu Unilon Standard psg 1.5000 Rp 18,280.00 Rp 27,420.00
- kunci 2 Slaagh ROYAL buah 1.0000 #N/A #N/A
- Alumunium Strip lebar 8 cm m 2
0.9982 Rp 273,036.00 Rp 272,544.54
Accessories (5%) Rp 92,183.73
Jumlah #N/A
Dibulatkan #N/A
1 UNIT Pekerjaan Kusen Pintu (P7)
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (3") m' 2.3000 Rp 98,670.00 Rp 226,941.00
- Daun Pintu Aluminium Natural (tanpa kaca dan accesoris) m' 6.2000 Rp 166,980.00 Rp 1,035,276.00
- Multiplek 9 mm 120 x 240 lbr 1.7731 Rp 273,036.91 Rp 484,121.75
- rel handerson lengkap set 1.0000 Rp 652,740.00 Rp 652,740.00
- kunci silinder buah 1.0000 Rp 234,025.00 Rp 234,025.00
- handle buah 1.0000 Rp 37,950.00 Rp 37,950.00
- Kaca polos 5 mm (ASAHI) m2 0.1269 Rp 181,200.00 Rp 22,994.28
- Accessories (5%) Rp 20,600.03
Jumlah Rp 2,714,648.06
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

Dibulatkan Rp 2,714,648.00
1 UNIT Pekerjaan Kusen Jendela Alumunium J1
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 4.6000 Rp 113,850.00 Rp 523,710.00
- Kaca polos 5 mm (ASAHI) m2 0.8944 Rp 181,200.00 Rp 162,065.28
Accessories (5%) Rp 34,288.76
Jumlah Rp 720,064.04
Dibulatkan Rp 720,064.00
1 UNIT Pekerjaan Kusen Jendela Alumunium J2
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 4.8000 Rp 113,850.00 Rp 546,480.00
- Daun Jendela Aluminium Natural (tanpa kaca dan accesoris) m' 4.4000 Rp 166,980.00 Rp 734,712.00
- Engsel Casement ps 1.0000 Rp 158,125.00 Rp 158,125.00
- Rambuncis buah 1.0000 #N/A #N/A
- Kaca polos 5 mm (ASAHI) m 2
0.7904 Rp 181,200.00 Rp 143,220.48
Accessories (5%) Rp 71,220.62
Jumlah #N/A
Dibulatkan #N/A
1 UNIT Pekerjaan Kusen Jendela Alumunium J3
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 6.0800 Rp 113,850.00 Rp 692,208.00
- Daun Jendela Aluminium Natural (tanpa kaca dan accesoris) m' 6.4800 Rp 166,980.00 Rp 1,082,030.40
- Engsel Casement ps 2.0000 Rp 158,125.00 Rp 316,250.00
- Rambuncis buah 2.0000 #N/A #N/A
- Kaca polos 5 mm (ASAHI) m 2
1.1016 Rp 181,200.00 Rp 199,609.92
Accessories (5%) Rp 98,692.42
Jumlah #N/A
Dibulatkan #N/A
1 UNIT Pekerjaan Kusen Jendela Alumunium J4
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 5.0000 Rp 113,850.00 Rp 569,250.00
- Daun Jendela Aluminium Natural (tanpa kaca dan accesoris) m' 6.3200 Rp 166,980.00 Rp 1,055,313.60
- rel sliding buah 2.0000 Rp 158,125.00 Rp 316,250.00
- Rambuncis buah 1.0000 Rp 25,300.00 Rp 25,300.00
- Kaca polos 5 mm (ASAHI) m 2
1.0200 Rp 181,200.00 Rp 184,824.00
Accessories (5%) Rp 90,469.38
Jumlah Rp 2,241,406.98
Dibulatkan Rp 2,241,406.00
1 UNIT Pekerjaan Kusen Jendela Alumunium J5
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 9.0000 Rp 113,850.00 Rp 1,024,650.00
- Daun Jendela Aluminium Natural (tanpa kaca dan accesoris) m' 6.6000 Rp 166,980.00 Rp 1,102,068.00
- Engsel Casement ps 2.0000 Rp 158,125.00 Rp 316,250.00
- Rambuncis buah 2.0000 Rp 25,300.00 Rp 50,600.00
- Kaca polos 5 mm (ASAHI) m2 2.0812 Rp 181,200.00 Rp 377,113.44
Accessories (5%) Rp 125,191.57
Jumlah Rp 2,995,873.01
Dibulatkan Rp 2,995,873.00
1 UNIT Pekerjaan Kusen Jendela Alumunium J6
- Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 3.6400 Rp 113,850.00 Rp 414,414.00
- Daun Jendela Aluminium Natural (tanpa kaca dan accesoris) m' 3.2400 Rp 166,980.00 Rp 541,015.20
- Engsel Casement ps 1.0000 Rp 158,125.00 Rp 158,125.00
- Rambuncis buah 1.0000 Rp 25,300.00 Rp 25,300.00
- Kaca polos 5 mm (ASAHI) m 2
0.5508 Rp 181,200.00 Rp 99,804.96
Accessories (5%) Rp 52,761.71
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

Jumlah Rp 1,291,420.87
Dibulatkan Rp 1,291,420.00
Memasang 1 m Dinding Rooster Beton 15 x 30, adk 1pc : 4pc
2

- Rooster Beton 15 x 30 buah 24.0000 Rp 16,160.00 Rp 387,840.00


- Semen Portland kg 11.0000 Rp 1,771.00 Rp 19,481.00
- Pasir pasang m 3
0.0350 Rp 352,000.00 Rp 12,320.00
- Pekerja Oh 0.3000 Rp 78,177.92 Rp 23,453.38
- Tukang Batu Oh 0.1000 Rp 107,758.75 Rp 10,775.88
- Kepala Tukang batu Oh 0.0100 Rp 124,662.08 Rp 1,246.62
- Mandor Oh 0.0150 Rp 160,159.08 Rp 2,402.39
Jumlah Rp 457,519.26
Dibulatkan Rp 457,519.00
1 m Pasang Atap Genteng Murando Glazur
2

- Genteng Murando Glazur buah 18.0000 Rp 6,345.24 Rp 114,214.32


- Pekerja Oh 0.1500 Rp 78,177.92 Rp 11,726.69
- Tukang batu Oh 0.0750 Rp 107,758.75 Rp 8,081.91
- Kepala Tukang batu Oh 0.0080 Rp 124,662.08 Rp 997.30
- Mandor Oh 0.0080 Rp 160,159.08 Rp 1,281.27
Jumlah Rp 136,301.48
Dibulatkan Rp 136,301.00
1 m' Pasang Genteng Bubung Murando Glazur
- Bubung Murando Glazur buah 5.0000 Rp 14,139.17 Rp 70,695.85
- Semen Portland kg 8.0000 Rp 1,771.00 Rp 14,168.00
- Pasir pasang m3 0.0320 Rp 352,000.00 Rp 11,264.00
- Pekerja Oh 0.4000 Rp 78,177.92 Rp 31,271.17
- Tukang batu Oh 0.2000 Rp 107,758.75 Rp 21,551.75
- Kepala Tukang batu Oh 0.0200 Rp 124,662.08 Rp 2,493.24
- Mandor Oh 0.0020 Rp 160,159.08 Rp 320.32
Jumlah Rp 151,764.33
Dibulatkan Rp 151,764.00
1 m Plafond Gypsum Board, tebal 9 mm + Rangka Besi Hollow galvalum
2

- Hollow 4 x 4 cm (400 cm) galvalum btg 0.4150 Rp 44,275.00 Rp 18,374.13


- Hollow 4 x 4 cm (400 cm) galvalum btg 0.1500 Rp 44,275.00 Rp 6,641.25
- Gypsum (120 x 240 t = 9 mm ex Jayaboard) lbr 0.3640 Rp 94,875.00 Rp 34,534.50
- Paku Gypsum kg 0.1100 Rp 25,300.00 Rp 2,783.00
- Ramset / DinaBolt buah 4.0000 Rp 5,150.00 Rp 20,600.00
- Cotton Plaster buah 0.0720 Rp 82,400.00 Rp 5,932.80
- Compound zak 0.1250 Rp 111,000.00 Rp 13,875.00
- Pekerja Oh 0.1000 Rp 78,177.92 Rp 7,817.79
- Tukang Kayu Oh 0.0500 Rp 107,758.75 Rp 5,387.94
- Kepala Tukang kayu Oh 0.0050 Rp 124,662.08 Rp 623.31
- Mandor Oh 0.0050 Rp 160,159.08 Rp 800.80
Jumlah Rp 117,370.51
Dibulatkan Rp 117,370.00
1 m Langit-langit GRC t = 4 mm + Rangka Besi Hollow galvalum
2

- Hollow 4 x 4 cm (400 cm) galvalum btg 0.4150 Rp 44,275.00 Rp 18,374.13


- Hollow 4 x 4 cm (400 cm) galvalum btg 0.1500 Rp 44,275.00 Rp 6,641.25
- GRC (120 x 240) cm, t = 4 mm lbr 0.3640 Rp 82,225.00 Rp 29,929.90
- Paku GRC kg 0.1100 Rp 31,625.00 Rp 3,478.75
- Ramset / DinaBolt buah 4.0000 Rp 5,150.00 Rp 20,600.00
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Cotton Plaster buah 0.0720 Rp 82,400.00 Rp 5,932.80


- Compound zak 0.1250 Rp 111,000.00 Rp 13,875.00
- Pekerja Oh 0.1000 Rp 78,177.92 Rp 7,817.79
- Tukang Kayu Oh 0.0500 Rp 107,758.75 Rp 5,387.94
- Kepala Tukang kayu Oh 0.0050 Rp 124,662.08 Rp 623.31
- Mandor Oh 0.0050 Rp 160,159.08 Rp 800.80
Jumlah Rp 113,461.66
Dibulatkan Rp 113,461.00
1 m' Lisplank GRC 20+10 cm
- Lisplang Kalsiplang (2400 x 200 x 8.0 mm) lbr 0.6250 Rp 48,740.00 Rp 30,462.50
- Kayu Kaso 4/6 m 3
0.0030 Rp 5,095,138.89 Rp 15,285.42
- Paku 1 cm s/d 3 cm kg 0.3000 Rp 26,600.00 Rp 7,980.00
- Pekerja Oh 0.1100 Rp 78,177.92 Rp 8,599.57
- Tukang Kayu Oh 0.2200 Rp 107,758.75 Rp 23,706.93
- Kepala Tukang Kayu Oh 0.0220 Rp 124,662.08 Rp 2,742.57
- Mandor Oh 0.0050 Rp 160,159.08 Rp 800.80
Jumlah Rp 89,577.77
Dibulatkan Rp 89,577.00
1 m Pengecatan Tembok Baru Setara ICI (2x Laburan) eksterior
2

- Cat dasar ICI kg 0.1200 Rp 37,950.00 Rp 4,554.00


- Cat Tembok ICI Eksterior kg 0.1800 Rp 140,731.25 Rp 25,331.63
- Pekerja Oh 0.0280 Rp 78,177.92 Rp 2,188.98
- Tukang cat Oh 0.0420 Rp 107,758.75 Rp 4,525.87
- Kepala Tukang cat Oh 0.0042 Rp 124,662.08 Rp 523.58
- Mandor Oh 0.0025 Rp 160,159.08 Rp 400.40
Jumlah Rp 37,524.45
Dibulatkan Rp 37,524.00
1 m 2 Pengecatan Tembok Baru Setara Vinilex (2x Laburan)
- Cat dasar kg 0.1200 Rp 30,043.75 Rp 3,605.25
- Cat tembok Vinilex kg 0.1800 Rp 33,206.25 Rp 5,977.13
- Pekerja Oh 0.0280 Rp 78,177.92 Rp 2,188.98
- Tukang cat Oh 0.0420 Rp 107,758.75 Rp 4,525.87
- Kepala Tukang cat Oh 0.0042 Rp 124,662.08 Rp 523.58
- Mandor Oh 0.0025 Rp 160,159.08 Rp 400.40
Jumlah Rp 17,221.20
Dibulatkan Rp 17,221.00
1 m Pengecatan Plafond (2x) Setara Vinilex
2

- Cat tembok Vinilex kg 0.1000 Rp 33,206.25 Rp 3,320.63


- Rol cat tembok bh 0.0067 Rp 30,000.00 Rp 200.00
- Pekerja Oh 0.1333 Rp 78,177.92 Rp 10,423.72
- Tukang Cat Oh 0.2000 Rp 107,758.75 Rp 21,551.75
- Kepala Tukang cat Oh 0.0200 Rp 124,662.08 Rp 2,493.24
- Mandor Oh 0.0067 Rp 160,159.08 Rp 1,067.73
Jumlah Rp 39,057.07
Dibulatkan Rp 39,057.00
1 m Pengecatan Bidang Kayu Baru Setara Sieve
2

- Cat dasar kg 0.1700 Rp 30,043.75 Rp 5,107.44


- Cat Kayu Sieve kg 0.2600 Rp 60,720.00 Rp 15,787.20
- Pekerja Oh 0.0700 Rp 78,177.92 Rp 5,472.45
- Tukang cat Oh 0.0090 Rp 107,758.75 Rp 969.83
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Kepala Tukang cat Oh 0.0060 Rp 124,662.08 Rp 747.97


- Mandor Oh 0.0025 Rp 160,159.08 Rp 400.40
Jumlah Rp 28,485.29
Dibulatkan Rp 28,485.00
1 m Pelaburan Bidang Kayu dengan Politur
2

- Politur ltr 0.2000 Rp 58,190.00 Rp 11,638.00


- Politur Jadi ltr 0.1500 Rp 58,190.00 Rp 8,728.50
- Amplas Lbr 1.0000 Rp 12,650.00 Rp 12,650.00
- Tukang Cat Oh 0.0600 Rp 107,758.75 Rp 6,465.53
- Kepala tukang cat Oh 0.0160 Rp 124,662.08 Rp 1,994.59
- Mandor Oh 0.0025 Rp 160,159.08 Rp 400.40
Jumlah Rp 41,877.02
Dibulatkan Rp 41,877.00
1 m Pengecatan Batu Alam Anti Lumut
2

- Cat anti lumut kg 0.3000 Rp 75,900.00 Rp 22,770.00


- Pekerja Oh 0.0060 Rp 78,177.92 Rp 469.07
- Tukang cat Oh 0.0600 Rp 107,758.75 Rp 6,465.53
- Kepala Tukang cat Oh 0.0120 Rp 124,662.08 Rp 1,495.94
- Mandor Oh 0.0060 Rp 160,159.08 Rp 960.95
Jumlah Rp 32,161.49
Dibulatkan Rp 32,161.00
1 buah Tangki Air Fibreglass Volume 1 m 3

- Tangki Air Fiber Glass 1 m3 ( Excel ) buah 1.0000 Rp 2,063,400.00 Rp 2,063,400.00


- Pekerja Oh 2.0000 Rp 78,177.92 Rp 156,355.84
- Tukang Batu Oh 1.1000 Rp 107,758.75 Rp 118,534.63
- Kepala Tukang batu Oh 0.0010 Rp 124,662.08 Rp 124.66
- Mandor Oh 0.1600 Rp 160,159.08 Rp 25,625.45
Perlengkapan 6% harga bak lot 0.0600 Rp 2,063,400.00 Rp 123,804.00
Jumlah Rp 2,487,844.58
Dibulatkan Rp 2,487,844.00
1 m' Pipa PVC 1/2" (AW)
- Pipa PVC Klass AW Uk. 1/2", 22 mm m' 1.2000 Rp 12,650.00 Rp 15,180.00
- Pekerja Oh 0.0360 Rp 78,177.92 Rp 2,814.41
- Tukang pipa Oh 0.0600 Rp 107,758.75 Rp 6,465.53
- Kepala Tukang batu Oh 0.0060 Rp 124,662.08 Rp 747.97
- Mandor Oh 0.0018 Rp 160,159.08 Rp 288.29
- Perlengkapan 35 % harga pipa lot 0.3500 Rp 15,180.00 Rp 5,313.00
Jumlah Rp 30,809.19
Dibulatkan Rp 30,809.00
1 m' Pipa PVC 3/4" (AW)
- Pipa PVC Klass AW Uk. 3/4", 26 mm m' 1.2000 Rp 15,180.00 Rp 18,216.00
- Pekerja Oh 0.0360 Rp 78,177.92 Rp 2,814.41
- Tukang pipa Oh 0.0600 Rp 107,758.75 Rp 6,465.53
- Kepala Tukang batu Oh 0.0060 Rp 124,662.08 Rp 747.97
- Mandor Oh 0.0016 Rp 160,159.08 Rp 256.25
- Perlengkapan 35 % harga pipa lot 0.3500 Rp 18,216.00 Rp 6,375.60
Jumlah Rp 34,875.76
Dibulatkan Rp 34,875.00
1 m' Pipa PVC 1" (AW)
- Pipa PVC Klass AW Uk. 1", 32 mm m' 1.2000 Rp 18,975.00 Rp 22,770.00
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Pekerja Oh 0.0360 Rp 78,177.92 Rp 2,814.41


- Tukang pipa Oh 0.0600 Rp 107,758.75 Rp 6,465.53
- Kepala Tukang batu Oh 0.0060 Rp 124,662.08 Rp 747.97
- Mandor Oh 0.0018 Rp 160,159.08 Rp 288.29
- Perlengkapan 35 % harga pipa lot 0.3500 Rp 22,770.00 Rp 7,969.50
Jumlah Rp 41,055.69
Dibulatkan Rp 41,055.00
1 m' Pipa PVC 1 1/2" (AW)
- Pipa PVC Klass AW Uk. 1 - 1/2", 48 mm m' 1.2000 Rp 20,556.25 Rp 24,667.50
- Pekerja Oh 0.0360 Rp 78,177.92 Rp 2,814.41
- Tukang pipa Oh 0.0600 Rp 107,758.75 Rp 6,465.53
- Kepala Tukang batu Oh 0.0060 Rp 124,662.08 Rp 747.97
- Mandor Oh 0.0018 Rp 160,159.08 Rp 288.29
- Perlengkapan 35 % harga pipa lot 0.3500 Rp 24,667.50 Rp 8,633.63
Jumlah Rp 43,617.31
Dibulatkan Rp 43,617.00
1 Buah Wastafel lengkap
- Wastafel Lengkap TOTO LW 7 CJ unit 1.0000 Rp 855,140.00 Rp 855,140.00
- Semen Portland kg 6.0000 Rp 1,771.00 Rp 10,626.00
- Pasir pasang m3 0.0100 Rp 352,000.00 Rp 3,520.00
- Pekerja Oh 1.2000 Rp 78,177.92 Rp 93,813.50
- Tukang batu Oh 1.4500 Rp 107,758.75 Rp 156,250.19
- Kepala Tukang batu Oh 0.1500 Rp 124,662.08 Rp 18,699.31
- Mandor Oh 0.1000 Rp 160,159.08 Rp 16,015.91
Perlengkapan 12 % harga wastafel lot 0.1200 Rp 855,140.00 Rp 102,616.80
Jumlah Rp 1,256,681.71
Dibulatkan Rp 1,256,681.00
1 Buah Kitchen Zink Stainless steel
- Kitchen Zink Stainless Standard Lokal ( 1 Lubang) buah 1.0000 Rp 665,400.00 Rp 665,400.00
- Pekerja Oh 0.0300 Rp 78,177.92 Rp 2,345.34
- Tukang pipa Oh 0.3000 Rp 107,758.75 Rp 32,327.63
- Kepala Tukang batu Oh 0.0300 Rp 124,662.08 Rp 3,739.86
- Mandor Oh 0.0015 Rp 160,159.08 Rp 240.24
Jumlah Rp 704,053.06
Dibulatkan Rp 704,053.00
1 buah kran 1/2"
- Kran Tembok ITAP dia. 1/2" buah 1.0000 Rp 55,800.00 Rp 55,800.00
- Seal Tape buah 0.0250 Rp 2,530.00 Rp 63.25
- Pekerja Oh 0.0100 Rp 78,177.92 Rp 781.78
- Tukang pipa Oh 0.1000 Rp 107,758.75 Rp 10,775.88
- Kepala Tukang batu Oh 0.0100 Rp 124,662.08 Rp 1,246.62
- Mandor Oh 0.0050 Rp 160,159.08 Rp 800.80
Jumlah Rp 69,468.32
Dibulatkan Rp 69,468.00
1 buah kran leher angsa 1/2" ITAP
- Kran leher angsa ITAP 1/2" buah 1.0000 Rp 92,400.00 Rp 92,400.00
- Seal Tape buah 0.0250 Rp 2,530.00 Rp 63.25
- Pekerja Oh 0.0100 Rp 78,177.92 Rp 781.78
- Tukang pipa Oh 0.1000 Rp 107,758.75 Rp 10,775.88
- Kepala Tukang batu Oh 0.0100 Rp 124,662.08 Rp 1,246.62
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Mandor Oh 0.0050 Rp 160,159.08 Rp 800.80


Jumlah Rp 106,068.32
Dibulatkan Rp 106,068.00
1 m' Pipa PVC 2" (AW)
- Pipa PVC Klass AW Uk. 2", 60 mm m' 1.2000 Rp 25,300.00 Rp 30,360.00
- Pekerja Oh 0.0360 Rp 78,177.92 Rp 2,814.41
- Tukang pipa Oh 0.0600 Rp 107,758.75 Rp 6,465.53
- Kepala Tukang batu Oh 0.0060 Rp 124,662.08 Rp 747.97
- Mandor Oh 0.0018 Rp 160,159.08 Rp 288.29
- Perlengkapan 35 % harga pipa lot 0.3500 Rp 30,360.00 Rp 10,626.00
Jumlah Rp 51,302.19
Dibulatkan Rp 51,302.00
1 m' Pipa PVC 3" (AW)
- Pipa PVC Klass AW Uk. 3", 89 mm m' 1.2000 Rp 40,796.25 Rp 48,955.50
- Pekerja Oh 0.0360 Rp 78,177.92 Rp 2,814.41
- Tukang pipa Oh 0.0600 Rp 107,758.75 Rp 6,465.53
- Kepala Tukang batu Oh 0.0060 Rp 124,662.08 Rp 747.97
- Mandor Oh 0.0018 Rp 160,159.08 Rp 288.29
- Perlengkapan 35 % harga pipa lot 0.3500 Rp 48,955.50 Rp 17,134.43
Jumlah Rp 76,406.11
Dibulatkan Rp 76,406.00
1 Buah Floor Drain
- Floor drain buah 1.0000 Rp 82,500.00 Rp 82,500.00
- Pekerja Oh 0.0100 Rp 78,177.92 Rp 781.78
- Tukang pipa Oh 0.1000 Rp 107,758.75 Rp 10,775.88
- Kepala Tukang batu Oh 0.0100 Rp 124,662.08 Rp 1,246.62
- Mandor Oh 0.0050 Rp 160,159.08 Rp 800.80
Jumlah Rp 96,105.07
Dibulatkan Rp 96,105.00
1 m' Pipa PVC 4" (AW)
- Pipa PVC Klass AW Uk. 4", 114 mm m' 1.2000 Rp 69,575.00 Rp 83,490.00
- Pekerja Oh 0.0810 Rp 78,177.92 Rp 6,332.41
- Tukang pipa Oh 0.1350 Rp 107,758.75 Rp 14,547.43
- Kepala Tukang batu Oh 0.0135 Rp 124,662.08 Rp 1,682.94
- Mandor Oh 0.0041 Rp 160,159.08 Rp 656.65
- Perlengkapan 35 % harga pipa lot 0.3500 Rp 83,490.00 Rp 29,221.50
Jumlah Rp 135,930.93
Dibulatkan Rp 135,930.00
1 m' Pipa PVC 6" (AW)
- Pipa PVC Klass AW Uk. 6" m' 1.2000 Rp 227,700.00 Rp 273,240.00
- Pekerja Oh 0.0810 Rp 78,177.92 Rp 6,332.41
- Tukang pipa Oh 0.1350 Rp 107,758.75 Rp 14,547.43
- Kepala Tukang batu Oh 0.0135 Rp 124,662.08 Rp 1,682.94
- Mandor Oh 0.0041 Rp 160,159.08 Rp 656.65
Perlengkapan 35 % harga pipa lot 0.3500 Rp 273,240.00 Rp 95,634.00
Jumlah Rp 392,093.43
Dibulatkan Rp 392,093.00
1 Buah Closet jongkok Standard Putih Poslin TOTO
- Closet Jongkok TOTO CE 7 buah 1.0000 Rp 379,500.00 Rp 379,500.00
- Semen Portland kg 6.0000 Rp 1,771.00 Rp 10,626.00
Harga Satuan Total Harga
No. Uraian Satuan Volume
(Rp) (Rp)

- Pasir pasang m3 0.0100 Rp 352,000.00 Rp 3,520.00


- Pekerja Oh 1.0000 Rp 78,177.92 Rp 78,177.92
- Tukang batu Oh 1.5000 Rp 107,758.75 Rp 161,638.13
- Kepala Tukang batu Oh 0.1500 Rp 124,662.08 Rp 18,699.31
- Mandor Oh 0.1600 Rp 160,159.08 Rp 25,625.45

Jumlah Rp 677,786.81
Dibulatkan Rp 677,786.00
1 Buah Closet Duduk Warna Standard TOTO C 240 Lengkap
- Closet Duduk Warna Standard TOTO CW 420 SJ Lengkap buah 1.0000 Rp 1,897,500.00 Rp 1,897,500.00
- Pekerja Oh 3.3000 Rp 78,177.92 Rp 257,987.14
- Tukang batu Oh 1.1000 Rp 107,758.75 Rp 118,534.63
- Kepala Tukang batu Oh 0.0110 Rp 124,662.08 Rp 1,371.28
- Mandor Oh 0.1600 Rp 160,159.08 Rp 25,625.45
Perlengkapan 6 % harga closet lot 0.0600 Rp 1,897,500.00 Rp 113,850.00
Jumlah Rp 2,414,868.50
Dibulatkan Rp 2,414,868.00
1 m' Grafel beton U 30 cm
- Grafel U 30 cm' buah 1.1000 Rp 68,700.00 Rp 75,570.00
- Bata merah bakar buah 12.0000 Rp 866.53 Rp 10,398.30
- Semen Portland kg 0.1030 Rp 1,771.00 Rp 182.41
- Pasir pasang m 3
0.0305 Rp 352,000.00 Rp 10,736.00
- Pekerja Oh 0.0100 Rp 78,177.92 Rp 781.78
- Tukang batu Oh 0.1000 Rp 107,758.75 Rp 10,775.88
- Kepala Tukang batu Oh 0.0100 Rp 124,662.08 Rp 1,246.62
- Mandor Oh 0.0050 Rp 160,159.08 Rp 800.80
Jumlah Rp 110,491.78
Dibulatkan Rp 110,491.00
1 Unit Septictank 1 x 1,50 x 1,50 m + Rembesan
- Galian Tanah m3 2.2500 Rp 62,637.00 Rp 140,933.25
- Pasir urug m 3
0.1070 Rp 327,454.00 Rp 35,037.58
- lantai kerja m 3
1.1250 Rp 1,038,478.00 Rp 1,168,287.75
- Pas. Bata adk 1pc : 3ps m2 7.5000 Rp 131,518.00 Rp 986,385.00
- Beton K-225 m 3 0.1500 Rp 1,209,340.00 Rp 181,401.00
- Plesteran adk 1pc : 3ps m 2
7.5000 Rp 62,222.00 Rp 466,665.00
- Pipa PVC 4" jenis AW m' 9.0000 Rp 135,930.00 Rp 1,223,370.00
- Pipa GIP 1 1/2" m' 2.5000 Rp 43,617.00 Rp 109,042.50
- Galian tanah untuk rembesan m 3
1.6880 Rp 62,637.00 Rp 105,731.26
- pas. Ijuk m 2
2.7000 Rp 30,613.00 Rp 82,655.10
- Urugan kerikil 3/5 m 3
0.5250 Rp 18,975.00 Rp 9,961.88
- Pipa PVC 4" berlubang jenis AW m' 9.0000 Rp 135,930.00 Rp 1,223,370.00
- Urugan dan Perataan tanah m3 0.5630 Rp 20,879.00 Rp 11,754.88
Jumlah Rp 3,232,550.61
Dibulatkan Rp 3,232,550.00
1 m 2 Pasang kembali paving block natural 8 cm
- Pekerja Oh 0.2500 Rp 78,177.92 Rp 19,544.48
- Tukang batu Oh 0.5000 Rp 107,758.75 Rp 53,879.38
- Kepala Tukang batu Oh 0.0250 Rp 124,662.08 Rp 3,116.55
- Mandor Oh 0.0025 Rp 160,159.08 Rp 400.40
Jumlah Rp 76,940.80
Dibulatkan Rp 76,940.00
C. HARGA SATUAN DASAR BAHAN DAN MATERIAL

NO BAHAN / MATERIAL SAT HARGA

A. Agregat Kasar, Bahan Perekat & Bahan Jadinya


1 Pasir Urug m3 252,000.00
2 Pasir Pasang m3 352,000.00
3 Pasir Beton m3 395,000.00
4 Abu Batu m3 342,309.00
5 koral beton m3 316,250.00
6 Batu Pecah Mesin 2/3 m3 316,250.00
7 Batu belah pondasi m3 323,850.00
8 Batu blondos m3 253,000.00
9 Batu Andesit alur lurus m2 139,150.00
10 Bata Merah Bakar buah 866.53
11 Rooster Beton 15 x 30 buah 16,160.00
12 Semen Portland kg 1,771.00
13 Semen warna kg 16,600.00
14 Ready mix beton K-225 m3 1,209,340.00
15 kerikil kg 18,975.00

B. Laburan, Pengisi dan Alatnya


1 Cat Tembok ICI Eksterior kg 140,731.25
2 Cat Tembok Vinilex kg 33,206.25
3 Cat dasar ICI kg 37,950.00
4 Cat dasar kg 30,043.75
5 Politur liter 58,190.00
6 Politur Jadi liter 58,190.00
7 Cat Kayu Sieve kg 60,720.00
8 cat anti lumut kg 75,900.00
9 Rol Cat Tembok buah 30,000.00

C. BAHAN KAYU BERIKUT BAHAN JADINYA


1 Bambu 6-10 (600) cm 7 s/d 10 btg 25,300.00
2 Kayu Kaso 4/6 m3 5,095,138.89
3 Kayu papan Kamper Banjar m3 12,083,280.00
4 Kayu papan Kelas III m3 1,828,000.00
5 Kayu Balok Kelas III m3 1,828,000.00
6 Kayu Balok Terentang m3 3,795,000.00
7 Kayu Papan 3/20 4m m3 3,289,000.00
8 Lapisan Ijuk tebal 10 cm tebal 10 cm m2 30,613.00

D. BAHAN PENUTUP RANGKA PLAFOND


1 Gypsum (120 x 240 t = 9 mm ex Jayaboard) lbr 94,875.00
2 Gypsum (120 x 240 t = 9 mm ex Jayaboard) water resist lbr 145,475.00
3 GRC (120 x 240) cm, t = 4 mm lbr 82,225.00
NO BAHAN / MATERIAL SAT HARGA

D. BAHAN KAYU LAPIS


1 Multiplek 9 mm 120 x 240 lbr 145,475.00
2 Plywood 9 mm 120 x 240 lbr 214,900.00

E. BAHAN LANTAI DAN PELAPIS DINDING

1 Keramik 25 x 25 (KM) KW 1 DN Corak/Warna/Anti Slip Mulia m2 86,020.00


2 Keramik 25 x 25 (KM) KW 1 DN Putih polos Mulia m 2
75,900.00
3 Keramik 25 x 40 Dinding (KM) KW 1 DN Polos Mulia m2 88,550.00
4 homogenous tile 60 x 60 cm polish garuda m 2
151,800.00
5 homogenous tile 30 x 60 cm antislip garuda m 2
98,037.50
6 homogenous tile 60 x 60 cm unpolish garuda m 2
139,150.00
7 Ornamen GRC motif kujang buah 885,500.00
8 Ornamen lisplang capit gunting lebar 30 cm, tebal 2 cm buah 1,138,500.00
9 Logo Kabupaten Bogor bahan stainless ; t = 50 cm buah 1,897,500.00
10 Logo Puskesmas bahan stainless ; t = 50 cm buah 1,897,500.00
11 letter stainless 8 cm buah 91,080.00
12 letter stainless 10 cm buah 113,850.00
13 letter stainless 15 cm buah 170,775.00
14 keramik 40 x 40 KW 1 DN Putih Polos Mulia m 2
59,455.00
15 keramik 40 x 40 KW 1 DN Warna/Corak (Anti Slip) Mulia m2 69,575.00

F. BAHAN SALURAN AIR KOTOR / BERSIH


1 Grafel U 30 cm' m' 68,700.00

G. BAHAN LOGAM DAN BAHAN JADINYA


1 Besi beton (polos/ulir) kg 8,104.77
2 Kawat Beton kg 25,300.00
3 Kusen Aluminium Natural 1.3 mm t = 1,3 mm (4") m' 94,875.00
4 Kusen Aluminium Natural 1.3 mm t = 1,3 mm (3") m' 82,225.00
5 Daun Jendela Aluminium Natural (tanpa kaca dan accesoris) m' 139,150.00
6 Daun Pintu Aluminium Natural (tanpa kaca dan accesoris) m' 139,150.00
7 Lem Fox kg 49,800.00
8 Alumunium strip m' 17,500.00
9 Hollow 4 x 4 cm (400 cm) galvalum btg 44,275.00
10 Wiremesh M8 m2 72,105.00

H. BAHAN KACA
1 Kaca Polos 5 mm (ASAHI) m2 151,000.00
2 Kaca Cermin 5 mm m2 341,550.00
3 Kaca Patri Lokal Terpasang Motif Kawung (ASAHI) buah 2,333,925.00
4 Seal tape buah 2,530.00

I. BAHAN PAKU DAN MUR BAUT


1 Paku 1 cm s/d 3 cm kg 26,600.00
2 Paku Biasa kg 16,445.00
3 Paku 4 cm s/d 7 cm kg 16,445.00
NO BAHAN / MATERIAL SAT HARGA

4 Paku 5 cm s/d 12 cm kg 16,445.00


5 Paku 8 cm s/d 15 cm kg 16,445.00
6 Paku Gypsum kg 25,300.00
7 Ramset / Dinabolt buah 5,150.00
8 Cotton Plaster buah 82,400.00
9 Compound zak 111,000.00
10 Paku GRC kg 31,625.00

J. BAHAN PERPIPAAN
PIPA PVC SETARA WAVIN
Klass AW (10 Kg/cm2)
1 Pipa PVC Klass AW Uk. 1/2", 22 mm m' 12,650.00
2 Pipa PVC Klass AW Uk. 3/4", 26 mm m' 15,180.00
3 Pipa PVC Klass AW Uk. 1", 32 mm m' 18,975.00
4 Pipa PVC Klass AW Uk. 1 - 1/2", 48 mm m' 20,556.25
5 Pipa PVC Klass AW Uk. 2", 60 mm m' 25,300.00
6 Pipa PVC Klass AW Uk. 3", 89 mm m' 40,796.25
7 Pipa PVC Klass AW Uk. 4", 114 mm m' 69,575.00
8 Pipa PVC Klass AW Uk. 6" m' 227,700.00

K. BAHAN SANITAIR
1 Kran Tembok ITAP dia. 1/2" buah 55,800.00
2 Kran leher angsa ITAP 1/2" buah 92,400.00
3 Wastafel Lengkap TOTO LW 7 CJ unit 855,140.00
4 Closet Duduk Warna Standard TOTO CW 420 SJ Lengkap unit 1,897,500.00
5 Wastafel Meja buah 969,130.00
6 Kitchen Zink Stainless Standard Lokal ( 1 Lubang) buah 665,400.00
7 Talang PVC U-15 cm btg 77,300.00
8 Floor drain buah 82,500.00
9 Closet Jongkok TOTO CE 7 unit 379,500.00
10 Gate valve 1" KIT buah 194,000.00
11 Gate valve 1 1/2" KIT buah 388,600.00
12 Gate valve 3/4" KIT buah 137,000.00

L. BAHAN PENUTUP ATAP


1 Genteng Murando Glazur buah 6,345.24
2 Bubung Murando Glazur buah 14,139.17
3 Lisplang Kalsiplang (2400 x 200 x 8.0 mm) lbr 48,740.00
4 Rangka atap baja ringan m2 180,000.00
5 Kanopi polycarbonat rangka besi hollow m2 442,750.00

M. BAHAN MEKANIKAL
1 exhaust fan H 100 W 40 x 40 cm unit 1,581,250.00

N. BAHAN ELEKTRIKAL
1 Saklar Broko Tunggal Standard ( 1 Phase ) bh 32,450.00
NO BAHAN / MATERIAL SAT HARGA

2 Saklar Broko Seri Standard ( 1 Phase ) bh 35,950.00


3 Stop Kontak Broko Standard ( 1 Phase ) bh 35,600.00
4 Instalasi Titik Lampu / Stop Kontak (Upah dan Alat) ttk 240,350.00
5 RMI 2 x 18 Watt bh 294,112.50
6 Down Light Inbow + SL 18 W bh 145,475.00
7 Down Light Inbow + SL 13 W bh 132,825.00
8 Down Light Outbow + SL 13 W bh 139,150.00
9 Lampu baret 22 Watt bh 316,250.00
10 TKO TL 2 x 36 W bh 140,745.00
11 MCB box 4 Group bh 75,900.00
12 NYY 3x4 mm2 dari panel lt. 1 ke MCB lt.2 m' 30,360.00
13 MCB 6 A bh 67,000.00
14 MCB 10 A bh 76,600.00
15 Lampu sorot LED 20 Watt bh 306,130.00
16 NYY 3 x 4 supreme m' 25,134.00
17 Stop Kontak Broko 3 Phase (Out Bow) bh 147,625.23
18 Penal Change Over Switch (COS) unit 1,454,750.00

O. BAHAN ALAT PENGANTUNG DAN KUNCI


1 kunci 2 Slaagh ROYAL bh 225,000.00
2 Engsel Pintu Unilon Standard ps 18,280.00
3 Engsel Casement ps 158,125.00
4 Rambuncis bh 25,300.00
5 Espagnolet tanam ps 84,328.32
6 rel handerson lengkap set 652,740.00
7 kunci silinder bh 234,025.00
8 handle bh 37,950.00
9 rel sliding bh 158,125.00

P. BAHAN PENAMPUNG AIR


1 Tangki Air Fiber Glass 1 m3 ( Excel ) bh 2,063,400.00

Q. BAHAN BAKAR DAN PELUMAS


1 Minyak Bekisting ltr 55,680.00
2 Amplas LBR 12,650.00

Keterangan :
Untuk harga material di atas sudah termasuk keuntungan dan ketentuan pajak yang berlaku.
HARGA SATUAN UPAH

UPAH
NO URAIAN Keterangan
Org/Jam Org/Hari

1 Mandor Rp 20,019.89 Rp 160,159.08


2 Kepala Tukang Batu Rp 15,582.76 Rp 124,662.08
2 Kepala Tukang Kayu Rp 15,582.76 Rp 124,662.08
3 Kepala Tukang Besi Rp 15,582.76 Rp 124,662.08
3 Kepala Tukang Cat Rp 15,582.76 Rp 124,662.08
4 Kepala Tukang Listrik Rp 15,582.76 Rp 124,662.08
4 Tukang Batu Rp 13,469.84 Rp 107,758.75
5 Tukang Kayu Rp 13,469.84 Rp 107,758.75
5 Tukang Besi/Baja Rp 13,469.84 Rp 107,758.75
6 Tukang Aluminium Rp 13,469.84 Rp 107,758.75
6 Tukang Cat Rp 13,469.84 Rp 107,758.75
7 Tukang Listrik Rp 13,469.84 Rp 107,758.75
7 Tukang Pipa Rp 13,469.84 Rp 107,758.75
8 Tukang Plitur Rp 13,469.84 Rp 107,758.75
8 Tukang Taman Rp 18,223.91 Rp 145,791.25
9 Pembantu Tukang Rp 11,356.93 Rp 90,855.42
9 Pekerja Rp 9,772.24 Rp 78,177.92
10 Penjaga Malam Rp 11,621.04 Rp 92,968.33
10 Sopir Rp 15,582.76 Rp 124,662.08
11 Operator Rp 15,582.76 Rp 124,662.08
11 Mekanik Rp 15,582.76 Rp 124,662.08
12 Pembantu Sopir Rp 11,621.04 Rp 92,968.33
12 Pembantu Operator Rp 11,621.04 Rp 92,968.33
13 Pembantu Mekanik Rp 11,621.04 Rp 92,968.33
Pintu Jendela
lt 1 PJ Luas total Pj politur
p1 2 1.7 3.57 4
p2 3 1.3 2.73 4.8 4.92 14.76
p2a 1 1.3 2.73 1.6 4.92 4.92
p3 7 0.9 1.89 8.4 3.28 22.96
p4 1 0.9 1.89 1.2 3.28 3.28
p5 1 0.3 0
p6 1 0.9 1.89 1.2 0
p6a 1 0.9 1.8 1.2 0
p7 2 1.05 2.205 2.7 4.2 8.4
j1 3 0.6 1.08 2.7
j2 4 0.7 1.26 4
j3 5 1.4 1.68 8.5
j4 2 1.4 1.68 3.4
j5 2 2.3 2.76 5.2
j6 1 0.75 0.9 1.05
50.25 54.32

lt2
p1 1.7 3.57
p2 3 1.3 2.73 4.92 14.76
p2a 1.3 2.73 4.92 0
p3 1 0.9 1.89 3.28 3.28
p4 0.9 1.89 3.28 0
p5 0 0 0
p6 2 0.9 1.89 2.4 0
p7 1.05 2.205 0 4.2 0
j1 0.6 1.08 0
j2 0.7 1.26 0
j3 8 1.4 1.68 13.6
j4 1.4 1.68 0
j5 1 2.3 2.76 2.6
j6 1 0.75 0.9 1.05
19.65 18.04

dinding cat

bata patisi pengurang


1 Lantai 1 22.4 71.4 202.51
baru v 35.75 71.05
h 35.3 223.8075 33.72
lama v 13 28.3 207.635
h 15.3 11.32
tmp duduk 2.35 6.2275
poli TB 4.095 4.2 9.345 10.665
LAB Paru 3.57 3.7 8.27 5.46
Suntik MDR 1.68 1.35 2.64 2.79
Lab 0 3.57
rg. Vaksin 1.89 1.85 4.03 2.79
gd. Obat 0 1.89
gd alat 1.89 3.7 9.95 1.89
pojok laktasi 1.89 3.7 9.95 1.89
depot obat 1.89 3.7 9.95 1.89
apotik 1.89 3.85 10.43 1.89
poli gigi 2.73 6.85 19.19 4.41
poli Kia 2.73 4.2 10.71 4.41
poli umum 1.35 4.32 4.41
ugd 7.935
rekam medik 3.57
km1 1.89
km2 1.89
selasar 13.335 13.25 29.065 44.55
luar 22.89
17.22
207.635 127.85

2 lantai 2
mushaolla 1.68 1.8 3.72 3.36
admin 2.73 5.35 13.32 6.09
dapur 1.68
r. konsul 2.73 4.85 11.82 5.49
r meeting 2.73 5.85 14.82 9.45
kapus 1.89 5.35 14.16 5.46
km 1 1.89
km kapus 1.89
koridor 11.76 15.2 33.84 16.23
tempat wudhlu
luar 22.77 58.3 163.79 17.1
163.79 91.68
cat plafond keramik

pj dalam luar gypsum gypsum wr hom 60x6 hom 60 x 60 u 25x25 tali air
10.4 22.615
8.4 19.74 4.2
5.4 14.49
9.4 26.03 3.8475 1.2
9.4 27.29
10.4 31.39 6.6975 6.6975
9.4 28.19
7.4 21.79
7.4 21.79
5.85 16.83
13.4 38.47
13.4 38.47
13.4 38.47
12.4 14.345 9.0475 9.0475 8.7
8.4 23.31 4.3475 4.3475
5.4 6.39 1.8225 1.8225 4.5
5.4 6.39 1.8225 1.8225 4.5
49.72 114.554 29.21 121.1783
32.33 67.634 51.39
36.29 93.4645
510.554 161.0985 49.3025 55.035 145.1183 0 3.645 23.1

11.9 32.34
13.4 34.11
7.9 20.9 3.76 3.76
12.4 31.71
14.4 33.75
13.4 34.74
5.4 5.31 1.8225 1.8225 4.5
5.4 5.31 1.8225 1.8225 4.5
35.1 89.07 84.86 73.41
0.85
43.75 107.5875 36.24
287.24 107.5875 88.62 39.885 77.17 0 4.495 9
25x40 25x25 p beron meja dapur
1.68 1.6693 0.107944

0.48 1.295 0.0888

17.4

9
9

37.56 2.9643 0.196744

1.12 1.12 0.0768

9
9

5.2

24.32 1.12 0.0768


qty p l tg

A Pekerjaan Tanah dan Pondasi


1 Galian Tanah
Pondasi Setempat
p1 2 1.7 1.7 2.28
p2 10 1.3 1.3 2.28
p3 2 0.6 0.6 0.95
Tie Beam
TB1 23.5 0.2 0.3
TB2 23.6 0.2 0.2
TB3 3.7 0.15 0.35
TB4 2.55 0.15 0.3
Menerus 54 0.6 0.88
2 Urugan Pasir
Pondasi Setempat
p1 2 1.7 1.7 0.05
p2 10 1.3 1.3 0.05
p3 2 0.6 0.6 1.05
Tie Beam
TB1 23.5 0.2 0.05
TB2 23.6 0.2 0.05
TB3 3.7 0.15 0.05
TB4 2.55 0.15 0.05
Menerus 53 0.6 0.05
3 Lantai kerja
Pondasi Setempat
p1 2 1.7 1.7 0.05
p2 10 1.3 1.3 0.05
p3 2 0.6 0.6 0.05
Tie Beam
TB1 23.5 0.2 0.05
TB2 23.6 0.2 0.05
TB3 3.7 0.15 0.05
TB4 2.55 0.15 0.05
4 Aanstamping 53 0.6 0.2
5 Batu Kali 53
6 Urugan tanah Kembali

B Pekerjaan Beton
1 Pondasi Setempat
P1 2 1.7 1.7 0.3
P2 10 1.3 1.3 0.3
P3 2 0.6 0.6 0.2
2 TB n Sloop
TB1 23.5 0.2 0.4
TB2 23.6 0.2 0.3
TB3 3.7 0.15 0.25
TB4 2.55 0.15 0.2
Sloop 53 0.15 0.2
3 Kolom
Lantai 1
pedestal k1 12 0.3 0.3 2.07
pedestal k2 2 0.2 0.2 0.6
k1 12 0.3 0.3 3.45
k2 2 0.2 0.2 3.65
kp 29 3.3
kps 7 0.95
Lantai 2
k1 10 0.3 0.3 3.45
kp 19 3.45
2 1
4 Balok
Lantai 1
B1 38.9 0.25 0.4
B1A 1.85 0.25 0.4
B1* 13.1 0.25 0.45
B2 33.7 0.2 0.3
B2A 9.75 0.2 0.3
RB3 6.5 0.15 0.25
RB4 48.65 0.15 0.2
Lantai 2
RB1 18.8 0.2 0.35
RB1* 9.4 0.25 0.4
RB2 11.8 0.2 0.3
RB4 20.8 0.15 0.2
5 Plat
Lanyai 1
12 cm 0.12
2 4.8 3.8
3 4.8 2.3
1 4.8 0.95
1 1.35 1.7
1 3.3 1.15
1 0.35 1.35
plat 10 cm 0.1
2 1.95 0.95
2 2.45 0.95
Plat topi-2 8 cm 0.08
4.3 0.4
3.8 0.4
15.15 0.4
rabat 0.07
ramp 0.01
Lantai 2
Plat 12 cm 1.3 1.3 0.12

C ATAP DAN LAINNYA


Lantai 1
Baja Ringan
Nog

Lany=tai 2
Baja Ringan
Nog
L V Total

52.3944
13.1784
38.532
0.684
2.663
1.41
0.944
0.19425
0.11475
28.512

1.89
0.289
0.845
0.756
0.517875
0.235
0.236
0.02775
0.019125
1.59

1.17
0.289
0.845
0.036
0.517875
0.235
0.236
0.02775
0.019125
6.36
0.27 14.31
46.3548

1.734
5.07
0.144

1.88
1.416
0.13875
0.0765
1.59

2.2356
0.048
3.726
0.292
95.7
6.65

` 3.105
65.55 67.55
2

3.89
0.185
1.47375
2.022
0.585
0.24375
1.4595

1.316
0.94
0.708
0.624

80.7225 9.6867
36.48
33.12
4.56
2.295
3.795
0.4725
8.36 0.836
3.705
4.655
9.3 0.744
1.72
1.52
6.06
46.2448 3.237136
13.8449 0.141542
0.2028