Pusk. Plantungan
PEKERJAAN LT. I
PONDASI FOOTPLAT Footplat 1 (150x 150)
GALIAN TANAH BIASA P =
Sedalam 1 Meter L =
T =
Jumlah =
V Total =
V Total =
V Total =
PONDASI FOOTPLAT
BETON Footplat 1 (150 x 150) A
P =
L =
T =
Jumlah =
V Total =
V Total =
V Total =
P =
Tulangan besi D13 =
Jarak Beugel 8 =
Jumlah =
V Tulangan besi D 13 =
V Tulangan besi 12 =
V Beugel 8 =
V Total =
BEKESTING footplat P =
FP1 (150 x 150) L =
Jumlah =
P =
L =
Jumlah =
Pusk. Plantungan
PEKERJAAN LT. I
PONDASI FOOTPLAT Footplat 2 (120x 120)
GALIAN TANAH BIASA P =
Sedalam 1 Meter L =
T =
Jumlah =
V Total =
V Total =
V Total =
PONDASI FOOTPLAT
BETON Footplat 1 (120 x 120) A
P =
L =
T =
Jumlah =
V Total =
V Total =
V Total =
P =
Tulangan besi D13 =
Jarak Beugel 8 =
Jumlah =
V Tulangan besi D 13 =
V Tulangan besi 12 =
V Beugel 8 =
V Total =
BEKESTING footplat P =
FP1 (120 x 120) L =
Jumlah =
P =
L =
Jumlah =
V Total =
Rolag bata
P =
L =
T =
V Total =
V Total =
Rolag bata
P =
L =
T =
V Total =
V Total =
L Total =
PEERJAAN SLOOF
BETON
S 1 (20 X 30) P =
L =
T =
L Total =
BETON
SP (15 X 20) P =
L =
T =
L Total =
PEMBESIAN SLOOF
S 1 (20 X 30) P =
Tulangan besi D 16 =
Jarak Beugel 8 =
S2 (15 X 20) P =
Tulangan besi 10 =
Jarak Beugel 8 =
S2 (15 X 20) P =
L =
Jumlah =
LUAS TOTAL BEGESTING SLOOF 2X PAKAI
PEKERJAAN TANAH
URUGAN TANAH PADAS Luasan Bangunan =
T =
Volume
Volume
Volume
PEKERJAAN BETON
KOLOM 1 30/30
BETON
P =
L =
T =
Jumlah =
L Total =
KOLOM 1 30/30
Pembesian P Tulangan =
Jumlah Tulangan =
Jumlah =
P Beugel =
Jumlah Beugel =
Jumlah =
V Tulangan besi D 13 =
V Tulangan besi 8 =
V Total =
KOLOM 1 30/30
BEGESTING
P =
L =
T =
Jumlah =
Pemakaian =
L Total =
Jumlah =
L Total =
P Beugel =
Jumlah Beugel =
Jumlah =
V Tulangan besi 10 =
V Tulangan besi 8 =
V Total =
Jumlah =
Pemakaian =
L Total =
BALOK LATAI 1 15/20
BETON
P =
L =
T =
V Total =
P Beugel =
Jumlah Beugel =
V Tulangan besi 10 =
V Tulangan besi 8 =
V Total =
Pemakaian =
L Total =
PLAT LEUFEL
BETON
P =
Luas penampang =
V Total =
PLAT LEUFEL
Pembesian Tulangan memanjang =
Jumlah Tulangan =
Tulangan melintang =
Jumlah Tulangan =
V Tulangan besi 10 =
V Total =
PLAT LEUFEL
BEGESTING
P =
l =
Pemakaian =
L Total =
BALOK 1 20/50
BETON
P =
L =
T =
L Total =
BALOK 1 20/50
Pembesian P Tulangan =
Tulangan Atas =
P Tulangan =
Tulangan Samping =
P Tulangan =
Tulangan Bawah =
P Beugel =
Jumlah Beugel =
V Tulangan besi D 16 =
V Tulangan besi D 13 =
V Tulangan besi 8 =
V Total =
BALOK 1 20/50
BEGESTING
P =
L =
Pemakaian =
L Total =
BALOK 2 20/40
BETON
P =
L =
T =
L Total =
BALOK 2 20/40
Pembesian P Tulangan =
Tulangan Atas =
P Tulangan =
Tulangan Samping =
P Tulangan =
Tulangan Bawah =
P Beugel =
Jumlah Beugel =
V Tulangan besi D 16 =
V Tulangan besi D 13 =
V Tulangan besi 8 =
V Total =
BALOK 2 20/40
BEGESTING
P =
L =
Pemakaian =
L Total =
BALOK 3 20/30
BETON
P =
L =
T =
L Total =
BALOK 3 20/30
Pembesian P Tulangan =
Tulangan Atas =
P Tulangan =
Tulangan Samping =
P Tulangan =
Tulangan Bawah =
P Beugel =
Jumlah Beugel =
V Tulangan besi D 16 =
V Tulangan besi D 13 =
V Tulangan besi 8 =
V Total =
BALOK 3 20/30
BEGESTING
P =
L =
Pemakaian =
L Total =
BALOK 4 20/30
BETON
P =
L =
T =
L Total =
BALOK 4 20/30
Pembesian P Tulangan =
Tulangan Atas =
P Tulangan =
Tulangan Bawah =
P Beugel =
Jumlah Beugel =
V Tulangan besi D 16 =
V Tulangan besi 8 =
V Total =
BALOK 4 20/30
BEGESTING
P =
L =
Pemakaian =
L Total =
L Total =
luas void
P =
L =
T =
Jumlah =
L Total =
V Tulangan besi D 10 =
V Total =
PLAT BETON LANTAI 2
melintang
Pembesian P Tulangan =
Tulangan Atas =
P Tulangan =
Tulangan Bawah =
V Tulangan besi D 10 =
V Total =
L Total =
Beton Tangga Lt 1 ke Lt 2
Beton Plat tangga Bordes
Panjang 8.12 0.9
lebar 1.5 1.85
tinggi 0.2 0.2
volume 2.436 0.333
Total 3.462
Pembesian
Anak Tangga
panjang 0.9
jrk beugel 0.15
jml tulangan 0.9 0.15
8.12
SALURAN DRAINASE
GOT U -20 P =
ACIAN BETON
plat leufel
P =
L =
L Total =
Luas Total acian beton =
KUSEN P2
L =
T =
Jumlah =
KUSEN P3
L =
T =
Jumlah =
KUSEN P4
L =
T =
Jumlah =
KUSEN J1
L =
T =
Jumlah =
KUSEN J2
L =
T =
Jumlah =
KUSEN J3
L =
T =
Jumlah =
KUSEN J4
L =
T =
Jumlah =
KUSEN J5
L =
T =
Jumlah =
KUSEN J6
L =
T =
Jumlah =
KUSEN Bv
L =
T =
Jumlah =
TOTAL PANJANG KUSEN ALUMUNIUM
KUSEN P2
L =
T =
Jumlah =
Luas
KUSEN P3
L =
T =
Jumlah =
Luas
PINTU KACA p4
TEMPERED 12mm L =
T =
Jumlah =
Luas
teras
P =
L =
Luas =
ruang tunggu
P =
L =
Luas =
rekan medik
P =
L =
Luas =
apotik
P =
L =
Luas =
ruang farmasi
P =
L =
Luas =
persalinan
P =
L =
Luas =
PLAFOND CALSIBOARD =
TOTAL LUASAN PLAFOND CALSIBOARD
PLAFOND GYPSUM
luas bangunan
teras
P =
L =
Luas =
ruang tunggu
P =
L =
Luas =
rekan medik
P =
L =
Luas =
apotik
P =
L =
Luas =
ruang farmasi
P =
L =
Luas =
persalinan
P =
L =
Luas =
(A+B)/2 =
T =
Jumlah =
Luas =
A =
T =
Jumlah =
Luas =
(A+B)/2 =
T =
Jumlah =
Luas =
GENTENG KODOK
Luas =
BUBUNGAN PANJANG =
TOTAL PANJANG BUBUNGAN
LISPLANK PANJANG =
PEKERJAAN SANITAIR
1 Pemasangan 1 buah closet duduk
2 Pemasangan 1 buah wastafel
3 Pemasangan 1 buah floor drain
4 Pemasangan 1 buah kran diameter " atau 3/4"
5 Pemasangan 1 m' pipa PVC tipe AW diameter 1"
6 Pemasangan 1 m pipa PVC tipe AW diameter 3
7 Pemasangan 1 m pipa PVC tipe AW diameter 4
9 Pekerjaan Septictank dan Peresapan
BACK UP DATA LANTAI 2
PEKERJAAN : PEMBANGUNAN PUSKESMAS PLANTUNGAN
LOKASI : KECAMATAN PLANTUNGAN
TAHUN ANGGARAN : 2017
Jumlah =
L Total =
P Beugel =
Jumlah Beugel =
Jumlah =
V Tulangan besi 10 =
V Tulangan besi 8 =
V Total =
Jumlah =
Pemakaian =
L Total =
PEKERJAAN BETON
KOLOM 1 30/30
BETON
P =
L =
T =
Jumlah =
L Total =
KOLOM 1 30/30
Pembesian P Tulangan =
Jumlah Tulangan =
Jumlah =
P Beugel =
Jumlah Beugel =
Jumlah =
V Tulangan besi D 13 =
V Tulangan besi 8 =
V Total =
KOLOM 1 30/30
BEGESTING
P =
L =
T =
Jumlah =
Pemakaian =
L Total =
PEERJAANRING BALK.1
RB 1 20/30
BETON
P =
L =
T =
L Total =
RB 1 20/30
Pembesian P Tulangan =
Tulangan Atas =
P Tulangan =
Tulangan Bawah =
P Beugel =
Jumlah Beugel =
V Tulangan besi D 13 =
V Tulangan besi 8 =
V Total =
RB 1 20/30
BEGESTING
P =
L =
Pemakaian =
L Total =
PEERJAANRING BALK.2
RB 2 15/30
BETON
P =
L =
T =
L Total =
RB 2 15/30
Pembesian P Tulangan =
Tulangan Atas =
P Tulangan =
Tulangan Bawah =
P Beugel =
Jumlah Beugel =
V Tulangan besi D 13 =
V Tulangan besi 8 =
V Total =
RB 2 15/30
BEGESTING
P =
L =
Pemakaian =
L Total =
PEERJAANRING BALK.3
RB 3 15/25
BETON
P =
L =
T =
L Total =
RB 3 15/25
Pembesian P Tulangan =
Tulangan Atas =
P Tulangan =
Tulangan Bawah =
P Beugel =
Jumlah Beugel =
V Tulangan besi 12 =
V Tulangan besi 8 =
V Total =
RB 3 15/25
BEGESTING
P =
L =
Pemakaian =
L Total =
KUSEN P2
L =
T =
Jumlah =
KUSEN P3
L =
T =
Jumlah =
KUSEN J1
L =
T =
Jumlah =
KUSEN J2
L =
T =
Jumlah =
KUSEN J3
L =
T =
Jumlah =
KUSEN J5
L =
T =
Jumlah =
KUSEN J6
L =
T =
Jumlah =
KUSEN Bv
L =
T =
Jumlah =
KUSEN P2
L =
T =
Jumlah =
Luas
KUSEN P3
L =
T =
Jumlah =
Luas
TOTAL DAUN PINTU PLYWOOD
KUSEN J3
L =
T =
Jumlah =
Luas
KERAMIK 20 X 20 Km/WC
(dikurangi tembok) P =
L =
Jumlah =
Luas =
KERAMIK 40 X 40
luas bangunan
luas bangunan =
P =
L =
Luas
1.500 M
1.500 M
1.500 M
16.000 bh
PXLXT 54.00 M3
1.500 M
1.500 M
0.050 M
16.000 bh
PXLXT 1.80 M3
1.500 M
1.500 M
0.050 M
16.000 bh
PXLXT 1.80 M3
1.500 M
1.500 M
0.200 M
16.000 bh
PxLxT 7.200 M3
0.725 M
0.825 M
0.100 M
16.000 bh
PxLxT 0.957 M3
0.300 M
0.300 M
2.050 M
16.000 bh
PxLxT 2.952 M3
11.109 M3
2.020 M
22.000 bh 631.404 KG
1.700 M
22.000 bh 531.379 KG
16.000 bh
2.100 M
8.000 bh
0.150 M
16.000 bh
1.900 M
1.500 M
16.000 Bh 45.60 M2
1.200 M
1.200 M
1.500 M
8.000 bh
PXLXT 17.28 M3
1.200 M
1.200 M
0.050 M
8.000 bh
PXLXT 0.58 M3
1.200 M
1.200 M
0.050 M
8.000 bh
PXLXT 0.58 M3
1.200 M
1.200 M
0.200 M
8.000 bh
PxLxT 2.304 M3
0.625 M
0.725 M
0.100 M
8.000 bh
PxLxT 0.363 M3
0.300 M
0.300 M
2.050 M
8.000 bh
PxLxT 1.476 M3
4.143 M3
1.720 M
14.000 bh 171.064 KG
1.400 M
14.000 bh 139.238 KG
8.000 bh
2.100 M
8.000 bh
0.150 M
8.000 bh
1.900 M
1.200 M
8.000 Bh 18.24 M2
121.000 M
0.850 M
0.800 M
PXLXT 82.28 M3
38.000 M
0.300 M
0.300 M
PXLXT 3.42 M3
PB 1 + Rolag 85.700 M3
104.000 M
0.800 M
0.050 M
PXLXT 4.16 M3
38.000 M
0.300 M
0.050 M
PXLXT 0.57 M3
PB 1 + Rolag 4.730 M3
104.000 M
(0,30 + 6,00) : 2 M
0.600 M
PXLXT 28.08 M3
104.000 M
0.200 M
0.800
PXTxl 16.64 M2
38.000 M
0.300 M
PXT 11.40 M2
138.000 M
0.200 M
0.300 M
PxLxT 8.280 M3
16.000 M
0.150 M
0.200 M
PxLxT 0.480 M3
8.760 M3
138.000 M
4.000 bh 552.000 M'
0.150 M 920.000 M'
16.000 M
4.000 bh 64.000 M'
0.150 M 64.000 M'
1304.336 KG
138.000 M
0.300 M
2.000 Bh x 1/2 41.40 M2
16.000 M
0.150 M
2.000 Bh x 1/2 2.40 M2
ING SLOOF 2X PAKAI 43.80 M2
170.000 M2
0.200 M'
34.000 M3
170.000 M2
0.050 M'
8.500 M3
170.000 M2
0.050 M'
8.500 M3
0.300 M
0.300 M
4.000 M
28.000 BH
PxLxT 10.080 M3
4.000 M
8.000 BH
28.000 BH
1.300 M
24.000 BH
28.000 BH
P x Jumlah Tulangan x (1,04 kg/m') 931.840 KG
P x Jumlah Tulangan x (0,40 kg/m') 349.440 KG
1281.28 KG
0.300 M
0.300 M
3.500 M
28.000
2 x pakai
(2 P + L ) x T 58.800 M2
0.150 M
0.150 M
3.500 M
10.000 BH
PxLxT 0.788 M3
3.500 M
4.000 BH
10.000 BH
0.700 M
24.000 BH
10.000 BH
0.150 M
0.150 M
3.500 M
10.000
2 x pakai
(2 P + L ) x T 10.500 M2
63.340 M
0.150 M
0.200 M
PxLxT 1.900 M3
63.340 M
4.000 BH
0.700 M
426.500 BH
63.340 M
0.200 M
2 x pakai
(2) x T 9.501 M2
14.700 M
0.035 M2
14.700 M
4.000 BH 58.800 M'
0.500 M
98.000 BH 49.000 M'
14.700 M
0.600 M
2 x pakai
PxT 4.410 M2
20.000 M
0.200 M
0.500 M
PxLxT 2.000 M3
20.000 M
2.000 BH 40.000 M'
20.000 M
8.000 BH 160.000 M'
20.000 M
2.000 BH 40.000 M'
1.500 M
133.333 BH
20.000 M
0.800 M
1 x pakai
(2 P + L ) x T 16.000 M2
103.000 M
0.200 M
0.400 M
PxLxT 8.240 M3
103.000 M
2.000 BH 206.000 M'
103.000 M
2.000 BH 206.000 M'
103.000 M
2.000 BH 206.000 M'
1.000 M
686.667 BH
103.000 M
1.000 M
1 x pakai
(2 P + L ) x T 103.000 M2
30.000 M
0.200 M
0.300 M
PxLxT 1.800 M3
30.000 M
2.000 BH 60.000 M'
30.000 M
1.000 BH 30.000 M'
30.000 M
2.000 BH 60.000 M'
1.100 M
200.000 BH
1 x pakai
(2 P + L ) x T 24.000 M2
30.000 M
0.200 M
0.300 M
PxLxT 1.800 M3
30.000 M
2.000 BH 60.000 M'
30.000 M
2.000 BH 60.000 M'
1.100 M
200.000 BH
30.000 M
0.800 M
1 x pakai
(2 P + L ) x T 24.000 M2
10.000 M
17.000 M
0.120 M
20.400
PxLxT M3
3.000 M
8.000 M
0.120 M
2.880
17.000 M
56.000 BH 952.000 M'
17.000 M
56.000 BH 952.000 M'
10.000 M
34.000 BH 340.000 M'
10.000 M
34.000 BH 340.000 M'
10.000 M
17.000 M
24.000 M2
6.000
0.890 2.00
0.617 2.00
0.000
0.617 1.00
0.617 1.00
55.345
12.333
6.000
0.617 2.00
1.040 2.00
18.333
0.260 0.26
0.890
0.395
36.785 17.15
KG
9.744
1.600
3.086
3.086
1.430
2.340
21.285 M2
54.000 M
0.750 M
0.100 M
Pxlxt 4.050 M3
54.000 M
0.750 M
0.050 M
Pxlxt 2.025 M3
6.350 M
2.000 M
PxT 12.700 M2
93.000 M2
3.800 M
PxT 353.400 M2
353.400 M2
89.430 m2
12.700 M2 12.700 M2
263.970 M2
12.700 M2
263.970 M2
12.700 M2
14.700 M
0.600 M
PxL M2
8.820 M2
1.400 M
2.600 M
8.000 bh
80.000 M'
0.900 M
2.600 M
2.000 bh
19.600 M'
0.900 M
2.600 M
2.000 bh
19.200 M'
2.400 M
2.700 M
2.000 bh
15.600 M'
1.350 M
2.350 M
5.000 bh
62.250 M'
0.700 M
2.350 M
1.000 bh
9.850 M'
2.100 M
2.350 M
1.000 bh
17.800 M'
0.800 M
1.800 M
2.000 bh
7.000 M'
0.700 M
1.900 M
2.000 bh
7.100 M'
3.600 M
2.500 M
1.000 bh
9.000 M'
0.600 M
0.500 M
2.000 bh
4.400 M'
1.300 M
2.100 M
8.000 bh
21.840 M2
0.800 M
2.100 M
2.000 bh
3.360 M2
0.800 M
2.100 M
2.000 bh
3.360 M2
28.560 M2
1.850 M
2.400 M
2.000 bh
8.880 M2
0.600 M
1.350 M
10.000 bh
8.100 M2
0.600 M
1.350 M
1.000 bh
0.810 M2
0.600 M
1.350 M
3.000 bh
2.430 M2
ALUMUNIUM 11.340 M2
M2
5.850 M
0.850 M
PXL 4.973 M2
7.850 M
7.850 M
PXL 61.623 M2
2.850 M
2.850 M
PXL 8.123 M2
1.850 M
2.850 M
PXL 10.545 M2
3.850 M
3.850 M
PXL 14.823 M2
2.850 M
2.850 M
PXL 8.123 M2
2.850 M
2.850 M
PXL 8.123 M2
3.850 M
4.850 M
PXL 18.673 M2
5.850 M
3.350 M
PXL 19.598 M2
149.050 M2
1.850 M
1.500 M
2.000 bh
PXL 5.550 M2
5.600 M
2.000 M
2.000 bh
PXL 11.200 M2
10.820 M2
5.850 M
0.850 M
PXL 4.973 M2
7.850 M
7.850 M
PXL 61.623 M2
2.850 M
2.850 M
PXL 8.123 M2
1.850 M
2.850 M
PXL 5.273 M2
3.850 M
3.850 M
PXL 14.823 M2
2.850 M
2.850 M
PXL 8.123 M2
2.850 M
2.850 M
PXL 8.123 M2
3.850 M
4.850 M
PXL 18.673 M2
5.850 M
3.350 M
PXL 19.598 M2
149.328 M2
262.000 M'
12.000 M
6.820 M
2.000 sisi
1/2 A x T 81.840 M2
13.000 M
6.820 M
2.000 sisi
AxT 177.320 M2
8.000 M
2.450 M
2.000 sisi
1/2 A x T M2
8.000 M
2.450 M
2.000 sisi
AxT M2
259.160 M2
259.160 259.160 M2
259.160 259.160 M2
58.000 M'
NG BUBUNGAN 58.000 M'
31 Titik
9 BH
22 BH
17 BH
1 BH
1 BH
2.000 bh
5.000 unit
2.000 m'
" atau 3/4" 2.000 m'
diameter 1" 34.000 m'
diameter 3 25.000 m'
diameter 4 15.000 set
2.000 BH
A LANTAI 2
ANTUNGAN
PERHITUNGAN
0.150 M
0.150 M
3.700 M
13.000 BH
PxLxT 1.082 M3
3.500 M
4.000 BH
13.000 BH
0.700 M
24.000 BH
13.000 BH
0.150 M
0.150 M
3.700 M
13.000
2 x pakai
(2 P + L ) x T 14.430 M2
0.300 M
0.300 M
4.000 M
24.000 BH
PxLxT 8.640 M3
4.000 M
8.000 BH
24.000 BH
1.300 M
24.000 BH
24.000 BH
0.300 M
0.300 M
3.500 M
24.000
3 x pakai
(2 P + L ) x T 50.400 M2
46.000 M
0.200 M
0.300 M
PxLxT 2.760 M3
46.000 M
2.000 BH 92.000 M'
46.000 M
2.000 BH 92.000 M'
1.100 M
306.667 BH
46.000 M
0.800 M
2 x pakai
(2 P + L ) x T 18.400 M2
89.000 M
0.150 M
0.300 M
PxLxT 4.005 M3
89.000 M
2.000 BH 178.000 M'
89.000 M
2.000 BH 178.000 M'
1.000 M
593.333 BH
89.000 M
0.750 M
2 x pakai
(2 P + L ) x T 33.375 M2
30.000 M
0.150 M
0.250 M
PxLxT 1.125 M3
30.000 M
2.000 BH 60.000 M'
30.000 M
2.000 BH 60.000 M'
1.000 M
200.000 BH
30.000 M
0.650 M
2 x pakai
(2 P + L ) x T 9.750 M2
1.400 M
2.600 M
2.000 bh
16.000 M'
0.900 M
2.600 M
1.000 bh
7.000 M'
0.900 M
2.600 M
1.000 bh
7.000 M'
1.350 M
2.350 M
5.000 bh
55.500 M'
0.700 M
2.350 M
2.000 bh
19.700 M'
2.100 M
2.350 M
1.000 bh
17.800 M'
0.700 M
1.900 M
2.000 bh
7.100 M'
1.150 M
0.600 M
1.000 bh
M'
0.600 M
0.500 M
3.000 bh
6.600 M'
1.300 M
2.100 M
2.000 bh
5.460 M2
0.800 M
2.100 M
1.000 bh
1.680 M2
0.800 M
2.100 M
1.000 bh
1.680 M2
8.820 M2
0.600 M
1.350 M
10.000 bh
8.100 M2
0.600 M
1.350 M
2.000 bh
1.620 M2
0.600 M
1.350 M
3.000 bh
2.430 M2
ALUMUNIUM 12.150 M2
1.850 M
1.500 M
1.000 bh
PXL 2.775 M2
5.600 M
2.000 M
1.000 bh
PXL 11.200 M2
10.000 M
17.000 M
PXL 170.000 M2
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
46,200.00
28,050.00
3,135.00
2,640.00
80,025.00
6,000.00
2,900.00
82,500.00
49,000.00
56,000.00
196,400.00
276,425.00
37,317.38
313,742.38
Jumlah Harga
(Rp)
46,200.00
28,050.00
3,135.00
2,640.00
80,025.00
160,000.00
6,000.00
2,900.00
168,900.00
248,925.00
33,604.88
282,529.88
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : PELAYANAN KESEHATAN DASAR
PEKERJAAN : PEMBANGUNAN PUSKESMAS PLANTUNGAN
LOKASI : KECAMATAN PLANTUNGAN
TH ANGGARAN : 2017
A PEKERJAAN LANTAI I
I. PEKERJAAN PERSIAPAN :
1 Pengukuran dan pemasangan 1 m' Bouwplank A. 2.2.1.4 53.00 m
2 Pembuatan Papan Nama Proyek ls 1.00 ls
3 Pembersihan 1 m2 lapangan dan perataan A. 2.2.1.9 170.00 m2
4 Direksi Keet ls 24.00 m2
II Pekerjaan tanah
1 Penggalian 1 m3 tanah biasa sedalam 1 m (Pondasi foot plat) A.2.3.1.1 71.28 m3
2 Penggalian 1 m3 tanah biasa sedalam 1 m (pondasi batu belah) A.2.3.1.1 82.28 m3
3 Penggalian 1 m3 tanah biasa sedalam 1 m (rollag bata) A.2.3.1.1 3.42 m3
4 Pengurugan kembali 1 m3 Pengurugan kembali 1 m3 galian tanah A.2.3.1.9 51.19 m3
5 Pemasangan 1 m3 Urugan Tanah Padas ( dipadatkan dengan alat pemadat tangan ) Dihit. UTP 1 34.00 m3
6 Pengurugan 1 m3 dengan Pasir urug ( Pondasi + Foot Plat ) A.2.3.1.11 7.11 m3
IV Pekerjaan beton
1 Pondasi footplat fp 1
a (K3) Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 68.64 m2
b Pembesian dengan besi polos A.4.1.1.17.p 1,162.78 kg
c Pembesian dengan besi ulir A.4.1.1.17.u 279.55 kg
d Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 11.11 m3
e Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K 100) A.4.1.1.4 1.80 m3
2 Pondasi footplat fp 2
a (K3) Pemasangan 1 m2 bekisting untuk pondasi A.4.1.1.20 29.76 m2
b Pembesian dengan besi polos A.4.1.1.17.p 310.30 kg
c Pembesian dengan besi ulir A.4.1.1.17.u 139.78 kg
d Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 4.14 m3
e Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K 100) A.4.1.1.4 0.58 m3
4 Sloof beton S1 20/30
(K3) Pemasangan 1 m2 bekisting untuk Sloof 2 x pakai A.4.1.1.21 41.40 m2
Pembesian dengan besi polos A.4.1.1.17.p 368.00 kg
Pembesian dengan besi ulir A.4.1.1.17.u 871.06 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 8.28 m3
5 Sloof beton SP 15/20
(K3) Pemasangan 1 m2 bekisting untuk Sloof 2 x pakai A.4.1.1.21 2.40 m2
Pembesian dengan besi polos A.4.1.1.17.p 65.28 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 0.48 m3
7 Kolom praktis
Pemasangan 1 m2 bekisting untuk Kolom 2 x pakai Dihit. A.4.1.1.a 10.50 m2
Pembesian dengan besi polos A.4.1.1.17.p 154.00 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 0.79 m3
8 Kolom beton K.1. 30/30
Pemasangan 1 m2 bekisting untuk Kolom 3 x pakai A.4.1.1.22 58.80 m2
Pembesian dengan besi polos A.4.1.1.17.p 349.44 kg
Pembesian dengan besi ulir A.4.1.1.17.u 931.84 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 10.08 m3
11 Membuat 1 m' balok lateau (15 x 20) cm
(K3) Pemasangan 1 m2 bekisting untuk balok 2 x pakai Dihit. A.4.1.1.b 9.50 m2
Pembesian dengan besi polos A.4.1.1.17.p 276.50 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 1.90 m3
12 Plat leufel
Pemasangan 1 m2 bekisting untuk balok 2 x pakai A.4.1.1.23 4.41 m2
Pembesian dengan besi polos A.4.1.1.17.p 102.41 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 0.51 m3
13 Balok beton B1. 20/50
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 16.00 m2
Pembesian dengan besi polos A.4.1.1.17.p 80.00 kg
Pembesian dengan besi ulir A.4.1.1.17.u 292.64 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 2.00 m3
14 Balok beton B2. 20/40
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 103.00 m2
Pembesian dengan besi polos A.4.1.1.17.p 274.67 kg
Pembesian dengan besi ulir A.4.1.1.17.u 864.38 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 8.24 m3
15 Balok beton B3. 20/30
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 24.00 m2
Pembesian dengan besi polos A.4.1.1.17.p 88.00 kg
Pembesian dengan besi ulir A.4.1.1.17.u 220.56 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 1.80 m3
16 Balok beton B4. 20/30
Pemasangan 1 m2 bekisting untuk balok A.4.1.1.23 24.00 m2
Pembesian dengan besi polos A.4.1.1.17.p 88.00 kg
Pembesian dengan besi ulir A.4.1.1.17.u 189.36 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 1.80 m3
X Pekerjaan Pengecatan
1 Pengecatan 1 m2 tembok baru ( 1lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) A.4.7.1.10 502.54 m2
2 Pengecatan 1 m2 Dak expose A.4.7.1.10 160.15 m2
3 Pengomponan m2 Dak expose ls 160.15 m2
4 Pengecatan 1 m2 Partisi A.4.7.1.10 139.58 m2
B PEKERJAAN LANTAI II :
I Pekerjaan beton
1 Kolom praktis kp. 15/15
Pemasangan 1 m2 bekisting untuk Kolom 2 x pakai Dihit. A.4.1.1.a 14.43 m2
Pembesian dengan besi polos A.4.1.1.17.p 200.20 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 1.08 m3
7 Plat atap + 7. 50
Pemasangan 1 m2 bekisting untuk lantai A.4.1.1.24 4.00 m2
Pembesian dengan besi polos A.4.1.1.17.p 111.60 kg
Membuat Beton mutu f'c=19,3 MPa (K225), slum (122)cm, w/c = 0,58 A.4.1.1.7 0.48 m3
:MENGETAHUI :MENGETAHUI
PLT. KEPALA DINAS PEKERJAAN UMUM DAN PLT. KEPALA DINAS KESE
PENATAAN RUANG KABUPATEN KENDAL KABUPATEN KENDA
HARGA SATUAN
JUMLAH
(Rp.)
14,966,468.25
146,585.25 7,769,018.25
275,000.00 275,000.00
12,485.00 2,122,450.00
200,000.00 4,800,000.00
20,121,738.44
61,857.50 4,409,202.60
61,857.50 5,089,635.10
61,857.50 211,552.65
20,619.17 1,055,426.41
213,071.28 7,244,423.52
297,143.00 2,111,498.16
40,755,317.36
1,055,635.13 29,642,234.31
614,006.63 10,217,070.24
261,992.05 896,012.81
464,208,488.10
259,915.00 17,840,565.60
14,151.75 16,455,407.45
15,343.50 4,289,305.41
1,295,798.87 14,395,029.68
1,082,905.90 1,949,230.62
259,915.00 7,735,070.40
14,151.75 4,391,325.74
15,343.50 2,144,652.71
1,295,798.87 5,367,846.83
1,082,905.90 623,753.80
282,615.00 11,700,261.00
14,151.75 5,207,843.08
15,343.50 13,365,045.56
1,295,798.87 10,729,214.67
282,615.00 678,276.00
14,151.75 923,826.08
1,295,798.87 621,983.46
313,742.38 3,294,294.94
14,151.75 2,179,369.12
1,295,798.87 1,020,441.61
522,582.38 30,727,843.65
14,151.75 4,945,186.65
15,343.50 14,297,684.71
1,295,798.87 13,061,652.64
282,529.88 2,684,316.34
14,151.75 3,913,003.47
1,295,798.87 2,462,277.02
541,309.88 2,387,176.55
14,151.75 1,449,280.46
1,295,798.87 666,688.52
541,309.88 8,660,958.00
14,151.75 1,132,139.80
15,343.50 4,490,121.11
1,295,798.87 2,591,597.75
541,309.88 55,754,917.13
14,151.75 3,887,013.31
15,343.50 13,262,551.00
1,295,798.87 10,677,382.71
541,309.88 12,991,437.00
14,151.75 1,245,353.78
15,343.50 3,384,161.81
1,295,798.87 2,332,437.97
541,309.88 12,991,437.00
14,151.75 1,245,353.78
15,343.50 2,905,444.69
1,295,798.87 2,332,437.97
704,182.38 59,010,483.03
14,151.75 22,672,231.63
1,295,798.87 22,702,396.26
476,359.50 10,139,407.23
14,151.75 3,805,315.70
1,295,798.87 4,486,055.70
31,648,066.53
125,154.18 1,589,458.09
119,626.73 30,058,608.45
60,066,353.50
64,934.94 1,649,347.45
61,411.90 30,861,935.72
58,588.70 9,998,161.66
33,255.50 17,556,908.67
56,833,059.14
229,571.91 34,217,693.19
198,607.98 1,102,274.26
202,143.50 1,428,143.83
1,082,905.90 9,204,700.17
297,143.00 2,525,715.50
297,307.58 3,329,844.84
1,240,663.55 5,024,687.36
7,947,956.68
30,335.71 7,947,956.68
88,209,885.39
122,848.43 9,827,874.20
742,658.88 16,219,669.83
142,032.77 639,147.44
45,444.27 2,181,324.72
91,231.30 1,459,700.80
237,646.30 3,802,340.80
142,839.75 1,142,718.00
122,848.43 2,407,829.18
853,274.27 2,867,001.56
142,032.77 170,439.32
45,444.27 272,665.59
91,231.30 182,462.60
237,646.30 475,292.60
142,839.75 285,679.50
122,848.43 2,358,689.81
742,658.88 2,495,333.82
142,032.77 497,114.68
45,444.27 272,665.59
91,231.30 182,462.60
237,646.30 475,292.60
142,839.75 285,679.50
1,574,459.52 13,981,200.49
150,000.00 1,200,000.00
237,646.30 950,585.20
250,000.00 1,000,000.00
122,848.43 7,647,314.61
489,031.78 3,961,157.38
142,032.77 1,136,262.12
39,373.15 787,463.00
47,233.03 944,660.50
29,158.15 145,790.75
122,848.43 2,186,702.01
489,031.78 1,188,347.21
142,032.77 695,960.55
39,373.15 236,238.90
47,233.03 283,398.15
29,158.15 87,474.45
122,848.43 859,938.99
142,032.77 426,098.30
122,848.43 859,938.99
142,032.77 397,691.74
122,848.43 540,533.08
142,032.77 191,744.23
34,451,104.66
38,949.80 19,573,829.98
38,949.80 6,237,712.29
20,000.00 3,202,950.00
38,949.80 5,436,612.39
45,109,527.89
1,894,031.25 3,788,062.50
1,667,221.93 8,336,109.65
74,853.25 149,706.50
148,741.75 297,483.50
25,211.19 857,180.38
90,215.48 2,255,386.88
130,238.41 1,953,576.19
135,305.00 7,847,690.00
456,973.70 1,827,894.80
8,398,218.75 16,796,437.50
1,000,000.00 1,000,000.00
24,294,053.50
335,627.50 10,404,452.50
325,000.00 2,925,000.00
167,000.00 3,674,000.00
248,653.00 4,227,101.00
2,500,000.00 2,500,000.00
563,500.00 563,500.00
40,892,587.20
6,000,000.00 6,000,000.00
2,400,000.00 2,400,000.00
4,000,000.00 4,000,000.00
101,610.88 7,091,422.97
38,552.55 5,381,164.23
660,000.00 14,520,000.00
1,500,000.00 1,500,000.00
929,504,606.64
121,003,431.32
313,742.38 4,527,302.47
14,151.75 2,833,179.85
1,295,798.87 1,402,378.33
522,582.38 26,338,151.70
14,151.75 4,238,731.41
15,343.50 12,255,158.32
1,295,798.87 11,195,702.26
282,529.88 5,198,549.70
14,151.75 1,909,542.46
15,343.50 2,936,131.68
1,295,798.87 3,576,404.89
282,529.88 9,429,434.58
14,151.75 3,358,681.41
15,343.50 5,680,776.51
1,295,798.87 5,189,674.49
282,529.88 2,754,666.28
14,151.75 2,643,546.43
1,295,798.87 1,457,773.73
704,182.38 2,816,729.50
14,151.75 1,579,335.02
1,295,798.87 621,983.46
282,529.88 2,684,316.34
14,151.75 3,913,003.47
1,295,798.87 2,462,277.02
53,940,382.90
208,135.45 53,940,382.90
46,639,713.74
112,677.13 29,201,403.72
109,028.10 6,323,629.80
28,732.53 7,446,321.18
43,670.94 3,668,359.04
20,375,639.77
125,154.18 1,589,458.09
119,626.73 18,786,181.68
38,964,874.33
64,934.94 1,649,347.45
61,411.90 19,288,249.24
58,588.70 6,737,700.50
33,255.50 11,289,577.14
32,794,511.89
229,571.91 32,243,374.76
198,607.98 551,137.13
38,469,346.32
122,848.43 2,456,968.55
742,658.88 4,054,917.46
142,032.77 159,786.86
45,444.27 545,331.18
91,231.30 364,925.20
237,646.30 950,585.20
142,839.75 285,679.50
122,848.43 859,938.99
853,274.27 1,433,500.78
142,032.77 81,952.91
45,444.27 136,332.80
91,231.30 91,231.30
142,839.75 142,839.75
122,848.43 6,818,087.73
489,031.78 3,961,157.38
142,032.77 1,633,376.80
39,373.15 787,463.00
47,233.03 944,660.50
29,158.15 466,530.40
122,848.43 2,420,114.02
489,031.78 792,231.48
142,032.77 178,961.28
39,373.15 157,492.60
47,233.03 188,932.10
29,158.15 58,316.30
122,848.43 2,186,702.01
489,031.78 1,188,347.21
142,032.77 695,960.55
39,373.15 236,238.90
47,233.03 283,398.15
29,158.15 87,474.45
122,848.43 859,938.99
142,032.77 397,691.74
122,848.43 1,105,635.85
142,032.77 724,367.10
122,848.43 540,533.08
142,032.77 191,744.23
18,621,117.99
38,949.80 13,222,676.41
38,949.80 5,398,441.59
4,575,426.19
1,894,031.25 1,894,031.25
148,741.75 148,741.75
74,853.25 74,853.25
25,211.19 504,223.75
130,238.41 1,953,576.19
20,462,492.50
335,627.50 11,746,962.50
325,000.00 4,225,000.00
167,000.00 2,004,000.00
248,653.00 2,486,530.00
17,585,016.37
101,610.88 7,041,633.64
38,552.55 5,343,382.74
5,200,000.00 5,200,000.00
413,431,953.32
Dibuat Oleh
ultan Perencana
PRAMBANAN
ATMIATI, SH
Direktur
ENGETAHUI
A DINAS KESEHATAN
PATEN KENDAL
LYANI, Sp.A.M.Kes
0520 198910 2 001
RENCANA ANGGARAN BIAYA ( RAB )
KEGIATAN : PELAYANAN KESEHATAN DASAR
PEKERJAAN : PEMBANGUNAN PUSKESMAS PLANTUNGAN
LOKASI : KECAMATAN PLANTUNGAN
TH ANGGARAN : 2017
A. PEKERJAAN LANTAI I :
I Pekerjaan Persiapan Rp
II Pekerjaan Tanah Rp
III Pekerjaan Pondasi Rp
IV Pekerjaan Beton Rp
V Pekerjaan Pasangan Dinding Rp
VI Pekerjaan Plesteran dan Acian Rp
VII Pekerjaan penutup lantai & penutup dinding Rp
VIII Pekerjaan List Dak expose Rp
IX Pekerjaan Pintu dan Jendela Rp
X Pekerjaan Pengecatan Rp
XI Pekerjaan Sanitasi Gedung Rp
XII Pekerjaan Mekanikal Elektrikal Rp
XIII Pekerjaan Lain Lain Rp
JUMLAH PEKERJAAN LANTAI I Rp
B. PEKERJAAN LANTAI II :
I Pekerjaan Beton Rp
II Pekerjaan Rangka Atap Rp
III Pekerjaan Penutup atap Rp
IV Pekerjaan Pasangan Dinding Rp
V Pekerjaan Plesteran, Acian Rp
VI Pekerjaan penutup lantai & penutup dinding Rp
VIII Pekerjaan Pintu dan Jendela Rp
IX Pekerjaan Pengecatan Rp
X Pekerjaan Sanitasi Gedung Rp
XI Pekerjaan Mekanikal Elektrikal Rp
XII Pekerjaan Lain -Lain Rp
JUMLAH PEKERJAAN LANTAI II Rp
JUMLAH Rp
PPN 10% Rp
JUMLAH TOTAL (Jumlah + PPN 10%) Rp
PEMBULATAN Rp
Terbilang :
Satu Milyar Empat ratus Tujuh Puluh Tujuh Juta Dua Ratus Tiga Puluh Ribu Rupiah
Kendal, 2017
:Disetujui :Dibuat Oleh
PEJABAT PEMBUAT KOMITMEN DINAS Konsultan Perencana
KESEHATAN KABUPATEN KENDAL CV. PRAMBANAN
JUMLAH HARGA
14,966,468.25
20,121,738.44
40,755,317.36
464,208,488.10
31,648,066.53
60,066,353.50
56,833,059.14
7,947,956.68
88,209,885.39
34,451,104.66
45,109,527.89
24,294,053.50
40,892,587.20
929,504,606.64
121,003,431.32
53,940,382.90
46,639,713.74
20,375,639.77
38,964,874.33
32,794,511.89
38,469,346.32
18,621,117.99
4,575,426.19
20,462,492.50
17,585,016.37
413,431,953.32
1,342,936,559.96
134,293,656.00
1,477,230,215.96
1,477,230,000.00
us Tujuh Puluh Tujuh Juta Dua Ratus Tiga Puluh Ribu Rupiah
Kendal, 2017
:Dibuat Oleh
Konsultan Perencana
CV. PRAMBANAN
NGATMIATI, SH
Direktur
:MENGETAHUI
PLT. KEPALA DINAS KESEHATAN
KABUPATEN KENDAL
I UPAH TENAGA
1 Kepala Tukang Alumunium Hari
2 Kepala Tukang Batu Hari
3 Kepala Tukang Besi Hari
4 Kepala Tukang Cat Hari
5 Kepala Tukang Kayu Hari
6 Kepala Tukang Las Konstruksi Hari
7 Kepala Tukang Las Biasa Hari
8 Kepala Tukang Pipa Hari
9 Mandor Hari
10 Pekerja Hari
11 Tukang Allumunium Hari
12 Tukang Batu Halus Hari
13 Tukang Batu Kasar Hari
14 Tukang Besi Hari
15 Tukang Besi Konstruksi Hari
12 Tukang Cat Hari
13 Tukang Ereksi Hari
14 Tukang Gali Hari
15 Tukang Jalan Hari
16 Tukang Kayu Halus Hari
13 Tukang Kayu Kasar Hari
17 Tukang Listrik Hari
II BAHAN
1 Batu bata Welahan buah
2 Batu Belah m
3 Batu Granit Kg
4 Batu Kali Bulat Bulat/Utuh/Blondos m
5 Batu Paras buah
6 Batu Pecah m
7 Batu Tempel Hitam buah
8 Batu Teraso Kg
9 Beton 1:2:3 m
10 Beton Ready Mix K 175 m
11 Beton Ready Mix K 200 m
12 Beton Ready Mix K 225 m
13 Beton Ready Mix K 250 m
14 Beton Ready Mix K 275 m
15 Beton Ready Mix K 300 m
16 Compound Kg
17 HB-10 buah
18 HB-15 buah
19 HB-20 buah
20 Kapur m
21 Kapur Padam m
22 Kapur Sirih Kg
23 Kerikil beton / Split m
24 Kerikil (2cm/3cm) m
25 Kerikil (maks 30 mm) Kg
26 Kerikil Sawur / Koral Bulat m
27 Koral m
28 Koral Beton m
29 Mortar Siap Pakai kg
30 Pasir Beton m
31 Pasir Pasang m
32 Pasir Urug m
33 Screening kg
34 Semen Grout kg
38 Semen PC kg
39 Semen PC 40 kg zak
40 Semen PC 50 kg zak
41 Semen Portland kg
42 Semen Portland @40 kg kg
43 Semen Putih 40 kg zak
44 Semen Warna kg
45 Sirtu m
46 Tanah Liat m
47 Tanah Padas Quarry - Lokasi Pekerjaan m
48 Tanah Padas Quarry m
IV BAHAN KAYU
1 Balok Kayu Jati m
2 Balok Kayu Bengkirai m
3 Balok Kayu Kamper m
4 Balok Kayu Kruing m
5 Balok Kayu Meranti m
6 Balok Kayu Sengon m
7 Balok Kayu Lanan m
8 Dolken kayu 8-10/400 cm batang
7 Kaso 5/7 bengkirai m
8 Kaso 5/7 kamper m
9 Kaso 5/7 Kruing m
10 Kaso 5/7 meranti m
11 Kayu Lambersering m
12 Papan Kayu Jati m
13 Papan Kayu Bengkirai m
14 Papan Kayu Kamper m
15 Papan Kayu Kruing m
16 Papan Kayu Meranti m
17 Papan Kayu Sengon m
18 Papan Kayu Lanan m
19 Parket 7,5 x 75 x 900 mm m
20 Parket 10 x 75 x 490 mm m
21 Parket 9 x 75 x 1500 mm m
22 Phenol film 12 mm Lembar
23 Plywood 4 mm Ukuran 120 x 240 Lembar
24 Plywood tebal 12 mm Lembar
25 Plywood tebal 15 mm Lembar
26 Plywood tebal 3 mm Lembar
27 Plywood tebal 4 mm Lembar
28 Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar
29 Plywood tebal 6 mm Lembar
30 Plywood tebal 9 mm Lembar
31 Reng Bengkirai m
32 Reng Kamper m
33 Reng Kruing m
34 Reng Meranti m
35 Sasak Bambu (Anyaman Bambu) m
36 Teakwood 122 x 244 tebal 4 mm Lembar
37 Teakwood tebal 4 mm (90 x 220) cm Lembar
38 Tripleks Lembar
X BAHAN FINISHING
1 Cat kg
2 Cat Antara kg
3 Cat Acrilic Waterproofing kg
7 Cat Dasar kg
8 Cat Dasar Besi kg
9 Cat Dasar Kayu kg
10 Cat Genteng kg
11 Cat Kolam kg
12 Cat Meni kg
13 Cat Penutup Besi kg
14 Cat Penutup Kayu kg
15 Cat Penutup Tembok kg
16 Cat Penutup Tembok Eksterior Klas I kg
17 Cat Penutup Tembok Eksterior Klas II kg
18 Cat Penutup Tembok Interior Klas I kg
19 Cat Penutup Tembok Interior Klas II kg
20 Cat Pelapis Waterproofer kg
21 Dempul kg
22 Melamic kg
23 Meni A kg
24 Meni B kg
25 Meni Besi kg
26 Meni Kayu kg
27 Plamur / Dempul Besi kg
29 Plamur Tembok kg
30 Plamur/Dempul Kayu kg
31 Sanding kg
32 Semen Waterproofer kg
33 Serat Fiberglass m
34 Thinner Liter
XI BAHAN KACA (SETARA MULIA/ASAHI)
1 Bening/Polos 5 mm m
2 Bening/Polos 5 mm (Warna Hijau/Biru) m
3 Bening/Polos 8 mm m
4 Es ( Buram ) 5 mm m
5 Flat Tempered 10 mm m
6 Flat Tempered 12 mm m
7 Kaca Polos 5 mm m
8 Kaca tebal 3 mm m
9 Kaca tebal 5 mm m
10 Kaca tebal 8 mm m
11 Kaca wireglassed 5 mm m
12 One Way 5 mm m
13 One Way 8 mm m
14 Profil Kaca m
15 Ray Band 5 mm m
16 Ray Band 8 mm m
17 Sticker Sandblast m
HARGA SATUAN
95,000.00
95,000.00
95,000.00
90,000.00
95,000.00
95,000.00
95,000.00
95,000.00
80,000.00
70,000.00
90,000.00
90,000.00
85,000.00
90,000.00
90,000.00
70,000.00
70,000.00
70,000.00
70,000.00
90,000.00
85,000.00
80,000.00
600.00
300,000.00
22,500.00
150,000.00
60,000.00
350,000.00
16,000.00
21,000.00
875,000.00
825,000.00
850,000.00
875,000.00
900,000.00
925,000.00
944,000.00
5,000.00
6,500.00
7,700.00
8,800.00
310,000.00
310,000.00
2,600.00
350,000.00
350,000.00
259.26
350,000.00
350,000.00
350,000.00
3,750.00
400,000.00
400,000.00
200,000.00
259.26
2,430.00
1,400.00
56,000.00
63,000.00
1,400.00
1,400.00
77,500.00
15,000.00
225,000.00
75,000.00
132,800.00
35,000.00
15,000.00
9,500.00
9,500.00
6,500.00
25,000.00
27,000.00
21,000,000.00
10,500,000.00
6,500,000.00
5,500,000.00
4,500,000.00
3,500,000.00
2,500,000.00
40,000.00
10,500,000.00
6,500,000.00
5,500,000.00
4,500,000.00
13,000,000.00
25,000,000.00
11,200,000.00
7,000,000.00
6,500,000.00
5,000,000.00
4,000,000.00
3,000,000.00
245,000.00
305,000.00
325,000.00
160,000.00
60,000.00
160,000.00
202,000.00
45,000.00
60,000.00
105,000.00
75,000.00
140,000.00
10,500,000.00
6,500,000.00
5,500,000.00
4,500,000.00
20,000.00
115,000.00
105,000.00
45,000.00
45,000.00
20,000.00
830,000.00
985,000.00
150,000.00
145,000.00
46,000.00
76,000.00
72,000.00
54,000.00
49,500.00
51,000.00
45,000.00
60,000.00
54,000.00
80,000.00
90,000.00
84,000.00
1,200.00
665,800.00
6,050.00
12,100.00
6,500.00
32,400.00
9,000.00
10,500.00
9,000.00
140,000.00
69,300.00
14,000.00
10,500.00
9,493.67
16,200.00
10,500.00
10,500.00
11,500.00
14,000.00
12,500.00
14,000.00
14,300.00
16,200.00
22,500.00
16,200.00
11,000.00
23,000.00
11,000.00
14,000.00
7,500.00
14,000.00
75,000.00
99,000.00
66,000.00
99,000.00
22,000.00
29,000.00
70,000.00
92,000.00
15,000.00
24,000.00
420,000.00
1,020,000.00
540,000.00
540,000.00
1,140,000.00
630,000.00
1,320,000.00
78,600.00
39,600.00
48,000.00
60,000.00
50,000.00
60,000.00
1,290,000.00
160,000.00
200,000.00
240,000.00
1,896,000.00
280,000.00
30,000.00
36,000.00
21,658.33
30,000.00
33,000.00
33,000.00
42,000.00
51,000.00
72,000.00
25,000.00
32,500.00
49,500.00
75,000.00
169,000.00
244,000.00
4,750.00
15,250.00
19,500.00
15,825.00
38,750.00
6,500.00
61,500.00
1,050,000.00
900,000.00
92,000.00
69,000.00
77,000.00
77,000.00
28,000.00
28,000.00
17,000.00
400.00
65,000.00
128,000.00
183,000.00
77,000.00
77,000.00
47,500.00
34,000.00
34,000.00
34,000.00
67,500.00
68,000.00
46,000.00
77,000.00
77,000.00
80,000.00
90,000.00
80,000.00
70,000.00
35,000.00
83,000.00
30,000.00
54,500.00
71,000.00
53,000.00
46,000.00
46,000.00
30,000.00
35,000.00
30,000.00
53,000.00
22,500.00
15,000.00
27,000.00
95,000.00
185,000.00
235,000.00
148,000.00
465,000.00
525,000.00
95,000.00
80,000.00
95,000.00
235,000.00
1,015,000.00
425,000.00
525,000.00
32,400.00
120,000.00
345,000.00
80,000.00
55,000.00
58,000.00
555,000.00
8,000.00
8,000.00
12,000.00
8,000.00
30,000.00
40,000.00
50,000.00
3,320.00
80.00
80.00
750.00
822,000.00
250,000.00
300,000.00
540,000.00
450,000.00
17,850.00
112,000.00
47,000.00
66,000.00
87,000.00
48,000.00
200,000.00
1,200.00
205,000.00
332,000.00
520,000.00
755,000.00
535,000.00
962,000.00
754,000.00
996,000.00
924,000.00
1,234,000.00
1,949,000.00
2,576,000.00
12,000.00
12,000.00
24,000.00
29,000.00
32,000.00
24,000.00
28,000.00
30,000.00
31,000.00
37,000.00
84,000.00
32,000.00
40,000.00
1,500.00
20,000.00
23,000.00
185,000.00
240,000.00
35,000.00
37,000.00
39,000.00
85,000.00
63,000.00
63,000.00
81,000.00
24,000.00
132,000.00
24,000.00
1,500,000.00
34,000.00
59,000.00
63,000.00
98,000.00
20,000.00
25,000.00
64,000.00
25,000.00
34,000.00
84,000.00
75,000.00
75,000.00
234,000.00
15,000.00
188,000.00
212,000.00
303,000.00
514,100.00
1,050,000.00
275,000.00
275,000.00
1,250,000.00
205,000.00
55,000.00
286,000.00
55,000.00
90,000.00
211,000.00
90,000.00
348,000.00
125,000.00
32,000.00
950,000.00
1,050,000.00
1,300,000.00
1,800,000.00
2,100,000.00
890,000.00
1,520,000.00
2,540,000.00
DAFTAR HARGA SATUAN PEKERJAAN BIDANG KECIPTAKAR
KODE
NO.
ANALISA
I A.2.2.1
1 A. 2.2.1.1
2 A. 2.2.1.2
3 A. 2.2.1.3
4 A. 2.2.1.4
5 A. 2.2.1.9
6 A. 2.2.1.10
II A.2.3.1
1 A.2.3.1.1
2 A.2.3.1.2
3 A.2.3.1.9
4 A.2.3.1.10
5 A.2.3.1.11
6 A.2.3.1.13
III A.3.2.1
1 A.3.2.1.4
2 A.3.2.1.9
IV A.4.1.1
1 A.4.1.1.4
2 A.4.1.1.7
3 A.4.1.1.17.p
4 A.4.1.1.17.u
5 A.4.1.1.20
6 A.4.1.1.21
7 A.4.1.1.22
8 A.4.1.1.23
9 A.4.1.1.24
10 A.4.1.1.25
11 A.4.1.1.26
VI A.4.2.1
1 A.4.2.1.11
2 A.4.2.1.12
3 A.4.2.1.13
4 A.4.2.1.20
5 A.4.2.1.21
6 A.4.2.1.22.p
7 A.4.2.1.22.j
VII A.4.4.1
1 A.4.4.1.5
2 A.4.4.1.8
3 A.4.4.1.11
VIII A.4.4.2
3 A.4.4.2.3
1 A.4.4.2.6
17 A.4.4.2.17
3 A.4.4.2.20
4 A.4.4.2.27
IX A.4.4.3
1 A.4.4.3.36
2 A.4.4.3.39
3 A.4.4.3.54
X A.4.5.1
1 A.4.5.1.7
2 A.4.5.1.10
XI A.4.5.2
1 A.4.5.2.43
XII A.4.6.1
1 A.4.6.1.8
22 A.4.6.1.22
XIII A.4.6.2
1 A.4.6.2.2
2 A.4.6.2.5
3 A.4.6.2.6
4 A.4.6.2.17
XIV A.4.7.1
1 A.4.7.1.10
XV A.5.1.1
1 A.5.1.1.1
2 A.5.1.1 5
3 A.5.1.1 12
4 A.5.1.1 14
5 A.5.1.1 19
6 A.5.1.1 22
7 A.5.1.1 23
8 A.5.1.1 27
9 A.5.1.1 31
10 A.5.1.1 32
XXI A.8.4.6
1 A.8.4.6.1
2 A.8.4.6.2
DAFTAR HARGA SATUAN PEKERJAAN BIDANG KECIPTAKARYAAN
SATUA
URAIAN PEKERJAAN
N
Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K 100) m3
Membuat 1 m3 beton mutu fc = 19,3 Mpa (Setara K 225) m3
Pembesian 10 kg dengan besi polos 10 kg
Pembesian 10 kg dengan besi ulir 10 kg
(K3) Pemasangan 1 m2 bekisting untuk pondasi m2
(K3) Pemasangan 1 m2 bekisting untuk sloof m2
(K3) Pemasangan 1 m2 bekisting untuk kolom m2
(K3) Pemasangan 1 m2 bekisting untuk balok m2
(K3) Pemasangan 1 m2 bekisting untuk lantai m2
(K3) Pemasangan 1 m2 bekisting untuk dinding m2
(K3) Pemasangan 1 m2 bekisting untuk tangga m2
Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sampai 90 cm m2
Pemasangan 1 m lisplank ukuran (3 x 30) cm, kayu kelas kelas II (Bengkirai) m'
Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup) m2
HARGA SATUAN
(Rp)
587,419.25
694,812.95
249,908.08
146,017.75
12,485.00
339,496.66
61,857.50
75,591.00
20,619.17
50,545.33
297,143.00
41,881.50
1,055,635.13
614,006.63
1,082,905.90
1,295,798.87
141,517.48
153,434.98
259,915.00
282,615.00
522,582.38
541,309.88
704,182.38
601,918.88
476,359.50
122,848.43
853,274.27
489,031.78
200,231.03
132,055.63
188,723.06
208,135.45
253,105.00
125,154.18
119,626.73
64,934.94
61,411.90
82,064.13
58,588.70
33,255.50
198,607.98
96,958.51
242,543.83
48,978.66
261,162.48
28,732.53
742,658.88
171,668.75
142,839.75
45,444.27
39,373.15
142,032.77
38,949.80
1,894,031.25
1,667,221.93
1,308,825.25
74,853.25
148,741.75
161,306.20
334,138.33
25,211.19
90,215.48
130,238.41
335,627.50
251,528.00
A.2.2.1 HARGA SATUAN PEKERJAAN PERSIAPAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
7,000.00
8,500.00
950.00
400.00
16,850.00
66,000.00
300.00
45,500.00
111,800.00
128,650.00
17,367.75
146,017.75
7,000.00
4,000.00
11,000.00
11,000.00
1,485.00
12,485.00
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
52,500.00
2,000.00
54,500.00
54,500.00
7,357.50
61,857.50
63,000.00
3,600.00
66,600.00
66,600.00
8,991.00
75,591.00
17,500.00
666.67
18,166.67
18,166.67
2,452.50
20,619.17
35,000.00
4,000.00
39,000.00
5,533.33
5,533.33
44,533.33
6,012.00
50,545.33
21,000.00
800.00
21,800.00
240,000.00
240,000.00
261,800.00
35,343.00
297,143.00
Jumlah Harga (Rp)
10,500.00
1,200.00
11,700.00
25,200.00
25,200.00
36,900.00
4,981.50
41,881.50
A.3.2.1 HARGA SATUAN PEKERJAAN PONDASI
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
105,000.00
63,750.00
7,125.00
6,000.00
181,875.00
360,000.00
163,800.00
224,400.00
748,200.00
930,075.00
125,560.13
1,055,635.13
54,600.00
33,150.00
3,705.00
3,120.00
94,575.00
360,000.00
86,400.00
446,400.00
540,975.00
73,031.63
614,006.63
A.4.1.1 HARGA SATUAN PEKERJAAN BETON
A.4.1.1.4 Membuat 1 m3 lantai kerja beton mutu fc = 7,4 MPa slump (3-6) cm, w/c = 0,87 (K 1
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.2000 70,000.00
Tukang batu kasar L.02 OH 0.2000 85,000.00
Kepala tukang batu L.03 OH 0.0200 95,000.00
Mandor L.04 OH 0.0600 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen Portland kg 230.0000 1,400.00
Pasir beton kg 893.0000 285.71
Kerikil (Maks 30 mm) kg 1,027.0000 259.26
Air Liter 200.0000 15.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.21 (K3) Pemasangan 1 m2 bekisting untuk sloof
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.5200 70,000.00
Tukang Kayu Kasar L.02 OH 0.2600 85,000.00
Kepala Tukang Kayu L.03 OH 0.0260 95,000.00
Mandor L.04 OH 0.0260 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Sengon m3 0.0450 4,000,000.00
Paku 5 cm - 10 cm kg 0.3000 15,000.00
Minyak bekisting Liter 0.1000 14,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.1.23 (K3) Pemasangan 1 m2 bekisting untuk balok
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.6600 70,000.00
Tukang Kayu Kasar L.02 OH 0.3300 85,000.00
Kepala Tukang Kayu L.03 OH 0.0330 95,000.00
Mandor L.04 OH 0.0330 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan Kayu Sengon m3 0.0400 4,000,000.00
Paku 5 cm - 12 cm kg 0.4000 15,000.00
Minyak bekisting Liter 0.2000 14,500.00
Balok Kayu Kruing m3 0.0180 5,500,000.00
Plywood tebal 9 mm Lbr 0.3500 140,000.00
Dolken kayu 8-10/400 cm Batang 2.0000 40,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
w/c = 0,87 (K 100)
Jumlah Harga
(Rp)
84,000.00
17,000.00
1,900.00
4,800.00
107,700.00
322,000.00
255,142.86
266,259.26
3,000.00
846,402.12
954,102.12
128,803.79
1,082,905.90
Jumlah Harga
(Rp)
115,500.00
23,375.00
2,660.00
6,640.00
148,175.00
519,400.00
199,428.57
271,444.44
3,225.00
993,498.02
1,141,673.02
154,125.86
1,295,798.87
Jumlah Harga
(Rp)
4,900.00
6,300.00
665.00
320.00
12,185.00
110,250.00
2,250.00
112,500.00
124,685.00
16,832.48
141,517.48
Jumlah Harga
(Rp)
4,900.00
6,300.00
665.00
320.00
12,185.00
120,750.00
2,250.00
123,000.00
135,185.00
18,249.98
153,434.98
Jumlah Harga
(Rp)
36,400.00
22,100.00
2,470.00
2,080.00
63,050.00
160,000.00
4,500.00
1,450.00
165,950.00
229,000.00
30,915.00
259,915.00
Jumlah Harga
(Rp)
36,400.00
22,100.00
2,470.00
2,080.00
63,050.00
180,000.00
4,500.00
1,450.00
185,950.00
249,000.00
33,615.00
282,615.00
Jumlah Harga
(Rp)
46,200.00
28,050.00
3,135.00
2,640.00
80,025.00
160,000.00
6,000.00
2,900.00
82,500.00
49,000.00
80,000.00
380,400.00
460,425.00
62,157.38
522,582.38
Jumlah Harga
(Rp)
46,200.00
28,050.00
3,135.00
2,640.00
80,025.00
160,000.00
6,000.00
2,900.00
99,000.00
49,000.00
80,000.00
396,900.00
476,925.00
64,384.88
541,309.88
Jumlah Harga
(Rp)
46,200.00
28,050.00
3,135.00
2,640.00
80,025.00
160,000.00
6,000.00
2,900.00
82,500.00
49,000.00
240,000.00
540,400.00
620,425.00
83,757.38
704,182.38
Jumlah Harga
(Rp)
46,200.00
28,050.00
3,135.00
2,640.00
80,025.00
120,000.00
6,000.00
2,900.00
110,000.00
49,000.00
120,000.00
42,400.00
450,300.00
530,325.00
71,593.88
601,918.88
Jumlah Harga
(Rp)
46,200.00
28,050.00
3,135.00
2,640.00
80,025.00
120,000.00
6,000.00
2,175.00
82,500.00
49,000.00
80,000.00
339,675.00
419,700.00
56,659.50
476,359.50
A.4.1.2 HARGA SATUAN PEKERJAAN BETON PRACETAK
Untuk produksi pracetak bisa dilakukan dipabrik (cor di plant) atau di lapangan (cast inplace). Inde
ada dalam pedoman
A.4.1.2.1 ini hanya1 m2
(K3) Pembuatan untuk pekerjaan
lahan produksiproduksi yang
tebal 8 cm dilakukan
beton di MPa,
fc 14,5 lapangan,
slumpterutama
(120 20
analisa cetakan (bekisting) pracetak baik untuk komponen kolom, balok dan pelat.
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1320 70,000.00
Tukang batu kasar L.02 OH 0.0220 85,000.00
Kepala tukang batu L.03 OH 0.0020 95,000.00
Mandor L.04 OH 0.0070 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 26.0800 1,400.00
Pasir beton Kg 60.8000 285.71
Kerikil (maks 30 mm) Kg 82.3200 259.26
Air L 17.2000 15.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.2 (K3) Pembuatan 1 m2 lahan produksi tebal 10 cm beton fc 14,5 MPa, slump (120 2
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1650 70,000.00
Tukang batu kasar L.02 OH 0.0280 85,000.00
Kepala tukang batu L.03 OH 0.0030 95,000.00
Mandor L.04 OH 0.0080 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 32.6000 1,400.00
Pasir beton Kg 76.0000 285.71
Kerikil (maks 30 mm) Kg 102.9000 259.26
Air L 21.5000 15.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.3 (K3) Pembuatan 1 m2 lahan produksi tebal 12 cm beton fc 14,5 MPa, slump (120 2
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.1980 70,000.00
Tukang batu kasar L.02 OH 0.0330 85,000.00
Kepala tukang batu L.03 OH 0.0030 95,000.00
Mandor L.04 OH 0.0100 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 39.1200 1,400.00
Pasir beton Kg 91.2000 285.71
Kerikil (maks 30 mm) Kg 123.4800 259.26
Air L 25.8000 15.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.4 (K3) Pembuatan 1 m2 lahan produksi tebal 15 cm beton fc 14,5 MPa, slump (120 2
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2480 70,000.00
Tukang batu kasar L.02 OH 0.0410 85,000.00
Kepala tukang batu L.03 OH 0.0040 95,000.00
Mandor L.04 OH 0.0130 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Semen PC Kg 48.9000 1,400.00
Pasir beton Kg 114.0000 285.71
Kerikil (maks 30 mm) Kg 154.3500 259.26
Air L 32.2500 15.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.6 Pembuatan 1 m2 bekisting untuk balok beton pracetak (10-12 kali pakai)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0040 70,000.00
Tukang kayu kasar L.02 OH 0.0380 85,000.00
Kepala tukang kayu L.03 OH 0.0040 95,000.00
Mandor L.04 OH 0.0010 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5/7 Kruing m3 0.0050 5,500,000.00
Phenol film 12 mm Lbr 0.0430 160,000.00
Minyak cetakan (bekisting) Ltr 0.2000 14,500.00
Paku 5 cm - 7 cm kg 0.0460 15,000.00
Dinabolt 12 mm (10 cm - 15 cm) buah 0.6930 2,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.7 Pembuatan 1 m2 bekisting untuk kolom beton pracetak (10-12 kali pakai)
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0040 70,000.00
Tukang kayu kasar L.02 OH 0.0380 85,000.00
Kepala tukang kayu L.03 OH 0.0040 95,000.00
Mandor L.04 OH 0.0010 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Kaso 5/7 Kruing m3 0.0040 5,500,000.00
Phenol film 12 mm Lbr 0.0480 160,000.00
Minyak cetakan (bekisting) ltr 0.2000 14,500.00
Paku 5 cm - 7 cm Kg 0.0460 15,000.00
Dinabolt 12 mm (10 cm - 15 cm) buah 0.6930 2,500.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.8 Pemasangan dan membuka bekisting 1 buah komponen pelat beton pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0530 70,000.00
Tukang kayu kasar L.02 OH 0.0180 85,000.00
Kepala tukang kayu L.04 OH 0.0050 95,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 13,5 %) 13,5% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.9 Pemasangan dan membuka bekisting 1 buah komponen balok beton pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0890 70,000.00
Tukang kayu kasar L.02 OH 0.0300 85,000.00
Mandor L.04 OH 0.0050 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.1.2.10 Pemasangan dan membuka bekisting 1 buah komponen kolom beton pracetak
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0710 70,000.00
Tukang kayu kasar L.02 OH 0.0240 85,000.00
Mandor L.04 OH 0.0050 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
st inplace). Indeks yang
ngan,
slumpterutama
(120 20)untuk
mm
Jumlah Harga
(Rp)
9,240.00
1,870.00
190.00
560.00
11,860.00
36,512.00
17,371.43
21,342.22
258.00
75,483.65
87,343.65
11,791.39
99,135.04
11,550.00
2,380.00
285.00
640.00
14,855.00
45,640.00
21,714.29
26,677.78
322.50
94,354.56
109,209.56
14,743.29
123,952.85
13,860.00
2,805.00
285.00
800.00
17,750.00
54,768.00
26,057.14
32,013.33
387.00
113,225.48
130,975.48
17,681.69
148,657.17
17,360.00
3,485.00
380.00
1,040.00
22,265.00
68,460.00
32,571.43
40,016.67
483.75
141,531.85
163,796.85
22,112.57
185,909.42
Jumlah Harga
(Rp)
490.00
6,460.00
760.00
80.00
7,790.00
991.62
131,516.00
27,500.00
12,800.00
2,900.00
9,705.00
185,412.62
193,202.62
26,082.35
219,284.98
Jumlah Harga
(Rp)
280.00
3,230.00
380.00
80.00
3,970.00
27,500.00
6,880.00
2,900.00
690.00
1,732.50
39,702.50
43,672.50
5,895.79
49,568.29
Jumlah Harga
(Rp)
280.00
3,230.00
380.00
80.00
3,970.00
22,000.00
7,680.00
2,900.00
690.00
1,732.50
35,002.50
38,972.50
5,261.29
44,233.79
Jumlah Harga
(Rp)
3,710.00
1,530.00
475.00
5,715.00
5,715.00
771.53
6,486.53
Jumlah Harga
(Rp)
6,230.00
2,550.00
400.00
9,180.00
9,180.00
1,239.30
10,419.30
eton pracetak
Jumlah Harga
(Rp)
4,970.00
2,040.00
400.00
7,410.00
7,410.00
1,000.35
8,410.35
Jumlah Harga
(Rp)
4,480.00
20,740.00
8,960.00
3,230.00
5,840.00
43,250.00
43,250.00
5,838.75
49,088.75
Jumlah Harga
(Rp)
4,830.00
20,570.00
9,660.00
3,515.00
5,840.00
44,415.00
44,415.00
5,996.03
50,411.03
Jumlah Harga
(Rp)
4,270.00
18,105.00
8,540.00
3,135.00
5,840.00
39,890.00
39,890.00
5,385.15
45,275.15
Jumlah Harga
(Rp)
10,050.00
4,020.00
4,690.00
5,695.00
9,380.00
6,365.00
5,360.00
45,560.00
86,788.00
86,788.00
236,224.98
332.75
236,557.73
368,905.73
49,802.27
418,708.01
Indeks kenaikan
lantai ereksi pelat
1.11
1.13
1.16
1.18
1.20
1.22
1.24
1.26
1.29
1.31
1.33
1.36
Jumlah Harga
(Rp)
9,150.00
3,660.00
4,270.00
5,185.00
8,540.00
5,795.00
4,880.00
41,480.00
79,430.00
79,430.00
215,070.51
3,300.00
218,370.51
339,280.51
45,802.87
385,083.37
Indeks kenaikan
lantai ereksi balok
1.07
1.08
1.09
1.10
1.12
1.13
1.14
1.15
1.17
1.18
1.19
1.21
Jumlah Harga
(Rp)
12,450.00
4,980.00
5,810.00
7,055.00
11,620.00
7,885.00
6,640.00
56,440.00
107,601.00
107,601.00
292,636.92
6,600.00
299,236.92
463,277.92
62,542.52
525,820.44
Indeks kenaikan
lantai ereksi
1.16
kolom 1.19
1.22
1.25
1.28
1.32
1.35
1.38
1.42
1.46
1.49
1.53
Jumlah Harga
(Rp)
2,850.00
1,140.00
1,330.00
3,230.00
8,550.00
24,661.00
24,661.00
66,989.17
66,989.17
100,200.17
13,527.02
113,727.20
Jumlah Harga
(Rp)
2,850.00
1,140.00
1,330.00
3,230.00
8,550.00
24,661.00
24,661.00
66,989.17
66,989.17
100,200.17
13,527.02
113,727.20
Jumlah Harga
(Rp)
2,850.00
1,140.00
1,330.00
3,230.00
8,550.00
24,661.00
24,661.00
66,989.17
66,989.17
100,200.17
13,527.02
113,727.20
Jumlah Harga
(Rp)
2,916,000.00
168,518.52
5,250.00
3,089,768.52
3,089,768.52
417,118.75
3,506,887.27
Jumlah Harga
(Rp)
4,495,500.00
6,000.00
4,501,500.00
4,501,500.00
607,702.50
5,109,202.50
Jumlah Harga
(Rp)
31,195.00
7,030.00
2,960.00
41,185.00
41,185.00
5,559.98
46,744.98
Jumlah Harga
(Rp)
10,290.00
12,495.00
1,425.00
400.00
24,610.00
66,000.00
16,000.00
3,960.00
85,960.00
110,570.00
14,926.95
125,496.95
Jumlah Harga
(Rp)
15,400.00
1,870.00
19,800.00
880.00
37,950.00
37,950.00
5,123.25
43,073.25
A.4.2.1 HARGA SATUAN PEKERJAAN BESI DAN ALUMUNIUM
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.20 Pemasangan 1 m2 rangka besi hollow 40x40 mm, modul 60 x120 cm, untuk partis
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.2500 70,000.00
Tukang Las Biasa L.02 OH 0.2500 70,000.00
Kepala Tukang Las Biasa L.03 OH 0.0250 95,000.00
Mandor L.04 OH 0.0130 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Hollow Meni 40 x 40 x 1,1 mm M1 5.0000 23,000.00
100% x
Assesoris (perkuatan, las dll) Ls 23,000.00
rangka
JUMLAH HARGA BAHAN
C PERALATAN
A.4.2.1.21 Pemasangan 1 m2 rangka besi hollow 40x40 mm, modul 60 x 60 cm, untuk plafon
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.3500 70,000.00
Tukang Besi L.02 OH 0.3500 90,000.00
Kepala Tukang Besi L.03 OH 0.0350 95,000.00
Mandor L.04 OH 0.0180 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Hollow Galvanis 40 x 40 x 0,35 mm M1 6.6667 7,250.00
Assesoris (perkuatan, las dll) Ls 100% x rangka 7,250.00
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.22.p (K3) Pemasangan 1 m2 atap pelana rangka atap baja canal dingin profil C75
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7340 70,000.00
Tukang Besi L.02 OH 0.7340 90,000.00
Kepala Tukang Besi L.03 OH 0.0730 95,000.00
Mandor L.04 OH 0.0370 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canal dingin C75 M1 3.0650 11,550.00
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10.0000 35,400.75
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.2.1.22.j (K3) Pemasangan 1 m2 atap jurai rangka atap baja canal dingin profil C75
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7604 70,000.00
Tukang besi L.02 OH 0.7604 90,000.00
Kepala Tukang Besi L.03 OH 0.0760 95,000.00
Mandor L.04 OH 0.0380 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Baja ringan canal dingin C75 M1 4.0500 11,550.00
JUMLAH HARGA BAHAN
C PERALATAN
Peralatan % 10.0000 46,777.50
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
5,950.00
7,650.00
807.50
336.00
14,743.50
264,000.00
473,040.00
737,040.00
751,783.50
101,490.77
853,274.27
Jumlah Harga
(Rp)
5,950.00
7,650.00
855.00
400.00
14,855.00
264,000.00
145,800.00
6,210.00
416,010.00
430,865.00
58,166.78
489,031.78
17,500.00
17,500.00
2,375.00
1,040.00
38,415.00
115,000.00
23,000.00
138,000.00
176,415.00
23,816.03
200,231.03
24,500.00
31,500.00
3,325.00
1,440.00
60,765.00
48,333.58
7,250.00
55,583.58
116,348.58
15,707.06
132,055.63
profil C75
Jumlah Harga
(Rp)
51,380.00
66,060.00
6,935.00
2,960.00
127,335.00
35,400.75
35,400.75
3,540.08
3,540.08
166,275.83
22,447.24
188,723.06
rofil C75
Jumlah Harga
(Rp)
53,228.00
68,436.00
7,220.00
3,040.00
131,924.00
46,777.50
46,777.50
4,677.75
4,677.75
183,379.25
24,756.20
208,135.45
A.4.4.1 HARGA SATUAN PEKERJAAN PASANGAN DINDING
A.4.4.1.8 Pemasangan 1 m2 dinding bata merah tebal batu campuran 1SP : 3PP
Uraian Kode Satuan Koefisien Harga Satuan
No (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 70,000.00
Tukang Batu Halus L.02 OH 0.1000 90,000.00
Kepala Tukang Batu L.03 OH 0.0100 95,000.00
Mandor L.04 OH 0.0150 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.0000 600.00
Semen Portland Kg 14.3700 1,400.00
Pasir pasang m3 0.0400 400,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.4.4.1.11 Pemasangan 1 m2 dinding bata merah tebal batu campuran 1SP : 6PP
Uraian Kode Satuan Koefisien Harga Satuan
No (Rp)
A TENAGA
Pekerja L.01 OH 0.3000 70,000.00
Tukang Batu Halus L.02 OH 0.1000 90,000.00
Kepala Tukang Batu L.03 OH 0.0100 95,000.00
Mandor L.04 OH 0.0150 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Bata merah buah 70.0000 600.00
Semen Portland Kg 8.3200 1,400.00
Pasir pasang m3 0.0490 400,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
1SP : 3PP
Jumlah Harga
(Rp)
21,000.00
9,000.00
950.00
1,200.00
32,150.00
42,000.00
20,118.00
16,000.00
78,118.00
110,268.00
14,886.18
125,154.18
1SP : 6PP
Jumlah Harga
(Rp)
21,000.00
9,000.00
950.00
1,200.00
32,150.00
42,000.00
11,648.00
19,600.00
73,248.00
105,398.00
14,228.73
119,626.73
A.4.4.2 HARGA SATUAN PEKERJAAN PLESTERAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit (Contoh 13,5 %) 13,5% x D (maksimum)
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
21,000.00
13,500.00
1,425.00
1,200.00
37,125.00
6,182.40
10,800.00
16,982.40
54,107.40
7,304.50
61,411.90
18,200.00
18,000.00
1,900.00
1,040.00
39,140.00
14,515.20
12,400.00
26,915.20
66,055.20
8,917.45
74,972.65
5,600.00
36,000.00
3,800.00
320.00
45,720.00
700.00
5,200.00
5,900.00
51,620.00
6,968.70
58,588.70
14,000.00
9,000.00
950.00
800.00
24,750.00
4,550.00
4,550.00
29,300.00
3,955.50
33,255.50
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP DINDING
A.4.4.3.36 Pemasangan 1 m2 lantai keramik ukuran 20 cm x 20 cm
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.7000
Tukang batu halus L.02 OH 0.3500
Kepala tukang batu L.03 OH 0.0350
Mandor L.04 OH 0.0350
JUMLAH TENAGA KERJA
B BAHAN
Ubin keramik 20 cm x 20 cm Doos 1.0500
Semen Portland Kg 10.4000
Pasir pasang m3 0.0450
Semen warna Kg 0.5000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.0900
Tukang batu halus L.02 OH 0.0900
Kepala tukang batu L.03 OH 0.0350
Mandor L.04 OH 0.0050
JUMLAH TENAGA KERJA
B BAHAN
Plint keramik 10 cm x 20 cm Bh 5.3000
Semen Portland Kg 1.1400
Pasir pasang m3 0.0030
Semen warna Kg 0.0250
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A TENAGA
Pekerja L.01 OH 0.9000
Tukang batu halus L.02 OH 0.4500
Kepala tukang batu L.03 OH 0.0450
Mandor L.04 OH 0.0450
JUMLAH TENAGA KERJA
B BAHAN
Keramik artistik 20 cm x 20 cm buah 26.5000
Semen Portland Kg 9.3000
Pasir pasang m3 0.0180
Semen warna Kg 1.9400
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
AN PENUTUP DINDING
70,000.00 49,000.00
90,000.00 31,500.00
95,000.00 3,325.00
80,000.00 2,800.00
UMLAH TENAGA KERJA 86,625.00
46,000.00 48,300.00
1,400.00 14,560.00
400,000.00 18,000.00
15,000.00 7,500.00
UMLAH HARGA BAHAN 88,360.00
174,985.00
3,5% x D 23,622.98
198,607.98
70,000.00 6,300.00
90,000.00 8,100.00
95,000.00 3,325.00
80,000.00 400.00
UMLAH TENAGA KERJA 18,125.00
12,100.00 64,130.00
1,400.00 1,596.00
400,000.00 1,200.00
15,000.00 375.00
UMLAH HARGA BAHAN 67,301.00
85,426.00
3,5% x D 11,532.51
96,958.51
70,000.00 63,000.00
90,000.00 40,500.00
95,000.00 4,275.00
80,000.00 3,600.00
UMLAH TENAGA KERJA 111,375.00
2,000.00 53,000.00
1,400.00 13,020.00
400,000.00 7,200.00
15,000.00 29,100.00
UMLAH HARGA BAHAN 102,320.00
213,695.00
3,5% x D 28,848.83
242,543.83
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
m, tebal 9 mm
7,000.00
4,500.00
475.00
400.00
12,375.00
28,028.00
2,750.00
30,778.00
43,153.00
5,825.66
48,978.66
A.4.2.1.21)
24,500.00
24,500.00
3,325.00
1,440.00
53,765.00
153,334.10
23,000.00
176,334.10
230,099.10
31,063.38
261,162.48
A.4.5.2. HARGA SATUAN PEKERJAAN PENUTUP ATAP
D Jumlah (A+B+C)
E 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
10,500.00
4,250.00
475.00
640.00
15,865.00
9,450.00
9,450.00
25,315.00
3,417.53
28,732.53
A.4.6.1 HARGA SATUAN PEKERJAAN KAYU
A.4.6.1.8 Pembuatan 1 m2 daun pintu plywood rangkap, rangka kayu kelas II tertutup (lebar sa
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.7000 70,000.00
Tukang kayu halus L.03 OH 2.1000 90,000.00
Kepala tukang kayu L.03 OH 0.2100 95,000.00
Mandor L.04 OH 0.0350 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Papan kayu bengkirai m3 0.0250 11,200,000.00
Paku 1 cm - 2,5 cm kg 0.0300 15,000.00
Lem kayu kg 0.5000 16,250.00
Plywood tebal 4 mm Ukuran (90 x 220) cm Lembar 1.0000 105,000.00
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
tutup (lebar sampai 90 cm)
Jumlah Harga
(Rp)
49,000.00
189,000.00
19,950.00
2,800.00
260,750.00
280,000.00
450.00
8,125.00
105,000.00
393,575.00
654,325.00
88,333.88
742,658.88
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
700.00
45,000.00
4,750.00
400.00
50,850.00
75,000.00
75,000.00
125,850.00
16,989.75
142,839.75
Jumlah Harga
(Rp)
350.00
45,000.00
4,750.00
240.00
50,340.00
75,000.00
75,000.00
125,340.00
16,920.90
142,260.90
Jumlah Harga
(Rp)
1,050.00
13,500.00
1,425.00
64.00
16,039.00
24,000.00
24,000.00
40,039.00
5,405.27
45,444.27
Jumlah Harga
(Rp)
700.00
9,000.00
950.00
40.00
10,690.00
24,000.00
24,000.00
34,690.00
4,683.15
39,373.15
Jumlah Harga
(Rp)
7,000.00
18,000.00
1,900.00
40.00
26,940.00
63,000.00
63,000.00
89,940.00
12,141.90
102,081.90
Jumlah Harga
(Rp)
1,050.00
13,500.00
1,425.00
640.00
16,615.00
25,000.00
25,000.00
41,615.00
5,618.03
47,233.03
Jumlah Harga
(Rp)
1,400.00
18,000.00
1,900.00
80.00
21,380.00
34,000.00
34,000.00
55,380.00
7,476.30
62,856.30
Jumlah Harga
(Rp)
700.00
9,000.00
950.00
400.00
11,050.00
85,000.00
85,000.00
96,050.00
12,966.75
109,016.75
Jumlah Harga
(Rp)
1,050.00
13,500.00
1,425.00
64.00
16,039.00
104,500.00
4,600.00
109,100.00
125,139.00
16,893.77
142,032.77
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
A.4.7.1.10 Pengecatan 1 m2 tembok baru (1 lapis plamuur, 1 lapis cat dasar, 2 lapis cat penutup
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0200 70,000.00
Tukang cat L.02 OH 0.0630 70,000.00
Kepala tukang cat L.03 OH 0.0063 90,000.00
Mandor L.04 OH 0.0030 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Plamur tembok Kg 0.1000 35,000.00
Cat dasar Kg 0.1000 34,000.00
Cat Penutup Tembok Kg 0.2600 80,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
t dasar, 2 lapis cat penutup
Jumlah Harga
(Rp)
1,400.00
4,410.00
567.00
240.00
6,617.00
3,500.00
3,400.00
20,800.00
27,700.00
34,317.00
4,632.80
38,949.80
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
231,000.00
99,000.00
950.00
12,800.00
343,750.00
1,250,000.00
75,000.00
1,325,000.00
1,668,750.00
225,281.25
1,894,031.25
Jumlah Harga
(Rp)
84,000.00
130,500.00
14,250.00
4,800.00
233,550.00
1,068,000.00
8,400.00
4,000.00
154,968.00
1,235,368.00
1,468,918.00
198,303.93
1,667,221.93
Jumlah Harga
(Rp)
2,100.00
27,000.00
2,850.00
1,200.00
33,150.00
1,050,000.00
70,000.00
1,120,000.00
1,153,150.00
155,675.25
1,308,825.25
Jumlah Harga
(Rp)
3,500.00
45,000.00
4,750.00
2,000.00
55,250.00
1,050,000.00
70,000.00
28,000.00
20,000.00
1,168,000.00
1,223,250.00
165,138.75
1,388,388.75
Jumlah Harga
(Rp)
700.00
9,000.00
950.00
300.00
10,950.00
55,000.00
55,000.00
65,950.00
8,903.25
74,853.25
Jumlah Harga
(Rp)
151,200.00
64,800.00
6,840.00
880.00
223,720.00
24,000.00
61,600.00
28,000.00
24,000.00
24,500.00
16,800.00
178,900.00
402,620.00
54,353.70
456,973.70
Jumlah Harga
(Rp)
700.00
36,000.00
3,800.00
400.00
40,900.00
90,000.00
150.00
90,150.00
131,050.00
17,691.75
148,741.75
Jumlah Harga
(Rp)
7,560.00
16,200.00
1,710.00
400.00
25,870.00
90,000.00
26,250.00
116,250.00
142,120.00
19,186.20
161,306.20
Jumlah Harga
(Rp)
9,450.00
20,250.00
2,185.00
560.00
32,445.00
202,800.00
59,150.00
261,950.00
294,395.00
39,743.33
334,138.33
Jumlah Harga
(Rp)
2,520.00
5,400.00
570.00
160.00
8,650.00
10,500.00
3,062.50
13,562.50
22,212.50
2,998.69
25,211.19
Jumlah Harga
(Rp)
5,670.00
12,150.00
1,282.50
320.00
19,422.50
46,500.00
13,562.50
60,062.50
79,485.00
10,730.48
90,215.48
Jumlah Harga
(Rp)
5,670.00
12,150.00
1,282.50
320.00
19,422.50
73,800.00
21,525.00
95,325.00
114,747.50
15,490.91
130,238.41
A.8.4.1 HARGA SATUAN PEKERJAAN PEMASANGAN PIPA DI LUAR GEDUNG
5,670.00
3,690.00
640.00
10,000.00
19,500.00
19,500.00
1,800.00
1,800.00
31,300.00
4,225.50
35,525.50
Jumlah Harga
(Rp)
6,580.00
4,230.00
720.00
11,530.00
38,750.00
38,750.00
2,400.00
2,400.00
52,680.00
7,111.80
59,791.80
Jumlah Harga
(Rp)
7,350.00
4,770.00
880.00
13,000.00
61,500.00
61,500.00
3,000.00
3,000.00
77,500.00
10,462.50
87,962.50
Jumlah Harga
(Rp)
8,260.00
5,310.00
960.00
14,530.00
98,750.00
98,750.00
3,600.00
3,600.00
116,880.00
15,778.80
132,658.80
Jumlah Harga
(Rp)
13,230.00
8,550.00
1,520.00
23,300.00
165,375.00
165,375.00
7,200.00
7,200.00
195,875.00
26,443.13
222,318.13
Jumlah Harga
(Rp)
17,920.00
11,520.00
2,080.00
31,520.00
186,925.00
186,925.00
10,200.00
10,200.00
228,645.00
30,867.08
259,512.08
Jumlah Harga
(Rp)
20,580.00
13,230.00
2,320.00
36,130.00
237,075.00
237,075.00
12,000.00
12,000.00
285,205.00
38,502.68
323,707.68
Jumlah Harga
(Rp)
38,080.00
24,480.00
4,320.00
66,880.00
389,300.00
389,300.00
24,000.00
24,000.00
480,180.00
64,824.30
545,004.30
Jumlah Harga
(Rp)
2,450.00
1,530.00
240.00
4,220.00
39,900.00
39,900.00
5,700.00
5,700.00
49,820.00
7,473.00
57,293.00
Jumlah Harga
(Rp)
2,800.00
1,800.00
320.00
4,920.00
98,300.00
98,300.00
5,700.00
5,700.00
108,920.00
14,704.20
123,624.20
Jumlah Harga
(Rp)
3,150.00
2,070.00
400.00
5,620.00
109,810.00
109,810.00
5,700.00
5,700.00
121,130.00
16,352.55
137,482.55
Jumlah Harga
(Rp)
4,340.00
2,790.00
480.00
7,610.00
207,700.00
207,700.00
5,700.00
5,700.00
221,010.00
29,836.35
250,846.35
Jumlah Harga
(Rp)
7,140.00
4,590.00
800.00
12,530.00
320,500.00
320,500.00
5,700.00
5,700.00
338,730.00
45,728.55
384,458.55
Jumlah Harga
(Rp)
9,310.00
6,030.00
1,040.00
16,380.00
502,000.00
502,000.00
12,600.00
12,600.00
530,980.00
71,682.30
602,662.30
Jumlah Harga
(Rp)
11,900.00
7,650.00
1,360.00
20,910.00
797,000.00
797,000.00
19,500.00
19,500.00
837,410.00
113,050.35
950,460.35
Jumlah Harga
(Rp)
20,300.00
13,050.00
2,320.00
35,670.00
1,289,000.00
1,289,000.00
45,600.00
45,600.00
1,370,270.00
184,986.45
1,555,256.45
Jumlah Harga
(Rp)
24,150.00
15,480.00
2,720.00
42,350.00
158,633.33
158,633.33
5,700.00
5,700.00
206,683.33
27,902.25
234,585.58
Jumlah Harga
(Rp)
28,000.00
18,000.00
3,200.00
49,200.00
296,633.33
296,633.33
5,700.00
5,700.00
351,533.33
47,457.00
398,990.33
Jumlah Harga
(Rp)
31,360.00
20,160.00
3,600.00
55,120.00
399,133.33
399,133.33
5,700.00
5,700.00
459,953.33
62,093.70
522,047.03
Jumlah Harga
(Rp)
35,420.00
22,770.00
4,080.00
62,270.00
475,300.00
475,300.00
5,700.00
5,700.00
543,270.00
73,341.45
616,611.45
Jumlah Harga
(Rp)
55,720.00
35,820.00
6,400.00
97,940.00
682,633.33
682,633.33
5,700.00
5,700.00
786,273.33
106,146.90
892,420.23
Jumlah Harga
(Rp)
34,230.00
8,820.00
3,920.00
46,970.00
97,600.00
97,600.00
5,700.00
5,700.00
150,270.00
20,286.45
170,556.45
Jumlah Harga
(Rp)
38,290.00
9,810.00
4,400.00
52,500.00
200,000.00
200,000.00
114,000.00
114,000.00
366,500.00
49,477.50
415,977.50
Jumlah Harga
(Rp)
42,910.00
11,070.00
4,880.00
58,860.00
219,500.00
219,500.00
5,700.00
5,700.00
284,060.00
38,348.10
322,408.10
Jumlah Harga
(Rp)
59,850.00
15,390.00
6,800.00
82,040.00
390,600.00
390,600.00
5,700.00
5,700.00
478,340.00
64,575.90
542,915.90
Jumlah Harga
(Rp)
66,570.00
17,100.00
7,600.00
91,270.00
550,000.00
550,000.00
15,000.00
15,000.00
656,270.00
88,596.45
744,866.45
Jumlah Harga
(Rp)
68,110.00
17,550.00
7,760.00
93,420.00
732,000.00
732,000.00
21,300.00
21,300.00
846,720.00
114,307.20
961,027.20
Jumlah Harga
(Rp)
108,150.00
27,810.00
13,950.00
12,320.00
162,230.00
2,076,000.00
2,076,000.00
13,087.28
13,087.28
26,174.55
2,264,404.55
305,694.61
2,570,099.17
Jumlah Harga
(Rp)
126,910.00
32,670.00
21,450.00
14,480.00
195,510.00
2,350,000.00
2,350,000.00
16,501.35
16,501.35
33,002.70
2,578,512.70
348,099.21
2,926,611.91
Jumlah Harga
(Rp)
143,290.00
36,810.00
28,950.00
209,050.00
2,750,000.00
2,750,000.00
19,346.41
19,346.41
38,692.82
2,997,742.82
404,695.28
3,402,438.10
Jumlah Harga
(Rp)
140,770.00
36,180.00
43,950.00
16,080.00
236,980.00
3,102,000.00
3,102,000.00
33,002.70
33,002.70
66,005.39
3,404,985.39
459,673.03
3,864,658.42
Jumlah Harga
(Rp)
270,130.00
69,480.00
73,950.00
30,880.00
444,440.00
4,152,000.00
4,152,000.00
47,797.01
47,797.01
95,594.02
4,692,034.02
633,424.59
5,325,458.61
Jumlah Harga
(Rp)
415,170.00
106,740.00
118,950.00
55,440.00
696,300.00
5,184,000.00
5,184,000.00
63,729.34
63,729.34
127,458.69
6,007,758.69
811,047.42
6,818,806.11
Jumlah Harga
(Rp)
486,430.00
125,100.00
118,950.00
55,600.00
786,080.00
5,600,000.00
5,600,000.00
86,489.82
86,489.82
172,979.65
6,559,059.65
885,473.05
7,444,532.70
Jumlah Harga
(Rp)
563,920.00
144,990.00
133,950.00
64,480.00
907,340.00
6,228,000.00
6,228,000.00
102,422.16
102,422.16
204,844.32
7,340,184.32
990,924.88
8,331,109.20
Jumlah Harga
(Rp)
34,930.00
9,000.00
4,000.00
47,930.00
153,750.00
153,750.00
1,200.00
1,200.00
202,880.00
27,388.80
230,268.80
Jumlah Harga
(Rp)
40,530.00
10,440.00
4,640.00
55,610.00
244,000.00
244,000.00
1,200.00
1,200.00
300,810.00
40,609.35
341,419.35
Jumlah Harga
(Rp)
45,360.00
11,700.00
5,200.00
62,260.00
335,833.33
335,833.33
1,200.00
1,200.00
399,293.33
53,904.60
453,197.93
Jumlah Harga
(Rp)
49,560.00
12,780.00
5,680.00
68,020.00
399,166.67
399,166.67
1,200.00
1,200.00
468,386.67
63,232.20
531,618.87
Jumlah Harga
(Rp)
77,910.00
20,070.00
8,880.00
106,860.00
565,833.33
565,833.33
1,200.00
1,200.00
673,893.33
90,975.60
764,868.93
A.8.4.2 HARGA SATUAN PEKERJAAN PEMOTONGAN PIPA
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.21 (K3) Pemotongan 1 buah pipa HDPE 200 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 0.0440 70,000.00
Tukang Pipa L.02 OH 0.0220 90,000.00
Mandor L.04 OH 0.0040 80,000.00
Operator (alat potong T2) L.08 OH 0.1710 75,000.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.32 (K3) Pemotongan 1 buah pipa HDPE 1200 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.6190 70,000.00
Tukang Pipa L.02 OH 0.8090 90,000.00
Mandor L.04 OH 0.1620 80,000.00
Operator (alat potong T2) L.08 OH 1.1710 75,000.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
A.8.4.2.58 (K3) Pemotongan 1 buah pipa DCI 600 mm
Harga Satuan
No Uraian Kode Satuan Koefisien
(Rp)
A TENAGA
Pekerja L.01 OH 1.3090 70,000.00
Tukang Pipa L.02 OH 0.2620 90,000.00
Mandor L.04 OH 0.1310 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
350.00
180.00
40.00
570.00
10.50
10.50
580.50
78.37
658.87
Jumlah Harga
(Rp)
980.00
630.00
80.00
1,690.00
10.50
10.50
1,700.50
229.57
1,930.07
Jumlah Harga
(Rp)
1,540.00
990.00
160.00
2,690.00
10.50
10.50
2,700.50
364.57
3,065.07
Jumlah Harga
(Rp)
2,170.00
1,350.00
240.00
3,760.00
10.50
10.50
3,770.50
509.02
4,279.52
Jumlah Harga
(Rp)
5,670.00
3,600.00
640.00
9,910.00
59.50
59.50
9,969.50
1,345.88
11,315.38
Jumlah Harga
(Rp)
8,960.00
5,760.00
1,040.00
15,760.00
105.00
105.00
15,865.00
2,141.78
18,006.78
Jumlah Harga
(Rp)
10,850.00
6,930.00
1,200.00
18,980.00
129.50
129.50
19,109.50
2,579.78
21,689.28
Jumlah Harga
(Rp)
23,170.00
14,940.00
2,640.00
40,750.00
301.00
301.00
41,051.00
5,541.89
46,592.89
Jumlah Harga
(Rp)
29,400.00
18,900.00
3,360.00
51,660.00
-
189.00
189.00
51,849.00
6,999.62
58,848.62
Jumlah Harga
(Rp)
36,260.00
23,310.00
4,160.00
63,730.00
241.50
241.50
63,971.50
8,636.15
72,607.65
Jumlah Harga
(Rp)
43,610.00
27,990.00
4,960.00
76,560.00
301.00
301.00
76,861.00
10,376.24
87,237.24
Jumlah Harga
(Rp)
76,230.00
49,050.00
8,720.00
134,000.00
-
560.00
560.00
134,560.00
18,165.60
152,725.60
Jumlah Harga
(Rp)
79,870.00
51,390.00
9,120.00
140,380.00
588.00
588.00
140,968.00
19,030.68
159,998.68
Jumlah Harga
(Rp)
89,950.00
57,870.00
10,320.00
158,140.00
668.50
668.50
158,808.50
21,439.15
180,247.65
Jumlah Harga
(Rp)
100,030.00
64,350.00
11,440.00
175,820.00
745.50
745.50
176,565.50
23,836.34
200,401.84
Jumlah Harga
(Rp)
110,110.00
70,830.00
12,560.00
193,500.00
826.00
826.00
194,326.00
26,234.01
220,560.01
Jumlah Harga
(Rp)
140.00
90.00
16.00
2,550.00
2,796.00
14.00
14.00
2,810.00
379.35
3,189.35
Jumlah Harga
(Rp)
420.00
270.00
80.00
5,325.00
6,095.00
17.50
17.50
6,112.50
825.19
6,937.69
Jumlah Harga
(Rp)
630.00
450.00
80.00
7,200.00
8,360.00
21.00
21.00
8,381.00
1,131.44
9,512.44
Jumlah Harga
(Rp)
1,120.00
720.00
160.00
9,075.00
11,075.00
31.50
31.50
11,106.50
1,499.38
12,605.88
Jumlah Harga
(Rp)
3,080.00
1,980.00
320.00
12,825.00
18,205.00
59.50
59.50
18,264.50
2,465.71
20,730.21
Jumlah Harga
(Rp)
4,690.00
2,970.00
560.00
16,575.00
24,795.00
80.50
80.50
24,875.50
3,358.19
28,233.69
Jumlah Harga
(Rp)
6,300.00
4,050.00
720.00
20,325.00
31,395.00
105.00
105.00
31,500.00
4,252.50
35,752.50
Jumlah Harga
(Rp)
12,390.00
7,920.00
1,440.00
27,825.00
49,575.00
192.50
192.50
49,767.50
6,718.61
56,486.11
Jumlah Harga
(Rp)
15,750.00
10,170.00
1,840.00
31,575.00
59,335.00
245.00
245.00
59,580.00
8,043.30
67,623.30
Jumlah Harga
(Rp)
19,390.00
12,510.00
2,240.00
35,325.00
69,465.00
-
297.50
297.50
69,762.50
9,417.94
79,180.44
Jumlah Harga
(Rp)
23,310.00
15,030.00
2,640.00
42,825.00
83,805.00
353.50
353.50
84,158.50
11,361.40
95,519.90
Jumlah Harga
(Rp)
42,070.00
27,090.00
4,800.00
57,825.00
131,785.00
626.50
626.50
132,411.50
17,875.55
150,287.05
Jumlah Harga
(Rp)
63,910.00
41,040.00
7,280.00
65,325.00
177,555.00
945.00
945.00
178,500.00
24,097.50
202,597.50
Jumlah Harga
(Rp)
78,750.00
50,580.00
8,960.00
72,825.00
211,115.00
1,162.00
1,162.00
212,277.00
28,657.40
240,934.40
Jumlah Harga
(Rp)
86,660.00
55,710.00
9,920.00
80,325.00
232,615.00
1,277.50
1,277.50
233,892.50
31,575.49
265,467.99
Jumlah Harga
(Rp)
113,330.00
72,810.00
12,960.00
87,825.00
286,925.00
1,669.50
1,669.50
288,594.50
38,960.26
327,554.76
Jumlah Harga
(Rp)
13,300.00
900.00
160.00
14,360.00
14.00
14.00
14,374.00
1,940.49
16,314.49
Jumlah Harga
(Rp)
40,600.00
2,610.00
480.00
43,690.00
14.00
14.00
43,704.00
5,900.04
49,604.04
Jumlah Harga
(Rp)
64,400.00
4,140.00
720.00
69,260.00
21.00
21.00
69,281.00
9,352.94
78,633.94
Jumlah Harga
(Rp)
91,700.00
5,940.00
1,040.00
98,680.00
31.50
31.50
98,711.50
13,326.05
112,037.55
Jumlah Harga
(Rp)
119,000.00
15,300.00
2,720.00
137,020.00
59.50
59.50
137,079.50
18,505.73
155,585.23
Jumlah Harga
(Rp)
165,900.00
21,330.00
3,760.00
190,990.00
80.50
80.50
191,070.50
25,794.52
216,865.02
Jumlah Harga
(Rp)
176,400.00
22,680.00
4,000.00
203,080.00
105.00
105.00
203,185.00
27,429.98
230,614.98
Jumlah Harga
(Rp)
51,660.00
33,210.00
5,920.00
90,790.00
-
192.50
192.50
90,982.50
12,282.64
103,265.14
Jumlah Harga
(Rp)
59,360.00
38,160.00
6,800.00
104,320.00
245.00
245.00
104,565.00
14,116.28
118,681.28
Jumlah Harga
(Rp)
65,870.00
42,390.00
7,520.00
115,780.00
297.50
297.50
116,077.50
15,670.46
131,747.96
Jumlah Harga
(Rp)
60,480.00
38,880.00
6,880.00
106,240.00
-
353.50
353.50
106,593.50
14,390.12
120,983.62
Jumlah Harga
(Rp)
109,690.00
70,470.00
12,560.00
192,720.00
626.50
626.50
193,346.50
26,101.78
219,448.28
Jumlah Harga
(Rp)
123,900.00
79,650.00
14,160.00
217,710.00
945.00
945.00
218,655.00
29,518.43
248,173.43
Jumlah Harga
(Rp)
138,180.00
88,830.00
15,760.00
242,770.00
1,162.00
1,162.00
243,932.00
32,930.82
276,862.82
Jumlah Harga
(Rp)
152,460.00
98,010.00
17,440.00
267,910.00
1,277.50
1,277.50
269,187.50
36,340.31
305,527.81
Jumlah Harga
(Rp)
166,740.00
107,190.00
19,040.00
292,970.00
1,669.50
1,669.50
294,639.50
39,776.33
334,415.83
Jumlah Harga
(Rp)
4,970.00
1,260.00
560.00
6,790.00
900.00
900.00
7,690.00
1,038.15
8,728.15
Jumlah Harga
(Rp)
7,840.00
1,980.00
880.00
10,700.00
3,000.00
3,000.00
13,700.00
1,849.50
15,549.50
Jumlah Harga
(Rp)
11,130.00
2,880.00
1,280.00
15,290.00
5,400.00
5,400.00
20,690.00
2,793.15
23,483.15
Jumlah Harga
(Rp)
25,620.00
6,570.00
2,960.00
35,150.00
16,200.00
16,200.00
51,350.00
6,932.25
58,282.25
Jumlah Harga
(Rp)
33,320.00
8,550.00
3,840.00
45,710.00
21,900.00
21,900.00
67,610.00
9,127.35
76,737.35
Jumlah Harga
(Rp)
35,840.00
9,180.00
4,080.00
49,100.00
23,700.00
23,700.00
72,800.00
9,828.00
82,628.00
Jumlah Harga
(Rp)
65,870.00
16,920.00
7,520.00
90,310.00
553.00
553.00
90,863.00
12,266.51
103,129.51
Jumlah Harga
(Rp)
79,590.00
20,430.00
9,120.00
109,140.00
616.00
616.00
109,756.00
14,817.06
124,573.06
Jumlah Harga
(Rp)
91,840.00
23,580.00
10,480.00
125,900.00
672.00
672.00
126,572.00
17,087.22
143,659.22
Jumlah Harga
(Rp)
91,630.00
23,580.00
10,480.00
125,690.00
672.00
672.00
126,362.00
17,058.87
143,420.87
Jumlah Harga
(Rp)
181,860.00
46,800.00
20,800.00
249,460.00
1,085.00
1,085.00
250,545.00
33,823.58
284,368.58
Jumlah Harga
(Rp)
235,900.00
60,660.00
26,960.00
323,520.00
1,333.50
1,333.50
324,853.50
43,855.22
368,708.72
Jumlah Harga
(Rp)
281,470.00
72,360.00
32,160.00
385,990.00
1,543.50
1,543.50
387,533.50
52,317.02
439,850.52
Jumlah Harga
(Rp)
331,170.00
85,140.00
37,840.00
454,150.00
1,771.00
1,771.00
455,921.00
61,549.34
517,470.34
Jumlah Harga
(Rp)
385,140.00
99,000.00
44,000.00
528,140.00
2,016.00
2,016.00
530,156.00
71,571.06
601,727.06
Jumlah Harga
(Rp)
1,960.00
540.00
240.00
2,740.00
129.50
129.50
2,869.50
387.38
3,256.88
Jumlah Harga
(Rp)
5,950.00
1,530.00
640.00
8,120.00
140.00
140.00
8,260.00
1,115.10
9,375.10
Jumlah Harga
(Rp)
9,310.00
2,430.00
1,040.00
12,780.00
-
147.00
147.00
12,927.00
1,745.15
14,672.15
Jumlah Harga
(Rp)
12,880.00
3,330.00
1,440.00
17,650.00
157.50
157.50
17,807.50
2,404.01
20,211.51
Jumlah Harga
(Rp)
33,320.00
8,550.00
3,840.00
45,710.00
-
-
210.00
210.00
45,920.00
6,199.20
52,119.20
Jumlah Harga
(Rp)
46,410.00
11,970.00
5,280.00
63,660.00
-
238.00
238.00
63,898.00
8,626.23
72,524.23
Jumlah Harga
(Rp)
52,150.00
13,410.00
5,920.00
71,480.00
252.00
252.00
71,732.00
9,683.82
81,415.82
Jumlah Harga
(Rp)
100,800.00
25,920.00
11,520.00
138,240.00
367.50
367.50
138,607.50
18,712.01
157,319.51
Jumlah Harga
(Rp)
97,930.00
25,200.00
11,200.00
134,330.00
-
374.50
374.50
134,704.50
18,185.11
152,889.61
Jumlah Harga
(Rp)
109,060.00
28,080.00
12,480.00
149,620.00
374.50
374.50
149,994.50
20,249.26
170,243.76
Jumlah Harga
(Rp)
100,590.00
25,830.00
11,520.00
137,940.00
395.50
395.50
138,335.50
18,675.29
157,010.79
Jumlah Harga
(Rp)
183,680.00
47,250.00
20,960.00
251,890.00
581.00
581.00
252,471.00
34,083.59
286,554.59
Jumlah Harga
(Rp)
207,970.00
53,460.00
23,760.00
285,190.00
640.50
640.50
285,830.50
38,587.12
324,417.62
Jumlah Harga
(Rp)
232,330.00
59,760.00
26,560.00
318,650.00
703.50
703.50
319,353.50
43,112.72
362,466.22
Jumlah Harga
(Rp)
256,690.00
65,970.00
29,360.00
352,020.00
763.00
763.00
352,783.00
47,625.71
400,408.71
Jumlah Harga
(Rp)
281,050.00
72,270.00
32,160.00
385,480.00
826.00
826.00
386,306.00
52,151.31
438,457.31
A.8.4.3 HARGA SATUAN PEKERJAAN PEMASANGAN AKSESORIS PIPA
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga (Rp)
100,030.00
64,350.00
11,440.00
175,820.00
11,501,600.00
11,501,600.00
30,000.00
30,000.00
11,707,420.00
1,580,501.70
13,287,921.70
119,980.00
77,130.00
13,680.00
210,790.00
18,370,000.00
18,370,000.00
90,000.00
90,000.00
18,670,790.00
2,520,556.65
21,191,346.65
119,980.00
77,130.00
13,680.00
210,790.00
30,897,900.00
30,897,900.00
120,000.00
120,000.00
31,228,690.00
4,215,873.15
35,444,563.15
140,000.00
90,000.00
16,000.00
246,000.00
40,675,800.00
40,675,800.00
150,000.00
150,000.00
41,071,800.00
5,544,693.00
46,616,493.00
7,420.00
4,770.00
880.00
13,070.00
203,560.00
203,560.00
8,400.00
8,400.00
225,030.00
30,379.05
255,409.05
15,120.00
9,720.00
1,760.00
26,600.00
367,690.00
367,690.00
8,700.00
8,700.00
402,990.00
54,403.65
457,393.65
22,820.00
14,670.00
2,640.00
40,130.00
639,630.00
639,630.00
11,700.00
11,700.00
691,460.00
93,347.10
784,807.10
30,520.00
19,620.00
3,520.00
53,660.00
960,260.00
960,260.00
150,000.00
150,000.00
1,163,920.00
157,129.20
1,321,049.20
A.8.4.5 HARGA SATUAN PEKERJAAN PENGETESAN PIPA
560.00
64.00
624.00
30.00
456.00
70.00
556.00
1,180.00
159.30
1,339.30
Jumlah Harga
560.00
64.00
624.00
60.00
456.00
70.00
586.00
1,210.00
163.35
1,373.35
Jumlah Harga
560.00
64.00
624.00
120.00
456.00
70.00
646.00
1,270.00
171.45
1,441.45
Jumlah Harga
560.00
64.00
624.00
270.00
456.00
70.00
796.00
1,420.00
191.70
1,611.70
Jumlah Harga
560.00
64.00
624.00
465.00
456.00
70.00
991.00
1,615.00
218.03
1,833.03
Jumlah Harga
560.00
64.00
624.00
735.00
456.00
70.00
1,261.00
1,885.00
282.75
2,167.75
Jumlah Harga
560.00
64.00
624.00
1,065.00
456.00
70.00
1,591.00
2,215.00
332.25
2,547.25
Jumlah Harga
560.00
64.00
624.00
1,890.00
456.00
70.00
2,416.00
3,040.00
456.00
3,496.00
Jumlah Harga
560.00
64.00
624.00
2,370.00
456.00
70.00
2,896.00
3,520.00
528.00
4,048.00
Jumlah Harga
560.00
64.00
624.00
4,245.00
456.00
70.00
4,771.00
5,395.00
809.25
6,204.25
A.8.4.6 HARGA SATUAN PEKERJAAN ELEKTRIKAL
80,000.00
80,000.00
36,000.00
79,680.00
4,500.00
3,000.00
53,550.00
1,920.00
1,200.00
24,000.00
8,000.00
211,850.00
291,850.00
43,777.50
335,627.50
Jumlah Harga
(Rp)
80,000.00
80,000.00
36,000.00
49,800.00
1,500.00
1,500.00
1,920.00
48,000.00
138,720.00
218,720.00
32,808.00
251,528.00
DAFTAR HARGA SATUAN DIHIT
I A.2.3.1
1 Dihit. UTP 1
A.4.4.3
1 Dihit. A.4.4.3.G.40/40. P
2 Dihit. A.4.4.3. W 20/40
3 Dihit. A.4.4.3. ACP PVDF
A.4.5.1
1 Dihit. A.4.5.1. Calsi
2 Dihit. Progips 10
Dihit. A.4.6.1 . GRC Uk
20
A.4.5.2
1 Dihit. A.4.5.2.3 Glaz
2 Dihit. A.4.5.2.6 Glaz
3 Dihit. A.4.5.2 Galva
A.4.6.2
1 Dihit. TF 12
2 Dihit. Grend 4
3 Dihit. HP 30
4 Dihit. Rambuncis
A.4.7.1
1 Dihit. A.4.7.1. RMP
L.1.2
1 Dihit. L.1.2.11
1.5.2
1 dihit 15.2.
1 Dihit. A.4.1.1.a
2 Dihit. A.4.1.1.b
DAFTAR HARGA SATUAN DIHIT
PEKERJAAN TANAH
Pemasangan 1 m3 Urugan Tanah Padas ( dipadatkan dengan alat pemadat tangan ) M3
PEKERJAAN PENUTUP DINDING DAN LANTAI
Pemasangan 1 m2 Lantai Keramik 40x40 cm (putih/polos) m2
Pemasangan 1 m2 Dinding Keramik 20 x 40 cm m2
Pemasangan 1 m2 Penutup Dinding Luar dg ACP Rangka hollow Galvanis m2
PEKERJAAN LANGIT- LANGIT
Pemasangan 1 m2 Langit - Langit Calsiboard, Uk. (120 x 240) cm Tebal 3,5 mm m2
Pemasangan 1 m List Langit - Langit Profil Gipsum Lebar 10 cm m2
Pemasangan 1 m Lisplank Urat Kayu 20 cm m'
PEKERJAAN PENUTUP ATAP
Pemasangan 1 m2 Atap Genteng Press Jatiwangi Besar Glazur m2
Pemasangan 1 m Bubung Genteng Jatiwangi Besar Glazur M'
Pemasangan 1 m2 Atap Galvalum M2
PEKERJAAN KUNCI DAN KACA
Pemasangan 1 m2 Kaca Tempered Frameless 12 mm m2
Pemasangan 1 Buah Grendel Panjang 4" BH
Pemasangan 1 Pasang Tarikan Pintu Panjang 30 cm PS
Pemasangan 1 Buah Rambuncis Jendela Allumunium 12" PS
PEKERJAAN PENGECATAN
Pelapisan 1 m2 Plat Atap/Talang Dengan Lapisan Membran Waterproofing M2
PEKERJAAN LISTRIK
Pemasangan 1 m Titik Stop Kontak Dengan Kabel NYM 3 x 2,5 mm2 M
213,071.28
229,571.91
297,307.58
815,667.75
38,552.55
30,335.71
43,670.94
112,677.13
123,783.10
109,215.38
1,574,459.52
91,231.30
237,646.30
29,158.15
89,403.38
231,199.50
135,305.00
313,742.38
282,529.88
A.2.3.1 HARGA SATUAN PEKERJAAN TANAH
Dihit. UTP 1 Pemasangan 1 m3 Urugan Tanah Padas ( dipadatkan dengan alat pem
Satua Harga
No Uraian Kode Koefisien
n Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.1368 70,000.00
Mandor L.04 OH 0.0274 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Tanah Padas Quarry - Lokasi Pekerjaan m3 1.2000 132,800.00
JUMLAH HARGA BAHAN
C PERALATAN
Stamper Jam 0.5000 33,200.00
JUMLAH HARGA ALAT
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
engan alat pemadat tangan )
Jumlah Harga
(Rp)
9,576.00
2,192.00
11,768.00
159,360.00
159,360.00
16,600.00
16,600.00
187,728.00
25,343.28
213,071.28
A.4.4.3 HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN PENUTUP
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Dihit. A.4.4.3. ACP P Pemasangan 1 m2 Penutup Dinding Luar dg ACP Rangka hol
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.8000
Tukang allumunium L.02 OH 0.8000
Kepala tukang L.03 OH 0.1600
alumunium
Mandor L.04 OH 0.0400
JUMLAH TENAGA KERJA
B BAHAN
ACP Coating PVDF
Lbr 0.2500
(Outdoor)
Hollow Galvanis 20 x 40 x
m3 3.6000
0,35 mm
Hollow Galvanis 40 x 40 x m3 3.6000
0,35
ACP Bracing Buah 1.0000
Sealant Liter 0.5000
Paku Sekrup 3,5" Buah 10.0000
ACP Bracket Buah 8.0000
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Dihit. A.4.4.3. W 20/4 Pemasangan 1 m2 Dinding Keramik 20 x 40 cm
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.9000
Tukang batu halus L.02 OH 0.4500
Kepala tukang batu L.03 OH 0.0450
Mandor L.04 OH 0.0450
JUMLAH TENAGA KERJA
B BAHAN
Keramik Dinding 20 x 40 Buah 13.5000
cm
Semen Portland Kg 9.3000
Semen warna Kg 1.9400
Pasir pasang (muntilan) m3 0.0180
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
LANTAI DAN PENUTUP DINDING
x40 cm (putih/polos)
Harga Jumlah
Satuan (Rp) Harga (Rp)
70,000.00 49,000.00
90,000.00 31,500.00
95,000.00 3,325.00
80,000.00 2,800.00
UMLAH TENAGA KERJA 86,625.00
9,000.00 61,875.00
1,400.00 11,466.00
15,000.00 24,300.00
400,000.00 18,000.00
UMLAH HARGA BAHAN 115,641.00
202,266.00
3,5% x D 27,305.91
229,571.91
70,000.00 56,000.00
90,000.00 72,000.00
95,000.00 15,200.00
80,000.00 3,200.00
UMLAH TENAGA KERJA 146,400.00
985,000.00 246,250.00
8,000.00 28,800.00
12,500.00 45,000.00
45,000.00 45,000.00
92,000.00 46,000.00
120.00 1,200.00
20,000.00 160,000.00
UMLAH HARGA BAHAN 572,250.00
718,650.00
3,5% x D 97,017.75
815,667.75
0 x 40 cm
Harga Jumlah
Satuan (Rp) Harga (Rp)
70,000.00 63,000.00
90,000.00 40,500.00
95,000.00 4,275.00
80,000.00 3,600.00
UMLAH TENAGA KERJA 111,375.00
7,500.00 101,250.00
1,400.00 13,020.00
15,000.00 29,100.00
400,000.00 7,200.00
UMLAH HARGA BAHAN 150,570.00
261,945.00
3,5% x D 35,362.58
297,307.58
A.4.5.1 SATUAN PEKERJAAN LANGIT-LANGIT (PLAFOND)
Dihit. A.4.5.1. Cals Pemasangan 1 m2 Langit - Langit Calsiboard, Uk. (120 x 240) cm
No Uraian Kode Satuan Koefisien
A TENAGA
Pekerja L.01 OH 0.0300
Tukang kayu halus L.02 OH 0.0700
Kepala tukang kayu L.03 OH 0.0070
Mandor L.04 OH 0.0040
JUMLAH TENAGA KERJA
B BAHAN
Calsiboard 122 x 244 cm tebal Lembar 0.3640
3,5 mm
Paku Plafon kg 0.1100
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
d, Uk. (120 x 240) cm Tebal 3,5 mm
Harga Jumlah
Satuan (Rp) Harga (Rp)
70,000.00 2,100.00
90,000.00 6,300.00
95,000.00 665.00
80,000.00 320.00
UMLAH TENAGA KERJA 9,385.00
63,000.00 22,932.00
15,000.00 1,650.00
UMLAH HARGA BAHAN 24,582.00
33,967.00
3,5% x D 4,585.55
38,552.55
Gipsum Lebar 10 cm
Harga Jumlah
Satuan (Rp) Harga (Rp)
70,000.00 3,500.00
90,000.00 4,500.00
95,000.00 475.00
80,000.00 240.00
UMLAH TENAGA KERJA 8,715.00
17,000.00 17,850.00
16,250.00 162.50
UMLAH HARGA BAHAN 18,012.50
26,727.50
3,5% x D 3,608.21
30,335.71
A.4.5.2 HARGA SATUAN PEKERJAAN PENUTUP ATAP
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
angi Besar Glazur
Harga Jumlah
Satuan (Rp) Harga (Rp)
70,000.00 10,500.00
85,000.00 6,375.00
95,000.00 760.00
80,000.00 640.00
UMLAH TENAGA KERJA 18,275.00
4,500.00 81,000.00
UMLAH HARGA BAHAN 81,000.00
99,275.00
3,5% x D 13,402.13
112,677.13
Besar Glazur
Harga Jumlah
Satuan (Rp) Harga (Rp)
70,000.00 28,000.00
85,000.00 17,000.00
95,000.00 1,900.00
80,000.00 160.00
UMLAH TENAGA KERJA 47,060.00
9,500.00 38,000.00
1,400.00 11,200.00
400,000.00 12,800.00
UMLAH HARGA BAHAN 62,000.00
109,060.00
3,5% x D 14,723.10
123,783.10
A.4.6.2 HARGA SATUAN PEKERJAAN KUNCI DAN KACA
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Dihit. Grend
4 Pemasangan 1 Buah Grendel Panjang 4"
Satua Harga
No Uraian Kode Koefisien
n Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 70,000.00
Tukang kayu halus L.02 OH 0.2000 90,000.00
Kepala tukang kayu L.03 OH 0.0200 95,000.00
Mandor L.04 OH 0.0010 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Grendel 4" kuning/silver Buah 1.0000 59,000.00
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah Harga
(Rp)
1,050.00
13,500.00
1,425.00
64.00
16,039.00
577,500.00
793,650.00
1,371,150.00
1,387,189.00
187,270.52
###
Jumlah Harga
(Rp)
1,400.00
18,000.00
1,900.00
80.00
21,380.00
59,000.00
59,000.00
80,380.00
10,851.30
91,231.30
Jumlah Harga
(Rp)
1,400.00
18,000.00
1,900.00
80.00
21,380.00
188,000.00
188,000.00
209,380.00
28,266.30
237,646.30
Jumlah Harga
(Rp)
700.00
9,000.00
950.00
40.00
10,690.00
15,000.00
15,000.00
25,690.00
3,468.15
29,158.15
A.4.7.1 HARGA SATUAN PEKERJAAN PENGECATAN
Dihit. A.4.7.1.
Pelapisan 1 m2 Plat Atap/Talang Dengan Lapisan Membran Waterproofi
RMP
Harga
No Uraian Kode Satuan Koefisien
Satuan (Rp)
A TENAGA
Pekerja L.01 OH 0.0200 70,000.00
Tukang cat L.02 OH 0.0630 70,000.00
Kepala tukang cat L.03 OH 0.0063 90,000.00
Mandor L.04 OH 0.0030 80,000.00
JUMLAH TENAGA KERJA
B BAHAN
Serat Fiberglass m2 1.1000 15,000.00
Semen Waterproofer Kg 1.6250 22,500.00
Cat Pelapis Kg 0.2300 83,000.00
Waterproofer JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Membran Waterproofing
Jumlah
Harga (Rp)
1,400.00
4,410.00
567.00
240.00
6,617.00
16,500.00
36,562.50
19,090.00
72,152.50
78,769.50
10,633.88
89,403.38
A.5.1.1 HARGA SATUAN PEKERJAAN SANITASI DALAM GEDUNG
No Uraian Kode
A TENAGA
Pekerja L.01
Tukang kayu halus L.02
Kepala tukang kayu L.03
Mandor L.04
B BAHAN
Talang PVC Persegi Abu-abu 4"
Perlengkapan 35% x talang PVC
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
No Uraian Kode
A TENAGA
Pekerja L.01
Tukang kayu halus L.02
Kepala tukang kayu L.03
Mandor L.04
B BAHAN
Talang PVC 1/2 Lingkaran
Perlengkapan 35% x talang PVC
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Dihit. T 1/2 Pemasangan 1 m Talang Air Hujan 1/2 Lingkaran 6"
Galva
No Uraian Kode
A TENAGA
Pekerja L.01
Tukang kayu halus L.02
Kepala tukang kayu L.03
Mandor L.04
B BAHAN
Talang Metal Setengah Lingkaran 6"
Perlengkapan 35% x talang PVC
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Dihit. ST. Pemasangan 1 Unit Septictank Dinding Bata Trassram 2x1, 5x1,5 m
Tipe A
No Uraian Kode
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
Dihit. ST. Pemasangan 1 Unit Septictank Dinding Bata Trassram 1,5x1, 2x1,7
Tipe B
No Uraian Kode
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
No Uraian Kode
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
No Uraian Kode
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit
F Harga Satuan Pekerjaan (D+E)
DALAM GEDUNG
75,300.00
13,5% x D 10,165.50
85,465.50
69,100.00
13,5% x D 9,328.50
78,428.50
gkaran 6"
95,450.00
13,5% x D 12,885.75
108,335.75
16,401,486.24
-
###
11,149,829.71
-
###
pasitas 6 orang
Harga Jumlah Harga
Satuan Koefisien
Satuan (Rp) (Rp)
6,149,039.25
13,5% x D 830,120.30
###
pasitas 8 orang
Harga Jumlah Harga
Satuan Koefisien
Satuan (Rp) (Rp)
7,249,039.25
13,5% x D 978,620.30
###
pasitas 12 orang
Harga Jumlah Harga
Satuan Koefisien
Satuan (Rp) (Rp)
9,449,039.25
13,5% x D 1,275,620.30
###
Penggalian 1 m3 tanah biasa sedalam 2 m
Pengurugan kembali 1 m3 galian tanah
Pengurugan 1 m3 dengan pasir urug
(K3) Pemasangan 1 m3 batu kosong (anstamping)
Pemasangan 1m2 dinding bata merah tebal 1 batu
campuran 1SP
Pemasangan 1m2: 3PP
dinding bata merah tebal batu
campuran
Pemasangan 1SP : 3PP
1 m2 plesteran 1SP : 3PP tebal 15mm
Membuat 1 m3 beton mutu fc = 16,9 Mpa
Pembesian 10 kg dengan besi polos
K3) Pemasangan 1 m2 bekisting untuk lantai
Pemasangan 1 m pipa galvanis diameter 1
Dihit.
Pemasangan 1 m Titik Stop Kontak Dengan Kabel NYM 3 x 2,5 mm2
L.1.2.11
Harga Satuan
No Kode Satuan Koefisien
(Rp)
A TENAGA
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
mm2
Jumlah Harga
(Rp)
30,000.00
30,000.00
36,000.00
96,200.00
4,500.00
3,000.00
800.00
1,200.00
32,000.00
173,700.00
203,700.00
27,499.50
231,199.50
XVIII KODE ANALISA
HARGA SATUAN PEKERJAAN DINDING PEMISAH (PARTISI)
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Jumlah
Harga
(Rp)
65,000.00
65,000.00
727.53
2,415.27
8,563.40
12,600.00
29,906.00
54,212.20
119,212.20
16,093.65
135,305.00
Dihit. A.4.6.1 . GRC Pemasangan 1 m Lisplank Urat Kayu 20 cm
Koefisi
No Uraian Kode Satuan
en
A TENAGA
Pekerja L.01 OH ###
Tukang kayu kasar L.03 OH ###
Kepala tukang kayu L.11 OH ###
Mandor L.15 OH ###
JUMLAH TENAGA KERJA
B BAHAN
Lisplank GRC Urat Kayu 20 cm (200x Lbr ###
Paku Plafon Kg ###
JUMLAH HARGA BAHAN
C PERALATAN
D Jumlah (A+B+C)
E Overhead & Profit 13,5% x D
F Harga Satuan Pekerjaan (D+E)
Harga Satuan Jumlah Harga
(Rp) (Rp)
38,476.60
13,5% x D 5,194.34
43,670.94