PEKERJAAN : PEMBANGUNAN SARANA DAN PRASARANA KOMPLEK RISET DAN AGROWISATA UNIV. BRAWIJAYA
LOKASI : Jalan Kepuharjo - Ngijo, Malang
TOTAL BIAYA
No. URAIAN PEKERJAAN
(Rp.)
Ir. SAHIRWAN
Direktur
RING ESTIMATE (EE)
TOTAL BIAYA
(Rp.)
4,008,467,000.00
#REF!
#REF!
Ir. SAHIRWAN
Direktur
BILL OF QUANTITY (BQ)
PEKERJAAN : Perencanaan Pembuatan Gazebo, Kamar Mandi Laboratorium Ngijo Universitas Brawijaya Ma
LOKASI : Jalan Kepuharjo - Ngijo, Malang
TOTAL B
No. URAIAN PEKERJAAN
(Rp.
I PEKERJAAN PERSIAPAN
II PEKERJAAN PAGAR
III PEKERJAAN PAGAR TIANG
IV PEKERJAAN PAPAN NAMA
V PEKERJAAN SHELTER
VI PEKERJAAN PIPA SALURAN AIR BERSIH KAWASAN & INSTALASI KABEL LISTRIK
JUMLAH
PPN 10 %
JUMLAH TOTAL BIAYA
TOTAL DIBULATKAN
Terbilang : Tiga Ratus Delapan Puluh Juta Tiga Ratus Empat Puluh Empat Ribu Rupia
Malang, 01 Sept
CV. ADHIJAY
GATOT HARIA
Direkt
BILL OF QUANTITY (BQ)
TOTAL BIAYA
(Rp.)
3,717,331.60
11,767,342.88
2,887,436.70
49,184,613.54
196,969,603.28
81,241,523.81
345,767,851.81
34,576,785.18
380,344,636.99
380,344,000.00
s Delapan Puluh Juta Tiga Ratus Empat Puluh Empat Ribu Rupiah
GATOT HARIANTO, SE
Direktur
BILL OF QUANTITY (BQ)
PEKERJAAN : Perencanaan Pembuatan Gazebo, Kamar Mandi Laboratorium Ngijo Universitas Brawijaya Malan
LOKASI : Jalan Kepuharjo - Ngijo, Malang
HARGA SATUAN
No. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.)
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi 1.00 ls Ls 2,500,000.00
2 Pengukuran 62.96 m' A.011 19,335.00
Sub Total
A PEKERJAAN PAGAR
I PEKERJAAN TANAH
1.20 m B.001
3
1 Galian tanah pondasi bt. Kali 74,565.00
0.36 m B.002
3
2 Urugan tanah kembali 24,855.00
0.08 m B.003
3
3 Urugan pasir bawah pondasi t = 5 cm 342,270.00
Sub Total
IV PEKERJAAN PONDASI
0.44 m C.002
3
1 Pasang pondasi batu kali 1 Pc : 5 Ps 998,175.00
0.15 m C.001
3
2 Aanstamping 607,218.00
Sub Total
V PEKERJAAN BETON
0.06 m D.011 5,330,740.73
3
1 Sloof 15/15
0.11 m D.012 4,554,407.70
3
2 Kolom 20/20
Sub Total
VI PEKERJAAN PASANGAN BATU DAN PLESTERAN
1 Pasang bata merah tebal 1/2 bata, 1 Pc : 4 ps 5.22 m2 E.002 114,320.00
2 Plesteran 9.98 m2 F.001 46,873.00
3 Acian 2.06 m2 F.003 28,898.50
4 Benangan 5.00 m 1
F.004 24,021.00
5 Pasang batu alam 8.67 m2 E.007 293,062.50
6 Pasang Ornamen Motif cakra 4.00 m2 Ls 1,500,000.00
Sub Total
VII PEKERJAAN FINISHING
1 Pengecatan Eksterior 2.06 m2 I.003 51,474.00
2 Coating Batu Alam 8.67 m2 I.006 47,994.00
3 Coating Ornamen 0.32 m2 I.006 47,994.00
Sub Total
Jumlah Total
Total Pagar
HARGA SATUAN
No. URAIAN PEKERJAAN VOLUME ANALISA
(Rp.)
B PEKERJAAN PAGAR TIANG
I PEKERJAAN TANAH
1 Galian tanah pondasi footplate 0.29 m3 B.001 74,565.00
2 Urugan tanah kembali 0.09 m3 B.002 24,855.00
3 Urugan pasir bawah pondasi t = 5 cm 0.03 m3 B.003 342,270.00
Sub Total
II PEKERJAAN PONDASI
1 Pasang pondasi footplate 0.14 m3 C.007 5,995,970.37
Sub Total
III PEKERJAAN BETON
1 Kolom 20/20 0.06 m3 D.012 4,554,407.70
Sub Total
IV PEKERJAAN PASANGAN BATU DAN PLESTERAN
1 Pasang bata merah tebal 1/2 bata, 1 Pc : 4 ps 1.87 m2 E.002 114,320.00
2 Plesteran 2.89 m2 F.001 46,873.00
3 Acian 2.89 m2 F.003 28,898.50
4 Benangan 4.80 m1 F.004 24,021.00
5 Pasang batu alam 2.10 m2 E.007 293,062.50
6 Pasang Besi Hollow 40mm 3.68 m1 L.011 101,746.00
Sub Total
V PEKERJAAN FINISHING
1 Pengecatan Eksterior 1.24 m2 I.003 51,474.00
2 Coating batu alam 2.10 m2 I.006 47,994.00
3 cat meni besi 0.07 m2 I.007 51,510.00
Sub Total
Jumlah Total
Total Tiang
E PEKERJAAN PIPA SALURAN AIR BERSIH KAWASAN & INSTALASI KABEL LISTRIK
I PEKERJAAN TANAH
1 Galian tanah 118.22 m3 B.001 74,565.00
2 Urugan pasir 9.85 m3 B.005 37,520.00
3 Urugan tanah kembali 108.37 m3 B.002 24,855.00
Sub Total
II PEKERJAAN PIPA
492.60 m J.018
3
1 Pasang Pipa PPR 2" 112,418.90
Sub Total
III PEKERJAAN INSTALASI KABEL LISTRIK
1 Kabel Listrik Bawah Tanah 226.65 m1 N.007 61,705.00
Sub Total
Jumlah Total
L OF QUANTITY (BQ)
JUMLAH HARGA
(Rp.)
2,500,000.00
1,217,331.60
3,717,331.60
89,478.00
8,947.80
25,670.25
124,096.05
436,701.56
91,082.70
527,784.26
299,854.17
491,876.03
791,730.20
596,750.40
467,792.54
59,397.98
120,105.00
2,542,199.96
6,000,000.00
9,786,245.88
105,799.66
416,328.75
15,358.08
537,486.49
11,767,342.88
11,767,342.88
JUMLAH HARGA
(Rp.)
21,474.72
2,147.47
10,952.64
34,574.83
863,419.73
863,419.73
282,373.28
282,373.28
213,206.80
135,350.47
83,447.31
115,300.80
616,720.73
374,425.28
1,538,451.39
63,827.76
100,998.57
3,791.14
168,617.47
2,887,436.70
2,887,436.70
196,851.60
19,685.16
56,474.55
273,011.31
1,097,992.50
200,381.94
1,298,374.44
780,336.01
1,448,301.65
2,228,637.66
8,413,952.00
11,660,956.88
23,400,000.00
JUMLAH HARGA
(Rp.)
43,474,908.88
1,909,681.26
1,909,681.26
49,184,613.54
JUMLAH HARGA
(Rp.)
820,215.00
223,695.00
117,067.05
268,434.00
82,021.50
26,843.40
274,598.04
150,598.80
49,286.88
2,012,759.67
4,666,468.13
534,351.84
6,907,357.87
502,395.84
12,610,573.67
5,746,110.60
9,928,433.35
7,561,720.47
4,481,019.54
57,847,673.16
408,737.67
2,104,650.35
4,390,423.62
6,906,019.94
99,374,788.69
9,634,546.64
2,385,444.36
2,633,231.39
1,623,459.93
2,586,276.56
18,862,958.89
3,672,859.16
1,351,321.80
3,904,978.87
5,909,222.00
2,680,317.60
13,705,544.00
1,645,270.00
32,869,513.43
422,100.00
JUMLAH HARGA
(Rp.)
2,365,065.00
1,504,109.77
423,547.05
4,729,988.54
9,444,810.37
JUMLAH HARGA
(Rp.)
641,120.00
1,653,350.00
47,405.00
487,552.50
2,044,508.95
754,970.00
256,006.50
309,073.60
392,375.46
209,171.65
6,795,533.66
3,843,000.00
4,083,000.00
803,250.00
1,606,500.00
10,335,750.00
431,790.00
482,632.18
507,854.02
8,953.36
67,497.12
41,613.84
38,554.56
1,128,290.63
184,776.90
2,891,962.60
124,739.33
310,263.54
148,631.88
14,101.54
134,525.51
82,938.70
76,841.38
87,918.75
14,398.20
994,358.83
124,739.33
310,263.54
74,315.94
14,101.54
92,339.81
JUMLAH HARGA
(Rp.)
56,930.05
52,744.78
43,959.38
7,199.10
776,593.47
196,969,603.28
196,969,603.28
8,815,372.56
369,647.04
2,693,515.82
11,878,535.42
55,377,550.14
55,377,550.14
13,985,438.25
13,985,438.25
81,241,523.81
BACKUP VOLUME
VOL
No. JENIS PEKERJAAN + SKETSA GAMBAR PANJANG LEBAR
P L
I PEKERJAAN PERSIAPAN
1 Pembersihan Lokasi
2 Pengukuran
3 Bongkaran Beton Jembatan
4 Bongkaran dinding bata
PEKERJAAN PAGAR
1 PEKERJAAN PAGAR DINDING
PEKERJAAN TANAH
Galian tanah pondasi bt. Kali
Urugan tanah kembali
Urugan pasir bawah pondasi t = 5 cm
PEKERJAAN PONDASI
Pasang pondasi batu kali 1 Pc : 5 Ps
Aanstamping
PEKERJAAN BETON
Sloof 15/15
Kolom 20/20
PEKERJAAN PASANGAN BATU DAN PLESTERAN
Pasang bata merah tebal 1/2 bata, 1 Pc : 4 ps
Plesteran
atas
body
bawah
Acian
Benangan
Pasang batu alam
atas
body
bawah
Pasang Ornamen Motif cakra
PEKERJAAN FINISHING
Pengecatan Eksterior
Coating Batu Alam
Coating Ornamen
2 PEKERJAAN PAGAR TIANG
PEKERJAAN TANAH
Galian tanah pondasi footplate
Urugan tanah kembali
Urugan pasir bawah pondasi t = 5 cm
PEKERJAAN PONDASI
Pasang pondasi footplate
PEKERJAAN BETON
Kolom 20/20
PEKERJAAN PASANGAN BATU DAN PLESTERAN
Pasang bata merah tebal 1/2 bata, 1 Pc : 4 ps
Plesteran
mahkota
atas
body
bawah
Acian
Benangan
Pasang batu alam
mahkota
atas
body
bawah
Pasang Besi Hollow 40mm
PEKERJAAN FINISHING
Pengecatan Eksterior
Coating batu alam
cat meni besi
body
bawah
1.00 ls
62.96 m'
61.00 m2
5.42 m2
6.60 m3
0.48 m3
61.00 m3
1.20 m3
0.36 m3
0.08 m3
0.44 m3
0.15 m3
0.06 m3
0.11 m3
5.22 m2
3.63 m2
1.60 m2
9.98 m2
0.26 m2
0.25 m2
0.24 m2
0.01 m2
0.02 m2
0.03 m2
0.65 m2
6.25 m2
0.38 m2
0.58 m2
0.11 m2
1.60 m2
0.38 m2
2.06 m2
6.25 m2
4.57 m2
0.38 m2
5.00 m1
8.67 m2
1.45 m2
4.57 m2
2.66 m2
4.00 bh
2.06 m2
8.67 m2
0.32 m2
0.29 m3
0.09 m3
0.03 m3
0.14 m3
0.06 m3
1.87 m2
2.89 m2
0.01 m2
0.02 m2
0.03 m2
0.04 m2
0.09 m2
0.06 m2
0.08 m2
0.10 m2
0.16 m2
0.05 m2
0.16 m2
0.09 m2
1.44 m2
0.16 m2
0.28 m2
0.49 m2
0.09 m2
1.24 m2
1.44 m2
0.20 m2
4.80 m1
2.10 m2
0.19 m2
0.70 m2
0.20 m2
1.02 m2
3.68 m1
1.24 m2
2.10 m2
0.07 m2
2.64 m3
0.79 m3
0.17 m3
1.10 m3
0.33 m3
0.17 m3
0.32 m3
73.60 m2
39.79 m2
0.90 m2
0.12 m2
0.70 m2
0.12 m2
1.60 m2
0.32 m2
3.20 m2
1.60 m2
0.40 m2
14.40 m2
1.28 m2
1.00 m2
0.20 m2
2.20 m2
0.50 m2
2.10 m2
0.45 m2
10.50 m2
1.80 m2
39.79 m2
39.00 bh
39.79 m2
11.00 m3
3.00 m3
1.57 m3
3.60 m3
3.30 m3
1.08 m3
11.05 m3
9.00 m3
2.05 m3
0.44 m3
0.14 m3
4.68 m3
0.88 m3
1.15 m3
0.11 m3
1.22 m3
1.30 m3
0.91 m3
0.54 m3
5.47 m3
0.08 m3
2.05 m3
0.40 m3
0.62 m3
84.28 m2
24.53 m2
8.40 m2
2.40 m2
5.76 m2
2.40 m2
10.50 m2
6.28 m2
m2
3.15 m2
3.34 m2
17.52 m2
56.18 m2
17.52 m2
11.68 m2
2.00 m2
8.00 m2
4.00 m2
12.98 m2
8.83 m2
5.84 m2
1.20 m2
0.96 m2
0.38 m3
0.14 m3
0.43 m3
45.20 m2
16.40 m1
45.20 m2
22.00 m1
3.00 m2
9.00 m2
56.18 m2
8.83 m2
59.05 m2
0.46 m2
0.23 m2
0.67 m2
0.34 m2
1.51 m2
0.38 m2
1.58 m2
0.40 m2
1.66 m2
6.62 m2
45.20 m2
1.00 bh
1.00 bh
1.00 bh
3.00 bh
1.14 m2
1.00 bh
7.50 m1
8.00 m1
11.40 m1
5.59 m1
10.00 ttk
10.00 bh
3.00 bh
6.00 bh
0.08 m3
0.06 m3
0.10 m3
0.08 m2
1.44 m2
1.44 m2
3.85 m2
3.85 m2
0.02 m3
0.04 m3
0.03 m3
0.13 m2
2.87 m2
2.87 m2
0.3 m2
0.3 m2
0.02 m3
0.04 m3
0.02 m3
0.13 m2
1.97 m2
1.97 m2
0.15 m2
0.15 m2
118.22 m3
9.85 m3
108.37 m3
492.60 m1
226.65 m1
DAFTAR HARGA SATUAN PEKERJAAN KONSTRUKSI (HSPK)
TAHUN ANGGARAN 2016
KODE
JENIS PEKERJAAN SATUAN
ANALISA
I. PEKERJAAN PERSIAPAN
A.001 Pengukuran dan pemasangan bouwplank m
A.002 Bongkar dinding bata m3
A.003 Bongkar atap m2
A.004 Bongkar lantai m2
A.005 Bongkar plafond m2
A.006 Buang bongkaran sejauh > 1km m
A.007 Pembersihan dan perataan m2
A.008 Bongkaran beton bertulang m3
A.009 Bongkaran tembok bata merah m2
A.010 Bongkaran lantai m2
A.011 Pengukuran m
V. PEKERJAAN PASANGAN
E.001 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps m2
E.002 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps m2
E.003 Pasangan bata merah tebal 1 bata, 1 Pc : 5 Ps m2
E.004 Pasang dinding kalsiboar+gipsum board t = mm + rangka metalstud m2
E.005 Pasang finishing HPL dinding partisi multipleks m2
E.006 Pasang Finising dinding bata multiplek t=6mm finishing HPL m2
E.007 Pasang dinding batu andhesit m2
E.008 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps m2
HARGA
(Rp)
86,279.00
517,220.00
90,550.00
16,570.00
23,200.00
28,960.95
13,550.00
552,320.00
517,220.00
16,570.00
19,335.00
74,565.00
24,855.00
342,270.00
90,520.00
37,520.00
607,218.00
998,175.00
936,925.00
3,840,766.84
6,796,091.21
6,709,658.26
5,995,970.37
3,602,838.89
1,024,410.00
4,651,813.33
8,298,184.33
11,951,556.19
10,567,715.23
10,716,260.36
5,290,146.00
4,954,396.00
61,158,096.00
5,062,678.50
5,330,740.73
4,554,407.70
6,154,235.33
1,015,485.00
5,036,385.89
7,660,828.20
4,729,309.13
11,086,928.33
111,917.00
114,320.00
265,040.00
617,285.67
118,720.00
226,160.00
293,062.50
136,155.50
46,873.00
61,606.50
28,898.50
24,021.00
225,220.00
48,930.00
27,226.00
195,182.00
195,182.00
153,682.00
153,682.00
154,830.00
145,182.00
105,521.00
192,050.00
63,516.67
140,700.00
262,785.00
26,774.00
69,472.50
51,474.00
41,194.00
12,842.50
47,994.00
51,510.00
80,102.50
2,308,925.00
1,358,525.00
137,517.50
47,405.00
1,653,350.00
77,405.00
162,517.50
732,817.75
520,182.00
267,643.00
641,120.00
754,970.00
37,418.90
34,418.90
34,134.20
41,634.20
38,634.20
112,418.90
272,766.70
331,619.00
155,317.75
67,817.75
32,817.75
198,757.00
23,878.50
51,878.50
51,878.50
1,165,100.00
176,768.25
55,908.50
32,726.00
5,493,100.00
803,933.33
1,793,428.90
32,810.00
32,810.00
32,810.00
35,010.00
27,310.00
28,410.00
27,310.00
26,210.00
26,210.00
45,810.00
101,746.00
212,398.00
303,220.00
163,434.00
726,800.00
408,300.00
199,750.00
267,750.00
267,750.00
384,300.00
61,705.00
74,785.00
8,979,440.00
130,735.00
9,694,400.00
ANALISA HARGA SATUAN
PERKIRAAN HARGA
NO. KOMPONEN SATUAN KUANTITAS SATUAN
(Rp.)
JENIS PEKERJAAN : 1 m' Pengukuran dan pemasangan bouwplank
A. TENAGA
1 Pekerja Biasa L17 Org/hr 0.1000 77,000.00
2 Tukang Kayu L08 Org/hr 0.0900 100,000.00
3 Kepala Tukang Kayu L03 Org/hr 0.0090 105,000.00
4 Mandor L01 Org/hr 0.0020 117,000.00
JUMLAH HARGA TENAGA
B BAHAN
1 Reng 2/3, 3/5 M061 m 0.0100 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.0200 20,000.00
3 Balok M063 m 0.0070 4,000,000.00
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Balok M063 m 0.0040 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.0400 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 0.4500 20,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Reng 2/3, 3/5 M061 m 0.0320 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.3200 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 0.2250 20,000.00
4 Balok M062 m 0.1200 4,000,000.00
5 Multiplek 9 mm M217 lbr 0.2800 145,000.00
6 Papan (3x30) cm M089 m 0.3200 4,000,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Reng 2/3, 3/5 M061 m 0.3200 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 3.2000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 2.2500 20,000.00
4 Balok M062 m 0.1200 4,000,000.00
5 Multiplek 9 mm M217 lbr 2.8000 145,000.00
6 Papan (3x30) cm M089 m 0.3200 4,000,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Reng 2/3, 3/5 M061 m 0.3200 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 3.2000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 2.2500 20,000.00
4 Balok M062 m 0.1400 4,000,000.00
5 Multiplek 9 mm M217 lbr 2.8000 145,000.00
6 Papan (3x30) cm M089 m 0.6000 4,000,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Reng 2/3, 3/5 M061 m 0.3200 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 3.2000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 2.2500 20,000.00
4 Balok M062 m 0.1400 4,000,000.00
5 Multiplek 9 mm M217 lbr 2.8000 145,000.00
6 Papan (3x30) cm M089 m 0.6000 4,000,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Reng 2/3, 3/5 M061 m 0.3200 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 3.2000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 2.2500 20,000.00
4 Balok M062 m 0.1400 4,000,000.00
5 Multiplek 9 mm M217 lbr 2.8000 145,000.00
6 Papan (3x30) cm M089 m 0.6000 4,000,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Reng 2/3, 3/5 M061 m 0.1500 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 1.5000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 1.5000 20,000.00
4 Balok M062 m
5 Multiplek 9 mm M217 lbr 2.5000 145,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Reng 2/3, 3/5 M061 m 0.1500 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 1.5000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 1.5000 20,000.00
4 Balok M062 m
5 Multiplek 9 mm M217 lbr 2.5000 145,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Reng 2/3, 3/5 M061 m 0.1500 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 1.5000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 1.5000 20,000.00
4 Balok M062 m
5 Multiplek 9 mm M217 lbr 2.5000 145,000.00
6 Papan (3x30) cm M089 m 14.0000 4,000,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
C PERALATAN
b Bekisting
1 Balok M063 m 0.0040 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 0.0400 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 0.4500 20,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Balok M063 m3 0.1080 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 2.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 3.0000 20,000.00
Bekisting 2x Pakai
JUMLAH HARGA BAHAN
C PERALATAN
JUMLAH HARGA PERALATAN
b Bekisting
1 Balok M063 m3 0.1080 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 2.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 3.0000 20,000.00
Bekisting
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Balok M063 m3 0.1080 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 2.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 3.0000 20,000.00
Bekisting
JUMLAH HARGA BAHAN
C PERALATAN
b Bekisting
1 Balok M063 m3 0.1080 7,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 2.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 3.0000 20,000.00
Bekisting
JUMLAH HARGA BAHAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
JUMLAH HARGA PERALATAN
C PERALATAN
b Bekisting
1 Papan (2x20) cm kayu begisting M063 m3 0.2700 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 2.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 3.0000 20,000.00
b Bekisting
1 Papan (2x20) cm kayu begisting M063 m3 0.2700 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 2.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 3.0000 20,000.00
b Bekisting
1 Papan (2x20) cm kayu begisting M063 m3 0.2700 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 2.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 3.0000 20,000.00
b Bekisting
1 Papan (2x20) cm M063 m3 0.2700 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 2.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 3.0000 20,000.00
b Bekisting
1 Usuk : 5/7 M061 m3 0.4000 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 4.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 4.5000 20,000.00
4 Balok M062 m3 0.1500 4,000,000.00
5 Multiplek 9 mm M217 lbr 3.5000 145,000.00
6 Papan (3x30) cm M089 btg 20.0000 15,000.00
b Bekisting
1 Usuk : 5/7 M061 m3 0.4000 4,000,000.00
2 Paku Kayu Segala Ukuran M140 kg 4.0000 20,000.00
3 Kawat Beton/Bendrat RRT M135 kg 4.5000 20,000.00
4 Balok M062 m3 0.1500 4,000,000.00
5 Multiplek 9 mm M217 lbr 3.5000 145,000.00
6 Papan (3x30) cm M089 btg 20.0000 15,000.00
Bekisting 2 kali pakai
JUMLAH HARGA BAHAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
C PERALATAN
JUMLAH
HARGA
(Rp.)
7,700.00
9,000.00
945.00
234.00
17,879.00
40,000.00
400.00
28,000.00
68,400.00
86,279.00
69,300.00
-
-
5,265.00
74,565.00
74,565.00
23,100.00
-
-
1,755.00
24,855.00
24,855.00
23,100.00
-
-
1,170.00
24,270.00
318,000.00
318,000.00
342,270.00
23,100.00
-
-
1,170.00
24,270.00
66,250.00
66,250.00
90,520.00
23,100.00
-
-
1,170.00
-
24,270.00
13,250.00
13,250.00
37,520.00
513,359.00
-
-
3,861.00
517,220.00
517,220.00
84,700.00
-
-
5,850.00
90,550.00
-
90,550.00
15,400.00
-
-
1,170.00
16,570.00
16,570.00
15,400.00
6,000.00
630.00
1,170.00
23,200.00
23,200.00
25,410.00
-
-
1,170.00
26,580.00
2,380.95
2,380.95
28,960.95
7,700.00
-
-
5,850.00
13,550.00
13,550.00
60,060.00
39,000.00
4,095.00
4,563.00
107,718.00
420,000.00
79,500.00
499,500.00
607,218.00
115,500.00
60,000.00
6,300.00
8,775.00
190,575.00
385,000.00
193,050.00
168,300.00
746,350.00
936,925.00
115,500.00
60,000.00
6,300.00
8,775.00
190,575.00
420,000.00
224,400.00
163,200.00
807,600.00
998,175.00
127,050.00
2,500.00
26,250.00
9,360.00
165,160.00
359,700.00
182,000.00
317,550.00
859,250.00
1,024,410.00
408,100.00
27,500.00
130,000.00
105,000.00
27,825.00
31,005.00
729,430.00
407,550.00
182,000.00
1,967,466.67
1,039,266.67
300,300.00
3,896,583.33
16,000.00
800.00
9,000.00
25,800.00
3,922,383.33
4,651,813.33
488,950.00
27,500.00
165,000.00
140,000.00
34,965.00
37,206.00
893,621.00
532,950.00
182,000.00
3,522,400.00
831,413.33
300,300.00
5,369,063.33
224,000.00
6,400.00
4,500.00
480,000.00
40,600.00
1,280,000.00
2,035,500.00
7,404,563.33
8,298,184.33
488,950.00
27,500.00
165,000.00
140,000.00
34,965.00
37,206.00
893,621.00
633,600.00
189,000.00
3,430,000.00
1,978,485.19
311,850.00
6,542,935.19
2,240,000.00
64,000.00
45,000.00
480,000.00
406,000.00
1,280,000.00
4,515,000.00
11,057,935.19
11,951,556.19
431,200.00
27,500.00
156,000.00
140,000.00
33,915.00
33,111.00
821,726.00
554,400.00
189,000.00
2,975,739.23
311,850.00
4,030,989.23
2,240,000.00
64,000.00
45,000.00
560,000.00
406,000.00
2,400,000.00
5,715,000.00
9,745,989.23
10,567,715.23
431,200.00
27,500.00
156,000.00
140,000.00
33,915.00
33,111.00
821,726.00
554,400.00
189,000.00
3,494,952.33
311,850.00
4,550,202.33
2,240,000.00
64,000.00
45,000.00
560,000.00
406,000.00
2,400,000.00
5,715,000.00
10,265,202.33
11,086,928.33
431,200.00
27,500.00
156,000.00
140,000.00
33,915.00
33,111.00
821,726.00
554,400.00
189,000.00
3,124,284.36
311,850.00
4,179,534.36
2,240,000.00
64,000.00
45,000.00
560,000.00
406,000.00
2,400,000.00
5,715,000.00
9,894,534.36
10,716,260.36
431,200.00
27,500.00
156,000.00
140,000.00
33,915.00
33,111.00
821,726.00
532,950.00
182,000.00
1,980,670.00
300,300.00
2,995,920.00
1,050,000.00
30,000.00
30,000.00
-
362,500.00
1,472,500.00
4,468,420.00
5,290,146.00
431,200.00
27,500.00
156,000.00
140,000.00
33,915.00
33,111.00
821,726.00
532,950.00
182,000.00
1,644,920.00
300,300.00
2,660,170.00
1,050,000.00
30,000.00
30,000.00
-
362,500.00
1,472,500.00
4,132,670.00
4,954,396.00
431,200.00
27,500.00
156,000.00
140,000.00
33,915.00
33,111.00
821,726.00
532,950.00
182,000.00
3,321,120.00
300,300.00
4,336,370.00
1,050,000.00
30,000.00
30,000.00
-
362,500.00
56,000,000.00
57,472,500.00
60,336,370.00
61,158,096.00
1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 5 Ps
24,640.00
10,000.00
1,050.00
1,755.00
37,445.00
45,000.00
15,972.00
13,500.00
74,472.00
111,917.00
1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 4 Ps
24,640.00
10,000.00
1,050.00
1,755.00
37,445.00
45,000.00
18,975.00
12,900.00
76,875.00
-
114,320.00
46,200.00
20,000.00
2,100.00
3,510.00
71,810.00
126,000.00
36,630.00
30,600.00
193,230.00
265,040.00
1 m2 Pasang dinding kalsiboar+gipsum board t = mm + rangka metalstud
50,050.00
65,000.00
6,825.00
3,744.00
125,619.00
45,000.00
48,000.00
12,000.00
386,666.67
491,666.67
617,285.67
1 m2 Pasang finishing HPL dinding partisi multipleks
15,400.00
30,000.00
3,150.00
1,170.00
49,720.00
65,000.00
4,000.00
69,000.00
118,720.00
1m2 Pasang Finising dinding bata multiplek t=6mm finishing HPL
15,400.00
30,000.00
3,150.00
1,170.00
49,720.00
65,000.00
2,000.00
109,440.00
176,440.00
226,160.00
47,740.00
35,000.00
3,675.00
3,510.00
89,925.00
173,250.00
19,387.50
10,500.00
203,137.50
293,062.50
15,400.00
15,000.00
1,575.00
1,170.00
33,145.00
7,128.00
6,600.00
13,728.00
46,873.00
20,020.00
20,000.00
2,100.00
1,521.00
43,641.00
11,665.50
6,300.00
17,965.50
61,606.50
11,550.00
10,000.00
1,050.00
936.00
23,536.00
5,362.50
5,362.50
-
28,898.50
-
12,000.00
-
936.00
12,936.00
4,785.00
6,300.00
11,085.00
24,021.00
15,400.00
30,000.00
3,150.00
1,170.00
49,720.00
159,500.00
6,000.00
165,500.00
10,000.00
10,000.00
225,220.00
7,700.00
5,000.00
525.00
585.00
13,810.00
29,120.00
6,000.00
35,120.00
48,930.00
3,850.00
5,000.00
525.00
351.00
9,726.00
16,500.00
1,000.00
17,500.00
-
27,226.00
1 m2 Pasang lantai keramik polish ukuran 60 x 60 cm
23,870.00
17,500.00
3,675.00
3,510.00
48,555.00
110,000.00
18,777.00
12,600.00
5,250.00
146,627.00
195,182.00
1 m2 Pasang lantai keramik Roman ukuran 60 x 60 cm
23,870.00
17,500.00
3,675.00
3,510.00
48,555.00
110,000.00
18,777.00
12,600.00
5,250.00
146,627.00
195,182.00
1 m2 Pasang lantai keramik anpolish ukuran 40 x 40 cm
23,870.00
17,500.00
3,675.00
3,510.00
48,555.00
68,500.00
18,777.00
12,600.00
5,250.00
105,127.00
153,682.00
1 m2 Pasang keramik ukuran 40 x 40 cm sekualitas Roman
23,870.00
17,500.00
3,675.00
3,510.00
48,555.00
68,500.00
18,777.00
12,600.00
5,250.00
105,127.00
153,682.00
23,100.00
22,500.00
4,725.00
3,510.00
53,835.00
75,000.00
15,345.00
5,400.00
5,250.00
100,995.00
154,830.00
69,300.00
45,000.00
4,725.00
5,265.00
124,290.00
112,500.00
15,345.00
5,400.00
5,250.00
138,495.00
262,785.00
23,870.00
17,500.00
3,675.00
3,510.00
48,555.00
60,000.00
18,777.00
12,600.00
5,250.00
96,627.00
145,182.00
-
12,500.00
-
1,521.00
14,021.00
75,000.00
16,500.00
-
-
91,500.00
105,521.00
770.00
10,750.00
661.50
292.50
12,474.00
3,000.00
3,500.00
7,800.00
14,300.00
26,774.00
-
6,000.00
1,680.00
292.50
7,972.50
49,500.00
12,000.00
61,500.00
69,472.50
1 m2 Pengecatan dinding exterior sekualitas Dulux Watershield
770.00
10,750.00
661.50
292.50
12,474.00
3,000.00
3,500.00
32,500.00
39,000.00
51,474.00
5,390.00
10,500.00
420.00
292.50
16,602.50
14,000.00
10,500.00
12,750.00
26,250.00
63,500.00
80,102.50
1,540.00
6,300.00
661.50
292.50
8,794.00
32,400.00
32,400.00
41,194.00
254,100.00
110,000.00
105.00
18,720.00
382,925.00
1,800,000.00
125,000.00
1,000.00
1,926,000.00
2,308,925.00
254,100.00
110,000.00
105.00
18,720.00
382,925.00
850,000.00
125,000.00
600.00
975,600.00
1,358,525.00
770.00
10,000.00
1,050.00
585.00
12,405.00
125,000.00
112.50
125,112.50
137,517.50
770.00
10,000.00
1,050.00
585.00
12,405.00
35,000.00
35,000.00
47,405.00
1bh Pasang Wastafel Komplit sekualitas TOTO, Am. Standart
92,400.00
145,000.00
15,750.00
11,700.00
264,850.00
1,250,000.00
600.00
125,000.00
9,900.00
3,000.00
1,388,500.00
1,653,350.00
770.00
10,000.00
1,050.00
585.00
12,405.00
65,000.00
65,000.00
77,405.00
770.00
10,000.00
1,050.00
585.00
12,405.00
150,000.00
112.50
150,112.50
162,517.50
1,155.00
15,000.00
1,575.00
87.75
17,817.75
715,000.00
715,000.00
732,817.75
1 m' Pasang Kusen Alluminium Coklat 4" sekualitas INDAL
26,950.00
35,000.00
5,512.50
304.20
67,766.70
203,500.00
1,500.00
205,000.00
272,766.70
1 m' Pasang daun jendela Alluminium Coklat sekualitas INDAL
50,050.00
65,000.00
6,825.00
3,744.00
125,619.00
203,500.00
2,500.00
206,000.00
331,619.00
1,155.00
15,000.00
1,575.00
87.75
17,817.75
137,500.00
137,500.00
155,317.75
1,155.00
15,000.00
1,575.00
87.75
17,817.75
50,000.00
50,000.00
67,817.75
1,155.00
15,000.00
1,575.00
87.75
17,817.75
15,000.00
15,000.00
32,817.75
1,540.00
20,000.00
2,100.00
117.00
23,757.00
175,000.00
175,000.00
198,757.00
770.00
10,000.00
1,050.00
58.50
11,878.50
12,000.00
12,000.00
-
23,878.50
770.00
10,000.00
1,050.00
58.50
11,878.50
40,000.00
40,000.00
51,878.50
770.00
10,000.00
1,050.00
58.50
11,878.50
40,000.00
40,000.00
51,878.50
77,000.00
250,000.00
26,250.00
5,850.00
359,100.00
800,000.00
6,000.00
806,000.00
1,165,100.00
25,025.00
13,330.00
1,575.00
2,340.00
42,270.00
42,248.25
45,000.00
47,250.00
134,498.25
176,768.25
513,359.00
-
-
38,961.00
552,320.00
-
552,320.00
513,359.00
-
-
3,861.00
517,220.00
517,220.00
15,400.00
-
-
1,170.00
16,570.00
16,570.00
84,700.00
-
-
5,850.00
90,550.00
90,550.00
15,400.00
6,000.00
630.00
1,170.00
23,200.00
23,200.00
1,540.00
3,000.00
-
-
4,540.00
22,000.00
770.00
5,500.00
28,270.00
32,810.00
1,540.00
3,000.00
-
-
4,540.00
22,000.00
770.00
5,500.00
28,270.00
32,810.00
1,540.00
3,000.00
-
-
4,540.00
22,000.00
770.00
5,500.00
28,270.00
32,810.00
1,540.00
3,000.00
-
-
4,540.00
24,200.00
770.00
5,500.00
30,470.00
35,010.00
1,540.00
3,000.00
-
-
4,540.00
16,500.00
770.00
5,500.00
22,770.00
27,310.00
1,540.00
3,000.00
-
-
4,540.00
17,600.00
770.00
5,500.00
23,870.00
28,410.00
1,540.00
3,000.00
-
-
-
4,540.00
16,500.00
770.00
5,500.00
22,770.00
27,310.00
1,540.00
3,000.00
-
-
4,540.00
15,400.00
770.00
5,500.00
21,670.00
26,210.00
1,540.00
3,000.00
-
-
4,540.00
15,400.00
770.00
5,500.00
21,670.00
26,210.00
1,540.00
3,000.00
-
-
4,540.00
30,000.00
770.00
5,500.00
5,000.00
41,270.00
45,810.00
3,080.00
20,000.00
2,100.00
468.00
25,648.00
28,000.00
33,750.00
120,000.00
5,000.00
186,750.00
212,398.00
15,400.00
10,000.00
1,050.00
1,170.00
27,620.00
275,000.00
600.00
275,600.00
303,220.00
m' Pasang bubung genteng sekualitas kanmuri 1 pc : 3 ps
30,800.00
20,000.00
2,100.00
234.00
53,134.00
87,500.00
13,200.00
9,600.00
110,300.00
163,434.00
408,100.00
27,500.00
130,000.00
105,000.00
27,825.00
31,005.00
729,430.00
633,600.00
172,900.00
2,657,812.50
546,840.00
296,296.00
4,307,448.50
16,000.00
800.00
9,000.00
25,800.00
4,333,248.50
5,062,678.50
300,300.00
35,000.00
105,000.00
25,725.00
19,305.00
485,330.00
2,175,986.84
45,000.00
633,600.00
189,000.00
311,850.00
3,355,436.84
3,840,766.84
11,550.00
-
-
292.50
11,842.50
1,000.00
1,000.00
12,842.50
373,450.00
35,000.00
156,000.00
140,000.00
34,755.00
19,890.00
759,095.00
532,950.00
182,000.00
1,952,035.56
1,072,360.18
300,300.00
4,039,645.73
432,000.00
40,000.00
60,000.00
532,000.00
4,571,645.73
-
5,330,740.73
373,450.00
35,000.00
156,000.00
140,000.00
34,755.00
19,890.00
759,095.00
532,950.00
182,000.00
1,464,026.67
958,937.47
300,300.00
3,438,214.13
432,000.00
40,000.00
60,000.00
532,000.00
3,970,214.13
4,729,309.13
373,450.00
35,000.00
156,000.00
140,000.00
34,755.00
19,890.00
759,095.00
532,950.00
182,000.00
1,297,660.00
626,402.70
300,300.00
2,939,312.70
756,000.00
40,000.00
60,000.00
856,000.00
3,795,312.70
4,554,407.70
373,450.00
35,000.00
156,000.00
140,000.00
34,755.00
19,890.00
759,095.00
532,950.00
182,000.00
2,764,483.33
759,407.00
300,300.00
4,539,140.33
756,000.00
40,000.00
60,000.00
856,000.00
5,395,140.33
6,154,235.33
7,700.00
10,000.00
1,050.00
58.50
18,808.50
18,700.00
400.00
18,000.00
37,100.00
55,908.50
109,340.00
47,300.00
4,935.00
8,307.00
169,882.00
101,250.00
127,050.00
39,000.00
7,300.00
44,200.00
31,500.00
350,300.00
520,182.00
29,260.00
19,000.00
1,995.00
2,223.00
52,478.00
77,000.00
111,375.00
8,497.50
9,150.00
9,142.50
215,165.00
267,643.00
38,500.00
25,000.00
2,625.00
2,925.00
69,050.00
112,500.00
10,500.00
123,000.00
192,050.00
12,833.33
8,333.33
875.00
975.00
23,016.67
30,000.00
10,500.00
40,500.00
-
63,516.67
3,850.00
5,000.00
525.00
351.00
9,726.00
22,000.00
1,000.00
23,000.00
32,726.00
308,000.00
200,000.00
105,000.00
35,100.00
648,100.00
4,800,000.00
25,000.00
20,000.00
4,845,000.00
5,493,100.00
300,300.00
35,000.00
104,000.00
105,000.00
25,725.00
19,305.00
589,330.00
2,502,020.90
1,201,451.42
45,000.00
805,200.00
174,500.00
298,588.89
1,080,000.00
40,000.00
60,000.00
6,206,761.21
-
6,796,091.21
300,300.00
35,000.00
104,000.00
105,000.00
25,725.00
19,305.00
589,330.00
2,857,298.03
759,741.34
45,000.00
805,200.00
174,500.00
298,588.89
-
-
1,080,000.00
40,000.00
60,000.00
6,120,328.26
6,709,658.26
300,300.00
35,000.00
104,000.00
105,000.00
25,725.00
19,305.00
589,330.00
2,322,818.23
580,533.25
45,000.00
805,200.00
174,500.00
298,588.89
1,080,000.00
40,000.00
60,000.00
5,406,640.37
5,995,970.37
300,300.00
35,000.00
104,000.00
105,000.00
25,725.00
19,305.00
589,330.00
1,014,132.00
676,088.00
45,000.00
805,200.00
174,500.00
298,588.89
3,013,508.89
3,602,838.89
127,050.00
25,000.00
2,625.00
9,360.00
164,035.00
325,050.00
164,500.00
361,900.00
851,450.00
1,015,485.00
373,450.00
35,000.00
156,000.00
140,000.00
34,755.00
19,890.00
759,095.00
612,150.00
174,500.00
1,286,250.00
725,802.00
298,588.89
3,097,290.89
1,080,000.00
40,000.00
60,000.00
1,180,000.00
4,277,290.89
5,036,385.89
542,850.00
27,500.00
165,000.00
210,000.00
42,315.00
41,301.00
1,028,966.00
612,150.00
174,500.00
1,225,000.00
580,650.00
298,588.89
2,890,888.89
1,600,000.00
80,000.00
90,000.00
600,000.00
507,500.00
300,000.00
3,177,500.00
6,068,388.89
7,097,354.89
542,850.00
27,500.00
165,000.00
210,000.00
42,315.00
41,301.00
1,028,966.00
532,950.00
182,000.00
1,750,933.80
688,178.40
300,300.00
3,454,362.20
1,600,000.00
80,000.00
90,000.00
600,000.00
507,500.00
300,000.00
3,177,500.00
6,631,862.20
7,660,828.20
19,250.00
25,000.00
2,625.00
2,925.00
49,800.00
310,000.00
190,000.00
16,000.00
6,000.00
15,000.00
140,000.00
677,000.00
726,800.00
19,250.00
25,000.00
2,625.00
2,925.00
49,800.00
2,000.00
304,000.00
16,000.00
6,000.00
6,500.00
334,500.00
384,300.00
38,500.00
5,000.00
5,250.00
5,850.00
54,600.00
90,000.00
40,000.00
2,000.00
7,150.00
6,000.00
145,150.00
-
199,750.00
38,500.00
5,000.00
5,250.00
5,850.00
54,600.00
150,000.00
45,000.00
2,000.00
7,150.00
9,000.00
213,150.00
267,750.00
38,500.00
5,000.00
5,250.00
5,850.00
54,600.00
150,000.00
45,000.00
2,000.00
7,150.00
9,000.00
-
213,150.00
267,750.00
19,250.00
25,000.00
2,625.00
2,925.00
49,800.00
90,000.00
240,000.00
16,000.00
6,500.00
6,000.00
358,500.00
408,300.00
2,541.00
3,300.00
630.00
234.00
6,705.00
45,000.00
10,000.00
55,000.00
61,705.00
7,700.00
10,000.00
1,050.00
585.00
19,335.00
19,335.00
1,540.00
21,500.00
661.50
292.50
23,994.00
24,000.00
24,000.00
47,994.00
1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
24,640.00
10,000.00
1,050.00
1,755.00
37,445.00
63,000.00
23,710.50
12,000.00
98,710.50
136,155.50
50,050.00
20,000.00
2,100.00
3,510.00
75,660.00
162,000.00
70,000.00
232,000.00
307,660.00
12,320.00
5,000.00
1,050.00
877.50
19,247.50
18,000.00
10,428.00
14,700.00
43,128.00
62,375.50
1,540.00
20,000.00
2,100.00
1,170.00
24,810.00
7,000.00
19,500.00
26,500.00
200.00
200.00
51,510.00
1 m2 Pasangan bata merah tebal 1/2 bata, 1 Pc : 3 Ps
24,640.00
10,000.00
1,050.00
1,755.00
37,445.00
63,000.00
23,710.50
12,000.00
98,710.50
136,155.50
1 m' Pasang lisplang ukuran (3 x 20) cm, kayu meranti
7,700.00
20,000.00
2,100.00
585.00
30,385.00
42,400.00
2,000.00
44,400.00
74,785.00
77,000.00
150,000.00
157,500.00
18,720.00
403,220.00
225,000.00
9,900.00
3,000.00
237,900.00
641,120.00
1 bh Pasang pintu KM/WC DBS pvc PVC + kusen AKBS
38,500.00
83,333.33
26,250.00
5,850.00
153,933.33
650,000.00
650,000.00
803,933.33
6,545.00
8,500.00
892.50
491.40
16,428.90
682,000.00
1,095,000.00
1,777,000.00
1,793,428.90
138,600.00
270,000.00
56,700.00
12,870.00
478,170.00
275,000.00
1,800.00
276,800.00
754,970.00
6,237.00
13,500.00
1,417.50
479.70
21,634.20
9,000.00
3,500.00
12,500.00
34,134.20
6,237.00
13,500.00
1,417.50
479.70
21,634.20
13,500.00
3,500.00
17,000.00
38,634.20
6,237.00
13,500.00
1,417.50
479.70
21,634.20
16,500.00
3,500.00
20,000.00
41,634.20
4,158.00
9,000.00
945.00
315.90
14,418.90
19,500.00
3,500.00
23,000.00
37,418.90
4,158.00
9,000.00
945.00
315.90
14,418.90
16,500.00
3,500.00
20,000.00
34,418.90
4,158.00
9,000.00
945.00
315.90
14,418.90
94,500.00
3,500.00
98,000.00
112,418.90
184,800.00
720,000.00
75,600.00
14,040.00
994,440.00
7,700,000.00
225,000.00
60,000.00
7,985,000.00
-
8,979,440.00
7,700.00
10,000.00
1,050.00
585.00
19,335.00
56,000.00
5,000.00
50,400.00
111,400.00
130,735.00
308,000.00
1,200,000.00
126,000.00
23,400.00
1,657,400.00
7,700,000.00
225,000.00
112,000.00
8,037,000.00
9,694,400.00
1 m2 Pasang keramik ukuran 20 x 20 cm sekualitas Asia Tile
53,900.00
35,000.00
3,675.00
4,095.00
96,670.00
7,700.00
17,160.00
13,500.00
5,670.00
44,030.00
140,700.00
33,366.67
43,333.33
4,550.00
2,496.00
83,746.00
18,000.00
18,000.00
101,746.00
DAFTAR HARGA BAHAN BANGUNAN
TAHUN ANGGARAN 2016
HARGA KET.
265,000.00
300,000.00
350,000.00
265,000.00
350,000.00
365,000.00
385,000.00
900.00
2,500.00 per meter isi 45
12,000.00 per meter isi 33
1,650.00
3,500.00
55,000.00
65,000.00
70,000.00
4,000,000.00 11500
4,000,000.00
4,000,000.00
9,500,000.00
10,000,000.00
10,000,000.00
30,000.00
7,000,000.00
7,000,000.00
7,000,000.00
7,500,000.00
7,500,000.00
7,500,000.00
30,000.00
15,000.00
185,000.00
20,000.00
20,000.00
20,000.00
20,000.00
HARGA KET.
17,000.00
17,000.00
17,000.00
17,000.00
17,000.00
20,000.00
95,000.00
11,000.00
15,000.00
25,000.00
45,000.00
15,000.00
80,000.00
75,000.00
HARGA KET.
95,000.00 90000/lbr
145,000.00 105000/lbr
175,000.00 165000/lbr
225,000.00
125,000.00
275,000.00
850,000.00
1,250,000.00
65,000.00
35,000.00
315,000.00
50,000.00
40,000.00
40,000.00
15,000.00
12,000.00
175,000.00
125,000.00
650,000.00
7,000.00
9,000.00
6,000.00
30,000.00
35,000.00
70,000.00
70,000.00
125,000.00
90,000.00
90,000.00
75,000.00
20,000.00
75,000.00
20,000.00
75,000.00
20,000.00
35,000.00
35,000.00
4,500.00
250,000.00
145,000.00
110,000.00
75,000.00
110,000.00
HARGA KET.
1,800,000.00
150,000.00
14,000.00
15,000.00
14,000.00
14,000.00
30,000.00
68,500.00
14,000.00
62,500.00
60,000.00 harga TK. Aneka Batu Hias
165,000.00
15,000.00
125,000.00
45,000.00
20,000.00
20,000.00
20,000.00
22,000.00
145,000.00
65,000.00
15,000.00
16,000.00
15,000.00
56,000.00
45,000.00
20,000.00
15,000.00
3,000.00
4,000.00
2,000.00
11,000.00
3,500.00
19,000.00
3,500.00
155,000.00
19,000.00
140,000.00
90,000.00
140,000.00
40,000.00
3,500.00
45,000.00
45,000.00
135,000.00
6,500.00
3,000.00
40,000.00
65,000.00
90,000.00
45,000.00
30,000.00
35,000.00
HARGA KET.
55,000.00
55,000.00
65,000.00
155,000.00
75,000.00
45,000.00
650,000.00
DAFTAR UPAH
TAHUN ANGGARAN 2016
Nilai : 380,344,000
Hasil: Tiga Ratus Delapan Puluh Juta Tiga Ratus Em
Empat
Puluh 0 Juta 3 Ratus 4 Puluh 4 Ribu 0
Puluh 0 Juta Tiga Ratus Empat Puluh Empat Ribu 0
Puluh Juta Tiga Ratus Empat Puluh Empat Ribu
us Delapan Puluh Juta Tiga Ratus Empat Puluh Empat Ribu Rupiah
0
Ratus 0 Puluh 0
0 0 0 0 Rupiah
Rupiah