DATA KUALITAS BATUBARA PLTU BUKIT ASAM

PEMASOK PT . PLN BATUBARA (Persero)


TAHUN 2017
JUMLAH KADAR AIR TOTAL ASH VOLATILE KADAR TOTAL

TANGGAL PENGAMBILAN PENGIRIMAN KERING MOISTURE CONTENT MATER KARBON SULFUR


NO. LOT HGI
CONTOH
( TON ) UDARA % WT % WT % WT PADAT %WT % WT
% WT AR AR AR AR AR

0,5 55
240.000 28,0 5,0
KONTRAK ---> N/A 40 37 (Tolak (Tolak <41
10 % (Tolak>32) (Tolak>8)
>1,2) atau >65)
Standar

DESAIN BOILER N/A N/A 23.6 7.80 30.3 38.3 0.53 61.80

LOT 445 21 - 26 januari 2017 2,089.650 10.82 30.57 3.25 32.61 33.56 0.17 63.00

LOT 446 26 - 31 januari 2017 1,999.580 9.62 30.30 5.38 31.83 32.49 0.21 64.00

LOT 447 03 - 08 Februari 2017 2,011.010 10.81 29.73 4.58 31.61 34.08 0.25 63.00

LOT 448 08 - 20 Februari 2017 2,069.700 10.39 30.85 3.75 31.81 33.59 0.12 61.00

LOT 449 20 - 24 Februari 2017 981,960 10.88 31.54 3.21 32.66 32.59 0.38 64.00

LOT 450 05 - 20 Maret 2017 2,019.170 12.60 30.90 3.37 32.24 33.49 0.25 64.00

LOT 451 20 - 30 Maret 2017 2,024.560 11.71 31.07 4.11 31.72 33.10 0.18 62.00

LOT 452 04 - 18 April 2017 2,010.220 15.46 31.20 2.92 32.34 33.54 0.18 62.00

LOT 453 18 - 30 April 2017 1,728.940 13.31 30.32 4.27 33.16 32.25 0.32 61.00

LOT 454 02 - 24 Mei 2017 2,027.740 12.87 29.37 6.71 32.43 31.48 0.37 60.00

LOT 455 24 - 31 Mei 2017 969.800 15.76 31.04 3.94 32.76 32.26 0.21 63.00

LOT 456 02 - 14 Juni 2017 1,225.020 10.78 28.21 4.05 34.08 33.66 0.14 58.00

JUMLAH 987,019 DATA STATISTIK


DATA KUALITAS BATUBARA PLTU BUKIT ASAM
PEMASOK PT . PLN BATUBARA (Persero)
TAHUN 2017
JUMLAH KADAR AIR TOTAL ASH VOLATILE KADAR TOTAL

TANGGAL PENGAMBILAN PENGIRIMAN KERING MOISTURE CONTENT MATER KARBON SULFUR


NO. LOT HGI
CONTOH
( TON ) UDARA % WT % WT % WT PADAT %WT % WT
% WT AR AR AR AR AR

0,5 55
240.000 28,0 5,0
KONTRAK ---> N/A 40 37 (Tolak (Tolak <41
10 % (Tolak>32) (Tolak>8)
>1,2) atau >65)
Standar

DESAIN BOILER N/A N/A 23.6 7.80 30.3 38.3 0.53 61.80

Rata-rata 12.08 30.43 4.13 32.44 33.01 0.23 62.08

Nilai Maksimum 15.76 31.54 6.71 34.08 34.08 0.38 64

Nilai Minimum 9.62 28.21 2.92 31.61 31.48 0.12 58

Mengetahui
Asman Coal & Ash Handling

M. HASAN
ATUBARA PLTU BUKIT ASAM
LN BATUBARA (Persero)
HUN 2017
ASH FUSION NK UKURAN BUTIRAN
TEMPERATURE
KCal/kg Lolos Lolos Lolos Lolos

Ayakan Ayakan Ayakan Ayakan


Deformation AR
70 mm 50 mm 32 mm 2,38 mm

4800
1150
(Tolak<46 N/A N/A N/A N/A
(Tolak <1110)
00)

4902 -
N/A 0% 0% 97 < 20%
5292

4,824 100 95 71 15

4,666 100 95 62 10

4,814 100 96 62 13

4,814 100 96 68 13

4,752 100 97 72 15

4,793 100 96 69 15

4,723 100.00 96.00 67.00 18.00

4,780 100.00 96.00 65.00 13.00

4,709 100.00 96.00 71.00 10.00

4,626 100.00 96.00 67.00 11.00

4,695 100.00 100.00 75.00 18.00

4,823 100.00 95.00 68.00 19.00

DATA STATISTIK
ATUBARA PLTU BUKIT ASAM
LN BATUBARA (Persero)
HUN 2017
ASH FUSION NK UKURAN BUTIRAN
TEMPERATURE
KCal/kg Lolos Lolos Lolos Lolos

Ayakan Ayakan Ayakan Ayakan


Deformation AR
70 mm 50 mm 32 mm 2,38 mm

4800
1150
(Tolak<46 N/A N/A N/A N/A
(Tolak <1110)
00)

4902 -
N/A 0% 0% 97 < 20%
5292

N/A 4752 100.00 96.17 68.08 14.17

N/A 4824 100.00 100.00 75.00 19.00

N/A 4626 100.00 95.00 62.00 10.00

Tanjung Enim, 2017


Dibuat Oleh
Ass Pengelolaan Bahan Bakar

ZAINUDDIN
RENCANA DAN REALISASI
KEBUTUHAN BATUBARA PLTU BUKIT ASAM
PLN BB
NO BULAN RENCANA REALISASI
(Ton) (Ton)

1 JANUARI 4,000 4,089

2 FEBRUARI 5,000 5,063

3 MARET 4,000 4,044

4 APRIL 4,000 3,739

5 MEI 4,000 2,998

6 JUNI 4,000 1,225

7 JULI 4,000 -

8 AGUSTUS 2,000 -

9 SEPTEMBER 2,000 -

10 OKTOBER 4,000 -

11 NOPEMBER 4,000 -

12 DESEMBER 4,000 -

TOTAL 45,000 21,157

Rencana vs Realisasi Penerimaan Barubara Pemas


6,000 PT. PLN BATUBARA Tahun 2017
5,000

4,000

3,000

2,000

1,000
4,000

3,000

2,000

1,000

-
JANUARI FEBRUARI MARET APRIL MEI JUNI JULI AGUSTUS SEPT
RENCANA DAN REALISASI
HAN BATUBARA PLTU BUKIT ASAM TAHUN 2017

Presentasi
KETERANGAN Penerimaan

Unit 1 Mothballed
Unit 2 Gangguan Trus Wear Turbin
Unit 1 Mothballed
Unit 2 Proses Mothballed
Unit 3 Pecah Pipa LTS Boiler 01 - 07 Feb 2017
Unit 4 Pecah Pipa LTS Boiler 31 Jan - 06 Feb 2017
Unit 1 Mothballed
Unit 2 Proses Mothballed
Unit 1 Mothballed
Unit 2 Proses Mothballed
Unit 3 Pecah Pipa LTS Boiler 16 - 21 Apr 2017
Unit 1 Mothballed
Unit 2 Proses Mothballed
Unit 4 Pecah Pipa LTS Boiler 05 - 12 Mei 2017
Unit 1 Mothballed
Unit 2 Mothballed
Unit 1 Mothballed
47.02%
Unit 2 Mothballed
Unit 1 Mothballed
Unit 2 Mothballed
Unit 1 Mothballed
Unit 2 Mothballed
Unit 1 Mothballed
Unit 2 Mothballed
Unit 1 Mothballed
Unit 2 Mothballed
Unit 1 Mothballed
Unit 2 Mothballed

Prediksi 2017 PLN BB = 44.000 - 48.000 Ton

alisasi Penerimaan Barubara Pemasok


PLN BATUBARA Tahun 2017
APRIL MEI JUNI JULI AGUSTUS SEPTEMBER OKTOBER NOPEMBER DESEMBER
PT. PLN ( PERSERO )
PEMBANGKITAN DAN PENYALURAN SUMATERA BAGIAN SELATAN
SEKTOR BUKIT ASAM

EVALUASI PASOKAN BATUBARA PLN BB


KE PLTU BUKIT ASAM
BULAN JANUARI - JUNI 2017

KUALITAS BATUBARA
PARAMETER SATUAN Typical REALISASI
KONTRAK
RATA-RATA TERTINGGI TERENDAH
PROXIMATE ANALYSIS
Total Kadar Air % berat 29 Tolak>32 30.43 31.54 28.21
Kadar Abu % berat 5 Tolak>8 4.13 6.71 2.92
Volatile Matter % berat 40 40 32.44 34.08 31.61
Fixed Carbon % berat 37 37 33.01 34.08 31.48
Total Sulphur % berat 0.5 Tolak>1,2 0.23 0.38 0.12
Nilai Kalor Kkal/kg 4800 Tolak<4600 4,752 4,824 4,626
Lolos ayakan 32 mm % berat 97 68.08 75.00 62.00
Lolos ayakan 2,38 mm % berat <20 14.17 19.00 10.00

HGI 55 (Tolak <41 atau 62.08 64.00 58.00


- >65)

KESIMPULAN :

Dari data realisasi kualitas batubara diatas dapat disampaikan sbb :


1. Secara umum kualitas Batubara untuk PLN BB Bulan Januari s/d Juni 2017 baik dan telah memenuhi batasa

2. Realisasi pengiriman Batubara Bulan Januari s/d Juni 2017, PLN BB mampu menyediakan batubara denga
4.752 Kkal/kg, lebih rendah dari Typical kontrak (4.800 Kkal/kg).

3. Pasokan batubara dari Bulan Januari s/d Juni 2017 yaitu 21.157 MT atau 44,08 % dari rencana paso
48.000 MT.

4. PLN BB tidak dapat memenuhi permintaan pasokan Batubara dari PLN Bukit Asam Pada bulan April, Mei dan

5. PLN Batubara belum menyediakan Mobil Penyiram untuk jalan yang dilalui Dump Truk PLN BB sehingga dap
udara.

Mengetahui, Tanjung
ASMAN COAL & ASH HANDLING Plh Spv Peg

MUHAMMAD HASAN ZA
ASOKAN BATUBARA PLN BB
PLTU BUKIT ASAM
N JANUARI - JUNI 2017

ANGKA
PENYIMPANGAN
TERHADAP KONTRAK

Rata-rata TM masih diatas Typical

Rata-rata CV masih dibawah Typical

uari s/d Juni 2017 baik dan telah memenuhi batasan kontrak.

17, PLN BB mampu menyediakan batubara dengan nilai kalor rata-rata sebesar
kal/kg).

yaitu 21.157 MT atau 44,08 % dari rencana pasokan tahun 2017 yaitu sebesar

ara dari PLN Bukit Asam Pada bulan April, Mei dan Juni yaitu sebesar 4.000 MT.

jalan yang dilalui Dump Truk PLN BB sehingga dapat mengakibatkan pencemaran

Tanjung Enim, 03 Juli 2017


Plh Spv Pegelolaan Bahan Bakar

ZAINUDDIN