B : Breadth (m)
: Luas (m)
D : Depth (m)
: kedalaman
db : Ballast
: pemberat
AF : Area of projection of the front of ship above water line at full loaded condition
: Luas proyeksi bagian depan kapal diatas garis air pada kondisi penuh muatan
AFB : Area of projection of the front of ship above water line at ballast condition
: Luas proyeksi depan kapal diatas garis air pada kondisi pemberat
AS1F : Area of projection of the side of ship above water line at full loaded condition
: Luas proyeksi sisi kapal diatas garis air pada kondisi penuh muatan
AS1B : Area of projection of the side of ship above water line at ballast condition
: Luas proyeksi sisi kapal diatas garis air pada kondisi pemberat
AS2F : Area of ship side below the draft line at full loaded condition
AS2B : Area of ship side below the draft line at ballast condition