Anda di halaman 1dari 1

PT.

Sinar Mas Sentosa


Jl. Raya Sungai Hitam Ho, 99 Telp./Fax, 0736 - 23500 Bengkulu Tengah
KONTRAKTOR DAN RENTAL ALAT-ALAT BERAT

Bengkulu, 19 Januafi20l7

KepadaYth,
PT. TAIVIARA ENERGI ABADI
Di_
KEPAHIANG

Perihal: Penawaran SewaAlat Berd

Be rrsama densan ini kami dari P1'. Sinar Mas Sentosa sewa alat berat
No. Description QTY/Unit Remaks SewalJam Sewa
Bulanan
MOB ILIZATION & DEMOBILTZATION
I Mobilization 10^00 units 3.500.0001lnit 3.500.00011jnit
) Demobilization 10"00 units 3.500.0004jnit 3.500.000runit
TIEAVYEOUIPMENT
Dozer Shovel (DZ-AZ) Komatsu
- Regular (210 hrs/month) 1,00 u - months D 6s -PX 300.000 60.000.000
Overtime 0.00 u-months Th.2007 300.000
2. Excavator ( EX - 01 ) Sumitomo
- Regular (210 hrs/month) 1,00 u -months SH 2IO 225.W 40.0m.000
- Overtime 0-00 u -months Th.2016 200.m0
J. Excavator ( EX - 02 ) Sumitomo
- Regular (210 hrs/month) 1,00 u - months SH 210 225.000 40.000.000
- Overtime 0.00 u - months Th.2016 200.000
4. MotorGrader(MG-01 ) Komatsu
- Regular(2lOhrsimontr) 1,00 u -montrs GD4O5 300.m 60.000.000
- Overtinne 0.00 u -months Th.2010 250.m0
5. VibroRoller(VR-01 ) Volvo
-
Regular (210 hrVmonth) l,O0 u - months SD IIO 200.000 40.000.m0
-
Overtime 0.00 u-months Th.2013 175.000
6. Wheel Loader ( WL - 01 )
XGMA
-
Regular (210 hrs/month) 1,00 u * months
Th.2016
225.000 45.000.000
-
Overtime 0.00 u -months 200.000
7. Dump Truck ( DT - 01 )
Dyna 17.s00.0001
-
Regular (210 hrVmonth) 1,00 u - months Th.2016 Bulan
17.500.000
-
Overtime 0,00 u - months
8. Dump Truck ( DT - 02 )
-
Regular (210 hrVmonth) months
Dyna 17.500.000 /
1,00 u - Th.20r6
17.500.000
-
Overtime 0.00u-months Bulan
HEAVY EQUIPMENT (SUPPORT}
I FucoTruck(FT-01)
- Regular(2l0hrVmonth) 4,00 u- months 7.500.000 / Hari 100.000.000
- Overtime 0.00 u = months
2. Fuel Truck ( VT - 01 )
- Regular (210 hrs/month) 4,00 u-months 20.000.000
- Overtime 0,00 u-months
J. Rough Terrain Crane 25 Ton (
RT-01) 1,00 u -montls 7.500.000 / Hari 150.000.000
- Reeular(2l0hrslmonth)

Demikianlah penawaran harga ini kami ajukan, atas perhatian dan kerja samanya kami ucapkan
terima kasih.

NB : Harga Tersebut Belum Termasuk Solar dan Pajak - Pajak.

Anda mungkin juga menyukai