PROGRAM
KEGIATAN
PAKET
RUAS.
PROP/KAB
RENCANA ANGGARAN BIAYA
[REHABILTAS/PEMELIHARAAN JALAN DAN JENBATAN
PERECANAAN REHABIITASY/PEMBLIHARAAN JALAN
PERENCANAAN TFANI REHABILITAS/PEMELIHARAAN JALAN WILAYAHSS.
WONOMULYO-SUMBERE]O KECAMATAN FONCOKUSUMO
JAWA TIMUR/KABUPATEN MALANG
quavmry ‘am mx 650 m= 1000 af
15100) me 30) m= ASN
TRA] TEA
aT yewsraAan sar [maaan] ceroan | Hanca
ih i
7 aT ORT
123 [met pg | uw
12 lhc dn De i] im
See OAT
i a PAN AAT
ney 87 aco
610) fated sain
6.6.2 Lapis Fondasi atau Perata Penetrasi Macadam a BH
£6.35a)_|Lasion Lapis Ans (ACW) | 466000
Sea DRT KR aE
ERAT
1 bist. uw be
11 DIMI 6 PERKERASAN ASPAL te
rk t
rm mr
tal t
Dita, i
rs, zou
iba ik
over
‘retinDAFTAR
HARGA SEWA ALAT PER JAM KERJA
TRG
aan xr
7 Asc NG PLANT ear [20 | 6 Tam ——
2 [ASPHALT SHER ae | 72a] ——10-Ton zi 5
2p remacr emer fos [a0] eter
4 | euLLDoeR 100150 ot [750 /- —=
[ cowpresson wanesoocm—| ens | soa] 5900. —smm0| | — =
‘ConcRETE meRoS084t5 —| fos | 200| seo Lar : Ei
CRAKE 1015 TON or [i380] 15 Tor :
Dua TRUCK TON fe [1000] «To 3
DUMP TRUCK 10 TON. Es 1250 | 10 To = =
EXCAVATOR 800 10 [isa] 13 ei 3
FiaTeeD TRUCKS-an8 | ent ata] 10 un = |
‘GeneRaTOR set err [ie00| 135 WR = =
WoToR Grane sare — ers 50] Toso 60, = zi
TRACKLOADER 500K | eva | Too] a : :
Wieet toner 1161 | 16 | oo] 7a =
47 | TaNDEMROLER 8 eo] 6 ten = ——=|
16 TRE ROLLER 10 00s | Tor z
48 | WeRATORY ROWERS zo] 7 Ten 2
20 conGRETE VERATOR 35[ 5 — -
21 STONE CRUSHER eat [0 a
22] wareRPuwP roam ——[ er | 80 z i
2 | WATER TawcR smn