NO JENIS KEGIATAN
A SALURAN TERBUKA DENGAN BUIS BETON (BAGIAN 1 ) PANJANG = 160 M
I PEKERJAAN PENDAHULUAN
II PEKERJAAN TANAH DAN PASIR & PONDASI
III PEK. PAS. DINDING, PLESTERAN, LANTAI DAN BETON
JUMLAH A + B ........Rp.
PPN 10 % .........Rp.
TOTAL .........Rp.
DIBULATKAN
. ........Rp.
TERBILANG : DUA MILYARD DELAPAN RATUS ENAM PULUH JUTA RUPIAH
DIBUAT OLEH,
KONSULTAN PERENCANA
CV. ARKA DISAIN
BAMBANG SUTRISN
KEPALA CABANG
TOTAL HARGA
37,591,886.00
18,415,200.00
1,363,005,236.99
1,419,012,322.99
4,714,695.00
23,756,317.50
1,152,516,730.90
1,180,987,743.40
2,600,000,066.39
260,000,006.64
2,860,000,073.03
2,860,000,000.00
DIBUAT OLEH,
KONSULTAN PERENCANA
CV. ARKA DISAIN
BAMBANG SUTRISNO, ST
KEPALA CABANG
ENGINEERS ESTIMATE (EE)
PEKERJAAN : PEMBANGUNAN DRAINASE IFK ELELIM
LOKASI : ELELIM - KABUPATEN YALIMO
DISTRIK : DISTRIK ELELIM
TAHUN ANGGARAN : 2016
Harga Satuan
Jumlah Harga
(Rp.)
37,591,886.00
29,200,000.00 29,200,000.00
1,477,000.00 1,477,000.00
104,771.00 6,914,886.00
###
18,415,200.00
138,125.00 11,050,000.00
46,032.50 7,365,200.00
1,363,005,236.99
9,100,892.00 232,982,835.20
424,060.00 189,978,880.00
47,677.36 81,287,992.32
9,100,892.00 436,842,816.00
424,060.00 352,817,920.00
47,677.36 69,094,793.47
4,714,695.00
104,771.00 4,714,695.00
23,756,317.50
138,125.00 17,818,125.00
46,032.50 5,938,192.50
1,152,516,730.90
9,100,892.00 187,842,410.88
424,060.00 153,170,472.00
47,677.36 65,538,443.81
9,100,892.00 352,204,520.40
424,060.00 328,222,440.00
47,677.36 65,538,443.81
ANALISA HARGA SATUAN
PEKERJAAN : PEMBANGUNAN DRAINASE IFK ELELIM
LOKASI : ELELIM - KABUPATEN YALIMO
DISTRIK : DISTRIK ELELIM
TAHUN ANGGARAN : 2016
FATS
No. JENIS PEKERJAAN KOEFISIEN SATUAN
1 2 3 4
1 1 M' Pemasangan Bowplank
Papan Kayu 3/20 cm Kelas II 0.0050 M3
Kayu Kelas II Lokal - Balok 0.0100 M3
Paku Biasa 0.0200 Kg
Tukang 0.0500 O/H
Kepala Tukang 0.0100 O/H
Pekerja 0.0500 O/H
Mandor 0.0050 O/H
2 1 M³ Galian Pondasi Tanah Biasa
Pekerja 0.750 O/H
Mandor 0.025 O/H
3 1 M³ Urugan Kembali
Pekerja 0.250 O/H
Mandor 0.008 O/H
4 1 M³ Urugan Pasir Bawah Lantai dan Pondasi
Pasir Urug 1.200 M3
Pekerja 0.300 O/H
Mandor 0.010 O/H
5 1 M³ Pasangan Pondasi Mortar Batu Kali 1 : 4
Batu Kali 1.200 M3
Semen PC 3.260 Zak
Pasir Pasang 0.520 M3
Papan Kayu 3/20 cm Kelas II 0.025 M3
Paku Biasa 0.250 Kg
Tukang 0.600 O/H
Kepala Tukang 0.060 O/H
Pekerja 1.500 O/H
Mandor 0.075 O/H
6 1 M³ Beton tak Bertulang 1:2:3 (taman + diatas Sloof)
Pasir Pasang 0.870 M3
Kerikil Cor 0.520 M3
Semen PC 4.360 Zak
Tukang 0.250 O/H
Kepala Tukang 0.025 O/H
Pekerja 1.650 O/H
Mandor 0.080 O/H
7 1 M³ Beton Bertulang K.250
Pasir Pasang 0.577 M3
Kerikil Cor 0.490 M3
Semen PC 7.680 Zak
Tukang 0.250 O/H
Kepala Tukang 0.025 O/H
Pekerja 1.650 O/H
Mandor 0.080 O/H
8 1 M² Bekesting Pondasi
Cat Kayu 0.100 Kg
Kayu Kelas II Lokal - Balok 0.045 M3
Paku Biasa 0.300 Kg
Tukang 0.260 O/H
Kepala Tukang 0.026 O/H
Pekerja 0.520 O/H
Mandor 0.026 O/H
9 1 M² Bekesting Sloof
Cat Kayu 0.100 Kg
Kayu Kelas II Lokal - Balok 0.045 M3
Paku Biasa 0.300 Kg
Tukang 0.260 O/H
Kepala Tukang 0.026 O/H
Pekerja 0.520 O/H
Mandor 0.026 O/H
10 1 M² Bekesting Kolom
Kayu Kelas II Lokal - Balok 0.040 M3
Paku Biasa 0.400 Kg
Cat Kayu 0.200 Kg
Papan Kayu 3/20 cm Kelas II 0.015 M3
Tukang 0.330 O/H
Kepala Tukang 0.033 O/H
Pekerja 0.660 O/H
Mandor 0.033 O/H
11 1 M² Bekesting Balok
Kayu Kelas II Lokal - Balok 0.040 M3
Paku Biasa 0.400 Kg
Cat Kayu 0.200 Kg
Papan Kayu 3/20 cm Kelas II 0.018 M3
Tukang 0.330 O/H
Kepala Tukang 0.033 O/H
Pekerja 0.660 O/H
Mandor 0.033 O/H
12 1 M² Plesteran 1 : 4
Semen PC 0.104 Zak
Pasir Pasang 0.020 M3
Tukang 0.150 O/H
Kepala Tukang 0.015 O/H
Pekerja 0.200 O/H
Mandor 0.010 O/H
13 1 Kg Pembesian
1 Kg Pembesian 6 mm
1 Kg Pembesian 12 mm
1 Kg Pembesian 14 mm
1 Kg Pembesian 16 mm
Besi Beton 6 mm 1.000 Kg
Besi Beton 12 mm 1.000 Kg
Besi Beton 14 mm 1.000 Kg
Besi Beton 16 mm 1.000 Kg
Kawat baja/bendrat 0.015 Kg
Tukang 0.005 O/H
Kepala Tukang 0.001 O/H
Pekerja 0.005 O/H
Mandor 0.000 O/H
14 1 M' Pasang Instalasi Penerangan
Kabel NYM 3 x 2.5mm 1.000 M
Acessories Kabel 1.000 Ls
Pekerja 0.015 O/H
Tukang 0.150 O/H
Kepala Tukang 0.015 O/H
Mandor 0.002 O/H
15 1 Titi Pasang Lampu Taman
Lampu Taman 1.000 Set
Kabel NYM 3 x 2.5mm 8.000 M
Tukang 0.150 O/H
Kepala Tukang 0.015 O/H
Pekerja 0.015 O/H
Mandor 0.002 O/H
16 1 M² Acia / Plamur Tembok
Cat Tembok 0.008 Kg
Plamur Tembok 0.050 Zak
Tukang 0.006 O/H
Kepala Tukang 0.003 O/H
Pekerja 0.005 O/H
Mandor 0.005 O/H
17 1 M² Mengecat Tembok
Cat dasar 0.100 Kg
Cat Tembok (juton) 0.260 Kg
Tukang 0.063 O/H
Kepala Tukang 0.006 O/H
Pekerja 0.020 O/H
Mandor 0.003 O/H
HARGA JUMLAH
SATUAN HARGA
BAHAN & UPAH BAHAN & UPAH
5 6
104,771.00
5,400,000 27,000.00
5,400,000 54,000.00
57,300 1,146.00
200,000 10,000.00
250,000 2,500.00
175,000 8,750.00
275,000 1,375.00
138,125.00
175,000 131,250.00
275,000 6,875.00
46,032.50
175,000 43,750.00
275,000 2,282.50
1,375,250.00
1,100,000 1,320,000.00
175,000 52,500.00
275,000 2,750.00
5,668,594.00
1,100,000 1,320,000.00
984,400 3,209,144.00
1,100,000 572,000.00
5,400,000 135,000.00
57,300 14,325.00
200,000 120,000.00
250,000 15,000.00
175,000 262,500.00
275,000 20,625.00
6,187,984.00
1,100,000 957,000.00
1,100,000 572,000.00
984,400 4,291,984.00
200,000 50,000.00
250,000 6,250.00
175,000 288,750.00
275,000 22,000.00
9,100,892.00
1,100,000 634,700.00
1,100,000 539,000.00
984,400 7,560,192.00
200,000 50,000.00
250,000 6,250.00
175,000 288,750.00
275,000 22,000.00
424,060.00
72,200 7,220.00
5,400,000 243,000.00
57,300 17,190.00
200,000 52,000.00
250,000 6,500.00
175,000 91,000.00
275,000 7,150.00
424,060.00
72,200 7,220.00
5,400,000 243,000.00
57,300 17,190.00
200,000 52,000.00
250,000 6,500.00
175,000 91,000.00
275,000 7,150.00
533,185.00
5,400,000 216,000.00
57,300 22,920.00
72,200 14,440.00
5,400,000 81,000.00
200,000 66,000.00
250,000 8,250.00
175,000 115,500.00
275,000 9,075.00
549,385.00
5,400,000 216,000.00
57,300 22,920.00
72,200 14,440.00
5,400,000 97,200.00
200,000 66,000.00
250,000 8,250.00
175,000 115,500.00
275,000 9,075.00
195,877.60
984,400 102,377.60
1,100,000 22,000.00
200,000 30,000.00
250,000 3,750.00
175,000 35,000.00
275,000 2,750.00
208.25
26,196.50
47,677.36
47,677.36
44,628.02
23,255 23,254.50
44,735 44,735.36
44,735 44,735.36
41,686 41,686.02
57,300 859.50
200,000 1,000.00
250,000 125.00
175,000 875.00
275,000 82.50
62,827.50
21,040 21,040.00
5,000 5,000.00
175,000 2,625.00
200,000 30,000.00
250,000 3,750.00
275,000 412.50
855,107.50
650,000 650,000.00
21,040 168,320.00
200,000 30,000.00
250,000 3,750.00
175,000 2,625.00
275,000 412.50
61,157.54
29,068 232.54
1,131,300 56,565.00
200,000 1,260.00
250,000 850.00
175,000 875.00
275,000 1,375.00
61,634.30
29,068 2,906.80
155,250 40,365.00
200,000 12,600.00
250,000 1,575.00
175,000 3,500.00
275,000 687.50
1,825,925.00
65,000 720,000.00
29,730 594,600.00
175,000 208,750.00
200,000 250,500.00
250,000 33,400.00
275,000 18,675.00
29,730.00
396,300 6,580.00
35,000 7,500.00
93,000 3,400.00
175,000 5,000.00
200,000 3,000.00
250,000 400.00
275,000 450.00
20,000 3,400.00
DAFTAR HARGA BAHAN DAN UPAH
HARGA SATUAN
NO NAMA BAHAN
(Rp.)
A. HARGA BAHAN DASAR
1 Batu Kali 1,100,000.00 M3
2 Batu Tela 39,800.00 Bh
3 Pasir Pasang 1,100,000.00 M3
4 Kerikil Cor 1,100,000.00 M3
5 Pasir Urug 1,100,000.00 M3
6 Batu tela, 10 x 20 x 28 39,800.00 Bh
D. UPAH KERJA
1 Tukang ### O/H
2 Kepala tukang ### O/H
3 Pekerja ### O/H
4 Mandor ### O/H
I PEKERJAAN PENDAHULUAN JUMLAH
1 Pembuatan Gudang Bahan
2 Foto dokumentasi
3 Pemasangan Bowplank 66.00 Panjang Pondasi
Panjang Besi
jml besi yg dipakai d
berat jenis besi d=12
Jumlah Kolom
Berat besi total
berat besi behel total
Bekesting Pondasi 38.4
panjang pondasi
lebar bekesting
jml bekesting (ki-ka)
luas bekesting
9 Sloof 30/25 (k 250)
Beton Bertulang K.250 8.175 pjg galian pondasi
l.penampang sloff
Volume sloof
Pembesian 514.2882 pjg galian pondasi
jml besi yg dipakai dm
berat jenis besi d=12
Berat besi total
tinggi kolom
jarak antar besi behel
berat jenis besi d=6/
jml besi behel
pjg besi behel
jumlah kolom
berat besi behel total
Bekesting Kolom 9
tinggi kolom
lebar bekesting
jml bekesting (4 sisi=k
jml kolom
luas bekesting
14 Kolom 25/25 (k 250) Praktis
Beton Bertulang K.250 9.28125
t. Kolom
luas penampang kol
jumlah kolom
volume total kolom
Pembesian 1261.537
tinggi kolom
jml kolom
berat jenis besi d=12
jumlah besi
Berat besi total
tinggi kolom
jarak antar besi behel
berat jenis besi d=6/
jml besi behel
pjg 1 behel
jumlah kolom
berat besi behel total
4 Jendela 120 x 65 cm 9
VI PEKERJAAN SANITAIR/PLUMBING
1 Pasang Kloset Duduk Kia 2
Cat Lisplang 28 m2
0.325 m
1m
panjang galian ponda 109 m
Volume 35.425 m3
0.2 m
1m
panjang galian ponda 109 m
21.8 m3
1.8 0.90
luas penampang/trap 0.875 m rms trapesium 0.935
1.7 m 101.915
panjang galian ponda 109 m 2 sisi
162.1375 m3 203.83
215 m2
tebal/tinggi lantai 0.1 m
21.5 m3
KERJAKAN
Jml Pondasi 32
l.penampang pondasi 0.3
Volume Pondasai 9.6
Panjang Besi 2.44
jml besi yg dipakai d 7
berat jenis besi d=12 0.888
Jumlah Kolom 30
Berat besi total 455.0112
panjang pondasi 4
lebar bekesting 0.3
jml bekesting (ki-ka) 32
luas bekesting 38.4
4.75 m
luas penampang kol 0.09 m2
jumlah kolom 2 bh
volume kolom teras 0.855 m3
4.95 m
luas penampang kol 0.0625 m2
jumlah kolom 30 bh
volume total kolom 9.28125 m3
250 m2 cat:
jml gording dlm 10 me 11 buah krn luas atap 250 m2 maka diasumsikan 10m x 25m
L.penampang kayu 5 0.005 m2 mk dalam 10 meter terdapat 11 buah gording
1.375 m3
6 bh
L. Penampang kayu 5 0.005 m2
4m
Volume skoor 0.12 m3
250 m2 cat:
jml gording dlm 10 me 21 buah krn luas atap 250 m2 maka diasumsikan 10m x 25m
L.penampang kayu 5 0.0025 m2 mk dalam 10 meter terdapat 21 buah kaso
1.3125 m3
250 m2 cat:
jml gording dlm 10 me 28 buah krn luas atap 250 m2 maka diasumsikan 10m x 25m
L.penampang kayu 5 0.0012 m2 mk dalam 10 meter terdapat 11 buah gording
0.83 m3
215 m2
70 m
panjang dinding 101.5 m
total pnjg les 273 m
panjang rabat 70 m
lebar lisplank 0.4 m cat: papan 20 cm dua dan di tumpuk mjd 30 cm
luas lisplank 28 m2
keliling rabat 58 m
horisontal titik meter
61.27 21.44 80 26 3 78 m
273 m
0.04 m
luas cat les plafond 10.92 m2
#REF!
000000000000
#REF!
#REF!
#REF!
#REF!
000000000000
#REF!
#REF!
#REF!
Err:509
000000000000
Err:509
Err:509
Err:509
DELAPAN
SEMBILAN
DELAPAN
SEMBILAN
DELAPAN
SEMBILAN
DELAPAN
SEMBILAN